{
 "documentInfo": {
  "documentType": "https://xbrl.org/2021/xbrl-json",
  "features": {
   "xbrl:canonicalValues": true
  },
  "namespaces": {
   "ifrs-full": "https://xbrl.ifrs.org/taxonomy/2022-03-24/ifrs-full",
   "iso4217": "http://www.xbrl.org/2003/iso4217",
   "paragon": "http://paragon.com/xbrl/2023",
   "scheme": "http://standards.iso.org/iso/17442",
   "xbrl": "https://xbrl.org/2021",
   "xbrli": "http://www.xbrl.org/2003/instance"
  },
  "taxonomy": [
   "http://paragon.com/xbrl/2023/213800S1TDKIB1IUTS72-2023-09-30.xsd"
  ]
 },
 "facts": {
  "fact-1": {
   "value": "Paragon is a specialist banking group. We offer a range of savings products and provide finance for landlords, small businesses and residential property developers in the UK. Founded in 1985 and listed on the London Stock Exchange, we are a FTSE 250 company. We are headquartered in Solihull and employ more than 1,500 people. Our operations are organised into two lending divisions and lending is funded principally by retail deposits.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfNatureOfEntitysOperationsAndPrincipalActivities",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-7": {
   "value": "1010600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:RevenueFromInterest",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-8": {
   "value": "545700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:RevenueFromInterest",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-9": {
   "value": "561700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:InterestExpense",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-10": {
   "value": "174500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:InterestExpense",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-11": {
   "value": "448900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:InterestRevenueExpense",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-12": {
   "value": "371200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:InterestRevenueExpense",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-13": {
   "value": "27400000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:OtherLeasingIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-14": {
   "value": "24600000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:OtherLeasingIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-15": {
   "value": "21800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherExpenseByFunction",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-16": {
   "value": "20000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherExpenseByFunction",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-17": {
   "value": "5600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OperatingLeaseIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-18": {
   "value": "4600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OperatingLeaseIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-19": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:GainLossArisingFromDerecognitionOfFinancialAssetsMeasuredAtAmortisedCost",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-20": {
   "value": "4600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:GainLossArisingFromDerecognitionOfFinancialAssetsMeasuredAtAmortisedCost",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-21": {
   "value": "11500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-22": {
   "value": "12600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-23": {
   "value": "17100000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:OtherOperatingIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-24": {
   "value": "21800000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:OtherOperatingIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-25": {
   "value": "466000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherOperatingIncomeExpense",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-26": {
   "value": "393000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherOperatingIncomeExpense",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-27": {
   "value": "170400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OperatingExpense",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-28": {
   "value": "153000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OperatingExpense",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-29": {
   "value": "18000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ImpairmentLossImpairmentGainAndReversalOfImpairmentLossDeterminedInAccordanceWithIFRS9",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-30": {
   "value": "14000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ImpairmentLossImpairmentGainAndReversalOfImpairmentLossDeterminedInAccordanceWithIFRS9",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-31": {
   "value": "277600000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:OperatingProfitBeforeFairValueItems",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-32": {
   "value": "226000000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:OperatingProfitBeforeFairValueItems",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-33": {
   "value": "-77700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:GainsLossesOnChangeInFairValueOfDerivatives",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-34": {
   "value": "191900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:GainsLossesOnChangeInFairValueOfDerivatives",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-35": {
   "value": "199900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-36": {
   "value": "417900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-37": {
   "value": "46000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxExpenseContinuingOperations",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-38": {
   "value": "104300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxExpenseContinuingOperations",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-39": {
   "value": "153900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-40": {
   "value": "313600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-41": {
   "value": "0.687",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShare",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP/xbrli:shares"
   }
  },
  "fact-42": {
   "value": "1.292",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShare",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP/xbrli:shares"
   }
  },
  "fact-43": {
   "value": "0.663",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShare",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP/xbrli:shares"
   }
  },
  "fact-44": {
   "value": "1.259",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShare",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP/xbrli:shares"
   }
  },
  "fact-45": {
   "value": "153900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-46": {
   "value": "313600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-47": {
   "value": "2400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeBeforeTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-48": {
   "value": "15300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeBeforeTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-49": {
   "value": "800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToRemeasurementsOfDefinedBenefitPlansOfOtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-50": {
   "value": "3700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToRemeasurementsOfDefinedBenefitPlansOfOtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-51": {
   "value": "1600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeThatWillNotBeReclassifiedToProfitOrLossNetOfTax",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-52": {
   "value": "11600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeThatWillNotBeReclassifiedToProfitOrLossNetOfTax",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-53": {
   "value": "155500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-54": {
   "value": "325200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-55": {
   "value": "2783300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndBankBalancesAtCentralBanks",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-56": {
   "value": "1612500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndBankBalancesAtCentralBanks",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-57": {
   "value": "1142000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndBankBalancesAtCentralBanks",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-58": {
   "value": "211000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:LoansAndAdvancesToBanks",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-59": {
   "value": "318400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:LoansAndAdvancesToBanks",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-60": {
   "value": "218100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:LoansAndAdvancesToBanks",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-61": {
   "value": "14495000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:LoansAndAdvancesToCustomers",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-62": {
   "value": "13650400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:LoansAndAdvancesToCustomers",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-63": {
   "value": "13408200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:LoansAndAdvancesToCustomers",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-64": {
   "value": "615400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DerivativeFinancialAssets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-65": {
   "value": "779000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DerivativeFinancialAssets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-66": {
   "value": "44200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DerivativeFinancialAssets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-67": {
   "value": "51000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherAssets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-68": {
   "value": "39200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherAssets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-69": {
   "value": "69200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherAssets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-70": {
   "value": "8900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxAssets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-71": {
   "value": "5400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxAssets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-72": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxAssets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-73": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxAssets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-74": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxAssets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-75": {
   "value": "14400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxAssets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-76": {
   "value": "12700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:RecognisedAssetsDefinedBenefitPlan",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-77": {
   "value": "7100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:RecognisedAssetsDefinedBenefitPlan",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-78": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:RecognisedAssetsDefinedBenefitPlan",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-79": {
   "value": "74700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PropertyPlantAndEquipment",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-80": {
   "value": "71400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PropertyPlantAndEquipment",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-81": {
   "value": "70400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PropertyPlantAndEquipment",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-82": {
   "value": "168200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IntangibleAssetsAndGoodwill",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-83": {
   "value": "170200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IntangibleAssetsAndGoodwill",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-84": {
   "value": "170500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IntangibleAssetsAndGoodwill",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-85": {
   "value": "18420200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Assets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-86": {
   "value": "16653600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Assets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-87": {
   "value": "15137000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Assets",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-88": {
   "value": "200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ShorttermBorrowings",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-89": {
   "value": "400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ShorttermBorrowings",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-90": {
   "value": "300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ShorttermBorrowings",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-91": {
   "value": "13234400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DepositsFromCustomers",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-92": {
   "value": "10569500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DepositsFromCustomers",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-93": {
   "value": "9297400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DepositsFromCustomers",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-94": {
   "value": "39900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DerivativeFinancialLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-95": {
   "value": "102100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DerivativeFinancialLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-96": {
   "value": "43900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DerivativeFinancialLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-97": {
   "value": "28000000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:AssetBackedLoanNotes",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-98": {
   "value": "409300000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:AssetBackedLoanNotes",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-99": {
   "value": "516000000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:AssetBackedLoanNotes",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-100": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:SecuredBankLoansReceived",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-101": {
   "value": "586000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:SecuredBankLoansReceived",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-102": {
   "value": "730000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:SecuredBankLoansReceived",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-103": {
   "value": "112400000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:RetailBondIssuance",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-104": {
   "value": "112300000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:RetailBondIssuance",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-105": {
   "value": "237100000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:RetailBondIssuance",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-106": {
   "value": "145800000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CorporateBondIssuance",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-107": {
   "value": "149200000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CorporateBondIssuance",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-108": {
   "value": "149000000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CorporateBondIssuance",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-109": {
   "value": "2750000000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CentralBankFacilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-110": {
   "value": "2750000000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CentralBankFacilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-111": {
   "value": "2819000000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CentralBankFacilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-112": {
   "value": "50000000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:SaleAndRepurchaseAgreements",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-113": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:SaleAndRepurchaseAgreements",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-114": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:SaleAndRepurchaseAgreements",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-115": {
   "value": "631200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-116": {
   "value": "513100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-117": {
   "value": "90700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-118": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-119": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-120": {
   "value": "1400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-121": {
   "value": "17700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-122": {
   "value": "44400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-123": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-124": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:RecognisedLiabilitiesDefinedBenefitPlan",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-125": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:RecognisedLiabilitiesDefinedBenefitPlan",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-126": {
   "value": "10300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:RecognisedLiabilitiesDefinedBenefitPlan",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-127": {
   "value": "17009600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Liabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-128": {
   "value": "15236300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Liabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-129": {
   "value": "13895100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Liabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-130": {
   "value": "228700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssuedCapital",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-131": {
   "value": "241400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssuedCapital",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-132": {
   "value": "262500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssuedCapital",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-133": {
   "value": "1257500000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:Reserves",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-134": {
   "value": "1223900000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:Reserves",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-135": {
   "value": "1056100000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:Reserves",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-136": {
   "value": "75600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:TreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-137": {
   "value": "48000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:TreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-138": {
   "value": "76700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:TreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-139": {
   "value": "1410600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-140": {
   "value": "1417300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-141": {
   "value": "1241900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-142": {
   "value": "18420200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:EquityAndLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-143": {
   "value": "16653600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:EquityAndLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-144": {
   "value": "15137000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:EquityAndLiabilities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-2": {
   "value": "Appro<span class=\"_ _0\"></span>ved by<span class=\"_ _0\"></span> the Boar<span class=\"_ _0\"></span>d of Dir<span class=\"_ _0\"></span>ectors on 6 December<span class=\"_ _0\"></span> 2023.<span class=\"_ _36a\"> </span>Signed of behalf<span class=\"_ _1\"></span> of the Boar<span class=\"_ _0\"></span>d of Dir<span class=\"_ _0\"></span>ectors.<span class=\"_ _36a\"> </span>N <span class=\"_ _1c4\"></span>S <span class=\"_ _1c4\"></span>T<span class=\"_ _2f\"></span>errington <span class=\"_ _1c5\"></span>   R <span class=\"_ _1c4\"></span>J <span class=\"_ _1c6\"></span>W<span class=\"_ _0\"></span>oodman<span class=\"_ _36a\"> </span>Chief Ex<span class=\"_ _0\"></span>ecutive <span class=\"_ _c0\"> </span> <span class=\"_ _c5\"> </span> <span class=\"_ _28\"> </span> <span class=\"_ _28\"> </span>Chief Financial Officer",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAuthorisationOfFinancialStatementsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-145": {
   "value": "2171700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-146": {
   "value": "1168700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-147": {
   "value": "-3100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-148": {
   "value": "-2400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-149": {
   "value": "-1105000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-150": {
   "value": "-595600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivities",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-151": {
   "value": "1063600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInCashAndCashEquivalents",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-152": {
   "value": "570700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInCashAndCashEquivalents",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-153": {
   "value": "1930500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-154": {
   "value": "1359800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-155": {
   "value": "2994100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-156": {
   "value": "1930500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-157": {
   "value": "2994300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Cash",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-158": {
   "value": "1930900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Cash",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-159": {
   "value": "200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ShorttermBorrowings",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-160": {
   "value": "400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ShorttermBorrowings",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-161": {
   "value": "2994100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-162": {
   "value": "1930500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-163": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-164": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-165": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-166": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-167": {
   "value": "153900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-168": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-169": {
   "value": "153900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-170": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-171": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-172": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-173": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-174": {
   "value": "1600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-175": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-176": {
   "value": "1600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-177": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-178": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-179": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-180": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-181": {
   "value": "155500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-182": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-183": {
   "value": "155500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-184": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-185": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-186": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-187": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-188": {
   "value": "67900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-189": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-190": {
   "value": "67900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-191": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-192": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-193": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-194": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-195": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-196": {
   "value": "120500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-197": {
   "value": "120500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-198": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:IrrevocableInstructionAccrual",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-199": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:IrrevocableInstructionAccrual",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-200": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:IrrevocableInstructionAccrual",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-201": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:IrrevocableInstructionAccrual",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-202": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:IrrevocableInstructionAccrual",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-203": {
   "value": "10800000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:IrrevocableInstructionAccrual",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-204": {
   "value": "10800000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:IrrevocableInstructionAccrual",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-205": {
   "value": "200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-206": {
   "value": "300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-207": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-208": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-209": {
   "value": "-11400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-210": {
   "value": "14800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-211": {
   "value": "3900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-212": {
   "value": "-12900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CancellationOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-213": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CancellationOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-214": {
   "value": "12900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CancellationOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-215": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CancellationOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-216": {
   "value": "-67300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CancellationOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-217": {
   "value": "67300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CancellationOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-218": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CancellationOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-219": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CapitalReorganisation",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-220": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CapitalReorganisation",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-221": {
   "value": "-71800000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CapitalReorganisation",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-222": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CapitalReorganisation",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-223": {
   "value": "71800000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CapitalReorganisation",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-224": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CapitalReorganisation",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-225": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CapitalReorganisation",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-226": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-227": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-228": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-229": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-230": {
   "value": "9600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-231": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-232": {
   "value": "9600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-233": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DecreaseIncreaseThroughTaxOnSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-234": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DecreaseIncreaseThroughTaxOnSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-235": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DecreaseIncreaseThroughTaxOnSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-236": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DecreaseIncreaseThroughTaxOnSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-237": {
   "value": "-1900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DecreaseIncreaseThroughTaxOnSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-238": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DecreaseIncreaseThroughTaxOnSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-239": {
   "value": "-1900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DecreaseIncreaseThroughTaxOnSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-240": {
   "value": "-12700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ChangesInEquity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-241": {
   "value": "300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ChangesInEquity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-242": {
   "value": "-58900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ChangesInEquity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-243": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ChangesInEquity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-244": {
   "value": "92200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ChangesInEquity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-245": {
   "value": "-27600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ChangesInEquity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-246": {
   "value": "-6700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ChangesInEquity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-247": {
   "value": "241400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-248": {
   "value": "71100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-249": {
   "value": "71800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-250": {
   "value": "-70200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-251": {
   "value": "1151200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-252": {
   "value": "-48000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-253": {
   "value": "1417300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-254": {
   "value": "228700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-255": {
   "value": "71400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-256": {
   "value": "12900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-257": {
   "value": "-70200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-258": {
   "value": "1243400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-259": {
   "value": "-75600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-260": {
   "value": "1410600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-261": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-262": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-263": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-264": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-265": {
   "value": "313600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-266": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-267": {
   "value": "313600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-268": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-269": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-270": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-271": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-272": {
   "value": "11600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-273": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-274": {
   "value": "11600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-275": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-276": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-277": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-278": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-279": {
   "value": "325200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-280": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-281": {
   "value": "325200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-282": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-283": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-284": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-285": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-286": {
   "value": "68900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-287": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-288": {
   "value": "68900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-289": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-290": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-291": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-292": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-293": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-294": {
   "value": "79500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-295": {
   "value": "79500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-296": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:IrrevocableInstructionAccrual",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-297": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:IrrevocableInstructionAccrual",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-298": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:IrrevocableInstructionAccrual",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-299": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:IrrevocableInstructionAccrual",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-300": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:IrrevocableInstructionAccrual",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-301": {
   "value": "-10800000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:IrrevocableInstructionAccrual",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-302": {
   "value": "-10800000",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:IrrevocableInstructionAccrual",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-303": {
   "value": "400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-304": {
   "value": "1000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-305": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-306": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-307": {
   "value": "-10300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-308": {
   "value": "9600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-309": {
   "value": "700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-310": {
   "value": "-21500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CancellationOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-311": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CancellationOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-312": {
   "value": "21500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CancellationOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-313": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CancellationOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-314": {
   "value": "-109400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CancellationOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-315": {
   "value": "109400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CancellationOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-316": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CancellationOfTreasuryShares",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-317": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CapitalReorganisation",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-318": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CapitalReorganisation",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-319": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CapitalReorganisation",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-320": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CapitalReorganisation",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-321": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CapitalReorganisation",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-322": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CapitalReorganisation",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-323": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "paragon:CapitalReorganisation",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-324": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-325": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-326": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-327": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-328": {
   "value": "9200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-329": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-330": {
   "value": "9200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-331": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DecreaseIncreaseThroughTaxOnSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-332": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DecreaseIncreaseThroughTaxOnSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-333": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DecreaseIncreaseThroughTaxOnSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-334": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DecreaseIncreaseThroughTaxOnSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-335": {
   "value": "500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DecreaseIncreaseThroughTaxOnSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-336": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DecreaseIncreaseThroughTaxOnSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-337": {
   "value": "500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DecreaseIncreaseThroughTaxOnSharebasedPaymentTransactions",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-338": {
   "value": "-21100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ChangesInEquity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-339": {
   "value": "1000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ChangesInEquity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-340": {
   "value": "21500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ChangesInEquity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-341": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ChangesInEquity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-342": {
   "value": "145300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ChangesInEquity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-343": {
   "value": "28700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ChangesInEquity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-344": {
   "value": "175400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ChangesInEquity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-345": {
   "value": "262500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-346": {
   "value": "70100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-347": {
   "value": "50300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-348": {
   "value": "-70200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-349": {
   "value": "1005900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-350": {
   "value": "-76700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-351": {
   "value": "1241900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-352": {
   "value": "241400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-353": {
   "value": "71100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-354": {
   "value": "71800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:CapitalRedemptionReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-355": {
   "value": "-70200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MergerReserveMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-356": {
   "value": "1151200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-357": {
   "value": "-48000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:GBP"
   }
  },
  "fact-358": {
   "value": "1417300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-363": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws2e gs4\">1.  <span class=\"_ _4a\"> </span>General information<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5\">Paragon Banking Gr<span class=\"_ _0\"></span>oup PL<span class=\"_ _0\"></span>C (the \u2018Company\u2019) is a compan<span class=\"_ _0\"></span>y domiciled in the Unit<span class=\"_ _0\"></span>ed Kingdom and incorporated in England and <span class=\"_ _0\"></span>W<span class=\"_ _0\"></span>ales </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6\">under <span class=\"_ _0\"></span>the Companies A<span class=\"_ _0\"></span>ct 2006 with company<span class=\"_ _0\"></span> number 2336032. <span class=\"_ _1\"></span>The Company controls a number<span class=\"_ _1\"></span> of subsidiary entities and pr<span class=\"_ _0\"></span>esents </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7\">financial statements on a consolidated basis f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the Company and all its subsidiaries (t<span class=\"_ _0\"></span>ogether<span class=\"_ _0\"></span> the \u2018Group<span class=\"_ _1\"></span>\u2019). The address o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs8\">Company\u2019<span class=\"_ _1\"></span>s register<span class=\"_ _0\"></span>ed office is 51 Homer R<span class=\"_ _0\"></span>oad, Solihull, W<span class=\"_ _1\"></span>est Midlands, B91 3QJ. <span class=\"_ _1\"></span>The nature of<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s operations and its  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9\">principal activities are set out<span class=\"_ _0\"></span> in the Strategic R<span class=\"_ _0\"></span>eport in section <span class=\"_ _0\"></span>A2.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa\">These financial statements ar<span class=\"_ _0\"></span>e presented in pounds st<span class=\"_ _0\"></span>erling, which is <span class=\"_ _0\"></span>the currency<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the economic envir<span class=\"_ _0\"></span>onment in which <span class=\"_ _0\"></span>the  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb\">Group operat<span class=\"_ _0\"></span>es.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc\">The remaining no<span class=\"_ _0\"></span>tes to <span class=\"_ _0\"></span>the accounts are organised int<span class=\"_ _0\"></span>o four<span class=\"_ _0\"></span> sections:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Analysis \u2013 pro<span class=\"_ _0\"></span>viding further analy<span class=\"_ _0\"></span>sis and information on the amounts sho<span class=\"_ _0\"></span>wn in the primary<span class=\"_ _0\"></span> financial statements<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Employment Costs \u2013 pro<span class=\"_ _0\"></span>viding information on employ<span class=\"_ _0\"></span>ee and ke<span class=\"_ _0\"></span>y management r<span class=\"_ _0\"></span>emuneration arrang<span class=\"_ _0\"></span>ements including share </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf\">schemes and pension arrangements<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Capital and Financial Risk \u2013 providing inf<span class=\"_ _0\"></span>ormation on the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s management of<span class=\"_ _0\"></span> operational and r<span class=\"_ _0\"></span>egulatory capital and its </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws1b gs11\">principal financial risks<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Basis of pr<span class=\"_ _0\"></span>eparation \u2013 pro<span class=\"_ _0\"></span>viding details of <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s accounting policies and of how<span class=\"_ _0\"></span> the<span class=\"_ _0\"></span>y hav<span class=\"_ _0\"></span>e been applied in the pr<span class=\"_ _0\"></span>eparation of<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws1b gs13\">the financial statements</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGeneralInformationAboutFinancialStatementsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-361": {
   "value": "Paragon Banking Group PLC ",
   "dimensions": {
    "concept": "ifrs-full:NameOfUltimateParentOfGroup",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-3": {
   "value": "Paragon Banking Group PLC",
   "dimensions": {
    "concept": "ifrs-full:NameOfReportingEntityOrOtherMeansOfIdentification",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-359": {
   "value": "Paragon Banking Group PLC",
   "dimensions": {
    "concept": "ifrs-full:NameOfParentEntity",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-360": {
   "value": "PLC",
   "dimensions": {
    "concept": "ifrs-full:LegalFormOfEntity",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-4": {
   "value": "United Kingdom",
   "dimensions": {
    "concept": "ifrs-full:DomicileOfEntity",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-5": {
   "value": "England and Wales",
   "dimensions": {
    "concept": "ifrs-full:CountryOfIncorporation",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-6": {
   "value": "51 Homer Road, Solihull, West Midlands, B91 3QJ",
   "dimensions": {
    "concept": "ifrs-full:AddressOfRegisteredOfficeOfEntity",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-364": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws98 gs15\">2.  <span class=\"_ _af\"> </span>Segmental <span class=\"_ _19\"> </span>information<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs16\">The Group analy<span class=\"_ _0\"></span>ses its operations, both f<span class=\"_ _0\"></span>or internal manag<span class=\"_ _0\"></span>ement reporting and ext<span class=\"_ _0\"></span>ernal financial reporting<span class=\"_ _0\"></span>, on the basis of<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs17\">markets <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>which its assets are gener<span class=\"_ _0\"></span>ated. T<span class=\"_ _0\"></span>he segments used at 30 September 2023 ar<span class=\"_ _1\"></span>e described below:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs18\">\u2022 <span class=\"_ _13\"> </span>Mortgage Lending<span class=\"_ _0\"></span>, including the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s buy-to-let, and o<span class=\"_ _0\"></span>wner-occupied <span class=\"_ _0\"></span>first and second charge lending and r<span class=\"_ _0\"></span>elated activities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs19\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Commercial Lending<span class=\"_ _0\"></span>, including the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s equipment leasing activities, dev<span class=\"_ _0\"></span>elopment finance, structured lending and o<span class=\"_ _0\"></span>ther </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1a\">offerings <span class=\"_ _0\"></span>targeted <span class=\"_ _0\"></span>towar<span class=\"_ _0\"></span>ds SME customers, tog<span class=\"_ _0\"></span>ether <span class=\"_ _0\"></span>with its motor <span class=\"_ _0\"></span>finance business<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1b\">These segments are <span class=\"_ _0\"></span>the same as those used at 30 Sep<span class=\"_ _0\"></span>tember 2022.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1c\">Dedicated financing and administration costs o<span class=\"_ _0\"></span>f each of<span class=\"_ _0\"></span> these businesses ar<span class=\"_ _0\"></span>e allocated to <span class=\"_ _0\"></span>the segment. With eff<span class=\"_ _0\"></span>ect fr<span class=\"_ _0\"></span>om the 2023 </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1d\">financial y<span class=\"_ _0\"></span>ear<span class=\"_ _0\"></span>, inter<span class=\"_ _0\"></span>est impacts of <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value hedging activities hav<span class=\"_ _0\"></span>e been allocated to segments <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> management accounting purposes. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1e\">Comparative <span class=\"_ _0\"></span>figures hav<span class=\"_ _0\"></span>e been adjusted for<span class=\"_ _0\"></span> consistency<span class=\"_ _1\"></span>. Shared central costs ar<span class=\"_ _0\"></span>e not allocated between segments, nor<span class=\"_ _1\"></span> is income </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1f\">from central cash balances or<span class=\"_ _1\"></span> the carrying costs of unallocated sa<span class=\"_ _0\"></span>vings balances.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs20\">Gains on derecognition of<span class=\"_ _0\"></span> financial assets ha<span class=\"_ _0\"></span>ve not been allocated <span class=\"_ _0\"></span>to segment results.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs21\">Loans <span class=\"_ _0\"></span>to customers and operating lease assets ar<span class=\"_ _0\"></span>e allocated to segments as ar<span class=\"_ _0\"></span>e dedicated securitisation funding arr<span class=\"_ _0\"></span>angements and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs22\">their r<span class=\"_ _0\"></span>elated cash balances.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs23\">Retail deposits and <span class=\"_ _0\"></span>their r<span class=\"_ _0\"></span>elated costs are allocated <span class=\"_ _0\"></span>to the segments based on <span class=\"_ _0\"></span>the utilisation of <span class=\"_ _0\"></span>those deposits. Retail deposits raised </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs24\">in advance of<span class=\"_ _0\"></span> lending are no<span class=\"_ _0\"></span>t allocated.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs25\">Other assets and liabilities ar<span class=\"_ _0\"></span>e not allocated betw<span class=\"_ _0\"></span>een segments.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs26\">All the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s operations are conducted in the UK, all r<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>enues arise from e<span class=\"_ _0\"></span>xternal customers and ther<span class=\"_ _0\"></span>e are no inter<span class=\"_ _1\"></span>-segment </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs27\">re<span class=\"_ _0\"></span>venues. No customer<span class=\"_ _0\"></span> contributes more <span class=\"_ _0\"></span>than 10% of <span class=\"_ _0\"></span>the re<span class=\"_ _0\"></span>venue of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs29\">Financial information about <span class=\"_ _0\"></span>these business segments, prepar<span class=\"_ _0\"></span>ed on the same basis as used in the consolidated accounts o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2a\">Group, is sho<span class=\"_ _0\"></span>wn below<span class=\"_ _0\"></span>. </div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs2b\">Y<span class=\"_ _2\"></span>ear ended 30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs2c\">Mortgage<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs2d\">Lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs2e\">Commercial </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs2f\">Lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs30\">Unallocated </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs31\">items<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs32\">T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs33\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs34\">Inter<span class=\"_ _0\"></span>est receivable<span class=\"_ _b4\"> </span><span class=\"ff15\">713.6<span class=\"_ _d5\"> </span>207.4<span class=\"_ _3a\"> </span>89.6<span class=\"_ _12a\"> </span>1,010.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs35\">Inter<span class=\"_ _0\"></span>est pay<span class=\"_ _0\"></span>able<span class=\"_ _124\"> </span><span class=\"ff15\">(436.0)<span class=\"_ _6c\"> </span>(71.7)<span class=\"_ _19c\"> </span>(54.0)<span class=\"_ _b6\"> </span>(561.7)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs36\">Net inter<span class=\"_ _0\"></span>est income<span class=\"_ _1bc\"> </span><span class=\"ff15\">277.6<span class=\"_ _d5\"> </span>135.7<span class=\"_ _3a\"> </span>35.6<span class=\"_ _150\"> </span>448.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs37\">Other operating inc<span class=\"_ _0\"></span>ome<span class=\"_ _1d7\"> </span><span class=\"ff15\">5.6<span class=\"_ _3a\"> </span>11.5<span class=\"_ _43\"> </span>-<span class=\"_ _40\"> </span>17.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs38\">T<span class=\"_ _2\"></span>otal operating income<span class=\"_ _1d8\"> </span><span class=\"ff15\">283.2<span class=\"_ _d5\"> </span>147.2<span class=\"_ _3a\"> </span>35.6<span class=\"_ _d5\"> </span>466.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs39\">Operating e<span class=\"_ _0\"></span>xpenses<span class=\"_ _1d9\"> </span><span class=\"ff15\">(26.2)<span class=\"_ _bf\"> </span>(26.4)<span class=\"_ _b6\"> </span>(117.8)<span class=\"_ _110\"> </span>(170.4)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs3a\">Provisions f<span class=\"_ _0\"></span>or losses<span class=\"_ _1da\"> </span><span class=\"ff15\">(10.4)<span class=\"_ _1db\"> </span>(7.6)<span class=\"_ _16b\"> </span>-<span class=\"_ _1c1\"> </span>(18.0)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3b\">246.6<span class=\"_ _d5\"> </span>113.2<span class=\"_ _12c\"> </span>(82.2)<span class=\"_ _133\"> </span>277.6<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs3c\">Y<span class=\"_ _2\"></span>ear ended 30 September 2022 (<span class=\"_ _0\"></span>restated)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3d\">Mortgage<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3e\">Lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3f\">Commercial </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs40\">Lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs41\">Unallocated </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs42\">items<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs43\">T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs44\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs45\">Inter<span class=\"_ _0\"></span>est receivable<span class=\"_ _b4\"> </span><span class=\"ff16\">399.7<span class=\"_ _d5\"> </span>134.8<span class=\"_ _3a\"> </span>11.2<span class=\"_ _150\"> </span>545.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs46\">Inter<span class=\"_ _0\"></span>est pay<span class=\"_ _0\"></span>able<span class=\"_ _124\"> </span>(148.5)<span class=\"_ _6c\"> </span>(23.6)<span class=\"_ _c8\"> </span>(2.4)<span class=\"_ _71\"> </span>(174.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs47\">Net inter<span class=\"_ _0\"></span>est income<span class=\"_ _1bc\"> </span><span class=\"ff16\">251.2<span class=\"_ _150\"> </span>111.2<span class=\"_ _9e\"> </span>8.8<span class=\"_ _150\"> </span>371.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs48\">Other operating inc<span class=\"_ _0\"></span>ome<span class=\"_ _1d7\"> </span><span class=\"ff16\">7.4<span class=\"_ _9e\"> </span>9.8<span class=\"_ _9e\"> </span>4.6<span class=\"_ _3a\"> </span>21.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs49\">T<span class=\"_ _2\"></span>otal operating income<span class=\"_ _1d8\"> </span><span class=\"ff16\">258.6<span class=\"_ _d5\"> </span>121.0<span class=\"_ _f7\"> </span>13.4<span class=\"_ _150\"> </span>393.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs4a\">Operating e<span class=\"_ _0\"></span>xpenses<span class=\"_ _1d9\"> </span>(24.4)<span class=\"_ _6c\"> </span>(24.9)<span class=\"_ _b6\"> </span>(103.7)<span class=\"_ _71\"> </span>(153.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs4b\">Provisions f<span class=\"_ _0\"></span>or losses<span class=\"_ _11c\"> </span>(4.6)<span class=\"_ _c8\"> </span>(9.4)<span class=\"_ _b7\"> </span>-<span class=\"_ _1c1\"> </span>(14.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff16 fs1 fc1 sc0 ls0 ws0 gs4c\">229.6<span class=\"_ _3a\"> </span>86.7<span class=\"_ _12c\"> </span><span class=\"ff17\">(90.3)<span class=\"_ _12b\"> </span></span>226.0<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4d\">The segmental pro<span class=\"_ _0\"></span>fits disclosed above r<span class=\"_ _0\"></span>econcile to <span class=\"_ _0\"></span>the Group r<span class=\"_ _0\"></span>esults as shown below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4e\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4f\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs50\">Results shown abov<span class=\"_ _0\"></span>e<span class=\"_ _1dc\"> </span><span class=\"ff15\">277.6<span class=\"_ _d5\"> </span><span class=\"ff16\">226.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs51\">Fair v<span class=\"_ _0\"></span>alue items<span class=\"_ _1dd\"> </span><span class=\"ff15\">(77.7)<span class=\"_ _133\"> </span><span class=\"ff16\">191.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs52\">Operating pr<span class=\"_ _0\"></span>ofit<span class=\"_ _1de\"> </span><span class=\"ff15\">199.9<span class=\"_ _d5\"> </span><span class=\"ff16\">417.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs54\">The assets and liabilities attributable t<span class=\"_ _0\"></span>o each of <span class=\"_ _0\"></span>the segments at 30 September<span class=\"_ _0\"></span> 2023, 30 September 2022 and 30 Sep<span class=\"_ _0\"></span>tember 2021 on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs55\">the basis described above <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gs56\">Note<span class=\"_ _88\"> </span><span class=\"ff15\">Mortgag<span class=\"_ _0\"></span>e </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs57\">Lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs58\">Commercial </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs59\">Lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5a\">T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5b\">Segments<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5c\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5d\">30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5e\">Segment assets</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5f\"> <span class=\"_ _c0\"> </span>Loans to customers<span class=\"_ _167\"> </span><span class=\"ff2c\">18<span class=\"_ _70\"> </span><span class=\"ff15\">12,902.3<span class=\"_ _12a\"> </span>1,972.0<span class=\"_ _42\"> </span>14,874.3</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs60\"> <span class=\"_ _c0\"> </span>Operating lease assets<span class=\"_ _1df\"> </span><span class=\"ff2c\">29<span class=\"_ _10b\"> </span><span class=\"ff15\">-<span class=\"_ _40\"> </span>44.3<span class=\"_ _3a\"> </span>44.3</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs61\"> <span class=\"_ _c0\"> </span>Securitisation cash<span class=\"_ _1e0\"> </span><span class=\"ff2c\">17<span class=\"_ _40\"> </span><span class=\"ff15\">86.1<span class=\"_ _43\"> </span>-<span class=\"_ _d1\"> </span>86.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs62\">12,988.4<span class=\"_ _86\"> </span>2,016.3<span class=\"_ _42\"> </span>15,004.7<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs63\">Segment liabilities</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs64\"> <span class=\"_ _c0\"> </span>Allocated deposits<span class=\"_ _1b7\"> </span><span class=\"ff15\">13,160.4<span class=\"_ _12a\"> </span>2,199.4<span class=\"_ _42\"> </span>15,359.8</span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs65\"> <span class=\"_ _c0\"> </span>Securitisation funding<span class=\"_ _1e1\"> </span><span class=\"ff15\">28.0<span class=\"_ _43\"> </span>-<span class=\"_ _40\"> </span>28.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs66\">13,188.4<span class=\"_ _86\"> </span>2,199.4<span class=\"_ _42\"> </span>15,387.8<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gs67\">Note<span class=\"_ _88\"> </span><span class=\"ff15\">Mortgag<span class=\"_ _0\"></span>e </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs68\">Lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs69\">Commercial </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6a\">Lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6b\">T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6c\">Segments<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6d\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6e\">30 September 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6f\">Segment assets</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs70\"> <span class=\"_ _c0\"> </span>Loans to customers<span class=\"_ _167\"> </span><span class=\"ff2c\">18<span class=\"_ _70\"> </span><span class=\"ff16\">12,328.7<span class=\"_ _86\"> </span>1,881.6<span class=\"_ _42\"> </span>14,210.3</span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs71\"> <span class=\"_ _c0\"> </span>Operating lease assets<span class=\"_ _1df\"> </span><span class=\"ff2c\">29<span class=\"_ _10b\"> </span></span>-<span class=\"_ _40\"> </span><span class=\"ff16\">41.6<span class=\"_ _f7\"> </span>41.6</span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs72\"> <span class=\"_ _c0\"> </span>Securitisation cash<span class=\"_ _1e0\"> </span><span class=\"ff2c\">17<span class=\"_ _c8\"> </span><span class=\"ff16\">240.5<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">240.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h27 ff16 fs1 fc1 sc0 ls0 ws0 gs73\">12,569.2<span class=\"_ _86\"> </span>1,923.2<span class=\"_ _42\"> </span>14,492.4<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs74\">Segment liabilities</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs75\"> <span class=\"_ _c0\"> </span>Allocated deposits<span class=\"_ _1b7\"> </span><span class=\"ff16\">11,864.7<span class=\"_ _86\"> </span>2,193.7<span class=\"_ _42\"> </span>14,058.4</span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs76\"> <span class=\"_ _c0\"> </span>Securitisation funding<span class=\"_ _1e2\"> </span><span class=\"ff16\">995.3<span class=\"_ _43\"> </span></span>-<span class=\"_ _c8\"> </span><span class=\"ff16\">995.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h27 ff16 fs1 fc1 sc0 ls0 ws0 gs77\">12,860.0<span class=\"_ _86\"> </span>2,193.7<span class=\"_ _42\"> </span>15,053.7<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gs78\">Note<span class=\"_ _88\"> </span><span class=\"ff15\">Mortgag<span class=\"_ _0\"></span>e </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs79\">Lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7a\">Commercial </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7b\">Lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7c\">T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7d\">Segments<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7e\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7f\">30 September 2021<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs80\">Segment assets</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs81\"> <span class=\"_ _c0\"> </span>Loans to customers<span class=\"_ _167\"> </span><span class=\"ff2c\">18<span class=\"_ _70\"> </span><span class=\"ff16\">11,829.6<span class=\"_ _86\"> </span>1,573.1<span class=\"_ _42\"> </span>13,402.7</span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs82\"> <span class=\"_ _c0\"> </span>Operating lease assets<span class=\"_ _1df\"> </span><span class=\"ff2c\">29<span class=\"_ _10b\"> </span></span>-<span class=\"_ _40\"> </span><span class=\"ff16\">39.3<span class=\"_ _f7\"> </span>39.3</span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs83\"> <span class=\"_ _c0\"> </span>Securitisation cash<span class=\"_ _1e0\"> </span><span class=\"ff2c\">17<span class=\"_ _c8\"> </span><span class=\"ff16\">123.3<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">123.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h27 ff16 fs1 fc1 sc0 ls0 ws0 gs84\">11,952.9<span class=\"_ _86\"> </span>1,612.4<span class=\"_ _42\"> </span>13,565.3<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs85\">Segment liabilities</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs86\"> <span class=\"_ _c0\"> </span>Allocated deposits<span class=\"_ _1b7\"> </span><span class=\"ff16\">10,943.2<span class=\"_ _86\"> </span>1,901.2<span class=\"_ _42\"> </span>12,844.4</span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs87\"> <span class=\"_ _c0\"> </span>Securitisation funding<span class=\"_ _1e3\"> </span><span class=\"ff16\">1,246.0<span class=\"_ _43\"> </span></span>-<span class=\"_ _133\"> </span><span class=\"ff16\">1,246.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h27 ff16 fs1 fc1 sc0 ls0 ws0 gs88\">12,189.2<span class=\"_ _86\"> </span>1,901.2<span class=\"_ _42\"> </span>14,090.4<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs89\">An analysis of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s financial assets by <span class=\"_ _0\"></span>type and segment is shown in not<span class=\"_ _0\"></span>e 18. All <span class=\"_ _0\"></span>the assets shown abov<span class=\"_ _0\"></span>e wer<span class=\"_ _0\"></span>e located in the UK.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs8b\">The additions to non-curr<span class=\"_ _0\"></span>ent assets, ex<span class=\"_ _0\"></span>cluding financial assets, in <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span> which are included in segmental assets abov<span class=\"_ _0\"></span>e, are </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs8c\">investments o<span class=\"_ _0\"></span>f \u00a315.3m (2022: \u00a314.5m<span class=\"_ _0\"></span>) in assets held for<span class=\"_ _1\"></span> leasing under operating leases. T<span class=\"_ _0\"></span>hese are included in the Commer<span class=\"_ _0\"></span>cial Lending </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs8d\">segment. No other <span class=\"_ _0\"></span>fixed asset additions <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e allocated to segments.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs8e\">The segmental assets and liabilities may<span class=\"_ _0\"></span> be reconciled <span class=\"_ _0\"></span>to the consolidated balance sheet<span class=\"_ _0\"></span> as shown below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8f\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs90\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs91\">T<span class=\"_ _2\"></span>otal segment assets<span class=\"_ _1e4\"> </span>15,004.7<span class=\"_ _42\"> </span><span class=\"ff16\">14,492.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs92\">Unallocated asse<span class=\"_ _0\"></span>ts</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs93\"> <span class=\"_ _c0\"> </span>Central cash and inv<span class=\"_ _0\"></span>estments<span class=\"_ _1e5\"> </span><span class=\"ff15\">2,908.2<span class=\"_ _86\"> </span><span class=\"ff16\">1,690.4</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs94\"> <span class=\"_ _c0\"> </span>Derivative financial instruments<span class=\"_ _1e6\"> </span><span class=\"ff15\">615.4<span class=\"_ _d5\"> </span><span class=\"ff16\">779.0</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs95\"> <span class=\"_ _c0\"> </span>Fair value hedging adjustments<span class=\"_ _1e7\"> </span><span class=\"ff15\">(379.3)<span class=\"_ _110\"> </span></span>(559.9)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs96\"> <span class=\"_ _c0\"> </span>Operational property<span class=\"_ _2\"></span>, plant and equipment<span class=\"_ _1e8\"> </span><span class=\"ff15\">30.4<span class=\"_ _3a\"> </span><span class=\"ff16\">29.8</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs97\"> <span class=\"_ _c0\"> </span>Retirement benefit oblig<span class=\"_ _0\"></span>ations<span class=\"_ _1d2\"> </span><span class=\"ff15\">12.7<span class=\"_ _9e\"> </span><span class=\"ff16\">7.1</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs98\"> <span class=\"_ _c0\"> </span>Intangible assets<span class=\"_ _1e9\"> </span><span class=\"ff15\">168.2<span class=\"_ _d5\"> </span><span class=\"ff16\">170.2</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs99\"> <span class=\"_ _c0\"> </span>Other<span class=\"_ _1ea\"> </span><span class=\"ff15\">59.9<span class=\"_ _3a\"> </span><span class=\"ff16\">44.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9a\">T<span class=\"_ _2\"></span>otal assets<span class=\"_ _1eb\"> </span>18,420.2<span class=\"_ _42\"> </span><span class=\"ff16\">16,653.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9b\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9c\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs9d\">T<span class=\"_ _2\"></span>otal segment liabilities<span class=\"_ _1ec\"> </span><span class=\"ff15\">15,387.8<span class=\"_ _42\"> </span><span class=\"ff16\">15,053.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs9e\">Unallocated liabilities</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9f\"> <span class=\"_ _c0\"> </span>Unallocated retail deposits<span class=\"_ _1ed\"> </span><span class=\"ff15\">(2,094.5)<span class=\"_ _1d4\"> </span></span>(3,389.2)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa0\"> <span class=\"_ _c0\"> </span>Derivative financial instruments<span class=\"_ _1c2\"> </span><span class=\"ff15\">39.9<span class=\"_ _d5\"> </span><span class=\"ff16\">102.1</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa1\"> <span class=\"_ _c0\"> </span>Central borrowings<span class=\"_ _1ee\"> </span><span class=\"ff15\">3,058.4<span class=\"_ _86\"> </span><span class=\"ff16\">3,011.9</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa2\"> <span class=\"_ _c0\"> </span>T<span class=\"_ _0\"></span>ax liabilities<span class=\"_ _1ef\"> </span><span class=\"ff15\">17.7<span class=\"_ _3a\"> </span><span class=\"ff16\">44.4</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa3\"> <span class=\"_ _c0\"> </span>Other<span class=\"_ _1f0\"> </span><span class=\"ff15\">600.3<span class=\"_ _d5\"> </span><span class=\"ff16\">413.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsa4\">T<span class=\"_ _2\"></span>otal liabilities<span class=\"_ _1f1\"> </span><span class=\"ff15\">17,009.6<span class=\"_ _42\"> </span><span class=\"ff16\">15,236.3</span></span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEntitysReportableSegmentsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-365": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws99 gsa6\">3.  <span class=\"_ _af\"> </span>Re<span class=\"_ _0\"></span>venue<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gsa7\">Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa8\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa9\">Inter<span class=\"_ _0\"></span>est receivable<span class=\"_ _1f2\"> </span><span class=\"ff2c\">4<span class=\"_ _6c\"> </span><span class=\"ff15\">1,010.6<span class=\"_ _d5\"> </span><span class=\"ff16\">545.7<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaa\">Operating lease inc<span class=\"_ _0\"></span>ome<span class=\"_ _1f3\"> </span><span class=\"ff2c\">6<span class=\"_ _16b\"> </span><span class=\"ff15\">27.4<span class=\"_ _3a\"> </span><span class=\"ff16\">24.6<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsab\">Other income<span class=\"_ _1f4\"> </span><span class=\"ff2c\">8<span class=\"_ _16b\"> </span><span class=\"ff15\">11.5<span class=\"_ _3a\"> </span><span class=\"ff16\">12.6<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsac\">T<span class=\"_ _2\"></span>otal revenue<span class=\"_ _1f5\"> </span><span class=\"ff15\">1,049.5<span class=\"_ _d5\"> </span><span class=\"ff16\">582.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsad\">Arising from:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsae\">Mortgage Lending<span class=\"_ _1f6\"> </span><span class=\"ff15\">719.2<span class=\"_ _d5\"> </span><span class=\"ff16\">407.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaf\">Commercial Lending<span class=\"_ _1f7\"> </span><span class=\"ff15\">240.6<span class=\"_ _d5\"> </span><span class=\"ff16\">164.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb0\">T<span class=\"_ _2\"></span>otal revenue from segmen<span class=\"_ _0\"></span>ts<span class=\"_ _1f8\"> </span><span class=\"ff15\">959.8<span class=\"_ _d5\"> </span><span class=\"ff16\">571.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb1\">Unallocated r<span class=\"_ _0\"></span>evenue<span class=\"_ _1f9\"> </span><span class=\"ff15\">89.7<span class=\"_ _3a\"> </span><span class=\"ff16\">11.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb2\">T<span class=\"_ _2\"></span>otal revenue<span class=\"_ _1f5\"> </span><span class=\"ff15\">1,049.5<span class=\"_ _d5\"> </span><span class=\"ff16\">582.9</span></span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRevenueExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-431": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws9a gsb4\">4.  <span class=\"_ _c6\"> </span>Inter<span class=\"_ _0\"></span>est <span class=\"_ _19\"> </span>receiv<span class=\"_ _1\"></span>able<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb5\">Interest r<span class=\"_ _1\"></span>eceivable is analysed as follo<span class=\"_ _0\"></span>ws.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gsb6\">Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsb7\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsb8\">Inter<span class=\"_ _0\"></span>est receivable in r<span class=\"_ _0\"></span>espect of<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb9\">Loans and receivables<span class=\"_ _1fa\"> </span><span class=\"ff15\">642.9<span class=\"_ _d5\"> </span><span class=\"ff16\">486.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsba\">Finance leases<span class=\"_ _1fb\"> </span><span class=\"ff15\">59.6<span class=\"_ _3a\"> </span><span class=\"ff16\">45.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsbb\">Invoice finance inc<span class=\"_ _0\"></span>ome<span class=\"_ _1f7\"> </span><span class=\"ff15\">4.3<span class=\"_ _9e\"> </span><span class=\"ff16\">3.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsbc\">Inter<span class=\"_ _0\"></span>est on loans to customer<span class=\"_ _0\"></span>s<span class=\"_ _1fc\"> </span><span class=\"ff15\">706.8<span class=\"_ _d5\"> </span><span class=\"ff16\">535.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsbd\">Eff<span class=\"_ _1\"></span>ect of fair value hedging of loan assets<span class=\"_ _1fd\"> </span><span class=\"ff15\">210.0<span class=\"_ _ff\"> </span></span>(1.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsbe\">Inter<span class=\"_ _0\"></span>est on loans to customer<span class=\"_ _0\"></span>s after hedging<span class=\"_ _1cc\"> </span><span class=\"ff15\">916.8<span class=\"_ _d5\"> </span><span class=\"ff16\">533.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsbf\">Pension scheme surplus<span class=\"_ _1fe\"> </span><span class=\"ff2c\">60<span class=\"_ _9b\"> </span><span class=\"ff15\">0.4<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc0\">Other inter<span class=\"_ _0\"></span>est receivable<span class=\"_ _1ff\"> </span><span class=\"ff15\">93.4<span class=\"_ _3a\"> </span><span class=\"ff16\">12.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsc1\">T<span class=\"_ _2\"></span>otal interest on financial asse<span class=\"_ _0\"></span>ts<span class=\"_ _200\"> </span><span class=\"ff15\">1,010.6<span class=\"_ _d5\"> </span><span class=\"ff16\">545.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc2\">The abov<span class=\"_ _0\"></span>e amounts relate <span class=\"_ _0\"></span>to:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc3\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc4\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc5\">Financial assets held at amortised cost<span class=\"_ _1a0\"> </span><span class=\"ff15\">740.6<span class=\"_ _d5\"> </span><span class=\"ff16\">502.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc6\">Finance leases<span class=\"_ _1fb\"> </span><span class=\"ff15\">59.6<span class=\"_ _3a\"> </span><span class=\"ff16\">45.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc7\">Pension scheme surplus<span class=\"_ _201\"> </span><span class=\"ff15\">0.4<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc8\">Derivativ<span class=\"_ _0\"></span>e financial instruments held at f<span class=\"_ _0\"></span>air value<span class=\"_ _1e3\"> </span><span class=\"ff15\">210.0<span class=\"_ _ff\"> </span></span>(1.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc9\">1,010.6<span class=\"_ _d5\"> </span><span class=\"ff16\">545.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsca\">Other inter<span class=\"_ _0\"></span>est r<span class=\"_ _0\"></span>eceivable relat<span class=\"_ _0\"></span>es principally t<span class=\"_ _0\"></span>o cash deposits at central and retail bank<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span>.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInterestIncomeExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-489": {
   "value": "4.  <span class=\"_ _c6\"> </span>Inter<span class=\"_ _0\"></span>est <span class=\"_ _19\"> </span>receiv<span class=\"_ _1\"></span>able<span class=\"_ _36a\"> </span>Interest r<span class=\"_ _1\"></span>eceivable is analysed as follo<span class=\"_ _0\"></span>ws.<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Inter<span class=\"_ _0\"></span>est receivable in r<span class=\"_ _0\"></span>espect of<span class=\"_ _36a\"> </span>Loans and receivables<span class=\"_ _1fa\"> </span><span class=\"ff15\">642.9<span class=\"_ _d5\"> </span><span class=\"ff16\">486.7<span class=\"_ _36a\"> </span></span></span>Finance leases<span class=\"_ _1fb\"> </span><span class=\"ff15\">59.6<span class=\"_ _3a\"> </span><span class=\"ff16\">45.0<span class=\"_ _36a\"> </span></span></span>Invoice finance inc<span class=\"_ _0\"></span>ome<span class=\"_ _1f7\"> </span><span class=\"ff15\">4.3<span class=\"_ _9e\"> </span><span class=\"ff16\">3.4<span class=\"_ _36a\"> </span></span></span>Inter<span class=\"_ _0\"></span>est on loans to customer<span class=\"_ _0\"></span>s<span class=\"_ _1fc\"> </span><span class=\"ff15\">706.8<span class=\"_ _d5\"> </span><span class=\"ff16\">535.1<span class=\"_ _36a\"> </span></span></span>Eff<span class=\"_ _1\"></span>ect of fair value hedging of loan assets<span class=\"_ _1fd\"> </span><span class=\"ff15\">210.0<span class=\"_ _ff\"> </span></span>(1.5)<span class=\"_ _36a\"> </span>Inter<span class=\"_ _0\"></span>est on loans to customer<span class=\"_ _0\"></span>s after hedging<span class=\"_ _1cc\"> </span><span class=\"ff15\">916.8<span class=\"_ _d5\"> </span><span class=\"ff16\">533.6<span class=\"_ _36a\"> </span></span></span>Pension scheme surplus<span class=\"_ _1fe\"> </span><span class=\"ff2c\">60<span class=\"_ _9b\"> </span><span class=\"ff15\">0.4<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span>Other inter<span class=\"_ _0\"></span>est receivable<span class=\"_ _1ff\"> </span><span class=\"ff15\">93.4<span class=\"_ _3a\"> </span><span class=\"ff16\">12.1<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal interest on financial asse<span class=\"_ _0\"></span>ts<span class=\"_ _200\"> </span><span class=\"ff15\">1,010.6<span class=\"_ _d5\"> </span><span class=\"ff16\">545.7<span class=\"_ _36a\"> </span></span></span>The abov<span class=\"_ _0\"></span>e amounts relate <span class=\"_ _0\"></span>to:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Financial assets held at amortised cost<span class=\"_ _1a0\"> </span><span class=\"ff15\">740.6<span class=\"_ _d5\"> </span><span class=\"ff16\">502.2<span class=\"_ _36a\"> </span></span></span>Finance leases<span class=\"_ _1fb\"> </span><span class=\"ff15\">59.6<span class=\"_ _3a\"> </span><span class=\"ff16\">45.0<span class=\"_ _36a\"> </span></span></span>Pension scheme surplus<span class=\"_ _201\"> </span><span class=\"ff15\">0.4<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial instruments held at f<span class=\"_ _0\"></span>air value<span class=\"_ _1e3\"> </span><span class=\"ff15\">210.0<span class=\"_ _ff\"> </span></span>(1.5)<span class=\"_ _36a\"> </span>1,010.6<span class=\"_ _d5\"> </span><span class=\"ff16\">545.7<span class=\"_ _36a\"> </span></span>Other inter<span class=\"_ _0\"></span>est r<span class=\"_ _0\"></span>eceivable relat<span class=\"_ _0\"></span>es principally t<span class=\"_ _0\"></span>o cash deposits at central and retail bank<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinanceIncomeExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-366": {
   "value": "4.  <span class=\"_ _c6\"> </span>Inter<span class=\"_ _0\"></span>est <span class=\"_ _19\"> </span>receiv<span class=\"_ _1\"></span>able<span class=\"_ _36a\"> </span>Interest r<span class=\"_ _1\"></span>eceivable is analysed as follo<span class=\"_ _0\"></span>ws.<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Inter<span class=\"_ _0\"></span>est receivable in r<span class=\"_ _0\"></span>espect of<span class=\"_ _36a\"> </span>Loans and receivables<span class=\"_ _1fa\"> </span><span class=\"ff15\">642.9<span class=\"_ _d5\"> </span><span class=\"ff16\">486.7<span class=\"_ _36a\"> </span></span></span>Finance leases<span class=\"_ _1fb\"> </span><span class=\"ff15\">59.6<span class=\"_ _3a\"> </span><span class=\"ff16\">45.0<span class=\"_ _36a\"> </span></span></span>Invoice finance inc<span class=\"_ _0\"></span>ome<span class=\"_ _1f7\"> </span><span class=\"ff15\">4.3<span class=\"_ _9e\"> </span><span class=\"ff16\">3.4<span class=\"_ _36a\"> </span></span></span>Inter<span class=\"_ _0\"></span>est on loans to customer<span class=\"_ _0\"></span>s<span class=\"_ _1fc\"> </span><span class=\"ff15\">706.8<span class=\"_ _d5\"> </span><span class=\"ff16\">535.1<span class=\"_ _36a\"> </span></span></span>Eff<span class=\"_ _1\"></span>ect of fair value hedging of loan assets<span class=\"_ _1fd\"> </span><span class=\"ff15\">210.0<span class=\"_ _ff\"> </span></span>(1.5)<span class=\"_ _36a\"> </span>Inter<span class=\"_ _0\"></span>est on loans to customer<span class=\"_ _0\"></span>s after hedging<span class=\"_ _1cc\"> </span><span class=\"ff15\">916.8<span class=\"_ _d5\"> </span><span class=\"ff16\">533.6<span class=\"_ _36a\"> </span></span></span>Pension scheme surplus<span class=\"_ _1fe\"> </span><span class=\"ff2c\">60<span class=\"_ _9b\"> </span><span class=\"ff15\">0.4<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span>Other inter<span class=\"_ _0\"></span>est receivable<span class=\"_ _1ff\"> </span><span class=\"ff15\">93.4<span class=\"_ _3a\"> </span><span class=\"ff16\">12.1<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal interest on financial asse<span class=\"_ _0\"></span>ts<span class=\"_ _200\"> </span><span class=\"ff15\">1,010.6<span class=\"_ _d5\"> </span><span class=\"ff16\">545.7<span class=\"_ _36a\"> </span></span></span>The abov<span class=\"_ _0\"></span>e amounts relate <span class=\"_ _0\"></span>to:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Financial assets held at amortised cost<span class=\"_ _1a0\"> </span><span class=\"ff15\">740.6<span class=\"_ _d5\"> </span><span class=\"ff16\">502.2<span class=\"_ _36a\"> </span></span></span>Finance leases<span class=\"_ _1fb\"> </span><span class=\"ff15\">59.6<span class=\"_ _3a\"> </span><span class=\"ff16\">45.0<span class=\"_ _36a\"> </span></span></span>Pension scheme surplus<span class=\"_ _201\"> </span><span class=\"ff15\">0.4<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial instruments held at f<span class=\"_ _0\"></span>air value<span class=\"_ _1e3\"> </span><span class=\"ff15\">210.0<span class=\"_ _ff\"> </span></span>(1.5)<span class=\"_ _36a\"> </span>1,010.6<span class=\"_ _d5\"> </span><span class=\"ff16\">545.7<span class=\"_ _36a\"> </span></span>Other inter<span class=\"_ _0\"></span>est r<span class=\"_ _0\"></span>eceivable relat<span class=\"_ _0\"></span>es principally t<span class=\"_ _0\"></span>o cash deposits at central and retail bank<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span>.<span class=\"_ _36a\"> </span><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gscc\">5. <span class=\"_ _e0\"></span> <span class=\"_ _4a\"> </span>Interest pa<span class=\"_ _0\"></span>yable and similar<span class=\"_ _1\"></span> charges<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gscd\">Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsce\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gscf\">On financial liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd0\">Ret<span class=\"_ _0\"></span>ail deposits<span class=\"_ _14f\"> </span><span class=\"ff15\">334.1<span class=\"_ _d5\"> </span><span class=\"ff16\">108.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd1\">Eff<span class=\"_ _1\"></span>ect of fair value hedging of deposits<span class=\"_ _1f2\"> </span><span class=\"ff15\">54.4<span class=\"_ _d1\"> </span><span class=\"ff16\">4.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd2\">Inter<span class=\"_ _0\"></span>est on ret<span class=\"_ _0\"></span>ail deposits after hedging<span class=\"_ _202\"> </span><span class=\"ff15\">388.5<span class=\"_ _d5\"> </span><span class=\"ff16\">113.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd3\">Asset back<span class=\"_ _0\"></span>ed loan notes<span class=\"_ _166\"> </span><span class=\"ff15\">10.9<span class=\"_ _d1\"> </span><span class=\"ff16\">9.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd4\">Bank loans and overdr<span class=\"_ _0\"></span>afts<span class=\"_ _203\"> </span><span class=\"ff15\">34.8<span class=\"_ _3a\"> </span><span class=\"ff16\">13.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd5\">Corporat<span class=\"_ _0\"></span>e bonds<span class=\"_ _204\"> </span><span class=\"ff15\">6.6<span class=\"_ _9e\"> </span><span class=\"ff16\">6.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd6\">Eff<span class=\"_ _1\"></span>ect of fair value hedging of bonds<span class=\"_ _205\"> </span><span class=\"ff15\">0.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd7\">Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _206\"> </span><span class=\"ff15\">6.5<span class=\"_ _9e\"> </span><span class=\"ff16\">9.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd8\">Central bank f<span class=\"_ _0\"></span>acilities<span class=\"_ _207\"> </span><span class=\"ff15\">111.9<span class=\"_ _3a\"> </span><span class=\"ff16\">22.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd9\">Sale and repurchase agr<span class=\"_ _0\"></span>eements <span class=\"_ _208\"> </span><span class=\"ff15\">0.7<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsda\">T<span class=\"_ _2\"></span>otal interest on financial liabilities<span class=\"_ _1c8\"> </span><span class=\"ff15\">560.5<span class=\"_ _d5\"> </span><span class=\"ff16\">173.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdb\">Pension scheme deficit<span class=\"_ _1f3\"> </span><span class=\"ff2c\">60<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdc\">Discounting on con<span class=\"_ _0\"></span>tingent consider<span class=\"_ _0\"></span>ation<span class=\"_ _20a\"> </span><span class=\"ff2c\">41<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.1<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdd\">Discounting on lease liabilities<span class=\"_ _20b\"> </span><span class=\"ff15\">0.3<span class=\"_ _9e\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsde\">Other finance costs<span class=\"_ _20c\"> </span><span class=\"ff15\">0.9<span class=\"_ _9e\"> </span><span class=\"ff16\">0.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsdf\">561.7<span class=\"_ _d5\"> </span><span class=\"ff16\">174.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse0\">The abov<span class=\"_ _0\"></span>e amounts relate <span class=\"_ _0\"></span>to:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse1\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse2\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse3\">Financial liabilities held at amortised cost<span class=\"_ _20d\"> </span><span class=\"ff15\">505.5<span class=\"_ _d5\"> </span><span class=\"ff16\">169.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse4\">Derivativ<span class=\"_ _0\"></span>e financial instruments held at f<span class=\"_ _0\"></span>air value<span class=\"_ _20e\"> </span><span class=\"ff15\">55.0<span class=\"_ _9e\"> </span><span class=\"ff16\">4.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse5\">Other items<span class=\"_ _20f\"> </span><span class=\"ff15\">1.2<span class=\"_ _9e\"> </span><span class=\"ff16\">1.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse6\">561.7<span class=\"_ _d5\"> </span><span class=\"ff16\">174.5</span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInterestIncomeExpenseExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-470": {
   "value": "4.  <span class=\"_ _c6\"> </span>Inter<span class=\"_ _0\"></span>est <span class=\"_ _19\"> </span>receiv<span class=\"_ _1\"></span>able<span class=\"_ _36a\"> </span>Interest r<span class=\"_ _1\"></span>eceivable is analysed as follo<span class=\"_ _0\"></span>ws.<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Inter<span class=\"_ _0\"></span>est receivable in r<span class=\"_ _0\"></span>espect of<span class=\"_ _36a\"> </span>Loans and receivables<span class=\"_ _1fa\"> </span><span class=\"ff15\">642.9<span class=\"_ _d5\"> </span><span class=\"ff16\">486.7<span class=\"_ _36a\"> </span></span></span>Finance leases<span class=\"_ _1fb\"> </span><span class=\"ff15\">59.6<span class=\"_ _3a\"> </span><span class=\"ff16\">45.0<span class=\"_ _36a\"> </span></span></span>Invoice finance inc<span class=\"_ _0\"></span>ome<span class=\"_ _1f7\"> </span><span class=\"ff15\">4.3<span class=\"_ _9e\"> </span><span class=\"ff16\">3.4<span class=\"_ _36a\"> </span></span></span>Inter<span class=\"_ _0\"></span>est on loans to customer<span class=\"_ _0\"></span>s<span class=\"_ _1fc\"> </span><span class=\"ff15\">706.8<span class=\"_ _d5\"> </span><span class=\"ff16\">535.1<span class=\"_ _36a\"> </span></span></span>Eff<span class=\"_ _1\"></span>ect of fair value hedging of loan assets<span class=\"_ _1fd\"> </span><span class=\"ff15\">210.0<span class=\"_ _ff\"> </span></span>(1.5)<span class=\"_ _36a\"> </span>Inter<span class=\"_ _0\"></span>est on loans to customer<span class=\"_ _0\"></span>s after hedging<span class=\"_ _1cc\"> </span><span class=\"ff15\">916.8<span class=\"_ _d5\"> </span><span class=\"ff16\">533.6<span class=\"_ _36a\"> </span></span></span>Pension scheme surplus<span class=\"_ _1fe\"> </span><span class=\"ff2c\">60<span class=\"_ _9b\"> </span><span class=\"ff15\">0.4<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span>Other inter<span class=\"_ _0\"></span>est receivable<span class=\"_ _1ff\"> </span><span class=\"ff15\">93.4<span class=\"_ _3a\"> </span><span class=\"ff16\">12.1<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal interest on financial asse<span class=\"_ _0\"></span>ts<span class=\"_ _200\"> </span><span class=\"ff15\">1,010.6<span class=\"_ _d5\"> </span><span class=\"ff16\">545.7<span class=\"_ _36a\"> </span></span></span>The abov<span class=\"_ _0\"></span>e amounts relate <span class=\"_ _0\"></span>to:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Financial assets held at amortised cost<span class=\"_ _1a0\"> </span><span class=\"ff15\">740.6<span class=\"_ _d5\"> </span><span class=\"ff16\">502.2<span class=\"_ _36a\"> </span></span></span>Finance leases<span class=\"_ _1fb\"> </span><span class=\"ff15\">59.6<span class=\"_ _3a\"> </span><span class=\"ff16\">45.0<span class=\"_ _36a\"> </span></span></span>Pension scheme surplus<span class=\"_ _201\"> </span><span class=\"ff15\">0.4<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial instruments held at f<span class=\"_ _0\"></span>air value<span class=\"_ _1e3\"> </span><span class=\"ff15\">210.0<span class=\"_ _ff\"> </span></span>(1.5)<span class=\"_ _36a\"> </span>1,010.6<span class=\"_ _d5\"> </span><span class=\"ff16\">545.7<span class=\"_ _36a\"> </span></span>Other inter<span class=\"_ _0\"></span>est r<span class=\"_ _0\"></span>eceivable relat<span class=\"_ _0\"></span>es principally t<span class=\"_ _0\"></span>o cash deposits at central and retail bank<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span>.<span class=\"_ _36a\"> </span>5. <span class=\"_ _e0\"></span> <span class=\"_ _4a\"> </span>Interest pa<span class=\"_ _0\"></span>yable and similar<span class=\"_ _1\"></span> charges<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>On financial liabilities<span class=\"_ _36a\"> </span>Ret<span class=\"_ _0\"></span>ail deposits<span class=\"_ _14f\"> </span><span class=\"ff15\">334.1<span class=\"_ _d5\"> </span><span class=\"ff16\">108.8<span class=\"_ _36a\"> </span></span></span>Eff<span class=\"_ _1\"></span>ect of fair value hedging of deposits<span class=\"_ _1f2\"> </span><span class=\"ff15\">54.4<span class=\"_ _d1\"> </span><span class=\"ff16\">4.2<span class=\"_ _36a\"> </span></span></span>Inter<span class=\"_ _0\"></span>est on ret<span class=\"_ _0\"></span>ail deposits after hedging<span class=\"_ _202\"> </span><span class=\"ff15\">388.5<span class=\"_ _d5\"> </span><span class=\"ff16\">113.0<span class=\"_ _36a\"> </span></span></span>Asset back<span class=\"_ _0\"></span>ed loan notes<span class=\"_ _166\"> </span><span class=\"ff15\">10.9<span class=\"_ _d1\"> </span><span class=\"ff16\">9.1<span class=\"_ _36a\"> </span></span></span>Bank loans and overdr<span class=\"_ _0\"></span>afts<span class=\"_ _203\"> </span><span class=\"ff15\">34.8<span class=\"_ _3a\"> </span><span class=\"ff16\">13.3<span class=\"_ _36a\"> </span></span></span>Corporat<span class=\"_ _0\"></span>e bonds<span class=\"_ _204\"> </span><span class=\"ff15\">6.6<span class=\"_ _9e\"> </span><span class=\"ff16\">6.6<span class=\"_ _36a\"> </span></span></span>Eff<span class=\"_ _1\"></span>ect of fair value hedging of bonds<span class=\"_ _205\"> </span><span class=\"ff15\">0.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span>Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _206\"> </span><span class=\"ff15\">6.5<span class=\"_ _9e\"> </span><span class=\"ff16\">9.1<span class=\"_ _36a\"> </span></span></span>Central bank f<span class=\"_ _0\"></span>acilities<span class=\"_ _207\"> </span><span class=\"ff15\">111.9<span class=\"_ _3a\"> </span><span class=\"ff16\">22.2<span class=\"_ _36a\"> </span></span></span>Sale and repurchase agr<span class=\"_ _0\"></span>eements <span class=\"_ _208\"> </span><span class=\"ff15\">0.7<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal interest on financial liabilities<span class=\"_ _1c8\"> </span><span class=\"ff15\">560.5<span class=\"_ _d5\"> </span><span class=\"ff16\">173.3<span class=\"_ _36a\"> </span></span></span>Pension scheme deficit<span class=\"_ _1f3\"> </span><span class=\"ff2c\">60<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span></span>Discounting on con<span class=\"_ _0\"></span>tingent consider<span class=\"_ _0\"></span>ation<span class=\"_ _20a\"> </span><span class=\"ff2c\">41<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.1<span class=\"_ _36a\"> </span></span></span></span>Discounting on lease liabilities<span class=\"_ _20b\"> </span><span class=\"ff15\">0.3<span class=\"_ _9e\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span>Other finance costs<span class=\"_ _20c\"> </span><span class=\"ff15\">0.9<span class=\"_ _9e\"> </span><span class=\"ff16\">0.7<span class=\"_ _36a\"> </span></span></span>561.7<span class=\"_ _d5\"> </span><span class=\"ff16\">174.5<span class=\"_ _36a\"> </span></span>The abov<span class=\"_ _0\"></span>e amounts relate <span class=\"_ _0\"></span>to:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Financial liabilities held at amortised cost<span class=\"_ _20d\"> </span><span class=\"ff15\">505.5<span class=\"_ _d5\"> </span><span class=\"ff16\">169.1<span class=\"_ _36a\"> </span></span></span>Derivativ<span class=\"_ _0\"></span>e financial instruments held at f<span class=\"_ _0\"></span>air value<span class=\"_ _20e\"> </span><span class=\"ff15\">55.0<span class=\"_ _9e\"> </span><span class=\"ff16\">4.2<span class=\"_ _36a\"> </span></span></span>Other items<span class=\"_ _20f\"> </span><span class=\"ff15\">1.2<span class=\"_ _9e\"> </span><span class=\"ff16\">1.2<span class=\"_ _36a\"> </span></span></span>561.7<span class=\"_ _d5\"> </span><span class=\"ff16\">174.5</span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinanceIncomeExpenseExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-500": {
   "value": "5. <span class=\"_ _e0\"></span> <span class=\"_ _4a\"> </span>Interest pa<span class=\"_ _0\"></span>yable and similar<span class=\"_ _1\"></span> charges<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>On financial liabilities<span class=\"_ _36a\"> </span>Ret<span class=\"_ _0\"></span>ail deposits<span class=\"_ _14f\"> </span><span class=\"ff15\">334.1<span class=\"_ _d5\"> </span><span class=\"ff16\">108.8<span class=\"_ _36a\"> </span></span></span>Eff<span class=\"_ _1\"></span>ect of fair value hedging of deposits<span class=\"_ _1f2\"> </span><span class=\"ff15\">54.4<span class=\"_ _d1\"> </span><span class=\"ff16\">4.2<span class=\"_ _36a\"> </span></span></span>Inter<span class=\"_ _0\"></span>est on ret<span class=\"_ _0\"></span>ail deposits after hedging<span class=\"_ _202\"> </span><span class=\"ff15\">388.5<span class=\"_ _d5\"> </span><span class=\"ff16\">113.0<span class=\"_ _36a\"> </span></span></span>Asset back<span class=\"_ _0\"></span>ed loan notes<span class=\"_ _166\"> </span><span class=\"ff15\">10.9<span class=\"_ _d1\"> </span><span class=\"ff16\">9.1<span class=\"_ _36a\"> </span></span></span>Bank loans and overdr<span class=\"_ _0\"></span>afts<span class=\"_ _203\"> </span><span class=\"ff15\">34.8<span class=\"_ _3a\"> </span><span class=\"ff16\">13.3<span class=\"_ _36a\"> </span></span></span>Corporat<span class=\"_ _0\"></span>e bonds<span class=\"_ _204\"> </span><span class=\"ff15\">6.6<span class=\"_ _9e\"> </span><span class=\"ff16\">6.6<span class=\"_ _36a\"> </span></span></span>Eff<span class=\"_ _1\"></span>ect of fair value hedging of bonds<span class=\"_ _205\"> </span><span class=\"ff15\">0.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span>Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _206\"> </span><span class=\"ff15\">6.5<span class=\"_ _9e\"> </span><span class=\"ff16\">9.1<span class=\"_ _36a\"> </span></span></span>Central bank f<span class=\"_ _0\"></span>acilities<span class=\"_ _207\"> </span><span class=\"ff15\">111.9<span class=\"_ _3a\"> </span><span class=\"ff16\">22.2<span class=\"_ _36a\"> </span></span></span>Sale and repurchase agr<span class=\"_ _0\"></span>eements <span class=\"_ _208\"> </span><span class=\"ff15\">0.7<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal interest on financial liabilities<span class=\"_ _1c8\"> </span><span class=\"ff15\">560.5<span class=\"_ _d5\"> </span><span class=\"ff16\">173.3<span class=\"_ _36a\"> </span></span></span>Pension scheme deficit<span class=\"_ _1f3\"> </span><span class=\"ff2c\">60<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span></span>Discounting on con<span class=\"_ _0\"></span>tingent consider<span class=\"_ _0\"></span>ation<span class=\"_ _20a\"> </span><span class=\"ff2c\">41<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.1<span class=\"_ _36a\"> </span></span></span></span>Discounting on lease liabilities<span class=\"_ _20b\"> </span><span class=\"ff15\">0.3<span class=\"_ _9e\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span>Other finance costs<span class=\"_ _20c\"> </span><span class=\"ff15\">0.9<span class=\"_ _9e\"> </span><span class=\"ff16\">0.7<span class=\"_ _36a\"> </span></span></span>561.7<span class=\"_ _d5\"> </span><span class=\"ff16\">174.5<span class=\"_ _36a\"> </span></span>The abov<span class=\"_ _0\"></span>e amounts relate <span class=\"_ _0\"></span>to:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Financial liabilities held at amortised cost<span class=\"_ _20d\"> </span><span class=\"ff15\">505.5<span class=\"_ _d5\"> </span><span class=\"ff16\">169.1<span class=\"_ _36a\"> </span></span></span>Derivativ<span class=\"_ _0\"></span>e financial instruments held at f<span class=\"_ _0\"></span>air value<span class=\"_ _20e\"> </span><span class=\"ff15\">55.0<span class=\"_ _9e\"> </span><span class=\"ff16\">4.2<span class=\"_ _36a\"> </span></span></span>Other items<span class=\"_ _20f\"> </span><span class=\"ff15\">1.2<span class=\"_ _9e\"> </span><span class=\"ff16\">1.2<span class=\"_ _36a\"> </span></span></span>561.7<span class=\"_ _d5\"> </span><span class=\"ff16\">174.5</span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBorrowingCostsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-490": {
   "value": "5. <span class=\"_ _e0\"></span> <span class=\"_ _4a\"> </span>Interest pa<span class=\"_ _0\"></span>yable and similar<span class=\"_ _1\"></span> charges<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>On financial liabilities<span class=\"_ _36a\"> </span>Ret<span class=\"_ _0\"></span>ail deposits<span class=\"_ _14f\"> </span><span class=\"ff15\">334.1<span class=\"_ _d5\"> </span><span class=\"ff16\">108.8<span class=\"_ _36a\"> </span></span></span>Eff<span class=\"_ _1\"></span>ect of fair value hedging of deposits<span class=\"_ _1f2\"> </span><span class=\"ff15\">54.4<span class=\"_ _d1\"> </span><span class=\"ff16\">4.2<span class=\"_ _36a\"> </span></span></span>Inter<span class=\"_ _0\"></span>est on ret<span class=\"_ _0\"></span>ail deposits after hedging<span class=\"_ _202\"> </span><span class=\"ff15\">388.5<span class=\"_ _d5\"> </span><span class=\"ff16\">113.0<span class=\"_ _36a\"> </span></span></span>Asset back<span class=\"_ _0\"></span>ed loan notes<span class=\"_ _166\"> </span><span class=\"ff15\">10.9<span class=\"_ _d1\"> </span><span class=\"ff16\">9.1<span class=\"_ _36a\"> </span></span></span>Bank loans and overdr<span class=\"_ _0\"></span>afts<span class=\"_ _203\"> </span><span class=\"ff15\">34.8<span class=\"_ _3a\"> </span><span class=\"ff16\">13.3<span class=\"_ _36a\"> </span></span></span>Corporat<span class=\"_ _0\"></span>e bonds<span class=\"_ _204\"> </span><span class=\"ff15\">6.6<span class=\"_ _9e\"> </span><span class=\"ff16\">6.6<span class=\"_ _36a\"> </span></span></span>Eff<span class=\"_ _1\"></span>ect of fair value hedging of bonds<span class=\"_ _205\"> </span><span class=\"ff15\">0.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span>Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _206\"> </span><span class=\"ff15\">6.5<span class=\"_ _9e\"> </span><span class=\"ff16\">9.1<span class=\"_ _36a\"> </span></span></span>Central bank f<span class=\"_ _0\"></span>acilities<span class=\"_ _207\"> </span><span class=\"ff15\">111.9<span class=\"_ _3a\"> </span><span class=\"ff16\">22.2<span class=\"_ _36a\"> </span></span></span>Sale and repurchase agr<span class=\"_ _0\"></span>eements <span class=\"_ _208\"> </span><span class=\"ff15\">0.7<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal interest on financial liabilities<span class=\"_ _1c8\"> </span><span class=\"ff15\">560.5<span class=\"_ _d5\"> </span><span class=\"ff16\">173.3<span class=\"_ _36a\"> </span></span></span>Pension scheme deficit<span class=\"_ _1f3\"> </span><span class=\"ff2c\">60<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span></span>Discounting on con<span class=\"_ _0\"></span>tingent consider<span class=\"_ _0\"></span>ation<span class=\"_ _20a\"> </span><span class=\"ff2c\">41<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.1<span class=\"_ _36a\"> </span></span></span></span>Discounting on lease liabilities<span class=\"_ _20b\"> </span><span class=\"ff15\">0.3<span class=\"_ _9e\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span>Other finance costs<span class=\"_ _20c\"> </span><span class=\"ff15\">0.9<span class=\"_ _9e\"> </span><span class=\"ff16\">0.7<span class=\"_ _36a\"> </span></span></span>561.7<span class=\"_ _d5\"> </span><span class=\"ff16\">174.5<span class=\"_ _36a\"> </span></span>The abov<span class=\"_ _0\"></span>e amounts relate <span class=\"_ _0\"></span>to:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Financial liabilities held at amortised cost<span class=\"_ _20d\"> </span><span class=\"ff15\">505.5<span class=\"_ _d5\"> </span><span class=\"ff16\">169.1<span class=\"_ _36a\"> </span></span></span>Derivativ<span class=\"_ _0\"></span>e financial instruments held at f<span class=\"_ _0\"></span>air value<span class=\"_ _20e\"> </span><span class=\"ff15\">55.0<span class=\"_ _9e\"> </span><span class=\"ff16\">4.2<span class=\"_ _36a\"> </span></span></span>Other items<span class=\"_ _20f\"> </span><span class=\"ff15\">1.2<span class=\"_ _9e\"> </span><span class=\"ff16\">1.2<span class=\"_ _36a\"> </span></span></span>561.7<span class=\"_ _d5\"> </span><span class=\"ff16\">174.5</span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinanceCostExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-432": {
   "value": "5. <span class=\"_ _e0\"></span> <span class=\"_ _4a\"> </span>Interest pa<span class=\"_ _0\"></span>yable and similar<span class=\"_ _1\"></span> charges<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>On financial liabilities<span class=\"_ _36a\"> </span>Ret<span class=\"_ _0\"></span>ail deposits<span class=\"_ _14f\"> </span><span class=\"ff15\">334.1<span class=\"_ _d5\"> </span><span class=\"ff16\">108.8<span class=\"_ _36a\"> </span></span></span>Eff<span class=\"_ _1\"></span>ect of fair value hedging of deposits<span class=\"_ _1f2\"> </span><span class=\"ff15\">54.4<span class=\"_ _d1\"> </span><span class=\"ff16\">4.2<span class=\"_ _36a\"> </span></span></span>Inter<span class=\"_ _0\"></span>est on ret<span class=\"_ _0\"></span>ail deposits after hedging<span class=\"_ _202\"> </span><span class=\"ff15\">388.5<span class=\"_ _d5\"> </span><span class=\"ff16\">113.0<span class=\"_ _36a\"> </span></span></span>Asset back<span class=\"_ _0\"></span>ed loan notes<span class=\"_ _166\"> </span><span class=\"ff15\">10.9<span class=\"_ _d1\"> </span><span class=\"ff16\">9.1<span class=\"_ _36a\"> </span></span></span>Bank loans and overdr<span class=\"_ _0\"></span>afts<span class=\"_ _203\"> </span><span class=\"ff15\">34.8<span class=\"_ _3a\"> </span><span class=\"ff16\">13.3<span class=\"_ _36a\"> </span></span></span>Corporat<span class=\"_ _0\"></span>e bonds<span class=\"_ _204\"> </span><span class=\"ff15\">6.6<span class=\"_ _9e\"> </span><span class=\"ff16\">6.6<span class=\"_ _36a\"> </span></span></span>Eff<span class=\"_ _1\"></span>ect of fair value hedging of bonds<span class=\"_ _205\"> </span><span class=\"ff15\">0.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span>Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _206\"> </span><span class=\"ff15\">6.5<span class=\"_ _9e\"> </span><span class=\"ff16\">9.1<span class=\"_ _36a\"> </span></span></span>Central bank f<span class=\"_ _0\"></span>acilities<span class=\"_ _207\"> </span><span class=\"ff15\">111.9<span class=\"_ _3a\"> </span><span class=\"ff16\">22.2<span class=\"_ _36a\"> </span></span></span>Sale and repurchase agr<span class=\"_ _0\"></span>eements <span class=\"_ _208\"> </span><span class=\"ff15\">0.7<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal interest on financial liabilities<span class=\"_ _1c8\"> </span><span class=\"ff15\">560.5<span class=\"_ _d5\"> </span><span class=\"ff16\">173.3<span class=\"_ _36a\"> </span></span></span>Pension scheme deficit<span class=\"_ _1f3\"> </span><span class=\"ff2c\">60<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span></span>Discounting on con<span class=\"_ _0\"></span>tingent consider<span class=\"_ _0\"></span>ation<span class=\"_ _20a\"> </span><span class=\"ff2c\">41<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.1<span class=\"_ _36a\"> </span></span></span></span>Discounting on lease liabilities<span class=\"_ _20b\"> </span><span class=\"ff15\">0.3<span class=\"_ _9e\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span>Other finance costs<span class=\"_ _20c\"> </span><span class=\"ff15\">0.9<span class=\"_ _9e\"> </span><span class=\"ff16\">0.7<span class=\"_ _36a\"> </span></span></span>561.7<span class=\"_ _d5\"> </span><span class=\"ff16\">174.5<span class=\"_ _36a\"> </span></span>The abov<span class=\"_ _0\"></span>e amounts relate <span class=\"_ _0\"></span>to:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Financial liabilities held at amortised cost<span class=\"_ _20d\"> </span><span class=\"ff15\">505.5<span class=\"_ _d5\"> </span><span class=\"ff16\">169.1<span class=\"_ _36a\"> </span></span></span>Derivativ<span class=\"_ _0\"></span>e financial instruments held at f<span class=\"_ _0\"></span>air value<span class=\"_ _20e\"> </span><span class=\"ff15\">55.0<span class=\"_ _9e\"> </span><span class=\"ff16\">4.2<span class=\"_ _36a\"> </span></span></span>Other items<span class=\"_ _20f\"> </span><span class=\"ff15\">1.2<span class=\"_ _9e\"> </span><span class=\"ff16\">1.2<span class=\"_ _36a\"> </span></span></span>561.7<span class=\"_ _d5\"> </span><span class=\"ff16\">174.5</span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInterestExpenseExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-367": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gse8\">6. <span class=\"_ _4a\"> </span>Net operating lease income </div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gse9\">Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsea\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gseb\">Income<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsec\">Operating lease r<span class=\"_ _0\"></span>entals<span class=\"_ _1fa\"> </span><span class=\"ff15\">19.5<span class=\"_ _3a\"> </span><span class=\"ff16\">17.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsed\">Maintenance income<span class=\"_ _210\"> </span><span class=\"ff15\">7.9<span class=\"_ _9e\"> </span><span class=\"ff16\">6.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsee\">T<span class=\"_ _2\"></span>otal operating lease income<span class=\"_ _211\"> </span><span class=\"ff15\">27.4<span class=\"_ _3a\"> </span><span class=\"ff16\">24.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsef\">Costs<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf0\">Depreciation of lease assets<span class=\"_ _1b7\"> </span><span class=\"ff2c\">29<span class=\"_ _1c1\"> </span><span class=\"ff15\">(10.7)<span class=\"_ _bf\"> </span></span></span>(10.1)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf1\">Maintenance salaries<span class=\"_ _158\"> </span><span class=\"ff2c\">57<span class=\"_ _fb\"> </span><span class=\"ff15\">(3.2)<span class=\"_ _1db\"> </span></span></span>(2.7)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf2\">Other maintenance cos<span class=\"_ _0\"></span>ts<span class=\"_ _212\"> </span><span class=\"ff15\">(7.9)<span class=\"_ _1db\"> </span></span>(7.2)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf3\">T<span class=\"_ _2\"></span>otal operating lease cos<span class=\"_ _0\"></span>ts<span class=\"_ _213\"> </span><span class=\"ff15\">(21.8)<span class=\"_ _bf\"> </span></span>(20.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf4\">Net opera<span class=\"_ _0\"></span>ting lease income<span class=\"_ _214\"> </span><span class=\"ff15\">5.6<span class=\"_ _9e\"> </span><span class=\"ff16\">4.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gsf6\">7<span class=\"_ _2\"></span>. <span class=\"_ _2\"></span> <span class=\"_ _4a\"> </span>Gain on derecognition of<span class=\"_ _0\"></span> financial assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf7\">On 8 June 2022 <span class=\"_ _0\"></span>the Group disposed o<span class=\"_ _0\"></span>f almost all of<span class=\"_ _0\"></span> its unsecured consumer<span class=\"_ _0\"></span> loan balances, and has no continuing interest<span class=\"_ _0\"></span> in these </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf8\">assets. T<span class=\"_ _0\"></span>he carrying v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the loans disposed of <span class=\"_ _0\"></span>was \u00a37<span class=\"_ _1\"></span>4.<span class=\"_ _0\"></span>1m and cash consideration of<span class=\"_ _0\"></span> \u00a378.9m w<span class=\"_ _0\"></span>as receiv<span class=\"_ _0\"></span>ed, resulting in a gain on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf9\">disposal of \u00a34<span class=\"_ _0\"></span>.6m after<span class=\"_ _0\"></span> allowing f<span class=\"_ _0\"></span>or costs arising <span class=\"_ _0\"></span>from the <span class=\"_ _0\"></span>transaction.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gsfa\">8. <span class=\"_ _4a\"> </span>Other<span class=\"_ _0\"></span> income<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsfb\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsfc\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsfd\">Loan account f<span class=\"_ _0\"></span>ee income<span class=\"_ _215\"> </span><span class=\"ff15\">4.8<span class=\"_ _9e\"> </span><span class=\"ff16\">6.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsfe\">Brok<span class=\"_ _0\"></span>er commissions<span class=\"_ _216\"> </span><span class=\"ff15\">2.1<span class=\"_ _9e\"> </span><span class=\"ff16\">2.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsff\">Third party servicing<span class=\"_ _1f1\"> </span><span class=\"ff15\">4.3<span class=\"_ _d1\"> </span><span class=\"ff16\">3.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs100\">Other income<span class=\"_ _217\"> </span><span class=\"ff15\">0.3<span class=\"_ _9e\"> </span><span class=\"ff16\">0.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs101\">11.5<span class=\"_ _3a\"> </span><span class=\"ff16\">12.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs102\">All loan account fee income arises <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>financial assets held at amortised cost.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherOperatingIncomeExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-471": {
   "value": "6. <span class=\"_ _4a\"> </span>Net operating lease income Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Income<span class=\"_ _36a\"> </span>Operating lease r<span class=\"_ _0\"></span>entals<span class=\"_ _1fa\"> </span><span class=\"ff15\">19.5<span class=\"_ _3a\"> </span><span class=\"ff16\">17.7<span class=\"_ _36a\"> </span></span></span>Maintenance income<span class=\"_ _210\"> </span><span class=\"ff15\">7.9<span class=\"_ _9e\"> </span><span class=\"ff16\">6.9<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal operating lease income<span class=\"_ _211\"> </span><span class=\"ff15\">27.4<span class=\"_ _3a\"> </span><span class=\"ff16\">24.6<span class=\"_ _36a\"> </span></span></span>Costs<span class=\"_ _36a\"> </span>Depreciation of lease assets<span class=\"_ _1b7\"> </span><span class=\"ff2c\">29<span class=\"_ _1c1\"> </span><span class=\"ff15\">(10.7)<span class=\"_ _bf\"> </span></span></span>(10.1)<span class=\"_ _36a\"> </span>Maintenance salaries<span class=\"_ _158\"> </span><span class=\"ff2c\">57<span class=\"_ _fb\"> </span><span class=\"ff15\">(3.2)<span class=\"_ _1db\"> </span></span></span>(2.7)<span class=\"_ _36a\"> </span>Other maintenance cos<span class=\"_ _0\"></span>ts<span class=\"_ _212\"> </span><span class=\"ff15\">(7.9)<span class=\"_ _1db\"> </span></span>(7.2)<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal operating lease cos<span class=\"_ _0\"></span>ts<span class=\"_ _213\"> </span><span class=\"ff15\">(21.8)<span class=\"_ _bf\"> </span></span>(20.0)<span class=\"_ _36a\"> </span>Net opera<span class=\"_ _0\"></span>ting lease income<span class=\"_ _214\"> </span><span class=\"ff15\">5.6<span class=\"_ _9e\"> </span><span class=\"ff16\">4.6<span class=\"_ _36a\"> </span></span></span>9<span class=\"_ _0\"></span>.  <span class=\"_ _af\"> </span>Operating <span class=\"_ _7\"> </span>expenses<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Employment cos<span class=\"_ _0\"></span>ts <span class=\"_ _ea\"> </span><span class=\"ff2c\">57<span class=\"_ _cb\"> </span><span class=\"ff15\">108.3<span class=\"_ _d5\"> </span><span class=\"ff16\">103.6<span class=\"_ _36a\"> </span></span></span></span>Auditor remuner<span class=\"_ _0\"></span>ation <span class=\"_ _218\"> </span><span class=\"ff2c\">10<span class=\"_ _9b\"> </span><span class=\"ff15\">2.9<span class=\"_ _9e\"> </span><span class=\"ff16\">2.5<span class=\"_ _36a\"> </span></span></span></span>Amortisation of intangible asse<span class=\"_ _0\"></span>ts <span class=\"_ _219\"> </span><span class=\"ff2c\">30<span class=\"_ _9b\"> </span><span class=\"ff15\">1.8<span class=\"_ _9e\"> </span><span class=\"ff16\">2.0<span class=\"_ _36a\"> </span></span></span></span>Depreciation of oper<span class=\"_ _0\"></span>ational assets<span class=\"_ _128\"> </span><span class=\"ff2c\">29<span class=\"_ _a8\"> </span><span class=\"ff15\">3.9<span class=\"_ _d1\"> </span><span class=\"ff16\">3.5<span class=\"_ _36a\"> </span></span></span></span>TBMC closure<span class=\"_ _21a\"> </span><span class=\"ff2c\">11<span class=\"_ _9b\"> </span><span class=\"ff15\">2.0<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span>Restructuring c<span class=\"_ _0\"></span>osts<span class=\"_ _21b\"> </span><span class=\"ff15\">2.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span>Other administra<span class=\"_ _0\"></span>tive costs<span class=\"_ _21c\"> </span><span class=\"ff15\">48.9<span class=\"_ _3a\"> </span><span class=\"ff16\">41.4<span class=\"_ _36a\"> </span></span></span>170.4<span class=\"_ _d5\"> </span><span class=\"ff16\">153.0<span class=\"_ _36a\"> </span></span>Restructuring costs arise fr<span class=\"_ _0\"></span>om a strategic r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>w of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s operational structures and r<span class=\"_ _0\"></span>esources carried out<span class=\"_ _0\"></span> in the y<span class=\"_ _0\"></span>ear and include consultancy<span class=\"_ _0\"></span> costs and redundancy<span class=\"_ _0\"></span>-related expenses. The Group incurr<span class=\"_ _0\"></span>ed no costs in respect<span class=\"_ _0\"></span> of short-<span class=\"_ _0\"></span>term operating leases in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> (2022: none).",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDepreciationAndAmortisationExpenseExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-433": {
   "value": "6. <span class=\"_ _4a\"> </span>Net operating lease income Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Income<span class=\"_ _36a\"> </span>Operating lease r<span class=\"_ _0\"></span>entals<span class=\"_ _1fa\"> </span><span class=\"ff15\">19.5<span class=\"_ _3a\"> </span><span class=\"ff16\">17.7<span class=\"_ _36a\"> </span></span></span>Maintenance income<span class=\"_ _210\"> </span><span class=\"ff15\">7.9<span class=\"_ _9e\"> </span><span class=\"ff16\">6.9<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal operating lease income<span class=\"_ _211\"> </span><span class=\"ff15\">27.4<span class=\"_ _3a\"> </span><span class=\"ff16\">24.6<span class=\"_ _36a\"> </span></span></span>Costs<span class=\"_ _36a\"> </span>Depreciation of lease assets<span class=\"_ _1b7\"> </span><span class=\"ff2c\">29<span class=\"_ _1c1\"> </span><span class=\"ff15\">(10.7)<span class=\"_ _bf\"> </span></span></span>(10.1)<span class=\"_ _36a\"> </span>Maintenance salaries<span class=\"_ _158\"> </span><span class=\"ff2c\">57<span class=\"_ _fb\"> </span><span class=\"ff15\">(3.2)<span class=\"_ _1db\"> </span></span></span>(2.7)<span class=\"_ _36a\"> </span>Other maintenance cos<span class=\"_ _0\"></span>ts<span class=\"_ _212\"> </span><span class=\"ff15\">(7.9)<span class=\"_ _1db\"> </span></span>(7.2)<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal operating lease cos<span class=\"_ _0\"></span>ts<span class=\"_ _213\"> </span><span class=\"ff15\">(21.8)<span class=\"_ _bf\"> </span></span>(20.0)<span class=\"_ _36a\"> </span>Net opera<span class=\"_ _0\"></span>ting lease income<span class=\"_ _214\"> </span><span class=\"ff15\">5.6<span class=\"_ _9e\"> </span><span class=\"ff16\">4.6<span class=\"_ _36a\"> </span></span></span><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs1e4\">19<span class=\"_ _0\"></span>. <span class=\"_ _5\"> </span>Finance lease receiv<span class=\"_ _0\"></span>ables<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1e5\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s finance leases can be analysed as sho<span class=\"_ _0\"></span>wn below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1e6\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1e7\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1e8\">Motor finance<span class=\"_ _247\"> </span><span class=\"ff15\">297.7<span class=\"_ _d5\"> </span><span class=\"ff16\">261.3<span class=\"_ _150\"> </span>229.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1e9\">Asset finance<span class=\"_ _248\"> </span><span class=\"ff15\">559.1<span class=\"_ _d5\"> </span><span class=\"ff16\">498.8<span class=\"_ _150\"> </span>440.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1ea\">RLS and CBILS<span class=\"_ _231\"> </span><span class=\"ff15\">50.5<span class=\"_ _3a\"> </span><span class=\"ff16\">65.1<span class=\"_ _3a\"> </span>50.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1eb\">Carrying value<span class=\"_ _247\"> </span><span class=\"ff15\">907.3<span class=\"_ _d5\"> </span><span class=\"ff16\">825.2<span class=\"_ _150\"> </span>720.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1ec\">The minimum lease payments due under<span class=\"_ _0\"></span> these loan agr<span class=\"_ _0\"></span>eements are:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1ed\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1ee\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1ef\">Amounts receiv<span class=\"_ _0\"></span>able<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1f0\">Within one year<span class=\"_ _249\"> </span><span class=\"ff15\">318.5<span class=\"_ _d5\"> </span><span class=\"ff16\">284.7<span class=\"_ _150\"> </span>255.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1f1\">Within one to two year<span class=\"_ _0\"></span>s<span class=\"_ _24a\"> </span><span class=\"ff15\">269.9<span class=\"_ _d5\"> </span><span class=\"ff16\">244.4<span class=\"_ _150\"> </span>220.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1f2\">Within two to three y<span class=\"_ _0\"></span>ears<span class=\"_ _154\"> </span><span class=\"ff15\">218.7<span class=\"_ _d5\"> </span><span class=\"ff16\">189.5<span class=\"_ _150\"> </span>164.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1f3\">Within three to f<span class=\"_ _0\"></span>our years<span class=\"_ _24b\"> </span><span class=\"ff15\">143.5<span class=\"_ _d5\"> </span><span class=\"ff16\">136.5<span class=\"_ _150\"> </span>105.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1f4\">Within four to fiv<span class=\"_ _0\"></span>e years<span class=\"_ _24c\"> </span><span class=\"ff15\">67.1<span class=\"_ _3a\"> </span><span class=\"ff16\">60.5<span class=\"_ _3a\"> </span>50.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1f5\">After five y<span class=\"_ _0\"></span>ears<span class=\"_ _127\"> </span><span class=\"ff15\">60.2<span class=\"_ _3a\"> </span><span class=\"ff16\">46.2<span class=\"_ _3a\"> </span>41.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1f6\">1,077.9<span class=\"_ _d5\"> </span><span class=\"ff16\">961.8<span class=\"_ _150\"> </span>837.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1f7\">Less: future finance income<span class=\"_ _24d\"> </span><span class=\"ff15\">(158.1)<span class=\"_ _110\"> </span></span>(119.8)<span class=\"_ _6c\"> </span>(96.3)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1f8\">Present v<span class=\"_ _0\"></span>alue<span class=\"_ _200\"> </span><span class=\"ff15\">919.8<span class=\"_ _150\"> </span><span class=\"ff16\">842.0<span class=\"_ _150\"> </span>741.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1f9\">The present<span class=\"_ _0\"></span> values o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>those payments, net of<span class=\"_ _0\"></span> pro<span class=\"_ _0\"></span>visions for<span class=\"_ _0\"></span> impairment, carried in the accounts ar<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1fa\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1fb\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1fc\">Amounts receiv<span class=\"_ _0\"></span>able<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1fd\">Within one year<span class=\"_ _249\"> </span><span class=\"ff15\">272.9<span class=\"_ _d5\"> </span><span class=\"ff16\">248.7<span class=\"_ _150\"> </span>225.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1fe\">Within two to five y<span class=\"_ _0\"></span>ears<span class=\"_ _24e\"> </span><span class=\"ff15\">597.0<span class=\"_ _d5\"> </span><span class=\"ff16\">554.0<span class=\"_ _150\"> </span>480.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1ff\">After five y<span class=\"_ _0\"></span>ears<span class=\"_ _127\"> </span><span class=\"ff15\">49.9<span class=\"_ _3a\"> </span><span class=\"ff16\">39.3<span class=\"_ _3a\"> </span>36.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs200\">Present v<span class=\"_ _0\"></span>alue<span class=\"_ _200\"> </span><span class=\"ff15\">919.8<span class=\"_ _150\"> </span><span class=\"ff16\">842.0<span class=\"_ _150\"> </span>741.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs201\">Allowance f<span class=\"_ _0\"></span>or uncollectible amounts <span class=\"_ _24f\"> </span><span class=\"ff15\">(12.5)<span class=\"_ _bf\"> </span></span>(16.8)<span class=\"_ _6c\"> </span>(21.1)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs202\">Carrying value<span class=\"_ _247\"> </span><span class=\"ff15\">907.3<span class=\"_ _d5\"> </span><span class=\"ff16\">825.2<span class=\"_ _150\"> </span>720.3<span class=\"_ _36a\"> </span></span></span></div>42. <span class=\"_ _1c\"></span>L<span class=\"_ _0\"></span>ease pay<span class=\"_ _0\"></span>ables<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s lease liabilities arise under <span class=\"_ _0\"></span>the leasing arrangements described in note 54<span class=\"_ _0\"></span>. Related right of<span class=\"_ _0\"></span> use assets ar<span class=\"_ _0\"></span>e shown in note 29<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _180\"> </span>The Company<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span></span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Leasing liabilities falling due:<span class=\"_ _36a\"> </span>In more than five y<span class=\"_ _0\"></span>ears<span class=\"_ _1be\"> </span><span class=\"ff15\">0.5<span class=\"_ _9e\"> </span><span class=\"ff16\">1.1<span class=\"_ _9e\"> </span></span>6.7<span class=\"_ _9e\"> </span><span class=\"ff16\">8.2<span class=\"_ _36a\"> </span></span></span>In more than two but less than five y<span class=\"_ _0\"></span>ears<span class=\"_ _2b4\"> </span><span class=\"ff15\">3.4<span class=\"_ _d1\"> </span><span class=\"ff16\">3.8<span class=\"_ _11f\"> </span></span>4.3<span class=\"_ _d1\"> </span><span class=\"ff16\">4.2<span class=\"_ _36a\"> </span></span></span>In more than one year but less than tw<span class=\"_ _0\"></span>o years<span class=\"_ _171\"> </span><span class=\"ff15\">2.4<span class=\"_ _9e\"> </span><span class=\"ff16\">1.9<span class=\"_ _9e\"> </span></span>1.4<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _36a\"> </span></span></span>In more than one year (not<span class=\"_ _0\"></span>e 40)<span class=\"_ _2c8\"> </span><span class=\"ff15\">6.3<span class=\"_ _9e\"> </span><span class=\"ff16\">6.8<span class=\"_ _3a\"> </span></span>12.4<span class=\"_ _3a\"> </span><span class=\"ff16\">13.7<span class=\"_ _36a\"> </span></span></span>In less than one year (note 40)<span class=\"_ _26d\"> </span><span class=\"ff15\">2.6<span class=\"_ _d1\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span></span>1.3<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _36a\"> </span></span></span>8.9<span class=\"_ _9e\"> </span><span class=\"ff16\">9.0<span class=\"_ _3a\"> </span></span>13.7<span class=\"_ _3a\"> </span><span class=\"ff16\">15.0<span class=\"_ _36a\"> </span></span><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs8fd\">54. <span class=\"_ _1c\"></span>Leasing arr<span class=\"_ _0\"></span>angements<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9c gs8fe\">(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>As <span class=\"_ _15\"></span>Lessor<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs8ff\">The Group<span class=\"_ _0\"></span>, through its mo<span class=\"_ _0\"></span>tor <span class=\"_ _0\"></span>finance and asset finance businesses, leases assets under<span class=\"_ _0\"></span> both finance and oper<span class=\"_ _0\"></span>ating leases. In respect </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs900\">of certain o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>these assets, the Gr<span class=\"_ _0\"></span>oup also provides maintenance services <span class=\"_ _0\"></span>to the lessee.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs901\">It also leases green mo<span class=\"_ _0\"></span>tor <span class=\"_ _0\"></span>vehicles t<span class=\"_ _0\"></span>o its employees under<span class=\"_ _0\"></span> a salary sacrifice scheme.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs902\">Disclosures in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> these balances are se<span class=\"_ _0\"></span>t out in these financial stat<span class=\"_ _0\"></span>ements as follow<span class=\"_ _0\"></span>s:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs903\">Disclosure<span class=\"_ _2e6\"> </span><span class=\"ff15\">Note<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs904\">Inves<span class=\"_ _0\"></span>tment in finance leases<span class=\"_ _2e7\"> </span><span class=\"ff16\">19<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs905\">Finance income on net inv<span class=\"_ _0\"></span>estment in finance leases<span class=\"_ _22c\"> </span><span class=\"ff16\">4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs906\">Assets leased under opera<span class=\"_ _0\"></span>ting leases<span class=\"_ _2e8\"> </span><span class=\"ff16\">29<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs907\">Operating lease inc<span class=\"_ _0\"></span>ome<span class=\"_ _2e9\"> </span><span class=\"ff16\">6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs908\">The undiscounted futur<span class=\"_ _0\"></span>e minimum lease payments r<span class=\"_ _0\"></span>eceivable by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup under oper<span class=\"_ _0\"></span>ating lease arrangements may<span class=\"_ _0\"></span> be analysed as </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs909\">follow<span class=\"_ _0\"></span>s:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs90a\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs90b\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs90c\">Amounts falling due:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs90d\">Within one year<span class=\"_ _2ea\"> </span><span class=\"ff15\">14.5<span class=\"_ _3a\"> </span><span class=\"ff16\">14.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs90e\">Within one to two year<span class=\"_ _0\"></span>s<span class=\"_ _201\"> </span><span class=\"ff15\">9.3<span class=\"_ _d1\"> </span><span class=\"ff16\">8.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs90f\">Within two to three y<span class=\"_ _0\"></span>ears<span class=\"_ _2eb\"> </span><span class=\"ff15\">5.8<span class=\"_ _9e\"> </span><span class=\"ff16\">5.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs910\">Within three to f<span class=\"_ _0\"></span>our years<span class=\"_ _2ec\"> </span><span class=\"ff15\">3.5<span class=\"_ _9e\"> </span><span class=\"ff16\">3.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs911\">Within four to fiv<span class=\"_ _0\"></span>e years<span class=\"_ _22f\"> </span><span class=\"ff15\">1.6<span class=\"_ _d1\"> </span><span class=\"ff16\">1.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs912\">After more than fiv<span class=\"_ _0\"></span>e years<span class=\"_ _2ed\"> </span><span class=\"ff15\">0.3<span class=\"_ _9e\"> </span><span class=\"ff16\">0.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs913\">35.0<span class=\"_ _3a\"> </span><span class=\"ff16\">34.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9d gs914\">(b)  <span class=\"_ _ce\"> </span>As  Lessee<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs915\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s use of leases as a lessee r<span class=\"_ _0\"></span>elates to <span class=\"_ _0\"></span>the rental o<span class=\"_ _0\"></span>f office buildings and company<span class=\"_ _1\"></span> cars, together<span class=\"_ _0\"></span> with the pr<span class=\"_ _0\"></span>ocurement<span class=\"_ _0\"></span> of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws33 gs916\">vehicles f<span class=\"_ _0\"></span>or leasing <span class=\"_ _0\"></span>to employees under<span class=\"_ _1\"></span> its green car scheme. Under<span class=\"_ _0\"></span> IFRS 16 these have been accounted <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> as right of use assets and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs917\">corresponding lease liabilities.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs918\">The av<span class=\"_ _0\"></span>erage term o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the current building leases fr<span class=\"_ _1\"></span>om inception or acquisition is 8 y<span class=\"_ _0\"></span>ears (2022: 8 y<span class=\"_ _0\"></span>ears) <span class=\"_ _0\"></span>with rents subject <span class=\"_ _0\"></span>to re<span class=\"_ _0\"></span>view </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs919\">ev<span class=\"_ _0\"></span>ery fiv<span class=\"_ _0\"></span>e y<span class=\"_ _0\"></span>ears, while <span class=\"_ _0\"></span>the averag<span class=\"_ _0\"></span>e term of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>vehicle leases is 3 y<span class=\"_ _0\"></span>ears (2022: 3 y<span class=\"_ _0\"></span>ears).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs91a\">The Company\u2019<span class=\"_ _1\"></span>s use of leases as lessee is limit<span class=\"_ _0\"></span>ed to the r<span class=\"_ _0\"></span>ental of<span class=\"_ _0\"></span> an office building fr<span class=\"_ _0\"></span>om a subsidiary entity<span class=\"_ _1\"></span>. The lease t<span class=\"_ _0\"></span>erm from </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs91b\">inception is 15 y<span class=\"_ _0\"></span>ears.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs91c\">Disclosures r<span class=\"_ _0\"></span>elating to <span class=\"_ _0\"></span>these leases are set out in <span class=\"_ _0\"></span>these financial statements as <span class=\"_ _0\"></span>follows:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs91d\">Disclosure<span class=\"_ _2e6\"> </span><span class=\"ff15\">Note<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs91e\">Depreciation on right of use asse<span class=\"_ _0\"></span>ts<span class=\"_ _2c7\"> </span><span class=\"ff16\">29<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs91f\">Inter<span class=\"_ _0\"></span>est expense on lease liabilities<span class=\"_ _2ee\"> </span><span class=\"ff16\">5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs920\">Expense relating t<span class=\"_ _0\"></span>o short-term leases<span class=\"_ _2ef\"> </span><span class=\"ff16\">9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs921\">Additions to right of use assets<span class=\"_ _2f0\"> </span><span class=\"ff16\">29<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs922\">Carrying amount of right of use assets<span class=\"_ _2f1\"> </span><span class=\"ff16\">29<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs923\">Maturity analysis of lease liabilities<span class=\"_ _157\"> </span><span class=\"ff16\">64<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs924\">Salary sacrifice amounts of<span class=\"_ _1\"></span> \u00a30.<span class=\"_ _0\"></span>1m in respect of<span class=\"_ _0\"></span> the gr<span class=\"_ _0\"></span>een car scheme ar<span class=\"_ _0\"></span>e included within operating lease income (<span class=\"_ _0\"></span>note 6). <span class=\"_ _0\"></span>There <span class=\"_ _0\"></span>was </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs925\">no other subleasing o<span class=\"_ _0\"></span>f right of<span class=\"_ _1\"></span> use assets and the total cash <span class=\"_ _0\"></span>flows r<span class=\"_ _0\"></span>elating to leasing as a lessee <span class=\"_ _0\"></span>were \u00a32.3m (2022: \u00a31.<span class=\"_ _0\"></span>9m).</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfLeasesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-434": {
   "value": "7.   Gain on derecognition of financial assets On 8 June 2022 the Group disposed of almost all of its unsecured consumer loan balances, and has no continuing interest in these assets. The carrying value of the loans disposed of was \u00a374.1m and cash consideration of \u00a378.9m was received, resulting in a gain on disposal of \u00a34.6m after allowing for costs arising from the transaction. ",
   "dimensions": {
    "concept": "paragon:DisclosureOfGainOnDerecognitionOfFinancialAssets",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-435": {
   "value": "8. <span class=\"_ _4a\"> </span>Other<span class=\"_ _0\"></span> income<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Loan account f<span class=\"_ _0\"></span>ee income<span class=\"_ _215\"> </span><span class=\"ff15\">4.8<span class=\"_ _9e\"> </span><span class=\"ff16\">6.1<span class=\"_ _36a\"> </span></span></span>Brok<span class=\"_ _0\"></span>er commissions<span class=\"_ _216\"> </span><span class=\"ff15\">2.1<span class=\"_ _9e\"> </span><span class=\"ff16\">2.3<span class=\"_ _36a\"> </span></span></span>Third party servicing<span class=\"_ _1f1\"> </span><span class=\"ff15\">4.3<span class=\"_ _d1\"> </span><span class=\"ff16\">3.5<span class=\"_ _36a\"> </span></span></span>Other income<span class=\"_ _217\"> </span><span class=\"ff15\">0.3<span class=\"_ _9e\"> </span><span class=\"ff16\">0.7<span class=\"_ _36a\"> </span></span></span>11.5<span class=\"_ _3a\"> </span><span class=\"ff16\">12.6<span class=\"_ _36a\"> </span></span>All loan account fee income arises <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>financial assets held at amortised cost.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFeeAndCommissionIncomeExpenseExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-368": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws93 gs104\">9<span class=\"_ _0\"></span>.  <span class=\"_ _af\"> </span>Operating <span class=\"_ _7\"> </span>expenses<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gs105\">Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs106\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs107\">Employment cos<span class=\"_ _0\"></span>ts <span class=\"_ _ea\"> </span><span class=\"ff2c\">57<span class=\"_ _cb\"> </span><span class=\"ff15\">108.3<span class=\"_ _d5\"> </span><span class=\"ff16\">103.6<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs108\">Auditor remuner<span class=\"_ _0\"></span>ation <span class=\"_ _218\"> </span><span class=\"ff2c\">10<span class=\"_ _9b\"> </span><span class=\"ff15\">2.9<span class=\"_ _9e\"> </span><span class=\"ff16\">2.5<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs109\">Amortisation of intangible asse<span class=\"_ _0\"></span>ts <span class=\"_ _219\"> </span><span class=\"ff2c\">30<span class=\"_ _9b\"> </span><span class=\"ff15\">1.8<span class=\"_ _9e\"> </span><span class=\"ff16\">2.0<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs10a\">Depreciation of oper<span class=\"_ _0\"></span>ational assets<span class=\"_ _128\"> </span><span class=\"ff2c\">29<span class=\"_ _a8\"> </span><span class=\"ff15\">3.9<span class=\"_ _d1\"> </span><span class=\"ff16\">3.5<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs10b\">TBMC closure<span class=\"_ _21a\"> </span><span class=\"ff2c\">11<span class=\"_ _9b\"> </span><span class=\"ff15\">2.0<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs10c\">Restructuring c<span class=\"_ _0\"></span>osts<span class=\"_ _21b\"> </span><span class=\"ff15\">2.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs10d\">Other administra<span class=\"_ _0\"></span>tive costs<span class=\"_ _21c\"> </span><span class=\"ff15\">48.9<span class=\"_ _3a\"> </span><span class=\"ff16\">41.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs10e\">170.4<span class=\"_ _d5\"> </span><span class=\"ff16\">153.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10f\">Restructuring costs arise fr<span class=\"_ _0\"></span>om a strategic r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>w of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s operational structures and r<span class=\"_ _0\"></span>esources carried out<span class=\"_ _0\"></span> in the y<span class=\"_ _0\"></span>ear and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs110\">include consultancy<span class=\"_ _0\"></span> costs and redundancy<span class=\"_ _0\"></span>-related expenses. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs111\">The Group incurr<span class=\"_ _0\"></span>ed no costs in respect<span class=\"_ _0\"></span> of short-<span class=\"_ _0\"></span>term operating leases in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> (2022: none).</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherOperatingExpenseExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-369": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs113\">10. <span class=\"_ _d\"> </span>Auditor<span class=\"_ _0\"></span> remuneration<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs114\">The analysis of<span class=\"_ _1\"></span> fees payable <span class=\"_ _0\"></span>to the Company\u2019<span class=\"_ _2\"></span>s auditors (KPMG LLP) and their associates, e<span class=\"_ _0\"></span>xcluding irr<span class=\"_ _0\"></span>ecoverable <span class=\"_ _1\"></span>VA<span class=\"_ _1\"></span>T<span class=\"_ _1\"></span>, required b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs115\">Companies (Disclosure of<span class=\"_ _0\"></span> <span class=\"_ _0\"></span>Auditor R<span class=\"_ _0\"></span>emuneration and Liability Limitation <span class=\"_ _1\"></span>Agreements) Regulations 2008 is set<span class=\"_ _0\"></span> out below<span class=\"_ _0\"></span>. </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs116\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs117\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs118\">Audit fee of the compan<span class=\"_ _0\"></span>y<span class=\"_ _1e4\"> </span>0.7<span class=\"_ _d1\"> </span><span class=\"ff16\">0.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs119\">Other services<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs11a\">Audit of subsidiary undertakings pursuan<span class=\"_ _0\"></span>t to legislation<span class=\"_ _1b2\"> </span><span class=\"ff15\">1.5<span class=\"_ _d1\"> </span><span class=\"ff16\">1.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs11b\">T<span class=\"_ _2\"></span>otal audit fees<span class=\"_ _21d\"> </span><span class=\"ff15\">2.2<span class=\"_ _9e\"> </span><span class=\"ff16\">1.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs11c\">Audit relat<span class=\"_ _0\"></span>ed assurance services</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs11d\"> <span class=\"_ _c0\"> </span>Interim review<span class=\"_ _21e\"> </span><span class=\"ff15\">0.2<span class=\"_ _9e\"> </span><span class=\"ff16\">0.2</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs11e\"> <span class=\"_ _c0\"> </span>Other<span class=\"_ _21f\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs11f\">T<span class=\"_ _2\"></span>otal fees<span class=\"_ _220\"> </span><span class=\"ff15\">2.4<span class=\"_ _9e\"> </span><span class=\"ff16\">2.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs120\">Irrecov<span class=\"_ _0\"></span>erable V<span class=\"_ _1\"></span>A<span class=\"_ _1\"></span>T<span class=\"_ _1ef\"> </span><span class=\"ff15\">0.5<span class=\"_ _d1\"> </span><span class=\"ff16\">0.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs121\">T<span class=\"_ _2\"></span>otal cost to the Group (not<span class=\"_ _0\"></span>e 9)<span class=\"_ _221\"> </span><span class=\"ff15\">2.9<span class=\"_ _9e\"> </span><span class=\"ff16\">2.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs122\">F<span class=\"_ _1\"></span>ees paid to the auditors and <span class=\"_ _0\"></span>their associates <span class=\"_ _0\"></span>for non-<span class=\"_ _0\"></span>audit services to <span class=\"_ _0\"></span>the Company ar<span class=\"_ _0\"></span>e not disclosed because <span class=\"_ _0\"></span>the consolidated </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs123\">accounts of <span class=\"_ _0\"></span>the Group ar<span class=\"_ _0\"></span>e requir<span class=\"_ _0\"></span>ed to disclose such <span class=\"_ _0\"></span>fees on a consolidated basis.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAuditorsRemunerationExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-370": {
   "value": "11.  TBMC closure During the year, after a review of strategic priorities, the Group announced the closure of its TBMC mortgage brokerage business, which it considered to be non-core. As a result of this decision the remaining goodwill balance of the TBMC CGU and the other intangible assets relating to the business have been derecognised. The total amount expensed to the profit and loss account on the closure is set out below. Note 2023 \u00a3m Goodwill derecognised 30 1.6 Intangible assets derecognised 29 0.2 Other closure costs 0.2 Total closure costs 9 2.0 The contribution to profit of the closed business in the year, which was included in the Mortgage Lending segment, was a loss of \u00a30.5m excluding the costs shown above (2022: loss of \u00a30.8m).",
   "dimensions": {
    "concept": "paragon:DisclosureOfTBMCClosure",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-371": {
   "value": "12.  Loan impairments \u2013 provisions charged / credited to income The amounts charged / (credited) to the profit and loss account in the year are analysed as follows. Mortgage Lending Commercial Lending Total \u00a3m \u00a3m \u00a3m 30 September 2023 Provided in period (note 23) 10.8 8.3 19.1 Recovery of written off amounts (0.4) (0.7) (1.1) 10.4 7.6 18.0 Of which Loan accounts 10.4 10.5 20.9 Finance leases - (2.9) (2.9) 10.4 7.6 18.0 30 September 2022 Provided in period (note 23) 5.1 10.7 15.8 Recovery of written off amounts (0.5) (1.3) (1.8) 4.6 9.4 14.0 Of which Loan accounts 4.6 2.4 7.0 Finance leases - 7.0 7.0 4.6 9.4 14.0",
   "dimensions": {
    "concept": "paragon:DisclosureOfLoansImpairmentsProvisionsChargedCreditedToIncome",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-501": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs13e\">13. <span class=\"_ _b3\"> </span>F<span class=\"_ _0\"></span>air<span class=\"_ _0\"></span> v<span class=\"_ _1\"></span>alue net (losses) / gains<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs13f\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs140\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs141\">Ineff<span class=\"_ _0\"></span>ectiveness of fair v<span class=\"_ _0\"></span>alue hedges (note 26)</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs142\"> <span class=\"_ _c0\"> </span>Portfolio hedges of int<span class=\"_ _0\"></span>erest r<span class=\"_ _0\"></span>ate risk</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs143\"> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Deposit hedge<span class=\"_ _22a\"> </span><span class=\"ff15\">7.8<span class=\"_ _3a\"> </span><span class=\"ff16\">11.6</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs144\"> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Loan hedge<span class=\"_ _22b\"> </span><span class=\"ff15\">(23.7)<span class=\"_ _12c\"> </span><span class=\"ff16\">15.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs145\">(15.9)<span class=\"_ _12c\"> </span><span class=\"ff16\">26.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs146\">Individual hedges of inter<span class=\"_ _0\"></span>est ra<span class=\"_ _0\"></span>te risk<span class=\"_ _169\"> </span><span class=\"ff15\">-<span class=\"_ _209\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs147\">(15.9)<span class=\"_ _12c\"> </span><span class=\"ff16\">26.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs148\">Other hedging movements<span class=\"_ _22c\"> </span><span class=\"ff15\">(53.5)<span class=\"_ _72\"> </span><span class=\"ff16\">4.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs149\">Net gains / (losses) on other deriv<span class=\"_ _0\"></span>atives<span class=\"_ _ea\"> </span><span class=\"ff15\">(8.3)<span class=\"_ _12b\"> </span><span class=\"ff16\">160.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs14a\">(77.7)<span class=\"_ _133\"> </span><span class=\"ff16\">191.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs14b\">The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue net gain / (loss<span class=\"_ _0\"></span>) repr<span class=\"_ _0\"></span>esents the accounting <span class=\"_ _0\"></span>volatility on deriv<span class=\"_ _0\"></span>ative instruments <span class=\"_ _0\"></span>which are matching risk e<span class=\"_ _0\"></span>xposures on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs14c\">an economic basis, generated b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the requir<span class=\"_ _0\"></span>ements of IA<span class=\"_ _0\"></span>S 39. Some accounting <span class=\"_ _0\"></span>volatility<span class=\"_ _0\"></span> arises on these items due t<span class=\"_ _0\"></span>o accounting </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs14d\">ineffectiveness on designat<span class=\"_ _0\"></span>ed hedges, or because hedg<span class=\"_ _0\"></span>e accounting has not been adopted or<span class=\"_ _0\"></span> is not achiev<span class=\"_ _0\"></span>able on certain items. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs14e\">The losses and gains ar<span class=\"_ _0\"></span>e primarily due <span class=\"_ _0\"></span>to timing differ<span class=\"_ _0\"></span>ences in income recognition betw<span class=\"_ _0\"></span>een the derivativ<span class=\"_ _0\"></span>e instruments and the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs14f\">economically hedg<span class=\"_ _0\"></span>ed assets and liabilities. Such differences <span class=\"_ _0\"></span>will re<span class=\"_ _0\"></span>verse o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>time and have no impact<span class=\"_ _0\"></span> on the cash flo<span class=\"_ _0\"></span>ws of<span class=\"_ _0\"></span> the Group<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs150\">The impact of<span class=\"_ _0\"></span> hedging arrangements on <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s balance sheet is summarised in note 26 which also pr<span class=\"_ _0\"></span>ovides a full descrip<span class=\"_ _0\"></span>tion of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs151\">the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s use of deriv<span class=\"_ _0\"></span>ative financial instruments <span class=\"_ _0\"></span>for hedging purposes.<span class=\"_ _36a\"> </span></div>71. <span class=\"_ _18\"> </span>Financial asse<span class=\"_ _0\"></span>ts and financial liabilities<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s financial assets and financial liabilities ar<span class=\"_ _0\"></span>e v<span class=\"_ _0\"></span>alued on one of<span class=\"_ _0\"></span> two bases, defined b<span class=\"_ _0\"></span>y IFRS 9:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Financial assets and liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue through pr<span class=\"_ _0\"></span>ofit and loss (\u2018FVTPL<span class=\"_ _2f\"></span>\u2019)<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Financial assets and liabilities carried at amortised cost<span class=\"_ _36a\"> </span>IFRS 7 \u2013 \u2018Financial Instruments: Disclosures\u2019 r<span class=\"_ _0\"></span>equires <span class=\"_ _0\"></span>that wher<span class=\"_ _0\"></span>e assets are measur<span class=\"_ _0\"></span>ed at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue these measur<span class=\"_ _0\"></span>ements should be classified using the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value hierar<span class=\"_ _0\"></span>chy se<span class=\"_ _0\"></span>t out in IFRS 13 \u2013 \u2018F<span class=\"_ _0\"></span>air <span class=\"_ _1\"></span>Value Measur<span class=\"_ _0\"></span>ement\u2019<span class=\"_ _2\"></span>. This hier<span class=\"_ _0\"></span>archy<span class=\"_ _0\"></span> reflects <span class=\"_ _0\"></span>the inputs used and defines three lev<span class=\"_ _0\"></span>els:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 1 measurements ar<span class=\"_ _0\"></span>e unadjusted market prices \u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 2 measurements ar<span class=\"_ _0\"></span>e derived fr<span class=\"_ _0\"></span>om directly<span class=\"_ _0\"></span> or indir<span class=\"_ _0\"></span>ectly observ<span class=\"_ _0\"></span>able data, such as market prices or<span class=\"_ _1\"></span> rates \u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 3 measurements r<span class=\"_ _0\"></span>ely on significant inputs <span class=\"_ _0\"></span>which are not deriv<span class=\"_ _0\"></span>ed fr<span class=\"_ _0\"></span>om observable data As quoted prices ar<span class=\"_ _0\"></span>e not available <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> level 2 and 3 measur<span class=\"_ _0\"></span>ements, the <span class=\"_ _0\"></span>valuation is derived <span class=\"_ _0\"></span>from cash <span class=\"_ _0\"></span>flow models based, <span class=\"_ _0\"></span>where possible, on independently sour<span class=\"_ _0\"></span>ced parameters. <span class=\"_ _0\"></span>The accurac<span class=\"_ _0\"></span>y of<span class=\"_ _0\"></span> the calculation <span class=\"_ _0\"></span>would ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e be affected by<span class=\"_ _0\"></span> unexpected mark<span class=\"_ _0\"></span>et movements or<span class=\"_ _1\"></span> other v<span class=\"_ _0\"></span>ariances in the operation of<span class=\"_ _1\"></span> the models or the assump<span class=\"_ _0\"></span>tions used.<span class=\"_ _36a\"> </span>The Group had no <span class=\"_ _0\"></span>financial assets or liabilities in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear ended 30 Sept<span class=\"_ _0\"></span>ember 2023 or<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year ended 30 Sep<span class=\"_ _0\"></span>tember 2022 carried at fair <span class=\"_ _0\"></span>value and <span class=\"_ _0\"></span>valued using le<span class=\"_ _0\"></span>vel 3 measur<span class=\"_ _0\"></span>ements, other <span class=\"_ _0\"></span>than contingent consideration amounts (no<span class=\"_ _0\"></span>te 41).<span class=\"_ _36a\"> </span>The Group has no<span class=\"_ _0\"></span>t reclassified any<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> its measurements during <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>The methods by<span class=\"_ _0\"></span> which <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value is established <span class=\"_ _0\"></span>for each class o<span class=\"_ _0\"></span>f financial assets and liabilities ar<span class=\"_ _1\"></span>e set out below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>(a<span class=\"_ _0\"></span>) <span class=\"_ _1\"></span> <span class=\"_ _45\"> </span>Assets and liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span>The f<span class=\"_ _0\"></span>ollowing table summarises <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s financial assets and liabilities which ar<span class=\"_ _0\"></span>e carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Financial assets<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial assets<span class=\"_ _325\"> </span><span class=\"ff2c\">26<span class=\"_ _c8\"> </span><span class=\"ff15\">615.4<span class=\"_ _150\"> </span><span class=\"ff16\">779.0<span class=\"_ _36a\"> </span></span></span></span>615.4<span class=\"_ _d5\"> </span><span class=\"ff16\">779.0<span class=\"_ _36a\"> </span></span>Financial liabilities<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial liabilities<span class=\"_ _251\"> </span><span class=\"ff2c\">26<span class=\"_ _d1\"> </span><span class=\"ff15\">39.9<span class=\"_ _d5\"> </span><span class=\"ff16\">102.1<span class=\"_ _36a\"> </span></span></span></span>Contingent c<span class=\"_ _0\"></span>onsideration<span class=\"_ _1cc\"> </span><span class=\"ff2c\">41<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _36a\"> </span></span></span></span>39.9<span class=\"_ _d5\"> </span><span class=\"ff16\">104.3<span class=\"_ _36a\"> </span></span>All of <span class=\"_ _0\"></span>these financial assets and <span class=\"_ _0\"></span>financial liabilities are r<span class=\"_ _0\"></span>equired t<span class=\"_ _0\"></span>o be carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue by IFRS 9<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>The Company<span class=\"_ _0\"></span> has no financial assets or<span class=\"_ _0\"></span> liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial assets and liabilities<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial instruments are stated at<span class=\"_ _0\"></span> their<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> values in <span class=\"_ _0\"></span>the accounts. T<span class=\"_ _0\"></span>he Group uses a number<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>techniques to det<span class=\"_ _0\"></span>ermine the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of its deriv<span class=\"_ _0\"></span>ative assets and liabilities, <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>which observable prices in activ<span class=\"_ _0\"></span>e markets ar<span class=\"_ _0\"></span>e not av<span class=\"_ _0\"></span>ailable. These ar<span class=\"_ _0\"></span>e principally present <span class=\"_ _0\"></span>value calculations based on estimated <span class=\"_ _0\"></span>future cash <span class=\"_ _0\"></span>flows arising fr<span class=\"_ _0\"></span>om the instruments, discounted using a mark<span class=\"_ _0\"></span>et inter<span class=\"_ _0\"></span>est rate, adjusted for<span class=\"_ _1\"></span> risk as appropriate. <span class=\"_ _0\"></span>The principal inputs to <span class=\"_ _0\"></span>these valuation models ar<span class=\"_ _1\"></span>e SON<span class=\"_ _15\"></span>IA sterling benchmark int<span class=\"_ _0\"></span>erest rates.<span class=\"_ _36a\"> </span>In order<span class=\"_ _0\"></span> to det<span class=\"_ _0\"></span>ermine the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues, the management<span class=\"_ _0\"></span> applies valuation adjustments <span class=\"_ _0\"></span>to observed data <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>that data would no<span class=\"_ _0\"></span>t fully r<span class=\"_ _0\"></span>eflect the attribut<span class=\"_ _0\"></span>es of <span class=\"_ _0\"></span>the instrument being v<span class=\"_ _0\"></span>alued, such as particular contractual <span class=\"_ _0\"></span>features or<span class=\"_ _0\"></span> the identity<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the counterparty<span class=\"_ _1\"></span>. The management r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>ws the models used on an ong<span class=\"_ _0\"></span>oing basis to ensur<span class=\"_ _0\"></span>e that the <span class=\"_ _1\"></span>valuations produced are r<span class=\"_ _0\"></span>easonable and re<span class=\"_ _0\"></span>flect all rele<span class=\"_ _0\"></span>vant <span class=\"_ _0\"></span>factors. T<span class=\"_ _0\"></span>hese v<span class=\"_ _0\"></span>aluations are based on mark<span class=\"_ _0\"></span>et information, and the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e classified as level 2 measur<span class=\"_ _0\"></span>ements. Details of <span class=\"_ _0\"></span>these assets are giv<span class=\"_ _0\"></span>en in note 26.<span class=\"_ _36a\"> </span>Contingent considera<span class=\"_ _0\"></span>tion<span class=\"_ _36a\"> </span>The v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> the contingent consideration balances sho<span class=\"_ _0\"></span>wn in note 41 ar<span class=\"_ _0\"></span>e requir<span class=\"_ _0\"></span>ed to be stated at <span class=\"_ _0\"></span>fair <span class=\"_ _1\"></span>value in the accounts. T<span class=\"_ _0\"></span>hese amounts are <span class=\"_ _0\"></span>valued based on <span class=\"_ _0\"></span>the expected outcomes of<span class=\"_ _0\"></span> the performance <span class=\"_ _0\"></span>tests set out in <span class=\"_ _0\"></span>the respective sale and pur<span class=\"_ _0\"></span>chase agreements, discounted as appr<span class=\"_ _0\"></span>opriate. <span class=\"_ _0\"></span>The most significant inputs t<span class=\"_ _0\"></span>o these v<span class=\"_ _0\"></span>aluations are <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s forecasts on <span class=\"_ _0\"></span>future activity<span class=\"_ _0\"></span> relating <span class=\"_ _0\"></span>to business generated b<span class=\"_ _0\"></span>y operational units acquir<span class=\"_ _0\"></span>ed, business derived as a r<span class=\"_ _0\"></span>esult of <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>endor\u2019<span class=\"_ _1\"></span>s contacts or other g<span class=\"_ _0\"></span>oodwill and any<span class=\"_ _0\"></span> other ne<span class=\"_ _0\"></span>w business flo<span class=\"_ _0\"></span>ws which ar<span class=\"_ _0\"></span>e or might<span class=\"_ _0\"></span> be attributable to the acquisition agr<span class=\"_ _0\"></span>eement, which ar<span class=\"_ _0\"></span>e drawn fr<span class=\"_ _0\"></span>om the o<span class=\"_ _0\"></span>verall Group <span class=\"_ _0\"></span>forecasting model. <span class=\"_ _1\"></span>As such, these are classified as unobservable inputs and <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>aluations classified as level 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Assets and liabilities carried at amortised cost<span class=\"_ _36a\"> </span>The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues for<span class=\"_ _1\"></span> financial assets and financial liabilities held at amortised cost, determined in accor<span class=\"_ _0\"></span>dance with the me<span class=\"_ _0\"></span>thodologies set out below<span class=\"_ _0\"></span> are summarised belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2022<span class=\"_ _36a\"> </span></span></span>Carrying amount<span class=\"_ _3f\"> </span>Fair value<span class=\"_ _c2\"> </span><span class=\"ff17\">Carrying amount<span class=\"_ _73\"> </span>Fair v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>The Group<span class=\"_ _36a\"> </span>Financial assets<span class=\"_ _36a\"> </span>Cash<span class=\"_ _1b1\"> </span><span class=\"ff2c\">17<span class=\"_ _133\"> </span><span class=\"ff15\">2,994.3<span class=\"_ _86\"> </span>2,994.3<span class=\"_ _12a\"> </span><span class=\"ff16\">1,930.9<span class=\"_ _86\"> </span>1,930.9<span class=\"_ _36a\"> </span></span></span></span>Loans to customer<span class=\"_ _0\"></span>s<span class=\"_ _2b4\"> </span><span class=\"ff2c\">18<span class=\"_ _12a\"> </span><span class=\"ff15\">14,874.3<span class=\"_ _42\"> </span>14,524.0<span class=\"_ _42\"> </span><span class=\"ff16\">14,210.3<span class=\"_ _67\"> </span>13,898.4<span class=\"_ _36a\"> </span></span></span></span>Sundry financial assets<span class=\"_ _144\"> </span><span class=\"ff2c\">27<span class=\"_ _d1\"> </span><span class=\"ff15\">46.0<span class=\"_ _3a\"> </span>46.0<span class=\"_ _3a\"> </span><span class=\"ff16\">35.4<span class=\"_ _3a\"> </span>35.4<span class=\"_ _36a\"> </span></span></span></span>17,914.6<span class=\"_ _42\"> </span>17,564.3<span class=\"_ _42\"> </span><span class=\"ff16\">16,176.6<span class=\"_ _67\"> </span>15,864.7<span class=\"_ _36a\"> </span></span>Financial liabilities<span class=\"_ _36a\"> </span>Short-t<span class=\"_ _0\"></span>erm bank borrowings<span class=\"_ _2f9\"> </span><span class=\"ff15\">0.2<span class=\"_ _d1\"> </span>0.2<span class=\"_ _9e\"> </span><span class=\"ff16\">0.4<span class=\"_ _9e\"> </span>0.4<span class=\"_ _36a\"> </span></span></span>Asset back<span class=\"_ _0\"></span>ed loan notes <span class=\"_ _83\"> </span><span class=\"ff15\">28.0<span class=\"_ _cb\"> </span>28.0<span class=\"_ _150\"> </span><span class=\"ff16\">409.3<span class=\"_ _150\"> </span>409.3<span class=\"_ _36a\"> </span></span></span>Secured bank borro<span class=\"_ _0\"></span>wings<span class=\"_ _167\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _3a\"> </span><span class=\"ff16\">586.0<span class=\"_ _d5\"> </span>586.0<span class=\"_ _36a\"> </span></span></span>Ret<span class=\"_ _0\"></span>ail deposits<span class=\"_ _356\"> </span><span class=\"ff2c\">33<span class=\"_ _70\"> </span><span class=\"ff15\">13,265.3<span class=\"_ _42\"> </span>13,177.3<span class=\"_ _42\"> </span><span class=\"ff16\">10,669.2<span class=\"_ _67\"> </span>10,592.9<span class=\"_ _36a\"> </span></span></span></span>Corporat<span class=\"_ _0\"></span>e and retail bonds<span class=\"_ _2ff\"> </span><span class=\"ff15\">258.2<span class=\"_ _d5\"> </span>234.8<span class=\"_ _150\"> </span><span class=\"ff16\">261.5<span class=\"_ _150\"> </span>254.4<span class=\"_ _36a\"> </span></span></span>Sale and repurchase agr<span class=\"_ _0\"></span>eements<span class=\"_ _1a7\"> </span><span class=\"ff2c\">39<span class=\"_ _d1\"> </span><span class=\"ff15\">50.0<span class=\"_ _3a\"> </span>50.0<span class=\"_ _a8\"> </span></span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>Other financial liabilities<span class=\"_ _260\"> </span><span class=\"ff2c\">40<span class=\"_ _cb\"> </span><span class=\"ff15\">608.8<span class=\"_ _d5\"> </span>608.8<span class=\"_ _150\"> </span><span class=\"ff16\">491.2<span class=\"_ _d5\"> </span>491.2<span class=\"_ _36a\"> </span></span></span></span>14,210.5<span class=\"_ _42\"> </span>14,099.1<span class=\"_ _42\"> </span><span class=\"ff16\">12,417.6<span class=\"_ _67\"> </span>12,334.2<span class=\"_ _36a\"> </span></span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2022<span class=\"_ _36a\"> </span></span></span>Carrying amount<span class=\"_ _3f\"> </span>Fair value<span class=\"_ _c2\"> </span><span class=\"ff17\">Carrying amount<span class=\"_ _73\"> </span>Fair v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>The Company<span class=\"_ _36a\"> </span>Financial assets<span class=\"_ _36a\"> </span>Cash<span class=\"_ _1b1\"> </span><span class=\"ff2c\">17<span class=\"_ _40\"> </span><span class=\"ff15\">27.6<span class=\"_ _3a\"> </span>27.6<span class=\"_ _3a\"> </span><span class=\"ff16\">19.7<span class=\"_ _f7\"> </span>19.7<span class=\"_ _36a\"> </span></span></span></span>Intra-gr<span class=\"_ _0\"></span>oup cash deposits<span class=\"_ _153\"> </span><span class=\"ff2c\">27<span class=\"_ _cb\"> </span><span class=\"ff15\">193.6<span class=\"_ _d5\"> </span>193.6<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _36a\"> </span>Amounts owed to gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _76\"> </span><span class=\"ff2c\">27<span class=\"_ _40\"> </span><span class=\"ff15\">35.1<span class=\"_ _3a\"> </span>35.1<span class=\"_ _3a\"> </span><span class=\"ff16\">39.1<span class=\"_ _f7\"> </span>39.1<span class=\"_ _36a\"> </span></span></span></span>Sundry financial assets<span class=\"_ _144\"> </span><span class=\"ff2c\">27<span class=\"_ _a8\"> </span><span class=\"ff15\">0.1<span class=\"_ _d1\"> </span>0.1<span class=\"_ _9e\"> </span><span class=\"ff16\">0.1<span class=\"_ _9e\"> </span>0.1<span class=\"_ _36a\"> </span></span></span></span>256.4<span class=\"_ _d5\"> </span>256.4<span class=\"_ _3a\"> </span><span class=\"ff16\">58.9<span class=\"_ _3a\"> </span>58.9<span class=\"_ _36a\"> </span></span>Financial liabilities<span class=\"_ _36a\"> </span>Corporat<span class=\"_ _0\"></span>e and retail bonds<span class=\"_ _2ff\"> </span><span class=\"ff15\">261.8<span class=\"_ _d5\"> </span>234.8<span class=\"_ _150\"> </span><span class=\"ff16\">261.5<span class=\"_ _150\"> </span>254.4<span class=\"_ _36a\"> </span></span></span>Amounts owed by gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _4d\"> </span><span class=\"ff2c\">40<span class=\"_ _40\"> </span><span class=\"ff15\">24.0<span class=\"_ _3a\"> </span>24.0<span class=\"_ _3a\"> </span><span class=\"ff16\">23.2<span class=\"_ _f7\"> </span>23.2<span class=\"_ _36a\"> </span></span></span></span>Other financial liabilities<span class=\"_ _260\"> </span><span class=\"ff2c\">40<span class=\"_ _a8\"> </span><span class=\"ff15\">0.7<span class=\"_ _d1\"> </span>0.7<span class=\"_ _3a\"> </span><span class=\"ff16\">12.9<span class=\"_ _f7\"> </span>12.9<span class=\"_ _36a\"> </span></span></span></span>286.5<span class=\"_ _d5\"> </span>259.5<span class=\"_ _150\"> </span><span class=\"ff16\">297.6<span class=\"_ _d5\"> </span>290.5<span class=\"_ _36a\"> </span></span>The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of<span class=\"_ _0\"></span> retail deposits and corporate and r<span class=\"_ _0\"></span>etail bonds shown abo<span class=\"_ _0\"></span>ve will include amounts <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the relat<span class=\"_ _0\"></span>ed accrued interest.<span class=\"_ _36a\"> </span>Cash, sale and repurchase agr<span class=\"_ _0\"></span>eements, bank loans and securitisation borro<span class=\"_ _0\"></span>wings<span class=\"_ _36a\"> </span>The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of<span class=\"_ _0\"></span> cash and cash equivalents, sale and repur<span class=\"_ _0\"></span>chase agreements, bank<span class=\"_ _0\"></span> loans and over<span class=\"_ _0\"></span>drafts and asset back<span class=\"_ _0\"></span>ed loan notes, which ar<span class=\"_ _0\"></span>e carried at amortised cost ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be not materially<span class=\"_ _0\"></span> different <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>their book <span class=\"_ _0\"></span>values. In arriving at <span class=\"_ _0\"></span>that conclusion market inputs ha<span class=\"_ _0\"></span>ve been consider<span class=\"_ _0\"></span>ed but because all the assets and <span class=\"_ _0\"></span>the sale and repur<span class=\"_ _0\"></span>chase agreements matur<span class=\"_ _0\"></span>e within three months of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end and the inter<span class=\"_ _0\"></span>est rates charg<span class=\"_ _0\"></span>ed on financial liabilities rese<span class=\"_ _0\"></span>t to mark<span class=\"_ _0\"></span>et rates on a quarterly<span class=\"_ _0\"></span> basis, little differ<span class=\"_ _0\"></span>ence arises. This also applies <span class=\"_ _0\"></span>to the par<span class=\"_ _0\"></span>ent company\u2019<span class=\"_ _1\"></span>s loans to its subsidiaries. While the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s asset backed loan notes ar<span class=\"_ _0\"></span>e listed, the quoted prices <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> an individual note may<span class=\"_ _0\"></span> not be indicative of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the issue as a whole, due <span class=\"_ _0\"></span>to the specialised natur<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the market in such instruments and <span class=\"_ _0\"></span>the limited number o<span class=\"_ _0\"></span>f inv<span class=\"_ _0\"></span>estors participating in it. As these <span class=\"_ _0\"></span>valuation ex<span class=\"_ _0\"></span>ercises ar<span class=\"_ _0\"></span>e not wholly<span class=\"_ _0\"></span> market<span class=\"_ _0\"></span> based, they<span class=\"_ _0\"></span> are consider<span class=\"_ _0\"></span>ed to be le<span class=\"_ _0\"></span>vel 2 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>L<span class=\"_ _0\"></span>oans to customers<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>o assess the likely<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s loan assets in the absence of<span class=\"_ _0\"></span> a liquid market, <span class=\"_ _0\"></span>the directors ha<span class=\"_ _0\"></span>ve considered <span class=\"_ _0\"></span>the estimated cash flow<span class=\"_ _0\"></span>s expected to arise <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s investments in its loans to cust<span class=\"_ _0\"></span>omers based on a mixture of<span class=\"_ _0\"></span> market<span class=\"_ _0\"></span> based inputs, such as rates and pricing and non-mark<span class=\"_ _0\"></span>et based inputs such as redemption r<span class=\"_ _0\"></span>ates. Given the mixtur<span class=\"_ _1\"></span>e of observable and non-observ<span class=\"_ _0\"></span>able inputs these ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be level 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>Corporate debt<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s retail and corporat<span class=\"_ _0\"></span>e bonds are listed on <span class=\"_ _0\"></span>the London Stock Ex<span class=\"_ _0\"></span>change and <span class=\"_ _0\"></span>there is pr<span class=\"_ _0\"></span>esently a r<span class=\"_ _0\"></span>easonably liquid mark<span class=\"_ _0\"></span>et in the instruments. It is <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore appr<span class=\"_ _0\"></span>opriate to consider<span class=\"_ _0\"></span> that <span class=\"_ _0\"></span>the market price of<span class=\"_ _1\"></span> these borrowings constitutes a <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value. <span class=\"_ _0\"></span>As this valuation is based on a mark<span class=\"_ _0\"></span>et price, it is consider<span class=\"_ _0\"></span>ed to be a lev<span class=\"_ _0\"></span>el 1 measurement.<span class=\"_ _36a\"> </span>Retail deposits<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>o assess the likely<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s retail deposit liabilities, <span class=\"_ _0\"></span>the directors ha<span class=\"_ _0\"></span>ve considered <span class=\"_ _0\"></span>the estimated cash flow<span class=\"_ _0\"></span>s expected to arise based on a mixture o<span class=\"_ _0\"></span>f mark<span class=\"_ _0\"></span>et based inputs, such as rates and pricing and non-mark<span class=\"_ _0\"></span>et based inputs such as withdra<span class=\"_ _0\"></span>wal rates. Given <span class=\"_ _0\"></span>the mixture of<span class=\"_ _0\"></span> observable and non-observ<span class=\"_ _0\"></span>able inputs, these are consider<span class=\"_ _0\"></span>ed to be le<span class=\"_ _0\"></span>vel 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>Sundry assets and liabilities<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>air v<span class=\"_ _0\"></span>alues of <span class=\"_ _0\"></span>financial assets and liabilities disclosed as sundry assets and sundry<span class=\"_ _0\"></span> liabilities are no<span class=\"_ _0\"></span>t considered <span class=\"_ _0\"></span>to be materially differ<span class=\"_ _0\"></span>ent to their carrying values.<span class=\"_ _36a\"> </span>These assets and liabilities ar<span class=\"_ _0\"></span>e of r<span class=\"_ _0\"></span>elatively<span class=\"_ _0\"></span> low <span class=\"_ _0\"></span>value and may<span class=\"_ _0\"></span> be settled at <span class=\"_ _0\"></span>their carrying <span class=\"_ _0\"></span>value at <span class=\"_ _0\"></span>the balance sheet date or  shortly ther<span class=\"_ _0\"></span>eafter<span class=\"_ _1\"></span>.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFairValueOfFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-372": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs153\">14. <span class=\"_ _b3\"> </span>T<span class=\"_ _2\"></span>ax charg<span class=\"_ _0\"></span>e on profit on or<span class=\"_ _0\"></span>dinary activities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs154\">(a<span class=\"_ _0\"></span>) <span class=\"_ _1\"></span> <span class=\"_ _45\"> </span>Analysis of<span class=\"_ _0\"></span> charge in the <span class=\"_ _0\"></span>year<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs155\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs156\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs157\">Current ta<span class=\"_ _0\"></span>x<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs158\">UK Corporation T<span class=\"_ _2\"></span>ax on profits of the period<span class=\"_ _1f3\"> </span><span class=\"ff15\">73.6<span class=\"_ _3a\"> </span><span class=\"ff16\">50.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs159\">Adjustment in r<span class=\"_ _0\"></span>espect of prior periods<span class=\"_ _22d\"> </span><span class=\"ff15\">(1.1)<span class=\"_ _72\"> </span><span class=\"ff16\">0.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs15a\">T<span class=\"_ _2\"></span>otal current tax <span class=\"_ _22e\"> </span><span class=\"ff15\">72.5<span class=\"_ _3a\"> </span><span class=\"ff16\">50.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs15b\">Def<span class=\"_ _0\"></span>erred tax (not<span class=\"_ _0\"></span>e 44)<span class=\"_ _22f\"> </span><span class=\"ff15\">(26.5)<span class=\"_ _12c\"> </span><span class=\"ff16\">53.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs15c\">T<span class=\"_ _1\"></span>ax charge on pr<span class=\"_ _0\"></span>ofit on ordinary activities<span class=\"_ _230\"> </span><span class=\"ff15\">46.0<span class=\"_ _d5\"> </span><span class=\"ff16\">104.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs15d\">The standard r<span class=\"_ _0\"></span>ate of corpor<span class=\"_ _0\"></span>ation tax in the UK<span class=\"_ _0\"></span> applicable to <span class=\"_ _0\"></span>the Group in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>as 22.0% (2022 : 19<span class=\"_ _0\"></span>.0%), based on legislation </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs15e\">enacted at the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end. During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2021, <span class=\"_ _0\"></span>the UK Gov<span class=\"_ _0\"></span>ernment enacted legislation incr<span class=\"_ _0\"></span>easing the standard </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs15f\">rate of<span class=\"_ _0\"></span> corporation tax in <span class=\"_ _0\"></span>the UK fr<span class=\"_ _0\"></span>om 19.<span class=\"_ _0\"></span>0% to 25.<span class=\"_ _0\"></span>0% fr<span class=\"_ _0\"></span>om April 2023. Consequently<span class=\"_ _1\"></span>, the current<span class=\"_ _0\"></span> year<span class=\"_ _1\"></span> falls partly in the period during </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs160\">which the 19<span class=\"_ _0\"></span>.0% rat<span class=\"_ _0\"></span>e applies and partly in <span class=\"_ _0\"></span>that wher<span class=\"_ _0\"></span>e the rate is 25.<span class=\"_ _0\"></span>0%. These measur<span class=\"_ _0\"></span>es will incr<span class=\"_ _0\"></span>ease the standar<span class=\"_ _0\"></span>d rate of<span class=\"_ _0\"></span> corporation </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs161\">tax applicable to <span class=\"_ _0\"></span>the Group <span class=\"_ _0\"></span>to 25.0% in <span class=\"_ _0\"></span>the year<span class=\"_ _0\"></span> ending 30 September<span class=\"_ _0\"></span> 2024 and ther<span class=\"_ _0\"></span>eafter<span class=\"_ _1\"></span>. The effect<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>these changes on deferr<span class=\"_ _0\"></span>ed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs162\">tax balances w<span class=\"_ _0\"></span>as accounted for<span class=\"_ _0\"></span> in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2021.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs163\">The Bank Corporation <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>ax Surcharge subjects an<span class=\"_ _0\"></span>y taxable pr<span class=\"_ _1\"></span>ofits arising in the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s banking subsidiary, P<span class=\"_ _0\"></span>aragon Bank PL<span class=\"_ _1\"></span>C  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs164\">(and no other<span class=\"_ _0\"></span> Group entity<span class=\"_ _1\"></span>), to an additional rate of<span class=\"_ _0\"></span> tax to <span class=\"_ _0\"></span>the extent <span class=\"_ _0\"></span>these profits ex<span class=\"_ _0\"></span>ceed a thr<span class=\"_ _0\"></span>eshold. T<span class=\"_ _0\"></span>he effect of<span class=\"_ _0\"></span> the sur<span class=\"_ _0\"></span>charge </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs165\">shown in note (b<span class=\"_ _1\"></span>) below.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs166\">In the financial <span class=\"_ _1\"></span>year ended 30 September<span class=\"_ _0\"></span> 2022 the UK Go<span class=\"_ _0\"></span>vernment enacted legislation r<span class=\"_ _0\"></span>educing the rat<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the Banking Surcharg<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs167\">from 8.<span class=\"_ _0\"></span>0% to 3.<span class=\"_ _0\"></span>0%, fr<span class=\"_ _0\"></span>om April 2023, <span class=\"_ _0\"></span>while increasing <span class=\"_ _0\"></span>the profit <span class=\"_ _0\"></span>threshold at <span class=\"_ _0\"></span>which the sur<span class=\"_ _0\"></span>charge applies t<span class=\"_ _0\"></span>o \u00a3100.0m <span class=\"_ _0\"></span>from \u00a325.<span class=\"_ _0\"></span>0m. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs168\">This has result<span class=\"_ _0\"></span>ed in the surchar<span class=\"_ _0\"></span>ge applying to P<span class=\"_ _0\"></span>aragon Bank in <span class=\"_ _0\"></span>the current <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> reducing t<span class=\"_ _0\"></span>o 5.5%, with a thr<span class=\"_ _0\"></span>eshold of<span class=\"_ _0\"></span> \u00a362.5m, while </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs169\">in futur<span class=\"_ _0\"></span>e year<span class=\"_ _0\"></span>s a surcharge o<span class=\"_ _0\"></span>f 3.<span class=\"_ _0\"></span>0% on earnings over<span class=\"_ _0\"></span> \u00a3100.<span class=\"_ _0\"></span>0m will apply<span class=\"_ _1\"></span>. The impact o<span class=\"_ _0\"></span>f this chang<span class=\"_ _0\"></span>e on deferr<span class=\"_ _0\"></span>ed tax balances w<span class=\"_ _0\"></span>as </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs16a\">accounted for<span class=\"_ _1\"></span> in the year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2022. T<span class=\"_ _0\"></span>he combination of <span class=\"_ _0\"></span>the standard rate o<span class=\"_ _0\"></span>f tax and <span class=\"_ _0\"></span>the surcharg<span class=\"_ _0\"></span>e results in <span class=\"_ _0\"></span>taxable </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs16b\">profits in e<span class=\"_ _0\"></span>xcess of<span class=\"_ _0\"></span> the annual <span class=\"_ _0\"></span>threshold arising in Parag<span class=\"_ _0\"></span>on Bank being tax<span class=\"_ _0\"></span>ed at 27<span class=\"_ _2\"></span>.5% in the current <span class=\"_ _0\"></span>year (2022: 27<span class=\"_ _2\"></span>.0%). <span class=\"_ _0\"></span>This will rise <span class=\"_ _0\"></span>to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs16c\">28.0% in subsequent <span class=\"_ _0\"></span>financial y<span class=\"_ _0\"></span>ears.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws21 gs16d\">(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Fact<span class=\"_ _0\"></span>ors affecting tax <span class=\"_ _15\"></span>charge for<span class=\"_ _0\"></span> the year<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs16e\">Accounting standards r<span class=\"_ _0\"></span>equire companies <span class=\"_ _0\"></span>to explain the r<span class=\"_ _0\"></span>elationship between <span class=\"_ _0\"></span>tax expense and accounting pro<span class=\"_ _0\"></span>fit. This ma<span class=\"_ _0\"></span>y be </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs16f\">demonstrated by<span class=\"_ _0\"></span> reconciling <span class=\"_ _0\"></span>the tax charg<span class=\"_ _0\"></span>e to <span class=\"_ _0\"></span>the product of<span class=\"_ _0\"></span> the accounting pr<span class=\"_ _0\"></span>ofit and the \u2018<span class=\"_ _0\"></span>applicable rate<span class=\"_ _0\"></span>\u2019<span class=\"_ _2\"></span>, generally<span class=\"_ _0\"></span> the domestic </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs170\">rate of<span class=\"_ _0\"></span> tax le<span class=\"_ _0\"></span>vied on corporate income in the jurisdiction in <span class=\"_ _0\"></span>which the entity<span class=\"_ _0\"></span> operates.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs171\">The Group oper<span class=\"_ _0\"></span>ates wholly<span class=\"_ _0\"></span> in the UK and all <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s income arises in UK resident companies. Consequently<span class=\"_ _1\"></span>, it is appropriate <span class=\"_ _0\"></span>to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs172\">use the pr<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>ailing UK corporation tax r<span class=\"_ _0\"></span>ate as the comparator<span class=\"_ _0\"></span> to <span class=\"_ _0\"></span>the effectiv<span class=\"_ _0\"></span>e tax rate. <span class=\"_ _0\"></span>As noted in (<span class=\"_ _0\"></span>a) abov<span class=\"_ _0\"></span>e, the UK corporation <span class=\"_ _0\"></span>tax </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs173\">rate applicable t<span class=\"_ _0\"></span>o the Group <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the y<span class=\"_ _0\"></span>ear <span class=\"_ _0\"></span>was 22.<span class=\"_ _0\"></span>0% (2022: 19.<span class=\"_ _0\"></span>0%).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs174\">The impact of<span class=\"_ _0\"></span> the Banking Sur<span class=\"_ _0\"></span>charge is shown as a diff<span class=\"_ _0\"></span>erence betw<span class=\"_ _0\"></span>een tax at this r<span class=\"_ _0\"></span>ate and the actual tax char<span class=\"_ _0\"></span>ge in the <span class=\"_ _0\"></span>table below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs175\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs176\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs177\">Profit on ordinary activities be<span class=\"_ _0\"></span>fore t<span class=\"_ _0\"></span>axation<span class=\"_ _1fe\"> </span><span class=\"ff15\">199.9<span class=\"_ _d5\"> </span><span class=\"ff16\">417.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs178\">Profit on ordinary activities multiplied by the UK s<span class=\"_ _0\"></span>tandard r<span class=\"_ _0\"></span>ate of corpor<span class=\"_ _0\"></span>ation ta<span class=\"_ _0\"></span>x<span class=\"_ _91\"> </span><span class=\"ff15\">44.0<span class=\"_ _3a\"> </span><span class=\"ff16\">79.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs179\">Eff<span class=\"_ _1\"></span>ects of:</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs17a\"> <span class=\"_ _c0\"> </span>Permanent differ<span class=\"_ _0\"></span>ences</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs17b\"> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Recurring disallowable expenditur<span class=\"_ _0\"></span>e and similar items<span class=\"_ _17b\"> </span><span class=\"ff15\">0.5<span class=\"_ _ff\"> </span></span>(0.1)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs17c\"> <span class=\"_ _c0\"> </span>Mismatch in timing differences<span class=\"_ _231\"> </span><span class=\"ff15\">(1.3)<span class=\"_ _72\"> </span><span class=\"ff16\">0.8</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs17d\"> <span class=\"_ _c0\"> </span>Change in rate of ta<span class=\"_ _0\"></span>xation on curr<span class=\"_ _0\"></span>ent and def<span class=\"_ _0\"></span>erred tax (e<span class=\"_ _0\"></span>xcluding Bank Sur<span class=\"_ _0\"></span>charge)<span class=\"_ _142\"> </span><span class=\"ff15\">(2.1)<span class=\"_ _12c\"> </span><span class=\"ff16\">10.9</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs17e\"> <span class=\"_ _c0\"> </span>Impact of Bank <span class=\"_ _15\"></span>Surcharg<span class=\"_ _0\"></span>e on current and def<span class=\"_ _0\"></span>erred t<span class=\"_ _0\"></span>ax<span class=\"_ _232\"> </span><span class=\"ff15\">5.1<span class=\"_ _3a\"> </span><span class=\"ff16\">13.1</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs17f\"> <span class=\"_ _c0\"> </span>Prior year charge<span class=\"_ _233\"> </span><span class=\"ff15\">(0.2)<span class=\"_ _72\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs180\">T<span class=\"_ _1\"></span>ax charge f<span class=\"_ _0\"></span>or the year<span class=\"_ _201\"> </span><span class=\"ff15\">46.0<span class=\"_ _d5\"> </span><span class=\"ff16\">104.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs181\">The timing diff<span class=\"_ _0\"></span>erence mismatch arises because <span class=\"_ _0\"></span>tax relief<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> share based pa<span class=\"_ _0\"></span>yments is given on a differ<span class=\"_ _0\"></span>ent basis fr<span class=\"_ _0\"></span>om that on <span class=\"_ _0\"></span>which the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs182\">accounting charge <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the pro<span class=\"_ _0\"></span>vision of <span class=\"_ _0\"></span>these awar<span class=\"_ _0\"></span>ds is recognised under<span class=\"_ _0\"></span> IFRS 2.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs183\">Change in rate o<span class=\"_ _0\"></span>f taxation includes <span class=\"_ _0\"></span>the effect of<span class=\"_ _1\"></span> providing for<span class=\"_ _1\"></span> deferred tax balances at r<span class=\"_ _0\"></span>ates other<span class=\"_ _0\"></span> than the comparat<span class=\"_ _0\"></span>or rate. <span class=\"_ _1\"></span>This </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs184\">includes deferr<span class=\"_ _0\"></span>ed tax pr<span class=\"_ _0\"></span>ovision on fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue movements in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>, which form the lar<span class=\"_ _0\"></span>gest part of<span class=\"_ _0\"></span> this balance.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs186\">(c<span class=\"_ _1\"></span>)  <span class=\"_ _29\"> </span>Factors aff<span class=\"_ _0\"></span>ecting future tax char<span class=\"_ _0\"></span>ges<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs187\">The futur<span class=\"_ _0\"></span>e direction of<span class=\"_ _0\"></span> UK <span class=\"_ _0\"></span>tax policy <span class=\"_ _0\"></span>will significantly aff<span class=\"_ _0\"></span>ect the tax pa<span class=\"_ _0\"></span>yable by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup, and this r<span class=\"_ _0\"></span>emains uncertain.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs188\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s over<span class=\"_ _0\"></span>all future eff<span class=\"_ _0\"></span>ective tax r<span class=\"_ _0\"></span>ate will also be impacted b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the future le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> the Sur<span class=\"_ _0\"></span>charge and by<span class=\"_ _1\"></span> the proportion of<span class=\"_ _0\"></span> its </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs189\">taxable profit<span class=\"_ _0\"></span> subject to it, <span class=\"_ _0\"></span>with the increase in <span class=\"_ _0\"></span>the thr<span class=\"_ _0\"></span>eshold at which it applies lik<span class=\"_ _0\"></span>ely <span class=\"_ _0\"></span>to narro<span class=\"_ _0\"></span>w the diff<span class=\"_ _0\"></span>erential betw<span class=\"_ _0\"></span>een the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs18a\">effective <span class=\"_ _0\"></span>tax rate and <span class=\"_ _0\"></span>the standard rate of<span class=\"_ _1\"></span> corporation tax.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs18b\">V<span class=\"_ _1\"></span>arious asset leasing businesses are included within <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s Commercial Lending division. <span class=\"_ _0\"></span>Whilst such businesses do not, in </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs18c\">general, hav<span class=\"_ _0\"></span>e significant permanent differ<span class=\"_ _0\"></span>ences, the <span class=\"_ _0\"></span>taxable profits in a giv<span class=\"_ _0\"></span>en accounting period are usually<span class=\"_ _0\"></span> significantly differ<span class=\"_ _0\"></span>ent fr<span class=\"_ _0\"></span>om </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs18d\">the accounting profits due <span class=\"_ _0\"></span>to tempor<span class=\"_ _0\"></span>ary differ<span class=\"_ _0\"></span>ences. </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs18e\">At <span class=\"_ _0\"></span>the balance sheet date ther<span class=\"_ _0\"></span>e w<span class=\"_ _0\"></span>ere no material <span class=\"_ _0\"></span>tax uncertainties and no significant open matters with <span class=\"_ _0\"></span>the UK tax authorities. <span class=\"_ _1\"></span>The </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs18f\">Group has no material e<span class=\"_ _0\"></span>xposure t<span class=\"_ _0\"></span>o any other<span class=\"_ _1\"></span> tax jurisdiction.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs190\">As a wholly<span class=\"_ _0\"></span> UK based business the Gr<span class=\"_ _0\"></span>oup does not expect <span class=\"_ _0\"></span>to be significantly impact<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the OECD pr<span class=\"_ _0\"></span>oject on Base Erosion and Pr<span class=\"_ _0\"></span>ofit </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs191\">Shifting (\u2018BEPS\u2019).</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-373": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs193\">16. <span class=\"_ _b3\"> </span>Earnings per shar<span class=\"_ _0\"></span>e<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs194\">Earnings per or<span class=\"_ _0\"></span>dinary shar<span class=\"_ _0\"></span>e is calculated as follo<span class=\"_ _0\"></span>ws:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs195\">2023<span class=\"_ _7f\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs196\">Profit f<span class=\"_ _0\"></span>or the year (\u00a3m)<span class=\"_ _210\"> </span><span class=\"ff15\">153.9<span class=\"_ _8e\"> </span><span class=\"ff16\">313.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs197\">Basic weighted a<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span>age number of ordinary shares r<span class=\"_ _0\"></span>anking for dividend during the year (m)<span class=\"_ _c3\"> </span><span class=\"ff15\">224.1<span class=\"_ _8e\"> </span><span class=\"ff16\">242.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs198\">Dilutive eff<span class=\"_ _0\"></span>ect of the weighted a<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span>age number of share options and incentive plans in issue during the y<span class=\"_ _0\"></span>ear (m)<span class=\"_ _43\"> </span><span class=\"ff15\">8.0<span class=\"_ _86\"> </span><span class=\"ff16\">6.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs199\">Diluted weight<span class=\"_ _0\"></span>ed aver<span class=\"_ _0\"></span>age number of ordinary shares r<span class=\"_ _0\"></span>anking for dividend during the y<span class=\"_ _0\"></span>ear (m)<span class=\"_ _234\"> </span><span class=\"ff15\">232.1<span class=\"_ _8e\"> </span><span class=\"ff16\">249.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs19a\">Earnings per ordinary shar<span class=\"_ _0\"></span>e</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs19b\"> <span class=\"_ _c0\"> </span>- basic<span class=\"_ _235\"> </span><span class=\"ff15\">68.7p<span class=\"_ _34\"> </span><span class=\"ff16\">129.2p</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs19c\"> <span class=\"_ _c0\"> </span>- diluted<span class=\"_ _236\"> </span><span class=\"ff15\">66.3p<span class=\"_ _34\"> </span><span class=\"ff16\">125.9p</span></span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEarningsPerShareExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-374": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs19e\">17<span class=\"_ _2\"></span>. <span class=\"_ _13\"> </span>Cash and cash equiv<span class=\"_ _1\"></span>alents<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs19f\">\u2018Cash and Cash Equiv<span class=\"_ _0\"></span>alents\u2019 includes current<span class=\"_ _0\"></span> bank balances, money<span class=\"_ _0\"></span> market placements and <span class=\"_ _0\"></span>fixed rate st<span class=\"_ _0\"></span>erling term deposits <span class=\"_ _0\"></span>with </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1a0\">London banks, and balances <span class=\"_ _0\"></span>with the Bank o<span class=\"_ _0\"></span>f England. It is analy<span class=\"_ _0\"></span>sed as set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1a1\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1a2\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1a3\">Deposits with the Bank of England<span class=\"_ _237\"> </span><span class=\"ff15\">2,783.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,612.5<span class=\"_ _86\"> </span>1,142.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1a4\">Balances with central bank<span class=\"_ _0\"></span>s<span class=\"_ _238\"> </span><span class=\"ff15\">2,783.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,612.5<span class=\"_ _86\"> </span>1,142.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1a5\">Deposits with other banks<span class=\"_ _1e2\"> </span><span class=\"ff15\">211.0<span class=\"_ _d5\"> </span><span class=\"ff16\">318.4<span class=\"_ _150\"> </span>218.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1a6\">Balances with other banks<span class=\"_ _239\"> </span><span class=\"ff15\">211.0<span class=\"_ _d5\"> </span><span class=\"ff16\">318.4<span class=\"_ _150\"> </span>218.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1a7\">Cash and cash equivalents<span class=\"_ _23a\"> </span><span class=\"ff15\">2,994.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,930.9<span class=\"_ _86\"> </span>1,360.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1a8\">Not all of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s cash is immediately available <span class=\"_ _0\"></span>for its g<span class=\"_ _0\"></span>eneral purposes, including liquidity manag<span class=\"_ _0\"></span>ement. Cash receiv<span class=\"_ _0\"></span>ed in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1a9\">respect o<span class=\"_ _0\"></span>f loan assets <span class=\"_ _0\"></span>funded through <span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ehouse facilities and securitisations is not immediately<span class=\"_ _1\"></span> available, due to <span class=\"_ _0\"></span>the terms of<span class=\"_ _0\"></span> those </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1aa\">arrangements. <span class=\"_ _0\"></span>This cash is shown as \u2018<span class=\"_ _0\"></span>securitisation cash\u2019 below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1ab\">Cash held by<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>rustee of the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s employee share o<span class=\"_ _0\"></span>wnership plan (\u2018ESOP\u2019) may only<span class=\"_ _0\"></span> be used to in<span class=\"_ _0\"></span>vest in <span class=\"_ _0\"></span>the shares of<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1ac\">Company<span class=\"_ _1\"></span>, pursuant to the aims o<span class=\"_ _0\"></span>f that<span class=\"_ _0\"></span> plan. This is sho<span class=\"_ _0\"></span>wn as \u2018ESOP cash<span class=\"_ _0\"></span>\u2019 below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1ad\">The to<span class=\"_ _0\"></span>tal consolidated \u2018Cash and Cash Equiv<span class=\"_ _0\"></span>alents\u2019 balance may<span class=\"_ _0\"></span> be analysed as shown belo<span class=\"_ _0\"></span>w:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1ae\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1af\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1b0\">Av<span class=\"_ _0\"></span>ailable cash<span class=\"_ _1f2\"> </span><span class=\"ff15\">2,907.7<span class=\"_ _86\"> </span><span class=\"ff16\">1,689.1<span class=\"_ _12a\"> </span>1,236.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1b1\">Securitisation cash<span class=\"_ _1a0\"> </span><span class=\"ff15\">86.1<span class=\"_ _150\"> </span><span class=\"ff16\">240.5<span class=\"_ _150\"> </span>123.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1b2\">ESOP cash<span class=\"_ _23b\"> </span><span class=\"ff15\">0.5<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _9e\"> </span>0.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1b3\">2,994.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,930.9<span class=\"_ _86\"> </span>1,360.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1b4\">The \u2018Cash and Cash Equiv<span class=\"_ _0\"></span>alents\u2019 amount of<span class=\"_ _1\"></span> \u00a327<span class=\"_ _1\"></span>.6m (2022: \u00a319.<span class=\"_ _0\"></span>7m, 2021: \u00a319.<span class=\"_ _0\"></span>6m) shown in <span class=\"_ _0\"></span>the Company balance shee<span class=\"_ _0\"></span>t is not subject </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1b5\">to restrictions.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1b6\">Cash and cash equivalents ar<span class=\"_ _0\"></span>e classified as Stage 1 exposur<span class=\"_ _0\"></span>es (see note 22) <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the purposes of<span class=\"_ _0\"></span> impairment pro<span class=\"_ _0\"></span>visioning. T<span class=\"_ _0\"></span>he </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1b7\">probabilities of<span class=\"_ _0\"></span> default ha<span class=\"_ _0\"></span>ve been assessed to be so lo<span class=\"_ _0\"></span>w as t<span class=\"_ _0\"></span>o requir<span class=\"_ _0\"></span>e no significant impairment pro<span class=\"_ _0\"></span>vision.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCashAndCashEquivalentsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-436": {
   "value": "17<span class=\"_ _2\"></span>. <span class=\"_ _13\"> </span>Cash and cash equiv<span class=\"_ _1\"></span>alents<span class=\"_ _36a\"> </span>\u2018Cash and Cash Equiv<span class=\"_ _0\"></span>alents\u2019 includes current<span class=\"_ _0\"></span> bank balances, money<span class=\"_ _0\"></span> market placements and <span class=\"_ _0\"></span>fixed rate st<span class=\"_ _0\"></span>erling term deposits <span class=\"_ _0\"></span>with London banks, and balances <span class=\"_ _0\"></span>with the Bank o<span class=\"_ _0\"></span>f England. It is analy<span class=\"_ _0\"></span>sed as set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Deposits with the Bank of England<span class=\"_ _237\"> </span><span class=\"ff15\">2,783.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,612.5<span class=\"_ _86\"> </span>1,142.0<span class=\"_ _36a\"> </span></span></span>Balances with central bank<span class=\"_ _0\"></span>s<span class=\"_ _238\"> </span><span class=\"ff15\">2,783.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,612.5<span class=\"_ _86\"> </span>1,142.0<span class=\"_ _36a\"> </span></span></span>Deposits with other banks<span class=\"_ _1e2\"> </span><span class=\"ff15\">211.0<span class=\"_ _d5\"> </span><span class=\"ff16\">318.4<span class=\"_ _150\"> </span>218.1<span class=\"_ _36a\"> </span></span></span>Balances with other banks<span class=\"_ _239\"> </span><span class=\"ff15\">211.0<span class=\"_ _d5\"> </span><span class=\"ff16\">318.4<span class=\"_ _150\"> </span>218.1<span class=\"_ _36a\"> </span></span></span>Cash and cash equivalents<span class=\"_ _23a\"> </span><span class=\"ff15\">2,994.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,930.9<span class=\"_ _86\"> </span>1,360.1<span class=\"_ _36a\"> </span></span></span>Not all of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s cash is immediately available <span class=\"_ _0\"></span>for its g<span class=\"_ _0\"></span>eneral purposes, including liquidity manag<span class=\"_ _0\"></span>ement. Cash receiv<span class=\"_ _0\"></span>ed in respect o<span class=\"_ _0\"></span>f loan assets <span class=\"_ _0\"></span>funded through <span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ehouse facilities and securitisations is not immediately<span class=\"_ _1\"></span> available, due to <span class=\"_ _0\"></span>the terms of<span class=\"_ _0\"></span> those arrangements. <span class=\"_ _0\"></span>This cash is shown as \u2018<span class=\"_ _0\"></span>securitisation cash\u2019 below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>Cash held by<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>rustee of the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s employee share o<span class=\"_ _0\"></span>wnership plan (\u2018ESOP\u2019) may only<span class=\"_ _0\"></span> be used to in<span class=\"_ _0\"></span>vest in <span class=\"_ _0\"></span>the shares of<span class=\"_ _0\"></span> the Company<span class=\"_ _1\"></span>, pursuant to the aims o<span class=\"_ _0\"></span>f that<span class=\"_ _0\"></span> plan. This is sho<span class=\"_ _0\"></span>wn as \u2018ESOP cash<span class=\"_ _0\"></span>\u2019 below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfLoansAndAdvancesToBanksExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-472": {
   "value": "Not all of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s cash is immediately available <span class=\"_ _0\"></span>for its g<span class=\"_ _0\"></span>eneral purposes, including liquidity manag<span class=\"_ _0\"></span>ement. Cash receiv<span class=\"_ _0\"></span>ed in respect o<span class=\"_ _0\"></span>f loan assets <span class=\"_ _0\"></span>funded through <span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ehouse facilities and securitisations is not immediately<span class=\"_ _1\"></span> available, due to <span class=\"_ _0\"></span>the terms of<span class=\"_ _0\"></span> those arrangements. <span class=\"_ _0\"></span>This cash is shown as \u2018<span class=\"_ _0\"></span>securitisation cash\u2019 below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>Cash held by<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>rustee of the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s employee share o<span class=\"_ _0\"></span>wnership plan (\u2018ESOP\u2019) may only<span class=\"_ _0\"></span> be used to in<span class=\"_ _0\"></span>vest in <span class=\"_ _0\"></span>the shares of<span class=\"_ _0\"></span> the Company<span class=\"_ _1\"></span>, pursuant to the aims o<span class=\"_ _0\"></span>f that<span class=\"_ _0\"></span> plan. This is sho<span class=\"_ _0\"></span>wn as \u2018ESOP cash<span class=\"_ _0\"></span>\u2019 below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>The to<span class=\"_ _0\"></span>tal consolidated \u2018Cash and Cash Equiv<span class=\"_ _0\"></span>alents\u2019 balance may<span class=\"_ _0\"></span> be analysed as shown belo<span class=\"_ _0\"></span>w:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Av<span class=\"_ _0\"></span>ailable cash<span class=\"_ _1f2\"> </span><span class=\"ff15\">2,907.7<span class=\"_ _86\"> </span><span class=\"ff16\">1,689.1<span class=\"_ _12a\"> </span>1,236.5<span class=\"_ _36a\"> </span></span></span>Securitisation cash<span class=\"_ _1a0\"> </span><span class=\"ff15\">86.1<span class=\"_ _150\"> </span><span class=\"ff16\">240.5<span class=\"_ _150\"> </span>123.3<span class=\"_ _36a\"> </span></span></span>ESOP cash<span class=\"_ _23b\"> </span><span class=\"ff15\">0.5<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _9e\"> </span>0.3<span class=\"_ _36a\"> </span></span></span>2,994.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,930.9<span class=\"_ _86\"> </span>1,360.1<span class=\"_ _36a\"> </span></span>The \u2018Cash and Cash Equiv<span class=\"_ _0\"></span>alents\u2019 amount of<span class=\"_ _1\"></span> \u00a327<span class=\"_ _1\"></span>.6m (2022: \u00a319.<span class=\"_ _0\"></span>7m, 2021: \u00a319.<span class=\"_ _0\"></span>6m) shown in <span class=\"_ _0\"></span>the Company balance shee<span class=\"_ _0\"></span>t is not subject to restrictions.<span class=\"_ _36a\"> </span>Cash and cash equivalents ar<span class=\"_ _0\"></span>e classified as Stage 1 exposur<span class=\"_ _0\"></span>es (see note 22) <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the purposes of<span class=\"_ _0\"></span> impairment pro<span class=\"_ _0\"></span>visioning. T<span class=\"_ _0\"></span>he probabilities of<span class=\"_ _0\"></span> default ha<span class=\"_ _0\"></span>ve been assessed to be so lo<span class=\"_ _0\"></span>w as t<span class=\"_ _0\"></span>o requir<span class=\"_ _0\"></span>e no significant impairment pro<span class=\"_ _0\"></span>vision.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRestrictedCashAndCashEquivalentsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-375": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws2f gs1b9\">18. <span class=\"_ _b3\"> </span>Loans to customers<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1ba\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s loans to customers at<span class=\"_ _0\"></span> 30 September 2023, analy<span class=\"_ _0\"></span>sed between <span class=\"_ _0\"></span>the segments described in note 2 are as <span class=\"_ _0\"></span>follows:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gs1bb\">Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _a0\"> </span>2021<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1bc\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1bd\">First mortg<span class=\"_ _0\"></span>ages<span class=\"_ _23c\"> </span><span class=\"ff15\">12,747.8<span class=\"_ _42\"> </span><span class=\"ff16\">12,122.4<span class=\"_ _67\"> </span>11,460.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1be\">Second charge mortg<span class=\"_ _0\"></span>ages<span class=\"_ _154\"> </span><span class=\"ff15\">154.5<span class=\"_ _d5\"> </span><span class=\"ff16\">206.3<span class=\"_ _d5\"> </span>281.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1bf\">Unsecured consumer loans<span class=\"_ _23d\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _d1\"> </span><span class=\"ff16\">87.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1c0\">T<span class=\"_ _2\"></span>otal Mortgage Lending<span class=\"_ _23e\"> </span>12,902.3<span class=\"_ _42\"> </span><span class=\"ff16\">12,328.7<span class=\"_ _67\"> </span>11,829.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1c1\">Finance lease receivables<span class=\"_ _23f\"> </span><span class=\"ff2c\">19<span class=\"_ _c8\"> </span><span class=\"ff15\">907.3<span class=\"_ _150\"> </span><span class=\"ff16\">825.2<span class=\"_ _150\"> </span>720.3<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1c2\">Development finance<span class=\"_ _184\"> </span><span class=\"ff15\">747.8<span class=\"_ _d5\"> </span><span class=\"ff16\">719.9<span class=\"_ _150\"> </span>608.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1c3\">Other secured commer<span class=\"_ _0\"></span>cial lending<span class=\"_ _240\"> </span><span class=\"ff15\">227.6<span class=\"_ _d5\"> </span><span class=\"ff16\">238.1<span class=\"_ _150\"> </span>168.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1c4\">Other commercial loans<span class=\"_ _241\"> </span><span class=\"ff15\">89.3<span class=\"_ _3a\"> </span><span class=\"ff16\">98.4<span class=\"_ _3a\"> </span>76.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1c5\">T<span class=\"_ _2\"></span>otal Commercial Lending<span class=\"_ _23a\"> </span>1,972.0<span class=\"_ _12a\"> </span><span class=\"ff16\">1,881.6<span class=\"_ _86\"> </span>1,573.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1c6\">Loans to customer<span class=\"_ _0\"></span>s<span class=\"_ _242\"> </span><span class=\"ff15\">14,874.3<span class=\"_ _42\"> </span><span class=\"ff16\">14,210.3<span class=\"_ _67\"> </span>13,402.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1c7\">Fair v<span class=\"_ _0\"></span>alue adjustments fr<span class=\"_ _0\"></span>om portfolio hedging<span class=\"_ _196\"> </span><span class=\"ff2c\">26<span class=\"_ _84\"> </span><span class=\"ff15\">(379.3)<span class=\"_ _b6\"> </span></span></span>(559.9)<span class=\"_ _ff\"> </span><span class=\"ff16\">5.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1c8\">14,495.0<span class=\"_ _42\"> </span><span class=\"ff16\">13,650.4<span class=\"_ _67\"> </span>13,408.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1c9\">Other secur<span class=\"_ _0\"></span>ed commercial lending includes structur<span class=\"_ _0\"></span>ed lending, aviation mortgag<span class=\"_ _0\"></span>es and invoice <span class=\"_ _0\"></span>finance.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1ca\">Other commer<span class=\"_ _0\"></span>cial loans includes principally pr<span class=\"_ _0\"></span>ofessions <span class=\"_ _0\"></span>finance, discounted receiv<span class=\"_ _0\"></span>ables, term loans issued under<span class=\"_ _0\"></span> the RLS, CBILS </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1cb\">and BBLS schemes and other<span class=\"_ _0\"></span> short term commer<span class=\"_ _0\"></span>cial balances.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1cc\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s purchased loan portfolios ar<span class=\"_ _0\"></span>e analysed belo<span class=\"_ _0\"></span>w. </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1cd\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1ce\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1cf\">First mortg<span class=\"_ _0\"></span>age loans<span class=\"_ _1f1\"> </span><span class=\"ff15\">9.6<span class=\"_ _3a\"> </span><span class=\"ff16\">10.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1d0\">Consumer loans<span class=\"_ _1eb\"> </span><span class=\"ff15\">49.0<span class=\"_ _3a\"> </span><span class=\"ff16\">64.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1d1\">Motor finance loans<span class=\"_ _243\"> </span><span class=\"ff15\">0.2<span class=\"_ _9e\"> </span><span class=\"ff16\">0.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1d2\">58.8<span class=\"_ _3a\"> </span><span class=\"ff16\">75.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1d3\">Information on the Estimat<span class=\"_ _0\"></span>ed Remaining Collections (\u2018ERCs\u2019), <span class=\"_ _0\"></span>the undiscounted for<span class=\"_ _0\"></span>ecast collectible amounts, f<span class=\"_ _0\"></span>or fir<span class=\"_ _0\"></span>st mortgages and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1d4\">consumer loans is giv<span class=\"_ _0\"></span>en in note 63. <span class=\"_ _0\"></span>All other loans abo<span class=\"_ _0\"></span>ve ar<span class=\"_ _0\"></span>e internally gener<span class=\"_ _0\"></span>ated or arise <span class=\"_ _0\"></span>from acquir<span class=\"_ _0\"></span>ed operations.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1d5\">The amounts of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s first mortg<span class=\"_ _0\"></span>age assets pledged as collateral under<span class=\"_ _1\"></span> the central bank facilities described in not<span class=\"_ _0\"></span>e 38 or under<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1d6\">the securitisation and w<span class=\"_ _0\"></span>arehouse funding arr<span class=\"_ _0\"></span>angements described in notes 34 and 35 ar<span class=\"_ _0\"></span>e shown below<span class=\"_ _0\"></span>. <span class=\"_ _0\"></span>These include notes r<span class=\"_ _0\"></span>etained </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1d7\">by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup described in note 64. <span class=\"_ _0\"></span>The table also sho<span class=\"_ _0\"></span>ws assets prepositioned <span class=\"_ _0\"></span>with the Bank o<span class=\"_ _0\"></span>f England f<span class=\"_ _0\"></span>or use in <span class=\"_ _0\"></span>future drawings.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1d8\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1d9\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs1da\">Pledged as collat<span class=\"_ _0\"></span>eral in respect of</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1db\"> <span class=\"_ _c0\"> </span>Asset backed loan notes<span class=\"_ _db\"> </span><span class=\"ff15\">1,529.5<span class=\"_ _86\"> </span><span class=\"ff16\">2,099.8<span class=\"_ _86\"> </span>2,414.5</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1dc\"> <span class=\"_ _c0\"> </span>Warehouse f<span class=\"_ _0\"></span>acilities<span class=\"_ _244\"> </span><span class=\"ff15\">-<span class=\"_ _cb\"> </span><span class=\"ff16\">850.8<span class=\"_ _86\"> </span>1,041.1</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1dd\"> <span class=\"_ _c0\"> </span>Central bank facilities<span class=\"_ _245\"> </span><span class=\"ff15\">4,109.0<span class=\"_ _86\"> </span><span class=\"ff16\">3,790.9<span class=\"_ _86\"> </span>2,901.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1de\">T<span class=\"_ _2\"></span>otal pledged as collater<span class=\"_ _0\"></span>al<span class=\"_ _1bf\"> </span><span class=\"ff15\">5,638.5<span class=\"_ _86\"> </span><span class=\"ff16\">6,741.5<span class=\"_ _86\"> </span>6,356.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1df\">Prepositioned with Bank of England<span class=\"_ _2e\"> </span><span class=\"ff15\">2,568.7<span class=\"_ _86\"> </span><span class=\"ff16\">2,675.5<span class=\"_ _86\"> </span>3,190.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1e0\">Other first mortg<span class=\"_ _0\"></span>age assets<span class=\"_ _e9\"> </span><span class=\"ff15\">4,540.6<span class=\"_ _12a\"> </span><span class=\"ff16\">2,705.4<span class=\"_ _86\"> </span>1,913.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1e1\">T<span class=\"_ _2\"></span>otal first mortgag<span class=\"_ _0\"></span>e assets<span class=\"_ _246\"> </span><span class=\"ff15\">12,747.8<span class=\"_ _42\"> </span><span class=\"ff16\">12,122.4<span class=\"_ _67\"> </span>11,460.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1e2\">No assets of<span class=\"_ _0\"></span> other classes <span class=\"_ _0\"></span>were pledg<span class=\"_ _0\"></span>ed as collateral at 30 September<span class=\"_ _1\"></span> 2023, 30 September 2022 or 30 Sep<span class=\"_ _0\"></span>tember 2021.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfLoansAndAdvancesToCustomersExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-473": {
   "value": "19<span class=\"_ _0\"></span>. <span class=\"_ _5\"> </span>Finance lease receiv<span class=\"_ _0\"></span>ables<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s finance leases can be analysed as sho<span class=\"_ _0\"></span>wn below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Motor finance<span class=\"_ _247\"> </span><span class=\"ff15\">297.7<span class=\"_ _d5\"> </span><span class=\"ff16\">261.3<span class=\"_ _150\"> </span>229.2<span class=\"_ _36a\"> </span></span></span>Asset finance<span class=\"_ _248\"> </span><span class=\"ff15\">559.1<span class=\"_ _d5\"> </span><span class=\"ff16\">498.8<span class=\"_ _150\"> </span>440.5<span class=\"_ _36a\"> </span></span></span>RLS and CBILS<span class=\"_ _231\"> </span><span class=\"ff15\">50.5<span class=\"_ _3a\"> </span><span class=\"ff16\">65.1<span class=\"_ _3a\"> </span>50.6<span class=\"_ _36a\"> </span></span></span>Carrying value<span class=\"_ _247\"> </span><span class=\"ff15\">907.3<span class=\"_ _d5\"> </span><span class=\"ff16\">825.2<span class=\"_ _150\"> </span>720.3<span class=\"_ _36a\"> </span></span></span>The minimum lease payments due under<span class=\"_ _0\"></span> these loan agr<span class=\"_ _0\"></span>eements are:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Amounts receiv<span class=\"_ _0\"></span>able<span class=\"_ _36a\"> </span>Within one year<span class=\"_ _249\"> </span><span class=\"ff15\">318.5<span class=\"_ _d5\"> </span><span class=\"ff16\">284.7<span class=\"_ _150\"> </span>255.5<span class=\"_ _36a\"> </span></span></span>Within one to two year<span class=\"_ _0\"></span>s<span class=\"_ _24a\"> </span><span class=\"ff15\">269.9<span class=\"_ _d5\"> </span><span class=\"ff16\">244.4<span class=\"_ _150\"> </span>220.3<span class=\"_ _36a\"> </span></span></span>Within two to three y<span class=\"_ _0\"></span>ears<span class=\"_ _154\"> </span><span class=\"ff15\">218.7<span class=\"_ _d5\"> </span><span class=\"ff16\">189.5<span class=\"_ _150\"> </span>164.8<span class=\"_ _36a\"> </span></span></span>Within three to f<span class=\"_ _0\"></span>our years<span class=\"_ _24b\"> </span><span class=\"ff15\">143.5<span class=\"_ _d5\"> </span><span class=\"ff16\">136.5<span class=\"_ _150\"> </span>105.0<span class=\"_ _36a\"> </span></span></span>Within four to fiv<span class=\"_ _0\"></span>e years<span class=\"_ _24c\"> </span><span class=\"ff15\">67.1<span class=\"_ _3a\"> </span><span class=\"ff16\">60.5<span class=\"_ _3a\"> </span>50.5<span class=\"_ _36a\"> </span></span></span>After five y<span class=\"_ _0\"></span>ears<span class=\"_ _127\"> </span><span class=\"ff15\">60.2<span class=\"_ _3a\"> </span><span class=\"ff16\">46.2<span class=\"_ _3a\"> </span>41.6<span class=\"_ _36a\"> </span></span></span>1,077.9<span class=\"_ _d5\"> </span><span class=\"ff16\">961.8<span class=\"_ _150\"> </span>837.7<span class=\"_ _36a\"> </span></span>Less: future finance income<span class=\"_ _24d\"> </span><span class=\"ff15\">(158.1)<span class=\"_ _110\"> </span></span>(119.8)<span class=\"_ _6c\"> </span>(96.3)<span class=\"_ _36a\"> </span>Present v<span class=\"_ _0\"></span>alue<span class=\"_ _200\"> </span><span class=\"ff15\">919.8<span class=\"_ _150\"> </span><span class=\"ff16\">842.0<span class=\"_ _150\"> </span>741.4<span class=\"_ _36a\"> </span></span></span>The present<span class=\"_ _0\"></span> values o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>those payments, net of<span class=\"_ _0\"></span> pro<span class=\"_ _0\"></span>visions for<span class=\"_ _0\"></span> impairment, carried in the accounts ar<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Amounts receiv<span class=\"_ _0\"></span>able<span class=\"_ _36a\"> </span>Within one year<span class=\"_ _249\"> </span><span class=\"ff15\">272.9<span class=\"_ _d5\"> </span><span class=\"ff16\">248.7<span class=\"_ _150\"> </span>225.0<span class=\"_ _36a\"> </span></span></span>Within two to five y<span class=\"_ _0\"></span>ears<span class=\"_ _24e\"> </span><span class=\"ff15\">597.0<span class=\"_ _d5\"> </span><span class=\"ff16\">554.0<span class=\"_ _150\"> </span>480.2<span class=\"_ _36a\"> </span></span></span>After five y<span class=\"_ _0\"></span>ears<span class=\"_ _127\"> </span><span class=\"ff15\">49.9<span class=\"_ _3a\"> </span><span class=\"ff16\">39.3<span class=\"_ _3a\"> </span>36.2<span class=\"_ _36a\"> </span></span></span>Present v<span class=\"_ _0\"></span>alue<span class=\"_ _200\"> </span><span class=\"ff15\">919.8<span class=\"_ _150\"> </span><span class=\"ff16\">842.0<span class=\"_ _150\"> </span>741.4<span class=\"_ _36a\"> </span></span></span>Allowance f<span class=\"_ _0\"></span>or uncollectible amounts <span class=\"_ _24f\"> </span><span class=\"ff15\">(12.5)<span class=\"_ _bf\"> </span></span>(16.8)<span class=\"_ _6c\"> </span>(21.1)<span class=\"_ _36a\"> </span>Carrying value<span class=\"_ _247\"> </span><span class=\"ff15\">907.3<span class=\"_ _d5\"> </span><span class=\"ff16\">825.2<span class=\"_ _150\"> </span>720.3<span class=\"_ _36a\"> </span></span></span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfMaturityAnalysisOfFinanceLeasePaymentsReceivableExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-376": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs204\">20. <span class=\"_ _96\"></span>Impairment pro<span class=\"_ _0\"></span>visions on loans t<span class=\"_ _0\"></span>o customers<span class=\"_ _36a\"> </span></div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs205\">The f<span class=\"_ _0\"></span>ollowing notes set out inf<span class=\"_ _0\"></span>ormation on the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s impairment pro<span class=\"_ _0\"></span>visioning under IFRS 9 f<span class=\"_ _0\"></span>or the loans <span class=\"_ _0\"></span>to customers balances set </div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs206\">out in note 18, including both <span class=\"_ _0\"></span>finance leases, accounted for<span class=\"_ _0\"></span> under IFRS 16, and loans held at amortised cost, accounted <span class=\"_ _0\"></span>for under<span class=\"_ _1\"></span> I<span class=\"_ _15\"></span>FRS 9, </div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs207\">as both groups o<span class=\"_ _0\"></span>f assets ar<span class=\"_ _0\"></span>e subject to <span class=\"_ _0\"></span>the IFRS 9 impairment requirements. </div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs208\">The disclosures ar<span class=\"_ _0\"></span>e set out <span class=\"_ _0\"></span>within the f<span class=\"_ _0\"></span>ollowing notes:<span class=\"_ _36a\"> </span></div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs209\">\u2022 <span class=\"_ _1b\"> </span>21  Loan impairments \u2013 Basis of pr<span class=\"_ _0\"></span>ovision<span class=\"_ _36a\"> </span></div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs20a\">\u2022 <span class=\"_ _1b\"> </span>22 <span class=\"_ _96\"></span>Loan impairments b<span class=\"_ _0\"></span>y stage and division<span class=\"_ _36a\"> </span></div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs20b\">\u2022 <span class=\"_ _1b\"> </span>23 <span class=\"_ _96\"></span>L<span class=\"_ _0\"></span>oan impairments \u2013 Provision mo<span class=\"_ _0\"></span>vements in <span class=\"_ _0\"></span>the year<span class=\"_ _36a\"> </span></div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs20c\">\u2022 <span class=\"_ _1b\"> </span>24 <span class=\"_ _15\"></span>Loan impairments \u2013 Economic inputs t<span class=\"_ _0\"></span>o calculations<span class=\"_ _36a\"> </span></div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs20d\">\u2022 <span class=\"_ _1b\"> </span>25 <span class=\"_ _96\"></span>Loan impairments \u2013 Sensitivity<span class=\"_ _1\"></span> analysis<span class=\"_ _36a\"> </span></div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs20e\">The impact on the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s profit and loss account f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span> is set out in note 12.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs210\">21. <span class=\"_ _b3\"> </span>Loan impairment \u2013 basis of pr<span class=\"_ _0\"></span>ovisions<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs211\">IFRS 9 requires <span class=\"_ _0\"></span>that impairment is ev<span class=\"_ _0\"></span>aluated on an expected cr<span class=\"_ _0\"></span>edit loss (\u2018ECL<span class=\"_ _2f\"></span>\u2019) basis. ECLs ar<span class=\"_ _0\"></span>e based on an assessment of <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs212\">probability<span class=\"_ _0\"></span> of de<span class=\"_ _0\"></span>fault (\u2018PD\u2019) and loss given default<span class=\"_ _0\"></span> (\u2018LGD\u2019), discount<span class=\"_ _0\"></span>ed to give a ne<span class=\"_ _0\"></span>t present <span class=\"_ _0\"></span>value. <span class=\"_ _0\"></span>The estimation of<span class=\"_ _0\"></span> ECL<span class=\"_ _0\"></span> should be </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs213\">unbiased and probability<span class=\"_ _0\"></span> weight<span class=\"_ _0\"></span>ed, considering all reasonable and supportable information, including <span class=\"_ _0\"></span>forwar<span class=\"_ _0\"></span>d-looking economic </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs214\">assumptions and a range o<span class=\"_ _0\"></span>f possible outcomes. <span class=\"_ _0\"></span>The pro<span class=\"_ _0\"></span>vision may<span class=\"_ _0\"></span> be based on either <span class=\"_ _0\"></span>twelve month or<span class=\"_ _0\"></span> lifetime E<span class=\"_ _0\"></span>CL, dependent on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs215\">whether an account<span class=\"_ _0\"></span> has experienced a significant increase in cr<span class=\"_ _0\"></span>edit risk (\u2018SICR\u2019). </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs216\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s process f<span class=\"_ _0\"></span>or det<span class=\"_ _0\"></span>ermining its provisions <span class=\"_ _0\"></span>for impairments is summarised belo<span class=\"_ _0\"></span>w<span class=\"_ _0\"></span>. This includes:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs217\">i. <span class=\"_ _13\"> </span>The methods used <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the calculation of E<span class=\"_ _0\"></span>CL<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs218\">ii. <span class=\"_ _b3\"> </span>How it defines SICR<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs219\">iii.  Ho<span class=\"_ _0\"></span>w it defines default<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs21a\">iv<span class=\"_ _0\"></span>.  Ho<span class=\"_ _0\"></span>w it identifies <span class=\"_ _0\"></span>which loans are cr<span class=\"_ _0\"></span>edit impaired, as defined b<span class=\"_ _0\"></span>y IFRS 9<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs21b\">v<span class=\"_ _0\"></span>. <span class=\"_ _b3\"> </span>How the E<span class=\"_ _0\"></span>CL estimation pr<span class=\"_ _0\"></span>ocess is monitored and contr<span class=\"_ _0\"></span>olled<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs21c\">vi. <span class=\"_ _41\"> </span>How <span class=\"_ _0\"></span>the Group de<span class=\"_ _0\"></span>velops and enhances <span class=\"_ _0\"></span>the models it uses in the E<span class=\"_ _0\"></span>CL estimation pr<span class=\"_ _0\"></span>ocess<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs21d\">vii. <span class=\"_ _1\"></span>How <span class=\"_ _0\"></span>the Group uses judgemental adjustments <span class=\"_ _0\"></span>to ensure all elements of<span class=\"_ _0\"></span> credit<span class=\"_ _0\"></span> risk are <span class=\"_ _0\"></span>fully addr<span class=\"_ _0\"></span>essed<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs21e\">i) <span class=\"_ _18\"> </span> <span class=\"_ _45\"> </span>Calculation of<span class=\"_ _0\"></span> expected credit loss (\u2018E<span class=\"_ _0\"></span>CL<span class=\"_ _2f\"></span>\u2019)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs21f\">F<span class=\"_ _1\"></span>or the majority<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s loan assets, the ECL<span class=\"_ _1\"></span> is generated using statistical models applied to account data <span class=\"_ _0\"></span>to generate PD </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs220\">and L<span class=\"_ _0\"></span>GD components. In determining f<span class=\"_ _0\"></span>or which portf<span class=\"_ _0\"></span>olios a statistically modelled appr<span class=\"_ _0\"></span>oach is appropriate, <span class=\"_ _0\"></span>the Group considers <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs221\">volume of<span class=\"_ _0\"></span> available data and <span class=\"_ _0\"></span>the lev<span class=\"_ _0\"></span>el of similarity<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the credit<span class=\"_ _0\"></span> characteristics of<span class=\"_ _0\"></span> the underlying accounts.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs222\">PD on both a tw<span class=\"_ _0\"></span>elve month and lifetime basis is estimated based on statistical models <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s most significant asset classes. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs223\">The PD calculation is a function of<span class=\"_ _1\"></span> current asset performance, customer<span class=\"_ _0\"></span> information and futur<span class=\"_ _0\"></span>e economic assumptions. <span class=\"_ _0\"></span>The structure </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs224\">of <span class=\"_ _0\"></span>the models w<span class=\"_ _0\"></span>as derived thr<span class=\"_ _0\"></span>ough analysis of<span class=\"_ _0\"></span> correlation in hist<span class=\"_ _0\"></span>oric data, which identified which curr<span class=\"_ _0\"></span>ent and historical customer<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs225\">attributes and external economic <span class=\"_ _0\"></span>variables w<span class=\"_ _0\"></span>ere pr<span class=\"_ _0\"></span>edictive of<span class=\"_ _0\"></span> futur<span class=\"_ _0\"></span>e loss. PD measures ar<span class=\"_ _0\"></span>e calculated for<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>full contractual lives </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs226\">of loans <span class=\"_ _0\"></span>with the models deriving pr<span class=\"_ _0\"></span>obabilities that, at a giv<span class=\"_ _0\"></span>en future dat<span class=\"_ _0\"></span>e, a loan will be in default, performing or<span class=\"_ _1\"></span> closed. The Group </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs227\">utilised all reasonably<span class=\"_ _0\"></span> available inf<span class=\"_ _0\"></span>ormation in its possession for<span class=\"_ _0\"></span> this ex<span class=\"_ _0\"></span>ercise.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs228\">L<span class=\"_ _0\"></span>GD for<span class=\"_ _0\"></span> each account is derived b<span class=\"_ _0\"></span>y calculating a <span class=\"_ _0\"></span>value f<span class=\"_ _0\"></span>or exposur<span class=\"_ _0\"></span>e at the point o<span class=\"_ _0\"></span>f default (<span class=\"_ _1\"></span>which will include consideration of <span class=\"_ _0\"></span>future </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs229\">interest, account char<span class=\"_ _0\"></span>ges and receip<span class=\"_ _0\"></span>ts) and reducing <span class=\"_ _0\"></span>this for<span class=\"_ _1\"></span> security v<span class=\"_ _0\"></span>alues, net of lik<span class=\"_ _0\"></span>ely costs o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>ecovery<span class=\"_ _1\"></span>. These calculations allo<span class=\"_ _0\"></span>w </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws33 gs22a\">for<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s potential case management activities. <span class=\"_ _0\"></span>This e<span class=\"_ _0\"></span>valuation includes the po<span class=\"_ _0\"></span>tential impact of economic conditions at<span class=\"_ _0\"></span> the time </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs22b\">of an<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>future default or<span class=\"_ _0\"></span> enfor<span class=\"_ _0\"></span>cement. The deriv<span class=\"_ _0\"></span>ation of<span class=\"_ _0\"></span> the significant assumptions used in <span class=\"_ _0\"></span>these calculations is discussed below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs22c\">In certain asset classes a fully<span class=\"_ _0\"></span> modelled approach is not<span class=\"_ _0\"></span> possible. This is g<span class=\"_ _0\"></span>enerally <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>there ar<span class=\"_ _0\"></span>e fe<span class=\"_ _0\"></span>w assets in the class, <span class=\"_ _0\"></span>where  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs22d\">there is insufficient historical data on <span class=\"_ _0\"></span>which to base an analy<span class=\"_ _0\"></span>sis or <span class=\"_ _0\"></span>where certain measur<span class=\"_ _0\"></span>es, such as days past due ar<span class=\"_ _0\"></span>e not useful </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs22e\">(including cases wher<span class=\"_ _0\"></span>e the loan agr<span class=\"_ _0\"></span>eement does not requir<span class=\"_ _0\"></span>e regular<span class=\"_ _0\"></span> payments of<span class=\"_ _0\"></span> pre-det<span class=\"_ _0\"></span>ermined amounts). In these cases, <span class=\"_ _0\"></span>which </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs22f\">repr<span class=\"_ _0\"></span>esent a small proportion o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>total portfolio<span class=\"_ _0\"></span>, alternative approaches ar<span class=\"_ _0\"></span>e adopted. <span class=\"_ _0\"></span>These rely<span class=\"_ _1\"></span> on internal case monitoring </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs230\">practices and pro<span class=\"_ _0\"></span>fessional credit judg<span class=\"_ _0\"></span>ement.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs231\">The largest<span class=\"_ _0\"></span> portfolio wher<span class=\"_ _0\"></span>e a fully modelled appr<span class=\"_ _1\"></span>oach is not taken is <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s development <span class=\"_ _0\"></span>finance book, which has a relativ<span class=\"_ _0\"></span>ely lo<span class=\"_ _0\"></span>w </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs232\">number o<span class=\"_ _0\"></span>f cases (less than 250<span class=\"_ _0\"></span>) and a low incidence o<span class=\"_ _0\"></span>f historical losses on <span class=\"_ _0\"></span>which to base a model. F<span class=\"_ _1\"></span>or this portf<span class=\"_ _0\"></span>olio the impairment </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs233\">pro<span class=\"_ _0\"></span>vision is based on the output of<span class=\"_ _0\"></span> internal case-by<span class=\"_ _0\"></span>-case monitoring.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs234\">Notwithstanding the mechanical pr<span class=\"_ _0\"></span>ocedures discussed abo<span class=\"_ _0\"></span>ve, the Gr<span class=\"_ _0\"></span>oup will alw<span class=\"_ _0\"></span>ays consider<span class=\"_ _0\"></span> whether<span class=\"_ _0\"></span> the pr<span class=\"_ _0\"></span>ocess generates </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs235\">sufficient pro<span class=\"_ _0\"></span>vision for<span class=\"_ _0\"></span> particular loans, especially<span class=\"_ _0\"></span> large e<span class=\"_ _0\"></span>xposures, and will pr<span class=\"_ _0\"></span>ovide additional amounts as appr<span class=\"_ _0\"></span>opriate.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs236\">In extreme or<span class=\"_ _1\"></span> unprecedented economic conditions, it is likely<span class=\"_ _0\"></span> that mechanical models <span class=\"_ _0\"></span>will be less predictiv<span class=\"_ _0\"></span>e of outcomes as <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs237\">historical data used for<span class=\"_ _1\"></span> modelling will be insufficiently r<span class=\"_ _0\"></span>epresentative o<span class=\"_ _0\"></span>f conditions at <span class=\"_ _0\"></span>the balance sheet date. <span class=\"_ _0\"></span>This may be <span class=\"_ _0\"></span>the case </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs238\">where economic indicators at<span class=\"_ _0\"></span> the reporting dat<span class=\"_ _0\"></span>e and future e<span class=\"_ _0\"></span>xpectations for<span class=\"_ _0\"></span> those indicators lie outside <span class=\"_ _0\"></span>the range of<span class=\"_ _0\"></span> the observ<span class=\"_ _0\"></span>ations </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs239\">used to construct <span class=\"_ _0\"></span>the models. In such circumstances, manag<span class=\"_ _0\"></span>ement carefully<span class=\"_ _0\"></span> re<span class=\"_ _0\"></span>view all outputs <span class=\"_ _0\"></span>to ensure pr<span class=\"_ _0\"></span>ovision is adequate.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs23a\">During the curr<span class=\"_ _0\"></span>ent financial <span class=\"_ _0\"></span>year int<span class=\"_ _0\"></span>erest rat<span class=\"_ _0\"></span>es have risen t<span class=\"_ _0\"></span>o their<span class=\"_ _0\"></span> highest levels in some <span class=\"_ _0\"></span>time, and with unusual speed. Rates o<span class=\"_ _0\"></span>f </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs23b\">inflation in the UK ha<span class=\"_ _0\"></span>ve been subject <span class=\"_ _0\"></span>to significant fluctuations in the <span class=\"_ _1\"></span>year<span class=\"_ _0\"></span>, reaching 9<span class=\"_ _0\"></span>.6% in October<span class=\"_ _0\"></span> 2022, which <span class=\"_ _0\"></span>the ONS suggested </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs23c\">was a f<span class=\"_ _0\"></span>orty-y<span class=\"_ _0\"></span>ear high point. <span class=\"_ _0\"></span>This type o<span class=\"_ _0\"></span>f economic envir<span class=\"_ _0\"></span>onment is not significantly<span class=\"_ _0\"></span> repr<span class=\"_ _0\"></span>esented in the historic data sets used b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs23d\">Group <span class=\"_ _0\"></span>to construct its IFRS 9 impairment models. It w<span class=\"_ _0\"></span>as also noted that <span class=\"_ _0\"></span>the rate of<span class=\"_ _0\"></span> change in the economic situation o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs23e\">might lead to a lagging impact<span class=\"_ _0\"></span> on the credit<span class=\"_ _0\"></span> bureau data which <span class=\"_ _0\"></span>forms an input t<span class=\"_ _0\"></span>o models of customer<span class=\"_ _1\"></span> behaviour<span class=\"_ _0\"></span>, which may<span class=\"_ _0\"></span> delay<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs23f\">recognition of<span class=\"_ _0\"></span> an account potentially<span class=\"_ _0\"></span> at risk.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs240\">These fact<span class=\"_ _0\"></span>ors led management t<span class=\"_ _0\"></span>o conclude that curr<span class=\"_ _0\"></span>ent and for<span class=\"_ _0\"></span>ecast economic conditions w<span class=\"_ _0\"></span>ere not ones under<span class=\"_ _0\"></span> which <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs241\">models would necessarily<span class=\"_ _1\"></span> perform well, and that<span class=\"_ _0\"></span> judgemental adjustments might be requir<span class=\"_ _0\"></span>ed to compensat<span class=\"_ _0\"></span>e for<span class=\"_ _0\"></span> these w<span class=\"_ _0\"></span>eaknesses.<span class=\"_ _36a\"> </span></div>The methodologies used t<span class=\"_ _0\"></span>o derive the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _0\"></span>s ECL<span class=\"_ _1\"></span> provisions at 30 September<span class=\"_ _0\"></span> 2023 are analy<span class=\"_ _0\"></span>sed below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>Gross<span class=\"_ _aa\"> </span>Impairment<span class=\"_ _57\"> </span><span class=\"ls18 ws5e\">Net<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Modelled portfolios<span class=\"_ _24c\"> </span><span class=\"ff15\">13,825.4<span class=\"_ _12c\"> </span>(48.3)<span class=\"_ _73\"> </span>13,777.1<span class=\"_ _36a\"> </span></span>Judgemental adjus<span class=\"_ _0\"></span>tments thereon <span class=\"_ _250\"> </span><span class=\"ff15\">-<span class=\"_ _fb\"> </span>(6.5)<span class=\"_ _1db\"> </span>(6.5)<span class=\"_ _36a\"> </span></span>13,825.4<span class=\"_ _12c\"> </span>(54.8)<span class=\"_ _73\"> </span>13,770.6<span class=\"_ _36a\"> </span>Non-modelled portfolios<span class=\"_ _251\"> </span><span class=\"ff15\">1,122.5<span class=\"_ _12c\"> </span>(18.8)<span class=\"_ _d6\"> </span>1,103.7<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _e8\"> </span><span class=\"ff15\">14,947.9<span class=\"_ _12c\"> </span>(73.6)<span class=\"_ _73\"> </span>14,874.3<span class=\"_ _36a\"> </span></span>Gross<span class=\"_ _aa\"> </span>Impairment<span class=\"_ _57\"> </span><span class=\"ls18 ws5e\">Net<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2022<span class=\"_ _36a\"> </span>Modelled portfolios<span class=\"_ _24c\"> </span><span class=\"ff16\">13,167.2<span class=\"_ _12c\"> </span></span>(39.9)<span class=\"_ _140\"> </span><span class=\"ff16\">13,127.3<span class=\"_ _36a\"> </span></span>Judgemental adjus<span class=\"_ _0\"></span>tments thereon <span class=\"_ _250\"> </span>-<span class=\"_ _72\"> </span>(15.0)<span class=\"_ _6c\"> </span>(15.0)<span class=\"_ _36a\"> </span>13,167.2<span class=\"_ _12c\"> </span><span class=\"ff17\">(54.9)<span class=\"_ _140\"> </span></span>13,112.3<span class=\"_ _36a\"> </span>Non-modelled portfolios<span class=\"_ _251\"> </span><span class=\"ff16\">1,106.6<span class=\"_ _ff\"> </span></span>(8.6)<span class=\"_ _b5\"> </span><span class=\"ff16\">1,098.0<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _e8\"> </span><span class=\"ff16\">14,273.8<span class=\"_ _12c\"> </span></span>(63.5)<span class=\"_ _140\"> </span><span class=\"ff16\">14,210.3<span class=\"_ _36a\"> </span></span>ii) <span class=\"_ _19\"> </span> <span class=\"_ _29\"> </span>Significant Increase in Credit Risk (\u2018SICR\u2019)<span class=\"_ _36a\"> </span>Under IFRS 9<span class=\"_ _0\"></span>, SICR is not defined solely<span class=\"_ _0\"></span> by account<span class=\"_ _0\"></span> performance, but on the basis of<span class=\"_ _0\"></span> the customer\u2019<span class=\"_ _2\"></span>s overall cr<span class=\"_ _0\"></span>edit position, and this ev<span class=\"_ _0\"></span>aluation should include consideration of<span class=\"_ _0\"></span> external data. T<span class=\"_ _0\"></span>he Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s aim is to define SICR to corr<span class=\"_ _0\"></span>espond, as closely as possible, to that population o<span class=\"_ _0\"></span>f accounts <span class=\"_ _0\"></span>which are subject <span class=\"_ _0\"></span>to enhanced administrative and monitoring pr<span class=\"_ _0\"></span>ocedures operationally<span class=\"_ _1\"></span>. The Gr<span class=\"_ _0\"></span>oup assesses SICR in its modelled portfolios primarily<span class=\"_ _0\"></span> on the basis of<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>elative differ<span class=\"_ _0\"></span>ence in an account\u2019<span class=\"_ _1\"></span>s lifetime PD between origination and the r<span class=\"_ _0\"></span>eporting date. T<span class=\"_ _0\"></span>he levels o<span class=\"_ _0\"></span>f differ<span class=\"_ _0\"></span>ence requir<span class=\"_ _0\"></span>ed to qualify<span class=\"_ _0\"></span> as an SICR may<span class=\"_ _0\"></span> differ betw<span class=\"_ _0\"></span>een portfolios and will depend, to some ext<span class=\"_ _0\"></span>ent, on the lev<span class=\"_ _0\"></span>el of risk<span class=\"_ _0\"></span> originally per<span class=\"_ _0\"></span>ceived and are monit<span class=\"_ _0\"></span>ored on an ongoing basis <span class=\"_ _0\"></span>to ensure <span class=\"_ _0\"></span>that this calibrates with actual experience.<span class=\"_ _36a\"> </span>It should be noted <span class=\"_ _0\"></span>that the use of<span class=\"_ _0\"></span> the curr<span class=\"_ _0\"></span>ent PD, <span class=\"_ _0\"></span>which includes external fact<span class=\"_ _0\"></span>ors such as credit bur<span class=\"_ _0\"></span>eau data, means that all r<span class=\"_ _0\"></span>elev<span class=\"_ _0\"></span>ant information in the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s hands concerning the customers\u2019 pr<span class=\"_ _0\"></span>esent credit position is included in <span class=\"_ _0\"></span>the ev<span class=\"_ _0\"></span>aluation, as well as <span class=\"_ _0\"></span>the impact of <span class=\"_ _0\"></span>future economic expectations. F<span class=\"_ _1\"></span>or non-modelled portfolios, the SICR assessment is based on <span class=\"_ _0\"></span>the credit monit<span class=\"_ _0\"></span>oring position of <span class=\"_ _0\"></span>the account in question and for<span class=\"_ _0\"></span> all portfolios a number<span class=\"_ _0\"></span> of qualitativ<span class=\"_ _0\"></span>e indicators which pr<span class=\"_ _0\"></span>ovide e<span class=\"_ _0\"></span>vidence of SICR hav<span class=\"_ _0\"></span>e been considered. As part of<span class=\"_ _0\"></span> its determination of<span class=\"_ _0\"></span> whether<span class=\"_ _0\"></span> model outputs form a r<span class=\"_ _0\"></span>eliable basis for<span class=\"_ _0\"></span> impairment pro<span class=\"_ _0\"></span>visioning, the Gr<span class=\"_ _0\"></span>oup considered whether it<span class=\"_ _0\"></span> had any e<span class=\"_ _0\"></span>vidence of gr<span class=\"_ _0\"></span>oups of<span class=\"_ _0\"></span> accounts demonstrating factors indicating a higher<span class=\"_ _1\"></span> level of<span class=\"_ _0\"></span> credit risk <span class=\"_ _0\"></span>than other accounts in the same portfolios, either<span class=\"_ _0\"></span> from oper<span class=\"_ _0\"></span>ational experience or its r<span class=\"_ _0\"></span>egular cr<span class=\"_ _0\"></span>edit risk monitoring activities. No such e<span class=\"_ _0\"></span>vidence was no<span class=\"_ _0\"></span>ted at 30 September<span class=\"_ _0\"></span> 2023 or 30 September<span class=\"_ _1\"></span> 2022, and hence no additional accounts were identified as ha<span class=\"_ _0\"></span>ving an SICR.<span class=\"_ _36a\"> </span>iii) <span class=\"_ _96\"></span> <span class=\"_ _45\"> </span>Definitions o<span class=\"_ _0\"></span>f default<span class=\"_ _36a\"> </span>As the IFRS 9 definition of<span class=\"_ _0\"></span> ECL<span class=\"_ _0\"></span> is based on PD, def<span class=\"_ _0\"></span>ault must be defined for<span class=\"_ _1\"></span> this purpose. The analy<span class=\"_ _0\"></span>sis of <span class=\"_ _0\"></span>these default cases pr<span class=\"_ _0\"></span>ovides the foundation <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s PD modelling. IFRS 9 provides a r<span class=\"_ _0\"></span>ebuttable presumption <span class=\"_ _0\"></span>that an account is in default <span class=\"_ _0\"></span>when it is 90 day<span class=\"_ _0\"></span>s over<span class=\"_ _0\"></span>due and this <span class=\"_ _0\"></span>was used as the basis o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s definition, combined with qualitative and quantitativ<span class=\"_ _0\"></span>e factors specific <span class=\"_ _0\"></span>to  each portfolio. The most influential quantitative <span class=\"_ _0\"></span>factor<span class=\"_ _0\"></span> in the majority o<span class=\"_ _0\"></span>f portfolios is <span class=\"_ _0\"></span>the arrears le<span class=\"_ _0\"></span>vel, <span class=\"_ _0\"></span>while the principal qualitative <span class=\"_ _0\"></span>factors relat<span class=\"_ _0\"></span>e to internal account management statuses. In particular<span class=\"_ _1\"></span> the decision to commence a pr<span class=\"_ _0\"></span>ocess of enfor<span class=\"_ _1\"></span>cement will be considered as a default in all portfolios. In <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019s buy<span class=\"_ _0\"></span>-to-let mortg<span class=\"_ _0\"></span>age portfolio the appointment<span class=\"_ _0\"></span> of a r<span class=\"_ _0\"></span>eceiver<span class=\"_ _0\"></span> of r<span class=\"_ _0\"></span>ent to manag<span class=\"_ _0\"></span>e the pr<span class=\"_ _0\"></span>operty on the customer\u2019<span class=\"_ _1\"></span>s behalf is considered a de<span class=\"_ _0\"></span>fault, while f<span class=\"_ _0\"></span>or portfolios assessed on a case-b<span class=\"_ _0\"></span>y-case basis, such as the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s development finance loans, the mo<span class=\"_ _0\"></span>vement of<span class=\"_ _0\"></span> an account to <span class=\"_ _0\"></span>the highest risk category<span class=\"_ _0\"></span> used for<span class=\"_ _1\"></span> internal monitoring is considered as a default. This ensures <span class=\"_ _0\"></span>that Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s definitions of de<span class=\"_ _0\"></span>fault for<span class=\"_ _0\"></span> its v<span class=\"_ _0\"></span>arious portfolios ar<span class=\"_ _0\"></span>e materially aligned <span class=\"_ _0\"></span>to the r<span class=\"_ _0\"></span>egulatory definitions o<span class=\"_ _0\"></span>f default used internally<span class=\"_ _1\"></span>, and are broadly<span class=\"_ _0\"></span> aligned to its internal operational pr<span class=\"_ _0\"></span>ocedures, allo<span class=\"_ _0\"></span>wing for<span class=\"_ _0\"></span> the arbitrary<span class=\"_ _0\"></span> nature of<span class=\"_ _1\"></span> the 90-day cut-o<span class=\"_ _0\"></span>ff, which is a regulatory<span class=\"_ _0\"></span> rather<span class=\"_ _0\"></span> than an operational r<span class=\"_ _0\"></span>equirement. In particular<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s receiver o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>ent cases are defined as def<span class=\"_ _0\"></span>aulted for<span class=\"_ _0\"></span> modelling purposes as the behaviour<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the case after<span class=\"_ _0\"></span> that point is significantly<span class=\"_ _0\"></span> influenced by int<span class=\"_ _0\"></span>ernal management decisions.<span class=\"_ _36a\"> </span><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs274\">iv) <span class=\"_ _15\"></span> <span class=\"_ _45\"> </span>Credit Impaired loans<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs275\">IFRS 9 defines a credit impair<span class=\"_ _0\"></span>ed account as one wher<span class=\"_ _0\"></span>e an account has suffer<span class=\"_ _0\"></span>ed one or mor<span class=\"_ _0\"></span>e events <span class=\"_ _0\"></span>which have had a detrimental </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs276\">effect on <span class=\"_ _0\"></span>future cash flo<span class=\"_ _0\"></span>ws. It is thus a backw<span class=\"_ _0\"></span>ard-looking definition, r<span class=\"_ _0\"></span>ather <span class=\"_ _0\"></span>than one based on future e<span class=\"_ _0\"></span>xpectations.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs277\">Credit impair<span class=\"_ _0\"></span>ed assets are identified either<span class=\"_ _1\"></span> through quantitative measur<span class=\"_ _0\"></span>es or b<span class=\"_ _0\"></span>y operational status. Designations o<span class=\"_ _0\"></span>f accounts </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs278\">for<span class=\"_ _0\"></span> regulatory<span class=\"_ _0\"></span> capital purposes are also <span class=\"_ _0\"></span>taken into account. <span class=\"_ _0\"></span>Assets may<span class=\"_ _0\"></span> also be assigned to Stag<span class=\"_ _0\"></span>e 3 if the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e identified as credit </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs279\">impaired as a r<span class=\"_ _0\"></span>esult of<span class=\"_ _0\"></span> management re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> processes.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs27a\">All loans which ar<span class=\"_ _0\"></span>e in the pr<span class=\"_ _0\"></span>ocess of enf<span class=\"_ _0\"></span>orcement, fr<span class=\"_ _0\"></span>om the point <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>this becomes the administration strategy<span class=\"_ _1\"></span>, are classified as </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs27b\">credit impair<span class=\"_ _0\"></span>ed.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs27c\">Loans ar<span class=\"_ _0\"></span>e retained in Stag<span class=\"_ _0\"></span>e 3 for<span class=\"_ _0\"></span> thr<span class=\"_ _0\"></span>ee months after <span class=\"_ _0\"></span>the point wher<span class=\"_ _0\"></span>e the<span class=\"_ _0\"></span>y cease t<span class=\"_ _0\"></span>o exhibit the charact<span class=\"_ _0\"></span>eristics of default. <span class=\"_ _1\"></span>After <span class=\"_ _0\"></span>this </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs27d\">point, the<span class=\"_ _0\"></span>y may<span class=\"_ _0\"></span> mov<span class=\"_ _0\"></span>e to Stage 2 or<span class=\"_ _1\"></span> Stage 1 depending on whether<span class=\"_ _0\"></span> an SICR trigger<span class=\"_ _0\"></span> remains.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs27e\">All default cases ar<span class=\"_ _0\"></span>e considered t<span class=\"_ _0\"></span>o be credit impair<span class=\"_ _0\"></span>ed, including all receiv<span class=\"_ _0\"></span>er of<span class=\"_ _0\"></span> rent cases and all cases <span class=\"_ _0\"></span>with at least one payment mor<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs27f\">than 90 days o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span>due, even <span class=\"_ _0\"></span>where such cases ar<span class=\"_ _0\"></span>e being managed in the expectation o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>ealising all of <span class=\"_ _0\"></span>the carrying balance. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs280\">In order<span class=\"_ _0\"></span> to pr<span class=\"_ _0\"></span>ovide better<span class=\"_ _0\"></span> information f<span class=\"_ _0\"></span>or users, additional analy<span class=\"_ _0\"></span>sis of cr<span class=\"_ _0\"></span>edit impair<span class=\"_ _0\"></span>ed accounts has been presented in note 22, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs281\">distinguishing between pr<span class=\"_ _0\"></span>obationary accounts, r<span class=\"_ _0\"></span>eceiver<span class=\"_ _0\"></span> of r<span class=\"_ _0\"></span>ent accounts, accounts subject to r<span class=\"_ _1\"></span>ealisation / enforcement procedur<span class=\"_ _0\"></span>es </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs282\">and long term manag<span class=\"_ _0\"></span>ed accounts, all of <span class=\"_ _0\"></span>which are <span class=\"_ _0\"></span>treated as cr<span class=\"_ _0\"></span>edit impaired. <span class=\"_ _0\"></span>While other indicat<span class=\"_ _0\"></span>ors of de<span class=\"_ _0\"></span>fault are in use, <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs283\">categories shown account<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> the ov<span class=\"_ _0\"></span>erwhelming majority of<span class=\"_ _0\"></span> Stage 3 cases.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs284\">v) <span class=\"_ _7\"> </span> <span class=\"_ _29\"> </span>Monitoring of E<span class=\"_ _0\"></span>CL estima<span class=\"_ _0\"></span>tion processes </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs285\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s ECL<span class=\"_ _0\"></span> models are compiled on <span class=\"_ _0\"></span>the basis of <span class=\"_ _0\"></span>the analysis of<span class=\"_ _0\"></span> rele<span class=\"_ _0\"></span>vant historical data. Bef<span class=\"_ _0\"></span>ore a model is adopted <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> use </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs286\">its operations and outputs are e<span class=\"_ _0\"></span>xamined to ensur<span class=\"_ _0\"></span>e that it is expect<span class=\"_ _0\"></span>ed to be appropriat<span class=\"_ _0\"></span>ely pr<span class=\"_ _0\"></span>edictive and, if it<span class=\"_ _0\"></span> is an updated model, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs287\">expected t<span class=\"_ _0\"></span>o be more pr<span class=\"_ _0\"></span>edictive than any<span class=\"_ _1\"></span> existing model. Before a ne<span class=\"_ _0\"></span>w model is adopted <span class=\"_ _0\"></span>the changes and impacts will be consider<span class=\"_ _0\"></span>ed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs288\">by<span class=\"_ _0\"></span> the CF<span class=\"_ _0\"></span>O, alongside an<span class=\"_ _0\"></span>y advice fr<span class=\"_ _0\"></span>om the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s independent model revie<span class=\"_ _0\"></span>w functions. <span class=\"_ _1\"></span>The performance of all models is r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>wed on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs289\">an ongoing basis, by<span class=\"_ _0\"></span> senior <span class=\"_ _0\"></span>finance and risk management, including <span class=\"_ _0\"></span>the CFO<span class=\"_ _0\"></span>. Monitoring packs comparing actual and pr<span class=\"_ _0\"></span>edicted loss </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs28a\">lev<span class=\"_ _0\"></span>els are pr<span class=\"_ _0\"></span>oduced at regular<span class=\"_ _0\"></span> intervals, set on <span class=\"_ _0\"></span>the basis of<span class=\"_ _0\"></span> the materiality<span class=\"_ _0\"></span> of each model. <span class=\"_ _0\"></span>The continuing appropriat<span class=\"_ _0\"></span>eness of model </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs28b\">assumptions is also re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span>ed as part of <span class=\"_ _0\"></span>this process. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs28c\">Models are r<span class=\"_ _0\"></span>evisited on a r<span class=\"_ _0\"></span>egular basis <span class=\"_ _0\"></span>to ensure <span class=\"_ _0\"></span>that the<span class=\"_ _0\"></span>y continue <span class=\"_ _0\"></span>to reflect <span class=\"_ _0\"></span>the most recent data as <span class=\"_ _0\"></span>the av<span class=\"_ _0\"></span>ailable information </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gs28d\">increases ov<span class=\"_ _0\"></span>er time.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs28e\">On a monthly basis all model outputs, model o<span class=\"_ _0\"></span>verlay<span class=\"_ _0\"></span>s and provisions calculat<span class=\"_ _0\"></span>ed for<span class=\"_ _0\"></span> non-modelled books are r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>wed by<span class=\"_ _0\"></span> senior </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs28f\">finance management including <span class=\"_ _0\"></span>the CFO in conjunction <span class=\"_ _0\"></span>with the latest cr<span class=\"_ _0\"></span>edit risk operational and economic metrics <span class=\"_ _0\"></span>to ensure <span class=\"_ _0\"></span>that the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs290\">impairment pro<span class=\"_ _0\"></span>vision by<span class=\"_ _0\"></span> asset type r<span class=\"_ _0\"></span>emains appropriate. <span class=\"_ _0\"></span>This ex<span class=\"_ _0\"></span>ercise <span class=\"_ _0\"></span>will be the subject of<span class=\"_ _0\"></span> particular <span class=\"_ _0\"></span>focus at the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end and the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws17 gs291\">half y<span class=\"_ _0\"></span>ear<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs292\">This information is summarised <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the Audit<span class=\"_ _0\"></span> Committee on a biannual basis, and they<span class=\"_ _0\"></span> hav<span class=\"_ _0\"></span>e regar<span class=\"_ _0\"></span>d to <span class=\"_ _0\"></span>this data in forming <span class=\"_ _0\"></span>their </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs293\">conclusions on the appr<span class=\"_ _0\"></span>opriateness of pr<span class=\"_ _0\"></span>ovisioning le<span class=\"_ _0\"></span>vels.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs294\">vi) <span class=\"_ _15\"></span> <span class=\"_ _45\"> </span>Model dev<span class=\"_ _0\"></span>elopment<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs295\">The models used by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup are updated <span class=\"_ _0\"></span>from time <span class=\"_ _0\"></span>to time <span class=\"_ _0\"></span>to allow<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> changes in the business, de<span class=\"_ _0\"></span>velopments in best practice </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs296\">and the av<span class=\"_ _0\"></span>ailability o<span class=\"_ _0\"></span>f additional data with <span class=\"_ _0\"></span>the passing of<span class=\"_ _0\"></span> time. During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2023 a major update <span class=\"_ _0\"></span>to the SME </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs297\">Lending PD model <span class=\"_ _0\"></span>took place, meaning that <span class=\"_ _0\"></span>two of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s four principal PD models, co<span class=\"_ _0\"></span>vering ov<span class=\"_ _0\"></span>er 96% of<span class=\"_ _0\"></span> modelled balances, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs298\">have been updated since IFRS9 <span class=\"_ _0\"></span>was implemented.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs299\">The adoption of<span class=\"_ _0\"></span> the ne<span class=\"_ _0\"></span>w SME lending model has enabled the r<span class=\"_ _0\"></span>eporting process in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> to be mor<span class=\"_ _0\"></span>e streamlined, and supported </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs29a\">increased use of<span class=\"_ _0\"></span> scenario analysis, and incr<span class=\"_ _0\"></span>eased the ability<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the model to r<span class=\"_ _0\"></span>espond to economic inputs and <span class=\"_ _0\"></span>wider customer<span class=\"_ _0\"></span> credit<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs29b\">data. T<span class=\"_ _0\"></span>his included more extensiv<span class=\"_ _0\"></span>e use of e<span class=\"_ _0\"></span>xternal credit bur<span class=\"_ _0\"></span>eau data, enabling at risk cases t<span class=\"_ _0\"></span>o be identified for<span class=\"_ _0\"></span> provisioning on a mor<span class=\"_ _1\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs29c\">timely basis.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs29d\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s programme o<span class=\"_ _0\"></span>f model dev<span class=\"_ _0\"></span>elopment continued during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> with a particular<span class=\"_ _0\"></span> focus on analy<span class=\"_ _0\"></span>sing how def<span class=\"_ _0\"></span>ault and loss </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs29e\">data recor<span class=\"_ _0\"></span>ded over<span class=\"_ _0\"></span> the period o<span class=\"_ _0\"></span>f the Co<span class=\"_ _0\"></span>vid pandemic should be reflected in <span class=\"_ _0\"></span>the next gener<span class=\"_ _0\"></span>ation of <span class=\"_ _0\"></span>forwar<span class=\"_ _0\"></span>d-looking models, given the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs29f\">unprecedented natur<span class=\"_ _0\"></span>e of<span class=\"_ _0\"></span> the pandemic and the national and international r<span class=\"_ _0\"></span>esponse to it.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2a0\">All re<span class=\"_ _0\"></span>vised models and model enhancements are car<span class=\"_ _0\"></span>efully r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>wed and test<span class=\"_ _0\"></span>ed before adop<span class=\"_ _0\"></span>tion, and are subject <span class=\"_ _0\"></span>to a gov<span class=\"_ _0\"></span>ernance </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gs2a1\">process for<span class=\"_ _1\"></span> their approv<span class=\"_ _0\"></span>al. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2a2\">The impacts of<span class=\"_ _0\"></span> the adoption of<span class=\"_ _0\"></span> the ne<span class=\"_ _0\"></span>w SME lending PD model in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 on a lik<span class=\"_ _0\"></span>e-for<span class=\"_ _1\"></span>-like basis wer<span class=\"_ _1\"></span>e to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2a3\">increase pr<span class=\"_ _0\"></span>ovision by<span class=\"_ _0\"></span> \u00a30.<span class=\"_ _0\"></span>9m and transf<span class=\"_ _0\"></span>er \u00a310<span class=\"_ _0\"></span>.8m of gr<span class=\"_ _0\"></span>oss balances fr<span class=\"_ _0\"></span>om Stage 1 to S<span class=\"_ _0\"></span>tage 2.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws9b gs2a5\">vii)  <span class=\"_ _af\"> </span>Judgemental <span class=\"_ _41\"> </span>adjustments<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2a6\">In order<span class=\"_ _0\"></span> to ensur<span class=\"_ _0\"></span>e that its loan portf<span class=\"_ _0\"></span>olios are adequately<span class=\"_ _0\"></span> provisioned, <span class=\"_ _0\"></span>the Group considers <span class=\"_ _0\"></span>whether<span class=\"_ _0\"></span> there ar<span class=\"_ _0\"></span>e factor<span class=\"_ _0\"></span>s not fully<span class=\"_ _0\"></span> captured </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2a7\">by<span class=\"_ _0\"></span> the modelling pr<span class=\"_ _0\"></span>ocess, including economic conditions more generally<span class=\"_ _1\"></span>, which indicate a need f<span class=\"_ _0\"></span>or judg<span class=\"_ _0\"></span>emental adjustments. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2a8\">Information consider<span class=\"_ _0\"></span>ed includes credit data, customer<span class=\"_ _0\"></span> and brok<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>feedback r<span class=\"_ _0\"></span>eceived, the r<span class=\"_ _0\"></span>esults of insight<span class=\"_ _0\"></span> survey<span class=\"_ _0\"></span>s, industry </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2a9\">intelligence and expert kno<span class=\"_ _0\"></span>wledge within <span class=\"_ _0\"></span>the business lines.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2aa\">In the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 <span class=\"_ _0\"></span>the most significant fact<span class=\"_ _0\"></span>ors in these considerations <span class=\"_ _0\"></span>were <span class=\"_ _0\"></span>the extent <span class=\"_ _0\"></span>to which uncertainties in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2ab\">the UK economy<span class=\"_ _0\"></span> arising fr<span class=\"_ _0\"></span>om rapidly rising inter<span class=\"_ _0\"></span>est rates, incr<span class=\"_ _0\"></span>eases in the cost of<span class=\"_ _1\"></span> living and doing business in the UK and the impacts </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2ac\">of <span class=\"_ _0\"></span>the continuing conflict in Ukraine <span class=\"_ _0\"></span>were r<span class=\"_ _0\"></span>eflected in curr<span class=\"_ _0\"></span>ent customer perf<span class=\"_ _0\"></span>ormance at the period end and <span class=\"_ _0\"></span>were being <span class=\"_ _0\"></span>fully addr<span class=\"_ _0\"></span>essed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2ad\">by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s pro<span class=\"_ _0\"></span>vision modelling, particularly in <span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the lack of<span class=\"_ _0\"></span> recent observ<span class=\"_ _0\"></span>ations relating t<span class=\"_ _0\"></span>o similar conditions.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2ae\">Where manag<span class=\"_ _0\"></span>ement has identified a requir<span class=\"_ _0\"></span>ement to amend <span class=\"_ _0\"></span>the calculated pro<span class=\"_ _0\"></span>vision as a result of<span class=\"_ _0\"></span> either model de<span class=\"_ _0\"></span>ficiencies or </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2af\">idiosyncratic beha<span class=\"_ _0\"></span>viour in part of<span class=\"_ _0\"></span> the portf<span class=\"_ _0\"></span>olio, judgemental adjustments are applied <span class=\"_ _0\"></span>to the modelled outputs so <span class=\"_ _0\"></span>that the E<span class=\"_ _0\"></span>CL </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2b0\">recognised corr<span class=\"_ _0\"></span>esponds to expert<span class=\"_ _0\"></span> judgement, taking into account <span class=\"_ _0\"></span>the widest possible r<span class=\"_ _0\"></span>ange of curr<span class=\"_ _0\"></span>ent information, <span class=\"_ _0\"></span>which might not </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2b1\">be factor<span class=\"_ _0\"></span>ed into the modelling pr<span class=\"_ _0\"></span>ocess.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2b2\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s approach <span class=\"_ _0\"></span>to impairment modelling is based on the analy<span class=\"_ _0\"></span>sis of historical cr<span class=\"_ _0\"></span>edit data. In normal circumstances <span class=\"_ _0\"></span>the  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2b3\">Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s objective is to de<span class=\"_ _0\"></span>velop its modelling <span class=\"_ _0\"></span>to the point <span class=\"_ _0\"></span>where the le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> judgemental adjustments r<span class=\"_ _0\"></span>equired is minimal, but in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2b4\">economic conditions wher<span class=\"_ _0\"></span>e pre<span class=\"_ _0\"></span>vious rele<span class=\"_ _0\"></span>vant experience is limited or<span class=\"_ _0\"></span> non-existent, some f<span class=\"_ _0\"></span>orm of judg<span class=\"_ _0\"></span>emental adjustment is alway<span class=\"_ _0\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws4a gs2b5\">likely<span class=\"_ _0\"></span> to be necessary<span class=\"_ _1\"></span>. While high inter<span class=\"_ _0\"></span>est rate and inflation scenarios hav<span class=\"_ _0\"></span>e occurred in the UK<span class=\"_ _0\"></span> in the past, mark<span class=\"_ _0\"></span>et conditions, products </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2b6\">and regulatory<span class=\"_ _0\"></span> expectations hav<span class=\"_ _0\"></span>e moved on consider<span class=\"_ _0\"></span>ably in the meantime, and most<span class=\"_ _0\"></span> such observations w<span class=\"_ _0\"></span>ould pre-date <span class=\"_ _0\"></span>the existence </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2b7\">of buy<span class=\"_ _0\"></span>-to-let mortg<span class=\"_ _0\"></span>ages as a distinct asset class. <span class=\"_ _0\"></span>This means that <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>alue of past hist<span class=\"_ _0\"></span>ory as a guide <span class=\"_ _0\"></span>to future cr<span class=\"_ _0\"></span>edit performance  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2b8\">is reduced.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2b9\">The current<span class=\"_ _0\"></span> model behaviour and <span class=\"_ _0\"></span>the potential f<span class=\"_ _0\"></span>or unobserved cr<span class=\"_ _1\"></span>edit issues have meant that <span class=\"_ _0\"></span>the requir<span class=\"_ _0\"></span>ement for<span class=\"_ _1\"></span> such adjustments </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2ba\">over<span class=\"_ _1\"></span> recent periods has been significant. Evidence consider<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> management included internal performance data, cust<span class=\"_ _0\"></span>omer and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2bb\">brok<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>feedback, insight surve<span class=\"_ _0\"></span>ys, industry<span class=\"_ _0\"></span> intelligence, evidence on <span class=\"_ _0\"></span>the wider<span class=\"_ _0\"></span> economy<span class=\"_ _0\"></span> and quantitative and qualitative data and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2bc\">statements fr<span class=\"_ _0\"></span>om industry<span class=\"_ _0\"></span>, gov<span class=\"_ _0\"></span>ernment and regulatory<span class=\"_ _0\"></span> bodies. <span class=\"_ _0\"></span>These wer<span class=\"_ _0\"></span>e combined with <span class=\"_ _0\"></span>the expert knowledg<span class=\"_ _0\"></span>e within the business  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2bd\">to form a br<span class=\"_ _0\"></span>oad estimate of<span class=\"_ _0\"></span> the le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> provision r<span class=\"_ _0\"></span>equired acr<span class=\"_ _0\"></span>oss the Gr<span class=\"_ _0\"></span>oup.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2be\">As part of<span class=\"_ _0\"></span> this ex<span class=\"_ _0\"></span>ercise, the po<span class=\"_ _0\"></span>tential for<span class=\"_ _0\"></span> climate relat<span class=\"_ _0\"></span>ed issues to impact on customer<span class=\"_ _0\"></span> business models or security<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues ov<span class=\"_ _0\"></span>er the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2bf\">timescales for<span class=\"_ _0\"></span> ECL<span class=\"_ _1\"></span> calculation required by<span class=\"_ _0\"></span> IFRS 9 was consider<span class=\"_ _0\"></span>ed. No specific requir<span class=\"_ _0\"></span>ement for<span class=\"_ _1\"></span> additional impairment provisions ov<span class=\"_ _0\"></span>er </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2c0\">the amounts already<span class=\"_ _0\"></span> determined w<span class=\"_ _0\"></span>as identified.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2c1\">The requir<span class=\"_ _0\"></span>ement f<span class=\"_ _0\"></span>or judgemental adjustments is consider<span class=\"_ _0\"></span>ed on a portfolio-b<span class=\"_ _0\"></span>y-portfolio basis, and the po<span class=\"_ _0\"></span>tential for<span class=\"_ _0\"></span> the existence o<span class=\"_ _0\"></span>f </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2c2\">significant groups o<span class=\"_ _0\"></span>f assets being particularly<span class=\"_ _0\"></span> exposed to cr<span class=\"_ _0\"></span>edit risk in <span class=\"_ _0\"></span>the expected economic scenarios is also considered.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2c3\">The to<span class=\"_ _0\"></span>tal amounts of judg<span class=\"_ _0\"></span>emental adjustments provided acr<span class=\"_ _0\"></span>oss the Gr<span class=\"_ _0\"></span>oup are set out<span class=\"_ _0\"></span> below b<span class=\"_ _0\"></span>y segment.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs2c4\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs2c5\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs2c6\">Mortgage Lending<span class=\"_ _1ef\"> </span><span class=\"ff15\">3.0<span class=\"_ _9e\"> </span><span class=\"ff16\">5.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs2c7\">Commercial Lending<span class=\"_ _1f1\"> </span><span class=\"ff15\">3.5<span class=\"_ _cb\"> </span><span class=\"ff16\">10.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs2c8\">6.5<span class=\"_ _3a\"> </span><span class=\"ff16\">15.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2c9\">The mov<span class=\"_ _0\"></span>ements in the <span class=\"_ _0\"></span>year r<span class=\"_ _0\"></span>epresent<span class=\"_ _0\"></span> principally the e<span class=\"_ _0\"></span>xtent to <span class=\"_ _0\"></span>which the anticipated economic and customer<span class=\"_ _0\"></span> behaviours <span class=\"_ _0\"></span>which </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2ca\">gav<span class=\"_ _0\"></span>e rise to judgemental adjustments at 30 Sep<span class=\"_ _0\"></span>tember 2022 ar<span class=\"_ _0\"></span>e now observ<span class=\"_ _0\"></span>able and thus ar<span class=\"_ _0\"></span>e reflected b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s models. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2cb\">The mov<span class=\"_ _0\"></span>ements also reflect <span class=\"_ _0\"></span>the enhanced ability of<span class=\"_ _0\"></span> the ne<span class=\"_ _0\"></span>w SME lending PD model introduced in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear t<span class=\"_ _0\"></span>o identify potential </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2cc\">impairment, reducing <span class=\"_ _0\"></span>the need for<span class=\"_ _0\"></span> additional overla<span class=\"_ _0\"></span>ys. <span class=\"_ _0\"></span>There has also been a r<span class=\"_ _0\"></span>eduction in the le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> economic and political </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2cd\">uncertainty in <span class=\"_ _0\"></span>the UK, compared <span class=\"_ _0\"></span>to the position at 30 September<span class=\"_ _1\"></span> 2022, which also impacts on the lev<span class=\"_ _0\"></span>el of adjustments r<span class=\"_ _0\"></span>equired. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2ce\">The mov<span class=\"_ _0\"></span>ements in the 2022 financial <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> repr<span class=\"_ _0\"></span>esented a transition <span class=\"_ _0\"></span>from Co<span class=\"_ _0\"></span>vid related o<span class=\"_ _0\"></span>verlays <span class=\"_ _0\"></span>to ones which r<span class=\"_ _0\"></span>elated more <span class=\"_ _0\"></span>to the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2cf\">responsiv<span class=\"_ _0\"></span>eness of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s provision models <span class=\"_ _0\"></span>to economic conditions at the end of<span class=\"_ _0\"></span> that <span class=\"_ _1\"></span>year<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2d0\">The adjustment at 30 September<span class=\"_ _1\"></span> 2022 in the Mortgage Lending book<span class=\"_ _0\"></span> was principally<span class=\"_ _0\"></span> a result<span class=\"_ _0\"></span> of a disconnect betw<span class=\"_ _0\"></span>een the cr<span class=\"_ _0\"></span>edit </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2d1\">metrics which driv<span class=\"_ _0\"></span>e the models and the economic e<span class=\"_ _0\"></span>xpectations of manag<span class=\"_ _0\"></span>ement, brok<span class=\"_ _0\"></span>ers and customers at the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end date. While </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2d2\">some of <span class=\"_ _0\"></span>the anticipated impacts hav<span class=\"_ _0\"></span>e begun to manifest <span class=\"_ _0\"></span>themselves in arr<span class=\"_ _0\"></span>ears performance, neither<span class=\"_ _0\"></span> the Group nor<span class=\"_ _1\"></span> the mortgage </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2d3\">industry mor<span class=\"_ _0\"></span>e generally<span class=\"_ _0\"></span> has seen a significant reaction <span class=\"_ _0\"></span>to higher le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> interest<span class=\"_ _0\"></span> rates and inflation in credit perf<span class=\"_ _0\"></span>ormance as y<span class=\"_ _0\"></span>et. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2d4\">Combined with potential model limitations in r<span class=\"_ _0\"></span>esponding to significant<span class=\"_ _0\"></span> rapid changes in inter<span class=\"_ _0\"></span>est and inflation rates, management </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2d5\">determined it <span class=\"_ _0\"></span>was appropriat<span class=\"_ _0\"></span>e to reduce, but<span class=\"_ _0\"></span> not remo<span class=\"_ _0\"></span>ve the judgmental adjustment.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2d7\">In the Commer<span class=\"_ _0\"></span>cial Lending segment <span class=\"_ _0\"></span>the adjustment at 30 September<span class=\"_ _0\"></span> 2022 related <span class=\"_ _0\"></span>to general economic exposur<span class=\"_ _0\"></span>es for<span class=\"_ _1\"></span> SM<span class=\"_ _15\"></span>Es, with </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2d8\">the outlook f<span class=\"_ _0\"></span>or the sect<span class=\"_ _0\"></span>or consider<span class=\"_ _0\"></span>ed to be less positive <span class=\"_ _0\"></span>than credit me<span class=\"_ _0\"></span>trics indicated at that <span class=\"_ _0\"></span>time. While business confidence is </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2d9\">somewhat impr<span class=\"_ _0\"></span>oved o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the period, <span class=\"_ _0\"></span>views on <span class=\"_ _0\"></span>the outlook are g<span class=\"_ _0\"></span>enerally mix<span class=\"_ _0\"></span>ed, with contradictory<span class=\"_ _0\"></span> indicators on <span class=\"_ _0\"></span>the likely<span class=\"_ _0\"></span> future </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2da\">direction. Ov<span class=\"_ _0\"></span>erall, howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, the av<span class=\"_ _0\"></span>ailable information is indicative o<span class=\"_ _0\"></span>f a more neg<span class=\"_ _0\"></span>ative position than indicat<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the credit metrics in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2db\">the portfolio alone. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs2dc\">During the period a ne<span class=\"_ _0\"></span>w SME lending model was intr<span class=\"_ _0\"></span>oduced, addressing some o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>weakness in <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s modelling approach, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs2dd\">reducing <span class=\"_ _0\"></span>the need for<span class=\"_ _0\"></span> judgemental adjustments. How<span class=\"_ _0\"></span>ever<span class=\"_ _1\"></span>, issues relating <span class=\"_ _0\"></span>to the av<span class=\"_ _0\"></span>ailability o<span class=\"_ _0\"></span>f data r<span class=\"_ _0\"></span>epresenting similar<span class=\"_ _0\"></span> economic </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs2de\">conditions to <span class=\"_ _0\"></span>those currently<span class=\"_ _0\"></span> being observed remain, and it<span class=\"_ _0\"></span> is likely<span class=\"_ _0\"></span> that in the short<span class=\"_ _0\"></span> term a judgemental adjustment <span class=\"_ _0\"></span>will remain </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs2df\">necessary <span class=\"_ _0\"></span>to ensure appr<span class=\"_ _0\"></span>opriate pro<span class=\"_ _0\"></span>visioning levels. <span class=\"_ _1\"></span>These factors t<span class=\"_ _0\"></span>ogether r<span class=\"_ _0\"></span>educed the SME lending ov<span class=\"_ _0\"></span>erlay <span class=\"_ _0\"></span>to \u00a32.5m (2022: \u00a310.<span class=\"_ _0\"></span>0m).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2e0\">In addition a \u00a31.0m o<span class=\"_ _0\"></span>verlay<span class=\"_ _0\"></span> was made <span class=\"_ _0\"></span>to the modelled mo<span class=\"_ _0\"></span>tor <span class=\"_ _0\"></span>finance provision (2022: \u00a3nil) <span class=\"_ _0\"></span>to allow<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> difficulties noted in that model </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2e1\">in responding <span class=\"_ _0\"></span>to a period of <span class=\"_ _0\"></span>falling inflation rapidly<span class=\"_ _0\"></span> following a period o<span class=\"_ _0\"></span>f sharp price rises. <span class=\"_ _0\"></span>This economic scenario depressed <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2e2\">calculated pro<span class=\"_ _0\"></span>vision below a le<span class=\"_ _0\"></span>vel management<span class=\"_ _0\"></span> considered r<span class=\"_ _0\"></span>easonable, given other<span class=\"_ _0\"></span> portfolio data. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2e3\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s analysis f<span class=\"_ _0\"></span>ound no evidence of<span class=\"_ _0\"></span> particular concentrations o<span class=\"_ _0\"></span>f cr<span class=\"_ _0\"></span>edit risk below<span class=\"_ _0\"></span> portfolio lev<span class=\"_ _0\"></span>el. Given this, and <span class=\"_ _0\"></span>the high lev<span class=\"_ _0\"></span>el </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2e4\">nature of<span class=\"_ _0\"></span> the e<span class=\"_ _0\"></span>xercise undertak<span class=\"_ _0\"></span>en, the judg<span class=\"_ _0\"></span>emental adjustments have been apportioned acr<span class=\"_ _0\"></span>oss the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s buy-to-let<span class=\"_ _0\"></span> mortgage, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2e5\">SME lending and motor <span class=\"_ _0\"></span>finance portfolios, as appropriate, <span class=\"_ _0\"></span>to individual Stage 1 cases. <span class=\"_ _1\"></span>As such they ar<span class=\"_ _0\"></span>e included in the cr<span class=\"_ _0\"></span>edit risk </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2e6\">disclosures r<span class=\"_ _0\"></span>equired b<span class=\"_ _0\"></span>y IFRS 7<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2e7\">The Group <span class=\"_ _0\"></span>will continue to monitor<span class=\"_ _1\"></span> the requirement<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> these adjustments as <span class=\"_ _0\"></span>the economic situation develops and its impacts </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2e8\">are mor<span class=\"_ _0\"></span>e fully<span class=\"_ _0\"></span> reflected in model outputs. It is anticipat<span class=\"_ _0\"></span>ed that a mor<span class=\"_ _0\"></span>e normal economic situation would r<span class=\"_ _0\"></span>equire a low<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2e9\">adjustments, but the <span class=\"_ _0\"></span>timescale in which such a scenario might be r<span class=\"_ _0\"></span>eached appears uncertain.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2ea\">The Group has adop<span class=\"_ _0\"></span>ted the <span class=\"_ _0\"></span>terminology f<span class=\"_ _0\"></span>or impairment adjustments pr<span class=\"_ _0\"></span>oposed by<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>askforce on Disclosures about<span class=\"_ _0\"></span> Expected </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2eb\">Credit L<span class=\"_ _0\"></span>oss (\u2018DECL<span class=\"_ _2f\"></span>\u2019) which restricts <span class=\"_ _0\"></span>the use of<span class=\"_ _0\"></span> the term \u2018P<span class=\"_ _0\"></span>ost Model <span class=\"_ _0\"></span>Adjustment\u2019 (\u2018PMA<span class=\"_ _1\"></span>\u2019) to those adjustments calculat<span class=\"_ _0\"></span>ed on an </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2ec\">account-by-<span class=\"_ _0\"></span>account basis and ther<span class=\"_ _0\"></span>efore no long<span class=\"_ _0\"></span>er uses <span class=\"_ _0\"></span>that term <span class=\"_ _0\"></span>for o<span class=\"_ _0\"></span>ther judgemental adjustments.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs2ee\">22. <span class=\"_ _1c\"></span>Loan impairments b<span class=\"_ _0\"></span>y s<span class=\"_ _0\"></span>tage and division<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2ef\">IFRS 9 calculations and related disclosur<span class=\"_ _0\"></span>es require loan asse<span class=\"_ _0\"></span>ts to be divided into <span class=\"_ _0\"></span>three stages, <span class=\"_ _0\"></span>with accounts which <span class=\"_ _0\"></span>were cr<span class=\"_ _0\"></span>edit </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2f0\">impaired on initial r<span class=\"_ _0\"></span>ecognition repr<span class=\"_ _0\"></span>esenting a fourth class.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2f1\">The thr<span class=\"_ _0\"></span>ee classes comprise: those <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>there has been no SICR since advance or<span class=\"_ _1\"></span> acquisition (Stage 1); those wher<span class=\"_ _0\"></span>e ther<span class=\"_ _0\"></span>e has been </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2f2\">an SICR (Stage 2); and loans <span class=\"_ _0\"></span>which are impair<span class=\"_ _0\"></span>ed (Stage 3).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2f3\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>On initial recognition, and for<span class=\"_ _1\"></span> assets where <span class=\"_ _0\"></span>there has not been an SICR, pr<span class=\"_ _0\"></span>ovisions <span class=\"_ _0\"></span>will be made in respect of<span class=\"_ _0\"></span> losses resulting <span class=\"_ _0\"></span>from </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2f4\">the lev<span class=\"_ _0\"></span>el of cr<span class=\"_ _0\"></span>edit default e<span class=\"_ _0\"></span>vents expected in <span class=\"_ _0\"></span>the twelv<span class=\"_ _0\"></span>e months follo<span class=\"_ _0\"></span>wing the balance sheet date<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2f5\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Where a loan has experienced an SICR, whe<span class=\"_ _0\"></span>ther or<span class=\"_ _0\"></span> not the loan is consider<span class=\"_ _0\"></span>ed to be cr<span class=\"_ _0\"></span>edit impaired, pr<span class=\"_ _0\"></span>ovisions <span class=\"_ _0\"></span>will be made based </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2f6\">on the E<span class=\"_ _0\"></span>CLs over<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>full life of<span class=\"_ _0\"></span> the loan </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2f7\">\u2022 <span class=\"_ _13\"> </span>F<span class=\"_ _0\"></span>or cr<span class=\"_ _0\"></span>edit impaired assets, pr<span class=\"_ _0\"></span>ovisions <span class=\"_ _0\"></span>will also be made on the basis of<span class=\"_ _0\"></span> lifetime E<span class=\"_ _0\"></span>CLs<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2f8\">F<span class=\"_ _1\"></span>or assets which <span class=\"_ _0\"></span>were \u2018Pur<span class=\"_ _0\"></span>chased or Originat<span class=\"_ _0\"></span>ed as Credit Impair<span class=\"_ _0\"></span>ed\u2019 (\u2018POCI\u2019) accounts (those considered as cr<span class=\"_ _0\"></span>edit impaired at<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2f9\">point of<span class=\"_ _0\"></span> first r<span class=\"_ _0\"></span>ecognition), such as certain of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s acquired assets in Mortg<span class=\"_ _0\"></span>age Lending<span class=\"_ _0\"></span>, the carrying v<span class=\"_ _0\"></span>aluation is based on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2fa\">expected cash flo<span class=\"_ _0\"></span>ws discounted by<span class=\"_ _0\"></span> the EIR determined at <span class=\"_ _0\"></span>the point of<span class=\"_ _0\"></span> acquisition. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2fb\">The recommendations o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the taskfor<span class=\"_ _0\"></span>ce on Disclosures about Expected Cr<span class=\"_ _0\"></span>edit Loss (\u2018DE<span class=\"_ _0\"></span>CL<span class=\"_ _2f\"></span>\u2019) suggest standard categories <span class=\"_ _0\"></span>for analy<span class=\"_ _0\"></span>sis </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2fc\">of <span class=\"_ _0\"></span>firm\u2019<span class=\"_ _1\"></span>s loan books. In the conte<span class=\"_ _0\"></span>xt of <span class=\"_ _0\"></span>the DECL<span class=\"_ _0\"></span> categorisation <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s Mortgage Lending balances ar<span class=\"_ _0\"></span>e classified as \u2018UK re<span class=\"_ _0\"></span>tail </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2fd\">mortgage<span class=\"_ _0\"></span>\u2019 business while its Commer<span class=\"_ _0\"></span>cial Lending balances, being adv<span class=\"_ _0\"></span>anced primarily t<span class=\"_ _0\"></span>o SME entities correspond with <span class=\"_ _0\"></span>the \u2018UK other<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2fe\">retail\u2019 business classification.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2ff\">The Group de<span class=\"_ _0\"></span>fines coverag<span class=\"_ _0\"></span>e as the <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the E<span class=\"_ _0\"></span>CL pr<span class=\"_ _0\"></span>ovision divided by<span class=\"_ _0\"></span> the gr<span class=\"_ _0\"></span>oss carrying v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the related loans.<span class=\"_ _36a\"> </span></div>An analysis of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s loan portfolios between the stages de<span class=\"_ _0\"></span>fined above is set<span class=\"_ _0\"></span> out below<span class=\"_ _0\"></span>. Stage 1<span class=\"_ _67\"> </span>Stage 2*<span class=\"_ _67\"> </span>Stage 3*<span class=\"_ _a0\"> </span>POCI<span class=\"_ _2c\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Gross loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _13a\"> </span><span class=\"ff15\">12,159.7<span class=\"_ _150\"> </span>625.0<span class=\"_ _d5\"> </span>142.2<span class=\"_ _3a\"> </span>17.7<span class=\"_ _42\"> </span>12,944.6<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _252\"> </span><span class=\"ff15\">1,812.6<span class=\"_ _d5\"> </span>119.8<span class=\"_ _3a\"> </span>63.8<span class=\"_ _9e\"> </span>7.1<span class=\"_ _86\"> </span>2,003.3<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _199\"> </span>13,972.3<span class=\"_ _150\"> </span>744.8<span class=\"_ _d5\"> </span>206.0<span class=\"_ _3a\"> </span>24.8<span class=\"_ _42\"> </span>14,947.9<span class=\"_ _36a\"> </span>Impairment provision<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _162\"> </span><span class=\"ff15\">(4.8)<span class=\"_ _1db\"> </span>(6.1)<span class=\"_ _6c\"> </span>(31.4)<span class=\"_ _fb\"> </span>-<span class=\"_ _72\"> </span>(42.3)<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _253\"> </span><span class=\"ff15\">(14.8)<span class=\"_ _1db\"> </span>(3.3)<span class=\"_ _1db\"> </span>(8.4)<span class=\"_ _1db\"> </span>(4.8)<span class=\"_ _bf\"> </span>(31.3)<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _254\"> </span>(19.6)<span class=\"_ _1db\"> </span>(9.4)<span class=\"_ _bf\"> </span>(39.8)<span class=\"_ _1db\"> </span>(4.8)<span class=\"_ _bf\"> </span>(73.6)<span class=\"_ _36a\"> </span>Net loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _13a\"> </span><span class=\"ff15\">12,154.9<span class=\"_ _150\"> </span>618.9<span class=\"_ _d5\"> </span>110.8<span class=\"_ _3a\"> </span>17.7<span class=\"_ _42\"> </span>12,902.3<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _252\"> </span><span class=\"ff15\">1,797.8<span class=\"_ _d5\"> </span>116.5<span class=\"_ _3a\"> </span>55.4<span class=\"_ _9e\"> </span>2.3<span class=\"_ _86\"> </span>1,972.0<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _199\"> </span>13,952.7<span class=\"_ _150\"> </span>735.4<span class=\"_ _d5\"> </span>166.2<span class=\"_ _3a\"> </span>20.0<span class=\"_ _42\"> </span>14,874.3<span class=\"_ _36a\"> </span>Cover<span class=\"_ _0\"></span>age ra<span class=\"_ _0\"></span>tio<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _90\"> </span><span class=\"ff15\">0.04%<span class=\"_ _9f\"> </span>0.98%<span class=\"_ _86\"> </span>22.08%<span class=\"_ _2c\"> </span>-<span class=\"_ _a8\"> </span>0.33%<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _102\"> </span><span class=\"ff15\">0.82%<span class=\"_ _9f\"> </span>2.75%<span class=\"_ _86\"> </span>13.17%<span class=\"_ _86\"> </span>67.61%<span class=\"_ _9f\"> </span>1.56%<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _195\"> </span>0.14%<span class=\"_ _9f\"> </span>1.26%<span class=\"_ _86\"> </span>19.32%<span class=\"_ _86\"> </span>19.35%<span class=\"_ _9f\"> </span>0.49%<span class=\"_ _36a\"> </span>* Stage 2 and 3 balances are analy<span class=\"_ _0\"></span>sed in more detail below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>Stage 1<span class=\"_ _67\"> </span>Stage 2*<span class=\"_ _67\"> </span>Stage 3*<span class=\"_ _a0\"> </span>POCI<span class=\"_ _2c\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2022<span class=\"_ _36a\"> </span>Gross loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _13a\"> </span><span class=\"ff16\">10,339.6<span class=\"_ _86\"> </span>1,886.4<span class=\"_ _150\"> </span>119.3<span class=\"_ _f7\"> </span>21.4<span class=\"_ _42\"> </span>12,366.7<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _252\"> </span><span class=\"ff16\">1,817.4<span class=\"_ _3a\"> </span>77.2<span class=\"_ _9e\"> </span>5.1<span class=\"_ _9e\"> </span>7.4<span class=\"_ _86\"> </span>1,907.1<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _255\"> </span><span class=\"ff16\">12,157.0<span class=\"_ _86\"> </span>1,963.6<span class=\"_ _d5\"> </span>124.4<span class=\"_ _f7\"> </span>28.8<span class=\"_ _42\"> </span>14,273.8<span class=\"_ _36a\"> </span></span>Impairment provision<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _8b\"> </span>(5.8)<span class=\"_ _1db\"> </span>(6.1)<span class=\"_ _6c\"> </span>(26.1)<span class=\"_ _16b\"> </span>-<span class=\"_ _72\"> </span>(38.0)<span class=\"_ _36a\"> </span>Commercial Lending<span class=\"_ _253\"> </span>(19.7)<span class=\"_ _c8\"> </span>(1.9)<span class=\"_ _c8\"> </span>(2.4)<span class=\"_ _c8\"> </span>(1.5)<span class=\"_ _6c\"> </span>(25.5)<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _254\"> </span><span class=\"ff17\">(25.5)<span class=\"_ _c8\"> </span>(8.0)<span class=\"_ _6c\"> </span>(28.5)<span class=\"_ _1db\"> </span>(1.5)<span class=\"_ _6c\"> </span>(63.5)<span class=\"_ _36a\"> </span></span>Net loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _13a\"> </span><span class=\"ff16\">10,333.8<span class=\"_ _86\"> </span>1,880.3<span class=\"_ _f7\"> </span>93.2<span class=\"_ _3a\"> </span>21.4<span class=\"_ _67\"> </span>12,328.7<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _252\"> </span><span class=\"ff16\">1,797.7<span class=\"_ _3a\"> </span>75.3<span class=\"_ _9e\"> </span>2.7<span class=\"_ _9e\"> </span>5.9<span class=\"_ _86\"> </span>1,881.6<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _255\"> </span><span class=\"ff16\">12,131.5<span class=\"_ _86\"> </span>1,955.6<span class=\"_ _3a\"> </span>95.9<span class=\"_ _3a\"> </span>27.3<span class=\"_ _67\"> </span>14,210.3<span class=\"_ _36a\"> </span></span>Cover<span class=\"_ _0\"></span>age ra<span class=\"_ _0\"></span>tio<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _90\"> </span><span class=\"ff16\">0.06%<span class=\"_ _9f\"> </span>0.32%<span class=\"_ _6d\"> </span>21.88%<span class=\"_ _2c\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.31%<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _102\"> </span><span class=\"ff16\">1.08%<span class=\"_ _9f\"> </span>2.46%<span class=\"_ _6d\"> </span>47.06%<span class=\"_ _86\"> </span>20.27%<span class=\"_ _19c\"> </span>1.34%<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _195\"> </span><span class=\"ff16\">0.21%<span class=\"_ _9f\"> </span>0.41%<span class=\"_ _6d\"> </span>22.91%<span class=\"_ _9f\"> </span>5.21%<span class=\"_ _19c\"> </span>0.44%<span class=\"_ _36a\"> </span></span>* Stage 2 and 3 balances are analy<span class=\"_ _0\"></span>sed in more detail below<span class=\"_ _36a\"> </span><span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>Finance leases included above, analy<span class=\"_ _0\"></span>sed by<span class=\"_ _0\"></span> staging, w<span class=\"_ _0\"></span>ere:<span class=\"_ _36a\"> </span>Stage 1<span class=\"_ _86\"> </span>Stage 2<span class=\"_ _86\"> </span>Stage 3<span class=\"_ _2c\"> </span>POCI<span class=\"_ _a0\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Gross loan book<span class=\"_ _256\"> </span><span class=\"ff15\">873.0<span class=\"_ _3a\"> </span>40.6<span class=\"_ _9e\"> </span>6.0<span class=\"_ _d1\"> </span>0.2<span class=\"_ _150\"> </span>919.8<span class=\"_ _36a\"> </span></span>Impairment provision<span class=\"_ _253\"> </span><span class=\"ff15\">(8.0)<span class=\"_ _1db\"> </span>(1.9)<span class=\"_ _1db\"> </span>(2.6)<span class=\"_ _16b\"> </span>-<span class=\"_ _72\"> </span>(12.5)<span class=\"_ _36a\"> </span></span>Net loan book<span class=\"_ _106\"> </span><span class=\"ff15\">865.0<span class=\"_ _3a\"> </span>38.7<span class=\"_ _d1\"> </span>3.4<span class=\"_ _9e\"> </span>0.2<span class=\"_ _d5\"> </span>907.3<span class=\"_ _36a\"> </span></span>Cover<span class=\"_ _0\"></span>age Ratio<span class=\"_ _257\"> </span><span class=\"ff15\">0.92%<span class=\"_ _9f\"> </span>4.68%<span class=\"_ _86\"> </span>43.33%<span class=\"_ _12d\"> </span>-<span class=\"_ _84\"> </span>1.36%<span class=\"_ _36a\"> </span></span>30 September 2022<span class=\"_ _36a\"> </span>Gross loan book<span class=\"_ _256\"> </span><span class=\"ff16\">801.7<span class=\"_ _3a\"> </span>35.4<span class=\"_ _9e\"> </span>4.4<span class=\"_ _9e\"> </span>0.5<span class=\"_ _150\"> </span>842.0<span class=\"_ _36a\"> </span></span>Impairment provision<span class=\"_ _142\"> </span>(13.3)<span class=\"_ _c8\"> </span>(1.5)<span class=\"_ _c8\"> </span>(2.0)<span class=\"_ _16b\"> </span>-<span class=\"_ _72\"> </span>(16.8)<span class=\"_ _36a\"> </span>Net loan book<span class=\"_ _120\"> </span><span class=\"ff16\">788.4<span class=\"_ _3a\"> </span>33.9<span class=\"_ _9e\"> </span>2.4<span class=\"_ _9e\"> </span>0.5<span class=\"_ _150\"> </span>825.2<span class=\"_ _36a\"> </span></span>Cover<span class=\"_ _0\"></span>age Ratio<span class=\"_ _257\"> </span><span class=\"ff16\">1.66%<span class=\"_ _19c\"> </span>4.24%<span class=\"_ _6d\"> </span>45.45%<span class=\"_ _43\"> </span><span class=\"ff15\">-<span class=\"_ _12c\"> </span></span>2.00%<span class=\"_ _36a\"> </span></span>In terms of<span class=\"_ _1\"></span> the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s credit management pr<span class=\"_ _0\"></span>ocesses, Stage 1 cases will <span class=\"_ _0\"></span>fall within <span class=\"_ _0\"></span>the appropriate customer<span class=\"_ _0\"></span> servicing functions and Stage 2 cases <span class=\"_ _0\"></span>will be subject to account manag<span class=\"_ _0\"></span>ement arrangements. Stage 3 cases <span class=\"_ _0\"></span>will include both those subject<span class=\"_ _0\"></span> to r<span class=\"_ _0\"></span>ecovery<span class=\"_ _0\"></span> or similar pr<span class=\"_ _0\"></span>ocesses and those <span class=\"_ _0\"></span>which, though being managed on a long<span class=\"_ _0\"></span>-term basis, are included <span class=\"_ _0\"></span>with defaulted accounts <span class=\"_ _0\"></span>for r<span class=\"_ _0\"></span>egulatory purposes. Howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, these broad cat<span class=\"_ _0\"></span>egorisations may<span class=\"_ _0\"></span> vary<span class=\"_ _0\"></span> between diff<span class=\"_ _0\"></span>erent pr<span class=\"_ _0\"></span>oduct types.<span class=\"_ _36a\"> </span>POCI balances included in the Commer<span class=\"_ _0\"></span>cial Lending segment arise principally<span class=\"_ _0\"></span> fr<span class=\"_ _0\"></span>om acquired businesses, wher<span class=\"_ _0\"></span>e those assets <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e identified as credit impair<span class=\"_ _0\"></span>ed at the point o<span class=\"_ _0\"></span>f acquisition <span class=\"_ _0\"></span>when the acquired portf<span class=\"_ _0\"></span>olios as a whole <span class=\"_ _0\"></span>were e<span class=\"_ _0\"></span>valuated. <span class=\"_ _1\"></span>Additional provision arising on these assets post-<span class=\"_ _0\"></span>acquisition is shown as \u2018Impairment Pro<span class=\"_ _0\"></span>vision\u2019 abo<span class=\"_ _0\"></span>ve.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s acquired consumer<span class=\"_ _0\"></span> loans are included in <span class=\"_ _0\"></span>the Mortgage L<span class=\"_ _0\"></span>ending segment, together<span class=\"_ _0\"></span> with its closed second char<span class=\"_ _0\"></span>ge mortgage portfolios. <span class=\"_ _1\"></span>Acquired loans which <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e performing on acquisition are included in <span class=\"_ _0\"></span>the staging analysis abov<span class=\"_ _0\"></span>e.<span class=\"_ _36a\"> </span>Acquired portf<span class=\"_ _0\"></span>olios which <span class=\"_ _0\"></span>were larg<span class=\"_ _0\"></span>ely non-perf<span class=\"_ _0\"></span>orming at acquisition, and which w<span class=\"_ _0\"></span>ere pur<span class=\"_ _0\"></span>chased at a deep discount to <span class=\"_ _0\"></span>face v<span class=\"_ _0\"></span>alue, are sho<span class=\"_ _0\"></span>wn as POCI assets above. <span class=\"_ _1\"></span>Although no provision is shown abo<span class=\"_ _0\"></span>ve for<span class=\"_ _1\"></span> such assets, the effect of<span class=\"_ _0\"></span> the discount on pur<span class=\"_ _0\"></span>chase is included in the gr<span class=\"_ _0\"></span>oss v<span class=\"_ _0\"></span>alue ensuring that the carrying <span class=\"_ _0\"></span>value is substantially<span class=\"_ _0\"></span> less than <span class=\"_ _0\"></span>the current balances due <span class=\"_ _0\"></span>from customers and <span class=\"_ _0\"></span>the lev<span class=\"_ _0\"></span>el of co<span class=\"_ _0\"></span>ver is consider<span class=\"_ _0\"></span>able.<span class=\"_ _36a\"> </span>Analysis of<span class=\"_ _0\"></span> Stage 2 loans The table belo<span class=\"_ _0\"></span>w analyses <span class=\"_ _0\"></span>the accounts in Stage 2 betw<span class=\"_ _0\"></span>een those not mor<span class=\"_ _0\"></span>e than one month in arr<span class=\"_ _0\"></span>ears wher<span class=\"_ _0\"></span>e an SICR has nonetheless been identified fr<span class=\"_ _0\"></span>om other inf<span class=\"_ _0\"></span>ormation and accounts more than one month in arr<span class=\"_ _0\"></span>ears.<span class=\"_ _36a\"> </span>Cases which hav<span class=\"_ _0\"></span>e been greater<span class=\"_ _0\"></span> than one month in arr<span class=\"_ _0\"></span>ears in the last <span class=\"_ _0\"></span>three months, but <span class=\"_ _0\"></span>which are not<span class=\"_ _0\"></span> at the balance sheet date ar<span class=\"_ _0\"></span>e shown as \u2018r<span class=\"_ _0\"></span>ecent arrears<span class=\"_ _0\"></span>\u2019 in the tables belo<span class=\"_ _0\"></span>w<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>In all cases accounts which ar<span class=\"_ _0\"></span>e more <span class=\"_ _0\"></span>than one month in arrears, <span class=\"_ _0\"></span>where this is a meaningful measur<span class=\"_ _0\"></span>e, are consider<span class=\"_ _0\"></span>ed to ha<span class=\"_ _0\"></span>ve an SICR. Howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, in certain loan portfolios, regular<span class=\"_ _0\"></span> monthly pa<span class=\"_ _0\"></span>yments of pr<span class=\"_ _0\"></span>e-set amounts are no<span class=\"_ _0\"></span>t requir<span class=\"_ _0\"></span>ed and hence this criterion cannot<span class=\"_ _0\"></span>  be used.<span class=\"_ _36a\"> </span>The Group uses arr<span class=\"_ _0\"></span>ears multiples as a pr<span class=\"_ _0\"></span>oxy <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> days past due, as <span class=\"_ _0\"></span>this measure is commonly<span class=\"_ _0\"></span> used in its arrears r<span class=\"_ _0\"></span>eporting. <span class=\"_ _0\"></span>A loan <span class=\"_ _0\"></span>will generally<span class=\"_ _0\"></span> be one month in arrears <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the point it is one day<span class=\"_ _0\"></span> past due until it is thirty<span class=\"_ _0\"></span> days past due.<span class=\"_ _36a\"> </span>The v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> accounts in Stage 2 has reduced significantly<span class=\"_ _0\"></span> in the Mortgag<span class=\"_ _0\"></span>e Lending segment o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>. This is driven principally<span class=\"_ _0\"></span> by<span class=\"_ _0\"></span> a lower<span class=\"_ _0\"></span> number of<span class=\"_ _1\"></span> accounts identified through model based criteria <span class=\"_ _0\"></span>which are driven b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the economic scenarios input into the models. T<span class=\"_ _0\"></span>he economic for<span class=\"_ _0\"></span>ecasts at 30 September<span class=\"_ _0\"></span> 2022 included significant short term shifts in inter<span class=\"_ _0\"></span>est rates and house prices. <span class=\"_ _0\"></span>These have been r<span class=\"_ _0\"></span>eflected in actual economic performance, <span class=\"_ _0\"></span>to some extent, and <span class=\"_ _0\"></span>the initial parts of <span class=\"_ _0\"></span>the September 2023 scenarios ha<span class=\"_ _0\"></span>ve lower<span class=\"_ _0\"></span> rate mo<span class=\"_ _0\"></span>vements.<span class=\"_ _36a\"> </span>The number<span class=\"_ _0\"></span> of arr<span class=\"_ _0\"></span>ears cases being recor<span class=\"_ _0\"></span>ded has increased, as a r<span class=\"_ _0\"></span>esult of incr<span class=\"_ _1\"></span>easing economic pressure on customers, <span class=\"_ _0\"></span>to some extent repr<span class=\"_ _0\"></span>esenting a proportion of<span class=\"_ _0\"></span> the SICR cases identified at <span class=\"_ _0\"></span>the pre<span class=\"_ _0\"></span>vious y<span class=\"_ _0\"></span>ear end. How<span class=\"_ _0\"></span>ever<span class=\"_ _1\"></span> the scale of <span class=\"_ _0\"></span>this increase is less than indicat<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s modelling at 30 September<span class=\"_ _0\"></span> 2022, with accounts not, so <span class=\"_ _0\"></span>far<span class=\"_ _1\"></span>, as severely<span class=\"_ _0\"></span> impacted by<span class=\"_ _0\"></span> rate rises and cost-of<span class=\"_ _0\"></span>-living issues as predicted. <span class=\"_ _1\"></span>T<span class=\"_ _1\"></span>ogether <span class=\"_ _0\"></span>these factors ha<span class=\"_ _0\"></span>ve led t<span class=\"_ _0\"></span>o a reduction in the o<span class=\"_ _0\"></span>verall Stag<span class=\"_ _0\"></span>e 2 pool.<span class=\"_ _36a\"> </span>In the Commer<span class=\"_ _0\"></span>cial Lending segment <span class=\"_ _0\"></span>the number of<span class=\"_ _0\"></span> Stage 2 accounts has incr<span class=\"_ _0\"></span>eased across all categ<span class=\"_ _0\"></span>ories as the impact of<span class=\"_ _0\"></span> economic pressur<span class=\"_ _0\"></span>es begins to be demonstrat<span class=\"_ _0\"></span>ed, but arrears le<span class=\"_ _0\"></span>vels r<span class=\"_ _0\"></span>emain low<span class=\"_ _0\"></span>. The number<span class=\"_ _1\"></span> of Stage 2 cases has also been incr<span class=\"_ _0\"></span>eased through the adoption of<span class=\"_ _0\"></span> a new SME lending model, <span class=\"_ _0\"></span>which is better able <span class=\"_ _0\"></span>to identify cases <span class=\"_ _0\"></span>where external data indicat<span class=\"_ _0\"></span>es a customer having credit pr<span class=\"_ _0\"></span>oblems befor<span class=\"_ _0\"></span>e any impact<span class=\"_ _0\"></span> is seen on the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s loan book. Overall S<span class=\"_ _0\"></span>tage 2 pro<span class=\"_ _0\"></span>visions have incr<span class=\"_ _0\"></span>eased with the S<span class=\"_ _0\"></span>tage 2 balance, with co<span class=\"_ _0\"></span>verage le<span class=\"_ _0\"></span>vels, on av<span class=\"_ _0\"></span>erage, also incr<span class=\"_ _0\"></span>easing. Pro<span class=\"_ _0\"></span>vision cover<span class=\"_ _0\"></span>age lev<span class=\"_ _0\"></span>els in the Mortgag<span class=\"_ _0\"></span>e Lending segment hav<span class=\"_ _0\"></span>e generally<span class=\"_ _0\"></span> increased, partly<span class=\"_ _0\"></span> as a result of<span class=\"_ _0\"></span> downw<span class=\"_ _0\"></span>ard pr<span class=\"_ _0\"></span>essure on pr<span class=\"_ _0\"></span>operty prices impacting on security <span class=\"_ _0\"></span>values. Co<span class=\"_ _0\"></span>verage le<span class=\"_ _0\"></span>vels in the Commer<span class=\"_ _1\"></span>cial Lending segment increased, although <span class=\"_ _0\"></span>this was mor<span class=\"_ _0\"></span>e related <span class=\"_ _0\"></span>to the mix of S<span class=\"_ _0\"></span>tage 2 assets, and the r<span class=\"_ _0\"></span>elatively<span class=\"_ _0\"></span> small number of<span class=\"_ _0\"></span> cases inv<span class=\"_ _0\"></span>olved.<span class=\"_ _36a\"> </span>&lt; 1 month arrears<span class=\"_ _36a\"> </span>Recent arrears<span class=\"_ _36a\"> </span>&gt; 1 &lt;= 3 months arrears<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal \u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Gross loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _1d1\"> </span><span class=\"ff15\">518.1<span class=\"_ _cb\"> </span>15.8<span class=\"_ _3a\"> </span>91.1<span class=\"_ _150\"> </span>625.0<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _258\"> </span><span class=\"ff15\">116.3<span class=\"_ _9e\"> </span>0.4<span class=\"_ _d1\"> </span>3.1<span class=\"_ _150\"> </span>119.8<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _24b\"> </span>634.4<span class=\"_ _3a\"> </span>16.2<span class=\"_ _3a\"> </span>94.2<span class=\"_ _150\"> </span>744.8<span class=\"_ _36a\"> </span>Impairment provision<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _2e\"> </span><span class=\"ff15\">(2.3)<span class=\"_ _1db\"> </span>(0.1)<span class=\"_ _1db\"> </span>(3.7)<span class=\"_ _1db\"> </span>(6.1)<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _259\"> </span><span class=\"ff15\">(2.9)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(0.4)<span class=\"_ _1db\"> </span>(3.3)<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _25a\"> </span>(5.2)<span class=\"_ _1db\"> </span>(0.1)<span class=\"_ _1db\"> </span>(4.1)<span class=\"_ _1db\"> </span>(9.4)<span class=\"_ _36a\"> </span>Net loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _1d1\"> </span><span class=\"ff15\">515.8<span class=\"_ _cb\"> </span>15.7<span class=\"_ _3a\"> </span>87.4<span class=\"_ _150\"> </span>618.9<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _258\"> </span><span class=\"ff15\">113.4<span class=\"_ _9e\"> </span>0.4<span class=\"_ _d1\"> </span>2.7<span class=\"_ _150\"> </span>116.5<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _24b\"> </span>629.2<span class=\"_ _3a\"> </span>16.1<span class=\"_ _3a\"> </span>90.1<span class=\"_ _150\"> </span>735.4<span class=\"_ _36a\"> </span>Cover<span class=\"_ _0\"></span>age ra<span class=\"_ _0\"></span>tio<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _25b\"> </span><span class=\"ff15\">0.44%<span class=\"_ _9f\"> </span>0.63%<span class=\"_ _9f\"> </span>4.06%<span class=\"_ _9f\"> </span>0.98%<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _19b\"> </span><span class=\"ff15\">2.49%<span class=\"_ _43\"> </span>-<span class=\"_ _12b\"> </span>12.90%<span class=\"_ _9f\"> </span>2.75%<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _251\"> </span>0.82%<span class=\"_ _9f\"> </span>0.62%<span class=\"_ _9f\"> </span>4.35%<span class=\"_ _9f\"> </span>1.26%<span class=\"_ _36a\"> </span>&lt; 1 month arrears<span class=\"_ _36a\"> </span>Recent arrears<span class=\"_ _36a\"> </span>&gt; 1 &lt;= 3 months arrears<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal \u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2022<span class=\"_ _36a\"> </span>Gross loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _25c\"> </span><span class=\"ff16\">1,850.0<span class=\"_ _3a\"> </span>10.8<span class=\"_ _3a\"> </span>25.6<span class=\"_ _86\"> </span>1,886.4<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _11a\"> </span><span class=\"ff16\">74.2<span class=\"_ _9e\"> </span>0.2<span class=\"_ _9e\"> </span>2.8<span class=\"_ _3a\"> </span>77.2<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _1bf\"> </span><span class=\"ff16\">1,924.2<span class=\"_ _f7\"> </span>11.0<span class=\"_ _3a\"> </span>28.4<span class=\"_ _86\"> </span>1,963.6<span class=\"_ _36a\"> </span></span>Impairment provision<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _2e\"> </span>(5.4)<span class=\"_ _c8\"> </span>(0.1)<span class=\"_ _c8\"> </span>(0.6)<span class=\"_ _c8\"> </span>(6.1)<span class=\"_ _36a\"> </span>Commercial Lending<span class=\"_ _259\"> </span>(1.6)<span class=\"_ _16b\"> </span>-<span class=\"_ _16b\"> </span>(0.3)<span class=\"_ _1db\"> </span>(1.9)<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _25a\"> </span><span class=\"ff17\">(7.0)<span class=\"_ _c8\"> </span>(0.1)<span class=\"_ _c8\"> </span>(0.9)<span class=\"_ _c8\"> </span>(8.0)<span class=\"_ _36a\"> </span></span>Net loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _25c\"> </span><span class=\"ff16\">1,844.6<span class=\"_ _3a\"> </span>10.7<span class=\"_ _3a\"> </span>25.0<span class=\"_ _86\"> </span>1,880.3<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _11a\"> </span><span class=\"ff16\">72.6<span class=\"_ _9e\"> </span>0.2<span class=\"_ _9e\"> </span>2.5<span class=\"_ _3a\"> </span>75.3<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _1bf\"> </span><span class=\"ff16\">1,917.2<span class=\"_ _f7\"> </span>10.9<span class=\"_ _3a\"> </span>27.5<span class=\"_ _86\"> </span>1,955.6<span class=\"_ _36a\"> </span></span>Cover<span class=\"_ _0\"></span>age ra<span class=\"_ _0\"></span>tio<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _25b\"> </span><span class=\"ff16\">0.29%<span class=\"_ _9f\"> </span>0.93%<span class=\"_ _19c\"> </span>2.34%<span class=\"_ _19c\"> </span>0.32%<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _19b\"> </span><span class=\"ff16\">2.16%<span class=\"_ _43\"> </span></span>-<span class=\"_ _9f\"> </span><span class=\"ff16\">10.71%<span class=\"_ _9f\"> </span>2.46%<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _251\"> </span><span class=\"ff16\">0.36%<span class=\"_ _19c\"> </span>0.91%<span class=\"_ _9f\"> </span>3.17%<span class=\"_ _19c\"> </span>0.41%<span class=\"_ _36a\"> </span></span>Analysis of<span class=\"_ _0\"></span> Stage 3 loans<span class=\"_ _36a\"> </span>The table belo<span class=\"_ _0\"></span>w analyses <span class=\"_ _0\"></span>the accounts in Stage 3 betw<span class=\"_ _0\"></span>een those:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>In the process of<span class=\"_ _1\"></span> sale or other enf<span class=\"_ _0\"></span>orcement pr<span class=\"_ _0\"></span>ocedures (\u2018R<span class=\"_ _0\"></span>ealisations\u2019)<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Where a receiv<span class=\"_ _0\"></span>er of<span class=\"_ _1\"></span> rent (\u2018RoR\u2019) has been appointed by<span class=\"_ _1\"></span> the Group to manag<span class=\"_ _0\"></span>e the pr<span class=\"_ _0\"></span>operty on the cust<span class=\"_ _0\"></span>omers\u2019 behalf<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Which are being managed on a long-<span class=\"_ _0\"></span>term basis and wher<span class=\"_ _0\"></span>e full r<span class=\"_ _0\"></span>ecovery<span class=\"_ _0\"></span> is possible, but which ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to meet regulat<span class=\"_ _0\"></span>ory default criteria at <span class=\"_ _0\"></span>the balance sheet date (\u2018&gt;3 month arr<span class=\"_ _0\"></span>ears\u2019)<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Which no longer meet r<span class=\"_ _0\"></span>egulatory<span class=\"_ _0\"></span> default criteria but <span class=\"_ _0\"></span>which are being r<span class=\"_ _0\"></span>etained in Stage 3 f<span class=\"_ _0\"></span>or a pr<span class=\"_ _0\"></span>obationary period (\u2018Pr<span class=\"_ _0\"></span>obation\u2019)<span class=\"_ _36a\"> </span>Where an account meets <span class=\"_ _0\"></span>two of<span class=\"_ _0\"></span> the criteria, it<span class=\"_ _0\"></span> will be assigned to <span class=\"_ _0\"></span>the category<span class=\"_ _0\"></span> shown first<span class=\"_ _0\"></span> in the list abov<span class=\"_ _0\"></span>e.<span class=\"_ _36a\"> </span>RoR accounts in Stage 3 ma<span class=\"_ _0\"></span>y be <span class=\"_ _0\"></span>fully up-to-dat<span class=\"_ _0\"></span>e with full r<span class=\"_ _0\"></span>ecovery<span class=\"_ _1\"></span> possible. These accounts are included in Stag<span class=\"_ _0\"></span>e 3 as the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e classified as defaulted f<span class=\"_ _0\"></span>or r<span class=\"_ _0\"></span>egulatory purposes.<span class=\"_ _36a\"> </span>The number<span class=\"_ _0\"></span> and value o<span class=\"_ _0\"></span>f Stage 3 accounts has incr<span class=\"_ _0\"></span>eased in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> across all books. <span class=\"_ _0\"></span>This has mostly<span class=\"_ _0\"></span> been driven by<span class=\"_ _0\"></span> increases in the number<span class=\"_ _0\"></span> of accounts in serious arr<span class=\"_ _0\"></span>ears and by<span class=\"_ _0\"></span> an increased number<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> poorly performing de<span class=\"_ _0\"></span>velopment <span class=\"_ _0\"></span>finance cases in the Commercial L<span class=\"_ _0\"></span>ending book. T<span class=\"_ _0\"></span>his sort of incr<span class=\"_ _0\"></span>ease is not unexpected in a climate o<span class=\"_ _0\"></span>f economic <span class=\"_ _0\"></span>tightening. Realisations cases, particularly<span class=\"_ _0\"></span> in Mortgage L<span class=\"_ _0\"></span>ending have incr<span class=\"_ _0\"></span>eased, as the increase in arr<span class=\"_ _1\"></span>ears cases reported at the half<span class=\"_ _0\"></span> y<span class=\"_ _0\"></span>ear <span class=\"_ _0\"></span>works its w<span class=\"_ _0\"></span>ay <span class=\"_ _0\"></span>through <span class=\"_ _0\"></span>the system. R<span class=\"_ _0\"></span>oR cases in the Mortgag<span class=\"_ _0\"></span>e Lending division hav<span class=\"_ _0\"></span>e remained br<span class=\"_ _0\"></span>oadly stable, how<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>er ther<span class=\"_ _0\"></span>e has been a lev<span class=\"_ _0\"></span>el of churn in <span class=\"_ _0\"></span>the book with old cases se<span class=\"_ _0\"></span>ttled and new appointments made.<span class=\"_ _36a\"> </span>Cover<span class=\"_ _0\"></span>age lev<span class=\"_ _0\"></span>els in the Mortgag<span class=\"_ _0\"></span>e Lending segment on Stage 3 cases ha<span class=\"_ _0\"></span>ve r<span class=\"_ _0\"></span>emained broadly<span class=\"_ _0\"></span> similar<span class=\"_ _0\"></span>, despite the <span class=\"_ _0\"></span>falls in house prices and thus security<span class=\"_ _0\"></span> cover<span class=\"_ _0\"></span> in the <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>. The relativ<span class=\"_ _0\"></span>ely lo<span class=\"_ _0\"></span>w amount of<span class=\"_ _0\"></span> Commercial L<span class=\"_ _0\"></span>ending cases and the <span class=\"_ _0\"></span>variety<span class=\"_ _0\"></span> of cr<span class=\"_ _0\"></span>edit pro<span class=\"_ _0\"></span>files cover<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the division\u2019<span class=\"_ _2\"></span>s lending means that the cover<span class=\"_ _0\"></span>age ratio at any<span class=\"_ _0\"></span> particular <span class=\"_ _0\"></span>time tends <span class=\"_ _0\"></span>to be more a <span class=\"_ _0\"></span>function of <span class=\"_ _0\"></span>the particular accounts in <span class=\"_ _0\"></span>the Stage 3 population at <span class=\"_ _0\"></span>that point, rather<span class=\"_ _0\"></span> than indicative of<span class=\"_ _0\"></span> a general <span class=\"_ _0\"></span>trend. <span class=\"_ _0\"></span>The incr<span class=\"_ _0\"></span>eased number of<span class=\"_ _0\"></span> dev<span class=\"_ _0\"></span>elopment finance cases, wher<span class=\"_ _0\"></span>e security co<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> is relatively<span class=\"_ _1\"></span> high, within the arr<span class=\"_ _0\"></span>ears population has reduced <span class=\"_ _0\"></span>the over<span class=\"_ _0\"></span>all percentage pr<span class=\"_ _0\"></span>ovision r<span class=\"_ _0\"></span>equirement in <span class=\"_ _0\"></span>that division.<span class=\"_ _36a\"> </span>Probation<span class=\"_ _194\"> </span><span class=\"ff15\">&gt; 3 month arrears<span class=\"_ _d0\"> </span>RoR managed<span class=\"_ _37\"> </span></span>Realisations<span class=\"_ _a0\"> </span><span class=\"ff15\">T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Gross loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _257\"> </span><span class=\"ff15\">8.8<span class=\"_ _3a\"> </span>40.4<span class=\"_ _3a\"> </span>50.3<span class=\"_ _3a\"> </span>42.7<span class=\"_ _d5\"> </span>142.2<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _160\"> </span><span class=\"ff15\">1.1<span class=\"_ _cb\"> </span>57.8<span class=\"_ _43\"> </span>-<span class=\"_ _9b\"> </span>4.9<span class=\"_ _3a\"> </span>63.8<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _83\"> </span>9.9<span class=\"_ _cb\"> </span>98.2<span class=\"_ _3a\"> </span>50.3<span class=\"_ _3a\"> </span>47.6<span class=\"_ _150\"> </span>206.0<span class=\"_ _36a\"> </span>Impairment provision<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _25d\"> </span><span class=\"ff15\">-<span class=\"_ _fb\"> </span>(1.2)<span class=\"_ _bf\"> </span>(16.6)<span class=\"_ _bf\"> </span>(13.6)<span class=\"_ _6c\"> </span>(31.4)<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _25e\"> </span><span class=\"ff15\">(0.3)<span class=\"_ _1db\"> </span>(5.5)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(2.6)<span class=\"_ _1db\"> </span>(8.4)<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _25f\"> </span>(0.3)<span class=\"_ _1db\"> </span>(6.7)<span class=\"_ _bf\"> </span>(16.6)<span class=\"_ _bf\"> </span>(16.2)<span class=\"_ _6c\"> </span>(39.8)<span class=\"_ _36a\"> </span>Net loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _257\"> </span><span class=\"ff15\">8.8<span class=\"_ _3a\"> </span>39.2<span class=\"_ _3a\"> </span>33.7<span class=\"_ _3a\"> </span>29.1<span class=\"_ _d5\"> </span>110.8<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _160\"> </span><span class=\"ff15\">0.8<span class=\"_ _cb\"> </span>52.3<span class=\"_ _43\"> </span>-<span class=\"_ _9b\"> </span>2.3<span class=\"_ _3a\"> </span>55.4<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _83\"> </span>9.6<span class=\"_ _cb\"> </span>91.5<span class=\"_ _3a\"> </span>33.7<span class=\"_ _3a\"> </span>31.4<span class=\"_ _150\"> </span>166.2<span class=\"_ _36a\"> </span>Cover<span class=\"_ _0\"></span>age ra<span class=\"_ _0\"></span>tio<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _25d\"> </span><span class=\"ff15\">-<span class=\"_ _12c\"> </span>2.97%<span class=\"_ _6d\"> </span>33.00%<span class=\"_ _86\"> </span>31.85%<span class=\"_ _86\"> </span>22.08%<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _260\"> </span><span class=\"ff15\">27.27%<span class=\"_ _9f\"> </span>9.52%<span class=\"_ _43\"> </span>-<span class=\"_ _12b\"> </span>53.06%<span class=\"_ _86\"> </span>13.17%<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _195\"> </span>3.03%<span class=\"_ _9f\"> </span>6.82%<span class=\"_ _86\"> </span>33.00%<span class=\"_ _86\"> </span>34.03%<span class=\"_ _86\"> </span>19.32%<span class=\"_ _36a\"> </span>Probation<span class=\"_ _194\"> </span><span class=\"ff15\">&gt; 3 month arrears<span class=\"_ _d0\"> </span>RoR managed<span class=\"_ _37\"> </span></span>Realisations<span class=\"_ _a0\"> </span><span class=\"ff15\">T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2022<span class=\"_ _36a\"> </span>Gross loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _257\"> </span><span class=\"ff16\">6.0<span class=\"_ _3a\"> </span>37.5<span class=\"_ _3a\"> </span>49.6<span class=\"_ _f7\"> </span>26.2<span class=\"_ _d5\"> </span>119.3<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _160\"> </span><span class=\"ff16\">0.2<span class=\"_ _d1\"> </span>0.7<span class=\"_ _43\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">4.2<span class=\"_ _9e\"> </span>5.1<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _83\"> </span><span class=\"ff16\">6.2<span class=\"_ _3a\"> </span>38.2<span class=\"_ _3a\"> </span>49.6<span class=\"_ _3a\"> </span>30.4<span class=\"_ _150\"> </span>124.4<span class=\"_ _36a\"> </span></span>Impairment provision<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _8b\"> </span>(0.4)<span class=\"_ _1db\"> </span>(1.0)<span class=\"_ _6c\"> </span>(17.2)<span class=\"_ _c8\"> </span>(7.5)<span class=\"_ _6c\"> </span>(26.1)<span class=\"_ _36a\"> </span>Commercial Lending<span class=\"_ _162\"> </span>-<span class=\"_ _fb\"> </span>(0.2)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(2.2)<span class=\"_ _c8\"> </span>(2.4)<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _25f\"> </span><span class=\"ff17\">(0.4)<span class=\"_ _c8\"> </span>(1.2)<span class=\"_ _6c\"> </span>(17.2)<span class=\"_ _1db\"> </span>(9.7)<span class=\"_ _6c\"> </span>(28.5)<span class=\"_ _36a\"> </span></span>Net loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _257\"> </span><span class=\"ff16\">5.6<span class=\"_ _3a\"> </span>36.5<span class=\"_ _3a\"> </span>32.4<span class=\"_ _f7\"> </span>18.7<span class=\"_ _3a\"> </span>93.2<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _160\"> </span><span class=\"ff16\">0.2<span class=\"_ _d1\"> </span>0.5<span class=\"_ _43\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.0<span class=\"_ _9e\"> </span>2.7<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _83\"> </span><span class=\"ff16\">5.8<span class=\"_ _3a\"> </span>37.0<span class=\"_ _3a\"> </span>32.4<span class=\"_ _3a\"> </span>20.7<span class=\"_ _f7\"> </span>95.9<span class=\"_ _36a\"> </span></span>Cover<span class=\"_ _0\"></span>age ra<span class=\"_ _0\"></span>tio<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _90\"> </span><span class=\"ff16\">6.67%<span class=\"_ _9f\"> </span>2.67%<span class=\"_ _6d\"> </span>34.68%<span class=\"_ _6d\"> </span>28.63%<span class=\"_ _86\"> </span>21.88%<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _162\"> </span>-<span class=\"_ _12b\"> </span><span class=\"ff16\">28.57%<span class=\"_ _43\"> </span></span>-<span class=\"_ _12b\"> </span><span class=\"ff16\">52.38%<span class=\"_ _6d\"> </span>47.06%<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _195\"> </span><span class=\"ff16\">6.45%<span class=\"_ _9f\"> </span>3.14%<span class=\"_ _6d\"> </span>34.68%<span class=\"_ _86\"> </span>31.91%<span class=\"_ _6d\"> </span>22.91%<span class=\"_ _36a\"> </span></span>The security <span class=\"_ _0\"></span>values a<span class=\"_ _0\"></span>vailable t<span class=\"_ _0\"></span>o reduce exposur<span class=\"_ _0\"></span>e at default in <span class=\"_ _0\"></span>the calculation shown above <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> Stage 3 accounts are se<span class=\"_ _0\"></span>t out below<span class=\"_ _0\"></span>. The estimated <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the security<span class=\"_ _0\"></span> repr<span class=\"_ _0\"></span>esents, for<span class=\"_ _0\"></span> each account, the lesser<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>aluation estimate and the exposur<span class=\"_ _0\"></span>e at default in the central scenario<span class=\"_ _0\"></span>. Security <span class=\"_ _0\"></span>values are based on <span class=\"_ _0\"></span>the most recent<span class=\"_ _0\"></span> valuation o<span class=\"_ _0\"></span>f the r<span class=\"_ _1\"></span>elevant asset held b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group, index<span class=\"_ _0\"></span>ed or depreciated as appr<span class=\"_ _0\"></span>opriate.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>First mortg<span class=\"_ _0\"></span>ages<span class=\"_ _261\"> </span><span class=\"ff15\">89.5<span class=\"_ _3a\"> </span><span class=\"ff16\">66.2<span class=\"_ _36a\"> </span></span></span>Second mortgag<span class=\"_ _0\"></span>es<span class=\"_ _262\"> </span><span class=\"ff15\">10.2<span class=\"_ _3a\"> </span><span class=\"ff16\">14.6<span class=\"_ _36a\"> </span></span></span>Asset finance<span class=\"_ _263\"> </span><span class=\"ff15\">1.6<span class=\"_ _9e\"> </span><span class=\"ff16\">1.6<span class=\"_ _36a\"> </span></span></span>Motor finance<span class=\"_ _264\"> </span><span class=\"ff15\">1.2<span class=\"_ _9e\"> </span><span class=\"ff16\">0.7<span class=\"_ _36a\"> </span></span></span>102.5<span class=\"_ _3a\"> </span><span class=\"ff16\">83.1<span class=\"_ _36a\"> </span></span>The RoR manag<span class=\"_ _0\"></span>ed accounts are being managed <span class=\"_ _0\"></span>to ensure <span class=\"_ _0\"></span>the optimal resolution <span class=\"_ _0\"></span>for landlor<span class=\"_ _0\"></span>ds, tenants and lender<span class=\"_ _0\"></span>s and have larg<span class=\"_ _0\"></span>ely reached a long<span class=\"_ _0\"></span>-term, stable position, but the e<span class=\"_ _0\"></span>xistence of <span class=\"_ _0\"></span>the RoR arrang<span class=\"_ _0\"></span>ement causes the accounts t<span class=\"_ _0\"></span>o be treat<span class=\"_ _0\"></span>ed as defaulted f<span class=\"_ _0\"></span>or regulatory<span class=\"_ _0\"></span> purposes. T<span class=\"_ _0\"></span>he Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s RoR arrangements ar<span class=\"_ _0\"></span>e described in more detail belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span>Mortgage L<span class=\"_ _0\"></span>ending balances with ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>three months arr<span class=\"_ _0\"></span>ears include second charge mortgag<span class=\"_ _0\"></span>e accounts originated ov<span class=\"_ _0\"></span>er t<span class=\"_ _0\"></span>en year<span class=\"_ _0\"></span>s ago which ha<span class=\"_ _0\"></span>ve been ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>three months in arr<span class=\"_ _0\"></span>ears for<span class=\"_ _0\"></span> some time. <span class=\"_ _0\"></span>These accounts ar<span class=\"_ _0\"></span>e generally making r<span class=\"_ _0\"></span>egular pa<span class=\"_ _0\"></span>yments and have significant lev<span class=\"_ _0\"></span>els of equity<span class=\"_ _0\"></span> in the underlying pr<span class=\"_ _0\"></span>operty <span class=\"_ _0\"></span>which reduces <span class=\"_ _0\"></span>the requir<span class=\"_ _0\"></span>ed provision <span class=\"_ _0\"></span>to the <span class=\"_ _0\"></span>value shown abo<span class=\"_ _0\"></span>ve. It is expected that a high proportion o<span class=\"_ _0\"></span>f these accounts <span class=\"_ _0\"></span>will ev<span class=\"_ _0\"></span>entually r<span class=\"_ _0\"></span>edeem naturally<span class=\"_ _0\"></span>, either on <span class=\"_ _0\"></span>the sale of<span class=\"_ _0\"></span> the property<span class=\"_ _0\"></span> or b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the satisfaction of<span class=\"_ _0\"></span> the amount due thr<span class=\"_ _0\"></span>ough instalment payments.<span class=\"_ _36a\"> </span>Buy-to-le<span class=\"_ _0\"></span>t receiver<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> rent cases (Stage 3)<span class=\"_ _36a\"> </span>Where a buy<span class=\"_ _0\"></span>-to-let mortgag<span class=\"_ _0\"></span>e customer in England or<span class=\"_ _0\"></span> W<span class=\"_ _1\"></span>ales falls into arrears on <span class=\"_ _0\"></span>their account<span class=\"_ _0\"></span> the Group has <span class=\"_ _0\"></span>the power<span class=\"_ _0\"></span> to appoint<span class=\"_ _0\"></span> a receiv<span class=\"_ _0\"></span>er of<span class=\"_ _0\"></span> rent under<span class=\"_ _1\"></span> the Law of<span class=\"_ _0\"></span> Property<span class=\"_ _0\"></span> A<span class=\"_ _0\"></span>ct. The r<span class=\"_ _0\"></span>eceiver<span class=\"_ _0\"></span> will <span class=\"_ _0\"></span>then manage the pr<span class=\"_ _0\"></span>operty on behalf<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the customer<span class=\"_ _1\"></span>, collecting rents and remitting <span class=\"_ _0\"></span>them to mak<span class=\"_ _0\"></span>e payments on the account. <span class=\"_ _0\"></span>While the r<span class=\"_ _0\"></span>eceiver<span class=\"_ _0\"></span> has the pow<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>to sell the pr<span class=\"_ _0\"></span>operty<span class=\"_ _0\"></span>, in many cases <span class=\"_ _0\"></span>they<span class=\"_ _0\"></span> will operate it as a buy-<span class=\"_ _0\"></span>to-let on at least a short <span class=\"_ _0\"></span>to medium term basis, po<span class=\"_ _0\"></span>tentially longer<span class=\"_ _2\"></span>, depending on the individual circumstances of<span class=\"_ _0\"></span> the case. T<span class=\"_ _0\"></span>his causes less disruption to <span class=\"_ _0\"></span>the tenants and may<span class=\"_ _0\"></span> result in <span class=\"_ _0\"></span>the mortgage account r<span class=\"_ _0\"></span>eturning t<span class=\"_ _0\"></span>o performing status and the property<span class=\"_ _0\"></span> being handed back to <span class=\"_ _0\"></span>the customer<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>The f<span class=\"_ _0\"></span>ollowing table analy<span class=\"_ _0\"></span>ses the number<span class=\"_ _0\"></span> and gross carrying v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> RoR managed accounts shown abo<span class=\"_ _0\"></span>ve b<span class=\"_ _0\"></span>y the dat<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the receiver<span class=\"_ _0\"></span>s\u2019 appointment, illustrating this position.<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _137\"> </span><span class=\"ff17\">30 September 2022<span class=\"_ _36a\"> </span></span>No.<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _118\"> </span><span class=\"ff16\">No.<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Managed accounts<span class=\"_ _36a\"> </span>Appointment date<span class=\"_ _36a\"> </span>2010 and earlier<span class=\"_ _1a5\"> </span><span class=\"ff15\">135<span class=\"_ _3a\"> </span>20.1<span class=\"_ _57\"> </span><span class=\"ff16\">199<span class=\"_ _3a\"> </span>31.2<span class=\"_ _36a\"> </span></span></span>2011 to 2015<span class=\"_ _db\"> </span><span class=\"ff15\">31<span class=\"_ _9e\"> </span>4.5<span class=\"_ _b7\"> </span><span class=\"ff16\">49<span class=\"_ _9e\"> </span>7.1<span class=\"_ _36a\"> </span></span></span>2016 to 2020<span class=\"_ _db\"> </span><span class=\"ff15\">15<span class=\"_ _9e\"> </span>2.0<span class=\"_ _b7\"> </span><span class=\"ff16\">24<span class=\"_ _9e\"> </span>3.2<span class=\"_ _36a\"> </span></span></span>2021 and later<span class=\"_ _265\"> </span><span class=\"ff15\">154<span class=\"_ _3a\"> </span>23.7<span class=\"_ _b7\"> </span><span class=\"ff16\">62<span class=\"_ _9e\"> </span>8.1<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal managed accounts<span class=\"_ _1b8\"> </span>335<span class=\"_ _3a\"> </span>50.3<span class=\"_ _d4\"> </span><span class=\"ff16\">334<span class=\"_ _f7\"> </span>49.6<span class=\"_ _36a\"> </span></span>Accounts in the pr<span class=\"_ _0\"></span>ocess of realisation<span class=\"_ _266\"> </span><span class=\"ff15\">225<span class=\"_ _3a\"> </span>41.0<span class=\"_ _d4\"> </span><span class=\"ff16\">141<span class=\"_ _f7\"> </span>23.5<span class=\"_ _36a\"> </span></span></span>560<span class=\"_ _3a\"> </span>91.3<span class=\"_ _d4\"> </span><span class=\"ff16\">475<span class=\"_ _f7\"> </span>73.1<span class=\"_ _36a\"> </span></span>Receiver<span class=\"_ _1\"></span> of rent accounts in <span class=\"_ _0\"></span>the process of<span class=\"_ _1\"></span> realisation at the period end ar<span class=\"_ _0\"></span>e included under <span class=\"_ _0\"></span>that heading in the Stage 3 <span class=\"_ _0\"></span>tables above. In addition to <span class=\"_ _0\"></span>the cases analysed abov<span class=\"_ _0\"></span>e ther<span class=\"_ _0\"></span>e wer<span class=\"_ _0\"></span>e four<span class=\"_ _0\"></span> other<span class=\"_ _0\"></span> receiver<span class=\"_ _1\"></span> of rent cases in acquir<span class=\"_ _0\"></span>ed mortgage books classified as POCI (2022: nil), meaning that <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s total of<span class=\"_ _0\"></span> receiv<span class=\"_ _0\"></span>er of<span class=\"_ _0\"></span> rent cases at<span class=\"_ _0\"></span> 30 September 2023 <span class=\"_ _0\"></span>was 564 (2022: 475).<span class=\"_ _36a\"> </span>23. <span class=\"_ _1c\"></span>Loan impairments \u2013 pro<span class=\"_ _1\"></span>vision mov<span class=\"_ _0\"></span>ements in the <span class=\"_ _0\"></span>year<span class=\"_ _36a\"> </span>The mov<span class=\"_ _0\"></span>ements in the impairment pr<span class=\"_ _0\"></span>ovision calculated under<span class=\"_ _0\"></span> IFRS 9, analysed b<span class=\"_ _0\"></span>y business segments, ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _36a\"> </span>Commercial Lending<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span>At 30 Sep<span class=\"_ _0\"></span>tember 2022<span class=\"_ _184\"> </span><span class=\"ff16\">38.0<span class=\"_ _f7\"> </span>25.5<span class=\"_ _3a\"> </span>63.5<span class=\"_ _36a\"> </span></span>Provided in period (note 12)<span class=\"_ _225\"> </span><span class=\"ff16\">10.8<span class=\"_ _9e\"> </span>8.3<span class=\"_ _3a\"> </span>19.1<span class=\"_ _36a\"> </span></span>Amounts written off<span class=\"_ _202\"> </span>(6.5)<span class=\"_ _c8\"> </span>(2.5)<span class=\"_ _c8\"> </span>(9.0)<span class=\"_ _36a\"> </span>Assets derecognised<span class=\"_ _155\"> </span>-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>At 30 Sep<span class=\"_ _0\"></span>tember 2023 (note 22)<span class=\"_ _178\"> </span>42.3<span class=\"_ _3a\"> </span>31.3<span class=\"_ _3a\"> </span>73.6<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2021<span class=\"_ _267\"> </span><span class=\"ff16\">37.7<span class=\"_ _3a\"> </span>27.7<span class=\"_ _3a\"> </span>65.4<span class=\"_ _36a\"> </span></span>Provided in period (note 12)<span class=\"_ _154\"> </span><span class=\"ff16\">5.1<span class=\"_ _3a\"> </span>10.7<span class=\"_ _3a\"> </span>15.8<span class=\"_ _36a\"> </span></span>Amounts written off<span class=\"_ _202\"> </span>(3.6)<span class=\"_ _6c\"> </span>(12.9)<span class=\"_ _6c\"> </span>(16.5)<span class=\"_ _36a\"> </span>Assets derecognised<span class=\"_ _23c\"> </span>(1.2)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(1.2)<span class=\"_ _36a\"> </span>At 30 Sep<span class=\"_ _0\"></span>tember 2022 (note 22)<span class=\"_ _178\"> </span><span class=\"ff16\">38.0<span class=\"_ _f7\"> </span>25.5<span class=\"_ _3a\"> </span>63.5<span class=\"_ _36a\"> </span></span>Accounts are consider<span class=\"_ _0\"></span>ed to be <span class=\"_ _0\"></span>written off<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> accounting purposes if a balance r<span class=\"_ _0\"></span>emains once standard enfor<span class=\"_ _0\"></span>cement pr<span class=\"_ _0\"></span>ocesses have been completed, subject <span class=\"_ _0\"></span>to any amount r<span class=\"_ _1\"></span>etained in respect of e<span class=\"_ _0\"></span>xpected salvage r<span class=\"_ _0\"></span>eceipts. <span class=\"_ _0\"></span>This has no effect on <span class=\"_ _0\"></span>the net carrying v<span class=\"_ _0\"></span>alue, only on <span class=\"_ _0\"></span>the amounts reported as gr<span class=\"_ _0\"></span>oss loan balances and accumulated impairment pro<span class=\"_ _0\"></span>visions.<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2023, enfor<span class=\"_ _0\"></span>ceable contractual balances of<span class=\"_ _0\"></span> \u00a37<span class=\"_ _1\"></span>.6m (2022: \u00a34.<span class=\"_ _0\"></span>9m) <span class=\"_ _0\"></span>were outstanding on non-POCI asse<span class=\"_ _0\"></span>ts written off<span class=\"_ _0\"></span> in the period. T<span class=\"_ _0\"></span>his excludes <span class=\"_ _0\"></span>those accounts where a <span class=\"_ _0\"></span>full and final settlement <span class=\"_ _0\"></span>was agr<span class=\"_ _0\"></span>eed and those wher<span class=\"_ _0\"></span>e the contractual <span class=\"_ _0\"></span>terms do not permit any<span class=\"_ _0\"></span> further<span class=\"_ _0\"></span> action. Enforceable balances ar<span class=\"_ _0\"></span>e kept under<span class=\"_ _1\"></span> review<span class=\"_ _0\"></span> for<span class=\"_ _1\"></span> operational purposes, but no amounts are recognised in respect o<span class=\"_ _0\"></span>f such accounts unless further<span class=\"_ _0\"></span> cash is receiv<span class=\"_ _0\"></span>ed or <span class=\"_ _0\"></span>there is a str<span class=\"_ _0\"></span>ong expectation that it <span class=\"_ _0\"></span>will be.<span class=\"_ _36a\"> </span>A mor<span class=\"_ _0\"></span>e detailed analysis o<span class=\"_ _0\"></span>f these mo<span class=\"_ _0\"></span>vements b<span class=\"_ _0\"></span>y IFRS 9 stage on a consolidated basis f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span> ended 30 September 2023 and  30 September<span class=\"_ _0\"></span> 2022 is set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>These tables, and <span class=\"_ _0\"></span>the matching tables analy<span class=\"_ _0\"></span>sing movements in gr<span class=\"_ _0\"></span>oss balances, have been compiled b<span class=\"_ _0\"></span>y comparing opening and closing balances on each account and analysing <span class=\"_ _0\"></span>the movements betw<span class=\"_ _0\"></span>een them.<span class=\"_ _36a\"> </span>Changes due t<span class=\"_ _0\"></span>o credit risk includes all chang<span class=\"_ _0\"></span>es in model parameters <span class=\"_ _0\"></span>whether r<span class=\"_ _0\"></span>elated to account perf<span class=\"_ _0\"></span>ormance, external credit<span class=\"_ _0\"></span> data or model assumptions, including economic scenarios and w<span class=\"_ _0\"></span>eightings.<span class=\"_ _36a\"> </span>The changes in models intr<span class=\"_ _0\"></span>oduced during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> did not create significant mo<span class=\"_ _0\"></span>vements in balances.<span class=\"_ _36a\"> </span>Stage 1<span class=\"_ _86\"> </span>Stage 2<span class=\"_ _86\"> </span>Stage 3<span class=\"_ _2c\"> </span>POCI<span class=\"_ _a0\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span>Loss allowance at 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _a2\"> </span><span class=\"ff16\">25.5<span class=\"_ _d1\"> </span>8.0<span class=\"_ _f7\"> </span>28.5<span class=\"_ _9e\"> </span>1.5<span class=\"_ _3a\"> </span>63.5<span class=\"_ _36a\"> </span></span>New assets originated or pur<span class=\"_ _0\"></span>chased<span class=\"_ _ac\"> </span><span class=\"ff16\">9.5<span class=\"_ _43\"> </span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">9.5<span class=\"_ _36a\"> </span></span>Changes in loss allowance <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 1<span class=\"_ _268\"> </span><span class=\"ff16\">2.8<span class=\"_ _ff\"> </span></span>(2.7)<span class=\"_ _c8\"> </span>(0.1)<span class=\"_ _16b\"> </span>-<span class=\"_ _10b\"> </span>- <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 2<span class=\"_ _142\"> </span>(1.7)<span class=\"_ _ff\"> </span><span class=\"ff16\">2.0<span class=\"_ _ff\"> </span></span>(0.3)<span class=\"_ _16b\"> </span>-<span class=\"_ _10b\"> </span>- <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 3<span class=\"_ _142\"> </span>(0.2)<span class=\"_ _1db\"> </span>(1.9)<span class=\"_ _d4\"> </span><span class=\"ff16\">2.1<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>- <span class=\"_ _c0\"> </span>Changes on stage trans<span class=\"_ _0\"></span>fer<span class=\"_ _e3\"> </span>(2.5)<span class=\"_ _ff\"> </span><span class=\"ff16\">2.3<span class=\"_ _f7\"> </span>14.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _40\"> </span><span class=\"ff16\">14.4</span> <span class=\"_ _c0\"> </span>Changes due to credit risk<span class=\"_ _79\"> </span>(13.8)<span class=\"_ _ff\"> </span><span class=\"ff16\">1.7<span class=\"_ _9e\"> </span>4.0<span class=\"_ _9e\"> </span>3.3<span class=\"_ _ff\"> </span></span>(4.8) <span class=\"_ _c0\"> </span>Loans sold<span class=\"_ _269\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>- <span class=\"_ _c0\"> </span>Write offs<span class=\"_ _105\"> </span>-<span class=\"_ _209\"> </span>-<span class=\"_ _16b\"> </span>(9.0)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(9.0)<span class=\"_ _36a\"> </span>Loss allowance at 30 Sept<span class=\"_ _0\"></span>ember 2023<span class=\"_ _c1\"> </span>19.6<span class=\"_ _9e\"> </span>9.4<span class=\"_ _3a\"> </span>39.8<span class=\"_ _d1\"> </span>4.8<span class=\"_ _3a\"> </span>73.6<span class=\"_ _36a\"> </span>Loss allowance at 30 Sept<span class=\"_ _0\"></span>ember 2021<span class=\"_ _a2\"> </span><span class=\"ff16\">15.0<span class=\"_ _3a\"> </span>11.3<span class=\"_ _3a\"> </span>38.9<span class=\"_ _9e\"> </span>0.2<span class=\"_ _3a\"> </span>65.4<span class=\"_ _36a\"> </span></span>New assets originated or pur<span class=\"_ _0\"></span>chased<span class=\"_ _ac\"> </span><span class=\"ff16\">7.2<span class=\"_ _43\"> </span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">7.2<span class=\"_ _36a\"> </span></span>Changes in loss allowance <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 1<span class=\"_ _268\"> </span><span class=\"ff16\">2.6<span class=\"_ _ff\"> </span></span>(2.3)<span class=\"_ _c8\"> </span>(0.3)<span class=\"_ _16b\"> </span>-<span class=\"_ _10b\"> </span>- <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 2<span class=\"_ _142\"> </span>(1.6)<span class=\"_ _ff\"> </span><span class=\"ff16\">2.3<span class=\"_ _ff\"> </span></span>(0.7)<span class=\"_ _16b\"> </span>-<span class=\"_ _10b\"> </span>- <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 3<span class=\"_ _142\"> </span>(0.2)<span class=\"_ _1db\"> </span>(0.4)<span class=\"_ _d4\"> </span><span class=\"ff16\">0.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>- <span class=\"_ _c0\"> </span>Changes on stage trans<span class=\"_ _0\"></span>fer<span class=\"_ _e3\"> </span>(2.4)<span class=\"_ _ff\"> </span><span class=\"ff16\">1.8<span class=\"_ _9e\"> </span>4.3<span class=\"_ _43\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">3.7</span> <span class=\"_ _c0\"> </span>Changes due to credit risk<span class=\"_ _114\"> </span><span class=\"ff16\">4.9<span class=\"_ _ff\"> </span></span>(4.7)<span class=\"_ _ff\"> </span><span class=\"ff16\">3.4<span class=\"_ _9e\"> </span>1.3<span class=\"_ _9e\"> </span>4.9</span> <span class=\"_ _c0\"> </span>Loans sold<span class=\"_ _269\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _fb\"> </span>(1.2)<span class=\"_ _16b\"> </span>-<span class=\"_ _16b\"> </span>(1.2) <span class=\"_ _c0\"> </span>Write offs<span class=\"_ _105\"> </span>-<span class=\"_ _209\"> </span>-<span class=\"_ _72\"> </span>(16.5)<span class=\"_ _b7\"> </span>-<span class=\"_ _1c1\"> </span>(16.5)<span class=\"_ _36a\"> </span>Loss allowance at 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _c1\"> </span><span class=\"ff16\">25.5<span class=\"_ _9e\"> </span>8.0<span class=\"_ _3a\"> </span>28.5<span class=\"_ _9e\"> </span>1.5<span class=\"_ _f7\"> </span>63.5<span class=\"_ _36a\"> </span></span>During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 <span class=\"_ _0\"></span>the impairment allow<span class=\"_ _0\"></span>ance increased, driven mostly<span class=\"_ _0\"></span> by<span class=\"_ _0\"></span> the incr<span class=\"_ _0\"></span>ease in Stage 3 and POCI cases, a result o<span class=\"_ _0\"></span>f the le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> actual defaults in <span class=\"_ _0\"></span>the period, particularly in the de<span class=\"_ _0\"></span>velopment <span class=\"_ _0\"></span>finance business, and by<span class=\"_ _0\"></span> reduced lev<span class=\"_ _0\"></span>els of available security<span class=\"_ _0\"></span> thr<span class=\"_ _0\"></span>ough declining house prices in the mortgag<span class=\"_ _0\"></span>e segment.<span class=\"_ _36a\"> </span>The net r<span class=\"_ _0\"></span>eduction in Stage 1 pr<span class=\"_ _0\"></span>ovisions includes the eff<span class=\"_ _0\"></span>ect of chang<span class=\"_ _0\"></span>es in judgemental adjustments in the period, <span class=\"_ _0\"></span>with items formerly<span class=\"_ _0\"></span> addressed b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>these provisions beginning <span class=\"_ _0\"></span>to mov<span class=\"_ _0\"></span>e through S<span class=\"_ _0\"></span>tage 2 and Stage 3. <span class=\"_ _0\"></span>These mov<span class=\"_ _0\"></span>ements wer<span class=\"_ _0\"></span>e driven b<span class=\"_ _0\"></span>y both account performance, and by<span class=\"_ _0\"></span> the impact o<span class=\"_ _0\"></span>f mor<span class=\"_ _0\"></span>e sever<span class=\"_ _0\"></span>e actual and for<span class=\"_ _0\"></span>ecast economic conditions.<span class=\"_ _36a\"> </span>During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2022 <span class=\"_ _0\"></span>the impairment allow<span class=\"_ _0\"></span>ance remained r<span class=\"_ _0\"></span>elatively stable, due <span class=\"_ _0\"></span>to the opposing eff<span class=\"_ _0\"></span>ects of <span class=\"_ _0\"></span>the easing of Co<span class=\"_ _0\"></span>vid-related pr<span class=\"_ _0\"></span>essures on <span class=\"_ _0\"></span>the UK economy<span class=\"_ _0\"></span> and mounting concerns about the nation<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s economic health more generally<span class=\"_ _1\"></span>, with inflation and interest r<span class=\"_ _0\"></span>ates increasing and <span class=\"_ _0\"></span>the potential f<span class=\"_ _0\"></span>or impacts fr<span class=\"_ _0\"></span>om the conflict in Ukr<span class=\"_ _0\"></span>aine.<span class=\"_ _36a\"> </span>The increase in S<span class=\"_ _0\"></span>tage 1 pro<span class=\"_ _0\"></span>vision in that <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> came mostly fr<span class=\"_ _0\"></span>om new<span class=\"_ _0\"></span> lending, coupled with <span class=\"_ _0\"></span>the need to mak<span class=\"_ _0\"></span>e judgemental increases in the pro<span class=\"_ _0\"></span>vision balance. Stage 2 pro<span class=\"_ _0\"></span>visions reduced slightly<span class=\"_ _0\"></span> as the impacts of<span class=\"_ _0\"></span> additional Covid-r<span class=\"_ _0\"></span>elated SICRs in 2021 fell a<span class=\"_ _0\"></span>way<span class=\"_ _1\"></span>. Stage 3 pro<span class=\"_ _0\"></span>vision declined as bought forw<span class=\"_ _0\"></span>ard cases <span class=\"_ _0\"></span>were r<span class=\"_ _0\"></span>esolved, in both <span class=\"_ _0\"></span>the Commercial L<span class=\"_ _0\"></span>ending and Mortgage L<span class=\"_ _0\"></span>ending divisions. The mov<span class=\"_ _0\"></span>ements in the L<span class=\"_ _0\"></span>oans to Customers balances in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> which these loss allo<span class=\"_ _0\"></span>wances hav<span class=\"_ _0\"></span>e been made are set out belo<span class=\"_ _0\"></span>w<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>Stage 1<span class=\"_ _86\"> </span>Stage 2<span class=\"_ _86\"> </span>Stage 3<span class=\"_ _2c\"> </span>POCI<span class=\"_ _a0\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span>Balance at 30 September 2022<span class=\"_ _54\"> </span><span class=\"ff16\">12,157.0<span class=\"_ _86\"> </span>1,963.6<span class=\"_ _150\"> </span>124.4<span class=\"_ _3a\"> </span>28.8<span class=\"_ _67\"> </span>14,273.8<span class=\"_ _36a\"> </span></span>New assets originated or pur<span class=\"_ _0\"></span>chased<span class=\"_ _182\"> </span><span class=\"ff16\">3,128.4<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _12b\"> </span><span class=\"ff16\">3,128.4<span class=\"_ _36a\"> </span></span>Changes in staging <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 1<span class=\"_ _7b\"> </span><span class=\"ff16\">1,258.9<span class=\"_ _44\"> </span></span>(1,255.7)<span class=\"_ _c8\"> </span>(3.2)<span class=\"_ _b7\"> </span>-<span class=\"_ _10b\"> </span>- <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 2<span class=\"_ _26a\"> </span>(365.6)<span class=\"_ _12b\"> </span><span class=\"ff16\">372.9<span class=\"_ _ff\"> </span></span>(7.3)<span class=\"_ _16b\"> </span>-<span class=\"_ _10b\"> </span>- <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 3<span class=\"_ _26b\"> </span>(28.9)<span class=\"_ _b6\"> </span>(104.7)<span class=\"_ _12b\"> </span><span class=\"ff16\">133.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>Redemptions and r<span class=\"_ _0\"></span>epayments<span class=\"_ _26c\"> </span>(2,773.3)<span class=\"_ _b6\"> </span>(250.6)<span class=\"_ _6c\"> </span>(44.8)<span class=\"_ _6c\"> </span>(10.5)<span class=\"_ _1d4\"> </span>(3,079.2)<span class=\"_ _36a\"> </span>Loans sold<span class=\"_ _1a3\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>Writ<span class=\"_ _0\"></span>e offs<span class=\"_ _26d\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _fb\"> </span>(9.0)<span class=\"_ _16b\"> </span>-<span class=\"_ _16b\"> </span>(9.0)<span class=\"_ _36a\"> </span>Other changes<span class=\"_ _26e\"> </span><span class=\"ff16\">595.8<span class=\"_ _3a\"> </span>19.3<span class=\"_ _3a\"> </span>12.3<span class=\"_ _9e\"> </span>6.5<span class=\"_ _150\"> </span>633.9<span class=\"_ _36a\"> </span></span>Balance at 30 September 2023<span class=\"_ _10a\"> </span>13,972.3<span class=\"_ _d5\"> </span>744.8<span class=\"_ _d5\"> </span>206.0<span class=\"_ _3a\"> </span>24.8<span class=\"_ _42\"> </span>14,947.9<span class=\"_ _36a\"> </span>Loss allowance<span class=\"_ _26f\"> </span>(19.6)<span class=\"_ _c8\"> </span>(9.4)<span class=\"_ _6c\"> </span>(39.8)<span class=\"_ _1db\"> </span>(4.8)<span class=\"_ _6c\"> </span>(73.6)<span class=\"_ _36a\"> </span>Carrying value<span class=\"_ _25e\"> </span><span class=\"ff16\">13,952.7<span class=\"_ _150\"> </span>735.4<span class=\"_ _150\"> </span>166.2<span class=\"_ _3a\"> </span>20.0<span class=\"_ _67\"> </span>14,874.3<span class=\"_ _36a\"> </span></span>Balance at 30 September 2021<span class=\"_ _54\"> </span><span class=\"ff16\">11,900.4<span class=\"_ _86\"> </span>1,279.1<span class=\"_ _150\"> </span>164.3<span class=\"_ _d5\"> </span>124.3<span class=\"_ _67\"> </span>13,468.1<span class=\"_ _36a\"> </span></span>New assets originated or pur<span class=\"_ _0\"></span>chased<span class=\"_ _182\"> </span><span class=\"ff16\">3,020.8<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _12b\"> </span><span class=\"ff16\">3,020.8<span class=\"_ _36a\"> </span></span>Changes in staging <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 1<span class=\"_ _c3\"> </span><span class=\"ff16\">519.4<span class=\"_ _133\"> </span></span>(516.8)<span class=\"_ _c8\"> </span>(2.6)<span class=\"_ _b7\"> </span>-<span class=\"_ _10b\"> </span>- <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 2<span class=\"_ _270\"> </span>(1,365.2)<span class=\"_ _44\"> </span><span class=\"ff16\">1,378.2<span class=\"_ _12c\"> </span></span>(13.0)<span class=\"_ _b7\"> </span>-<span class=\"_ _209\"> </span>- <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 3<span class=\"_ _26b\"> </span>(29.5)<span class=\"_ _6c\"> </span>(16.6)<span class=\"_ _12c\"> </span><span class=\"ff16\">46.1<span class=\"_ _43\"> </span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _36a\"> </span>Redemptions and r<span class=\"_ _0\"></span>epayments<span class=\"_ _26c\"> </span>(2,311.2)<span class=\"_ _b6\"> </span>(230.4)<span class=\"_ _6c\"> </span>(55.6)<span class=\"_ _6c\"> </span>(33.1)<span class=\"_ _1d4\"> </span>(2,630.3)<span class=\"_ _36a\"> </span>Loans sold<span class=\"_ _1a3\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _fb\"> </span>(1.5)<span class=\"_ _6c\"> </span>(73.8)<span class=\"_ _6c\"> </span>(75.3)<span class=\"_ _36a\"> </span>Writ<span class=\"_ _0\"></span>e offs<span class=\"_ _26d\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _72\"> </span>(16.5)<span class=\"_ _16b\"> </span>-<span class=\"_ _72\"> </span>(16.5)<span class=\"_ _36a\"> </span>Other changes<span class=\"_ _26e\"> </span><span class=\"ff16\">422.3<span class=\"_ _3a\"> </span>70.1<span class=\"_ _9e\"> </span>3.2<span class=\"_ _3a\"> </span>11.4<span class=\"_ _150\"> </span>507.0<span class=\"_ _36a\"> </span></span>Balance at 30 September 2022<span class=\"_ _10a\"> </span><span class=\"ff16\">12,157.0<span class=\"_ _86\"> </span>1,963.6<span class=\"_ _d5\"> </span>124.4<span class=\"_ _3a\"> </span>28.8<span class=\"_ _67\"> </span>14,273.8<span class=\"_ _36a\"> </span></span>Loss allowance<span class=\"_ _26f\"> </span>(25.5)<span class=\"_ _c8\"> </span>(8.0)<span class=\"_ _6c\"> </span>(28.5)<span class=\"_ _1db\"> </span>(1.5)<span class=\"_ _6c\"> </span>(63.5)<span class=\"_ _36a\"> </span>Carrying value<span class=\"_ _25e\"> </span><span class=\"ff16\">12,131.5<span class=\"_ _86\"> </span>1,955.6<span class=\"_ _3a\"> </span>95.9<span class=\"_ _f7\"> </span>27.3<span class=\"_ _67\"> </span>14,210.3<span class=\"_ _36a\"> </span></span>Other chang<span class=\"_ _0\"></span>es includes interest and similar<span class=\"_ _0\"></span> charges.<span class=\"_ _36a\"> </span>24. <span class=\"_ _1c\"></span>L<span class=\"_ _0\"></span>oan impairments \u2013 economic inputs to calculations<span class=\"_ _36a\"> </span>Impairment pro<span class=\"_ _0\"></span>vision under IFRS 9 is calculated on a f<span class=\"_ _0\"></span>orward-looking E<span class=\"_ _0\"></span>CL<span class=\"_ _0\"></span> basis, based on expected economic conditions in multiple internally coher<span class=\"_ _0\"></span>ent scenarios. <span class=\"_ _0\"></span>While the pro<span class=\"_ _0\"></span>vision calculation is intended to addr<span class=\"_ _0\"></span>ess all possible futur<span class=\"_ _0\"></span>e economic outcomes, the Gr<span class=\"_ _0\"></span>oup, in common with most other<span class=\"_ _1\"></span> lenders, uses a small number of diff<span class=\"_ _0\"></span>ering scenarios as repr<span class=\"_ _0\"></span>esentatives of<span class=\"_ _0\"></span> this univer<span class=\"_ _0\"></span>se of pot<span class=\"_ _0\"></span>ential outturns.<span class=\"_ _36a\"> </span>The Group uses <span class=\"_ _0\"></span>four<span class=\"_ _0\"></span> distinct economic scenarios chosen to r<span class=\"_ _0\"></span>epresent <span class=\"_ _0\"></span>the range of<span class=\"_ _0\"></span> possible outcomes and allow<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> the impact of<span class=\"_ _0\"></span> economic asymmetry<span class=\"_ _0\"></span> in the calculations. Each scenario comprises a number<span class=\"_ _0\"></span> of economic par<span class=\"_ _0\"></span>ameters and while models <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> different portfolios may<span class=\"_ _0\"></span> not use all of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>variables, the se<span class=\"_ _0\"></span>t, as a whole, is defined f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the Group and must be consistent.<span class=\"_ _36a\"> </span>As the Gr<span class=\"_ _0\"></span>oup does not hav<span class=\"_ _0\"></span>e an internal economics function, in dev<span class=\"_ _0\"></span>eloping its economic scenarios it considers analysis <span class=\"_ _0\"></span>from r<span class=\"_ _0\"></span>eputable external sour<span class=\"_ _0\"></span>ces to f<span class=\"_ _0\"></span>orm a general mark<span class=\"_ _0\"></span>et consensus which informs its centr<span class=\"_ _0\"></span>al scenario. T<span class=\"_ _0\"></span>hese sources include data and f<span class=\"_ _0\"></span>orecasts produced b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Office of Budge<span class=\"_ _0\"></span>t Responsibility<span class=\"_ _0\"></span> (\u2018OBR\u2019) and the PRA<span class=\"_ _0\"></span> as well as priv<span class=\"_ _0\"></span>ate sector<span class=\"_ _0\"></span> economic resear<span class=\"_ _0\"></span>ch bodies. The Gr<span class=\"_ _0\"></span>oup also tak<span class=\"_ _0\"></span>es account of public stat<span class=\"_ _0\"></span>ements from bodies such as <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England and the UK Go<span class=\"_ _0\"></span>vernment <span class=\"_ _0\"></span>to inform its final position.<span class=\"_ _36a\"> </span>The central scenario used f<span class=\"_ _0\"></span>or IFRS 9 impairment purposes is consistent <span class=\"_ _0\"></span>with the scenario <span class=\"_ _0\"></span>which forms the basis o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s business planning and for<span class=\"_ _0\"></span>ecasting and will <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore generally<span class=\"_ _0\"></span> carry <span class=\"_ _0\"></span>the highest probability<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>eighting. In its September<span class=\"_ _0\"></span> 2023 for<span class=\"_ _0\"></span>ecasting cycle (the \u2018October<span class=\"_ _1\"></span> forecast\u2019), <span class=\"_ _0\"></span>the Group has adopted a centr<span class=\"_ _0\"></span>al economic scenario derived using a broadly<span class=\"_ _0\"></span> equivalent approach <span class=\"_ _0\"></span>to that used in Sept<span class=\"_ _0\"></span>ember 2022, <span class=\"_ _0\"></span>with the starting point of<span class=\"_ _0\"></span> the scenario updated <span class=\"_ _0\"></span>to reflect <span class=\"_ _0\"></span>the actual mov<span class=\"_ _0\"></span>ements of economic variables in the year<span class=\"_ _1\"></span>. The general <span class=\"_ _0\"></span>trend of<span class=\"_ _1\"></span> the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s central forecasts <span class=\"_ _0\"></span>follow<span class=\"_ _0\"></span>s that published by<span class=\"_ _0\"></span> the Bank<span class=\"_ _0\"></span> of England in <span class=\"_ _0\"></span>August 2023, how<span class=\"_ _0\"></span>ever<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup has tak<span class=\"_ _0\"></span>en a more pessimistic position <span class=\"_ _0\"></span>than the Bank. Monetary<span class=\"_ _0\"></span> policy is <span class=\"_ _0\"></span>forecast<span class=\"_ _0\"></span> to remain <span class=\"_ _0\"></span>tight, with pr<span class=\"_ _0\"></span>essure on r<span class=\"_ _0\"></span>eal incomes, leading to minimal gr<span class=\"_ _0\"></span>owth, rising unemployment<span class=\"_ _0\"></span> and a slow decline in inflation. <span class=\"_ _0\"></span>As a result, inter<span class=\"_ _1\"></span>est rates are f<span class=\"_ _0\"></span>orecast <span class=\"_ _0\"></span>to remain high, with a short-term decline in pr<span class=\"_ _0\"></span>operty <span class=\"_ _0\"></span>values.<span class=\"_ _36a\"> </span>Compared <span class=\"_ _0\"></span>to the central scenario adop<span class=\"_ _0\"></span>ted at 30 September<span class=\"_ _0\"></span> 2022, the new<span class=\"_ _0\"></span> central f<span class=\"_ _0\"></span>orecast is gener<span class=\"_ _0\"></span>ally mor<span class=\"_ _0\"></span>e pessimistic across most v<span class=\"_ _0\"></span>ariables, with a much mor<span class=\"_ _0\"></span>e sever<span class=\"_ _0\"></span>e decline in house prices than in <span class=\"_ _0\"></span>the earlier scenario and a mor<span class=\"_ _0\"></span>e prolong<span class=\"_ _0\"></span>ed period of ele<span class=\"_ _0\"></span>vated interest r<span class=\"_ _0\"></span>ates. T<span class=\"_ _0\"></span>he scenario also begins from <span class=\"_ _0\"></span>the actual September<span class=\"_ _0\"></span> 2023 economic position, so the inter<span class=\"_ _0\"></span>est rate rises, incr<span class=\"_ _0\"></span>eased inflation and house price falls observ<span class=\"_ _0\"></span>ed in the period are included in <span class=\"_ _0\"></span>the starting position. The upside and downside scenarios continue <span class=\"_ _0\"></span>to be derived fr<span class=\"_ _0\"></span>om the central scenario<span class=\"_ _0\"></span>, as they<span class=\"_ _0\"></span> hav<span class=\"_ _0\"></span>e been in previous periods. <span class=\"_ _1\"></span>The shapes of <span class=\"_ _0\"></span>these thr<span class=\"_ _0\"></span>ee scenarios are br<span class=\"_ _0\"></span>oadly similar<span class=\"_ _0\"></span> across <span class=\"_ _0\"></span>the for<span class=\"_ _0\"></span>ecast period, with <span class=\"_ _0\"></span>the upside scenario having a more r<span class=\"_ _0\"></span>apid reduction in inflation, leading to a <span class=\"_ _0\"></span>faster r<span class=\"_ _0\"></span>eduction in base rates and a str<span class=\"_ _0\"></span>onger r<span class=\"_ _0\"></span>ecov<span class=\"_ _0\"></span>ery<span class=\"_ _0\"></span>. T<span class=\"_ _0\"></span>he downside includes traditional r<span class=\"_ _0\"></span>ecessionary <span class=\"_ _0\"></span>factors with additional pressur<span class=\"_ _0\"></span>e on house prices and rising unemployment, <span class=\"_ _0\"></span>with interest rat<span class=\"_ _0\"></span>es being reduced mor<span class=\"_ _0\"></span>e rapidly in r<span class=\"_ _0\"></span>esponse.<span class=\"_ _36a\"> </span>The sev<span class=\"_ _0\"></span>ere scenario has been deriv<span class=\"_ _0\"></span>ed from str<span class=\"_ _0\"></span>ess testing scenarios published b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Bank of England, as in pr<span class=\"_ _1\"></span>evious periods, with the 2022 Annual Cy<span class=\"_ _0\"></span>clical Scenario (\u2018<span class=\"_ _1\"></span>ACS\u2019) being used at 30 September<span class=\"_ _0\"></span> 2023. T<span class=\"_ _0\"></span>his scenario is based on a pronounced r<span class=\"_ _0\"></span>ecession with interest r<span class=\"_ _0\"></span>ates remaining high, rising unemplo<span class=\"_ _0\"></span>yment and a slump in house prices. The ov<span class=\"_ _0\"></span>erall shape of<span class=\"_ _0\"></span> the scenarios adopted, and <span class=\"_ _0\"></span>the change in the <span class=\"_ _0\"></span>forecasts <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span>-on-y<span class=\"_ _0\"></span>ear is illustrated b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the for<span class=\"_ _0\"></span>ecasts of <span class=\"_ _0\"></span>the UK\u2019<span class=\"_ _1\"></span>s unemployment rat<span class=\"_ _0\"></span>e set out in the charts belo<span class=\"_ _0\"></span>w. <span class=\"_ _1\"></span>The unemployment rate has been pr<span class=\"_ _0\"></span>esented as it is the principal indicator<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> general economic activity used in modelling losses in <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s buy-to-let mortgag<span class=\"_ _0\"></span>e portfolio. Historical and for<span class=\"_ _0\"></span>ecast Unemployment rat<span class=\"_ _0\"></span>es (End point measure)<span class=\"_ _36a\"> </span>As at September 2023<span class=\"_ _36a\"> </span>2021 -<span class=\"_ _36a\"> </span>2023 FY<span class=\"_ _36a\"> </span>2023 -<span class=\"_ _36a\"> </span>2024 FY<span class=\"_ _36a\"> </span>Reporting date<span class=\"_ _36a\"> </span>End of forecas<span class=\"_ _0\"></span>t period used for modelling<span class=\"_ _36a\"> </span>2024 -<span class=\"_ _36a\"> </span>2025 FY<span class=\"_ _36a\"> </span>2025 -<span class=\"_ _36a\"> </span>2026 FY<span class=\"_ _36a\"> </span>2026 -<span class=\"_ _36a\"> </span>2027 FY<span class=\"_ _36a\"> </span>2027 -<span class=\"_ _36a\"> </span>2028 FY<span class=\"_ _36a\"> </span>12.0%<span class=\"_ _36a\"> </span>10.0%<span class=\"_ _36a\"> </span>8.0%<span class=\"_ _36a\"> </span>6.0%<span class=\"_ _36a\"> </span>4.0%<span class=\"_ _36a\"> </span>2.0%<span class=\"_ _36a\"> </span>0.0%<span class=\"_ _36a\"> </span>Sever<span class=\"_ _0\"></span>e<span class=\"_ _13c\"> </span>Central<span class=\"_ _271\"></span>Downside<span class=\"_ _6f\"> </span>Upside<span class=\"_ _36a\"> </span>Historical and for<span class=\"_ _0\"></span>ecast Unemployment rat<span class=\"_ _0\"></span>es (End point measure)<span class=\"_ _36a\"> </span>As at September 2022<span class=\"_ _36a\"> </span>2021 -<span class=\"_ _36a\"> </span>2022 FY<span class=\"_ _36a\"> </span>2022 -<span class=\"_ _36a\"> </span>2023 FY<span class=\"_ _36a\"> </span>Reporting date<span class=\"_ _36a\"> </span>End of forecas<span class=\"_ _0\"></span>t period used for modelling<span class=\"_ _36a\"> </span>2023 -<span class=\"_ _36a\"> </span>2024 FY<span class=\"_ _36a\"> </span>2024 -<span class=\"_ _36a\"> </span>2025 FY<span class=\"_ _36a\"> </span>2025 -<span class=\"_ _36a\"> </span>2026 FY<span class=\"_ _36a\"> </span>2026 -<span class=\"_ _36a\"> </span>2027 FY<span class=\"_ _36a\"> </span>12.0%<span class=\"_ _36a\"> </span>10.0%<span class=\"_ _36a\"> </span>8.0%<span class=\"_ _36a\"> </span>6.0%<span class=\"_ _36a\"> </span>4.0%<span class=\"_ _36a\"> </span>2.0%<span class=\"_ _36a\"> </span>0.0%<span class=\"_ _36a\"> </span>Sever<span class=\"_ _0\"></span>e<span class=\"_ _13c\"> </span>Central<span class=\"_ _271\"></span>Downside<span class=\"_ _6f\"> </span>Upside<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>ollowing a revie<span class=\"_ _0\"></span>w of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>weightings of<span class=\"_ _0\"></span> the differ<span class=\"_ _0\"></span>ent scenarios, set against <span class=\"_ _0\"></span>the ov<span class=\"_ _0\"></span>erall potential f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>variability<span class=\"_ _0\"></span> in the futur<span class=\"_ _0\"></span>e economic outlook, the Gr<span class=\"_ _0\"></span>oup decided to maintain <span class=\"_ _0\"></span>the scenario weightings used at 30 Sep<span class=\"_ _0\"></span>tember 2022. <span class=\"_ _0\"></span>While the economic outlook is mor<span class=\"_ _0\"></span>e settled than it <span class=\"_ _0\"></span>was <span class=\"_ _0\"></span>twelve months earlier<span class=\"_ _0\"></span> ther<span class=\"_ _0\"></span>e remains a significant div<span class=\"_ _0\"></span>ergence in opinions on the lik<span class=\"_ _0\"></span>ely outlook<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> the UK econom<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, with a potential f<span class=\"_ _0\"></span>or serious downside out<span class=\"_ _0\"></span>comes. This supports <span class=\"_ _0\"></span>the maintenance of<span class=\"_ _0\"></span> the September<span class=\"_ _0\"></span> 2022 weightings.<span class=\"_ _36a\"> </span>Sensitivities comparing the eff<span class=\"_ _0\"></span>ect of <span class=\"_ _0\"></span>these weightings <span class=\"_ _0\"></span>with those <span class=\"_ _0\"></span>which might be seen in a more normal economic en<span class=\"_ _0\"></span>vironment ar<span class=\"_ _0\"></span>e set out in Note 25.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>Central Scenario<span class=\"_ _1dd\"> </span><span class=\"ff15\">40%<span class=\"_ _f7\"> </span><span class=\"ff16\">40%<span class=\"_ _36a\"> </span></span></span>Upside Scenario<span class=\"_ _1eb\"> </span><span class=\"ff15\">10%<span class=\"_ _f8\"> </span><span class=\"ff16\">10%<span class=\"_ _36a\"> </span></span></span>Downside Scenario<span class=\"_ _1f1\"> </span><span class=\"ff15\">30%<span class=\"_ _f7\"> </span><span class=\"ff16\">30%<span class=\"_ _36a\"> </span></span></span>Severe Scenario<span class=\"_ _272\"> </span><span class=\"ff15\">20%<span class=\"_ _f7\"> </span><span class=\"ff16\">20%<span class=\"_ _36a\"> </span></span></span>100%<span class=\"_ _150\"> </span><span class=\"ff16\">100%<span class=\"_ _36a\"> </span></span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s economic scenarios comprise seven <span class=\"_ _0\"></span>variables based on standar<span class=\"_ _0\"></span>d publicly a<span class=\"_ _0\"></span>vailable metrics f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the UK. These <span class=\"_ _0\"></span>variables ar<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _1b\"> </span>Y<span class=\"_ _2\"></span>ear-on-y<span class=\"_ _0\"></span>ear change in Gr<span class=\"_ _0\"></span>oss Domestic Product (\u2018GDP\u2019) as measur<span class=\"_ _1\"></span>ed by the Office <span class=\"_ _0\"></span>for National S<span class=\"_ _0\"></span>tatistics (\u2018ONS\u2019)<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _1b\"> </span>Y<span class=\"_ _2\"></span>ear-on-y<span class=\"_ _0\"></span>ear change in <span class=\"_ _0\"></span>the House Price Index (\u2018HPI\u2019) as measured by<span class=\"_ _0\"></span> the Nationwide Building Socie<span class=\"_ _0\"></span>ty<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _1b\"> </span>Bank Base Rate (\u2018BBR\u2019), as set b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Bank of England<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _1b\"> </span>Consumer Price Inflation (\u2018CPI\u2019) rat<span class=\"_ _0\"></span>e, as measured by<span class=\"_ _0\"></span> the ONS<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _1b\"> </span>Unemployment rat<span class=\"_ _0\"></span>e, as measured by<span class=\"_ _0\"></span> the ONS<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _1b\"> </span>Annual change in secured lending<span class=\"_ _0\"></span>, as measured by<span class=\"_ _1\"></span> the Bank of England \u2018mortg<span class=\"_ _0\"></span>age advances<span class=\"_ _0\"></span>\u2019 data series<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _1b\"> </span>Annual change in consumer<span class=\"_ _0\"></span> credit, as measur<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England \u2018unsecured adv<span class=\"_ _0\"></span>ances\u2019 data series<span class=\"_ _36a\"> </span>The project<span class=\"_ _0\"></span>ed averag<span class=\"_ _0\"></span>e annual values o<span class=\"_ _0\"></span>f each of<span class=\"_ _0\"></span> these <span class=\"_ _0\"></span>variables in each of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>first five <span class=\"_ _0\"></span>financial y<span class=\"_ _0\"></span>ears of <span class=\"_ _0\"></span>the for<span class=\"_ _0\"></span>ecast period are se<span class=\"_ _0\"></span>t  out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>30 September<span class=\"_ _0\"></span> 2023<span class=\"_ _36a\"> </span>Gross Domestic Pr<span class=\"_ _0\"></span>oduct (\u2018GDP\u2019) (year<span class=\"_ _1\"></span>-on-year chang<span class=\"_ _0\"></span>e)<span class=\"_ _36a\"> </span>2024<span class=\"_ _a0\"> </span>2025<span class=\"_ _2c\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _a0\"> </span>2028<span class=\"_ _36a\"> </span>Central Scenario<span class=\"_ _257\"> </span><span class=\"ff15\">0.4%<span class=\"_ _2c\"> </span>0.9%<span class=\"_ _2c\"> </span>1.0%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _36a\"> </span></span>Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff15\">1.6%<span class=\"_ _a0\"> </span>1.4%<span class=\"_ _2c\"> </span>1.0%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _36a\"> </span></span>Downside Scenario<span class=\"_ _107\"> </span><span class=\"ff15\">(0.4)%<span class=\"_ _d5\"> </span>0.7%<span class=\"_ _a0\"> </span>1.0%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _36a\"> </span></span>Severe Scenario<span class=\"_ _273\"> </span><span class=\"ff15\">(3.6)%<span class=\"_ _b9\"> </span>(0.2)%<span class=\"_ _d5\"> </span>1.2%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _36a\"> </span></span>House Price Index (\u2018HPI\u2019) (year<span class=\"_ _0\"></span>-on-year<span class=\"_ _0\"></span> change<span class=\"_ _0\"></span>)<span class=\"_ _36a\"> </span>2024<span class=\"_ _a0\"> </span>2025<span class=\"_ _2c\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _a0\"> </span>2028<span class=\"_ _36a\"> </span>Central Scenario<span class=\"_ _8b\"> </span><span class=\"ff15\">(6.4)%<span class=\"_ _133\"> </span>(1.7)%<span class=\"_ _d5\"> </span>4.7%<span class=\"_ _a0\"> </span>4.4%<span class=\"_ _2c\"> </span>3.2%<span class=\"_ _36a\"> </span></span>Upside Scenario<span class=\"_ _256\"> </span><span class=\"ff15\">(1.1)%<span class=\"_ _d5\"> </span>5.8%<span class=\"_ _a0\"> </span>6.8%<span class=\"_ _2c\"> </span>5.0%<span class=\"_ _2c\"> </span>4.5%<span class=\"_ _36a\"> </span></span>Downside Scenario<span class=\"_ _268\"> </span><span class=\"ff15\">(10.7)%<span class=\"_ _133\"> </span>(2.2)%<span class=\"_ _d5\"> </span>4.0%<span class=\"_ _2c\"> </span>4.0%<span class=\"_ _a0\"> </span>2.6%<span class=\"_ _36a\"> </span></span>Severe Scenario<span class=\"_ _89\"> </span><span class=\"ff15\">(13.1)%<span class=\"_ _70\"> </span>(15.1)%<span class=\"_ _cb\"> </span>-<span class=\"_ _a8\"> </span>7.0%<span class=\"_ _2c\"> </span>5.6%<span class=\"_ _36a\"> </span></span>Bank Base Rate (\u2018BBR\u2019) (r<span class=\"_ _0\"></span>ate)<span class=\"_ _36a\"> </span>2024<span class=\"_ _a0\"> </span>2025<span class=\"_ _2c\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _a0\"> </span>2028<span class=\"_ _36a\"> </span>Central Scenario<span class=\"_ _257\"> </span><span class=\"ff15\">5.5%<span class=\"_ _2c\"> </span>5.4%<span class=\"_ _2c\"> </span>4.8%<span class=\"_ _2c\"> </span>4.4%<span class=\"_ _2c\"> </span>4.1%<span class=\"_ _36a\"> </span></span>Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff15\">5.2%<span class=\"_ _a0\"> </span>4.4%<span class=\"_ _2c\"> </span>3.7%<span class=\"_ _2c\"> </span>3.5%<span class=\"_ _2c\"> </span>3.5%<span class=\"_ _36a\"> </span></span>Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff15\">5.6%<span class=\"_ _a0\"> </span>3.8%<span class=\"_ _2c\"> </span>2.6%<span class=\"_ _2c\"> </span>2.0%<span class=\"_ _a0\"> </span>2.0%<span class=\"_ _36a\"> </span></span>Severe Scenario<span class=\"_ _274\"> </span><span class=\"ff15\">6.0%<span class=\"_ _2c\"> </span>5.8%<span class=\"_ _a0\"> </span>5.1%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _2c\"> </span>3.4%<span class=\"_ _36a\"> </span></span>Consumer Price Inflation (\u2018CPI\u2019) (<span class=\"_ _0\"></span>rate)<span class=\"_ _36a\"> </span>2024<span class=\"_ _a0\"> </span>2025<span class=\"_ _2c\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _a0\"> </span>2028<span class=\"_ _36a\"> </span>Central Scenario<span class=\"_ _257\"> </span><span class=\"ff15\">4.4%<span class=\"_ _2c\"> </span>2.6%<span class=\"_ _2c\"> </span>1.6%<span class=\"_ _2c\"> </span>1.8%<span class=\"_ _2c\"> </span>2.0%<span class=\"_ _36a\"> </span></span>Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff15\">3.7%<span class=\"_ _a0\"> </span>2.1%<span class=\"_ _2c\"> </span>2.1%<span class=\"_ _2c\"> </span>2.0%<span class=\"_ _2c\"> </span>2.1%<span class=\"_ _36a\"> </span></span>Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff15\">4.5%<span class=\"_ _a0\"> </span>1.0%<span class=\"_ _2c\"> </span>0.7%<span class=\"_ _2c\"> </span>1.8%<span class=\"_ _a0\"> </span>2.0%<span class=\"_ _36a\"> </span></span>Severe Scenario<span class=\"_ _8b\"> </span><span class=\"ff15\">15.7%<span class=\"_ _9f\"> </span>12.8%<span class=\"_ _2c\"> </span>3.7%<span class=\"_ _2c\"> </span>2.4%<span class=\"_ _2c\"> </span>2.1%<span class=\"_ _36a\"> </span></span>Unemployment (<span class=\"_ _0\"></span>rate)<span class=\"_ _36a\"> </span>2024<span class=\"_ _a0\"> </span>2025<span class=\"_ _2c\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _a0\"> </span>2028<span class=\"_ _36a\"> </span>Central Scenario<span class=\"_ _257\"> </span><span class=\"ff15\">4.8%<span class=\"_ _2c\"> </span>5.6%<span class=\"_ _2c\"> </span>6.0%<span class=\"_ _2c\"> </span>5.6%<span class=\"_ _2c\"> </span>4.9%<span class=\"_ _36a\"> </span></span>Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff15\">4.3%<span class=\"_ _a0\"> </span>4.6%<span class=\"_ _2c\"> </span>4.8%<span class=\"_ _2c\"> </span>4.4%<span class=\"_ _2c\"> </span>3.9%<span class=\"_ _36a\"> </span></span>Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff15\">5.3%<span class=\"_ _a0\"> </span>6.4%<span class=\"_ _2c\"> </span>6.7%<span class=\"_ _2c\"> </span>6.1%<span class=\"_ _a0\"> </span>5.4%<span class=\"_ _36a\"> </span></span>Severe Scenario<span class=\"_ _274\"> </span><span class=\"ff15\">6.9%<span class=\"_ _2c\"> </span>8.4%<span class=\"_ _a0\"> </span>7.8%<span class=\"_ _2c\"> </span>7.2%<span class=\"_ _2c\"> </span>6.6%<span class=\"_ _36a\"> </span></span>Secured lending (<span class=\"_ _0\"></span>annual change)<span class=\"_ _36a\"> </span>2024<span class=\"_ _a0\"> </span>2025<span class=\"_ _2c\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _a0\"> </span>2028<span class=\"_ _36a\"> </span>Central Scenario<span class=\"_ _257\"> </span><span class=\"ff15\">0.8%<span class=\"_ _2c\"> </span>0.3%<span class=\"_ _2c\"> </span>1.8%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _36a\"> </span></span>Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff15\">1.5%<span class=\"_ _a0\"> </span>1.0%<span class=\"_ _2c\"> </span>2.5%<span class=\"_ _2c\"> </span>3.2%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _36a\"> </span></span>Downside Scenario<span class=\"_ _275\"> </span><span class=\"ff15\">-<span class=\"_ _fb\"> </span>(0.5)%<span class=\"_ _d5\"> </span>1.0%<span class=\"_ _a0\"> </span>2.8%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _36a\"> </span></span>Severe Scenario<span class=\"_ _273\"> </span><span class=\"ff15\">(1.3)%<span class=\"_ _b9\"> </span>(1.8)%<span class=\"_ _133\"> </span>(0.3)%<span class=\"_ _d5\"> </span>2.5%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _36a\"> </span></span>Consumer cr<span class=\"_ _0\"></span>edit (annual chang<span class=\"_ _0\"></span>e)<span class=\"_ _36a\"> </span>2024<span class=\"_ _a0\"> </span>2025<span class=\"_ _2c\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _a0\"> </span>2028<span class=\"_ _36a\"> </span>Central Scenario<span class=\"_ _257\"> </span><span class=\"ff15\">3.5%<span class=\"_ _2c\"> </span>2.3%<span class=\"_ _2c\"> </span>3.9%<span class=\"_ _2c\"> </span>4.9%<span class=\"_ _2c\"> </span>5.0%<span class=\"_ _36a\"> </span></span>Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff15\">4.3%<span class=\"_ _a0\"> </span>3.0%<span class=\"_ _2c\"> </span>4.7%<span class=\"_ _2c\"> </span>5.1%<span class=\"_ _2c\"> </span>5.0%<span class=\"_ _36a\"> </span></span>Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff15\">2.8%<span class=\"_ _a0\"> </span>1.5%<span class=\"_ _2c\"> </span>3.2%<span class=\"_ _2c\"> </span>4.8%<span class=\"_ _a0\"> </span>5.0%<span class=\"_ _36a\"> </span></span>Severe Scenario<span class=\"_ _274\"> </span><span class=\"ff15\">1.5%<span class=\"_ _2c\"> </span>0.3%<span class=\"_ _a0\"> </span>1.9%<span class=\"_ _2c\"> </span>4.4%<span class=\"_ _2c\"> </span>5.0%<span class=\"_ _36a\"> </span></span>30 September<span class=\"_ _0\"></span> 2022<span class=\"_ _36a\"> </span>Gross Domestic Pr<span class=\"_ _0\"></span>oduct (\u2018GDP\u2019) (year<span class=\"_ _1\"></span>-on-year chang<span class=\"_ _0\"></span>e)<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span>2024<span class=\"_ _2c\"> </span>2025<span class=\"_ _a0\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _36a\"> </span>Central Scenario<span class=\"_ _257\"> </span><span class=\"ff16\">0.4%<span class=\"_ _276\"> </span>1.3%<span class=\"_ _2c\"> </span>1.3%<span class=\"_ _276\"> </span>1.9%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _36a\"> </span></span>Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff16\">1.9%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _2c\"> </span>2.2%<span class=\"_ _276\"> </span>2.7%<span class=\"_ _2c\"> </span>1.7%<span class=\"_ _36a\"> </span></span>Downside Scenario<span class=\"_ _107\"> </span>(2.2)%<span class=\"_ _d5\"> </span><span class=\"ff16\">0.6%<span class=\"_ _276\"> </span>1.4%<span class=\"_ _2c\"> </span>1.9%<span class=\"_ _276\"> </span>1.2%<span class=\"_ _36a\"> </span></span>Severe Scenario<span class=\"_ _273\"> </span>(3.6)%<span class=\"_ _12b\"> </span>(0.2)%<span class=\"_ _d5\"> </span><span class=\"ff16\">1.2%<span class=\"_ _276\"> </span>1.2%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _36a\"> </span></span>House Price Index (\u2018HPI\u2019) (year<span class=\"_ _0\"></span>-on-year<span class=\"_ _0\"></span> change<span class=\"_ _0\"></span>)<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span>2024<span class=\"_ _2c\"> </span>2025<span class=\"_ _a0\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _36a\"> </span>Central Scenario<span class=\"_ _8b\"> </span>(0.6)%<span class=\"_ _150\"> </span><span class=\"ff16\">0.8%<span class=\"_ _276\"> </span>3.9%<span class=\"_ _2c\"> </span>4.2%<span class=\"_ _276\"> </span>4.4%<span class=\"_ _36a\"> </span></span>Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff16\">4.7%<span class=\"_ _2c\"> </span>4.7%<span class=\"_ _2c\"> </span>6.8%<span class=\"_ _276\"> </span>6.8%<span class=\"_ _2c\"> </span>5.0%<span class=\"_ _36a\"> </span></span>Downside Scenario<span class=\"_ _107\"> </span>(6.5)%<span class=\"_ _133\"> </span>(3.3)%<span class=\"_ _150\"> </span><span class=\"ff16\">4.4%<span class=\"_ _276\"> </span>4.0%<span class=\"_ _2c\"> </span>4.0%<span class=\"_ _36a\"> </span></span>Severe Scenario<span class=\"_ _273\"> </span>(7.2)%<span class=\"_ _12a\"> </span>(15.4)%<span class=\"_ _12a\"> </span>(14.4)%<span class=\"_ _150\"> </span><span class=\"ff16\">2.7%<span class=\"_ _2c\"> </span>5.5%<span class=\"_ _36a\"> </span></span>Bank Base Rate (\u2018BBR\u2019) (r<span class=\"_ _0\"></span>ate)<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span>2024<span class=\"_ _2c\"> </span>2025<span class=\"_ _a0\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _36a\"> </span>Central Scenario<span class=\"_ _257\"> </span><span class=\"ff16\">4.6%<span class=\"_ _276\"> </span>4.3%<span class=\"_ _2c\"> </span>3.8%<span class=\"_ _276\"> </span>3.3%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _36a\"> </span></span>Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff16\">4.1%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _2c\"> </span>3.8%<span class=\"_ _276\"> </span>3.4%<span class=\"_ _2c\"> </span>3.1%<span class=\"_ _36a\"> </span></span>Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff16\">5.0%<span class=\"_ _2c\"> </span>4.4%<span class=\"_ _2c\"> </span>3.8%<span class=\"_ _276\"> </span>3.3%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _36a\"> </span></span>Severe Scenario<span class=\"_ _274\"> </span><span class=\"ff16\">5.8%<span class=\"_ _2c\"> </span>5.8%<span class=\"_ _276\"> </span>5.1%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _276\"> </span>3.5%<span class=\"_ _36a\"> </span></span>Consumer Price Inflation (\u2018CPI\u2019) (<span class=\"_ _0\"></span>rate)<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span>2024<span class=\"_ _2c\"> </span>2025<span class=\"_ _a0\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _36a\"> </span>Central Scenario<span class=\"_ _1a9\"> </span><span class=\"ff16\">10.4%<span class=\"_ _2c\"> </span>3.9%<span class=\"_ _2c\"> </span>2.2%<span class=\"_ _276\"> </span>1.6%<span class=\"_ _2c\"> </span>1.9%<span class=\"_ _36a\"> </span></span>Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff16\">9.7%<span class=\"_ _2c\"> </span>2.9%<span class=\"_ _2c\"> </span>1.9%<span class=\"_ _276\"> </span>2.0%<span class=\"_ _2c\"> </span>1.9%<span class=\"_ _36a\"> </span></span>Downside Scenario<span class=\"_ _277\"> </span><span class=\"ff16\">13.0%<span class=\"_ _2c\"> </span>8.8%<span class=\"_ _276\"> </span>2.9%<span class=\"_ _2c\"> </span>2.0%<span class=\"_ _276\"> </span>1.9%<span class=\"_ _36a\"> </span></span>Severe Scenario<span class=\"_ _8b\"> </span><span class=\"ff16\">16.7%<span class=\"_ _19c\"> </span>10.0%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _2c\"> </span>2.3%<span class=\"_ _276\"> </span>2.0%<span class=\"_ _36a\"> </span></span>Unemployment (<span class=\"_ _0\"></span>rate)<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span>2024<span class=\"_ _2c\"> </span>2025<span class=\"_ _a0\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _36a\"> </span>Central Scenario<span class=\"_ _257\"> </span><span class=\"ff16\">4.2%<span class=\"_ _276\"> </span>4.9%<span class=\"_ _2c\"> </span>4.8%<span class=\"_ _276\"> </span>4.6%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _36a\"> </span></span>Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff16\">3.5%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _276\"> </span>4.1%<span class=\"_ _2c\"> </span>3.8%<span class=\"_ _36a\"> </span></span>Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff16\">4.6%<span class=\"_ _2c\"> </span>5.8%<span class=\"_ _2c\"> </span>6.3%<span class=\"_ _276\"> </span>6.2%<span class=\"_ _2c\"> </span>5.7%<span class=\"_ _36a\"> </span></span>Severe Scenario<span class=\"_ _274\"> </span><span class=\"ff16\">6.4%<span class=\"_ _2c\"> </span>9.2%<span class=\"_ _276\"> </span>8.8%<span class=\"_ _2c\"> </span>8.2%<span class=\"_ _276\"> </span>7.5%<span class=\"_ _36a\"> </span></span>Secured lending (<span class=\"_ _0\"></span>annual change)<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span>2024<span class=\"_ _2c\"> </span>2025<span class=\"_ _a0\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _36a\"> </span>Central Scenario<span class=\"_ _257\"> </span><span class=\"ff16\">3.3%<span class=\"_ _276\"> </span>2.6%<span class=\"_ _2c\"> </span>2.5%<span class=\"_ _276\"> </span>3.5%<span class=\"_ _2c\"> </span>3.5%<span class=\"_ _36a\"> </span></span>Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff16\">4.1%<span class=\"_ _2c\"> </span>3.3%<span class=\"_ _2c\"> </span>3.2%<span class=\"_ _276\"> </span>4.2%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _36a\"> </span></span>Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff16\">2.6%<span class=\"_ _2c\"> </span>1.8%<span class=\"_ _2c\"> </span>1.7%<span class=\"_ _276\"> </span>2.7%<span class=\"_ _2c\"> </span>2.8%<span class=\"_ _36a\"> </span></span>Severe Scenario<span class=\"_ _274\"> </span><span class=\"ff16\">0.2%<span class=\"_ _d5\"> </span></span>(0.7)%<span class=\"_ _150\"> </span><span class=\"ff16\">1.3%<span class=\"_ _276\"> </span>3.0%<span class=\"_ _2c\"> </span>3.7%<span class=\"_ _36a\"> </span></span>Consumer cr<span class=\"_ _0\"></span>edit (annual chang<span class=\"_ _0\"></span>e)<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span>2024<span class=\"_ _2c\"> </span>2025<span class=\"_ _a0\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _36a\"> </span>Central Scenario<span class=\"_ _257\"> </span><span class=\"ff16\">3.6%<span class=\"_ _276\"> </span>3.1%<span class=\"_ _2c\"> </span>3.6%<span class=\"_ _276\"> </span>3.5%<span class=\"_ _2c\"> </span>3.5%<span class=\"_ _36a\"> </span></span>Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff16\">4.4%<span class=\"_ _2c\"> </span>3.9%<span class=\"_ _2c\"> </span>4.4%<span class=\"_ _276\"> </span>4.3%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _36a\"> </span></span>Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff16\">2.9%<span class=\"_ _2c\"> </span>2.4%<span class=\"_ _2c\"> </span>2.9%<span class=\"_ _276\"> </span>2.8%<span class=\"_ _2c\"> </span>2.8%<span class=\"_ _36a\"> </span></span>Severe Scenario<span class=\"_ _273\"> </span>(3.7)%<span class=\"_ _12b\"> </span>(4.4)%<span class=\"_ _d5\"> </span><span class=\"ff16\">0.1%<span class=\"_ _276\"> </span>2.8%<span class=\"_ _2c\"> </span>4.7%<span class=\"_ _36a\"> </span></span>After<span class=\"_ _0\"></span> the end of<span class=\"_ _0\"></span> the initial <span class=\"_ _0\"></span>five y<span class=\"_ _0\"></span>ear period, <span class=\"_ _0\"></span>the final rate or<span class=\"_ _0\"></span> rate of<span class=\"_ _0\"></span> change (<span class=\"_ _0\"></span>as appropriate<span class=\"_ _0\"></span>) is assumed to continue into <span class=\"_ _0\"></span>the future in each scenario.<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>o illustrate the le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> non-linearity in the <span class=\"_ _0\"></span>various scenarios, <span class=\"_ _0\"></span>the maximum and minimum quarterly le<span class=\"_ _0\"></span>vels f<span class=\"_ _0\"></span>or each <span class=\"_ _0\"></span>variable o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>the five <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> period commencing on the balance sheet date ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>. 30 September<span class=\"_ _0\"></span> 2023<span class=\"_ _36a\"> </span>Central scenario<span class=\"_ _6c\"> </span>Upside scenario<span class=\"_ _b6\"> </span>Downside scenario<span class=\"_ _70\"> </span>Severe scenario<span class=\"_ _36a\"> </span>Max<span class=\"_ _278\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _55\"> </span></span>Max<span class=\"_ _7f\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _55\"> </span></span>Max<span class=\"_ _278\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _55\"> </span></span>Max<span class=\"_ _278\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _36a\"> </span></span>%<span class=\"_ _71\"> </span>%<span class=\"_ _132\"> </span>%<span class=\"_ _71\"> </span>%<span class=\"_ _71\"> </span>%<span class=\"_ _132\"> </span>%<span class=\"_ _71\"> </span>%<span class=\"_ _132\"> </span>%<span class=\"_ _36a\"> </span>Economic driver<span class=\"_ _36a\"> </span>GDP<span class=\"_ _147\"> </span><span class=\"ff15\">1.2<span class=\"_ _d6\"> </span>0.3<span class=\"_ _d6\"> </span>2.3<span class=\"_ _d6\"> </span>0.9<span class=\"_ _d6\"> </span>1.2<span class=\"_ _3b\"> </span>(0.8)<span class=\"_ _3b\"> </span>1.2<span class=\"_ _3b\"> </span>(5.0)<span class=\"_ _36a\"> </span></span>HPI<span class=\"_ _279\"> </span><span class=\"ff15\">4.4<span class=\"_ _3b\"> </span>(8.2)<span class=\"_ _3b\"> </span>7.4<span class=\"_ _3b\"> </span>(3.1)<span class=\"_ _278\"> </span>4.1<span class=\"_ _111\"> </span>(13.4)<span class=\"_ _3b\"> </span>7.2<span class=\"_ _28\"> </span>(16.4)<span class=\"_ _36a\"> </span></span>BBR<span class=\"_ _114\"> </span><span class=\"ff15\">5.5<span class=\"_ _50\"> </span>4.0<span class=\"_ _d6\"> </span>5.3<span class=\"_ _d6\"> </span>3.5<span class=\"_ _d6\"> </span>5.8<span class=\"_ _d6\"> </span>2.0<span class=\"_ _d6\"> </span>6.0<span class=\"_ _d6\"> </span>3.3<span class=\"_ _36a\"> </span></span>CPI<span class=\"_ _27a\"> </span><span class=\"ff15\">5.0<span class=\"_ _d6\"> </span>1.5<span class=\"_ _d6\"> </span>4.3<span class=\"_ _d6\"> </span>1.8<span class=\"_ _d6\"> </span>6.0<span class=\"_ _d6\"> </span>0.4<span class=\"_ _55\"> </span>17.0<span class=\"_ _d6\"> </span>2.0<span class=\"_ _36a\"> </span></span>Unemployment<span class=\"_ _1d3\"> </span><span class=\"ff15\">6.0<span class=\"_ _d6\"> </span>4.5<span class=\"_ _d6\"> </span>4.8<span class=\"_ _d6\"> </span>3.8<span class=\"_ _d6\"> </span>7.0<span class=\"_ _d6\"> </span>5.0<span class=\"_ _d6\"> </span>8.5<span class=\"_ _d6\"> </span>5.2<span class=\"_ _36a\"> </span></span>Secured lending<span class=\"_ _9a\"> </span><span class=\"ff15\">3.0<span class=\"_ _b6\"> </span>-<span class=\"_ _110\"> </span>3.8<span class=\"_ _d6\"> </span>0.8<span class=\"_ _d6\"> </span>3.0<span class=\"_ _3b\"> </span>(0.8)<span class=\"_ _3b\"> </span>3.0<span class=\"_ _3b\"> </span>(2.0)<span class=\"_ _36a\"> </span></span>Consumer credit<span class=\"_ _f4\"> </span><span class=\"ff15\">5.0<span class=\"_ _d6\"> </span>2.0<span class=\"_ _d6\"> </span>5.8<span class=\"_ _d6\"> </span>2.8<span class=\"_ _d6\"> </span>5.0<span class=\"_ _d6\"> </span>1.3<span class=\"_ _d6\"> </span>5.0<span class=\"_ _b6\"> </span>-<span class=\"_ _36a\"> </span></span>30 September<span class=\"_ _0\"></span> 2022<span class=\"_ _36a\"> </span>Central scenario<span class=\"_ _6c\"> </span>Upside scenario<span class=\"_ _b6\"> </span>Downside scenario<span class=\"_ _70\"> </span>Severe scenario<span class=\"_ _36a\"> </span>Max<span class=\"_ _278\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _55\"> </span></span>Max<span class=\"_ _7f\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _55\"> </span></span>Max<span class=\"_ _278\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _55\"> </span></span>Max<span class=\"_ _278\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _36a\"> </span></span>%<span class=\"_ _71\"> </span>%<span class=\"_ _132\"> </span>%<span class=\"_ _71\"> </span>%<span class=\"_ _71\"> </span>%<span class=\"_ _132\"> </span>%<span class=\"_ _71\"> </span>%<span class=\"_ _132\"> </span>%<span class=\"_ _36a\"> </span>Economic driver<span class=\"_ _36a\"> </span>GDP<span class=\"_ _147\"> </span>2.2<span class=\"_ _1d4\"> </span><span class=\"ff17\">(0.3)<span class=\"_ _3b\"> </span></span>3.5<span class=\"_ _d6\"> </span>1.2<span class=\"_ _d6\"> </span>2.2<span class=\"_ _1d4\"> </span><span class=\"ff17\">(2.7)<span class=\"_ _3b\"> </span></span>1.2<span class=\"_ _1d4\"> </span><span class=\"ff17\">(5.0)<span class=\"_ _36a\"> </span></span>HPI<span class=\"_ _279\"> </span><span class=\"ff16\">4.8<span class=\"_ _3b\"> </span></span>(4.5)<span class=\"_ _1d4\"> </span><span class=\"ff16\">7.5<span class=\"_ _d6\"> </span>3.3<span class=\"_ _d6\"> </span>4.9<span class=\"_ _111\"> </span></span>(13.1)<span class=\"_ _3b\"> </span><span class=\"ff16\">5.7<span class=\"_ _111\"> </span></span>(17.8)<span class=\"_ _36a\"> </span>BBR<span class=\"_ _114\"> </span><span class=\"ff16\">5.0<span class=\"_ _d6\"> </span>3.0<span class=\"_ _d6\"> </span>4.5<span class=\"_ _d6\"> </span>3.0<span class=\"_ _44\"> </span>5.5<span class=\"_ _d6\"> </span>3.0<span class=\"_ _d6\"> </span>6.0<span class=\"_ _44\"> </span>3.3<span class=\"_ _36a\"> </span></span>CPI<span class=\"_ _147\"> </span><span class=\"ff16\">10.8<span class=\"_ _50\"> </span>1.4<span class=\"_ _73\"> </span>10.3<span class=\"_ _d6\"> </span>1.7<span class=\"_ _73\"> </span>14.0<span class=\"_ _d6\"> </span>1.8<span class=\"_ _73\"> </span>17.0<span class=\"_ _d6\"> </span>1.8<span class=\"_ _36a\"> </span></span>Unemployment<span class=\"_ _1d3\"> </span><span class=\"ff16\">5.0<span class=\"_ _d6\"> </span>3.9<span class=\"_ _44\"> </span>4.5<span class=\"_ _d6\"> </span>3.4<span class=\"_ _d6\"> </span>6.3<span class=\"_ _44\"> </span>4.1<span class=\"_ _d6\"> </span>9.2<span class=\"_ _d6\"> </span>4.5<span class=\"_ _36a\"> </span></span>Secured lending<span class=\"_ _9a\"> </span><span class=\"ff16\">4.0<span class=\"_ _44\"> </span>2.3<span class=\"_ _d6\"> </span>4.8<span class=\"_ _d6\"> </span>3.1<span class=\"_ _d6\"> </span>3.3<span class=\"_ _44\"> </span>1.6<span class=\"_ _d6\"> </span>3.7<span class=\"_ _3b\"> </span></span>(1.2)<span class=\"_ _36a\"> </span>Consumer credit<span class=\"_ _f4\"> </span><span class=\"ff16\">5.0<span class=\"_ _d6\"> </span>2.5<span class=\"_ _44\"> </span>5.8<span class=\"_ _d6\"> </span>3.3<span class=\"_ _d6\"> </span>4.3<span class=\"_ _d6\"> </span>1.8<span class=\"_ _44\"> </span>4.8<span class=\"_ _3b\"> </span></span>(5.2)<span class=\"_ _36a\"> </span>The asymmetry<span class=\"_ _1\"></span> in the models is demonstrated by<span class=\"_ _0\"></span> comparing the calculated impairment pr<span class=\"_ _0\"></span>ovision with <span class=\"_ _0\"></span>that which <span class=\"_ _0\"></span>would hav<span class=\"_ _0\"></span>e been produced using <span class=\"_ _0\"></span>the Central scenario alone, 100% w<span class=\"_ _0\"></span>eighted.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Provision using centr<span class=\"_ _0\"></span>al scenario 100% weight<span class=\"_ _0\"></span>ed<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _27b\"> </span><span class=\"ff15\">38.4<span class=\"_ _3a\"> </span><span class=\"ff16\">29.1<span class=\"_ _36a\"> </span></span></span>Commercial Lending<span class=\"_ _27c\"> </span><span class=\"ff15\">29.0<span class=\"_ _3a\"> </span><span class=\"ff16\">24.2<span class=\"_ _36a\"> </span></span></span>67.4<span class=\"_ _3a\"> </span><span class=\"ff16\">53.3<span class=\"_ _36a\"> </span></span>Calculated impairment pr<span class=\"_ _0\"></span>ovision<span class=\"_ _27d\"> </span><span class=\"ff15\">73.6<span class=\"_ _3a\"> </span><span class=\"ff16\">63.5<span class=\"_ _36a\"> </span></span></span>Eff<span class=\"_ _1\"></span>ect of multiple economic scenarios<span class=\"_ _127\"> </span><span class=\"ff15\">6.2<span class=\"_ _3a\"> </span><span class=\"ff16\">10.2<span class=\"_ _36a\"> </span></span></span>25. <span class=\"_ _1c\"></span>Loan impairments \u2013 sensitivity<span class=\"_ _0\"></span> analysis<span class=\"_ _36a\"> </span>The calculation of<span class=\"_ _0\"></span> impairment pro<span class=\"_ _0\"></span>visions under IFRS 9 is subject to a <span class=\"_ _0\"></span>variety<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> uncertainties arising from assump<span class=\"_ _0\"></span>tions, for<span class=\"_ _0\"></span>ecasts and expectations about futur<span class=\"_ _0\"></span>e ev<span class=\"_ _0\"></span>ents and conditions. T<span class=\"_ _2f\"></span>o illustrate the impact of<span class=\"_ _0\"></span> these uncertainties, sensitivity calculations ha<span class=\"_ _0\"></span>ve been performed f<span class=\"_ _0\"></span>or some of<span class=\"_ _0\"></span> the most significant.<span class=\"_ _36a\"> </span>These sensitivities are int<span class=\"_ _0\"></span>ended as mathematical illustrations of <span class=\"_ _0\"></span>the impacts of<span class=\"_ _0\"></span> the v<span class=\"_ _0\"></span>arious assumptions on the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s modelling. They<span class=\"_ _0\"></span> do not necessarily<span class=\"_ _0\"></span> repr<span class=\"_ _0\"></span>esent alternative potential impairment<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues as other <span class=\"_ _0\"></span>factors might also need t<span class=\"_ _0\"></span>o be considered in arriving at a final pr<span class=\"_ _0\"></span>ovision figur<span class=\"_ _0\"></span>e if cir<span class=\"_ _0\"></span>cumstances differ<span class=\"_ _0\"></span>ed from <span class=\"_ _0\"></span>those at the balance sheet<span class=\"_ _0\"></span> date.<span class=\"_ _36a\"> </span>Economic conditions<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>o illustrate the potential impact o<span class=\"_ _0\"></span>f differing <span class=\"_ _0\"></span>future economic scenarios on <span class=\"_ _0\"></span>the total impairment, <span class=\"_ _0\"></span>the pro<span class=\"_ _0\"></span>visions which w<span class=\"_ _0\"></span>ould be calculated if each o<span class=\"_ _0\"></span>f the economic scenarios <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e 100% weight<span class=\"_ _0\"></span>ed are shown belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span>Scenario<span class=\"_ _152\"> </span>2023<span class=\"_ _17f\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>Provision<span class=\"_ _c5\"> </span><span class=\"ff1e\">Difference<span class=\"_ _278\"> </span><span class=\"ff17\">Provision<span class=\"_ _111\"> </span>Difference<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Central<span class=\"_ _225\"> </span><span class=\"ff15\">67.4<span class=\"_ _72\"> </span>(6.2)<span class=\"_ _12c\"> </span><span class=\"ff16\">53.3<span class=\"_ _12c\"> </span></span></span>(10.2)<span class=\"_ _36a\"> </span>Upside<span class=\"_ _27e\"> </span><span class=\"ff15\">59.0<span class=\"_ _12c\"> </span>(14.6)<span class=\"_ _84\"> </span><span class=\"ff16\">46.8<span class=\"_ _12c\"> </span></span></span>(16.7)<span class=\"_ _36a\"> </span>Downside<span class=\"_ _27f\"> </span><span class=\"ff15\">73.4<span class=\"_ _72\"> </span>(0.2)<span class=\"_ _12c\"> </span><span class=\"ff16\">62.5<span class=\"_ _ff\"> </span></span></span>(1.0)<span class=\"_ _36a\"> </span>Severe<span class=\"_ _251\"> </span><span class=\"ff15\">95.7<span class=\"_ _3a\"> </span>22.1<span class=\"_ _d5\"> </span><span class=\"ff16\">100.3<span class=\"_ _3a\"> </span>36.8<span class=\"_ _36a\"> </span></span></span>The w<span class=\"_ _0\"></span>eighted aver<span class=\"_ _0\"></span>age of <span class=\"_ _0\"></span>these 100% w<span class=\"_ _0\"></span>eighted pro<span class=\"_ _0\"></span>visions need not equal the <span class=\"_ _0\"></span>weighted av<span class=\"_ _0\"></span>erage E<span class=\"_ _0\"></span>CL due <span class=\"_ _0\"></span>to the impact of<span class=\"_ _0\"></span> the differing PDs on staging. Scenario weightings<span class=\"_ _36a\"> </span>In order<span class=\"_ _0\"></span> to illustrat<span class=\"_ _0\"></span>e the impact of<span class=\"_ _0\"></span> scenario weightings on <span class=\"_ _0\"></span>the outcomes, the impairment<span class=\"_ _0\"></span> provision r<span class=\"_ _0\"></span>equirements <span class=\"_ _0\"></span>were sensitised using alternative <span class=\"_ _0\"></span>weightings. <span class=\"_ _0\"></span>The sensitivity is based on <span class=\"_ _0\"></span>the weightings used at IFRS 9 <span class=\"_ _0\"></span>transition on 1 October 2018. <span class=\"_ _1\"></span>The use of the 2018 weighting is intended <span class=\"_ _0\"></span>to repr<span class=\"_ _0\"></span>esent a more settled outlook<span class=\"_ _0\"></span> than has been evident<span class=\"_ _0\"></span> at either of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>three most r<span class=\"_ _0\"></span>ecent y<span class=\"_ _0\"></span>ear ends.<span class=\"_ _36a\"> </span>The w<span class=\"_ _0\"></span>eightings used, and the r<span class=\"_ _0\"></span>esults of applying <span class=\"_ _0\"></span>these sensitivities to <span class=\"_ _0\"></span>the 30 September 2023 scenarios ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>W<span class=\"_ _0\"></span>eighting<span class=\"_ _162\"> </span><span class=\"ff15\">Impairment<span class=\"_ _c5\"> </span></span>Difference<span class=\"_ _36a\"> </span>Central<span class=\"_ _b6\"> </span>Upside<span class=\"_ _88\"> </span>Downside<span class=\"_ _d8\"> </span>Severe<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span>As reported<span class=\"_ _1ad\"> </span><span class=\"ff16\">40%<span class=\"_ _f8\"> </span>10%<span class=\"_ _f7\"> </span>30%<span class=\"_ _f8\"> </span>20%<span class=\"_ _3a\"> </span>73.6<span class=\"_ _11b\"> </span></span>-<span class=\"_ _36a\"> </span>Sensitivity<span class=\"_ _59\"> </span><span class=\"ff16\">40%<span class=\"_ _f8\"> </span>30%<span class=\"_ _f7\"> </span>25%<span class=\"_ _11f\"> </span>5%<span class=\"_ _f7\"> </span>67.6<span class=\"_ _f7\"> </span></span>(6.0)<span class=\"_ _36a\"> </span>Significant increase in credit risk<span class=\"_ _36a\"> </span>The most important driv<span class=\"_ _0\"></span>er of<span class=\"_ _0\"></span> SICR is relativ<span class=\"_ _0\"></span>e PD. If<span class=\"_ _0\"></span> all PDs across <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s principal buy-to-let mortgag<span class=\"_ _0\"></span>e book wer<span class=\"_ _1\"></span>e increased by 10%, loans with a gr<span class=\"_ _0\"></span>oss v<span class=\"_ _0\"></span>alue of \u00a368.4m <span class=\"_ _0\"></span>would tr<span class=\"_ _0\"></span>ansfer <span class=\"_ _0\"></span>from Stag<span class=\"_ _0\"></span>e 1 to Stag<span class=\"_ _0\"></span>e 2 (2022: \u00a3136.8m), and the <span class=\"_ _0\"></span>total pro<span class=\"_ _0\"></span>vision w<span class=\"_ _0\"></span>ould increase by<span class=\"_ _0\"></span> \u00a30.8m fr<span class=\"_ _0\"></span>om the combined eff<span class=\"_ _0\"></span>ects of higher<span class=\"_ _0\"></span> PDs on expected losses and <span class=\"_ _0\"></span>the impact of pr<span class=\"_ _0\"></span>oviding <span class=\"_ _0\"></span>for e<span class=\"_ _0\"></span>xpected lifetime losses, rather<span class=\"_ _0\"></span> than 12-month losses on <span class=\"_ _0\"></span>the additional Stage 2 cases (2022: \u00a30<span class=\"_ _0\"></span>.9m).<span class=\"_ _36a\"> </span>V<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> security<span class=\"_ _36a\"> </span>The principal assumptions impacting on L<span class=\"_ _1\"></span>GD are the estimated security<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues. If the r<span class=\"_ _0\"></span>ate of gr<span class=\"_ _0\"></span>owth in house prices assumed b<span class=\"_ _0\"></span>y the model after <span class=\"_ _0\"></span>the for<span class=\"_ _0\"></span>ecast minimum w<span class=\"_ _0\"></span>ere halv<span class=\"_ _0\"></span>ed, ignoring any PD eff<span class=\"_ _0\"></span>ects, then the pr<span class=\"_ _0\"></span>ovision <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s first and second mortgag<span class=\"_ _0\"></span>e assets under <span class=\"_ _0\"></span>the central scenario w<span class=\"_ _0\"></span>ould increase b<span class=\"_ _0\"></span>y \u00a30<span class=\"_ _0\"></span>.7m (2022: \u00a32.7m<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span>Receiver<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> rent<span class=\"_ _36a\"> </span>The majority o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>eceiver<span class=\"_ _0\"></span> of r<span class=\"_ _0\"></span>ent cases, which ar<span class=\"_ _0\"></span>e included in Stage 3, ar<span class=\"_ _0\"></span>e managed long-t<span class=\"_ _0\"></span>erm and there<span class=\"_ _0\"></span>fore <span class=\"_ _0\"></span>their assumed r<span class=\"_ _0\"></span>ealisation date has an important impact on <span class=\"_ _0\"></span>the provision calculation. If<span class=\"_ _0\"></span> the assumed rat<span class=\"_ _0\"></span>e of r<span class=\"_ _0\"></span>ealisations w<span class=\"_ _0\"></span>as increased by<span class=\"_ _0\"></span> 20%, the impairment pro<span class=\"_ _0\"></span>vision in the central scenario <span class=\"_ _0\"></span>would increase b<span class=\"_ _0\"></span>y \u00a30<span class=\"_ _0\"></span>.<span class=\"_ _0\"></span>1m (2022: \u00a30.4m<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws9e gs6a1\">31. Goodwill<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6a2\">The goodwill carried in <span class=\"_ _0\"></span>the accounts is attributable to <span class=\"_ _0\"></span>three cash generating units (\u2018CGU\u2019<span class=\"_ _2\"></span>s), which hav<span class=\"_ _0\"></span>e not changed in <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span>. T<span class=\"_ _0\"></span>hese </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6a3\">balances are r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>wed for<span class=\"_ _1\"></span> impairment annually, in accor<span class=\"_ _0\"></span>dance with <span class=\"_ _0\"></span>the requir<span class=\"_ _0\"></span>ements of IA<span class=\"_ _0\"></span>S 36 \u2013 \u2018Impairment of <span class=\"_ _1\"></span>Assets\u2019<span class=\"_ _2\"></span>. The balance is </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6a4\">as analysed below:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6a5\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6a6\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls18 ws5e gs6a7\">CGU<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gs6a8\">SME lending<span class=\"_ _284\"> </span><span class=\"ff15\">113.0<span class=\"_ _d5\"> </span></span>113.0<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs6a9\">Development finance<span class=\"_ _33\"> </span><span class=\"ff15\">49.8<span class=\"_ _3a\"> </span><span class=\"ff16\">49.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs6aa\">TBMC<span class=\"_ _2ae\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6ab\">162.8<span class=\"_ _d5\"> </span><span class=\"ff16\">164.4<span class=\"_ _36a\"> </span></span></div>(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>SME <span class=\"_ _96\"></span>lending<span class=\"_ _36a\"> </span>The goodwill carried in <span class=\"_ _0\"></span>the accounts relating t<span class=\"_ _0\"></span>o the SME lending CGU was r<span class=\"_ _0\"></span>ecognised on acquisitions in the <span class=\"_ _0\"></span>years ended  30 September<span class=\"_ _0\"></span> 2016 and 30 September 2018.<span class=\"_ _36a\"> </span>An impairment re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> undertaken at 30 September<span class=\"_ _1\"></span> 2023 indicated that no write do<span class=\"_ _0\"></span>wn was r<span class=\"_ _0\"></span>equired.<span class=\"_ _36a\"> </span>The reco<span class=\"_ _0\"></span>verable amount o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the SME lending CGU used in this impairment testing is determined on a <span class=\"_ _0\"></span>value in use basis using pr<span class=\"_ _0\"></span>e-tax cash flow<span class=\"_ _0\"></span> projections based on <span class=\"_ _0\"></span>financial budgets appro<span class=\"_ _0\"></span>ved by<span class=\"_ _1\"></span> the Board in Nov<span class=\"_ _0\"></span>ember 2023 co<span class=\"_ _0\"></span>vering a fiv<span class=\"_ _0\"></span>e-year<span class=\"_ _0\"></span> period. The ke<span class=\"_ _0\"></span>y assump<span class=\"_ _0\"></span>tions underlying the v<span class=\"_ _0\"></span>alue in use calculation for<span class=\"_ _0\"></span> the SME lending CGU are:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Lev<span class=\"_ _0\"></span>el of business activity<span class=\"_ _1\"></span>, based on management expectations. <span class=\"_ _0\"></span>The for<span class=\"_ _0\"></span>ecast assumes a compound annual gr<span class=\"_ _0\"></span>owth rate (\u2018CA<span class=\"_ _0\"></span>GR\u2019) for<span class=\"_ _0\"></span> new lending o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the fiv<span class=\"_ _0\"></span>e-year<span class=\"_ _0\"></span> period of<span class=\"_ _0\"></span> 14.<span class=\"_ _0\"></span>12%, compared <span class=\"_ _0\"></span>with 10.56% used in <span class=\"_ _0\"></span>the calculation at 30 September<span class=\"_ _0\"></span> 2022. The ne<span class=\"_ _0\"></span>w lending for<span class=\"_ _0\"></span>ecasts are <span class=\"_ _0\"></span>the ke<span class=\"_ _0\"></span>y driver<span class=\"_ _1\"></span> for <span class=\"_ _0\"></span>the profit and cashflo<span class=\"_ _0\"></span>w f<span class=\"_ _0\"></span>orecasts. Cash flo<span class=\"_ _0\"></span>ws be<span class=\"_ _0\"></span>yond the <span class=\"_ _0\"></span>five-y<span class=\"_ _0\"></span>ear budget<span class=\"_ _0\"></span> are extrapolat<span class=\"_ _0\"></span>ed using a constant gro<span class=\"_ _0\"></span>wth rate of<span class=\"_ _0\"></span> 1.20% (2022: 1.54%) which does not e<span class=\"_ _0\"></span>xceed the long <span class=\"_ _0\"></span>term aver<span class=\"_ _0\"></span>age gro<span class=\"_ _0\"></span>wth rates for<span class=\"_ _1\"></span> the markets in which the business is activ<span class=\"_ _0\"></span>e <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>Management have concluded <span class=\"_ _0\"></span>that the le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> activity assumed f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the purpose of <span class=\"_ _0\"></span>this for<span class=\"_ _0\"></span>ecast are r<span class=\"_ _0\"></span>easonable, based on past experience and the curr<span class=\"_ _0\"></span>ent economic envir<span class=\"_ _0\"></span>onment<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Discount rate, which is based on <span class=\"_ _0\"></span>third party<span class=\"_ _0\"></span> estimates of <span class=\"_ _0\"></span>the implied industry cost o<span class=\"_ _0\"></span>f capital. <span class=\"_ _0\"></span>The pre-<span class=\"_ _0\"></span>tax discount rate applied t<span class=\"_ _0\"></span>o the cash flow<span class=\"_ _0\"></span> projection is 16.2% (2022: 14<span class=\"_ _0\"></span>.8%)<span class=\"_ _36a\"> </span>As an illustration of<span class=\"_ _0\"></span> the sensitivity<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>this impairment test <span class=\"_ _0\"></span>to mov<span class=\"_ _0\"></span>ements in key<span class=\"_ _1\"></span> assumptions, the Group has calculated <span class=\"_ _0\"></span>that a 0.<span class=\"_ _0\"></span>0% gro<span class=\"_ _0\"></span>wth rate combined with an 11.5% reduction in pr<span class=\"_ _0\"></span>ofit le<span class=\"_ _0\"></span>vels w<span class=\"_ _0\"></span>ould eliminate the pr<span class=\"_ _0\"></span>ojected headroom of<span class=\"_ _0\"></span> \u00a359<span class=\"_ _0\"></span>.<span class=\"_ _0\"></span>1m. While such movements ar<span class=\"_ _0\"></span>e not expect<span class=\"_ _0\"></span>ed by manag<span class=\"_ _0\"></span>ement, they<span class=\"_ _0\"></span> are consider<span class=\"_ _0\"></span>ed \u2018reasonably<span class=\"_ _0\"></span> possible\u2019 <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the purposes of<span class=\"_ _0\"></span> IAS 36. <span class=\"_ _0\"></span>A 0<span class=\"_ _0\"></span>.0% gr<span class=\"_ _0\"></span>owth rate combined with an 14<span class=\"_ _0\"></span>.4% reduction in pr<span class=\"_ _0\"></span>ofit le<span class=\"_ _0\"></span>vels w<span class=\"_ _0\"></span>ould generate a <span class=\"_ _0\"></span>write down of<span class=\"_ _0\"></span> \u00a310.<span class=\"_ _0\"></span>0m. In the <span class=\"_ _0\"></span>testing carried out at 30 September<span class=\"_ _0\"></span> 2022, a 0.<span class=\"_ _0\"></span>0% growth r<span class=\"_ _0\"></span>ate combined with a 7<span class=\"_ _2\"></span>.5% reduction in pro<span class=\"_ _0\"></span>fit lev<span class=\"_ _0\"></span>els, would hav<span class=\"_ _0\"></span>e eliminated the pr<span class=\"_ _0\"></span>ojected headroom at <span class=\"_ _0\"></span>that date of<span class=\"_ _0\"></span> \u00a345.3m. A<span class=\"_ _1\"></span> 0.0% gr<span class=\"_ _0\"></span>owth rate combined <span class=\"_ _0\"></span>with an 11.2% reduction in profit<span class=\"_ _0\"></span> levels <span class=\"_ _0\"></span>would have g<span class=\"_ _0\"></span>enerated a write do<span class=\"_ _0\"></span>wn of \u00a310<span class=\"_ _0\"></span>.0m.<span class=\"_ _36a\"> </span>(b)  <span class=\"_ _ce\"> </span>Development <span class=\"_ _96\"></span>finance<span class=\"_ _36a\"> </span>The goodwill carried in <span class=\"_ _0\"></span>the accounts relating t<span class=\"_ _0\"></span>o the dev<span class=\"_ _0\"></span>elopment finance CGU <span class=\"_ _0\"></span>was first<span class=\"_ _0\"></span> recognised on a business acquisition in the year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2018. An impairment re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> undertaken at 30 September<span class=\"_ _1\"></span> 2023 indicated that no write do<span class=\"_ _0\"></span>wn was r<span class=\"_ _0\"></span>equired.<span class=\"_ _36a\"> </span>The reco<span class=\"_ _0\"></span>verable amount o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the development <span class=\"_ _0\"></span>finance CGU used in this impairment <span class=\"_ _0\"></span>testing is determined on a v<span class=\"_ _0\"></span>alue in use basis using pre-<span class=\"_ _0\"></span>tax cash flow<span class=\"_ _0\"></span> projections based on financial budg<span class=\"_ _0\"></span>ets appro<span class=\"_ _0\"></span>ved by<span class=\"_ _0\"></span> the Boar<span class=\"_ _0\"></span>d in November<span class=\"_ _0\"></span> 2023 covering a <span class=\"_ _0\"></span>five-y<span class=\"_ _0\"></span>ear period. The ke<span class=\"_ _0\"></span>y assump<span class=\"_ _0\"></span>tions underlying the v<span class=\"_ _0\"></span>alue in use calculation for<span class=\"_ _0\"></span> the de<span class=\"_ _0\"></span>velopment <span class=\"_ _0\"></span>finance CGU are:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Lev<span class=\"_ _0\"></span>el of business activity<span class=\"_ _1\"></span>, based on management expectations. <span class=\"_ _0\"></span>The for<span class=\"_ _0\"></span>ecast assumes a CA<span class=\"_ _0\"></span>GR for<span class=\"_ _0\"></span> drawdo<span class=\"_ _0\"></span>wns over<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>five-y<span class=\"_ _0\"></span>ear period of 11.<span class=\"_ _1\"></span>12%, compared with 8.<span class=\"_ _0\"></span>77% used in the calculation at 30 September<span class=\"_ _0\"></span> 2022. Cash flo<span class=\"_ _0\"></span>ws bey<span class=\"_ _0\"></span>ond the fiv<span class=\"_ _0\"></span>e-year<span class=\"_ _0\"></span> budget ar<span class=\"_ _0\"></span>e extrapolated using a constant gr<span class=\"_ _0\"></span>owth rate o<span class=\"_ _0\"></span>f 1.2% (2022: 1.54%) <span class=\"_ _0\"></span>which does not exceed <span class=\"_ _0\"></span>the long-term a<span class=\"_ _0\"></span>verage gr<span class=\"_ _1\"></span>owth rate for<span class=\"_ _0\"></span> the UK economy <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>Management have concluded <span class=\"_ _0\"></span>that the le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> activity assumed f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the purpose of <span class=\"_ _0\"></span>this for<span class=\"_ _0\"></span>ecast are r<span class=\"_ _0\"></span>easonable, based on past experience and the curr<span class=\"_ _0\"></span>ent economic envir<span class=\"_ _0\"></span>onment<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Discount rate, which is based on <span class=\"_ _0\"></span>third party<span class=\"_ _0\"></span> estimates of <span class=\"_ _0\"></span>the implied industry cost o<span class=\"_ _0\"></span>f capital. <span class=\"_ _0\"></span>The pre-<span class=\"_ _0\"></span>tax discount rate applied t<span class=\"_ _0\"></span>o the cash flow<span class=\"_ _0\"></span> projection is 15.<span class=\"_ _0\"></span>9% (2022: 14.4%)<span class=\"_ _36a\"> </span>As an illustration of<span class=\"_ _0\"></span> the sensitivity<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>this impairment test <span class=\"_ _0\"></span>to mov<span class=\"_ _0\"></span>ements in key<span class=\"_ _1\"></span> assumptions, the Group has calculated <span class=\"_ _0\"></span>that a 1.07% gro<span class=\"_ _0\"></span>wth rate combined with a 3.<span class=\"_ _1\"></span>1% reduction in pro<span class=\"_ _0\"></span>fit levels <span class=\"_ _0\"></span>would eliminate <span class=\"_ _0\"></span>the projected headr<span class=\"_ _0\"></span>oom of \u00a313.<span class=\"_ _0\"></span>9m. While such mo<span class=\"_ _0\"></span>vements are not<span class=\"_ _0\"></span> expected by<span class=\"_ _0\"></span> management, the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e considered \u2018r<span class=\"_ _0\"></span>easonably possible<span class=\"_ _0\"></span>\u2019 for<span class=\"_ _0\"></span> the purposes of<span class=\"_ _0\"></span> IAS 36. <span class=\"_ _0\"></span>A<span class=\"_ _0\"></span> 0.<span class=\"_ _1\"></span>17% growth rate combined with a 2.9% r<span class=\"_ _0\"></span>eduction in profit le<span class=\"_ _0\"></span>vels <span class=\"_ _0\"></span>would generate a <span class=\"_ _0\"></span>write down of<span class=\"_ _0\"></span> \u00a310.<span class=\"_ _0\"></span>0m.<span class=\"_ _36a\"> </span>On the basis of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>testing carried out at 30 September<span class=\"_ _0\"></span> 2022, management concluded <span class=\"_ _0\"></span>that no reasonably<span class=\"_ _0\"></span> possible change in the k<span class=\"_ _0\"></span>ey assumptions abov<span class=\"_ _0\"></span>e would cause <span class=\"_ _0\"></span>the reco<span class=\"_ _0\"></span>verable amount of<span class=\"_ _0\"></span> the de<span class=\"_ _0\"></span>velopment <span class=\"_ _0\"></span>finance CGU to fall belo<span class=\"_ _0\"></span>w <span class=\"_ _0\"></span>the balance sheet carrying v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span>(c<span class=\"_ _1\"></span>)  <span class=\"_ _ce\"> </span>TBMC<span class=\"_ _36a\"> </span>During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> the Group announced <span class=\"_ _0\"></span>the closure o<span class=\"_ _0\"></span>f its <span class=\"_ _0\"></span>TBMC mortgage br<span class=\"_ _0\"></span>okerage business (<span class=\"_ _0\"></span>note 11), which corr<span class=\"_ _0\"></span>esponded to <span class=\"_ _0\"></span>the TBMC CGU. <span class=\"_ _0\"></span>The goodwill r<span class=\"_ _0\"></span>elating to <span class=\"_ _0\"></span>this CGU, which <span class=\"_ _0\"></span>was r<span class=\"_ _0\"></span>ecognised on an acquisition in December 2008 and impair<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> \u00a36.0m in 2009, <span class=\"_ _0\"></span>was <span class=\"_ _0\"></span>therefor<span class=\"_ _0\"></span>e derecognised in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>, with the remaining net<span class=\"_ _0\"></span> goodwill of<span class=\"_ _0\"></span> \u00a31.6m expensed.<span class=\"_ _36a\"> </span>An impairment re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> carried out in the pr<span class=\"_ _0\"></span>evious <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>, on the basis that <span class=\"_ _0\"></span>the business would continue <span class=\"_ _0\"></span>to operate, indicated no requir<span class=\"_ _0\"></span>ement for<span class=\"_ _1\"></span> additional impairment provision at 30 September<span class=\"_ _1\"></span> 2022.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfImpairmentOfAssetsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-437": {
   "value": "20. <span class=\"_ _96\"></span>Impairment pro<span class=\"_ _0\"></span>visions on loans t<span class=\"_ _0\"></span>o customers<span class=\"_ _36a\"> </span>The f<span class=\"_ _0\"></span>ollowing notes set out inf<span class=\"_ _0\"></span>ormation on the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s impairment pro<span class=\"_ _0\"></span>visioning under IFRS 9 f<span class=\"_ _0\"></span>or the loans <span class=\"_ _0\"></span>to customers balances set out in note 18, including both <span class=\"_ _0\"></span>finance leases, accounted for<span class=\"_ _0\"></span> under IFRS 16, and loans held at amortised cost, accounted <span class=\"_ _0\"></span>for under<span class=\"_ _1\"></span> I<span class=\"_ _15\"></span>FRS 9, as both groups o<span class=\"_ _0\"></span>f assets ar<span class=\"_ _0\"></span>e subject to <span class=\"_ _0\"></span>the IFRS 9 impairment requirements. The disclosures ar<span class=\"_ _0\"></span>e set out <span class=\"_ _0\"></span>within the f<span class=\"_ _0\"></span>ollowing notes:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _1b\"> </span>21  Loan impairments \u2013 Basis of pr<span class=\"_ _0\"></span>ovision<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _1b\"> </span>22 <span class=\"_ _96\"></span>Loan impairments b<span class=\"_ _0\"></span>y stage and division<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _1b\"> </span>23 <span class=\"_ _96\"></span>L<span class=\"_ _0\"></span>oan impairments \u2013 Provision mo<span class=\"_ _0\"></span>vements in <span class=\"_ _0\"></span>the year<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _1b\"> </span>24 <span class=\"_ _15\"></span>Loan impairments \u2013 Economic inputs t<span class=\"_ _0\"></span>o calculations<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _1b\"> </span>25 <span class=\"_ _96\"></span>Loan impairments \u2013 Sensitivity<span class=\"_ _1\"></span> analysis<span class=\"_ _36a\"> </span>The impact on the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s profit and loss account f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span> is set out in note 12.<span class=\"_ _36a\"> </span>21. <span class=\"_ _b3\"> </span>Loan impairment \u2013 basis of pr<span class=\"_ _0\"></span>ovisions<span class=\"_ _36a\"> </span>IFRS 9 requires <span class=\"_ _0\"></span>that impairment is ev<span class=\"_ _0\"></span>aluated on an expected cr<span class=\"_ _0\"></span>edit loss (\u2018ECL<span class=\"_ _2f\"></span>\u2019) basis. ECLs ar<span class=\"_ _0\"></span>e based on an assessment of <span class=\"_ _0\"></span>the probability<span class=\"_ _0\"></span> of de<span class=\"_ _0\"></span>fault (\u2018PD\u2019) and loss given default<span class=\"_ _0\"></span> (\u2018LGD\u2019), discount<span class=\"_ _0\"></span>ed to give a ne<span class=\"_ _0\"></span>t present <span class=\"_ _0\"></span>value. <span class=\"_ _0\"></span>The estimation of<span class=\"_ _0\"></span> ECL<span class=\"_ _0\"></span> should be unbiased and probability<span class=\"_ _0\"></span> weight<span class=\"_ _0\"></span>ed, considering all reasonable and supportable information, including <span class=\"_ _0\"></span>forwar<span class=\"_ _0\"></span>d-looking economic assumptions and a range o<span class=\"_ _0\"></span>f possible outcomes. <span class=\"_ _0\"></span>The pro<span class=\"_ _0\"></span>vision may<span class=\"_ _0\"></span> be based on either <span class=\"_ _0\"></span>twelve month or<span class=\"_ _0\"></span> lifetime E<span class=\"_ _0\"></span>CL, dependent on whether an account<span class=\"_ _0\"></span> has experienced a significant increase in cr<span class=\"_ _0\"></span>edit risk (\u2018SICR\u2019). The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s process f<span class=\"_ _0\"></span>or det<span class=\"_ _0\"></span>ermining its provisions <span class=\"_ _0\"></span>for impairments is summarised belo<span class=\"_ _0\"></span>w<span class=\"_ _0\"></span>. This includes:<span class=\"_ _36a\"> </span>i. <span class=\"_ _13\"> </span>The methods used <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the calculation of E<span class=\"_ _0\"></span>CL<span class=\"_ _36a\"> </span>ii. <span class=\"_ _b3\"> </span>How it defines SICR<span class=\"_ _36a\"> </span>iii.  Ho<span class=\"_ _0\"></span>w it defines default<span class=\"_ _0\"></span> iv<span class=\"_ _0\"></span>.  Ho<span class=\"_ _0\"></span>w it identifies <span class=\"_ _0\"></span>which loans are cr<span class=\"_ _0\"></span>edit impaired, as defined b<span class=\"_ _0\"></span>y IFRS 9<span class=\"_ _36a\"> </span>v<span class=\"_ _0\"></span>. <span class=\"_ _b3\"> </span>How the E<span class=\"_ _0\"></span>CL estimation pr<span class=\"_ _0\"></span>ocess is monitored and contr<span class=\"_ _0\"></span>olled<span class=\"_ _36a\"> </span>vi. <span class=\"_ _41\"> </span>How <span class=\"_ _0\"></span>the Group de<span class=\"_ _0\"></span>velops and enhances <span class=\"_ _0\"></span>the models it uses in the E<span class=\"_ _0\"></span>CL estimation pr<span class=\"_ _0\"></span>ocess<span class=\"_ _36a\"> </span>vii. <span class=\"_ _1\"></span>How <span class=\"_ _0\"></span>the Group uses judgemental adjustments <span class=\"_ _0\"></span>to ensure all elements of<span class=\"_ _0\"></span> credit<span class=\"_ _0\"></span> risk are <span class=\"_ _0\"></span>fully addr<span class=\"_ _0\"></span>essed<span class=\"_ _36a\"> </span>i) <span class=\"_ _18\"> </span> <span class=\"_ _45\"> </span>Calculation of<span class=\"_ _0\"></span> expected credit loss (\u2018E<span class=\"_ _0\"></span>CL<span class=\"_ _2f\"></span>\u2019)<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>or the majority<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s loan assets, the ECL<span class=\"_ _1\"></span> is generated using statistical models applied to account data <span class=\"_ _0\"></span>to generate PD and L<span class=\"_ _0\"></span>GD components. In determining f<span class=\"_ _0\"></span>or which portf<span class=\"_ _0\"></span>olios a statistically modelled appr<span class=\"_ _0\"></span>oach is appropriate, <span class=\"_ _0\"></span>the Group considers <span class=\"_ _0\"></span>the volume of<span class=\"_ _0\"></span> available data and <span class=\"_ _0\"></span>the lev<span class=\"_ _0\"></span>el of similarity<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the credit<span class=\"_ _0\"></span> characteristics of<span class=\"_ _0\"></span> the underlying accounts.<span class=\"_ _36a\"> </span>PD on both a tw<span class=\"_ _0\"></span>elve month and lifetime basis is estimated based on statistical models <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s most significant asset classes. The PD calculation is a function of<span class=\"_ _1\"></span> current asset performance, customer<span class=\"_ _0\"></span> information and futur<span class=\"_ _0\"></span>e economic assumptions. <span class=\"_ _0\"></span>The structure of <span class=\"_ _0\"></span>the models w<span class=\"_ _0\"></span>as derived thr<span class=\"_ _0\"></span>ough analysis of<span class=\"_ _0\"></span> correlation in hist<span class=\"_ _0\"></span>oric data, which identified which curr<span class=\"_ _0\"></span>ent and historical customer<span class=\"_ _0\"></span> attributes and external economic <span class=\"_ _0\"></span>variables w<span class=\"_ _0\"></span>ere pr<span class=\"_ _0\"></span>edictive of<span class=\"_ _0\"></span> futur<span class=\"_ _0\"></span>e loss. PD measures ar<span class=\"_ _0\"></span>e calculated for<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>full contractual lives of loans <span class=\"_ _0\"></span>with the models deriving pr<span class=\"_ _0\"></span>obabilities that, at a giv<span class=\"_ _0\"></span>en future dat<span class=\"_ _0\"></span>e, a loan will be in default, performing or<span class=\"_ _1\"></span> closed. The Group utilised all reasonably<span class=\"_ _0\"></span> available inf<span class=\"_ _0\"></span>ormation in its possession for<span class=\"_ _0\"></span> this ex<span class=\"_ _0\"></span>ercise.<span class=\"_ _36a\"> </span>L<span class=\"_ _0\"></span>GD for<span class=\"_ _0\"></span> each account is derived b<span class=\"_ _0\"></span>y calculating a <span class=\"_ _0\"></span>value f<span class=\"_ _0\"></span>or exposur<span class=\"_ _0\"></span>e at the point o<span class=\"_ _0\"></span>f default (<span class=\"_ _1\"></span>which will include consideration of <span class=\"_ _0\"></span>future interest, account char<span class=\"_ _0\"></span>ges and receip<span class=\"_ _0\"></span>ts) and reducing <span class=\"_ _0\"></span>this for<span class=\"_ _1\"></span> security v<span class=\"_ _0\"></span>alues, net of lik<span class=\"_ _0\"></span>ely costs o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>ecovery<span class=\"_ _1\"></span>. These calculations allo<span class=\"_ _0\"></span>w for<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s potential case management activities. <span class=\"_ _0\"></span>This e<span class=\"_ _0\"></span>valuation includes the po<span class=\"_ _0\"></span>tential impact of economic conditions at<span class=\"_ _0\"></span> the time of an<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>future default or<span class=\"_ _0\"></span> enfor<span class=\"_ _0\"></span>cement. The deriv<span class=\"_ _0\"></span>ation of<span class=\"_ _0\"></span> the significant assumptions used in <span class=\"_ _0\"></span>these calculations is discussed below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>In certain asset classes a fully<span class=\"_ _0\"></span> modelled approach is not<span class=\"_ _0\"></span> possible. This is g<span class=\"_ _0\"></span>enerally <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>there ar<span class=\"_ _0\"></span>e fe<span class=\"_ _0\"></span>w assets in the class, <span class=\"_ _0\"></span>where  there is insufficient historical data on <span class=\"_ _0\"></span>which to base an analy<span class=\"_ _0\"></span>sis or <span class=\"_ _0\"></span>where certain measur<span class=\"_ _0\"></span>es, such as days past due ar<span class=\"_ _0\"></span>e not useful (including cases wher<span class=\"_ _0\"></span>e the loan agr<span class=\"_ _0\"></span>eement does not requir<span class=\"_ _0\"></span>e regular<span class=\"_ _0\"></span> payments of<span class=\"_ _0\"></span> pre-det<span class=\"_ _0\"></span>ermined amounts). In these cases, <span class=\"_ _0\"></span>which repr<span class=\"_ _0\"></span>esent a small proportion o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>total portfolio<span class=\"_ _0\"></span>, alternative approaches ar<span class=\"_ _0\"></span>e adopted. <span class=\"_ _0\"></span>These rely<span class=\"_ _1\"></span> on internal case monitoring practices and pro<span class=\"_ _0\"></span>fessional credit judg<span class=\"_ _0\"></span>ement.<span class=\"_ _36a\"> </span>The largest<span class=\"_ _0\"></span> portfolio wher<span class=\"_ _0\"></span>e a fully modelled appr<span class=\"_ _1\"></span>oach is not taken is <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s development <span class=\"_ _0\"></span>finance book, which has a relativ<span class=\"_ _0\"></span>ely lo<span class=\"_ _0\"></span>w number o<span class=\"_ _0\"></span>f cases (less than 250<span class=\"_ _0\"></span>) and a low incidence o<span class=\"_ _0\"></span>f historical losses on <span class=\"_ _0\"></span>which to base a model. F<span class=\"_ _1\"></span>or this portf<span class=\"_ _0\"></span>olio the impairment pro<span class=\"_ _0\"></span>vision is based on the output of<span class=\"_ _0\"></span> internal case-by<span class=\"_ _0\"></span>-case monitoring.<span class=\"_ _36a\"> </span>Notwithstanding the mechanical pr<span class=\"_ _0\"></span>ocedures discussed abo<span class=\"_ _0\"></span>ve, the Gr<span class=\"_ _0\"></span>oup will alw<span class=\"_ _0\"></span>ays consider<span class=\"_ _0\"></span> whether<span class=\"_ _0\"></span> the pr<span class=\"_ _0\"></span>ocess generates sufficient pro<span class=\"_ _0\"></span>vision for<span class=\"_ _0\"></span> particular loans, especially<span class=\"_ _0\"></span> large e<span class=\"_ _0\"></span>xposures, and will pr<span class=\"_ _0\"></span>ovide additional amounts as appr<span class=\"_ _0\"></span>opriate.<span class=\"_ _36a\"> </span>In extreme or<span class=\"_ _1\"></span> unprecedented economic conditions, it is likely<span class=\"_ _0\"></span> that mechanical models <span class=\"_ _0\"></span>will be less predictiv<span class=\"_ _0\"></span>e of outcomes as <span class=\"_ _0\"></span>the historical data used for<span class=\"_ _1\"></span> modelling will be insufficiently r<span class=\"_ _0\"></span>epresentative o<span class=\"_ _0\"></span>f conditions at <span class=\"_ _0\"></span>the balance sheet date. <span class=\"_ _0\"></span>This may be <span class=\"_ _0\"></span>the case where economic indicators at<span class=\"_ _0\"></span> the reporting dat<span class=\"_ _0\"></span>e and future e<span class=\"_ _0\"></span>xpectations for<span class=\"_ _0\"></span> those indicators lie outside <span class=\"_ _0\"></span>the range of<span class=\"_ _0\"></span> the observ<span class=\"_ _0\"></span>ations used to construct <span class=\"_ _0\"></span>the models. In such circumstances, manag<span class=\"_ _0\"></span>ement carefully<span class=\"_ _0\"></span> re<span class=\"_ _0\"></span>view all outputs <span class=\"_ _0\"></span>to ensure pr<span class=\"_ _0\"></span>ovision is adequate.<span class=\"_ _36a\"> </span>During the curr<span class=\"_ _0\"></span>ent financial <span class=\"_ _0\"></span>year int<span class=\"_ _0\"></span>erest rat<span class=\"_ _0\"></span>es have risen t<span class=\"_ _0\"></span>o their<span class=\"_ _0\"></span> highest levels in some <span class=\"_ _0\"></span>time, and with unusual speed. Rates o<span class=\"_ _0\"></span>f inflation in the UK ha<span class=\"_ _0\"></span>ve been subject <span class=\"_ _0\"></span>to significant fluctuations in the <span class=\"_ _1\"></span>year<span class=\"_ _0\"></span>, reaching 9<span class=\"_ _0\"></span>.6% in October<span class=\"_ _0\"></span> 2022, which <span class=\"_ _0\"></span>the ONS suggested was a f<span class=\"_ _0\"></span>orty-y<span class=\"_ _0\"></span>ear high point. <span class=\"_ _0\"></span>This type o<span class=\"_ _0\"></span>f economic envir<span class=\"_ _0\"></span>onment is not significantly<span class=\"_ _0\"></span> repr<span class=\"_ _0\"></span>esented in the historic data sets used b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group <span class=\"_ _0\"></span>to construct its IFRS 9 impairment models. It w<span class=\"_ _0\"></span>as also noted that <span class=\"_ _0\"></span>the rate of<span class=\"_ _0\"></span> change in the economic situation o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year might lead to a lagging impact<span class=\"_ _0\"></span> on the credit<span class=\"_ _0\"></span> bureau data which <span class=\"_ _0\"></span>forms an input t<span class=\"_ _0\"></span>o models of customer<span class=\"_ _1\"></span> behaviour<span class=\"_ _0\"></span>, which may<span class=\"_ _0\"></span> delay<span class=\"_ _0\"></span> the recognition of<span class=\"_ _0\"></span> an account potentially<span class=\"_ _0\"></span> at risk.<span class=\"_ _36a\"> </span>These fact<span class=\"_ _0\"></span>ors led management t<span class=\"_ _0\"></span>o conclude that curr<span class=\"_ _0\"></span>ent and for<span class=\"_ _0\"></span>ecast economic conditions w<span class=\"_ _0\"></span>ere not ones under<span class=\"_ _0\"></span> which <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s models would necessarily<span class=\"_ _1\"></span> perform well, and that<span class=\"_ _0\"></span> judgemental adjustments might be requir<span class=\"_ _0\"></span>ed to compensat<span class=\"_ _0\"></span>e for<span class=\"_ _0\"></span> these w<span class=\"_ _0\"></span>eaknesses.<span class=\"_ _36a\"> </span><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs243\">The methodologies used t<span class=\"_ _0\"></span>o derive the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _0\"></span>s ECL<span class=\"_ _1\"></span> provisions at 30 September<span class=\"_ _0\"></span> 2023 are analy<span class=\"_ _0\"></span>sed below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs244\">Gross<span class=\"_ _aa\"> </span>Impairment<span class=\"_ _57\"> </span><span class=\"ls18 ws5e\">Net<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs245\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs246\">30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs247\">Modelled portfolios<span class=\"_ _24c\"> </span><span class=\"ff15\">13,825.4<span class=\"_ _12c\"> </span>(48.3)<span class=\"_ _73\"> </span>13,777.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs248\">Judgemental adjus<span class=\"_ _0\"></span>tments thereon <span class=\"_ _250\"> </span><span class=\"ff15\">-<span class=\"_ _fb\"> </span>(6.5)<span class=\"_ _1db\"> </span>(6.5)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs249\">13,825.4<span class=\"_ _12c\"> </span>(54.8)<span class=\"_ _73\"> </span>13,770.6<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs24a\">Non-modelled portfolios<span class=\"_ _251\"> </span><span class=\"ff15\">1,122.5<span class=\"_ _12c\"> </span>(18.8)<span class=\"_ _d6\"> </span>1,103.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs24b\">T<span class=\"_ _2\"></span>otal<span class=\"_ _e8\"> </span><span class=\"ff15\">14,947.9<span class=\"_ _12c\"> </span>(73.6)<span class=\"_ _73\"> </span>14,874.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs24c\">Gross<span class=\"_ _aa\"> </span>Impairment<span class=\"_ _57\"> </span><span class=\"ls18 ws5e\">Net<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs24d\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs24e\">30 September 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs24f\">Modelled portfolios<span class=\"_ _24c\"> </span><span class=\"ff16\">13,167.2<span class=\"_ _12c\"> </span></span>(39.9)<span class=\"_ _140\"> </span><span class=\"ff16\">13,127.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs250\">Judgemental adjus<span class=\"_ _0\"></span>tments thereon <span class=\"_ _250\"> </span>-<span class=\"_ _72\"> </span>(15.0)<span class=\"_ _6c\"> </span>(15.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff16 fs1 fc1 sc0 ls0 ws0 gs251\">13,167.2<span class=\"_ _12c\"> </span><span class=\"ff17\">(54.9)<span class=\"_ _140\"> </span></span>13,112.3<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs252\">Non-modelled portfolios<span class=\"_ _251\"> </span><span class=\"ff16\">1,106.6<span class=\"_ _ff\"> </span></span>(8.6)<span class=\"_ _b5\"> </span><span class=\"ff16\">1,098.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs253\">T<span class=\"_ _2\"></span>otal<span class=\"_ _e8\"> </span><span class=\"ff16\">14,273.8<span class=\"_ _12c\"> </span></span>(63.5)<span class=\"_ _140\"> </span><span class=\"ff16\">14,210.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs254\">ii) <span class=\"_ _19\"> </span> <span class=\"_ _29\"> </span>Significant Increase in Credit Risk (\u2018SICR\u2019)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs255\">Under IFRS 9<span class=\"_ _0\"></span>, SICR is not defined solely<span class=\"_ _0\"></span> by account<span class=\"_ _0\"></span> performance, but on the basis of<span class=\"_ _0\"></span> the customer\u2019<span class=\"_ _2\"></span>s overall cr<span class=\"_ _0\"></span>edit position, and this </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs256\">ev<span class=\"_ _0\"></span>aluation should include consideration of<span class=\"_ _0\"></span> external data. T<span class=\"_ _0\"></span>he Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s aim is to define SICR to corr<span class=\"_ _0\"></span>espond, as closely as possible, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs257\">to that population o<span class=\"_ _0\"></span>f accounts <span class=\"_ _0\"></span>which are subject <span class=\"_ _0\"></span>to enhanced administrative and monitoring pr<span class=\"_ _0\"></span>ocedures operationally<span class=\"_ _1\"></span>. The Gr<span class=\"_ _0\"></span>oup </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs258\">assesses SICR in its modelled portfolios primarily<span class=\"_ _0\"></span> on the basis of<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>elative differ<span class=\"_ _0\"></span>ence in an account\u2019<span class=\"_ _1\"></span>s lifetime PD between </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs259\">origination and the r<span class=\"_ _0\"></span>eporting date. T<span class=\"_ _0\"></span>he levels o<span class=\"_ _0\"></span>f differ<span class=\"_ _0\"></span>ence requir<span class=\"_ _0\"></span>ed to qualify<span class=\"_ _0\"></span> as an SICR may<span class=\"_ _0\"></span> differ betw<span class=\"_ _0\"></span>een portfolios and will </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs25a\">depend, to some ext<span class=\"_ _0\"></span>ent, on the lev<span class=\"_ _0\"></span>el of risk<span class=\"_ _0\"></span> originally per<span class=\"_ _0\"></span>ceived and are monit<span class=\"_ _0\"></span>ored on an ongoing basis <span class=\"_ _0\"></span>to ensure <span class=\"_ _0\"></span>that this calibrates </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs25b\">with actual experience.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs25c\">It should be noted <span class=\"_ _0\"></span>that the use of<span class=\"_ _0\"></span> the curr<span class=\"_ _0\"></span>ent PD, <span class=\"_ _0\"></span>which includes external fact<span class=\"_ _0\"></span>ors such as credit bur<span class=\"_ _0\"></span>eau data, means that all r<span class=\"_ _0\"></span>elev<span class=\"_ _0\"></span>ant </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs25d\">information in the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s hands concerning the customers\u2019 pr<span class=\"_ _0\"></span>esent credit position is included in <span class=\"_ _0\"></span>the ev<span class=\"_ _0\"></span>aluation, as well as <span class=\"_ _0\"></span>the impact </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs25e\">of <span class=\"_ _0\"></span>future economic expectations. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs25f\">F<span class=\"_ _1\"></span>or non-modelled portfolios, the SICR assessment is based on <span class=\"_ _0\"></span>the credit monit<span class=\"_ _0\"></span>oring position of <span class=\"_ _0\"></span>the account in question and for<span class=\"_ _0\"></span> all </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs260\">portfolios a number<span class=\"_ _0\"></span> of qualitativ<span class=\"_ _0\"></span>e indicators which pr<span class=\"_ _0\"></span>ovide e<span class=\"_ _0\"></span>vidence of SICR hav<span class=\"_ _0\"></span>e been considered. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs261\">As part of<span class=\"_ _0\"></span> its determination of<span class=\"_ _0\"></span> whether<span class=\"_ _0\"></span> model outputs form a r<span class=\"_ _0\"></span>eliable basis for<span class=\"_ _0\"></span> impairment pro<span class=\"_ _0\"></span>visioning, the Gr<span class=\"_ _0\"></span>oup considered </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs262\">whether it<span class=\"_ _0\"></span> had any e<span class=\"_ _0\"></span>vidence of gr<span class=\"_ _0\"></span>oups of<span class=\"_ _0\"></span> accounts demonstrating factors indicating a higher<span class=\"_ _1\"></span> level of<span class=\"_ _0\"></span> credit risk <span class=\"_ _0\"></span>than other accounts in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs263\">the same portfolios, either<span class=\"_ _0\"></span> from oper<span class=\"_ _0\"></span>ational experience or its r<span class=\"_ _0\"></span>egular cr<span class=\"_ _0\"></span>edit risk monitoring activities. No such e<span class=\"_ _0\"></span>vidence was no<span class=\"_ _0\"></span>ted at </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs264\">30 September<span class=\"_ _0\"></span> 2023 or 30 September<span class=\"_ _1\"></span> 2022, and hence no additional accounts were identified as ha<span class=\"_ _0\"></span>ving an SICR.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs265\">iii) <span class=\"_ _96\"></span> <span class=\"_ _45\"> </span>Definitions o<span class=\"_ _0\"></span>f default<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs266\">As the IFRS 9 definition of<span class=\"_ _0\"></span> ECL<span class=\"_ _0\"></span> is based on PD, def<span class=\"_ _0\"></span>ault must be defined for<span class=\"_ _1\"></span> this purpose. The analy<span class=\"_ _0\"></span>sis of <span class=\"_ _0\"></span>these default cases pr<span class=\"_ _0\"></span>ovides </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs267\">the foundation <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s PD modelling. IFRS 9 provides a r<span class=\"_ _0\"></span>ebuttable presumption <span class=\"_ _0\"></span>that an account is in default <span class=\"_ _0\"></span>when it is 90 day<span class=\"_ _0\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs268\">over<span class=\"_ _0\"></span>due and this <span class=\"_ _0\"></span>was used as the basis o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s definition, combined with qualitative and quantitativ<span class=\"_ _0\"></span>e factors specific <span class=\"_ _0\"></span>to  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs269\">each portfolio. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs26a\">The most influential quantitative <span class=\"_ _0\"></span>factor<span class=\"_ _0\"></span> in the majority o<span class=\"_ _0\"></span>f portfolios is <span class=\"_ _0\"></span>the arrears le<span class=\"_ _0\"></span>vel, <span class=\"_ _0\"></span>while the principal qualitative <span class=\"_ _0\"></span>factors relat<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs26b\">to internal account management statuses. In particular<span class=\"_ _1\"></span> the decision to commence a pr<span class=\"_ _0\"></span>ocess of enfor<span class=\"_ _1\"></span>cement will be considered as a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs26c\">default in all portfolios. In <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019s buy<span class=\"_ _0\"></span>-to-let mortg<span class=\"_ _0\"></span>age portfolio the appointment<span class=\"_ _0\"></span> of a r<span class=\"_ _0\"></span>eceiver<span class=\"_ _0\"></span> of r<span class=\"_ _0\"></span>ent to manag<span class=\"_ _0\"></span>e the pr<span class=\"_ _0\"></span>operty on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs26d\">the customer\u2019<span class=\"_ _1\"></span>s behalf is considered a de<span class=\"_ _0\"></span>fault, while f<span class=\"_ _0\"></span>or portfolios assessed on a case-b<span class=\"_ _0\"></span>y-case basis, such as the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s development </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs26e\">finance loans, the mo<span class=\"_ _0\"></span>vement of<span class=\"_ _0\"></span> an account to <span class=\"_ _0\"></span>the highest risk category<span class=\"_ _0\"></span> used for<span class=\"_ _1\"></span> internal monitoring is considered as a default. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs26f\">This ensures <span class=\"_ _0\"></span>that Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s definitions of de<span class=\"_ _0\"></span>fault for<span class=\"_ _0\"></span> its v<span class=\"_ _0\"></span>arious portfolios ar<span class=\"_ _0\"></span>e materially aligned <span class=\"_ _0\"></span>to the r<span class=\"_ _0\"></span>egulatory definitions o<span class=\"_ _0\"></span>f default </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs270\">used internally<span class=\"_ _1\"></span>, and are broadly<span class=\"_ _0\"></span> aligned to its internal operational pr<span class=\"_ _0\"></span>ocedures, allo<span class=\"_ _0\"></span>wing for<span class=\"_ _0\"></span> the arbitrary<span class=\"_ _0\"></span> nature of<span class=\"_ _1\"></span> the 90-day cut-o<span class=\"_ _0\"></span>ff, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs271\">which is a regulatory<span class=\"_ _0\"></span> rather<span class=\"_ _0\"></span> than an operational r<span class=\"_ _0\"></span>equirement. In particular<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s receiver o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>ent cases are defined as def<span class=\"_ _0\"></span>aulted </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs272\">for<span class=\"_ _0\"></span> modelling purposes as the behaviour<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the case after<span class=\"_ _0\"></span> that point is significantly<span class=\"_ _0\"></span> influenced by int<span class=\"_ _0\"></span>ernal management decisions.<span class=\"_ _36a\"> </span></div>iv) <span class=\"_ _15\"></span> <span class=\"_ _45\"> </span>Credit Impaired loans<span class=\"_ _36a\"> </span>IFRS 9 defines a credit impair<span class=\"_ _0\"></span>ed account as one wher<span class=\"_ _0\"></span>e an account has suffer<span class=\"_ _0\"></span>ed one or mor<span class=\"_ _0\"></span>e events <span class=\"_ _0\"></span>which have had a detrimental effect on <span class=\"_ _0\"></span>future cash flo<span class=\"_ _0\"></span>ws. It is thus a backw<span class=\"_ _0\"></span>ard-looking definition, r<span class=\"_ _0\"></span>ather <span class=\"_ _0\"></span>than one based on future e<span class=\"_ _0\"></span>xpectations.<span class=\"_ _36a\"> </span>Credit impair<span class=\"_ _0\"></span>ed assets are identified either<span class=\"_ _1\"></span> through quantitative measur<span class=\"_ _0\"></span>es or b<span class=\"_ _0\"></span>y operational status. Designations o<span class=\"_ _0\"></span>f accounts for<span class=\"_ _0\"></span> regulatory<span class=\"_ _0\"></span> capital purposes are also <span class=\"_ _0\"></span>taken into account. <span class=\"_ _0\"></span>Assets may<span class=\"_ _0\"></span> also be assigned to Stag<span class=\"_ _0\"></span>e 3 if the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e identified as credit impaired as a r<span class=\"_ _0\"></span>esult of<span class=\"_ _0\"></span> management re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> processes.<span class=\"_ _36a\"> </span>All loans which ar<span class=\"_ _0\"></span>e in the pr<span class=\"_ _0\"></span>ocess of enf<span class=\"_ _0\"></span>orcement, fr<span class=\"_ _0\"></span>om the point <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>this becomes the administration strategy<span class=\"_ _1\"></span>, are classified as credit impair<span class=\"_ _0\"></span>ed.<span class=\"_ _36a\"> </span>Loans ar<span class=\"_ _0\"></span>e retained in Stag<span class=\"_ _0\"></span>e 3 for<span class=\"_ _0\"></span> thr<span class=\"_ _0\"></span>ee months after <span class=\"_ _0\"></span>the point wher<span class=\"_ _0\"></span>e the<span class=\"_ _0\"></span>y cease t<span class=\"_ _0\"></span>o exhibit the charact<span class=\"_ _0\"></span>eristics of default. <span class=\"_ _1\"></span>After <span class=\"_ _0\"></span>this point, the<span class=\"_ _0\"></span>y may<span class=\"_ _0\"></span> mov<span class=\"_ _0\"></span>e to Stage 2 or<span class=\"_ _1\"></span> Stage 1 depending on whether<span class=\"_ _0\"></span> an SICR trigger<span class=\"_ _0\"></span> remains.<span class=\"_ _36a\"> </span>All default cases ar<span class=\"_ _0\"></span>e considered t<span class=\"_ _0\"></span>o be credit impair<span class=\"_ _0\"></span>ed, including all receiv<span class=\"_ _0\"></span>er of<span class=\"_ _0\"></span> rent cases and all cases <span class=\"_ _0\"></span>with at least one payment mor<span class=\"_ _0\"></span>e than 90 days o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span>due, even <span class=\"_ _0\"></span>where such cases ar<span class=\"_ _0\"></span>e being managed in the expectation o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>ealising all of <span class=\"_ _0\"></span>the carrying balance. In order<span class=\"_ _0\"></span> to pr<span class=\"_ _0\"></span>ovide better<span class=\"_ _0\"></span> information f<span class=\"_ _0\"></span>or users, additional analy<span class=\"_ _0\"></span>sis of cr<span class=\"_ _0\"></span>edit impair<span class=\"_ _0\"></span>ed accounts has been presented in note 22, distinguishing between pr<span class=\"_ _0\"></span>obationary accounts, r<span class=\"_ _0\"></span>eceiver<span class=\"_ _0\"></span> of r<span class=\"_ _0\"></span>ent accounts, accounts subject to r<span class=\"_ _1\"></span>ealisation / enforcement procedur<span class=\"_ _0\"></span>es and long term manag<span class=\"_ _0\"></span>ed accounts, all of <span class=\"_ _0\"></span>which are <span class=\"_ _0\"></span>treated as cr<span class=\"_ _0\"></span>edit impaired. <span class=\"_ _0\"></span>While other indicat<span class=\"_ _0\"></span>ors of de<span class=\"_ _0\"></span>fault are in use, <span class=\"_ _0\"></span>the categories shown account<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> the ov<span class=\"_ _0\"></span>erwhelming majority of<span class=\"_ _0\"></span> Stage 3 cases.<span class=\"_ _36a\"> </span>v) <span class=\"_ _7\"> </span> <span class=\"_ _29\"> </span>Monitoring of E<span class=\"_ _0\"></span>CL estima<span class=\"_ _0\"></span>tion processes The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s ECL<span class=\"_ _0\"></span> models are compiled on <span class=\"_ _0\"></span>the basis of <span class=\"_ _0\"></span>the analysis of<span class=\"_ _0\"></span> rele<span class=\"_ _0\"></span>vant historical data. Bef<span class=\"_ _0\"></span>ore a model is adopted <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> use its operations and outputs are e<span class=\"_ _0\"></span>xamined to ensur<span class=\"_ _0\"></span>e that it is expect<span class=\"_ _0\"></span>ed to be appropriat<span class=\"_ _0\"></span>ely pr<span class=\"_ _0\"></span>edictive and, if it<span class=\"_ _0\"></span> is an updated model, expected t<span class=\"_ _0\"></span>o be more pr<span class=\"_ _0\"></span>edictive than any<span class=\"_ _1\"></span> existing model. Before a ne<span class=\"_ _0\"></span>w model is adopted <span class=\"_ _0\"></span>the changes and impacts will be consider<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the CF<span class=\"_ _0\"></span>O, alongside an<span class=\"_ _0\"></span>y advice fr<span class=\"_ _0\"></span>om the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s independent model revie<span class=\"_ _0\"></span>w functions. <span class=\"_ _1\"></span>The performance of all models is r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>wed on an ongoing basis, by<span class=\"_ _0\"></span> senior <span class=\"_ _0\"></span>finance and risk management, including <span class=\"_ _0\"></span>the CFO<span class=\"_ _0\"></span>. Monitoring packs comparing actual and pr<span class=\"_ _0\"></span>edicted loss lev<span class=\"_ _0\"></span>els are pr<span class=\"_ _0\"></span>oduced at regular<span class=\"_ _0\"></span> intervals, set on <span class=\"_ _0\"></span>the basis of<span class=\"_ _0\"></span> the materiality<span class=\"_ _0\"></span> of each model. <span class=\"_ _0\"></span>The continuing appropriat<span class=\"_ _0\"></span>eness of model assumptions is also re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span>ed as part of <span class=\"_ _0\"></span>this process. Models are r<span class=\"_ _0\"></span>evisited on a r<span class=\"_ _0\"></span>egular basis <span class=\"_ _0\"></span>to ensure <span class=\"_ _0\"></span>that the<span class=\"_ _0\"></span>y continue <span class=\"_ _0\"></span>to reflect <span class=\"_ _0\"></span>the most recent data as <span class=\"_ _0\"></span>the av<span class=\"_ _0\"></span>ailable information increases ov<span class=\"_ _0\"></span>er time.<span class=\"_ _36a\"> </span>On a monthly basis all model outputs, model o<span class=\"_ _0\"></span>verlay<span class=\"_ _0\"></span>s and provisions calculat<span class=\"_ _0\"></span>ed for<span class=\"_ _0\"></span> non-modelled books are r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>wed by<span class=\"_ _0\"></span> senior finance management including <span class=\"_ _0\"></span>the CFO in conjunction <span class=\"_ _0\"></span>with the latest cr<span class=\"_ _0\"></span>edit risk operational and economic metrics <span class=\"_ _0\"></span>to ensure <span class=\"_ _0\"></span>that the impairment pro<span class=\"_ _0\"></span>vision by<span class=\"_ _0\"></span> asset type r<span class=\"_ _0\"></span>emains appropriate. <span class=\"_ _0\"></span>This ex<span class=\"_ _0\"></span>ercise <span class=\"_ _0\"></span>will be the subject of<span class=\"_ _0\"></span> particular <span class=\"_ _0\"></span>focus at the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end and the half y<span class=\"_ _0\"></span>ear<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>This information is summarised <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the Audit<span class=\"_ _0\"></span> Committee on a biannual basis, and they<span class=\"_ _0\"></span> hav<span class=\"_ _0\"></span>e regar<span class=\"_ _0\"></span>d to <span class=\"_ _0\"></span>this data in forming <span class=\"_ _0\"></span>their conclusions on the appr<span class=\"_ _0\"></span>opriateness of pr<span class=\"_ _0\"></span>ovisioning le<span class=\"_ _0\"></span>vels.<span class=\"_ _36a\"> </span>vi) <span class=\"_ _15\"></span> <span class=\"_ _45\"> </span>Model dev<span class=\"_ _0\"></span>elopment<span class=\"_ _36a\"> </span>The models used by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup are updated <span class=\"_ _0\"></span>from time <span class=\"_ _0\"></span>to time <span class=\"_ _0\"></span>to allow<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> changes in the business, de<span class=\"_ _0\"></span>velopments in best practice and the av<span class=\"_ _0\"></span>ailability o<span class=\"_ _0\"></span>f additional data with <span class=\"_ _0\"></span>the passing of<span class=\"_ _0\"></span> time. During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2023 a major update <span class=\"_ _0\"></span>to the SME Lending PD model <span class=\"_ _0\"></span>took place, meaning that <span class=\"_ _0\"></span>two of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s four principal PD models, co<span class=\"_ _0\"></span>vering ov<span class=\"_ _0\"></span>er 96% of<span class=\"_ _0\"></span> modelled balances, have been updated since IFRS9 <span class=\"_ _0\"></span>was implemented.<span class=\"_ _36a\"> </span>The adoption of<span class=\"_ _0\"></span> the ne<span class=\"_ _0\"></span>w SME lending model has enabled the r<span class=\"_ _0\"></span>eporting process in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> to be mor<span class=\"_ _0\"></span>e streamlined, and supported increased use of<span class=\"_ _0\"></span> scenario analysis, and incr<span class=\"_ _0\"></span>eased the ability<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the model to r<span class=\"_ _0\"></span>espond to economic inputs and <span class=\"_ _0\"></span>wider customer<span class=\"_ _0\"></span> credit<span class=\"_ _0\"></span> data. T<span class=\"_ _0\"></span>his included more extensiv<span class=\"_ _0\"></span>e use of e<span class=\"_ _0\"></span>xternal credit bur<span class=\"_ _0\"></span>eau data, enabling at risk cases t<span class=\"_ _0\"></span>o be identified for<span class=\"_ _0\"></span> provisioning on a mor<span class=\"_ _1\"></span>e timely basis.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s programme o<span class=\"_ _0\"></span>f model dev<span class=\"_ _0\"></span>elopment continued during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> with a particular<span class=\"_ _0\"></span> focus on analy<span class=\"_ _0\"></span>sing how def<span class=\"_ _0\"></span>ault and loss data recor<span class=\"_ _0\"></span>ded over<span class=\"_ _0\"></span> the period o<span class=\"_ _0\"></span>f the Co<span class=\"_ _0\"></span>vid pandemic should be reflected in <span class=\"_ _0\"></span>the next gener<span class=\"_ _0\"></span>ation of <span class=\"_ _0\"></span>forwar<span class=\"_ _0\"></span>d-looking models, given the unprecedented natur<span class=\"_ _0\"></span>e of<span class=\"_ _0\"></span> the pandemic and the national and international r<span class=\"_ _0\"></span>esponse to it.<span class=\"_ _36a\"> </span>All re<span class=\"_ _0\"></span>vised models and model enhancements are car<span class=\"_ _0\"></span>efully r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>wed and test<span class=\"_ _0\"></span>ed before adop<span class=\"_ _0\"></span>tion, and are subject <span class=\"_ _0\"></span>to a gov<span class=\"_ _0\"></span>ernance process for<span class=\"_ _1\"></span> their approv<span class=\"_ _0\"></span>al. The impacts of<span class=\"_ _0\"></span> the adoption of<span class=\"_ _0\"></span> the ne<span class=\"_ _0\"></span>w SME lending PD model in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 on a lik<span class=\"_ _0\"></span>e-for<span class=\"_ _1\"></span>-like basis wer<span class=\"_ _1\"></span>e to increase pr<span class=\"_ _0\"></span>ovision by<span class=\"_ _0\"></span> \u00a30.<span class=\"_ _0\"></span>9m and transf<span class=\"_ _0\"></span>er \u00a310<span class=\"_ _0\"></span>.8m of gr<span class=\"_ _0\"></span>oss balances fr<span class=\"_ _0\"></span>om Stage 1 to S<span class=\"_ _0\"></span>tage 2.<span class=\"_ _36a\"> </span>vii)  <span class=\"_ _af\"> </span>Judgemental <span class=\"_ _41\"> </span>adjustments<span class=\"_ _36a\"> </span>In order<span class=\"_ _0\"></span> to ensur<span class=\"_ _0\"></span>e that its loan portf<span class=\"_ _0\"></span>olios are adequately<span class=\"_ _0\"></span> provisioned, <span class=\"_ _0\"></span>the Group considers <span class=\"_ _0\"></span>whether<span class=\"_ _0\"></span> there ar<span class=\"_ _0\"></span>e factor<span class=\"_ _0\"></span>s not fully<span class=\"_ _0\"></span> captured by<span class=\"_ _0\"></span> the modelling pr<span class=\"_ _0\"></span>ocess, including economic conditions more generally<span class=\"_ _1\"></span>, which indicate a need f<span class=\"_ _0\"></span>or judg<span class=\"_ _0\"></span>emental adjustments. Information consider<span class=\"_ _0\"></span>ed includes credit data, customer<span class=\"_ _0\"></span> and brok<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>feedback r<span class=\"_ _0\"></span>eceived, the r<span class=\"_ _0\"></span>esults of insight<span class=\"_ _0\"></span> survey<span class=\"_ _0\"></span>s, industry intelligence and expert kno<span class=\"_ _0\"></span>wledge within <span class=\"_ _0\"></span>the business lines.<span class=\"_ _36a\"> </span>In the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 <span class=\"_ _0\"></span>the most significant fact<span class=\"_ _0\"></span>ors in these considerations <span class=\"_ _0\"></span>were <span class=\"_ _0\"></span>the extent <span class=\"_ _0\"></span>to which uncertainties in the UK economy<span class=\"_ _0\"></span> arising fr<span class=\"_ _0\"></span>om rapidly rising inter<span class=\"_ _0\"></span>est rates, incr<span class=\"_ _0\"></span>eases in the cost of<span class=\"_ _1\"></span> living and doing business in the UK and the impacts of <span class=\"_ _0\"></span>the continuing conflict in Ukraine <span class=\"_ _0\"></span>were r<span class=\"_ _0\"></span>eflected in curr<span class=\"_ _0\"></span>ent customer perf<span class=\"_ _0\"></span>ormance at the period end and <span class=\"_ _0\"></span>were being <span class=\"_ _0\"></span>fully addr<span class=\"_ _0\"></span>essed by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s pro<span class=\"_ _0\"></span>vision modelling, particularly in <span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the lack of<span class=\"_ _0\"></span> recent observ<span class=\"_ _0\"></span>ations relating t<span class=\"_ _0\"></span>o similar conditions.<span class=\"_ _36a\"> </span>Where manag<span class=\"_ _0\"></span>ement has identified a requir<span class=\"_ _0\"></span>ement to amend <span class=\"_ _0\"></span>the calculated pro<span class=\"_ _0\"></span>vision as a result of<span class=\"_ _0\"></span> either model de<span class=\"_ _0\"></span>ficiencies or idiosyncratic beha<span class=\"_ _0\"></span>viour in part of<span class=\"_ _0\"></span> the portf<span class=\"_ _0\"></span>olio, judgemental adjustments are applied <span class=\"_ _0\"></span>to the modelled outputs so <span class=\"_ _0\"></span>that the E<span class=\"_ _0\"></span>CL recognised corr<span class=\"_ _0\"></span>esponds to expert<span class=\"_ _0\"></span> judgement, taking into account <span class=\"_ _0\"></span>the widest possible r<span class=\"_ _0\"></span>ange of curr<span class=\"_ _0\"></span>ent information, <span class=\"_ _0\"></span>which might not be factor<span class=\"_ _0\"></span>ed into the modelling pr<span class=\"_ _0\"></span>ocess.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s approach <span class=\"_ _0\"></span>to impairment modelling is based on the analy<span class=\"_ _0\"></span>sis of historical cr<span class=\"_ _0\"></span>edit data. In normal circumstances <span class=\"_ _0\"></span>the  Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s objective is to de<span class=\"_ _0\"></span>velop its modelling <span class=\"_ _0\"></span>to the point <span class=\"_ _0\"></span>where the le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> judgemental adjustments r<span class=\"_ _0\"></span>equired is minimal, but in economic conditions wher<span class=\"_ _0\"></span>e pre<span class=\"_ _0\"></span>vious rele<span class=\"_ _0\"></span>vant experience is limited or<span class=\"_ _0\"></span> non-existent, some f<span class=\"_ _0\"></span>orm of judg<span class=\"_ _0\"></span>emental adjustment is alway<span class=\"_ _0\"></span>s likely<span class=\"_ _0\"></span> to be necessary<span class=\"_ _1\"></span>. While high inter<span class=\"_ _0\"></span>est rate and inflation scenarios hav<span class=\"_ _0\"></span>e occurred in the UK<span class=\"_ _0\"></span> in the past, mark<span class=\"_ _0\"></span>et conditions, products and regulatory<span class=\"_ _0\"></span> expectations hav<span class=\"_ _0\"></span>e moved on consider<span class=\"_ _0\"></span>ably in the meantime, and most<span class=\"_ _0\"></span> such observations w<span class=\"_ _0\"></span>ould pre-date <span class=\"_ _0\"></span>the existence of buy<span class=\"_ _0\"></span>-to-let mortg<span class=\"_ _0\"></span>ages as a distinct asset class. <span class=\"_ _0\"></span>This means that <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>alue of past hist<span class=\"_ _0\"></span>ory as a guide <span class=\"_ _0\"></span>to future cr<span class=\"_ _0\"></span>edit performance  is reduced.<span class=\"_ _36a\"> </span>The current<span class=\"_ _0\"></span> model behaviour and <span class=\"_ _0\"></span>the potential f<span class=\"_ _0\"></span>or unobserved cr<span class=\"_ _1\"></span>edit issues have meant that <span class=\"_ _0\"></span>the requir<span class=\"_ _0\"></span>ement for<span class=\"_ _1\"></span> such adjustments over<span class=\"_ _1\"></span> recent periods has been significant. Evidence consider<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> management included internal performance data, cust<span class=\"_ _0\"></span>omer and brok<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>feedback, insight surve<span class=\"_ _0\"></span>ys, industry<span class=\"_ _0\"></span> intelligence, evidence on <span class=\"_ _0\"></span>the wider<span class=\"_ _0\"></span> economy<span class=\"_ _0\"></span> and quantitative and qualitative data and statements fr<span class=\"_ _0\"></span>om industry<span class=\"_ _0\"></span>, gov<span class=\"_ _0\"></span>ernment and regulatory<span class=\"_ _0\"></span> bodies. <span class=\"_ _0\"></span>These wer<span class=\"_ _0\"></span>e combined with <span class=\"_ _0\"></span>the expert knowledg<span class=\"_ _0\"></span>e within the business  to form a br<span class=\"_ _0\"></span>oad estimate of<span class=\"_ _0\"></span> the le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> provision r<span class=\"_ _0\"></span>equired acr<span class=\"_ _0\"></span>oss the Gr<span class=\"_ _0\"></span>oup.<span class=\"_ _36a\"> </span>As part of<span class=\"_ _0\"></span> this ex<span class=\"_ _0\"></span>ercise, the po<span class=\"_ _0\"></span>tential for<span class=\"_ _0\"></span> climate relat<span class=\"_ _0\"></span>ed issues to impact on customer<span class=\"_ _0\"></span> business models or security<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues ov<span class=\"_ _0\"></span>er the timescales for<span class=\"_ _0\"></span> ECL<span class=\"_ _1\"></span> calculation required by<span class=\"_ _0\"></span> IFRS 9 was consider<span class=\"_ _0\"></span>ed. No specific requir<span class=\"_ _0\"></span>ement for<span class=\"_ _1\"></span> additional impairment provisions ov<span class=\"_ _0\"></span>er the amounts already<span class=\"_ _0\"></span> determined w<span class=\"_ _0\"></span>as identified.<span class=\"_ _36a\"> </span>The requir<span class=\"_ _0\"></span>ement f<span class=\"_ _0\"></span>or judgemental adjustments is consider<span class=\"_ _0\"></span>ed on a portfolio-b<span class=\"_ _0\"></span>y-portfolio basis, and the po<span class=\"_ _0\"></span>tential for<span class=\"_ _0\"></span> the existence o<span class=\"_ _0\"></span>f significant groups o<span class=\"_ _0\"></span>f assets being particularly<span class=\"_ _0\"></span> exposed to cr<span class=\"_ _0\"></span>edit risk in <span class=\"_ _0\"></span>the expected economic scenarios is also considered.<span class=\"_ _36a\"> </span>The to<span class=\"_ _0\"></span>tal amounts of judg<span class=\"_ _0\"></span>emental adjustments provided acr<span class=\"_ _0\"></span>oss the Gr<span class=\"_ _0\"></span>oup are set out<span class=\"_ _0\"></span> below b<span class=\"_ _0\"></span>y segment.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Mortgage Lending<span class=\"_ _1ef\"> </span><span class=\"ff15\">3.0<span class=\"_ _9e\"> </span><span class=\"ff16\">5.0<span class=\"_ _36a\"> </span></span></span>Commercial Lending<span class=\"_ _1f1\"> </span><span class=\"ff15\">3.5<span class=\"_ _cb\"> </span><span class=\"ff16\">10.0<span class=\"_ _36a\"> </span></span></span>6.5<span class=\"_ _3a\"> </span><span class=\"ff16\">15.0<span class=\"_ _36a\"> </span></span>The mov<span class=\"_ _0\"></span>ements in the <span class=\"_ _0\"></span>year r<span class=\"_ _0\"></span>epresent<span class=\"_ _0\"></span> principally the e<span class=\"_ _0\"></span>xtent to <span class=\"_ _0\"></span>which the anticipated economic and customer<span class=\"_ _0\"></span> behaviours <span class=\"_ _0\"></span>which gav<span class=\"_ _0\"></span>e rise to judgemental adjustments at 30 Sep<span class=\"_ _0\"></span>tember 2022 ar<span class=\"_ _0\"></span>e now observ<span class=\"_ _0\"></span>able and thus ar<span class=\"_ _0\"></span>e reflected b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s models. The mov<span class=\"_ _0\"></span>ements also reflect <span class=\"_ _0\"></span>the enhanced ability of<span class=\"_ _0\"></span> the ne<span class=\"_ _0\"></span>w SME lending PD model introduced in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear t<span class=\"_ _0\"></span>o identify potential impairment, reducing <span class=\"_ _0\"></span>the need for<span class=\"_ _0\"></span> additional overla<span class=\"_ _0\"></span>ys. <span class=\"_ _0\"></span>There has also been a r<span class=\"_ _0\"></span>eduction in the le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> economic and political uncertainty in <span class=\"_ _0\"></span>the UK, compared <span class=\"_ _0\"></span>to the position at 30 September<span class=\"_ _1\"></span> 2022, which also impacts on the lev<span class=\"_ _0\"></span>el of adjustments r<span class=\"_ _0\"></span>equired. The mov<span class=\"_ _0\"></span>ements in the 2022 financial <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> repr<span class=\"_ _0\"></span>esented a transition <span class=\"_ _0\"></span>from Co<span class=\"_ _0\"></span>vid related o<span class=\"_ _0\"></span>verlays <span class=\"_ _0\"></span>to ones which r<span class=\"_ _0\"></span>elated more <span class=\"_ _0\"></span>to the responsiv<span class=\"_ _0\"></span>eness of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s provision models <span class=\"_ _0\"></span>to economic conditions at the end of<span class=\"_ _0\"></span> that <span class=\"_ _1\"></span>year<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>The adjustment at 30 September<span class=\"_ _1\"></span> 2022 in the Mortgage Lending book<span class=\"_ _0\"></span> was principally<span class=\"_ _0\"></span> a result<span class=\"_ _0\"></span> of a disconnect betw<span class=\"_ _0\"></span>een the cr<span class=\"_ _0\"></span>edit metrics which driv<span class=\"_ _0\"></span>e the models and the economic e<span class=\"_ _0\"></span>xpectations of manag<span class=\"_ _0\"></span>ement, brok<span class=\"_ _0\"></span>ers and customers at the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end date. While some of <span class=\"_ _0\"></span>the anticipated impacts hav<span class=\"_ _0\"></span>e begun to manifest <span class=\"_ _0\"></span>themselves in arr<span class=\"_ _0\"></span>ears performance, neither<span class=\"_ _0\"></span> the Group nor<span class=\"_ _1\"></span> the mortgage industry mor<span class=\"_ _0\"></span>e generally<span class=\"_ _0\"></span> has seen a significant reaction <span class=\"_ _0\"></span>to higher le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> interest<span class=\"_ _0\"></span> rates and inflation in credit perf<span class=\"_ _0\"></span>ormance as y<span class=\"_ _0\"></span>et. Combined with potential model limitations in r<span class=\"_ _0\"></span>esponding to significant<span class=\"_ _0\"></span> rapid changes in inter<span class=\"_ _0\"></span>est and inflation rates, management determined it <span class=\"_ _0\"></span>was appropriat<span class=\"_ _0\"></span>e to reduce, but<span class=\"_ _0\"></span> not remo<span class=\"_ _0\"></span>ve the judgmental adjustment.<span class=\"_ _36a\"> </span>In the Commer<span class=\"_ _0\"></span>cial Lending segment <span class=\"_ _0\"></span>the adjustment at 30 September<span class=\"_ _0\"></span> 2022 related <span class=\"_ _0\"></span>to general economic exposur<span class=\"_ _0\"></span>es for<span class=\"_ _1\"></span> SM<span class=\"_ _15\"></span>Es, with the outlook f<span class=\"_ _0\"></span>or the sect<span class=\"_ _0\"></span>or consider<span class=\"_ _0\"></span>ed to be less positive <span class=\"_ _0\"></span>than credit me<span class=\"_ _0\"></span>trics indicated at that <span class=\"_ _0\"></span>time. While business confidence is somewhat impr<span class=\"_ _0\"></span>oved o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the period, <span class=\"_ _0\"></span>views on <span class=\"_ _0\"></span>the outlook are g<span class=\"_ _0\"></span>enerally mix<span class=\"_ _0\"></span>ed, with contradictory<span class=\"_ _0\"></span> indicators on <span class=\"_ _0\"></span>the likely<span class=\"_ _0\"></span> future direction. Ov<span class=\"_ _0\"></span>erall, howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, the av<span class=\"_ _0\"></span>ailable information is indicative o<span class=\"_ _0\"></span>f a more neg<span class=\"_ _0\"></span>ative position than indicat<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the credit metrics in the portfolio alone. During the period a ne<span class=\"_ _0\"></span>w SME lending model was intr<span class=\"_ _0\"></span>oduced, addressing some o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>weakness in <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s modelling approach, reducing <span class=\"_ _0\"></span>the need for<span class=\"_ _0\"></span> judgemental adjustments. How<span class=\"_ _0\"></span>ever<span class=\"_ _1\"></span>, issues relating <span class=\"_ _0\"></span>to the av<span class=\"_ _0\"></span>ailability o<span class=\"_ _0\"></span>f data r<span class=\"_ _0\"></span>epresenting similar<span class=\"_ _0\"></span> economic conditions to <span class=\"_ _0\"></span>those currently<span class=\"_ _0\"></span> being observed remain, and it<span class=\"_ _0\"></span> is likely<span class=\"_ _0\"></span> that in the short<span class=\"_ _0\"></span> term a judgemental adjustment <span class=\"_ _0\"></span>will remain necessary <span class=\"_ _0\"></span>to ensure appr<span class=\"_ _0\"></span>opriate pro<span class=\"_ _0\"></span>visioning levels. <span class=\"_ _1\"></span>These factors t<span class=\"_ _0\"></span>ogether r<span class=\"_ _0\"></span>educed the SME lending ov<span class=\"_ _0\"></span>erlay <span class=\"_ _0\"></span>to \u00a32.5m (2022: \u00a310.<span class=\"_ _0\"></span>0m).<span class=\"_ _36a\"> </span>In addition a \u00a31.0m o<span class=\"_ _0\"></span>verlay<span class=\"_ _0\"></span> was made <span class=\"_ _0\"></span>to the modelled mo<span class=\"_ _0\"></span>tor <span class=\"_ _0\"></span>finance provision (2022: \u00a3nil) <span class=\"_ _0\"></span>to allow<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> difficulties noted in that model in responding <span class=\"_ _0\"></span>to a period of <span class=\"_ _0\"></span>falling inflation rapidly<span class=\"_ _0\"></span> following a period o<span class=\"_ _0\"></span>f sharp price rises. <span class=\"_ _0\"></span>This economic scenario depressed <span class=\"_ _0\"></span>the calculated pro<span class=\"_ _0\"></span>vision below a le<span class=\"_ _0\"></span>vel management<span class=\"_ _0\"></span> considered r<span class=\"_ _0\"></span>easonable, given other<span class=\"_ _0\"></span> portfolio data. The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s analysis f<span class=\"_ _0\"></span>ound no evidence of<span class=\"_ _0\"></span> particular concentrations o<span class=\"_ _0\"></span>f cr<span class=\"_ _0\"></span>edit risk below<span class=\"_ _0\"></span> portfolio lev<span class=\"_ _0\"></span>el. Given this, and <span class=\"_ _0\"></span>the high lev<span class=\"_ _0\"></span>el nature of<span class=\"_ _0\"></span> the e<span class=\"_ _0\"></span>xercise undertak<span class=\"_ _0\"></span>en, the judg<span class=\"_ _0\"></span>emental adjustments have been apportioned acr<span class=\"_ _0\"></span>oss the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s buy-to-let<span class=\"_ _0\"></span> mortgage, SME lending and motor <span class=\"_ _0\"></span>finance portfolios, as appropriate, <span class=\"_ _0\"></span>to individual Stage 1 cases. <span class=\"_ _1\"></span>As such they ar<span class=\"_ _0\"></span>e included in the cr<span class=\"_ _0\"></span>edit risk disclosures r<span class=\"_ _0\"></span>equired b<span class=\"_ _0\"></span>y IFRS 7<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>The Group <span class=\"_ _0\"></span>will continue to monitor<span class=\"_ _1\"></span> the requirement<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> these adjustments as <span class=\"_ _0\"></span>the economic situation develops and its impacts are mor<span class=\"_ _0\"></span>e fully<span class=\"_ _0\"></span> reflected in model outputs. It is anticipat<span class=\"_ _0\"></span>ed that a mor<span class=\"_ _0\"></span>e normal economic situation would r<span class=\"_ _0\"></span>equire a low<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> adjustments, but the <span class=\"_ _0\"></span>timescale in which such a scenario might be r<span class=\"_ _0\"></span>eached appears uncertain.<span class=\"_ _36a\"> </span>The Group has adop<span class=\"_ _0\"></span>ted the <span class=\"_ _0\"></span>terminology f<span class=\"_ _0\"></span>or impairment adjustments pr<span class=\"_ _0\"></span>oposed by<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>askforce on Disclosures about<span class=\"_ _0\"></span> Expected Credit L<span class=\"_ _0\"></span>oss (\u2018DECL<span class=\"_ _2f\"></span>\u2019) which restricts <span class=\"_ _0\"></span>the use of<span class=\"_ _0\"></span> the term \u2018P<span class=\"_ _0\"></span>ost Model <span class=\"_ _0\"></span>Adjustment\u2019 (\u2018PMA<span class=\"_ _1\"></span>\u2019) to those adjustments calculat<span class=\"_ _0\"></span>ed on an account-by-<span class=\"_ _0\"></span>account basis and ther<span class=\"_ _0\"></span>efore no long<span class=\"_ _0\"></span>er uses <span class=\"_ _0\"></span>that term <span class=\"_ _0\"></span>for o<span class=\"_ _0\"></span>ther judgemental adjustments.<span class=\"_ _36a\"> </span>22. <span class=\"_ _1c\"></span>Loan impairments b<span class=\"_ _0\"></span>y s<span class=\"_ _0\"></span>tage and division<span class=\"_ _36a\"> </span>IFRS 9 calculations and related disclosur<span class=\"_ _0\"></span>es require loan asse<span class=\"_ _0\"></span>ts to be divided into <span class=\"_ _0\"></span>three stages, <span class=\"_ _0\"></span>with accounts which <span class=\"_ _0\"></span>were cr<span class=\"_ _0\"></span>edit impaired on initial r<span class=\"_ _0\"></span>ecognition repr<span class=\"_ _0\"></span>esenting a fourth class.<span class=\"_ _36a\"> </span>The thr<span class=\"_ _0\"></span>ee classes comprise: those <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>there has been no SICR since advance or<span class=\"_ _1\"></span> acquisition (Stage 1); those wher<span class=\"_ _0\"></span>e ther<span class=\"_ _0\"></span>e has been an SICR (Stage 2); and loans <span class=\"_ _0\"></span>which are impair<span class=\"_ _0\"></span>ed (Stage 3).<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>On initial recognition, and for<span class=\"_ _1\"></span> assets where <span class=\"_ _0\"></span>there has not been an SICR, pr<span class=\"_ _0\"></span>ovisions <span class=\"_ _0\"></span>will be made in respect of<span class=\"_ _0\"></span> losses resulting <span class=\"_ _0\"></span>from the lev<span class=\"_ _0\"></span>el of cr<span class=\"_ _0\"></span>edit default e<span class=\"_ _0\"></span>vents expected in <span class=\"_ _0\"></span>the twelv<span class=\"_ _0\"></span>e months follo<span class=\"_ _0\"></span>wing the balance sheet date<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Where a loan has experienced an SICR, whe<span class=\"_ _0\"></span>ther or<span class=\"_ _0\"></span> not the loan is consider<span class=\"_ _0\"></span>ed to be cr<span class=\"_ _0\"></span>edit impaired, pr<span class=\"_ _0\"></span>ovisions <span class=\"_ _0\"></span>will be made based on the E<span class=\"_ _0\"></span>CLs over<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>full life of<span class=\"_ _0\"></span> the loan \u2022 <span class=\"_ _13\"> </span>F<span class=\"_ _0\"></span>or cr<span class=\"_ _0\"></span>edit impaired assets, pr<span class=\"_ _0\"></span>ovisions <span class=\"_ _0\"></span>will also be made on the basis of<span class=\"_ _0\"></span> lifetime E<span class=\"_ _0\"></span>CLs<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>or assets which <span class=\"_ _0\"></span>were \u2018Pur<span class=\"_ _0\"></span>chased or Originat<span class=\"_ _0\"></span>ed as Credit Impair<span class=\"_ _0\"></span>ed\u2019 (\u2018POCI\u2019) accounts (those considered as cr<span class=\"_ _0\"></span>edit impaired at<span class=\"_ _0\"></span> the point of<span class=\"_ _0\"></span> first r<span class=\"_ _0\"></span>ecognition), such as certain of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s acquired assets in Mortg<span class=\"_ _0\"></span>age Lending<span class=\"_ _0\"></span>, the carrying v<span class=\"_ _0\"></span>aluation is based on expected cash flo<span class=\"_ _0\"></span>ws discounted by<span class=\"_ _0\"></span> the EIR determined at <span class=\"_ _0\"></span>the point of<span class=\"_ _0\"></span> acquisition. The recommendations o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the taskfor<span class=\"_ _0\"></span>ce on Disclosures about Expected Cr<span class=\"_ _0\"></span>edit Loss (\u2018DE<span class=\"_ _0\"></span>CL<span class=\"_ _2f\"></span>\u2019) suggest standard categories <span class=\"_ _0\"></span>for analy<span class=\"_ _0\"></span>sis of <span class=\"_ _0\"></span>firm\u2019<span class=\"_ _1\"></span>s loan books. In the conte<span class=\"_ _0\"></span>xt of <span class=\"_ _0\"></span>the DECL<span class=\"_ _0\"></span> categorisation <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s Mortgage Lending balances ar<span class=\"_ _0\"></span>e classified as \u2018UK re<span class=\"_ _0\"></span>tail mortgage<span class=\"_ _0\"></span>\u2019 business while its Commer<span class=\"_ _0\"></span>cial Lending balances, being adv<span class=\"_ _0\"></span>anced primarily t<span class=\"_ _0\"></span>o SME entities correspond with <span class=\"_ _0\"></span>the \u2018UK other<span class=\"_ _0\"></span> retail\u2019 business classification.<span class=\"_ _36a\"> </span>The Group de<span class=\"_ _0\"></span>fines coverag<span class=\"_ _0\"></span>e as the <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the E<span class=\"_ _0\"></span>CL pr<span class=\"_ _0\"></span>ovision divided by<span class=\"_ _0\"></span> the gr<span class=\"_ _0\"></span>oss carrying v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the related loans.<span class=\"_ _36a\"> </span>An analysis of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s loan portfolios between the stages de<span class=\"_ _0\"></span>fined above is set<span class=\"_ _0\"></span> out below<span class=\"_ _0\"></span>. Stage 1<span class=\"_ _67\"> </span>Stage 2*<span class=\"_ _67\"> </span>Stage 3*<span class=\"_ _a0\"> </span>POCI<span class=\"_ _2c\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Gross loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _13a\"> </span><span class=\"ff15\">12,159.7<span class=\"_ _150\"> </span>625.0<span class=\"_ _d5\"> </span>142.2<span class=\"_ _3a\"> </span>17.7<span class=\"_ _42\"> </span>12,944.6<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _252\"> </span><span class=\"ff15\">1,812.6<span class=\"_ _d5\"> </span>119.8<span class=\"_ _3a\"> </span>63.8<span class=\"_ _9e\"> </span>7.1<span class=\"_ _86\"> </span>2,003.3<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _199\"> </span>13,972.3<span class=\"_ _150\"> </span>744.8<span class=\"_ _d5\"> </span>206.0<span class=\"_ _3a\"> </span>24.8<span class=\"_ _42\"> </span>14,947.9<span class=\"_ _36a\"> </span>Impairment provision<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _162\"> </span><span class=\"ff15\">(4.8)<span class=\"_ _1db\"> </span>(6.1)<span class=\"_ _6c\"> </span>(31.4)<span class=\"_ _fb\"> </span>-<span class=\"_ _72\"> </span>(42.3)<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _253\"> </span><span class=\"ff15\">(14.8)<span class=\"_ _1db\"> </span>(3.3)<span class=\"_ _1db\"> </span>(8.4)<span class=\"_ _1db\"> </span>(4.8)<span class=\"_ _bf\"> </span>(31.3)<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _254\"> </span>(19.6)<span class=\"_ _1db\"> </span>(9.4)<span class=\"_ _bf\"> </span>(39.8)<span class=\"_ _1db\"> </span>(4.8)<span class=\"_ _bf\"> </span>(73.6)<span class=\"_ _36a\"> </span>Net loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _13a\"> </span><span class=\"ff15\">12,154.9<span class=\"_ _150\"> </span>618.9<span class=\"_ _d5\"> </span>110.8<span class=\"_ _3a\"> </span>17.7<span class=\"_ _42\"> </span>12,902.3<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _252\"> </span><span class=\"ff15\">1,797.8<span class=\"_ _d5\"> </span>116.5<span class=\"_ _3a\"> </span>55.4<span class=\"_ _9e\"> </span>2.3<span class=\"_ _86\"> </span>1,972.0<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _199\"> </span>13,952.7<span class=\"_ _150\"> </span>735.4<span class=\"_ _d5\"> </span>166.2<span class=\"_ _3a\"> </span>20.0<span class=\"_ _42\"> </span>14,874.3<span class=\"_ _36a\"> </span>Cover<span class=\"_ _0\"></span>age ra<span class=\"_ _0\"></span>tio<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _90\"> </span><span class=\"ff15\">0.04%<span class=\"_ _9f\"> </span>0.98%<span class=\"_ _86\"> </span>22.08%<span class=\"_ _2c\"> </span>-<span class=\"_ _a8\"> </span>0.33%<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _102\"> </span><span class=\"ff15\">0.82%<span class=\"_ _9f\"> </span>2.75%<span class=\"_ _86\"> </span>13.17%<span class=\"_ _86\"> </span>67.61%<span class=\"_ _9f\"> </span>1.56%<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _195\"> </span>0.14%<span class=\"_ _9f\"> </span>1.26%<span class=\"_ _86\"> </span>19.32%<span class=\"_ _86\"> </span>19.35%<span class=\"_ _9f\"> </span>0.49%<span class=\"_ _36a\"> </span>* Stage 2 and 3 balances are analy<span class=\"_ _0\"></span>sed in more detail below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>Stage 1<span class=\"_ _67\"> </span>Stage 2*<span class=\"_ _67\"> </span>Stage 3*<span class=\"_ _a0\"> </span>POCI<span class=\"_ _2c\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2022<span class=\"_ _36a\"> </span>Gross loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _13a\"> </span><span class=\"ff16\">10,339.6<span class=\"_ _86\"> </span>1,886.4<span class=\"_ _150\"> </span>119.3<span class=\"_ _f7\"> </span>21.4<span class=\"_ _42\"> </span>12,366.7<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _252\"> </span><span class=\"ff16\">1,817.4<span class=\"_ _3a\"> </span>77.2<span class=\"_ _9e\"> </span>5.1<span class=\"_ _9e\"> </span>7.4<span class=\"_ _86\"> </span>1,907.1<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _255\"> </span><span class=\"ff16\">12,157.0<span class=\"_ _86\"> </span>1,963.6<span class=\"_ _d5\"> </span>124.4<span class=\"_ _f7\"> </span>28.8<span class=\"_ _42\"> </span>14,273.8<span class=\"_ _36a\"> </span></span>Impairment provision<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _8b\"> </span>(5.8)<span class=\"_ _1db\"> </span>(6.1)<span class=\"_ _6c\"> </span>(26.1)<span class=\"_ _16b\"> </span>-<span class=\"_ _72\"> </span>(38.0)<span class=\"_ _36a\"> </span>Commercial Lending<span class=\"_ _253\"> </span>(19.7)<span class=\"_ _c8\"> </span>(1.9)<span class=\"_ _c8\"> </span>(2.4)<span class=\"_ _c8\"> </span>(1.5)<span class=\"_ _6c\"> </span>(25.5)<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _254\"> </span><span class=\"ff17\">(25.5)<span class=\"_ _c8\"> </span>(8.0)<span class=\"_ _6c\"> </span>(28.5)<span class=\"_ _1db\"> </span>(1.5)<span class=\"_ _6c\"> </span>(63.5)<span class=\"_ _36a\"> </span></span>Net loan book<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _13a\"> </span><span class=\"ff16\">10,333.8<span class=\"_ _86\"> </span>1,880.3<span class=\"_ _f7\"> </span>93.2<span class=\"_ _3a\"> </span>21.4<span class=\"_ _67\"> </span>12,328.7<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _252\"> </span><span class=\"ff16\">1,797.7<span class=\"_ _3a\"> </span>75.3<span class=\"_ _9e\"> </span>2.7<span class=\"_ _9e\"> </span>5.9<span class=\"_ _86\"> </span>1,881.6<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _255\"> </span><span class=\"ff16\">12,131.5<span class=\"_ _86\"> </span>1,955.6<span class=\"_ _3a\"> </span>95.9<span class=\"_ _3a\"> </span>27.3<span class=\"_ _67\"> </span>14,210.3<span class=\"_ _36a\"> </span></span>Cover<span class=\"_ _0\"></span>age ra<span class=\"_ _0\"></span>tio<span class=\"_ _36a\"> </span>Mortgage Lending<span class=\"_ _90\"> </span><span class=\"ff16\">0.06%<span class=\"_ _9f\"> </span>0.32%<span class=\"_ _6d\"> </span>21.88%<span class=\"_ _2c\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.31%<span class=\"_ _36a\"> </span></span>Commercial Lending<span class=\"_ _102\"> </span><span class=\"ff16\">1.08%<span class=\"_ _9f\"> </span>2.46%<span class=\"_ _6d\"> </span>47.06%<span class=\"_ _86\"> </span>20.27%<span class=\"_ _19c\"> </span>1.34%<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _195\"> </span><span class=\"ff16\">0.21%<span class=\"_ _9f\"> </span>0.41%<span class=\"_ _6d\"> </span>22.91%<span class=\"_ _9f\"> </span>5.21%<span class=\"_ _19c\"> </span>0.44%<span class=\"_ _36a\"> </span></span>* Stage 2 and 3 balances are analy<span class=\"_ _0\"></span>sed in more detail below<span class=\"_ _36a\"> </span>Finance leases included above, analy<span class=\"_ _0\"></span>sed by<span class=\"_ _0\"></span> staging, w<span class=\"_ _0\"></span>ere:<span class=\"_ _36a\"> </span>Stage 1<span class=\"_ _86\"> </span>Stage 2<span class=\"_ _86\"> </span>Stage 3<span class=\"_ _2c\"> </span>POCI<span class=\"_ _a0\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Gross loan book<span class=\"_ _256\"> </span><span class=\"ff15\">873.0<span class=\"_ _3a\"> </span>40.6<span class=\"_ _9e\"> </span>6.0<span class=\"_ _d1\"> </span>0.2<span class=\"_ _150\"> </span>919.8<span class=\"_ _36a\"> </span></span>Impairment provision<span class=\"_ _253\"> </span><span class=\"ff15\">(8.0)<span class=\"_ _1db\"> </span>(1.9)<span class=\"_ _1db\"> </span>(2.6)<span class=\"_ _16b\"> </span>-<span class=\"_ _72\"> </span>(12.5)<span class=\"_ _36a\"> </span></span>Net loan book<span class=\"_ _106\"> </span><span class=\"ff15\">865.0<span class=\"_ _3a\"> </span>38.7<span class=\"_ _d1\"> </span>3.4<span class=\"_ _9e\"> </span>0.2<span class=\"_ _d5\"> </span>907.3<span class=\"_ _36a\"> </span></span>Cover<span class=\"_ _0\"></span>age Ratio<span class=\"_ _257\"> </span><span class=\"ff15\">0.92%<span class=\"_ _9f\"> </span>4.68%<span class=\"_ _86\"> </span>43.33%<span class=\"_ _12d\"> </span>-<span class=\"_ _84\"> </span>1.36%<span class=\"_ _36a\"> </span></span>30 September 2022<span class=\"_ _36a\"> </span>Gross loan book<span class=\"_ _256\"> </span><span class=\"ff16\">801.7<span class=\"_ _3a\"> </span>35.4<span class=\"_ _9e\"> </span>4.4<span class=\"_ _9e\"> </span>0.5<span class=\"_ _150\"> </span>842.0<span class=\"_ _36a\"> </span></span>Impairment provision<span class=\"_ _142\"> </span>(13.3)<span class=\"_ _c8\"> </span>(1.5)<span class=\"_ _c8\"> </span>(2.0)<span class=\"_ _16b\"> </span>-<span class=\"_ _72\"> </span>(16.8)<span class=\"_ _36a\"> </span>Net loan book<span class=\"_ _120\"> </span><span class=\"ff16\">788.4<span class=\"_ _3a\"> </span>33.9<span class=\"_ _9e\"> </span>2.4<span class=\"_ _9e\"> </span>0.5<span class=\"_ _150\"> </span>825.2<span class=\"_ _36a\"> </span></span>Cover<span class=\"_ _0\"></span>age Ratio<span class=\"_ _257\"> </span><span class=\"ff16\">1.66%<span class=\"_ _19c\"> </span>4.24%<span class=\"_ _6d\"> </span>45.45%<span class=\"_ _43\"> </span><span class=\"ff15\">-<span class=\"_ _12c\"> </span></span>2.00%<span class=\"_ _36a\"> </span></span>In terms of<span class=\"_ _1\"></span> the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s credit management pr<span class=\"_ _0\"></span>ocesses, Stage 1 cases will <span class=\"_ _0\"></span>fall within <span class=\"_ _0\"></span>the appropriate customer<span class=\"_ _0\"></span> servicing functions and Stage 2 cases <span class=\"_ _0\"></span>will be subject to account manag<span class=\"_ _0\"></span>ement arrangements. Stage 3 cases <span class=\"_ _0\"></span>will include both those subject<span class=\"_ _0\"></span> to r<span class=\"_ _0\"></span>ecovery<span class=\"_ _0\"></span> or similar pr<span class=\"_ _0\"></span>ocesses and those <span class=\"_ _0\"></span>which, though being managed on a long<span class=\"_ _0\"></span>-term basis, are included <span class=\"_ _0\"></span>with defaulted accounts <span class=\"_ _0\"></span>for r<span class=\"_ _0\"></span>egulatory purposes. Howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, these broad cat<span class=\"_ _0\"></span>egorisations may<span class=\"_ _0\"></span> vary<span class=\"_ _0\"></span> between diff<span class=\"_ _0\"></span>erent pr<span class=\"_ _0\"></span>oduct types.<span class=\"_ _36a\"> </span>POCI balances included in the Commer<span class=\"_ _0\"></span>cial Lending segment arise principally<span class=\"_ _0\"></span> fr<span class=\"_ _0\"></span>om acquired businesses, wher<span class=\"_ _0\"></span>e those assets <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e identified as credit impair<span class=\"_ _0\"></span>ed at the point o<span class=\"_ _0\"></span>f acquisition <span class=\"_ _0\"></span>when the acquired portf<span class=\"_ _0\"></span>olios as a whole <span class=\"_ _0\"></span>were e<span class=\"_ _0\"></span>valuated. <span class=\"_ _1\"></span>Additional provision arising on these assets post-<span class=\"_ _0\"></span>acquisition is shown as \u2018Impairment Pro<span class=\"_ _0\"></span>vision\u2019 abo<span class=\"_ _0\"></span>ve.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s acquired consumer<span class=\"_ _0\"></span> loans are included in <span class=\"_ _0\"></span>the Mortgage L<span class=\"_ _0\"></span>ending segment, together<span class=\"_ _0\"></span> with its closed second char<span class=\"_ _0\"></span>ge mortgage portfolios. <span class=\"_ _1\"></span>Acquired loans which <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e performing on acquisition are included in <span class=\"_ _0\"></span>the staging analysis abov<span class=\"_ _0\"></span>e.<span class=\"_ _36a\"> </span>Acquired portf<span class=\"_ _0\"></span>olios which <span class=\"_ _0\"></span>were larg<span class=\"_ _0\"></span>ely non-perf<span class=\"_ _0\"></span>orming at acquisition, and which w<span class=\"_ _0\"></span>ere pur<span class=\"_ _0\"></span>chased at a deep discount to <span class=\"_ _0\"></span>face v<span class=\"_ _0\"></span>alue, are sho<span class=\"_ _0\"></span>wn as POCI assets above. <span class=\"_ _1\"></span>Although no provision is shown abo<span class=\"_ _0\"></span>ve for<span class=\"_ _1\"></span> such assets, the effect of<span class=\"_ _0\"></span> the discount on pur<span class=\"_ _0\"></span>chase is included in the gr<span class=\"_ _0\"></span>oss v<span class=\"_ _0\"></span>alue ensuring that the carrying <span class=\"_ _0\"></span>value is substantially<span class=\"_ _0\"></span> less than <span class=\"_ _0\"></span>the current balances due <span class=\"_ _0\"></span>from customers and <span class=\"_ _0\"></span>the lev<span class=\"_ _0\"></span>el of co<span class=\"_ _0\"></span>ver is consider<span class=\"_ _0\"></span>able.<span class=\"_ _36a\"> </span>Analysis of<span class=\"_ _0\"></span> Stage 2 loans The table belo<span class=\"_ _0\"></span>w analyses <span class=\"_ _0\"></span>the accounts in Stage 2 betw<span class=\"_ _0\"></span>een those not mor<span class=\"_ _0\"></span>e than one month in arr<span class=\"_ _0\"></span>ears wher<span class=\"_ _0\"></span>e an SICR has nonetheless been identified fr<span class=\"_ _0\"></span>om other inf<span class=\"_ _0\"></span>ormation and accounts more than one month in arr<span class=\"_ _0\"></span>ears.<span class=\"_ _36a\"> </span>Cases which hav<span class=\"_ _0\"></span>e been greater<span class=\"_ _0\"></span> than one month in arr<span class=\"_ _0\"></span>ears in the last <span class=\"_ _0\"></span>three months, but <span class=\"_ _0\"></span>which are not<span class=\"_ _0\"></span> at the balance sheet date ar<span class=\"_ _0\"></span>e shown as \u2018r<span class=\"_ _0\"></span>ecent arrears<span class=\"_ _0\"></span>\u2019 in the tables belo<span class=\"_ _0\"></span>w<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>In all cases accounts which ar<span class=\"_ _0\"></span>e more <span class=\"_ _0\"></span>than one month in arrears, <span class=\"_ _0\"></span>where this is a meaningful measur<span class=\"_ _0\"></span>e, are consider<span class=\"_ _0\"></span>ed to ha<span class=\"_ _0\"></span>ve an SICR. Howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, in certain loan portfolios, regular<span class=\"_ _0\"></span> monthly pa<span class=\"_ _0\"></span>yments of pr<span class=\"_ _0\"></span>e-set amounts are no<span class=\"_ _0\"></span>t requir<span class=\"_ _0\"></span>ed and hence this criterion cannot<span class=\"_ _0\"></span>  be used.<span class=\"_ _36a\"> </span>The Group uses arr<span class=\"_ _0\"></span>ears multiples as a pr<span class=\"_ _0\"></span>oxy <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> days past due, as <span class=\"_ _0\"></span>this measure is commonly<span class=\"_ _0\"></span> used in its arrears r<span class=\"_ _0\"></span>eporting. <span class=\"_ _0\"></span>A loan <span class=\"_ _0\"></span>will generally<span class=\"_ _0\"></span> be one month in arrears <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the point it is one day<span class=\"_ _0\"></span> past due until it is thirty<span class=\"_ _0\"></span> days past due.<span class=\"_ _36a\"> </span>The v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> accounts in Stage 2 has reduced significantly<span class=\"_ _0\"></span> in the Mortgag<span class=\"_ _0\"></span>e Lending segment o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>. This is driven principally<span class=\"_ _0\"></span> by<span class=\"_ _0\"></span> a lower<span class=\"_ _0\"></span> number of<span class=\"_ _1\"></span> accounts identified through model based criteria <span class=\"_ _0\"></span>which are driven b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the economic scenarios input into the models. T<span class=\"_ _0\"></span>he economic for<span class=\"_ _0\"></span>ecasts at 30 September<span class=\"_ _0\"></span> 2022 included significant short term shifts in inter<span class=\"_ _0\"></span>est rates and house prices. <span class=\"_ _0\"></span>These have been r<span class=\"_ _0\"></span>eflected in actual economic performance, <span class=\"_ _0\"></span>to some extent, and <span class=\"_ _0\"></span>the initial parts of <span class=\"_ _0\"></span>the September 2023 scenarios ha<span class=\"_ _0\"></span>ve lower<span class=\"_ _0\"></span> rate mo<span class=\"_ _0\"></span>vements.<span class=\"_ _36a\"> </span>The number<span class=\"_ _0\"></span> of arr<span class=\"_ _0\"></span>ears cases being recor<span class=\"_ _0\"></span>ded has increased, as a r<span class=\"_ _0\"></span>esult of incr<span class=\"_ _1\"></span>easing economic pressure on customers, <span class=\"_ _0\"></span>to some extent repr<span class=\"_ _0\"></span>esenting a proportion of<span class=\"_ _0\"></span> the SICR cases identified at <span class=\"_ _0\"></span>the pre<span class=\"_ _0\"></span>vious y<span class=\"_ _0\"></span>ear end. How<span class=\"_ _0\"></span>ever<span class=\"_ _1\"></span> the scale of <span class=\"_ _0\"></span>this increase is less than indicat<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s modelling at 30 September<span class=\"_ _0\"></span> 2022, with accounts not, so <span class=\"_ _0\"></span>far<span class=\"_ _1\"></span>, as severely<span class=\"_ _0\"></span> impacted by<span class=\"_ _0\"></span> rate rises and cost-of<span class=\"_ _0\"></span>-living issues as predicted. <span class=\"_ _1\"></span>T<span class=\"_ _1\"></span>ogether <span class=\"_ _0\"></span>these factors ha<span class=\"_ _0\"></span>ve led t<span class=\"_ _0\"></span>o a reduction in the o<span class=\"_ _0\"></span>verall Stag<span class=\"_ _0\"></span>e 2 pool.<span class=\"_ _36a\"> </span>In the Commer<span class=\"_ _0\"></span>cial Lending segment <span class=\"_ _0\"></span>the number of<span class=\"_ _0\"></span> Stage 2 accounts has incr<span class=\"_ _0\"></span>eased across all categ<span class=\"_ _0\"></span>ories as the impact of<span class=\"_ _0\"></span> economic pressur<span class=\"_ _0\"></span>es begins to be demonstrat<span class=\"_ _0\"></span>ed, but arrears le<span class=\"_ _0\"></span>vels r<span class=\"_ _0\"></span>emain low<span class=\"_ _0\"></span>. The number<span class=\"_ _1\"></span> of Stage 2 cases has also been incr<span class=\"_ _0\"></span>eased through the adoption of<span class=\"_ _0\"></span> a new SME lending model, <span class=\"_ _0\"></span>which is better able <span class=\"_ _0\"></span>to iden<div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs301\">Overall S<span class=\"_ _0\"></span>tage 2 pro<span class=\"_ _0\"></span>visions have incr<span class=\"_ _0\"></span>eased with the S<span class=\"_ _0\"></span>tage 2 balance, with co<span class=\"_ _0\"></span>verage le<span class=\"_ _0\"></span>vels, on av<span class=\"_ _0\"></span>erage, also incr<span class=\"_ _0\"></span>easing. Pro<span class=\"_ _0\"></span>vision </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs302\">cover<span class=\"_ _0\"></span>age lev<span class=\"_ _0\"></span>els in the Mortgag<span class=\"_ _0\"></span>e Lending segment hav<span class=\"_ _0\"></span>e generally<span class=\"_ _0\"></span> increased, partly<span class=\"_ _0\"></span> as a result of<span class=\"_ _0\"></span> downw<span class=\"_ _0\"></span>ard pr<span class=\"_ _0\"></span>essure on pr<span class=\"_ _0\"></span>operty </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs303\">prices impacting on security <span class=\"_ _0\"></span>values. Co<span class=\"_ _0\"></span>verage le<span class=\"_ _0\"></span>vels in the Commer<span class=\"_ _1\"></span>cial Lending segment increased, although <span class=\"_ _0\"></span>this was mor<span class=\"_ _0\"></span>e related <span class=\"_ _0\"></span>to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs304\">the mix of S<span class=\"_ _0\"></span>tage 2 assets, and the r<span class=\"_ _0\"></span>elatively<span class=\"_ _0\"></span> small number of<span class=\"_ _0\"></span> cases inv<span class=\"_ _0\"></span>olved.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs305\">&lt; 1 month </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs306\">arrears<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs307\">Recent </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs308\">arrears<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs309\">&gt; 1 &lt;= 3 months </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs30a\">arrears<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs30b\">T<span class=\"_ _2\"></span>otal </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs30c\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs30d\">30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs30e\">Gross loan book<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs30f\">Mortgage Lending<span class=\"_ _1d1\"> </span><span class=\"ff15\">518.1<span class=\"_ _cb\"> </span>15.8<span class=\"_ _3a\"> </span>91.1<span class=\"_ _150\"> </span>625.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs310\">Commercial Lending<span class=\"_ _258\"> </span><span class=\"ff15\">116.3<span class=\"_ _9e\"> </span>0.4<span class=\"_ _d1\"> </span>3.1<span class=\"_ _150\"> </span>119.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs311\">T<span class=\"_ _2\"></span>otal<span class=\"_ _24b\"> </span>634.4<span class=\"_ _3a\"> </span>16.2<span class=\"_ _3a\"> </span>94.2<span class=\"_ _150\"> </span>744.8<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs312\">Impairment provision<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs313\">Mortgage Lending<span class=\"_ _2e\"> </span><span class=\"ff15\">(2.3)<span class=\"_ _1db\"> </span>(0.1)<span class=\"_ _1db\"> </span>(3.7)<span class=\"_ _1db\"> </span>(6.1)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs314\">Commercial Lending<span class=\"_ _259\"> </span><span class=\"ff15\">(2.9)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(0.4)<span class=\"_ _1db\"> </span>(3.3)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs315\">T<span class=\"_ _2\"></span>otal<span class=\"_ _25a\"> </span>(5.2)<span class=\"_ _1db\"> </span>(0.1)<span class=\"_ _1db\"> </span>(4.1)<span class=\"_ _1db\"> </span>(9.4)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs316\">Net loan book<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs317\">Mortgage Lending<span class=\"_ _1d1\"> </span><span class=\"ff15\">515.8<span class=\"_ _cb\"> </span>15.7<span class=\"_ _3a\"> </span>87.4<span class=\"_ _150\"> </span>618.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs318\">Commercial Lending<span class=\"_ _258\"> </span><span class=\"ff15\">113.4<span class=\"_ _9e\"> </span>0.4<span class=\"_ _d1\"> </span>2.7<span class=\"_ _150\"> </span>116.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs319\">T<span class=\"_ _2\"></span>otal<span class=\"_ _24b\"> </span>629.2<span class=\"_ _3a\"> </span>16.1<span class=\"_ _3a\"> </span>90.1<span class=\"_ _150\"> </span>735.4<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs31a\">Cover<span class=\"_ _0\"></span>age ra<span class=\"_ _0\"></span>tio<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs31b\">Mortgage Lending<span class=\"_ _25b\"> </span><span class=\"ff15\">0.44%<span class=\"_ _9f\"> </span>0.63%<span class=\"_ _9f\"> </span>4.06%<span class=\"_ _9f\"> </span>0.98%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs31c\">Commercial Lending<span class=\"_ _19b\"> </span><span class=\"ff15\">2.49%<span class=\"_ _43\"> </span>-<span class=\"_ _12b\"> </span>12.90%<span class=\"_ _9f\"> </span>2.75%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs31d\">T<span class=\"_ _2\"></span>otal<span class=\"_ _251\"> </span>0.82%<span class=\"_ _9f\"> </span>0.62%<span class=\"_ _9f\"> </span>4.35%<span class=\"_ _9f\"> </span>1.26%<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs31e\">&lt; 1 month </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs31f\">arrears<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs320\">Recent </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs321\">arrears<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs322\">&gt; 1 &lt;= 3 months </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs323\">arrears<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs324\">T<span class=\"_ _2\"></span>otal </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs325\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs326\">30 September 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs327\">Gross loan book<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs328\">Mortgage Lending<span class=\"_ _25c\"> </span><span class=\"ff16\">1,850.0<span class=\"_ _3a\"> </span>10.8<span class=\"_ _3a\"> </span>25.6<span class=\"_ _86\"> </span>1,886.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs329\">Commercial Lending<span class=\"_ _11a\"> </span><span class=\"ff16\">74.2<span class=\"_ _9e\"> </span>0.2<span class=\"_ _9e\"> </span>2.8<span class=\"_ _3a\"> </span>77.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs32a\">T<span class=\"_ _2\"></span>otal<span class=\"_ _1bf\"> </span><span class=\"ff16\">1,924.2<span class=\"_ _f7\"> </span>11.0<span class=\"_ _3a\"> </span>28.4<span class=\"_ _86\"> </span>1,963.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs32b\">Impairment provision<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs32c\">Mortgage Lending<span class=\"_ _2e\"> </span>(5.4)<span class=\"_ _c8\"> </span>(0.1)<span class=\"_ _c8\"> </span>(0.6)<span class=\"_ _c8\"> </span>(6.1)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs32d\">Commercial Lending<span class=\"_ _259\"> </span>(1.6)<span class=\"_ _16b\"> </span>-<span class=\"_ _16b\"> </span>(0.3)<span class=\"_ _1db\"> </span>(1.9)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs32e\">T<span class=\"_ _2\"></span>otal<span class=\"_ _25a\"> </span><span class=\"ff17\">(7.0)<span class=\"_ _c8\"> </span>(0.1)<span class=\"_ _c8\"> </span>(0.9)<span class=\"_ _c8\"> </span>(8.0)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs32f\">Net loan book<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs330\">Mortgage Lending<span class=\"_ _25c\"> </span><span class=\"ff16\">1,844.6<span class=\"_ _3a\"> </span>10.7<span class=\"_ _3a\"> </span>25.0<span class=\"_ _86\"> </span>1,880.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs331\">Commercial Lending<span class=\"_ _11a\"> </span><span class=\"ff16\">72.6<span class=\"_ _9e\"> </span>0.2<span class=\"_ _9e\"> </span>2.5<span class=\"_ _3a\"> </span>75.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs332\">T<span class=\"_ _2\"></span>otal<span class=\"_ _1bf\"> </span><span class=\"ff16\">1,917.2<span class=\"_ _f7\"> </span>10.9<span class=\"_ _3a\"> </span>27.5<span class=\"_ _86\"> </span>1,955.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs333\">Cover<span class=\"_ _0\"></span>age ra<span class=\"_ _0\"></span>tio<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs334\">Mortgage Lending<span class=\"_ _25b\"> </span><span class=\"ff16\">0.29%<span class=\"_ _9f\"> </span>0.93%<span class=\"_ _19c\"> </span>2.34%<span class=\"_ _19c\"> </span>0.32%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs335\">Commercial Lending<span class=\"_ _19b\"> </span><span class=\"ff16\">2.16%<span class=\"_ _43\"> </span></span>-<span class=\"_ _9f\"> </span><span class=\"ff16\">10.71%<span class=\"_ _9f\"> </span>2.46%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs336\">T<span class=\"_ _2\"></span>otal<span class=\"_ _251\"> </span><span class=\"ff16\">0.36%<span class=\"_ _19c\"> </span>0.91%<span class=\"_ _9f\"> </span>3.17%<span class=\"_ _19c\"> </span>0.41%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs338\">Analysis of<span class=\"_ _0\"></span> Stage 3 loans<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs339\">The table belo<span class=\"_ _0\"></span>w analyses <span class=\"_ _0\"></span>the accounts in Stage 3 betw<span class=\"_ _0\"></span>een those:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs33a\">\u2022 <span class=\"_ _13\"> </span>In the process of<span class=\"_ _1\"></span> sale or other enf<span class=\"_ _0\"></span>orcement pr<span class=\"_ _0\"></span>ocedures (\u2018R<span class=\"_ _0\"></span>ealisations\u2019)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs33b\">\u2022 <span class=\"_ _13\"> </span>Where a receiv<span class=\"_ _0\"></span>er of<span class=\"_ _1\"></span> rent (\u2018RoR\u2019) has been appointed by<span class=\"_ _1\"></span> the Group to manag<span class=\"_ _0\"></span>e the pr<span class=\"_ _0\"></span>operty on the cust<span class=\"_ _0\"></span>omers\u2019 behalf<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs33c\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Which are being managed on a long-<span class=\"_ _0\"></span>term basis and wher<span class=\"_ _0\"></span>e full r<span class=\"_ _0\"></span>ecovery<span class=\"_ _0\"></span> is possible, but which ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to meet regulat<span class=\"_ _0\"></span>ory </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs33d\">default criteria at <span class=\"_ _0\"></span>the balance sheet date (\u2018&gt;3 month arr<span class=\"_ _0\"></span>ears\u2019)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs33e\">\u2022 <span class=\"_ _13\"> </span>Which no longer meet r<span class=\"_ _0\"></span>egulatory<span class=\"_ _0\"></span> default criteria but <span class=\"_ _0\"></span>which are being r<span class=\"_ _0\"></span>etained in Stage 3 f<span class=\"_ _0\"></span>or a pr<span class=\"_ _0\"></span>obationary period (\u2018Pr<span class=\"_ _0\"></span>obation\u2019)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs33f\">Where an account meets <span class=\"_ _0\"></span>two of<span class=\"_ _0\"></span> the criteria, it<span class=\"_ _0\"></span> will be assigned to <span class=\"_ _0\"></span>the category<span class=\"_ _0\"></span> shown first<span class=\"_ _0\"></span> in the list abov<span class=\"_ _0\"></span>e.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs340\">RoR accounts in Stage 3 ma<span class=\"_ _0\"></span>y be <span class=\"_ _0\"></span>fully up-to-dat<span class=\"_ _0\"></span>e with full r<span class=\"_ _0\"></span>ecovery<span class=\"_ _1\"></span> possible. These accounts are included in Stag<span class=\"_ _0\"></span>e 3 as the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs341\">classified as defaulted f<span class=\"_ _0\"></span>or r<span class=\"_ _0\"></span>egulatory purposes.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs342\">The number<span class=\"_ _0\"></span> and value o<span class=\"_ _0\"></span>f Stage 3 accounts has incr<span class=\"_ _0\"></span>eased in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> across all books. <span class=\"_ _0\"></span>This has mostly<span class=\"_ _0\"></span> been driven by<span class=\"_ _0\"></span> increases </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs343\">in the number<span class=\"_ _0\"></span> of accounts in serious arr<span class=\"_ _0\"></span>ears and by<span class=\"_ _0\"></span> an increased number<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> poorly performing de<span class=\"_ _0\"></span>velopment <span class=\"_ _0\"></span>finance cases in the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs344\">Commercial L<span class=\"_ _0\"></span>ending book. T<span class=\"_ _0\"></span>his sort of incr<span class=\"_ _0\"></span>ease is not unexpected in a climate o<span class=\"_ _0\"></span>f economic <span class=\"_ _0\"></span>tightening. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs345\">Realisations cases, particularly<span class=\"_ _0\"></span> in Mortgage L<span class=\"_ _0\"></span>ending have incr<span class=\"_ _0\"></span>eased, as the increase in arr<span class=\"_ _1\"></span>ears cases reported at the half<span class=\"_ _0\"></span> y<span class=\"_ _0\"></span>ear <span class=\"_ _0\"></span>works </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs346\">its w<span class=\"_ _0\"></span>ay <span class=\"_ _0\"></span>through <span class=\"_ _0\"></span>the system. R<span class=\"_ _0\"></span>oR cases in the Mortgag<span class=\"_ _0\"></span>e Lending division hav<span class=\"_ _0\"></span>e remained br<span class=\"_ _0\"></span>oadly stable, how<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>er ther<span class=\"_ _0\"></span>e has been a lev<span class=\"_ _0\"></span>el </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs347\">of churn in <span class=\"_ _0\"></span>the book with old cases se<span class=\"_ _0\"></span>ttled and new appointments made.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs348\">Cover<span class=\"_ _0\"></span>age lev<span class=\"_ _0\"></span>els in the Mortgag<span class=\"_ _0\"></span>e Lending segment on Stage 3 cases ha<span class=\"_ _0\"></span>ve r<span class=\"_ _0\"></span>emained broadly<span class=\"_ _0\"></span> similar<span class=\"_ _0\"></span>, despite the <span class=\"_ _0\"></span>falls in house prices </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs349\">and thus security<span class=\"_ _0\"></span> cover<span class=\"_ _0\"></span> in the <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs34a\">The relativ<span class=\"_ _0\"></span>ely lo<span class=\"_ _0\"></span>w amount of<span class=\"_ _0\"></span> Commercial L<span class=\"_ _0\"></span>ending cases and the <span class=\"_ _0\"></span>variety<span class=\"_ _0\"></span> of cr<span class=\"_ _0\"></span>edit pro<span class=\"_ _0\"></span>files cover<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the division\u2019<span class=\"_ _2\"></span>s lending means that </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs34b\">the cover<span class=\"_ _0\"></span>age ratio at any<span class=\"_ _0\"></span> particular <span class=\"_ _0\"></span>time tends <span class=\"_ _0\"></span>to be more a <span class=\"_ _0\"></span>function of <span class=\"_ _0\"></span>the particular accounts in <span class=\"_ _0\"></span>the Stage 3 population at <span class=\"_ _0\"></span>that point, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs34c\">rather<span class=\"_ _0\"></span> than indicative of<span class=\"_ _0\"></span> a general <span class=\"_ _0\"></span>trend. <span class=\"_ _0\"></span>The incr<span class=\"_ _0\"></span>eased number of<span class=\"_ _0\"></span> dev<span class=\"_ _0\"></span>elopment finance cases, wher<span class=\"_ _0\"></span>e security co<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> is relatively<span class=\"_ _1\"></span> high, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs34d\">within the arr<span class=\"_ _0\"></span>ears population has reduced <span class=\"_ _0\"></span>the over<span class=\"_ _0\"></span>all percentage pr<span class=\"_ _0\"></span>ovision r<span class=\"_ _0\"></span>equirement in <span class=\"_ _0\"></span>that division.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs34f\">Probation<span class=\"_ _194\"> </span><span class=\"ff15\">&gt; 3 month arrears<span class=\"_ _d0\"> </span>RoR managed<span class=\"_ _37\"> </span></span>Realisations<span class=\"_ _a0\"> </span><span class=\"ff15\">T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs350\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs351\">30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs352\">Gross loan book<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs353\">Mortgage Lending<span class=\"_ _257\"> </span><span class=\"ff15\">8.8<span class=\"_ _3a\"> </span>40.4<span class=\"_ _3a\"> </span>50.3<span class=\"_ _3a\"> </span>42.7<span class=\"_ _d5\"> </span>142.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs354\">Commercial Lending<span class=\"_ _160\"> </span><span class=\"ff15\">1.1<span class=\"_ _cb\"> </span>57.8<span class=\"_ _43\"> </span>-<span class=\"_ _9b\"> </span>4.9<span class=\"_ _3a\"> </span>63.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs355\">T<span class=\"_ _2\"></span>otal<span class=\"_ _83\"> </span>9.9<span class=\"_ _cb\"> </span>98.2<span class=\"_ _3a\"> </span>50.3<span class=\"_ _3a\"> </span>47.6<span class=\"_ _150\"> </span>206.0<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs356\">Impairment provision<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs357\">Mortgage Lending<span class=\"_ _25d\"> </span><span class=\"ff15\">-<span class=\"_ _fb\"> </span>(1.2)<span class=\"_ _bf\"> </span>(16.6)<span class=\"_ _bf\"> </span>(13.6)<span class=\"_ _6c\"> </span>(31.4)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs358\">Commercial Lending<span class=\"_ _25e\"> </span><span class=\"ff15\">(0.3)<span class=\"_ _1db\"> </span>(5.5)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(2.6)<span class=\"_ _1db\"> </span>(8.4)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs359\">T<span class=\"_ _2\"></span>otal<span class=\"_ _25f\"> </span>(0.3)<span class=\"_ _1db\"> </span>(6.7)<span class=\"_ _bf\"> </span>(16.6)<span class=\"_ _bf\"> </span>(16.2)<span class=\"_ _6c\"> </span>(39.8)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs35a\">Net loan book<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs35b\">Mortgage Lending<span class=\"_ _257\"> </span><span class=\"ff15\">8.8<span class=\"_ _3a\"> </span>39.2<span class=\"_ _3a\"> </span>33.7<span class=\"_ _3a\"> </span>29.1<span class=\"_ _d5\"> </span>110.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs35c\">Commercial Lending<span class=\"_ _160\"> </span><span class=\"ff15\">0.8<span class=\"_ _cb\"> </span>52.3<span class=\"_ _43\"> </span>-<span class=\"_ _9b\"> </span>2.3<span class=\"_ _3a\"> </span>55.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs35d\">T<span class=\"_ _2\"></span>otal<span class=\"_ _83\"> </span>9.6<span class=\"_ _cb\"> </span>91.5<span class=\"_ _3a\"> </span>33.7<span class=\"_ _3a\"> </span>31.4<span class=\"_ _150\"> </span>166.2<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs35e\">Cover<span class=\"_ _0\"></span>age ra<span class=\"_ _0\"></span>tio<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs35f\">Mortgage Lending<span class=\"_ _25d\"> </span><span class=\"ff15\">-<span class=\"_ _12c\"> </span>2.97%<span class=\"_ _6d\"> </span>33.00%<span class=\"_ _86\"> </span>31.85%<span class=\"_ _86\"> </span>22.08%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs360\">Commercial Lending<span class=\"_ _260\"> </span><span class=\"ff15\">27.27%<span class=\"_ _9f\"> </span>9.52%<span class=\"_ _43\"> </span>-<span class=\"_ _12b\"> </span>53.06%<span class=\"_ _86\"> </span>13.17%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs361\">T<span class=\"_ _2\"></span>otal<span class=\"_ _195\"> </span>3.03%<span class=\"_ _9f\"> </span>6.82%<span class=\"_ _86\"> </span>33.00%<span class=\"_ _86\"> </span>34.03%<span class=\"_ _86\"> </span>19.32%<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs362\">Probation<span class=\"_ _194\"> </span><span class=\"ff15\">&gt; 3 month arrears<span class=\"_ _d0\"> </span>RoR managed<span class=\"_ _37\"> </span></span>Realisations<span class=\"_ _a0\"> </span><span class=\"ff15\">T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs363\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs364\">30 September 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs365\">Gross loan book<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs366\">Mortgage Lending<span class=\"_ _257\"> </span><span class=\"ff16\">6.0<span class=\"_ _3a\"> </span>37.5<span class=\"_ _3a\"> </span>49.6<span class=\"_ _f7\"> </span>26.2<span class=\"_ _d5\"> </span>119.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs367\">Commercial Lending<span class=\"_ _160\"> </span><span class=\"ff16\">0.2<span class=\"_ _d1\"> </span>0.7<span class=\"_ _43\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">4.2<span class=\"_ _9e\"> </span>5.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs368\">T<span class=\"_ _2\"></span>otal<span class=\"_ _83\"> </span><span class=\"ff16\">6.2<span class=\"_ _3a\"> </span>38.2<span class=\"_ _3a\"> </span>49.6<span class=\"_ _3a\"> </span>30.4<span class=\"_ _150\"> </span>124.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs369\">Impairment provision<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs36a\">Mortgage Lending<span class=\"_ _8b\"> </span>(0.4)<span class=\"_ _1db\"> </span>(1.0)<span class=\"_ _6c\"> </span>(17.2)<span class=\"_ _c8\"> </span>(7.5)<span class=\"_ _6c\"> </span>(26.1)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs36b\">Commercial Lending<span class=\"_ _162\"> </span>-<span class=\"_ _fb\"> </span>(0.2)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(2.2)<span class=\"_ _c8\"> </span>(2.4)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs36c\">T<span class=\"_ _2\"></span>otal<span class=\"_ _25f\"> </span><span class=\"ff17\">(0.4)<span class=\"_ _c8\"> </span>(1.2)<span class=\"_ _6c\"> </span>(17.2)<span class=\"_ _1db\"> </span>(9.7)<span class=\"_ _6c\"> </span>(28.5)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs36d\">Net loan book<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs36e\">Mortgage Lending<span class=\"_ _257\"> </span><span class=\"ff16\">5.6<span class=\"_ _3a\"> </span>36.5<span class=\"_ _3a\"> </span>32.4<span class=\"_ _f7\"> </span>18.7<span class=\"_ _3a\"> </span>93.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs36f\">Commercial Lending<span class=\"_ _160\"> </span><span class=\"ff16\">0.2<span class=\"_ _d1\"> </span>0.5<span class=\"_ _43\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.0<span class=\"_ _9e\"> </span>2.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs370\">T<span class=\"_ _2\"></span>otal<span class=\"_ _83\"> </span><span class=\"ff16\">5.8<span class=\"_ _3a\"> </span>37.0<span class=\"_ _3a\"> </span>32.4<span class=\"_ _3a\"> </span>20.7<span class=\"_ _f7\"> </span>95.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs371\">Cover<span class=\"_ _0\"></span>age ra<span class=\"_ _0\"></span>tio<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs372\">Mortgage Lending<span class=\"_ _90\"> </span><span class=\"ff16\">6.67%<span class=\"_ _9f\"> </span>2.67%<span class=\"_ _6d\"> </span>34.68%<span class=\"_ _6d\"> </span>28.63%<span class=\"_ _86\"> </span>21.88%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs373\">Commercial Lending<span class=\"_ _162\"> </span>-<span class=\"_ _12b\"> </span><span class=\"ff16\">28.57%<span class=\"_ _43\"> </span></span>-<span class=\"_ _12b\"> </span><span class=\"ff16\">52.38%<span class=\"_ _6d\"> </span>47.06%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs374\">T<span class=\"_ _2\"></span>otal<span class=\"_ _195\"> </span><span class=\"ff16\">6.45%<span class=\"_ _9f\"> </span>3.14%<span class=\"_ _6d\"> </span>34.68%<span class=\"_ _86\"> </span>31.91%<span class=\"_ _6d\"> </span>22.91%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs376\">The security <span class=\"_ _0\"></span>values a<span class=\"_ _0\"></span>vailable t<span class=\"_ _0\"></span>o reduce exposur<span class=\"_ _0\"></span>e at default in <span class=\"_ _0\"></span>the calculation shown above <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> Stage 3 accounts are se<span class=\"_ _0\"></span>t out below<span class=\"_ _0\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs377\">The estimated <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the security<span class=\"_ _0\"></span> repr<span class=\"_ _0\"></span>esents, for<span class=\"_ _0\"></span> each account, the lesser<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>aluation estimate and the exposur<span class=\"_ _0\"></span>e at default </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs378\">in the central scenario<span class=\"_ _0\"></span>. Security <span class=\"_ _0\"></span>values are based on <span class=\"_ _0\"></span>the most recent<span class=\"_ _0\"></span> valuation o<span class=\"_ _0\"></span>f the r<span class=\"_ _1\"></span>elevant asset held b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group, index<span class=\"_ _0\"></span>ed or </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs379\">depreciated as appr<span class=\"_ _0\"></span>opriate.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs37a\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs37b\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs37c\">First mortg<span class=\"_ _0\"></span>ages<span class=\"_ _261\"> </span><span class=\"ff15\">89.5<span class=\"_ _3a\"> </span><span class=\"ff16\">66.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs37d\">Second mortgag<span class=\"_ _0\"></span>es<span class=\"_ _262\"> </span><span class=\"ff15\">10.2<span class=\"_ _3a\"> </span><span class=\"ff16\">14.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs37e\">Asset finance<span class=\"_ _263\"> </span><span class=\"ff15\">1.6<span class=\"_ _9e\"> </span><span class=\"ff16\">1.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs37f\">Motor finance<span class=\"_ _264\"> </span><span class=\"ff15\">1.2<span class=\"_ _9e\"> </span><span class=\"ff16\">0.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs380\">102.5<span class=\"_ _3a\"> </span><span class=\"ff16\">83.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs381\">The RoR manag<span class=\"_ _0\"></span>ed accounts are being managed <span class=\"_ _0\"></span>to ensure <span class=\"_ _0\"></span>the optimal resolution <span class=\"_ _0\"></span>for landlor<span class=\"_ _0\"></span>ds, tenants and lender<span class=\"_ _0\"></span>s and have larg<span class=\"_ _0\"></span>ely </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs382\">reached a long<span class=\"_ _0\"></span>-term, stable position, but the e<span class=\"_ _0\"></span>xistence of <span class=\"_ _0\"></span>the RoR arrang<span class=\"_ _0\"></span>ement causes the accounts t<span class=\"_ _0\"></span>o be treat<span class=\"_ _0\"></span>ed as defaulted f<span class=\"_ _0\"></span>or </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs383\">regulatory<span class=\"_ _0\"></span> purposes. T<span class=\"_ _0\"></span>he Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s RoR arrangements ar<span class=\"_ _0\"></span>e described in more detail belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs384\">Mortgage L<span class=\"_ _0\"></span>ending balances with ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>three months arr<span class=\"_ _0\"></span>ears include second charge mortgag<span class=\"_ _0\"></span>e accounts originated ov<span class=\"_ _0\"></span>er t<span class=\"_ _0\"></span>en year<span class=\"_ _0\"></span>s </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs385\">ago which ha<span class=\"_ _0\"></span>ve been ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>three months in arr<span class=\"_ _0\"></span>ears for<span class=\"_ _0\"></span> some time. <span class=\"_ _0\"></span>These accounts ar<span class=\"_ _0\"></span>e generally making r<span class=\"_ _0\"></span>egular pa<span class=\"_ _0\"></span>yments and have </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs386\">significant lev<span class=\"_ _0\"></span>els of equity<span class=\"_ _0\"></span> in the underlying pr<span class=\"_ _0\"></span>operty <span class=\"_ _0\"></span>which reduces <span class=\"_ _0\"></span>the requir<span class=\"_ _0\"></span>ed provision <span class=\"_ _0\"></span>to the <span class=\"_ _0\"></span>value shown abo<span class=\"_ _0\"></span>ve. It is expected </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs387\">that a high proportion o<span class=\"_ _0\"></span>f these accounts <span class=\"_ _0\"></span>will ev<span class=\"_ _0\"></span>entually r<span class=\"_ _0\"></span>edeem naturally<span class=\"_ _0\"></span>, either on <span class=\"_ _0\"></span>the sale of<span class=\"_ _0\"></span> the property<span class=\"_ _0\"></span> or b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the satisfaction of<span class=\"_ _0\"></span> the </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs388\">amount due thr<span class=\"_ _0\"></span>ough instalment payments.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs389\">Buy-to-le<span class=\"_ _0\"></span>t receiver<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> rent cases (Stage 3)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs38a\">Where a buy<span class=\"_ _0\"></span>-to-let mortgag<span class=\"_ _0\"></span>e customer in England or<span class=\"_ _0\"></span> W<span class=\"_ _1\"></span>ales falls into arrears on <span class=\"_ _0\"></span>their account<span class=\"_ _0\"></span> the Group has <span class=\"_ _0\"></span>the power<span class=\"_ _0\"></span> to appoint<span class=\"_ _0\"></span> a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs38b\">receiv<span class=\"_ _0\"></span>er of<span class=\"_ _0\"></span> rent under<span class=\"_ _1\"></span> the Law of<span class=\"_ _0\"></span> Property<span class=\"_ _0\"></span> A<span class=\"_ _0\"></span>ct. The r<span class=\"_ _0\"></span>eceiver<span class=\"_ _0\"></span> will <span class=\"_ _0\"></span>then manage the pr<span class=\"_ _0\"></span>operty on behalf<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the customer<span class=\"_ _1\"></span>, collecting rents </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs38c\">and remitting <span class=\"_ _0\"></span>them to mak<span class=\"_ _0\"></span>e payments on the account. <span class=\"_ _0\"></span>While the r<span class=\"_ _0\"></span>eceiver<span class=\"_ _0\"></span> has the pow<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>to sell the pr<span class=\"_ _0\"></span>operty<span class=\"_ _0\"></span>, in many cases <span class=\"_ _0\"></span>they<span class=\"_ _0\"></span> will </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs38d\">operate it as a buy-<span class=\"_ _0\"></span>to-let on at least a short <span class=\"_ _0\"></span>to medium term basis, po<span class=\"_ _0\"></span>tentially longer<span class=\"_ _2\"></span>, depending on the individual circumstances of<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs38e\">the case. T<span class=\"_ _0\"></span>his causes less disruption to <span class=\"_ _0\"></span>the tenants and may<span class=\"_ _0\"></span> result in <span class=\"_ _0\"></span>the mortgage account r<span class=\"_ _0\"></span>eturning t<span class=\"_ _0\"></span>o performing status and the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs38f\">property<span class=\"_ _0\"></span> being handed back to <span class=\"_ _0\"></span>the customer<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws33 gs390\">The f<span class=\"_ _0\"></span>ollowing table analy<span class=\"_ _0\"></span>ses the number<span class=\"_ _0\"></span> and gross carrying v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> RoR managed accounts shown abo<span class=\"_ _0\"></span>ve b<span class=\"_ _0\"></span>y the dat<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the receiver<span class=\"_ _0\"></span>s\u2019 </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs391\">appointment, illustrating this position.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs392\">30 September 2023<span class=\"_ _137\"> </span><span class=\"ff17\">30 September 2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs393\">No.<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _118\"> </span><span class=\"ff16\">No.<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs394\">Managed accounts<span class=\"_ _36a\"> </span></div><div class=\"t m0 h27 ff23 fs1 fc1 sc0 ls0 ws0 gs395\">Appointment date<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs396\">2010 and earlier<span class=\"_ _1a5\"> </span><span class=\"ff15\">135<span class=\"_ _3a\"> </span>20.1<span class=\"_ _57\"> </span><span class=\"ff16\">199<span class=\"_ _3a\"> </span>31.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs397\">2011 to 2015<span class=\"_ _db\"> </span><span class=\"ff15\">31<span class=\"_ _9e\"> </span>4.5<span class=\"_ _b7\"> </span><span class=\"ff16\">49<span class=\"_ _9e\"> </span>7.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs398\">2016 to 2020<span class=\"_ _db\"> </span><span class=\"ff15\">15<span class=\"_ _9e\"> </span>2.0<span class=\"_ _b7\"> </span><span class=\"ff16\">24<span class=\"_ _9e\"> </span>3.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs399\">2021 and later<span class=\"_ _265\"> </span><span class=\"ff15\">154<span class=\"_ _3a\"> </span>23.7<span class=\"_ _b7\"> </span><span class=\"ff16\">62<span class=\"_ _9e\"> </span>8.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs39a\">T<span class=\"_ _2\"></span>otal managed accounts<span class=\"_ _1b8\"> </span>335<span class=\"_ _3a\"> </span>50.3<span class=\"_ _d4\"> </span><span class=\"ff16\">334<span class=\"_ _f7\"> </span>49.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs39b\">Accounts in the pr<span class=\"_ _0\"></span>ocess of realisation<span class=\"_ _266\"> </span><span class=\"ff15\">225<span class=\"_ _3a\"> </span>41.0<span class=\"_ _d4\"> </span><span class=\"ff16\">141<span class=\"_ _f7\"> </span>23.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs39c\">560<span class=\"_ _3a\"> </span>91.3<span class=\"_ _d4\"> </span><span class=\"ff16\">475<span class=\"_ _f7\"> </span>73.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs39d\">Receiver<span class=\"_ _1\"></span> of rent accounts in <span class=\"_ _0\"></span>the process of<span class=\"_ _1\"></span> realisation at the period end ar<span class=\"_ _0\"></span>e included under <span class=\"_ _0\"></span>that heading in the Stage 3 <span class=\"_ _0\"></span>tables above. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs39e\">In addition to <span class=\"_ _0\"></span>the cases analysed abov<span class=\"_ _0\"></span>e ther<span class=\"_ _0\"></span>e wer<span class=\"_ _0\"></span>e four<span class=\"_ _0\"></span> other<span class=\"_ _0\"></span> receiver<span class=\"_ _1\"></span> of rent cases in acquir<span class=\"_ _0\"></span>ed mortgage books classified as POCI </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs39f\">(2022: nil), meaning that <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s total of<span class=\"_ _0\"></span> receiv<span class=\"_ _0\"></span>er of<span class=\"_ _0\"></span> rent cases at<span class=\"_ _0\"></span> 30 September 2023 <span class=\"_ _0\"></span>was 564 (2022: 475).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs3a1\">23. <span class=\"_ _1c\"></span>Loan impairments \u2013 pro<span class=\"_ _1\"></span>vision mov<span class=\"_ _0\"></span>ements in the <span class=\"_ _0\"></span>year<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3a2\">The mov<span class=\"_ _0\"></span>ements in the impairment pr<span class=\"_ _0\"></span>ovision calculated under<span class=\"_ _0\"></span> IFRS 9, analysed b<span class=\"_ _0\"></span>y business segments, ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3a3\">Mortgage </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3a4\">Lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3a5\">Commercial </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3a6\">Lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3a7\">T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3a8\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3a9\">At 30 Sep<span class=\"_ _0\"></span>tember 2022<span class=\"_ _184\"> </span><span class=\"ff16\">38.0<span class=\"_ _f7\"> </span>25.5<span class=\"_ _3a\"> </span>63.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3aa\">Provided in period (note 12)<span class=\"_ _225\"> </span><span class=\"ff16\">10.8<span class=\"_ _9e\"> </span>8.3<span class=\"_ _3a\"> </span>19.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3ab\">Amounts written off<span class=\"_ _202\"> </span>(6.5)<span class=\"_ _c8\"> </span>(2.5)<span class=\"_ _c8\"> </span>(9.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3ac\">Assets derecognised<span class=\"_ _155\"> </span>-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3ad\">At 30 Sep<span class=\"_ _0\"></span>tember 2023 (note 22)<span class=\"_ _178\"> </span>42.3<span class=\"_ _3a\"> </span>31.3<span class=\"_ _3a\"> </span>73.6<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3ae\">At 30 Sept<span class=\"_ _0\"></span>ember 2021<span class=\"_ _267\"> </span><span class=\"ff16\">37.7<span class=\"_ _3a\"> </span>27.7<span class=\"_ _3a\"> </span>65.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3af\">Provided in period (note 12)<span class=\"_ _154\"> </span><span class=\"ff16\">5.1<span class=\"_ _3a\"> </span>10.7<span class=\"_ _3a\"> </span>15.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3b0\">Amounts written off<span class=\"_ _202\"> </span>(3.6)<span class=\"_ _6c\"> </span>(12.9)<span class=\"_ _6c\"> </span>(16.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3b1\">Assets derecognised<span class=\"_ _23c\"> </span>(1.2)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(1.2)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3b2\">At 30 Sep<span class=\"_ _0\"></span>tember 2022 (note 22)<span class=\"_ _178\"> </span><span class=\"ff16\">38.0<span class=\"_ _f7\"> </span>25.5<span class=\"_ _3a\"> </span>63.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3b3\">Accounts are consider<span class=\"_ _0\"></span>ed to be <span class=\"_ _0\"></span>written off<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> accounting purposes if a balance r<span class=\"_ _0\"></span>emains once standard enfor<span class=\"_ _0\"></span>cement pr<span class=\"_ _0\"></span>ocesses have </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3b4\">been completed, subject <span class=\"_ _0\"></span>to any amount r<span class=\"_ _1\"></span>etained in respect of e<span class=\"_ _0\"></span>xpected salvage r<span class=\"_ _0\"></span>eceipts. <span class=\"_ _0\"></span>This has no effect on <span class=\"_ _0\"></span>the net carrying v<span class=\"_ _0\"></span>alue, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3b5\">only on <span class=\"_ _0\"></span>the amounts reported as gr<span class=\"_ _0\"></span>oss loan balances and accumulated impairment pro<span class=\"_ _0\"></span>visions.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3b6\">At 30 Sept<span class=\"_ _0\"></span>ember 2023, enfor<span class=\"_ _0\"></span>ceable contractual balances of<span class=\"_ _0\"></span> \u00a37<span class=\"_ _1\"></span>.6m (2022: \u00a34.<span class=\"_ _0\"></span>9m) <span class=\"_ _0\"></span>were outstanding on non-POCI asse<span class=\"_ _0\"></span>ts written off<span class=\"_ _0\"></span> in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3b7\">the period. T<span class=\"_ _0\"></span>his excludes <span class=\"_ _0\"></span>those accounts where a <span class=\"_ _0\"></span>full and final settlement <span class=\"_ _0\"></span>was agr<span class=\"_ _0\"></span>eed and those wher<span class=\"_ _0\"></span>e the contractual <span class=\"_ _0\"></span>terms do not </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs190\">permit any<span class=\"_ _0\"></span> further<span class=\"_ _0\"></span> action. Enforceable balances ar<span class=\"_ _0\"></span>e kept under<span class=\"_ _1\"></span> review<span class=\"_ _0\"></span> for<span class=\"_ _1\"></span> operational purposes, but no amounts are recognised in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3b8\">respect o<span class=\"_ _0\"></span>f such accounts unless further<span class=\"_ _0\"></span> cash is receiv<span class=\"_ _0\"></span>ed or <span class=\"_ _0\"></span>there is a str<span class=\"_ _0\"></span>ong expectation that it <span class=\"_ _0\"></span>will be.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3ba\">A mor<span class=\"_ _0\"></span>e detailed analysis o<span class=\"_ _0\"></span>f these mo<span class=\"_ _0\"></span>vements b<span class=\"_ _0\"></span>y IFRS 9 stage on a consolidated basis f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span> ended 30 September 2023 and  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3bb\">30 September<span class=\"_ _0\"></span> 2022 is set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3bc\">These tables, and <span class=\"_ _0\"></span>the matching tables analy<span class=\"_ _0\"></span>sing movements in gr<span class=\"_ _0\"></span>oss balances, have been compiled b<span class=\"_ _0\"></span>y comparing opening and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3bd\">closing balances on each account and analysing <span class=\"_ _0\"></span>the movements betw<span class=\"_ _0\"></span>een them.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3be\">Changes due t<span class=\"_ _0\"></span>o credit risk includes all chang<span class=\"_ _0\"></span>es in model parameters <span class=\"_ _0\"></span>whether r<span class=\"_ _0\"></span>elated to account perf<span class=\"_ _0\"></span>ormance, external credit<span class=\"_ _0\"></span> data or </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3bf\">model assumptions, including economic scenarios and w<span class=\"_ _0\"></span>eightings.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3c0\">The changes in models intr<span class=\"_ _0\"></span>oduced during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> did not create significant mo<span class=\"_ _0\"></span>vements in balances.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3c1\">Stage 1<span class=\"_ _86\"> </span>Stage 2<span class=\"_ _86\"> </span>Stage 3<span class=\"_ _2c\"> </span>POCI<span class=\"_ _a0\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3c2\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3c3\">Loss allowance at 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _a2\"> </span><span class=\"ff16\">25.5<span class=\"_ _d1\"> </span>8.0<span class=\"_ _f7\"> </span>28.5<span class=\"_ _9e\"> </span>1.5<span class=\"_ _3a\"> </span>63.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3c4\">New assets originated or pur<span class=\"_ _0\"></span>chased<span class=\"_ _ac\"> </span><span class=\"ff16\">9.5<span class=\"_ _43\"> </span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">9.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3c5\">Changes in loss allowance</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3c6\"> <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 1<span class=\"_ _268\"> </span><span class=\"ff16\">2.8<span class=\"_ _ff\"> </span></span>(2.7)<span class=\"_ _c8\"> </span>(0.1)<span class=\"_ _16b\"> </span>-<span class=\"_ _10b\"> </span>-</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3c7\"> <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 2<span class=\"_ _142\"> </span>(1.7)<span class=\"_ _ff\"> </span><span class=\"ff16\">2.0<span class=\"_ _ff\"> </span></span>(0.3)<span class=\"_ _16b\"> </span>-<span class=\"_ _10b\"> </span>-</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3c8\"> <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 3<span class=\"_ _142\"> </span>(0.2)<span class=\"_ _1db\"> </span>(1.9)<span class=\"_ _d4\"> </span><span class=\"ff16\">2.1<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3c9\"> <span class=\"_ _c0\"> </span>Changes on stage trans<span class=\"_ _0\"></span>fer<span class=\"_ _e3\"> </span>(2.5)<span class=\"_ _ff\"> </span><span class=\"ff16\">2.3<span class=\"_ _f7\"> </span>14.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _40\"> </span><span class=\"ff16\">14.4</span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3ca\"> <span class=\"_ _c0\"> </span>Changes due to credit risk<span class=\"_ _79\"> </span>(13.8)<span class=\"_ _ff\"> </span><span class=\"ff16\">1.7<span class=\"_ _9e\"> </span>4.0<span class=\"_ _9e\"> </span>3.3<span class=\"_ _ff\"> </span></span>(4.8)</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3cb\"> <span class=\"_ _c0\"> </span>Loans sold<span class=\"_ _269\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3cc\"> <span class=\"_ _c0\"> </span>Write offs<span class=\"_ _105\"> </span>-<span class=\"_ _209\"> </span>-<span class=\"_ _16b\"> </span>(9.0)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(9.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3cd\">Loss allowance at 30 Sept<span class=\"_ _0\"></span>ember 2023<span class=\"_ _c1\"> </span>19.6<span class=\"_ _9e\"> </span>9.4<span class=\"_ _3a\"> </span>39.8<span class=\"_ _d1\"> </span>4.8<span class=\"_ _3a\"> </span>73.6<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3ce\">Loss allowance at 30 Sept<span class=\"_ _0\"></span>ember 2021<span class=\"_ _a2\"> </span><span class=\"ff16\">15.0<span class=\"_ _3a\"> </span>11.3<span class=\"_ _3a\"> </span>38.9<span class=\"_ _9e\"> </span>0.2<span class=\"_ _3a\"> </span>65.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3cf\">New assets originated or pur<span class=\"_ _0\"></span>chased<span class=\"_ _ac\"> </span><span class=\"ff16\">7.2<span class=\"_ _43\"> </span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">7.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3d0\">Changes in loss allowance</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3d1\"> <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 1<span class=\"_ _268\"> </span><span class=\"ff16\">2.6<span class=\"_ _ff\"> </span></span>(2.3)<span class=\"_ _c8\"> </span>(0.3)<span class=\"_ _16b\"> </span>-<span class=\"_ _10b\"> </span>-</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3d2\"> <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 2<span class=\"_ _142\"> </span>(1.6)<span class=\"_ _ff\"> </span><span class=\"ff16\">2.3<span class=\"_ _ff\"> </span></span>(0.7)<span class=\"_ _16b\"> </span>-<span class=\"_ _10b\"> </span>-</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3d3\"> <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 3<span class=\"_ _142\"> </span>(0.2)<span class=\"_ _1db\"> </span>(0.4)<span class=\"_ _d4\"> </span><span class=\"ff16\">0.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3d4\"> <span class=\"_ _c0\"> </span>Changes on stage trans<span class=\"_ _0\"></span>fer<span class=\"_ _e3\"> </span>(2.4)<span class=\"_ _ff\"> </span><span class=\"ff16\">1.8<span class=\"_ _9e\"> </span>4.3<span class=\"_ _43\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">3.7</span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3d5\"> <span class=\"_ _c0\"> </span>Changes due to credit risk<span class=\"_ _114\"> </span><span class=\"ff16\">4.9<span class=\"_ _ff\"> </span></span>(4.7)<span class=\"_ _ff\"> </span><span class=\"ff16\">3.4<span class=\"_ _9e\"> </span>1.3<span class=\"_ _9e\"> </span>4.9</span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3d6\"> <span class=\"_ _c0\"> </span>Loans sold<span class=\"_ _269\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _fb\"> </span>(1.2)<span class=\"_ _16b\"> </span>-<span class=\"_ _16b\"> </span>(1.2)</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3d7\"> <span class=\"_ _c0\"> </span>Write offs<span class=\"_ _105\"> </span>-<span class=\"_ _209\"> </span>-<span class=\"_ _72\"> </span>(16.5)<span class=\"_ _b7\"> </span>-<span class=\"_ _1c1\"> </span>(16.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3d8\">Loss allowance at 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _c1\"> </span><span class=\"ff16\">25.5<span class=\"_ _9e\"> </span>8.0<span class=\"_ _3a\"> </span>28.5<span class=\"_ _9e\"> </span>1.5<span class=\"_ _f7\"> </span>63.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3d9\">During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 <span class=\"_ _0\"></span>the impairment allow<span class=\"_ _0\"></span>ance increased, driven mostly<span class=\"_ _0\"></span> by<span class=\"_ _0\"></span> the incr<span class=\"_ _0\"></span>ease in Stage 3 and POCI </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3da\">cases, a result o<span class=\"_ _0\"></span>f the le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> actual defaults in <span class=\"_ _0\"></span>the period, particularly in the de<span class=\"_ _0\"></span>velopment <span class=\"_ _0\"></span>finance business, and by<span class=\"_ _0\"></span> reduced lev<span class=\"_ _0\"></span>els of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3db\">available security<span class=\"_ _0\"></span> thr<span class=\"_ _0\"></span>ough declining house prices in the mortgag<span class=\"_ _0\"></span>e segment.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3dc\">The net r<span class=\"_ _0\"></span>eduction in Stage 1 pr<span class=\"_ _0\"></span>ovisions includes the eff<span class=\"_ _0\"></span>ect of chang<span class=\"_ _0\"></span>es in judgemental adjustments in the period, <span class=\"_ _0\"></span>with items formerly<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3dd\">addressed b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>these provisions beginning <span class=\"_ _0\"></span>to mov<span class=\"_ _0\"></span>e through S<span class=\"_ _0\"></span>tage 2 and Stage 3. <span class=\"_ _0\"></span>These mov<span class=\"_ _0\"></span>ements wer<span class=\"_ _0\"></span>e driven b<span class=\"_ _0\"></span>y both account </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3de\">performance, and by<span class=\"_ _0\"></span> the impact o<span class=\"_ _0\"></span>f mor<span class=\"_ _0\"></span>e sever<span class=\"_ _0\"></span>e actual and for<span class=\"_ _0\"></span>ecast economic conditions.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3df\">During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2022 <span class=\"_ _0\"></span>the impairment allow<span class=\"_ _0\"></span>ance remained r<span class=\"_ _0\"></span>elatively stable, due <span class=\"_ _0\"></span>to the opposing eff<span class=\"_ _0\"></span>ects of <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3e0\">easing of Co<span class=\"_ _0\"></span>vid-related pr<span class=\"_ _0\"></span>essures on <span class=\"_ _0\"></span>the UK economy<span class=\"_ _0\"></span> and mounting concerns about the nation<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s economic health more generally<span class=\"_ _1\"></span>, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3e1\">with inflation and interest r<span class=\"_ _0\"></span>ates increasing and <span class=\"_ _0\"></span>the potential f<span class=\"_ _0\"></span>or impacts fr<span class=\"_ _0\"></span>om the conflict in Ukr<span class=\"_ _0\"></span>aine.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3e2\">The increase in S<span class=\"_ _0\"></span>tage 1 pro<span class=\"_ _0\"></span>vision in that <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> came mostly fr<span class=\"_ _0\"></span>om new<span class=\"_ _0\"></span> lending, coupled with <span class=\"_ _0\"></span>the need to mak<span class=\"_ _0\"></span>e judgemental increases in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3e3\">the pro<span class=\"_ _0\"></span>vision balance. Stage 2 pro<span class=\"_ _0\"></span>visions reduced slightly<span class=\"_ _0\"></span> as the impacts of<span class=\"_ _0\"></span> additional Covid-r<span class=\"_ _0\"></span>elated SICRs in 2021 fell a<span class=\"_ _0\"></span>way<span class=\"_ _1\"></span>. Stage 3 </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3e4\">pro<span class=\"_ _0\"></span>vision declined as bought forw<span class=\"_ _0\"></span>ard cases <span class=\"_ _0\"></span>were r<span class=\"_ _0\"></span>esolved, in both <span class=\"_ _0\"></span>the Commercial L<span class=\"_ _0\"></span>ending and Mortgage L<span class=\"_ _0\"></span>ending divisions. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs3e6\">The mov<span class=\"_ _0\"></span>ements in the L<span class=\"_ _0\"></span>oans to Customers balances in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> which these loss allo<span class=\"_ _0\"></span>wances hav<span class=\"_ _0\"></span>e been made are set out belo<span class=\"_ _0\"></span>w<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3e7\">Stage 1<span class=\"_ _86\"> </span>Stage 2<span class=\"_ _86\"> </span>Stage 3<span class=\"_ _2c\"> </span>POCI<span class=\"_ _a0\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3e8\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3e9\">Balance at 30 September 2022<span class=\"_ _54\"> </span><span class=\"ff16\">12,157.0<span class=\"_ _86\"> </span>1,963.6<span class=\"_ _150\"> </span>124.4<span class=\"_ _3a\"> </span>28.8<span class=\"_ _67\"> </span>14,273.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3ea\">New assets originated or pur<span class=\"_ _0\"></span>chased<span class=\"_ _182\"> </span><span class=\"ff16\">3,128.4<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _12b\"> </span><span class=\"ff16\">3,128.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3eb\">Changes in staging</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3ec\"> <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 1<span class=\"_ _7b\"> </span><span class=\"ff16\">1,258.9<span class=\"_ _44\"> </span></span>(1,255.7)<span class=\"_ _c8\"> </span>(3.2)<span class=\"_ _b7\"> </span>-<span class=\"_ _10b\"> </span>-</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3ed\"> <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 2<span class=\"_ _26a\"> </span>(365.6)<span class=\"_ _12b\"> </span><span class=\"ff16\">372.9<span class=\"_ _ff\"> </span></span>(7.3)<span class=\"_ _16b\"> </span>-<span class=\"_ _10b\"> </span>-</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3ee\"> <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 3<span class=\"_ _26b\"> </span>(28.9)<span class=\"_ _b6\"> </span>(104.7)<span class=\"_ _12b\"> </span><span class=\"ff16\">133.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3ef\">Redemptions and r<span class=\"_ _0\"></span>epayments<span class=\"_ _26c\"> </span>(2,773.3)<span class=\"_ _b6\"> </span>(250.6)<span class=\"_ _6c\"> </span>(44.8)<span class=\"_ _6c\"> </span>(10.5)<span class=\"_ _1d4\"> </span>(3,079.2)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3f0\">Loans sold<span class=\"_ _1a3\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3f1\">Writ<span class=\"_ _0\"></span>e offs<span class=\"_ _26d\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _fb\"> </span>(9.0)<span class=\"_ _16b\"> </span>-<span class=\"_ _16b\"> </span>(9.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3f2\">Other changes<span class=\"_ _26e\"> </span><span class=\"ff16\">595.8<span class=\"_ _3a\"> </span>19.3<span class=\"_ _3a\"> </span>12.3<span class=\"_ _9e\"> </span>6.5<span class=\"_ _150\"> </span>633.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3f3\">Balance at 30 September 2023<span class=\"_ _10a\"> </span>13,972.3<span class=\"_ _d5\"> </span>744.8<span class=\"_ _d5\"> </span>206.0<span class=\"_ _3a\"> </span>24.8<span class=\"_ _42\"> </span>14,947.9<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3f4\">Loss allowance<span class=\"_ _26f\"> </span>(19.6)<span class=\"_ _c8\"> </span>(9.4)<span class=\"_ _6c\"> </span>(39.8)<span class=\"_ _1db\"> </span>(4.8)<span class=\"_ _6c\"> </span>(73.6)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs3f5\">Carrying value<span class=\"_ _25e\"> </span><span class=\"ff16\">13,952.7<span class=\"_ _150\"> </span>735.4<span class=\"_ _150\"> </span>166.2<span class=\"_ _3a\"> </span>20.0<span class=\"_ _67\"> </span>14,874.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3f6\">Balance at 30 September 2021<span class=\"_ _54\"> </span><span class=\"ff16\">11,900.4<span class=\"_ _86\"> </span>1,279.1<span class=\"_ _150\"> </span>164.3<span class=\"_ _d5\"> </span>124.3<span class=\"_ _67\"> </span>13,468.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3f7\">New assets originated or pur<span class=\"_ _0\"></span>chased<span class=\"_ _182\"> </span><span class=\"ff16\">3,020.8<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _12b\"> </span><span class=\"ff16\">3,020.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3f8\">Changes in staging</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3f9\"> <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 1<span class=\"_ _c3\"> </span><span class=\"ff16\">519.4<span class=\"_ _133\"> </span></span>(516.8)<span class=\"_ _c8\"> </span>(2.6)<span class=\"_ _b7\"> </span>-<span class=\"_ _10b\"> </span>-</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3fa\"> <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 2<span class=\"_ _270\"> </span>(1,365.2)<span class=\"_ _44\"> </span><span class=\"ff16\">1,378.2<span class=\"_ _12c\"> </span></span>(13.0)<span class=\"_ _b7\"> </span>-<span class=\"_ _209\"> </span>-</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3fb\"> <span class=\"_ _c0\"> </span>Tr<span class=\"_ _1\"></span>ansfer to Stag<span class=\"_ _0\"></span>e 3<span class=\"_ _26b\"> </span>(29.5)<span class=\"_ _6c\"> </span>(16.6)<span class=\"_ _12c\"> </span><span class=\"ff16\">46.1<span class=\"_ _43\"> </span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3fc\">Redemptions and r<span class=\"_ _0\"></span>epayments<span class=\"_ _26c\"> </span>(2,311.2)<span class=\"_ _b6\"> </span>(230.4)<span class=\"_ _6c\"> </span>(55.6)<span class=\"_ _6c\"> </span>(33.1)<span class=\"_ _1d4\"> </span>(2,630.3)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3fd\">Loans sold<span class=\"_ _1a3\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _fb\"> </span>(1.5)<span class=\"_ _6c\"> </span>(73.8)<span class=\"_ _6c\"> </span>(75.3)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3fe\">Writ<span class=\"_ _0\"></span>e offs<span class=\"_ _26d\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _72\"> </span>(16.5)<span class=\"_ _16b\"> </span>-<span class=\"_ _72\"> </span>(16.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs3ff\">Other changes<span class=\"_ _26e\"> </span><span class=\"ff16\">422.3<span class=\"_ _3a\"> </span>70.1<span class=\"_ _9e\"> </span>3.2<span class=\"_ _3a\"> </span>11.4<span class=\"_ _150\"> </span>507.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs400\">Balance at 30 September 2022<span class=\"_ _10a\"> </span><span class=\"ff16\">12,157.0<span class=\"_ _86\"> </span>1,963.6<span class=\"_ _d5\"> </span>124.4<span class=\"_ _3a\"> </span>28.8<span class=\"_ _67\"> </span>14,273.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs401\">Loss allowance<span class=\"_ _26f\"> </span>(25.5)<span class=\"_ _c8\"> </span>(8.0)<span class=\"_ _6c\"> </span>(28.5)<span class=\"_ _1db\"> </span>(1.5)<span class=\"_ _6c\"> </span>(63.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs402\">Carrying value<span class=\"_ _25e\"> </span><span class=\"ff16\">12,131.5<span class=\"_ _86\"> </span>1,955.6<span class=\"_ _3a\"> </span>95.9<span class=\"_ _f7\"> </span>27.3<span class=\"_ _67\"> </span>14,210.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs403\">Other chang<span class=\"_ _0\"></span>es includes interest and similar<span class=\"_ _0\"></span> charges.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs405\">24. <span class=\"_ _1c\"></span>L<span class=\"_ _0\"></span>oan impairments \u2013 economic inputs to calculations<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs406\">Impairment pro<span class=\"_ _0\"></span>vision under IFRS 9 is calculated on a f<span class=\"_ _0\"></span>orward-looking E<span class=\"_ _0\"></span>CL<span class=\"_ _0\"></span> basis, based on expected economic conditions in multiple </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs407\">internally coher<span class=\"_ _0\"></span>ent scenarios. <span class=\"_ _0\"></span>While the pro<span class=\"_ _0\"></span>vision calculation is intended to addr<span class=\"_ _0\"></span>ess all possible futur<span class=\"_ _0\"></span>e economic outcomes, the Gr<span class=\"_ _0\"></span>oup, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs408\">in common with most other<span class=\"_ _1\"></span> lenders, uses a small number of diff<span class=\"_ _0\"></span>ering scenarios as repr<span class=\"_ _0\"></span>esentatives of<span class=\"_ _0\"></span> this univer<span class=\"_ _0\"></span>se of pot<span class=\"_ _0\"></span>ential outturns.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs409\">The Group uses <span class=\"_ _0\"></span>four<span class=\"_ _0\"></span> distinct economic scenarios chosen to r<span class=\"_ _0\"></span>epresent <span class=\"_ _0\"></span>the range of<span class=\"_ _0\"></span> possible outcomes and allow<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> the impact of<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs40a\">economic asymmetry<span class=\"_ _0\"></span> in the calculations. Each scenario comprises a number<span class=\"_ _0\"></span> of economic par<span class=\"_ _0\"></span>ameters and while models <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> different </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs40b\">portfolios may<span class=\"_ _0\"></span> not use all of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>variables, the se<span class=\"_ _0\"></span>t, as a whole, is defined f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the Group and must be consistent.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs40c\">As the Gr<span class=\"_ _0\"></span>oup does not hav<span class=\"_ _0\"></span>e an internal economics function, in dev<span class=\"_ _0\"></span>eloping its economic scenarios it considers analysis <span class=\"_ _0\"></span>from r<span class=\"_ _0\"></span>eputable </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs40d\">external sour<span class=\"_ _0\"></span>ces to f<span class=\"_ _0\"></span>orm a general mark<span class=\"_ _0\"></span>et consensus which informs its centr<span class=\"_ _0\"></span>al scenario. T<span class=\"_ _0\"></span>hese sources include data and f<span class=\"_ _0\"></span>orecasts </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs40e\">produced b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Office of Budge<span class=\"_ _0\"></span>t Responsibility<span class=\"_ _0\"></span> (\u2018OBR\u2019) and the PRA<span class=\"_ _0\"></span> as well as priv<span class=\"_ _0\"></span>ate sector<span class=\"_ _0\"></span> economic resear<span class=\"_ _0\"></span>ch bodies. The Gr<span class=\"_ _0\"></span>oup </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs40f\">also tak<span class=\"_ _0\"></span>es account of public stat<span class=\"_ _0\"></span>ements from bodies such as <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England and the UK Go<span class=\"_ _0\"></span>vernment <span class=\"_ _0\"></span>to inform its final position.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs410\">The central scenario used f<span class=\"_ _0\"></span>or IFRS 9 impairment purposes is consistent <span class=\"_ _0\"></span>with the scenario <span class=\"_ _0\"></span>which forms the basis o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs411\">business planning and for<span class=\"_ _0\"></span>ecasting and will <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore generally<span class=\"_ _0\"></span> carry <span class=\"_ _0\"></span>the highest probability<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>eighting. In its September<span class=\"_ _0\"></span> 2023 </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs412\">for<span class=\"_ _0\"></span>ecasting cycle (the \u2018October<span class=\"_ _1\"></span> forecast\u2019), <span class=\"_ _0\"></span>the Group has adopted a centr<span class=\"_ _0\"></span>al economic scenario derived using a broadly<span class=\"_ _0\"></span> equivalent </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs413\">approach <span class=\"_ _0\"></span>to that used in Sept<span class=\"_ _0\"></span>ember 2022, <span class=\"_ _0\"></span>with the starting point of<span class=\"_ _0\"></span> the scenario updated <span class=\"_ _0\"></span>to reflect <span class=\"_ _0\"></span>the actual mov<span class=\"_ _0\"></span>ements of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws17 gs414\">economic variables in the year<span class=\"_ _1\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs415\">The general <span class=\"_ _0\"></span>trend of<span class=\"_ _1\"></span> the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s central forecasts <span class=\"_ _0\"></span>follow<span class=\"_ _0\"></span>s that published by<span class=\"_ _0\"></span> the Bank<span class=\"_ _0\"></span> of England in <span class=\"_ _0\"></span>August 2023, how<span class=\"_ _0\"></span>ever<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs416\">has tak<span class=\"_ _0\"></span>en a more pessimistic position <span class=\"_ _0\"></span>than the Bank. Monetary<span class=\"_ _0\"></span> policy is <span class=\"_ _0\"></span>forecast<span class=\"_ _0\"></span> to remain <span class=\"_ _0\"></span>tight, with pr<span class=\"_ _0\"></span>essure on r<span class=\"_ _0\"></span>eal incomes, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs417\">leading to minimal gr<span class=\"_ _0\"></span>owth, rising unemployment<span class=\"_ _0\"></span> and a slow decline in inflation. <span class=\"_ _0\"></span>As a result, inter<span class=\"_ _1\"></span>est rates are f<span class=\"_ _0\"></span>orecast <span class=\"_ _0\"></span>to remain high, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs418\">with a short-term decline in pr<span class=\"_ _0\"></span>operty <span class=\"_ _0\"></span>values.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs419\">Compared <span class=\"_ _0\"></span>to the central scenario adop<span class=\"_ _0\"></span>ted at 30 September<span class=\"_ _0\"></span> 2022, the new<span class=\"_ _0\"></span> central f<span class=\"_ _0\"></span>orecast is gener<span class=\"_ _0\"></span>ally mor<span class=\"_ _0\"></span>e pessimistic across </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs41a\">most v<span class=\"_ _0\"></span>ariables, with a much mor<span class=\"_ _0\"></span>e sever<span class=\"_ _0\"></span>e decline in house prices than in <span class=\"_ _0\"></span>the earlier scenario and a mor<span class=\"_ _0\"></span>e prolong<span class=\"_ _0\"></span>ed period of ele<span class=\"_ _0\"></span>vated </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs41b\">interest r<span class=\"_ _0\"></span>ates. T<span class=\"_ _0\"></span>he scenario also begins from <span class=\"_ _0\"></span>the actual September<span class=\"_ _0\"></span> 2023 economic position, so the inter<span class=\"_ _0\"></span>est rate rises, incr<span class=\"_ _0\"></span>eased </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs41c\">inflation and house price falls observ<span class=\"_ _0\"></span>ed in the period are included in <span class=\"_ _0\"></span>the starting position. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs41d\">The upside and downside scenarios continue <span class=\"_ _0\"></span>to be derived fr<span class=\"_ _0\"></span>om the central scenario<span class=\"_ _0\"></span>, as they<span class=\"_ _0\"></span> hav<span class=\"_ _0\"></span>e been in previous periods. <span class=\"_ _1\"></span>The </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs41e\">shapes of <span class=\"_ _0\"></span>these thr<span class=\"_ _0\"></span>ee scenarios are br<span class=\"_ _0\"></span>oadly similar<span class=\"_ _0\"></span> across <span class=\"_ _0\"></span>the for<span class=\"_ _0\"></span>ecast period, with <span class=\"_ _0\"></span>the upside scenario having a more r<span class=\"_ _0\"></span>apid reduction </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs41f\">in inflation, leading to a <span class=\"_ _0\"></span>faster r<span class=\"_ _0\"></span>eduction in base rates and a str<span class=\"_ _0\"></span>onger r<span class=\"_ _0\"></span>ecov<span class=\"_ _0\"></span>ery<span class=\"_ _0\"></span>. T<span class=\"_ _0\"></span>he downside includes traditional r<span class=\"_ _0\"></span>ecessionary <span class=\"_ _0\"></span>factors </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs420\">with additional pressur<span class=\"_ _0\"></span>e on house prices and rising unemployment, <span class=\"_ _0\"></span>with interest rat<span class=\"_ _0\"></span>es being reduced mor<span class=\"_ _0\"></span>e rapidly in r<span class=\"_ _0\"></span>esponse.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs421\">The sev<span class=\"_ _0\"></span>ere scenario has been deriv<span class=\"_ _0\"></span>ed from str<span class=\"_ _0\"></span>ess testing scenarios published b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Bank of England, as in pr<span class=\"_ _1\"></span>evious periods, with </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs422\">the 2022 Annual Cy<span class=\"_ _0\"></span>clical Scenario (\u2018<span class=\"_ _1\"></span>ACS\u2019) being used at 30 September<span class=\"_ _0\"></span> 2023. T<span class=\"_ _0\"></span>his scenario is based on a pronounced r<span class=\"_ _0\"></span>ecession with </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs423\">interest r<span class=\"_ _0\"></span>ates remaining high, rising unemplo<span class=\"_ _0\"></span>yment and a slump in house prices. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs424\">The ov<span class=\"_ _0\"></span>erall shape of<span class=\"_ _0\"></span> the scenarios adopted, and <span class=\"_ _0\"></span>the change in the <span class=\"_ _0\"></span>forecasts <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span>-on-y<span class=\"_ _0\"></span>ear is illustrated b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the for<span class=\"_ _0\"></span>ecasts of <span class=\"_ _0\"></span>the UK\u2019<span class=\"_ _1\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs425\">unemployment rat<span class=\"_ _0\"></span>e set out in the charts belo<span class=\"_ _0\"></span>w. <span class=\"_ _1\"></span>The unemployment rate has been pr<span class=\"_ _0\"></span>esented as it is the principal indicator<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> general </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs426\">economic activity used in modelling losses in <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s buy-to-let mortgag<span class=\"_ _0\"></span>e portfolio. </div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs427\">Historical and for<span class=\"_ _0\"></span>ecast Unemployment rat<span class=\"_ _0\"></span>es (End point measure)<span class=\"_ _36a\"> </span></div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gs428\">As at September 2023<span class=\"_ _36a\"> </span></div><div class=\"c w10 h71 gs429\"><div class=\"t m0 xda h72 y282b ff2e fs1f fc1 sc0 ls0 ws0\">2021 -<span class=\"_ _36a\"> </span></div><div class=\"t m0 x19e h72 y282c ff2e fs1f fc1 sc0 ls0 ws0\">2023 FY<span class=\"_ _36a\"> </span></div><div class=\"t m0 x11d h72 y282b ff2e fs1f fc1 sc0 ls0 ws0\">2023 -<span class=\"_ _36a\"> </span></div><div class=\"t m0 x176 h72 y282c ff2e fs1f fc1 sc0 ls0 ws0\">2024 FY<span class=\"_ _36a\"> </span></div><div class=\"t m0 x9d h73 y282d ff2f fs1f fc1 sc0 ls0 ws0\">Reporting date<span class=\"_ _36a\"> </span></div><div class=\"t m0 x103 h73 y282e ff2f fs1f fc1 sc0 ls0 ws0\">End of forecas<span class=\"_ _0\"></span>t period used for modelling<span class=\"_ _36a\"> </span></div><div class=\"t m0 x11e h72 y282b ff2e fs1f fc1 sc0 ls0 ws0\">2024 -<span class=\"_ _36a\"> </span></div><div class=\"t m0 x93 h72 y282c ff2e fs1f fc1 sc0 ls0 ws0\">2025 FY<span class=\"_ _36a\"> </span></div><div class=\"t m0 xa9 h72 y282b ff2e fs1f fc1 sc0 ls0 ws0\">2025 -<span class=\"_ _36a\"> </span></div><div class=\"t m0 x19f h72 y282c ff2e fs1f fc1 sc0 ls0 ws0\">2026 FY<span class=\"_ _36a\"> </span></div><div class=\"t m0 xd0 h72 y282b ff2e fs1f fc1 sc0 ls0 ws0\">2026 -<span class=\"_ _36a\"> </span></div><div class=\"t m0 xa1 h72 y282c ff2e fs1f fc1 sc0 ls0 ws0\">2027 FY<span class=\"_ _36a\"> </span></div><div class=\"t m0 x9 h72 y282b ff2e fs1f fc1 sc0 ls0 ws0\">2027 -<span class=\"_ _36a\"> </span></div><div class=\"t m0 x151 h72 y282c ff2e fs1f fc1 sc0 ls0 ws0\">2028 FY<span class=\"_ _36a\"> </span></div><div class=\"t m0 x1a0 h72 y282f ff2e fs1f fc1 sc0 ls0 ws0\">12.0%<span class=\"_ _36a\"> </span></div><div class=\"t m0 x1a0 h72 y2830 ff2e fs1f fc1 sc0 ls0 ws0\">10.0%<span class=\"_ _36a\"> </span></div><div class=\"t m0 x1a1 h72 y2831 ff2e fs1f fc1 sc0 ls0 ws0\">8.0%<span class=\"_ _36a\"> </span></div><div class=\"t m0 x1a1 h72 y2832 ff2e fs1f fc1 sc0 ls0 ws0\">6.0%<span class=\"_ _36a\"> </span></div><div class=\"t m0 x1a1 h72 y2833 ff2e fs1f fc1 sc0 ls0 ws0\">4.0%<span class=\"_ _36a\"> </span></div><div class=\"t m0 x1a1 h72 y2834 ff2e fs1f fc1 sc0 ls0 ws0\">2.0%<span class=\"_ _36a\"> </span></div><div class=\"t m0 x1a1 h72 y2835 ff2e fs1f fc1 sc0 ls0 ws0\">0.0%<span class=\"_ _36a\"> </span></div><div class=\"t m0 x186 h74 y2836 ff30 fs20 fc1 sc0 ls0 ws0\">Sever<span class=\"_ _0\"></span>e<span class=\"_ _13c\"> </span>Central<span class=\"_ _271\"></span>Downside<span class=\"_ _6f\"> </span>Upside<span class=\"_ _36a\"> </span></div></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs42b\">Historical and for<span class=\"_ _0\"></span>ecast Unemployment rat<span class=\"_ _0\"></span>es (End point measure)<span class=\"_ _36a\"> </span></div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gs42c\">As at September 2022<span class=\"_ _36a\"> </span></div><div class=\"c w11 h71 gs42d\"><div class=\"t m0 xda h72 y2839 ff31 fs1f fc1 sc0 ls0 ws0\">2021 -<span class=\"_ _36a\"> </span></div><div class=\"t m0 x19e h72 y283a ff31 fs1f fc1 sc0 ls0 ws0\">2022 FY<span class=\"_ _36a\"> </span></div><div class=\"t m0 x11d h72 y2839 ff31 fs1f fc1 sc0 ls0 ws0\">2022 -<span class=\"_ _36a\"> </span></div><div class=\"t m0 x176 h72 y283a ff31 fs1f fc1 sc0 ls0 ws0\">2023 FY<span class=\"_ _36a\"> </span></div><div class=\"t m0 x9d h73 y283b ff32 fs1f fc1 sc0 ls0 ws0\">Reporting date<span class=\"_ _36a\"> </span></div><div class=\"t m0 x103 h73 y283c ff32 fs1f fc1 sc0 ls0 ws0\">End of forecas<span class=\"_ _0\"></span>t period used for modelling<span class=\"_ _36a\"> </span></div><div class=\"t m0 x11e h72 y2839 ff31 fs1f fc1 sc0 ls0 ws0\">2023 -<span class=\"_ _36a\"> </span></div><div class=\"t m0 x93 h72 y283a ff31 fs1f fc1 sc0 ls0 ws0\">2024 FY<span class=\"_ _36a\"> </span></div><div class=\"t m0 xa9 h72 y2839 ff31 fs1f fc1 sc0 ls0 ws0\">2024 -<span class=\"_ _36a\"> </span></div><div class=\"t m0 x19f h72 y283a ff31 fs1f fc1 sc0 ls0 ws0\">2025 FY<span class=\"_ _36a\"> </span></div><div class=\"t m0 xd0 h72 y2839 ff31 fs1f fc1 sc0 ls0 ws0\">2025 -<span class=\"_ _36a\"> </span></div><div class=\"t m0 xa1 h72 y283a ff31 fs1f fc1 sc0 ls0 ws0\">2026 FY<span class=\"_ _36a\"> </span></div><div class=\"t m0 x9 h72 y2839 ff31 fs1f fc1 sc0 ls0 ws0\">2026 -<span class=\"_ _36a\"> </span></div><div class=\"t m0 x151 h72 y283a ff31 fs1f fc1 sc0 ls0 ws0\">2027 FY<span class=\"_ _36a\"> </span></div><div class=\"t m0 x1a0 h72 y283d ff31 fs1f fc1 sc0 ls0 ws0\">12.0%<span class=\"_ _36a\"> </span></div><div class=\"t m0 x1a0 h72 y283e ff31 fs1f fc1 sc0 ls0 ws0\">10.0%<span class=\"_ _36a\"> </span></div><div class=\"t m0 x1a1 h72 y283f ff31 fs1f fc1 sc0 ls0 ws0\">8.0%<span class=\"_ _36a\"> </span></div><div class=\"t m0 x1a1 h72 y2840 ff31 fs1f fc1 sc0 ls0 ws0\">6.0%<span class=\"_ _36a\"> </span></div><div class=\"t m0 x1a1 h72 y2841 ff31 fs1f fc1 sc0 ls0 ws0\">4.0%<span class=\"_ _36a\"> </span></div><div class=\"t m0 x1a1 h72 y2842 ff31 fs1f fc1 sc0 ls0 ws0\">2.0%<span class=\"_ _36a\"> </span></div><div class=\"t m0 x1a1 h72 y2843 ff31 fs1f fc1 sc0 ls0 ws0\">0.0%<span class=\"_ _36a\"> </span></div><div class=\"t m0 x186 h74 y2844 ff33 fs20 fc1 sc0 ls0 ws0\">Sever<span class=\"_ _0\"></span>e<span class=\"_ _13c\"> </span>Central<span class=\"_ _271\"></span>Downside<span class=\"_ _6f\"> </span>Upside<span class=\"_ _36a\"> </span></div></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs42e\">F<span class=\"_ _1\"></span>ollowing a revie<span class=\"_ _0\"></span>w of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>weightings of<span class=\"_ _0\"></span> the differ<span class=\"_ _0\"></span>ent scenarios, set against <span class=\"_ _0\"></span>the ov<span class=\"_ _0\"></span>erall potential f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>variability<span class=\"_ _0\"></span> in the futur<span class=\"_ _0\"></span>e economic </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs42f\">outlook, the Gr<span class=\"_ _0\"></span>oup decided to maintain <span class=\"_ _0\"></span>the scenario weightings used at 30 Sep<span class=\"_ _0\"></span>tember 2022. <span class=\"_ _0\"></span>While the economic outlook is mor<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs430\">settled than it <span class=\"_ _0\"></span>was <span class=\"_ _0\"></span>twelve months earlier<span class=\"_ _0\"></span> ther<span class=\"_ _0\"></span>e remains a significant div<span class=\"_ _0\"></span>ergence in opinions on the lik<span class=\"_ _0\"></span>ely outlook<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> the UK econom<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs431\">with a potential f<span class=\"_ _0\"></span>or serious downside out<span class=\"_ _0\"></span>comes. This supports <span class=\"_ _0\"></span>the maintenance of<span class=\"_ _0\"></span> the September<span class=\"_ _0\"></span> 2022 weightings.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs432\">Sensitivities comparing the eff<span class=\"_ _0\"></span>ect of <span class=\"_ _0\"></span>these weightings <span class=\"_ _0\"></span>with those <span class=\"_ _0\"></span>which might be seen in a more normal economic en<span class=\"_ _0\"></span>vironment ar<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs433\">set out in Note 25.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs434\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs435\">Central Scenario<span class=\"_ _1dd\"> </span><span class=\"ff15\">40%<span class=\"_ _f7\"> </span><span class=\"ff16\">40%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs436\">Upside Scenario<span class=\"_ _1eb\"> </span><span class=\"ff15\">10%<span class=\"_ _f8\"> </span><span class=\"ff16\">10%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs437\">Downside Scenario<span class=\"_ _1f1\"> </span><span class=\"ff15\">30%<span class=\"_ _f7\"> </span><span class=\"ff16\">30%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs438\">Severe Scenario<span class=\"_ _272\"> </span><span class=\"ff15\">20%<span class=\"_ _f7\"> </span><span class=\"ff16\">20%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs439\">100%<span class=\"_ _150\"> </span><span class=\"ff16\">100%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs43a\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s economic scenarios comprise seven <span class=\"_ _0\"></span>variables based on standar<span class=\"_ _0\"></span>d publicly a<span class=\"_ _0\"></span>vailable metrics f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the UK. These <span class=\"_ _0\"></span>variables ar<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs43b\">\u2022 <span class=\"_ _1b\"> </span>Y<span class=\"_ _2\"></span>ear-on-y<span class=\"_ _0\"></span>ear change in Gr<span class=\"_ _0\"></span>oss Domestic Product (\u2018GDP\u2019) as measur<span class=\"_ _1\"></span>ed by the Office <span class=\"_ _0\"></span>for National S<span class=\"_ _0\"></span>tatistics (\u2018ONS\u2019)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs43c\">\u2022 <span class=\"_ _1b\"> </span>Y<span class=\"_ _2\"></span>ear-on-y<span class=\"_ _0\"></span>ear change in <span class=\"_ _0\"></span>the House Price Index (\u2018HPI\u2019) as measured by<span class=\"_ _0\"></span> the Nationwide Building Socie<span class=\"_ _0\"></span>ty<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs43d\">\u2022 <span class=\"_ _1b\"> </span>Bank Base Rate (\u2018BBR\u2019), as set b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Bank of England<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs43e\">\u2022 <span class=\"_ _1b\"> </span>Consumer Price Inflation (\u2018CPI\u2019) rat<span class=\"_ _0\"></span>e, as measured by<span class=\"_ _0\"></span> the ONS<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs43f\">\u2022 <span class=\"_ _1b\"> </span>Unemployment rat<span class=\"_ _0\"></span>e, as measured by<span class=\"_ _0\"></span> the ONS<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs440\">\u2022 <span class=\"_ _1b\"> </span>Annual change in secured lending<span class=\"_ _0\"></span>, as measured by<span class=\"_ _1\"></span> the Bank of England \u2018mortg<span class=\"_ _0\"></span>age advances<span class=\"_ _0\"></span>\u2019 data series<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs441\">\u2022 <span class=\"_ _1b\"> </span>Annual change in consumer<span class=\"_ _0\"></span> credit, as measur<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England \u2018unsecured adv<span class=\"_ _0\"></span>ances\u2019 data series<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs443\">The project<span class=\"_ _0\"></span>ed averag<span class=\"_ _0\"></span>e annual values o<span class=\"_ _0\"></span>f each of<span class=\"_ _0\"></span> these <span class=\"_ _0\"></span>variables in each of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>first five <span class=\"_ _0\"></span>financial y<span class=\"_ _0\"></span>ears of <span class=\"_ _0\"></span>the for<span class=\"_ _0\"></span>ecast period are se<span class=\"_ _0\"></span>t  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs444\">out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs445\">30 September<span class=\"_ _0\"></span> 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs446\">Gross Domestic Pr<span class=\"_ _0\"></span>oduct (\u2018GDP\u2019) (year<span class=\"_ _1\"></span>-on-year chang<span class=\"_ _0\"></span>e)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs447\">2024<span class=\"_ _a0\"> </span>2025<span class=\"_ _2c\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _a0\"> </span>2028<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs448\">Central Scenario<span class=\"_ _257\"> </span><span class=\"ff15\">0.4%<span class=\"_ _2c\"> </span>0.9%<span class=\"_ _2c\"> </span>1.0%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs449\">Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff15\">1.6%<span class=\"_ _a0\"> </span>1.4%<span class=\"_ _2c\"> </span>1.0%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs44a\">Downside Scenario<span class=\"_ _107\"> </span><span class=\"ff15\">(0.4)%<span class=\"_ _d5\"> </span>0.7%<span class=\"_ _a0\"> </span>1.0%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs44b\">Severe Scenario<span class=\"_ _273\"> </span><span class=\"ff15\">(3.6)%<span class=\"_ _b9\"> </span>(0.2)%<span class=\"_ _d5\"> </span>1.2%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs44c\">House Price Index (\u2018HPI\u2019) (year<span class=\"_ _0\"></span>-on-year<span class=\"_ _0\"></span> change<span class=\"_ _0\"></span>)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs44d\">2024<span class=\"_ _a0\"> </span>2025<span class=\"_ _2c\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _a0\"> </span>2028<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs44e\">Central Scenario<span class=\"_ _8b\"> </span><span class=\"ff15\">(6.4)%<span class=\"_ _133\"> </span>(1.7)%<span class=\"_ _d5\"> </span>4.7%<span class=\"_ _a0\"> </span>4.4%<span class=\"_ _2c\"> </span>3.2%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs44f\">Upside Scenario<span class=\"_ _256\"> </span><span class=\"ff15\">(1.1)%<span class=\"_ _d5\"> </span>5.8%<span class=\"_ _a0\"> </span>6.8%<span class=\"_ _2c\"> </span>5.0%<span class=\"_ _2c\"> </span>4.5%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs450\">Downside Scenario<span class=\"_ _268\"> </span><span class=\"ff15\">(10.7)%<span class=\"_ _133\"> </span>(2.2)%<span class=\"_ _d5\"> </span>4.0%<span class=\"_ _2c\"> </span>4.0%<span class=\"_ _a0\"> </span>2.6%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs451\">Severe Scenario<span class=\"_ _89\"> </span><span class=\"ff15\">(13.1)%<span class=\"_ _70\"> </span>(15.1)%<span class=\"_ _cb\"> </span>-<span class=\"_ _a8\"> </span>7.0%<span class=\"_ _2c\"> </span>5.6%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs452\">Bank Base Rate (\u2018BBR\u2019) (r<span class=\"_ _0\"></span>ate)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs453\">2024<span class=\"_ _a0\"> </span>2025<span class=\"_ _2c\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _a0\"> </span>2028<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs454\">Central Scenario<span class=\"_ _257\"> </span><span class=\"ff15\">5.5%<span class=\"_ _2c\"> </span>5.4%<span class=\"_ _2c\"> </span>4.8%<span class=\"_ _2c\"> </span>4.4%<span class=\"_ _2c\"> </span>4.1%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs455\">Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff15\">5.2%<span class=\"_ _a0\"> </span>4.4%<span class=\"_ _2c\"> </span>3.7%<span class=\"_ _2c\"> </span>3.5%<span class=\"_ _2c\"> </span>3.5%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs456\">Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff15\">5.6%<span class=\"_ _a0\"> </span>3.8%<span class=\"_ _2c\"> </span>2.6%<span class=\"_ _2c\"> </span>2.0%<span class=\"_ _a0\"> </span>2.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs457\">Severe Scenario<span class=\"_ _274\"> </span><span class=\"ff15\">6.0%<span class=\"_ _2c\"> </span>5.8%<span class=\"_ _a0\"> </span>5.1%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _2c\"> </span>3.4%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs458\">Consumer Price Inflation (\u2018CPI\u2019) (<span class=\"_ _0\"></span>rate)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs459\">2024<span class=\"_ _a0\"> </span>2025<span class=\"_ _2c\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _a0\"> </span>2028<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs45a\">Central Scenario<span class=\"_ _257\"> </span><span class=\"ff15\">4.4%<span class=\"_ _2c\"> </span>2.6%<span class=\"_ _2c\"> </span>1.6%<span class=\"_ _2c\"> </span>1.8%<span class=\"_ _2c\"> </span>2.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs45b\">Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff15\">3.7%<span class=\"_ _a0\"> </span>2.1%<span class=\"_ _2c\"> </span>2.1%<span class=\"_ _2c\"> </span>2.0%<span class=\"_ _2c\"> </span>2.1%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs45c\">Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff15\">4.5%<span class=\"_ _a0\"> </span>1.0%<span class=\"_ _2c\"> </span>0.7%<span class=\"_ _2c\"> </span>1.8%<span class=\"_ _a0\"> </span>2.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs45d\">Severe Scenario<span class=\"_ _8b\"> </span><span class=\"ff15\">15.7%<span class=\"_ _9f\"> </span>12.8%<span class=\"_ _2c\"> </span>3.7%<span class=\"_ _2c\"> </span>2.4%<span class=\"_ _2c\"> </span>2.1%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs45e\">Unemployment (<span class=\"_ _0\"></span>rate)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs45f\">2024<span class=\"_ _a0\"> </span>2025<span class=\"_ _2c\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _a0\"> </span>2028<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs460\">Central Scenario<span class=\"_ _257\"> </span><span class=\"ff15\">4.8%<span class=\"_ _2c\"> </span>5.6%<span class=\"_ _2c\"> </span>6.0%<span class=\"_ _2c\"> </span>5.6%<span class=\"_ _2c\"> </span>4.9%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs461\">Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff15\">4.3%<span class=\"_ _a0\"> </span>4.6%<span class=\"_ _2c\"> </span>4.8%<span class=\"_ _2c\"> </span>4.4%<span class=\"_ _2c\"> </span>3.9%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs462\">Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff15\">5.3%<span class=\"_ _a0\"> </span>6.4%<span class=\"_ _2c\"> </span>6.7%<span class=\"_ _2c\"> </span>6.1%<span class=\"_ _a0\"> </span>5.4%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs463\">Severe Scenario<span class=\"_ _274\"> </span><span class=\"ff15\">6.9%<span class=\"_ _2c\"> </span>8.4%<span class=\"_ _a0\"> </span>7.8%<span class=\"_ _2c\"> </span>7.2%<span class=\"_ _2c\"> </span>6.6%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs464\">Secured lending (<span class=\"_ _0\"></span>annual change)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs465\">2024<span class=\"_ _a0\"> </span>2025<span class=\"_ _2c\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _a0\"> </span>2028<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs466\">Central Scenario<span class=\"_ _257\"> </span><span class=\"ff15\">0.8%<span class=\"_ _2c\"> </span>0.3%<span class=\"_ _2c\"> </span>1.8%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs467\">Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff15\">1.5%<span class=\"_ _a0\"> </span>1.0%<span class=\"_ _2c\"> </span>2.5%<span class=\"_ _2c\"> </span>3.2%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs468\">Downside Scenario<span class=\"_ _275\"> </span><span class=\"ff15\">-<span class=\"_ _fb\"> </span>(0.5)%<span class=\"_ _d5\"> </span>1.0%<span class=\"_ _a0\"> </span>2.8%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs469\">Severe Scenario<span class=\"_ _273\"> </span><span class=\"ff15\">(1.3)%<span class=\"_ _b9\"> </span>(1.8)%<span class=\"_ _133\"> </span>(0.3)%<span class=\"_ _d5\"> </span>2.5%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs46b\">Consumer cr<span class=\"_ _0\"></span>edit (annual chang<span class=\"_ _0\"></span>e)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs46c\">2024<span class=\"_ _a0\"> </span>2025<span class=\"_ _2c\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _a0\"> </span>2028<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs46d\">Central Scenario<span class=\"_ _257\"> </span><span class=\"ff15\">3.5%<span class=\"_ _2c\"> </span>2.3%<span class=\"_ _2c\"> </span>3.9%<span class=\"_ _2c\"> </span>4.9%<span class=\"_ _2c\"> </span>5.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs46e\">Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff15\">4.3%<span class=\"_ _a0\"> </span>3.0%<span class=\"_ _2c\"> </span>4.7%<span class=\"_ _2c\"> </span>5.1%<span class=\"_ _2c\"> </span>5.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs46f\">Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff15\">2.8%<span class=\"_ _a0\"> </span>1.5%<span class=\"_ _2c\"> </span>3.2%<span class=\"_ _2c\"> </span>4.8%<span class=\"_ _a0\"> </span>5.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs470\">Severe Scenario<span class=\"_ _274\"> </span><span class=\"ff15\">1.5%<span class=\"_ _2c\"> </span>0.3%<span class=\"_ _a0\"> </span>1.9%<span class=\"_ _2c\"> </span>4.4%<span class=\"_ _2c\"> </span>5.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs471\">30 September<span class=\"_ _0\"></span> 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs472\">Gross Domestic Pr<span class=\"_ _0\"></span>oduct (\u2018GDP\u2019) (year<span class=\"_ _1\"></span>-on-year chang<span class=\"_ _0\"></span>e)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs473\">2023<span class=\"_ _a0\"> </span>2024<span class=\"_ _2c\"> </span>2025<span class=\"_ _a0\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs474\">Central Scenario<span class=\"_ _257\"> </span><span class=\"ff16\">0.4%<span class=\"_ _276\"> </span>1.3%<span class=\"_ _2c\"> </span>1.3%<span class=\"_ _276\"> </span>1.9%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs475\">Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff16\">1.9%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _2c\"> </span>2.2%<span class=\"_ _276\"> </span>2.7%<span class=\"_ _2c\"> </span>1.7%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs476\">Downside Scenario<span class=\"_ _107\"> </span>(2.2)%<span class=\"_ _d5\"> </span><span class=\"ff16\">0.6%<span class=\"_ _276\"> </span>1.4%<span class=\"_ _2c\"> </span>1.9%<span class=\"_ _276\"> </span>1.2%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs477\">Severe Scenario<span class=\"_ _273\"> </span>(3.6)%<span class=\"_ _12b\"> </span>(0.2)%<span class=\"_ _d5\"> </span><span class=\"ff16\">1.2%<span class=\"_ _276\"> </span>1.2%<span class=\"_ _2c\"> </span>1.2%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs478\">House Price Index (\u2018HPI\u2019) (year<span class=\"_ _0\"></span>-on-year<span class=\"_ _0\"></span> change<span class=\"_ _0\"></span>)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs479\">2023<span class=\"_ _a0\"> </span>2024<span class=\"_ _2c\"> </span>2025<span class=\"_ _a0\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs47a\">Central Scenario<span class=\"_ _8b\"> </span>(0.6)%<span class=\"_ _150\"> </span><span class=\"ff16\">0.8%<span class=\"_ _276\"> </span>3.9%<span class=\"_ _2c\"> </span>4.2%<span class=\"_ _276\"> </span>4.4%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs47b\">Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff16\">4.7%<span class=\"_ _2c\"> </span>4.7%<span class=\"_ _2c\"> </span>6.8%<span class=\"_ _276\"> </span>6.8%<span class=\"_ _2c\"> </span>5.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs47c\">Downside Scenario<span class=\"_ _107\"> </span>(6.5)%<span class=\"_ _133\"> </span>(3.3)%<span class=\"_ _150\"> </span><span class=\"ff16\">4.4%<span class=\"_ _276\"> </span>4.0%<span class=\"_ _2c\"> </span>4.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs47d\">Severe Scenario<span class=\"_ _273\"> </span>(7.2)%<span class=\"_ _12a\"> </span>(15.4)%<span class=\"_ _12a\"> </span>(14.4)%<span class=\"_ _150\"> </span><span class=\"ff16\">2.7%<span class=\"_ _2c\"> </span>5.5%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs47e\">Bank Base Rate (\u2018BBR\u2019) (r<span class=\"_ _0\"></span>ate)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs47f\">2023<span class=\"_ _a0\"> </span>2024<span class=\"_ _2c\"> </span>2025<span class=\"_ _a0\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs480\">Central Scenario<span class=\"_ _257\"> </span><span class=\"ff16\">4.6%<span class=\"_ _276\"> </span>4.3%<span class=\"_ _2c\"> </span>3.8%<span class=\"_ _276\"> </span>3.3%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs481\">Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff16\">4.1%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _2c\"> </span>3.8%<span class=\"_ _276\"> </span>3.4%<span class=\"_ _2c\"> </span>3.1%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs482\">Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff16\">5.0%<span class=\"_ _2c\"> </span>4.4%<span class=\"_ _2c\"> </span>3.8%<span class=\"_ _276\"> </span>3.3%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs483\">Severe Scenario<span class=\"_ _274\"> </span><span class=\"ff16\">5.8%<span class=\"_ _2c\"> </span>5.8%<span class=\"_ _276\"> </span>5.1%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _276\"> </span>3.5%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs484\">Consumer Price Inflation (\u2018CPI\u2019) (<span class=\"_ _0\"></span>rate)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs485\">2023<span class=\"_ _a0\"> </span>2024<span class=\"_ _2c\"> </span>2025<span class=\"_ _a0\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs486\">Central Scenario<span class=\"_ _1a9\"> </span><span class=\"ff16\">10.4%<span class=\"_ _2c\"> </span>3.9%<span class=\"_ _2c\"> </span>2.2%<span class=\"_ _276\"> </span>1.6%<span class=\"_ _2c\"> </span>1.9%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs487\">Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff16\">9.7%<span class=\"_ _2c\"> </span>2.9%<span class=\"_ _2c\"> </span>1.9%<span class=\"_ _276\"> </span>2.0%<span class=\"_ _2c\"> </span>1.9%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs488\">Downside Scenario<span class=\"_ _277\"> </span><span class=\"ff16\">13.0%<span class=\"_ _2c\"> </span>8.8%<span class=\"_ _276\"> </span>2.9%<span class=\"_ _2c\"> </span>2.0%<span class=\"_ _276\"> </span>1.9%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs489\">Severe Scenario<span class=\"_ _8b\"> </span><span class=\"ff16\">16.7%<span class=\"_ _19c\"> </span>10.0%<span class=\"_ _2c\"> </span>3.0%<span class=\"_ _2c\"> </span>2.3%<span class=\"_ _276\"> </span>2.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs48a\">Unemployment (<span class=\"_ _0\"></span>rate)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs48b\">2023<span class=\"_ _a0\"> </span>2024<span class=\"_ _2c\"> </span>2025<span class=\"_ _a0\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs48c\">Central Scenario<span class=\"_ _257\"> </span><span class=\"ff16\">4.2%<span class=\"_ _276\"> </span>4.9%<span class=\"_ _2c\"> </span>4.8%<span class=\"_ _276\"> </span>4.6%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs48d\">Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff16\">3.5%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _276\"> </span>4.1%<span class=\"_ _2c\"> </span>3.8%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs48e\">Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff16\">4.6%<span class=\"_ _2c\"> </span>5.8%<span class=\"_ _2c\"> </span>6.3%<span class=\"_ _276\"> </span>6.2%<span class=\"_ _2c\"> </span>5.7%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs48f\">Severe Scenario<span class=\"_ _274\"> </span><span class=\"ff16\">6.4%<span class=\"_ _2c\"> </span>9.2%<span class=\"_ _276\"> </span>8.8%<span class=\"_ _2c\"> </span>8.2%<span class=\"_ _276\"> </span>7.5%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs491\">Secured lending (<span class=\"_ _0\"></span>annual change)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs492\">2023<span class=\"_ _a0\"> </span>2024<span class=\"_ _2c\"> </span>2025<span class=\"_ _a0\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs493\">Central Scenario<span class=\"_ _257\"> </span><span class=\"ff16\">3.3%<span class=\"_ _276\"> </span>2.6%<span class=\"_ _2c\"> </span>2.5%<span class=\"_ _276\"> </span>3.5%<span class=\"_ _2c\"> </span>3.5%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs494\">Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff16\">4.1%<span class=\"_ _2c\"> </span>3.3%<span class=\"_ _2c\"> </span>3.2%<span class=\"_ _276\"> </span>4.2%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs495\">Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff16\">2.6%<span class=\"_ _2c\"> </span>1.8%<span class=\"_ _2c\"> </span>1.7%<span class=\"_ _276\"> </span>2.7%<span class=\"_ _2c\"> </span>2.8%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs496\">Severe Scenario<span class=\"_ _274\"> </span><span class=\"ff16\">0.2%<span class=\"_ _d5\"> </span></span>(0.7)%<span class=\"_ _150\"> </span><span class=\"ff16\">1.3%<span class=\"_ _276\"> </span>3.0%<span class=\"_ _2c\"> </span>3.7%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs497\">Consumer cr<span class=\"_ _0\"></span>edit (annual chang<span class=\"_ _0\"></span>e)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs498\">2023<span class=\"_ _a0\"> </span>2024<span class=\"_ _2c\"> </span>2025<span class=\"_ _a0\"> </span>2026<span class=\"_ _a0\"> </span>2027<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs499\">Central Scenario<span class=\"_ _257\"> </span><span class=\"ff16\">3.6%<span class=\"_ _276\"> </span>3.1%<span class=\"_ _2c\"> </span>3.6%<span class=\"_ _276\"> </span>3.5%<span class=\"_ _2c\"> </span>3.5%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs49a\">Upside Scenario<span class=\"_ _26f\"> </span><span class=\"ff16\">4.4%<span class=\"_ _2c\"> </span>3.9%<span class=\"_ _2c\"> </span>4.4%<span class=\"_ _276\"> </span>4.3%<span class=\"_ _2c\"> </span>4.3%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs49b\">Downside Scenario<span class=\"_ _16c\"> </span><span class=\"ff16\">2.9%<span class=\"_ _2c\"> </span>2.4%<span class=\"_ _2c\"> </span>2.9%<span class=\"_ _276\"> </span>2.8%<span class=\"_ _2c\"> </span>2.8%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs49c\">Severe Scenario<span class=\"_ _273\"> </span>(3.7)%<span class=\"_ _12b\"> </span>(4.4)%<span class=\"_ _d5\"> </span><span class=\"ff16\">0.1%<span class=\"_ _276\"> </span>2.8%<span class=\"_ _2c\"> </span>4.7%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs49d\">After<span class=\"_ _0\"></span> the end of<span class=\"_ _0\"></span> the initial <span class=\"_ _0\"></span>five y<span class=\"_ _0\"></span>ear period, <span class=\"_ _0\"></span>the final rate or<span class=\"_ _0\"></span> rate of<span class=\"_ _0\"></span> change (<span class=\"_ _0\"></span>as appropriate<span class=\"_ _0\"></span>) is assumed to continue into <span class=\"_ _0\"></span>the future in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs49e\">each scenario.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs49f\">T<span class=\"_ _2\"></span>o illustrate the le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> non-linearity in the <span class=\"_ _0\"></span>various scenarios, <span class=\"_ _0\"></span>the maximum and minimum quarterly le<span class=\"_ _0\"></span>vels f<span class=\"_ _0\"></span>or each <span class=\"_ _0\"></span>variable o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4a0\">five <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> period commencing on the balance sheet date ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>. </div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs4a1\">30 September<span class=\"_ _0\"></span> 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4a2\">Central scenario<span class=\"_ _6c\"> </span>Upside scenario<span class=\"_ _b6\"> </span>Downside scenario<span class=\"_ _70\"> </span>Severe scenario<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls1b ws61 gs4a3\">Max<span class=\"_ _278\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _55\"> </span></span>Max<span class=\"_ _7f\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _55\"> </span></span>Max<span class=\"_ _278\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _55\"> </span></span>Max<span class=\"_ _278\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4a4\">%<span class=\"_ _71\"> </span>%<span class=\"_ _132\"> </span>%<span class=\"_ _71\"> </span>%<span class=\"_ _71\"> </span>%<span class=\"_ _132\"> </span>%<span class=\"_ _71\"> </span>%<span class=\"_ _132\"> </span>%<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4a5\">Economic driver<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gs4a6\">GDP<span class=\"_ _147\"> </span><span class=\"ff15\">1.2<span class=\"_ _d6\"> </span>0.3<span class=\"_ _d6\"> </span>2.3<span class=\"_ _d6\"> </span>0.9<span class=\"_ _d6\"> </span>1.2<span class=\"_ _3b\"> </span>(0.8)<span class=\"_ _3b\"> </span>1.2<span class=\"_ _3b\"> </span>(5.0)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs4a7\">HPI<span class=\"_ _279\"> </span><span class=\"ff15\">4.4<span class=\"_ _3b\"> </span>(8.2)<span class=\"_ _3b\"> </span>7.4<span class=\"_ _3b\"> </span>(3.1)<span class=\"_ _278\"> </span>4.1<span class=\"_ _111\"> </span>(13.4)<span class=\"_ _3b\"> </span>7.2<span class=\"_ _28\"> </span>(16.4)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs4a8\">BBR<span class=\"_ _114\"> </span><span class=\"ff15\">5.5<span class=\"_ _50\"> </span>4.0<span class=\"_ _d6\"> </span>5.3<span class=\"_ _d6\"> </span>3.5<span class=\"_ _d6\"> </span>5.8<span class=\"_ _d6\"> </span>2.0<span class=\"_ _d6\"> </span>6.0<span class=\"_ _d6\"> </span>3.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs4a9\">CPI<span class=\"_ _27a\"> </span><span class=\"ff15\">5.0<span class=\"_ _d6\"> </span>1.5<span class=\"_ _d6\"> </span>4.3<span class=\"_ _d6\"> </span>1.8<span class=\"_ _d6\"> </span>6.0<span class=\"_ _d6\"> </span>0.4<span class=\"_ _55\"> </span>17.0<span class=\"_ _d6\"> </span>2.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs4aa\">Unemployment<span class=\"_ _1d3\"> </span><span class=\"ff15\">6.0<span class=\"_ _d6\"> </span>4.5<span class=\"_ _d6\"> </span>4.8<span class=\"_ _d6\"> </span>3.8<span class=\"_ _d6\"> </span>7.0<span class=\"_ _d6\"> </span>5.0<span class=\"_ _d6\"> </span>8.5<span class=\"_ _d6\"> </span>5.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs4ab\">Secured lending<span class=\"_ _9a\"> </span><span class=\"ff15\">3.0<span class=\"_ _b6\"> </span>-<span class=\"_ _110\"> </span>3.8<span class=\"_ _d6\"> </span>0.8<span class=\"_ _d6\"> </span>3.0<span class=\"_ _3b\"> </span>(0.8)<span class=\"_ _3b\"> </span>3.0<span class=\"_ _3b\"> </span>(2.0)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs4ac\">Consumer credit<span class=\"_ _f4\"> </span><span class=\"ff15\">5.0<span class=\"_ _d6\"> </span>2.0<span class=\"_ _d6\"> </span>5.8<span class=\"_ _d6\"> </span>2.8<span class=\"_ _d6\"> </span>5.0<span class=\"_ _d6\"> </span>1.3<span class=\"_ _d6\"> </span>5.0<span class=\"_ _b6\"> </span>-<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs4ad\">30 September<span class=\"_ _0\"></span> 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4ae\">Central scenario<span class=\"_ _6c\"> </span>Upside scenario<span class=\"_ _b6\"> </span>Downside scenario<span class=\"_ _70\"> </span>Severe scenario<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls1b ws61 gs4af\">Max<span class=\"_ _278\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _55\"> </span></span>Max<span class=\"_ _7f\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _55\"> </span></span>Max<span class=\"_ _278\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _55\"> </span></span>Max<span class=\"_ _278\"> </span><span class=\"ls0 ws0\">Min<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4b0\">%<span class=\"_ _71\"> </span>%<span class=\"_ _132\"> </span>%<span class=\"_ _71\"> </span>%<span class=\"_ _71\"> </span>%<span class=\"_ _132\"> </span>%<span class=\"_ _71\"> </span>%<span class=\"_ _132\"> </span>%<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4b1\">Economic driver<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff16 fs1 fc1 sc0 ls0 ws0 gs4b2\">GDP<span class=\"_ _147\"> </span>2.2<span class=\"_ _1d4\"> </span><span class=\"ff17\">(0.3)<span class=\"_ _3b\"> </span></span>3.5<span class=\"_ _d6\"> </span>1.2<span class=\"_ _d6\"> </span>2.2<span class=\"_ _1d4\"> </span><span class=\"ff17\">(2.7)<span class=\"_ _3b\"> </span></span>1.2<span class=\"_ _1d4\"> </span><span class=\"ff17\">(5.0)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs4b3\">HPI<span class=\"_ _279\"> </span><span class=\"ff16\">4.8<span class=\"_ _3b\"> </span></span>(4.5)<span class=\"_ _1d4\"> </span><span class=\"ff16\">7.5<span class=\"_ _d6\"> </span>3.3<span class=\"_ _d6\"> </span>4.9<span class=\"_ _111\"> </span></span>(13.1)<span class=\"_ _3b\"> </span><span class=\"ff16\">5.7<span class=\"_ _111\"> </span></span>(17.8)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs4b4\">BBR<span class=\"_ _114\"> </span><span class=\"ff16\">5.0<span class=\"_ _d6\"> </span>3.0<span class=\"_ _d6\"> </span>4.5<span class=\"_ _d6\"> </span>3.0<span class=\"_ _44\"> </span>5.5<span class=\"_ _d6\"> </span>3.0<span class=\"_ _d6\"> </span>6.0<span class=\"_ _44\"> </span>3.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs4b5\">CPI<span class=\"_ _147\"> </span><span class=\"ff16\">10.8<span class=\"_ _50\"> </span>1.4<span class=\"_ _73\"> </span>10.3<span class=\"_ _d6\"> </span>1.7<span class=\"_ _73\"> </span>14.0<span class=\"_ _d6\"> </span>1.8<span class=\"_ _73\"> </span>17.0<span class=\"_ _d6\"> </span>1.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs4b6\">Unemployment<span class=\"_ _1d3\"> </span><span class=\"ff16\">5.0<span class=\"_ _d6\"> </span>3.9<span class=\"_ _44\"> </span>4.5<span class=\"_ _d6\"> </span>3.4<span class=\"_ _d6\"> </span>6.3<span class=\"_ _44\"> </span>4.1<span class=\"_ _d6\"> </span>9.2<span class=\"_ _d6\"> </span>4.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs4b7\">Secured lending<span class=\"_ _9a\"> </span><span class=\"ff16\">4.0<span class=\"_ _44\"> </span>2.3<span class=\"_ _d6\"> </span>4.8<span class=\"_ _d6\"> </span>3.1<span class=\"_ _d6\"> </span>3.3<span class=\"_ _44\"> </span>1.6<span class=\"_ _d6\"> </span>3.7<span class=\"_ _3b\"> </span></span>(1.2)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs4b8\">Consumer credit<span class=\"_ _f4\"> </span><span class=\"ff16\">5.0<span class=\"_ _d6\"> </span>2.5<span class=\"_ _44\"> </span>5.8<span class=\"_ _d6\"> </span>3.3<span class=\"_ _d6\"> </span>4.3<span class=\"_ _d6\"> </span>1.8<span class=\"_ _44\"> </span>4.8<span class=\"_ _3b\"> </span></span>(5.2)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4ba\">The asymmetry<span class=\"_ _1\"></span> in the models is demonstrated by<span class=\"_ _0\"></span> comparing the calculated impairment pr<span class=\"_ _0\"></span>ovision with <span class=\"_ _0\"></span>that which <span class=\"_ _0\"></span>would hav<span class=\"_ _0\"></span>e been </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4bb\">produced using <span class=\"_ _0\"></span>the Central scenario alone, 100% w<span class=\"_ _0\"></span>eighted.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4bc\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4bd\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs4be\">Provision using centr<span class=\"_ _0\"></span>al scenario 100% weight<span class=\"_ _0\"></span>ed<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs4bf\">Mortgage Lending<span class=\"_ _27b\"> </span><span class=\"ff15\">38.4<span class=\"_ _3a\"> </span><span class=\"ff16\">29.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs4c0\">Commercial Lending<span class=\"_ _27c\"> </span><span class=\"ff15\">29.0<span class=\"_ _3a\"> </span><span class=\"ff16\">24.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4c1\">67.4<span class=\"_ _3a\"> </span><span class=\"ff16\">53.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs4c2\">Calculated impairment pr<span class=\"_ _0\"></span>ovision<span class=\"_ _27d\"> </span><span class=\"ff15\">73.6<span class=\"_ _3a\"> </span><span class=\"ff16\">63.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs4c3\">Eff<span class=\"_ _1\"></span>ect of multiple economic scenarios<span class=\"_ _127\"> </span><span class=\"ff15\">6.2<span class=\"_ _3a\"> </span><span class=\"ff16\">10.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs4c4\">25. <span class=\"_ _1c\"></span>Loan impairments \u2013 sensitivity<span class=\"_ _0\"></span> analysis<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4c5\">The calculation of<span class=\"_ _0\"></span> impairment pro<span class=\"_ _0\"></span>visions under IFRS 9 is subject to a <span class=\"_ _0\"></span>variety<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> uncertainties arising from assump<span class=\"_ _0\"></span>tions, for<span class=\"_ _0\"></span>ecasts and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4c6\">expectations about futur<span class=\"_ _0\"></span>e ev<span class=\"_ _0\"></span>ents and conditions. T<span class=\"_ _2f\"></span>o illustrate the impact of<span class=\"_ _0\"></span> these uncertainties, sensitivity calculations ha<span class=\"_ _0\"></span>ve been </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4c7\">performed f<span class=\"_ _0\"></span>or some of<span class=\"_ _0\"></span> the most significant.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4c8\">These sensitivities are int<span class=\"_ _0\"></span>ended as mathematical illustrations of <span class=\"_ _0\"></span>the impacts of<span class=\"_ _0\"></span> the v<span class=\"_ _0\"></span>arious assumptions on the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s modelling. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4c9\">They<span class=\"_ _0\"></span> do not necessarily<span class=\"_ _0\"></span> repr<span class=\"_ _0\"></span>esent alternative potential impairment<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues as other <span class=\"_ _0\"></span>factors might also need t<span class=\"_ _0\"></span>o be considered in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4ca\">arriving at a final pr<span class=\"_ _0\"></span>ovision figur<span class=\"_ _0\"></span>e if cir<span class=\"_ _0\"></span>cumstances differ<span class=\"_ _0\"></span>ed from <span class=\"_ _0\"></span>those at the balance sheet<span class=\"_ _0\"></span> date.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs4cb\">Economic conditions<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4cc\">T<span class=\"_ _2\"></span>o illustrate the potential impact o<span class=\"_ _0\"></span>f differing <span class=\"_ _0\"></span>future economic scenarios on <span class=\"_ _0\"></span>the total impairment, <span class=\"_ _0\"></span>the pro<span class=\"_ _0\"></span>visions which w<span class=\"_ _0\"></span>ould be </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4cd\">calculated if each o<span class=\"_ _0\"></span>f the economic scenarios <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e 100% weight<span class=\"_ _0\"></span>ed are shown belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4ce\">Scenario<span class=\"_ _152\"> </span>2023<span class=\"_ _17f\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4cf\">Provision<span class=\"_ _c5\"> </span><span class=\"ff1e\">Difference<span class=\"_ _278\"> </span><span class=\"ff17\">Provision<span class=\"_ _111\"> </span>Difference<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4d0\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs4d1\">Central<span class=\"_ _225\"> </span><span class=\"ff15\">67.4<span class=\"_ _72\"> </span>(6.2)<span class=\"_ _12c\"> </span><span class=\"ff16\">53.3<span class=\"_ _12c\"> </span></span></span>(10.2)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs4d2\">Upside<span class=\"_ _27e\"> </span><span class=\"ff15\">59.0<span class=\"_ _12c\"> </span>(14.6)<span class=\"_ _84\"> </span><span class=\"ff16\">46.8<span class=\"_ _12c\"> </span></span></span>(16.7)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs4d3\">Downside<span class=\"_ _27f\"> </span><span class=\"ff15\">73.4<span class=\"_ _72\"> </span>(0.2)<span class=\"_ _12c\"> </span><span class=\"ff16\">62.5<span class=\"_ _ff\"> </span></span></span>(1.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs4d4\">Severe<span class=\"_ _251\"> </span><span class=\"ff15\">95.7<span class=\"_ _3a\"> </span>22.1<span class=\"_ _d5\"> </span><span class=\"ff16\">100.3<span class=\"_ _3a\"> </span>36.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4d5\">The w<span class=\"_ _0\"></span>eighted aver<span class=\"_ _0\"></span>age of <span class=\"_ _0\"></span>these 100% w<span class=\"_ _0\"></span>eighted pro<span class=\"_ _0\"></span>visions need not equal the <span class=\"_ _0\"></span>weighted av<span class=\"_ _0\"></span>erage E<span class=\"_ _0\"></span>CL due <span class=\"_ _0\"></span>to the impact of<span class=\"_ _0\"></span> the differing </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4d6\">PDs on staging. </div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws30 gs4d7\">Scenario weightings<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4d8\">In order<span class=\"_ _0\"></span> to illustrat<span class=\"_ _0\"></span>e the impact of<span class=\"_ _0\"></span> scenario weightings on <span class=\"_ _0\"></span>the outcomes, the impairment<span class=\"_ _0\"></span> provision r<span class=\"_ _0\"></span>equirements <span class=\"_ _0\"></span>were sensitised using </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4d9\">alternative <span class=\"_ _0\"></span>weightings. <span class=\"_ _0\"></span>The sensitivity is based on <span class=\"_ _0\"></span>the weightings used at IFRS 9 <span class=\"_ _0\"></span>transition on 1 October 2018. <span class=\"_ _1\"></span>The use of the 2018 </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4da\">weighting is intended <span class=\"_ _0\"></span>to repr<span class=\"_ _0\"></span>esent a more settled outlook<span class=\"_ _0\"></span> than has been evident<span class=\"_ _0\"></span> at either of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>three most r<span class=\"_ _0\"></span>ecent y<span class=\"_ _0\"></span>ear ends.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4db\">The w<span class=\"_ _0\"></span>eightings used, and the r<span class=\"_ _0\"></span>esults of applying <span class=\"_ _0\"></span>these sensitivities to <span class=\"_ _0\"></span>the 30 September 2023 scenarios ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs4dc\">W<span class=\"_ _0\"></span>eighting<span class=\"_ _162\"> </span><span class=\"ff15\">Impairment<span class=\"_ _c5\"> </span></span>Difference<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs4dd\">Central<span class=\"_ _b6\"> </span>Upside<span class=\"_ _88\"> </span>Downside<span class=\"_ _d8\"> </span>Severe<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs4de\">As reported<span class=\"_ _1ad\"> </span><span class=\"ff16\">40%<span class=\"_ _f8\"> </span>10%<span class=\"_ _f7\"> </span>30%<span class=\"_ _f8\"> </span>20%<span class=\"_ _3a\"> </span>73.6<span class=\"_ _11b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs4df\">Sensitivity<span class=\"_ _59\"> </span><span class=\"ff16\">40%<span class=\"_ _f8\"> </span>30%<span class=\"_ _f7\"> </span>25%<span class=\"_ _11f\"> </span>5%<span class=\"_ _f7\"> </span>67.6<span class=\"_ _f7\"> </span></span>(6.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs4e1\">Significant increase in credit risk<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4e2\">The most important driv<span class=\"_ _0\"></span>er of<span class=\"_ _0\"></span> SICR is relativ<span class=\"_ _0\"></span>e PD. If<span class=\"_ _0\"></span> all PDs across <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s principal buy-to-let mortgag<span class=\"_ _0\"></span>e book wer<span class=\"_ _1\"></span>e increased by </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4e3\">10%, loans with a gr<span class=\"_ _0\"></span>oss v<span class=\"_ _0\"></span>alue of \u00a368.4m <span class=\"_ _0\"></span>would tr<span class=\"_ _0\"></span>ansfer <span class=\"_ _0\"></span>from Stag<span class=\"_ _0\"></span>e 1 to Stag<span class=\"_ _0\"></span>e 2 (2022: \u00a3136.8m), and the <span class=\"_ _0\"></span>total pro<span class=\"_ _0\"></span>vision w<span class=\"_ _0\"></span>ould increase </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4e4\">by<span class=\"_ _0\"></span> \u00a30.8m fr<span class=\"_ _0\"></span>om the combined eff<span class=\"_ _0\"></span>ects of higher<span class=\"_ _0\"></span> PDs on expected losses and <span class=\"_ _0\"></span>the impact of pr<span class=\"_ _0\"></span>oviding <span class=\"_ _0\"></span>for e<span class=\"_ _0\"></span>xpected lifetime losses, rather<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4e5\">than 12-month losses on <span class=\"_ _0\"></span>the additional Stage 2 cases (2022: \u00a30<span class=\"_ _0\"></span>.9m).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs4e6\">V<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> security<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4e7\">The principal assumptions impacting on L<span class=\"_ _1\"></span>GD are the estimated security<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues. If the r<span class=\"_ _0\"></span>ate of gr<span class=\"_ _0\"></span>owth in house prices assumed b<span class=\"_ _0\"></span>y the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4e8\">model after <span class=\"_ _0\"></span>the for<span class=\"_ _0\"></span>ecast minimum w<span class=\"_ _0\"></span>ere halv<span class=\"_ _0\"></span>ed, ignoring any PD eff<span class=\"_ _0\"></span>ects, then the pr<span class=\"_ _0\"></span>ovision <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s first and second mortgag<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4e9\">assets under <span class=\"_ _0\"></span>the central scenario w<span class=\"_ _0\"></span>ould increase b<span class=\"_ _0\"></span>y \u00a30<span class=\"_ _0\"></span>.7m (2022: \u00a32.7m<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs4ea\">Receiver<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> rent<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4eb\">The majority o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>eceiver<span class=\"_ _0\"></span> of r<span class=\"_ _0\"></span>ent cases, which ar<span class=\"_ _0\"></span>e included in Stage 3, ar<span class=\"_ _0\"></span>e managed long-t<span class=\"_ _0\"></span>erm and there<span class=\"_ _0\"></span>fore <span class=\"_ _0\"></span>their assumed r<span class=\"_ _0\"></span>ealisation </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4ec\">date has an important impact on <span class=\"_ _0\"></span>the provision calculation. If<span class=\"_ _0\"></span> the assumed rat<span class=\"_ _0\"></span>e of r<span class=\"_ _0\"></span>ealisations w<span class=\"_ _0\"></span>as increased by<span class=\"_ _0\"></span> 20%, the impairment </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4ed\">pro<span class=\"_ _0\"></span>vision in the central scenario <span class=\"_ _0\"></span>would increase b<span class=\"_ _0\"></span>y \u00a30<span class=\"_ _0\"></span>.<span class=\"_ _0\"></span>1m (2022: \u00a30.4m<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAllowanceForCreditLossesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-377": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs4ef\">26. <span class=\"_ _96\"></span>Derivative <span class=\"_ _0\"></span>financial instruments and hedge accounting<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs4f0\">Introduction<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4f1\">The Group uses deriv<span class=\"_ _0\"></span>ative <span class=\"_ _0\"></span>financial instruments such as interest rat<span class=\"_ _0\"></span>e swaps <span class=\"_ _0\"></span>for risk<span class=\"_ _0\"></span> management purposes only<span class=\"_ _1\"></span>. Each such derivative </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4f2\">contract is enter<span class=\"_ _0\"></span>ed into for<span class=\"_ _0\"></span> economic hedging purposes to manag<span class=\"_ _0\"></span>e a particular identified risk (<span class=\"_ _0\"></span>as described in notes 62 <span class=\"_ _0\"></span>to 65) and any </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4f3\">gains or<span class=\"_ _0\"></span> losses arising are incidental t<span class=\"_ _0\"></span>o this objective. No <span class=\"_ _0\"></span>trading in derivativ<span class=\"_ _0\"></span>e financial instruments is undertaken.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4f4\">Hedge accounting is applied wher<span class=\"_ _0\"></span>e appropriat<span class=\"_ _0\"></span>e, though some derivativ<span class=\"_ _0\"></span>es, while f<span class=\"_ _0\"></span>orming part of an economic hedg<span class=\"_ _0\"></span>e relationship, do </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4f5\">not qualify<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> this accounting tr<span class=\"_ _0\"></span>eatment under<span class=\"_ _0\"></span> the IAS 39 rules, particularly<span class=\"_ _0\"></span> wher<span class=\"_ _0\"></span>e the hedged risk<span class=\"_ _0\"></span> relates <span class=\"_ _0\"></span>to an off balance sheet<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4f6\">item. In other<span class=\"_ _0\"></span> cases, hedge accounting has not been adopted either<span class=\"_ _1\"></span> because natural accounting offsets are expected or<span class=\"_ _0\"></span> because </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4f7\">complying with <span class=\"_ _0\"></span>the IAS 39 hedge accounting rules <span class=\"_ _0\"></span>would be particularly oner<span class=\"_ _0\"></span>ous.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4f8\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s hedging arrangements can be analysed <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> accounting purposes between:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4f9\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>F<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value hedges o<span class=\"_ _0\"></span>f portfolio inter<span class=\"_ _0\"></span>est rate risk, <span class=\"_ _0\"></span>which are used <span class=\"_ _0\"></span>to manage the int<span class=\"_ _0\"></span>erest rate risk<span class=\"_ _0\"></span> inherent in <span class=\"_ _0\"></span>fixed rate lending and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gs4fa\">deposit taking<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4fb\">\u2022 <span class=\"_ _13\"> </span>F<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value hedges o<span class=\"_ _0\"></span>f inter<span class=\"_ _0\"></span>est rate risk r<span class=\"_ _0\"></span>elating to individual <span class=\"_ _0\"></span>financial liabilities.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4fc\">An economic hedge of<span class=\"_ _0\"></span> the inter<span class=\"_ _0\"></span>est rate risk in <span class=\"_ _0\"></span>fixed rate lending must also addr<span class=\"_ _1\"></span>ess pipeline exposures, wher<span class=\"_ _0\"></span>e future lending at<span class=\"_ _0\"></span> a given </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4fd\">fixed rat<span class=\"_ _0\"></span>e is anticipated. Howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, such pre-hedging arrangements do not<span class=\"_ _0\"></span> qualify as hedges <span class=\"_ _0\"></span>for accounting purposes.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4fe\">In addition, the Gr<span class=\"_ _0\"></span>oup utilises currency<span class=\"_ _0\"></span> derivativ<span class=\"_ _0\"></span>es to hedge its e<span class=\"_ _0\"></span>xposure on the small amount<span class=\"_ _0\"></span> of its lending denominated in <span class=\"_ _0\"></span>foreign </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4ff\">currencies. <span class=\"_ _0\"></span>These ar<span class=\"_ _0\"></span>e not tr<span class=\"_ _0\"></span>eated as hedges f<span class=\"_ _0\"></span>or accounting purposes due <span class=\"_ _0\"></span>to the low<span class=\"_ _0\"></span> lev<span class=\"_ _0\"></span>el of exposur<span class=\"_ _0\"></span>e.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs501\">The analysis belo<span class=\"_ _0\"></span>w splits derivativ<span class=\"_ _0\"></span>es between <span class=\"_ _0\"></span>those accounted for<span class=\"_ _0\"></span> within portfolio <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value hedg<span class=\"_ _0\"></span>es and those which, despit<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs502\">repr<span class=\"_ _0\"></span>esenting an economic hedge, are no<span class=\"_ _0\"></span>t accounted for<span class=\"_ _1\"></span> as hedges. </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs503\">2023<span class=\"_ _a0\"> </span>2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _a0\"> </span>2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs504\">Assets<span class=\"_ _55\"> </span><span class=\"ff1e\">Liabilities<span class=\"_ _12b\"> </span><span class=\"ff17\">Assets<span class=\"_ _7f\"> </span>Liabilities<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs505\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs506\">Derivativ<span class=\"_ _0\"></span>es in hedge accounting rela<span class=\"_ _0\"></span>tionships<span class=\"_ _36a\"> </span></div><div class=\"t m0 h67 ff22 fs1 fc1 sc0 ls0 ws0 gs507\">Fair value portf<span class=\"_ _0\"></span>olio hedges<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs508\">Inter<span class=\"_ _0\"></span>est ra<span class=\"_ _0\"></span>te swaps</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs509\"> <span class=\"_ _c0\"> </span>Fixed to floating<span class=\"_ _183\"> </span><span class=\"ff15\">519.0<span class=\"_ _ff\"> </span>(5.1)<span class=\"_ _133\"> </span><span class=\"ff16\">652.7<span class=\"_ _43\"> </span></span></span>-</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs50a\"> <span class=\"_ _c0\"> </span>Floating to fixed<span class=\"_ _25c\"> </span><span class=\"ff15\">76.2<span class=\"_ _12c\"> </span>(27.0)<span class=\"_ _ff\"> </span><span class=\"ff16\">0.3<span class=\"_ _12c\"> </span></span></span>(98.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs50b\">T<span class=\"_ _2\"></span>otal derivatives in portf<span class=\"_ _0\"></span>olio fair value hedging r<span class=\"_ _0\"></span>elationships<span class=\"_ _1d3\"> </span><span class=\"ff15\">595.2<span class=\"_ _84\"> </span>(32.1)<span class=\"_ _12b\"> </span><span class=\"ff16\">653.0<span class=\"_ _12c\"> </span></span></span>(98.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h67 ff22 fs1 fc1 sc0 ls0 ws0 gs50c\">Individual fair value hedges<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs50d\">Inter<span class=\"_ _0\"></span>est ra<span class=\"_ _0\"></span>te swaps</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs50e\"> <span class=\"_ _c0\"> </span>Floating to fixed<span class=\"_ _280\"> </span><span class=\"ff15\">-<span class=\"_ _fb\"> </span>(3.7)<span class=\"_ _16b\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs50f\">T<span class=\"_ _2\"></span>otal derivatives in hedge acc<span class=\"_ _0\"></span>ounting relationships<span class=\"_ _b2\"> </span><span class=\"ff15\">595.2<span class=\"_ _12c\"> </span>(35.8)<span class=\"_ _b9\"> </span><span class=\"ff16\">653.0<span class=\"_ _a0\"> </span></span></span>(98.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs510\">Other derivativ<span class=\"_ _0\"></span>es<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs511\">Inter<span class=\"_ _0\"></span>est ra<span class=\"_ _0\"></span>te swaps<span class=\"_ _259\"> </span><span class=\"ff15\">20.2<span class=\"_ _ff\"> </span>(4.1)<span class=\"_ _133\"> </span><span class=\"ff16\">125.5<span class=\"_ _d4\"> </span></span></span>(3.6)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs512\">Currency futures<span class=\"_ _281\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.5<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs513\">T<span class=\"_ _2\"></span>otal recognised derivativ<span class=\"_ _0\"></span>e assets / (liabilities)<span class=\"_ _7b\"> </span><span class=\"ff15\">615.4<span class=\"_ _84\"> </span>(39.9)<span class=\"_ _12b\"> </span><span class=\"ff16\">779.0<span class=\"_ _12b\"> </span></span></span>(102.1)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs514\">The credit<span class=\"_ _0\"></span> risk inherent in <span class=\"_ _0\"></span>the derivative <span class=\"_ _0\"></span>financial assets shown abo<span class=\"_ _0\"></span>ve is discussed in note 63.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs515\">The balances held on the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s balance sheet relating to <span class=\"_ _0\"></span>the hedging of int<span class=\"_ _0\"></span>erest rate risk<span class=\"_ _0\"></span> on its fixed r<span class=\"_ _0\"></span>ate customer loan and deposit </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs516\">balances are summarised belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gs517\">Note<span class=\"_ _3a\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs518\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs519\">Derivativ<span class=\"_ _0\"></span>e financial instruments</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs51a\"> <span class=\"_ _c0\"> </span>Assets<span class=\"_ _14d\"> </span><span class=\"ff15\">615.4<span class=\"_ _d5\"> </span><span class=\"ff16\">779.0</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs51b\"> <span class=\"_ _c0\"> </span>Liabilities<span class=\"_ _1fb\"> </span><span class=\"ff15\">(39.9)<span class=\"_ _b6\"> </span></span>(102.1)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs51c\">575.5<span class=\"_ _d5\"> </span><span class=\"ff16\">676.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs51d\">Fair v<span class=\"_ _0\"></span>alue hedging adjustments<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs51e\">On loans to customer<span class=\"_ _0\"></span>s<span class=\"_ _282\"> </span><span class=\"ff2c\">18<span class=\"_ _1d6\"> </span><span class=\"ff15\">(379.3)<span class=\"_ _b6\"> </span></span></span>(559.9)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs51f\">On retail deposits<span class=\"_ _283\"> </span><span class=\"ff2c\">33<span class=\"_ _40\"> </span><span class=\"ff15\">30.9<span class=\"_ _3a\"> </span><span class=\"ff16\">99.7<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs520\">On borrowings<span class=\"_ _284\"> </span><span class=\"ff15\">3.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs521\">(344.7)<span class=\"_ _110\"> </span><span class=\"ff17\">(460.2)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs522\">Net balance sheet position<span class=\"_ _285\"> </span><span class=\"ff15\">230.8<span class=\"_ _d5\"> </span><span class=\"ff16\">216.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs523\">Collater<span class=\"_ _0\"></span>al balances</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs524\"> <span class=\"_ _c0\"> </span>Posted (in sundry assets)<span class=\"_ _286\"> </span><span class=\"ff2c\">27<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span></span>-</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs525\"> <span class=\"_ _c0\"> </span>Received (in sundry liabilities)<span class=\"_ _e5\"> </span><span class=\"ff2c\">40<span class=\"_ _1d6\"> </span><span class=\"ff15\">(383.4)<span class=\"_ _b6\"> </span></span></span>(388.6)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs526\">(383.4)<span class=\"_ _110\"> </span><span class=\"ff17\">(388.6)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs528\">(a<span class=\"_ _0\"></span>) <span class=\"_ _1\"></span> <span class=\"_ _45\"> </span>F<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value macro hedg<span class=\"_ _0\"></span>es<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs529\">Background and hedging objectives<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs52a\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue hedges of<span class=\"_ _0\"></span> portfolios of int<span class=\"_ _0\"></span>erest rate risk<span class=\"_ _0\"></span> (\u2018macro hedges<span class=\"_ _0\"></span>\u2019) arise fr<span class=\"_ _0\"></span>om its management of<span class=\"_ _0\"></span> the inter<span class=\"_ _0\"></span>est rate risk </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs52b\">inherent in its <span class=\"_ _0\"></span>fixed rate lending and deposit<span class=\"_ _0\"></span> taking activities. <span class=\"_ _0\"></span>These activities would e<span class=\"_ _0\"></span>xpose the Group <span class=\"_ _0\"></span>to mov<span class=\"_ _0\"></span>ement in market<span class=\"_ _0\"></span> interest </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs52c\">rates if<span class=\"_ _0\"></span> not hedged. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs52d\">This position arises naturally<span class=\"_ _0\"></span> wher<span class=\"_ _0\"></span>e fixed r<span class=\"_ _0\"></span>ate loans are funded <span class=\"_ _0\"></span>with floating or<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>ariable rate borro<span class=\"_ _0\"></span>wings, as in the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs52e\">securitisation transactions, but ma<span class=\"_ _0\"></span>y also arise <span class=\"_ _0\"></span>where r<span class=\"_ _0\"></span>etail deposit funding is used. <span class=\"_ _0\"></span>Where possible <span class=\"_ _0\"></span>the Group tak<span class=\"_ _0\"></span>es advantag<span class=\"_ _0\"></span>e of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs52f\">natural hedging between <span class=\"_ _0\"></span>fixed rate asse<span class=\"_ _0\"></span>ts and deposits, but it is unlikely<span class=\"_ _0\"></span> that a pr<span class=\"_ _0\"></span>ecise match for<span class=\"_ _1\"></span> value and t<span class=\"_ _0\"></span>enor of<span class=\"_ _0\"></span> the instruments </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs530\">could be achiev<span class=\"_ _0\"></span>ed leaving unmatched items on both sides. <span class=\"_ _0\"></span>This is re<span class=\"_ _0\"></span>ferred <span class=\"_ _0\"></span>to as repricing or<span class=\"_ _0\"></span> duration risk and is contr<span class=\"_ _0\"></span>olled within </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs531\">limits under <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s interest rate risk<span class=\"_ _0\"></span> management pr<span class=\"_ _0\"></span>ocess, described in note 63. In order<span class=\"_ _0\"></span> to manag<span class=\"_ _0\"></span>e these exposur<span class=\"_ _0\"></span>es, they<span class=\"_ _0\"></span> are </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs532\">hedged with <span class=\"_ _0\"></span>financial derivativ<span class=\"_ _0\"></span>es and form part of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _0\"></span>s portfolio hedging arrang<span class=\"_ _0\"></span>ements. Duration risk is monitor<span class=\"_ _0\"></span>ed regularly<span class=\"_ _0\"></span> to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs533\">ensure mismatches or<span class=\"_ _0\"></span> gaps r<span class=\"_ _0\"></span>emain within limits set b<span class=\"_ _0\"></span>y policy<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs534\">Responsibility<span class=\"_ _0\"></span> to dir<span class=\"_ _0\"></span>ect and over<span class=\"_ _0\"></span>see structural interest r<span class=\"_ _0\"></span>ate risk management has been delegat<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the Board <span class=\"_ _0\"></span>to the Ex<span class=\"_ _0\"></span>ecutive Risk </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs535\">Committee (\u2018ERC\u2019) and by<span class=\"_ _0\"></span> ERC to <span class=\"_ _0\"></span>the Asset<span class=\"_ _0\"></span> and Liability Committee (\u2018<span class=\"_ _2\"></span>ALCO\u2019). <span class=\"_ _0\"></span>A hedging str<span class=\"_ _0\"></span>ategy is de<span class=\"_ _0\"></span>veloped f<span class=\"_ _0\"></span>or each fix<span class=\"_ _0\"></span>ed product </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs536\">considering behavioural characteristics, such as <span class=\"_ _0\"></span>whether<span class=\"_ _0\"></span> a customer is lik<span class=\"_ _0\"></span>ely <span class=\"_ _0\"></span>to prepay<span class=\"_ _1\"></span> before contractual maturity<span class=\"_ _1\"></span>. This is r<span class=\"_ _0\"></span>eview<span class=\"_ _0\"></span>ed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gs537\">from time to time with any<span class=\"_ _0\"></span> changes agreed with AL<span class=\"_ _0\"></span>CO<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs538\">In order<span class=\"_ _0\"></span> to manag<span class=\"_ _0\"></span>e potential exposure <span class=\"_ _0\"></span>to changes in inter<span class=\"_ _0\"></span>est rates betw<span class=\"_ _0\"></span>een the point at <span class=\"_ _0\"></span>which fixed r<span class=\"_ _0\"></span>ate products ar<span class=\"_ _0\"></span>e priced and the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs539\">advance date, it ma<span class=\"_ _0\"></span>y be necessary<span class=\"_ _0\"></span> to undertak<span class=\"_ _0\"></span>e pre-hedging of<span class=\"_ _0\"></span> assets in the pipeline. Inter<span class=\"_ _1\"></span>est rate swaps used <span class=\"_ _0\"></span>to pre-hedge pipeline </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs53a\">loan exposures, <span class=\"_ _0\"></span>which are not<span class=\"_ _0\"></span> ye<span class=\"_ _0\"></span>t recognised on <span class=\"_ _0\"></span>the balance sheet, can cause unmatched fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue costs or cr<span class=\"_ _0\"></span>edits to arise until </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs53b\">both sides of<span class=\"_ _0\"></span> the hedge can be r<span class=\"_ _0\"></span>ecognised within <span class=\"_ _0\"></span>the interest rat<span class=\"_ _0\"></span>e portfolio hedging arrangement, g<span class=\"_ _0\"></span>enerally a <span class=\"_ _0\"></span>few<span class=\"_ _0\"></span> months after <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs53c\">inception of<span class=\"_ _0\"></span> the derivativ<span class=\"_ _0\"></span>e contract.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs53d\">In managing interest r<span class=\"_ _0\"></span>ate exposure, <span class=\"_ _1\"></span>T<span class=\"_ _1\"></span>reasury ma<span class=\"_ _0\"></span>y use inter<span class=\"_ _0\"></span>est rate s<span class=\"_ _0\"></span>waps, forw<span class=\"_ _0\"></span>ard rat<span class=\"_ _0\"></span>e agreements, sw<span class=\"_ _0\"></span>aptions or int<span class=\"_ _0\"></span>erest rate caps </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs53e\">and floors. How<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>er<span class=\"_ _0\"></span>, interest<span class=\"_ _0\"></span> rate sw<span class=\"_ _0\"></span>aps are the most<span class=\"_ _0\"></span> generally<span class=\"_ _0\"></span> used instruments.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs53f\">This policy<span class=\"_ _0\"></span> creates <span class=\"_ _0\"></span>two macr<span class=\"_ _0\"></span>o hedges:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs540\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The \u2018loan hedge\u2019 matching <span class=\"_ _0\"></span>fixed rat<span class=\"_ _0\"></span>e buy-to-let mortg<span class=\"_ _0\"></span>age assets, or<span class=\"_ _0\"></span> other <span class=\"_ _0\"></span>fixed rate assets, <span class=\"_ _0\"></span>with interest<span class=\"_ _0\"></span> rate sw<span class=\"_ _0\"></span>aps to conv<span class=\"_ _0\"></span>ert the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs541\">interest r<span class=\"_ _1\"></span>eceivable to a floating r<span class=\"_ _0\"></span>ate<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs542\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The \u2018deposit hedg<span class=\"_ _0\"></span>e\u2019 matching <span class=\"_ _0\"></span>fixed rate deposits <span class=\"_ _0\"></span>with interest r<span class=\"_ _0\"></span>ate swaps <span class=\"_ _0\"></span>which operates in <span class=\"_ _0\"></span>the opposite direction, conv<span class=\"_ _0\"></span>erting the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs543\">fixed rat<span class=\"_ _0\"></span>e interest pay<span class=\"_ _0\"></span>able to <span class=\"_ _0\"></span>floating rate amounts<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs544\">During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2022 <span class=\"_ _0\"></span>the Group complet<span class=\"_ _0\"></span>ed the process o<span class=\"_ _0\"></span>f changing the principal st<span class=\"_ _0\"></span>erling refer<span class=\"_ _0\"></span>ence rate used </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs545\">in its interest r<span class=\"_ _0\"></span>ate risk management <span class=\"_ _0\"></span>framew<span class=\"_ _0\"></span>ork fr<span class=\"_ _0\"></span>om LIBOR to SONIA, with all hedges which r<span class=\"_ _0\"></span>efer<span class=\"_ _0\"></span>enced LIBOR transitioned t<span class=\"_ _0\"></span>o a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs546\">SONIA basis. How<span class=\"_ _0\"></span>ever<span class=\"_ _2\"></span>, for administrativ<span class=\"_ _0\"></span>e purposes, the macr<span class=\"_ _0\"></span>o hedges continued to be divided int<span class=\"_ _0\"></span>o two sections, one including <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs547\">transitioned sw<span class=\"_ _0\"></span>aps and the other<span class=\"_ _0\"></span> those sw<span class=\"_ _0\"></span>aps which r<span class=\"_ _0\"></span>efer<span class=\"_ _0\"></span>enced SONIA at inception.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs548\">Through <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>, as assets and deposits matured and wer<span class=\"_ _0\"></span>e replaced b<span class=\"_ _0\"></span>y ne<span class=\"_ _0\"></span>w business, the <span class=\"_ _0\"></span>formally<span class=\"_ _0\"></span> LIBOR-linked element of<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs549\">hedges r<span class=\"_ _0\"></span>educed, and the originally SONIA-link<span class=\"_ _1\"></span>ed element increased and the tw<span class=\"_ _0\"></span>o sections of each hedg<span class=\"_ _0\"></span>e wer<span class=\"_ _0\"></span>e combined in the second </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws17 gs54a\">half of the financial y<span class=\"_ _0\"></span>ear<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs54b\">During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> the Group has continued <span class=\"_ _0\"></span>to hedge inter<span class=\"_ _0\"></span>est rate risk on <span class=\"_ _0\"></span>fixed rate CBILS and BBL<span class=\"_ _0\"></span>S exposures using SONIA-link<span class=\"_ _0\"></span>ed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs54c\">basis guarantee sw<span class=\"_ _0\"></span>aps, which ar<span class=\"_ _0\"></span>e included in the loan hedge.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs54d\">The designation of<span class=\"_ _0\"></span> the macr<span class=\"_ _0\"></span>o hedges is updated, on a month-by<span class=\"_ _0\"></span>-month basis, using softwar<span class=\"_ _0\"></span>e which compares <span class=\"_ _0\"></span>the ov<span class=\"_ _0\"></span>erall tenor<span class=\"_ _1\"></span>, v<span class=\"_ _0\"></span>alue </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs54e\">and rate positions in or<span class=\"_ _0\"></span>der that<span class=\"_ _0\"></span> the expected <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value mov<span class=\"_ _0\"></span>ement of<span class=\"_ _0\"></span> the designated sw<span class=\"_ _0\"></span>aps matches the expect<span class=\"_ _0\"></span>ed interest r<span class=\"_ _0\"></span>ate risk </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs54f\">related mo<span class=\"_ _0\"></span>vement in <span class=\"_ _0\"></span>the fair<span class=\"_ _0\"></span> value o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the relev<span class=\"_ _0\"></span>ant assets or<span class=\"_ _0\"></span> liabilities as closely as possible o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>the designation period. T<span class=\"_ _0\"></span>he softwar<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs550\">applies regr<span class=\"_ _0\"></span>ession analysis t<span class=\"_ _0\"></span>echniques to <span class=\"_ _0\"></span>the potential impact of<span class=\"_ _0\"></span> changes in expected inter<span class=\"_ _0\"></span>est rates ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the designation period </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs551\">to maximise expected hedge e<span class=\"_ _0\"></span>ffectiveness on a pr<span class=\"_ _0\"></span>ospective basis. <span class=\"_ _0\"></span>The v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the portfolio of<span class=\"_ _0\"></span> loans or deposits selected is <span class=\"_ _0\"></span>then </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs552\">designated, as a monetary<span class=\"_ _0\"></span> amount of inter<span class=\"_ _0\"></span>est rate risk, as <span class=\"_ _0\"></span>the hedged item, <span class=\"_ _0\"></span>while the portfolio of<span class=\"_ _0\"></span> sw<span class=\"_ _0\"></span>aps selected are designated as </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs553\">the hedging instruments.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs554\">Any<span class=\"_ _0\"></span> swaps not select<span class=\"_ _0\"></span>ed in this process ar<span class=\"_ _0\"></span>e disclosed as derivativ<span class=\"_ _0\"></span>es not in hedging relationships. <span class=\"_ _1\"></span>These will generally<span class=\"_ _0\"></span> be swaps <span class=\"_ _0\"></span>taken </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs555\">out to pr<span class=\"_ _0\"></span>e-hedge <span class=\"_ _0\"></span>the pipeline of <span class=\"_ _0\"></span>fixed rate mortgag<span class=\"_ _0\"></span>e offers, <span class=\"_ _0\"></span>which will match <span class=\"_ _0\"></span>with the r<span class=\"_ _0\"></span>elated loans when the<span class=\"_ _0\"></span>y complet<span class=\"_ _0\"></span>e.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs556\">At <span class=\"_ _0\"></span>the end of each designation period <span class=\"_ _0\"></span>the Group <span class=\"_ _0\"></span>will assess the effectiv<span class=\"_ _0\"></span>eness of each hedg<span class=\"_ _0\"></span>e retr<span class=\"_ _0\"></span>ospectively<span class=\"_ _1\"></span>, based on fair <span class=\"_ _0\"></span>value </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs557\">movements (<span class=\"_ _0\"></span>relating <span class=\"_ _0\"></span>to interest r<span class=\"_ _0\"></span>ate risk components only<span class=\"_ _0\"></span>) which hav<span class=\"_ _0\"></span>e occurred in the period. Mo<span class=\"_ _0\"></span>vements ar<span class=\"_ _0\"></span>e compared t<span class=\"_ _0\"></span>o  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs558\">pre-determined <span class=\"_ _0\"></span>test <span class=\"_ _0\"></span>thresholds using regr<span class=\"_ _0\"></span>ession techniques <span class=\"_ _0\"></span>to determine <span class=\"_ _0\"></span>whether <span class=\"_ _0\"></span>the hedge w<span class=\"_ _0\"></span>as effective in <span class=\"_ _0\"></span>the period.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs55a\">Potential sour<span class=\"_ _0\"></span>ces of ine<span class=\"_ _0\"></span>ffectiveness<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs55b\">The Group has identified <span class=\"_ _0\"></span>the follo<span class=\"_ _0\"></span>wing possible sources of<span class=\"_ _0\"></span> hedge ineffectiv<span class=\"_ _0\"></span>eness in its portfolio hedges o<span class=\"_ _0\"></span>f inter<span class=\"_ _0\"></span>est rate risk:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs55c\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The maturity pr<span class=\"_ _0\"></span>ofile of <span class=\"_ _0\"></span>the hedging instruments may<span class=\"_ _0\"></span> not exactly<span class=\"_ _0\"></span> match that of<span class=\"_ _0\"></span> the hedg<span class=\"_ _0\"></span>ed items, particularly <span class=\"_ _0\"></span>where hedged items </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs55d\">settle early<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs55e\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The use of deriv<span class=\"_ _0\"></span>atives as a hedge of<span class=\"_ _1\"></span> interest rate risk additionally<span class=\"_ _0\"></span> exposes the Gr<span class=\"_ _0\"></span>oup to <span class=\"_ _0\"></span>the derivative count<span class=\"_ _0\"></span>erparties\u2019 cr<span class=\"_ _0\"></span>edit risk, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs55f\">which is not matched in <span class=\"_ _0\"></span>the hedged item. <span class=\"_ _0\"></span>This risk is minimised by<span class=\"_ _0\"></span> transacting only<span class=\"_ _0\"></span> with high quality<span class=\"_ _0\"></span> counterparties and thr<span class=\"_ _0\"></span>ough </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs560\">collateralisation arrang<span class=\"_ _0\"></span>ements (as described in note 63)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs561\">\u2022 <span class=\"_ _13\"> </span>The use of diff<span class=\"_ _0\"></span>erent discounting curves in measuring <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value chang<span class=\"_ _0\"></span>es in the hedged items and hedging instruments<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs562\">\u2022 <span class=\"_ _13\"> </span>Difference in <span class=\"_ _0\"></span>the timing of<span class=\"_ _0\"></span> interest pa<span class=\"_ _0\"></span>yments on the hedged items and settlements on <span class=\"_ _0\"></span>the hedging instruments<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs563\">These sources o<span class=\"_ _0\"></span>f ineff<span class=\"_ _0\"></span>ectiveness are minimised b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the portfolio matching process, <span class=\"_ _0\"></span>which seeks to mat<span class=\"_ _0\"></span>ch the terms o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the items as </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs564\">closely as possible.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs565\">In addition to <span class=\"_ _0\"></span>the hedging ineffectiveness described abo<span class=\"_ _0\"></span>ve, gr<span class=\"_ _0\"></span>oup profit <span class=\"_ _0\"></span>will also be affected by<span class=\"_ _1\"></span> the fair <span class=\"_ _0\"></span>value mo<span class=\"_ _0\"></span>vements of<span class=\"_ _0\"></span> interest </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs566\">rate sw<span class=\"_ _0\"></span>ap agreements <span class=\"_ _0\"></span>which wer<span class=\"_ _0\"></span>e entered int<span class=\"_ _0\"></span>o as part of <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019s int<span class=\"_ _0\"></span>erest rat<span class=\"_ _0\"></span>e risk hedging strategy<span class=\"_ _0\"></span> but failed t<span class=\"_ _0\"></span>o find a match in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs567\">the hedging portfolio, particularly<span class=\"_ _0\"></span> those r<span class=\"_ _0\"></span>elating to the pr<span class=\"_ _1\"></span>e-hedging of the lending pipeline. </div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs568\">Hedging Instruments<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs569\">The hedging portfolios at 30 Sept<span class=\"_ _0\"></span>ember 2023 and 30 September<span class=\"_ _1\"></span> 2022 consist of a large number<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> sterling denominated sw<span class=\"_ _0\"></span>aps. In </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs56a\">addition, ther<span class=\"_ _0\"></span>e are a small number<span class=\"_ _0\"></span> of Balance Guar<span class=\"_ _0\"></span>antee Swaps (\u2018BGS\u2019) in place at bo<span class=\"_ _0\"></span>th dates. Settlement on all sw<span class=\"_ _0\"></span>aps is generally<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs56b\">quarterly (<span class=\"_ _0\"></span>monthly <span class=\"_ _0\"></span>for BGS) <span class=\"_ _0\"></span>where:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs56c\">\u2022 <span class=\"_ _13\"> </span>One payment is calculated based on a fix<span class=\"_ _0\"></span>ed rate of<span class=\"_ _0\"></span> interest and <span class=\"_ _0\"></span>the nominal v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the swap<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs56d\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>An opposite payment is calculated based on the same nominal <span class=\"_ _0\"></span>value but using a <span class=\"_ _0\"></span>floating interest r<span class=\"_ _0\"></span>ate set at a fix<span class=\"_ _0\"></span>ed margin ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs56e\">SONIA r<span class=\"_ _0\"></span>eference r<span class=\"_ _0\"></span>ate<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs56f\">On the BGS <span class=\"_ _0\"></span>the nominal value o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the swap is link<span class=\"_ _0\"></span>ed to <span class=\"_ _0\"></span>the principal v<span class=\"_ _0\"></span>alue of a pool of<span class=\"_ _0\"></span> assets and reduces in line <span class=\"_ _0\"></span>with redemp<span class=\"_ _0\"></span>tions and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs570\">repa<span class=\"_ _0\"></span>yments until maturity<span class=\"_ _0\"></span>. Other inter<span class=\"_ _0\"></span>est rate sw<span class=\"_ _0\"></span>aps have a <span class=\"_ _0\"></span>fixed nominal <span class=\"_ _0\"></span>value thr<span class=\"_ _1\"></span>oughout their lives.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs571\">The Group pa<span class=\"_ _0\"></span>ys fix<span class=\"_ _0\"></span>ed rate and r<span class=\"_ _0\"></span>eceives floating <span class=\"_ _0\"></span>when hedging exposures <span class=\"_ _0\"></span>from fix<span class=\"_ _0\"></span>ed rate assets (in <span class=\"_ _0\"></span>the loan hedge). Con<span class=\"_ _0\"></span>versely<span class=\"_ _1\"></span>, the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs572\">Group pa<span class=\"_ _0\"></span>ys floating rate and r<span class=\"_ _1\"></span>eceives fixed rate <span class=\"_ _0\"></span>when hedging fix<span class=\"_ _0\"></span>ed rate deposits, in the deposit hedg<span class=\"_ _0\"></span>e.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs573\">The principal terms o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the hedging instruments are set out belo<span class=\"_ _0\"></span>w, analy<span class=\"_ _0\"></span>sed between <span class=\"_ _0\"></span>the two dir<span class=\"_ _0\"></span>ections of<span class=\"_ _0\"></span> the sw<span class=\"_ _0\"></span>ap.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs574\">2023<span class=\"_ _287\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs575\">Deposit Hedge<span class=\"_ _92\"> </span>Loan Hedge<span class=\"_ _a3\"> </span><span class=\"ff17\">Deposit Hedge<span class=\"_ _98\"> </span>Loan Hedge<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs576\">Aver<span class=\"_ _0\"></span>age fix<span class=\"_ _0\"></span>ed notional interes<span class=\"_ _0\"></span>t rat<span class=\"_ _0\"></span>e<span class=\"_ _288\"> </span><span class=\"ff15\">4.22%<span class=\"_ _9f\"> </span>1.77%<span class=\"_ _9f\"> </span><span class=\"ff16\">1.45%<span class=\"_ _19c\"> </span>0.99%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs577\">Aver<span class=\"_ _0\"></span>age notional margin ov<span class=\"_ _0\"></span>er SONIA<span class=\"_ _289\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _12d\"> </span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs578\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs579\">Notional principal value</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs57a\"> <span class=\"_ _c0\"> </span>SONIA BGS<span class=\"_ _28a\"> </span><span class=\"ff15\">-<span class=\"_ _d1\"> </span>31.6<span class=\"_ _a8\"> </span></span>-<span class=\"_ _d1\"> </span><span class=\"ff16\">47.0</span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs57b\"> <span class=\"_ _c0\"> </span>Other SONIA swaps<span class=\"_ _28b\"> </span><span class=\"ff15\">6,257.0<span class=\"_ _86\"> </span>7,781.8<span class=\"_ _12a\"> </span><span class=\"ff16\">4,286.0<span class=\"_ _86\"> </span>6,853.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs57c\">6,257.0<span class=\"_ _86\"> </span>7,813.4<span class=\"_ _12a\"> </span><span class=\"ff16\">4,286.0<span class=\"_ _86\"> </span>6,900.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs57d\">Maturing</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs57e\"> <span class=\"_ _c0\"> </span>Within one year<span class=\"_ _28c\"> </span><span class=\"ff15\">5,253.5<span class=\"_ _86\"> </span>1,616.3<span class=\"_ _12a\"> </span><span class=\"ff16\">3,097.0<span class=\"_ _86\"> </span>1,369.9</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs57f\"> <span class=\"_ _c0\"> </span>Between one and two years<span class=\"_ _28d\"> </span><span class=\"ff15\">857.5<span class=\"_ _86\"> </span>1,238.0<span class=\"_ _d5\"> </span><span class=\"ff16\">987.5<span class=\"_ _86\"> </span>1,641.7</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs580\"> <span class=\"_ _c0\"> </span>Between two and five year<span class=\"_ _0\"></span>s<span class=\"_ _269\"> </span><span class=\"ff15\">146.0<span class=\"_ _12a\"> </span>4,959.1<span class=\"_ _150\"> </span><span class=\"ff16\">201.5<span class=\"_ _86\"> </span>3,886.0</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs581\"> <span class=\"_ _c0\"> </span>More than five years<span class=\"_ _183\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs582\">6,257.0<span class=\"_ _86\"> </span>7,813.4<span class=\"_ _12a\"> </span><span class=\"ff16\">4,286.0<span class=\"_ _86\"> </span>6,900.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs583\">Fair v<span class=\"_ _0\"></span>alue<span class=\"_ _246\"> </span><span class=\"ff15\">49.2<span class=\"_ _d5\"> </span>513.9<span class=\"_ _12c\"> </span></span>(98.2)<span class=\"_ _12b\"> </span><span class=\"ff16\">652.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs584\">The v<span class=\"_ _0\"></span>alues included abov<span class=\"_ _0\"></span>e for<span class=\"_ _0\"></span> BGS are analy<span class=\"_ _0\"></span>sed by <span class=\"_ _0\"></span>their contr<span class=\"_ _0\"></span>actual maturity dates although, due <span class=\"_ _0\"></span>to the t<span class=\"_ _0\"></span>erms of <span class=\"_ _0\"></span>the instruments, it is </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs585\">likely<span class=\"_ _0\"></span> that <span class=\"_ _0\"></span>the balance outstanding will r<span class=\"_ _0\"></span>educe more quickly<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs586\">The increased le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> hedging shown abo<span class=\"_ _0\"></span>ve arise fr<span class=\"_ _0\"></span>om the gr<span class=\"_ _0\"></span>owth in both the loan and deposit<span class=\"_ _0\"></span> books. The chang<span class=\"_ _0\"></span>es in fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue are a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs587\">result o<span class=\"_ _0\"></span>f mov<span class=\"_ _0\"></span>es in market implied int<span class=\"_ _0\"></span>erest rates compar<span class=\"_ _1\"></span>ed to the rates on <span class=\"_ _0\"></span>the fixed legs o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the swaps.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff20 fs1 fc1 sc0 ls0 ws0 gs589\">Accounting impacts<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs58a\">Movements aff<span class=\"_ _0\"></span>ecting the portfolio <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value hedg<span class=\"_ _0\"></span>es during the y<span class=\"_ _0\"></span>ear ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs58b\">2023<span class=\"_ _1a4\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs58c\">Deposit hedge<span class=\"_ _10\"> </span>Loan hedge<span class=\"_ _74\"> </span><span class=\"ff17\">Deposit hedge<span class=\"_ _6a\"> </span>Loan hedg<span class=\"_ _0\"></span>e<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs58d\">\u00a3m<span class=\"_ _97\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _51\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs58e\">Hedging instruments<span class=\"_ _36a\"> </span></div><div class=\"t m0 h27 ff23 fs1 fc1 sc0 ls0 ws0 gs58f\">Interes<span class=\"_ _0\"></span>t rate swaps<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs590\">Included in derivativ<span class=\"_ _0\"></span>e financial assets<span class=\"_ _28e\"> </span><span class=\"ff15\">76.2<span class=\"_ _3b\"> </span>519.0<span class=\"_ _9e\"> </span><span class=\"ff16\">0.3<span class=\"_ _3b\"> </span>652.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs591\">Included in derivativ<span class=\"_ _0\"></span>e financial liabilities<span class=\"_ _28f\"> </span><span class=\"ff15\">(27.0)<span class=\"_ _b5\"> </span>(5.1)<span class=\"_ _bf\"> </span></span>(98.5)<span class=\"_ _19c\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs592\">49.2<span class=\"_ _3b\"> </span>513.9<span class=\"_ _12c\"> </span><span class=\"ff17\">(98.2)<span class=\"_ _3f\"> </span><span class=\"ff16\">652.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs593\">Notional principal value<span class=\"_ _17a\"> </span><span class=\"ff15\">6,257.0<span class=\"_ _4c\"> </span>7,813.4<span class=\"_ _12a\"> </span><span class=\"ff16\">4,286.0<span class=\"_ _31\"> </span>6,900.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs594\">Change in fair v<span class=\"_ _0\"></span>alue used in calculating hedge ineff<span class=\"_ _1\"></span>ectiveness<span class=\"_ _1a7\"> </span><span class=\"ff15\">77.7<span class=\"_ _3f\"> </span>(262.2)<span class=\"_ _bf\"> </span></span>(94.8)<span class=\"_ _77\"> </span><span class=\"ff16\">598.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs595\">2023<span class=\"_ _1a4\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs596\">Deposit hedge<span class=\"_ _10\"> </span>Loan hedge<span class=\"_ _74\"> </span><span class=\"ff17\">Deposit hedge<span class=\"_ _6a\"> </span>Loan hedg<span class=\"_ _0\"></span>e<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs597\">\u00a3m<span class=\"_ _97\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _51\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs598\">Hedged items<span class=\"_ _36a\"> </span></div><div class=\"t m0 h27 ff23 fs1 fc1 sc0 ls0 ws0 gs599\">Fixed rate deposits<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs59a\">Monetary amount of risk r<span class=\"_ _0\"></span>elating to Re<span class=\"_ _0\"></span>tail Deposits<span class=\"_ _290\"> </span><span class=\"ff15\">5,758.1<span class=\"_ _1d6\"> </span>-<span class=\"_ _133\"> </span><span class=\"ff16\">3,986.4<span class=\"_ _84\"> </span></span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h27 ff23 fs1 fc1 sc0 ls0 ws0 gs59b\">Fixed rate loans<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs59c\">Monetary amount of risk r<span class=\"_ _0\"></span>elating to Loans to Cust<span class=\"_ _0\"></span>omers<span class=\"_ _d2\"> </span><span class=\"ff15\">-<span class=\"_ _77\"> </span>8,043.5<span class=\"_ _43\"> </span></span>-<span class=\"_ _3f\"> </span><span class=\"ff16\">7,168.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs59d\">Accumulated amount of f<span class=\"_ _0\"></span>air value hedge adjus<span class=\"_ _0\"></span>tments included on balance </div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs59e\">sheet (notes 33 and 18)*<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs59f\">30.9<span class=\"_ _3f\"> </span>(379.3)<span class=\"_ _12c\"> </span><span class=\"ff16\">99.7<span class=\"_ _3f\"> </span><span class=\"ff17\">(559.9)<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs5a0\">Of which: amounts relat<span class=\"_ _0\"></span>ed to discontinued hedging r<span class=\"_ _0\"></span>elationships <span class=\"ff16\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs5a1\">being amortised<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5a2\">(4.3)<span class=\"_ _3f\"> </span>108.2<span class=\"_ _ff\"> </span><span class=\"ff17\">(7.9)<span class=\"_ _67\"> </span><span class=\"ff16\">73.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5a3\">Change in fair v<span class=\"_ _0\"></span>alue used in recognising hedge ine<span class=\"_ _0\"></span>ffectiveness<span class=\"_ _12f\"> </span><span class=\"ff15\">(69.9)<span class=\"_ _3f\"> </span>238.5<span class=\"_ _150\"> </span><span class=\"ff16\">106.4<span class=\"_ _3f\"> </span></span></span>(583.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs5a4\">Hedge ineff<span class=\"_ _0\"></span>ectiveness recognised<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5a5\">Included in fair v<span class=\"_ _0\"></span>alue gains / (losses) in the profit and loss accoun<span class=\"_ _0\"></span>t (note 13)<span class=\"_ _1c1\"> </span><span class=\"ff15\">7.8<span class=\"_ _67\"> </span>(23.7)<span class=\"_ _291\"> </span><span class=\"ff16\">11.6<span class=\"_ _58\"> </span>15.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gs5a6\">* <span class=\"_ _25\"></span>Under the IA<span class=\"_ _0\"></span>S 39 rules relating to f<span class=\"_ _0\"></span>air v<span class=\"_ _0\"></span>alue hedge accounting for<span class=\"_ _0\"></span> portfolios of inter<span class=\"_ _0\"></span>est rate risk, the chang<span class=\"_ _0\"></span>e in the fair<span class=\"_ _0\"></span> value of<span class=\"_ _0\"></span> the hedged items attributable <span class=\"_ _0\"></span>to the hedged risk is </div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gs5a7\">shown as \u2018fair <span class=\"_ _0\"></span>value adjustments fr<span class=\"_ _0\"></span>om portfolio hedging\u2019 next t<span class=\"_ _0\"></span>o the carrying v<span class=\"_ _0\"></span>alue of the hedg<span class=\"_ _0\"></span>ed assets or liabilities in the appr<span class=\"_ _0\"></span>opriate note.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs5a8\">(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>F<span class=\"_ _1\"></span>air v<span class=\"_ _0\"></span>alue micro hedges<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs5a9\">Background and hedging objectives<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5aa\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s individual fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue hedges of<span class=\"_ _0\"></span> interest rat<span class=\"_ _0\"></span>e risk (\u2018micro hedges<span class=\"_ _0\"></span>\u2019) relate <span class=\"_ _0\"></span>to its long-<span class=\"_ _0\"></span>term fixed int<span class=\"_ _0\"></span>erest rate liabilities. <span class=\"_ _1\"></span>The </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5ab\">structure of<span class=\"_ _0\"></span> these borr<span class=\"_ _0\"></span>owings exposes <span class=\"_ _0\"></span>the Group <span class=\"_ _0\"></span>to interest r<span class=\"_ _0\"></span>ate risk, in the ev<span class=\"_ _0\"></span>ent of<span class=\"_ _0\"></span> an adverse mov<span class=\"_ _0\"></span>ement in marke<span class=\"_ _0\"></span>t interest r<span class=\"_ _0\"></span>ates </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5ac\">and during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> the decision w<span class=\"_ _0\"></span>as tak<span class=\"_ _0\"></span>en to hedge ag<span class=\"_ _0\"></span>ainst any <span class=\"_ _0\"></span>future inter<span class=\"_ _0\"></span>est rate mo<span class=\"_ _0\"></span>vements. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5ad\">The hedge <span class=\"_ _0\"></span>takes the <span class=\"_ _0\"></span>form of<span class=\"_ _0\"></span> a single interest r<span class=\"_ _0\"></span>ate swap <span class=\"_ _0\"></span>which is intended to be in place <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the expected <span class=\"_ _0\"></span>fixed rate period o<span class=\"_ _0\"></span>f the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5ae\">related borr<span class=\"_ _0\"></span>owing. <span class=\"_ _0\"></span>The t<span class=\"_ _0\"></span>erms of <span class=\"_ _0\"></span>the fixed r<span class=\"_ _0\"></span>ate leg of <span class=\"_ _0\"></span>the derivativ<span class=\"_ _0\"></span>e match the t<span class=\"_ _0\"></span>erms of <span class=\"_ _0\"></span>the borrowing as <span class=\"_ _0\"></span>far as possible and <span class=\"_ _0\"></span>the hedging </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5af\">relationship <span class=\"_ _0\"></span>was designated at <span class=\"_ _0\"></span>the point at which <span class=\"_ _0\"></span>the swap contr<span class=\"_ _0\"></span>act was ent<span class=\"_ _0\"></span>ered into. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5b0\">The hedging relationship is <span class=\"_ _0\"></span>tested f<span class=\"_ _0\"></span>or eff<span class=\"_ _0\"></span>ectiveness on a monthly basis b<span class=\"_ _0\"></span>y comparing <span class=\"_ _0\"></span>the movements in <span class=\"_ _0\"></span>the calculated fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5b1\">hedged item <span class=\"_ _0\"></span>to the fair<span class=\"_ _1\"></span> value mov<span class=\"_ _0\"></span>ement in the deriv<span class=\"_ _0\"></span>ative hedge.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs5b3\">Potential sour<span class=\"_ _0\"></span>ces of ine<span class=\"_ _0\"></span>ffectiveness<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5b4\">In its interest r<span class=\"_ _0\"></span>ate hedging for<span class=\"_ _0\"></span> individual items the Gr<span class=\"_ _0\"></span>oup seeks t<span class=\"_ _0\"></span>o minimise hedge ineffectiv<span class=\"_ _0\"></span>eness by aligning <span class=\"_ _0\"></span>the terms of<span class=\"_ _0\"></span> the hedging </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5b5\">instrument as closely as possible <span class=\"_ _0\"></span>with those of<span class=\"_ _0\"></span> the hedg<span class=\"_ _0\"></span>ed item. The no<span class=\"_ _0\"></span>tional amount of <span class=\"_ _0\"></span>the derivativ<span class=\"_ _0\"></span>e matches that of<span class=\"_ _0\"></span> the hedg<span class=\"_ _0\"></span>ed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5b6\">item and settlements are due on <span class=\"_ _0\"></span>the same days and at<span class=\"_ _0\"></span> the same interv<span class=\"_ _0\"></span>als.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5b7\">Nonetheless, the Gr<span class=\"_ _0\"></span>oup has identified the f<span class=\"_ _0\"></span>ollowing possible sour<span class=\"_ _0\"></span>ces of hedge ine<span class=\"_ _0\"></span>ffectiveness in its hedges o<span class=\"_ _0\"></span>f inter<span class=\"_ _0\"></span>est rate risk:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5b8\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The use of deriv<span class=\"_ _0\"></span>atives as a hedge of<span class=\"_ _1\"></span> interest rate risk additionally<span class=\"_ _0\"></span> exposes the Gr<span class=\"_ _0\"></span>oup to <span class=\"_ _0\"></span>the derivative count<span class=\"_ _0\"></span>erparties\u2019 cr<span class=\"_ _0\"></span>edit risk, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5b9\">which is not matched in <span class=\"_ _0\"></span>the hedged item. <span class=\"_ _0\"></span>This risk is minimised by<span class=\"_ _0\"></span> transacting only<span class=\"_ _0\"></span> with high quality<span class=\"_ _0\"></span> counterparties and thr<span class=\"_ _0\"></span>ough </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5ba\">collateralisation arrang<span class=\"_ _0\"></span>ements (as described in note 63)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5bb\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The small difference betw<span class=\"_ _0\"></span>een the fix<span class=\"_ _0\"></span>ed rate of<span class=\"_ _0\"></span> interest<span class=\"_ _0\"></span> charged on the hedg<span class=\"_ _0\"></span>ed item and the <span class=\"_ _0\"></span>fixed rate leg of<span class=\"_ _0\"></span> the deriv<span class=\"_ _0\"></span>ative, <span class=\"_ _0\"></span>where </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5bc\">the impact of<span class=\"_ _0\"></span> discounting will mean that<span class=\"_ _0\"></span> movements in pr<span class=\"_ _0\"></span>esent v<span class=\"_ _0\"></span>alues of <span class=\"_ _0\"></span>the two <span class=\"_ _0\"></span>flows ar<span class=\"_ _0\"></span>e not exactly<span class=\"_ _0\"></span> parallel </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5bd\">\u2022 <span class=\"_ _13\"> </span>The use of diff<span class=\"_ _0\"></span>erent discounting curves in measuring <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value chang<span class=\"_ _0\"></span>es in the hedged items and hedging instruments<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs5be\">Hedging instrument<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5bf\">The financial deriv<span class=\"_ _0\"></span>ative used in the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s individual fair <span class=\"_ _0\"></span>value hedge is a single sterling denominat<span class=\"_ _0\"></span>ed interest rat<span class=\"_ _0\"></span>e swap <span class=\"_ _0\"></span>with a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5c0\">notional v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> \u00a3150.0m.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs5c1\">Settlement on the s<span class=\"_ _0\"></span>wap is twice-<span class=\"_ _0\"></span>yearly<span class=\"_ _1\"></span>, on the same days as <span class=\"_ _0\"></span>those when inter<span class=\"_ _0\"></span>est payments on the hedg<span class=\"_ _0\"></span>ed item fall due. On settlement:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5c2\">\u2022 <span class=\"_ _13\"> </span>The payment receiv<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup is calculated based on a fixed r<span class=\"_ _0\"></span>ate of int<span class=\"_ _0\"></span>erest of<span class=\"_ _0\"></span> 3.989% and <span class=\"_ _0\"></span>the notional v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the swap<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5c3\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The opposite payment made by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup is calculated based on the same notional <span class=\"_ _0\"></span>value but using a <span class=\"_ _0\"></span>floating interest<span class=\"_ _0\"></span> rate set at </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5c4\">the compound SONIA r<span class=\"_ _0\"></span>eference r<span class=\"_ _0\"></span>ate<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5c5\">The sw<span class=\"_ _0\"></span>ap matures on 25 September<span class=\"_ _1\"></span> 2026 (between two and fiv<span class=\"_ _0\"></span>e y<span class=\"_ _0\"></span>ears after <span class=\"_ _0\"></span>the balance sheet date<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs5c6\">Accounting impacts<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5c7\">Movements aff<span class=\"_ _0\"></span>ecting the micr<span class=\"_ _0\"></span>o fair<span class=\"_ _0\"></span> value hedg<span class=\"_ _0\"></span>es during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> are set out belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5c8\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5c9\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5ca\">Hedging instruments<span class=\"_ _36a\"> </span></div><div class=\"t m0 h67 ff22 fs1 fc1 sc0 ls0 ws0 gs5cb\">Interes<span class=\"_ _0\"></span>t rate swaps<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5cc\">Included in derivativ<span class=\"_ _0\"></span>e financial assets<span class=\"_ _205\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5cd\">Included in derivativ<span class=\"_ _0\"></span>e financial liabilities<span class=\"_ _292\"> </span><span class=\"ff15\">(3.7)<span class=\"_ _16b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5ce\">(3.7)<span class=\"_ _16b\"> </span><span class=\"ff17\">-<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5cf\">Notional principal value<span class=\"_ _1ff\"> </span><span class=\"ff15\">150.0<span class=\"_ _a8\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5d0\">Change in fair v<span class=\"_ _0\"></span>alue used in calculating hedge ineff<span class=\"_ _1\"></span>ectiveness<span class=\"_ _19d\"> </span><span class=\"ff15\">(3.7)<span class=\"_ _16b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5d1\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5d2\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5d3\">Hedged items<span class=\"_ _36a\"> </span></div><div class=\"t m0 h67 ff22 fs1 fc1 sc0 ls0 ws0 gs5d4\">Fixed rat<span class=\"_ _0\"></span>e borrowings<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5d5\">Corporat<span class=\"_ _0\"></span>e bond<span class=\"_ _21b\"> </span><span class=\"ff15\">(150.0)<span class=\"_ _16b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5d6\">Accumulated amount of f<span class=\"_ _0\"></span>air value hedge adjus<span class=\"_ _0\"></span>tments included in carrying value<span class=\"_ _106\"> </span><span class=\"ff15\">3.7<span class=\"_ _a8\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5d7\">Of which: amounts relat<span class=\"_ _0\"></span>ed to discontinued hedging r<span class=\"_ _0\"></span>elationships being amortised<span class=\"_ _288\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5d8\">Change in fair v<span class=\"_ _0\"></span>alue used in recognising hedge ine<span class=\"_ _0\"></span>ffectiveness<span class=\"_ _19d\"> </span><span class=\"ff15\">3.7<span class=\"_ _a8\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs5d9\">Hedge ineff<span class=\"_ _0\"></span>ectiveness recognised<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5da\">Included in fair v<span class=\"_ _0\"></span>alue gains / (losses) in the profit and loss accoun<span class=\"_ _0\"></span>t (note 13)<span class=\"_ _293\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs5dc\">(c<span class=\"_ _1\"></span>)  <span class=\"_ _29\"> </span>Derivatives not in a hedg<span class=\"_ _0\"></span>e accounting relationship<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5dd\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s other deriv<span class=\"_ _0\"></span>atives comprise:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5de\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Interest rate s<span class=\"_ _0\"></span>waps <span class=\"_ _0\"></span>which are economically<span class=\"_ _0\"></span> part of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s portfolio hedging arrangements but <span class=\"_ _0\"></span>failed to <span class=\"_ _0\"></span>find a match in the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5df\">hedge designation, particularly<span class=\"_ _0\"></span> including swaps pr<span class=\"_ _0\"></span>e-hedging interest r<span class=\"_ _0\"></span>ate risk on the ne<span class=\"_ _0\"></span>w lending pipeline<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5e0\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Currency<span class=\"_ _0\"></span> futures, economically<span class=\"_ _1\"></span> hedging exposures on lending denominated in currenc<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, wher<span class=\"_ _0\"></span>e hedge accounting has not been </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5e1\">adopted due t<span class=\"_ _0\"></span>o the size of<span class=\"_ _0\"></span> the exposur<span class=\"_ _0\"></span>e<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs5e2\">The principal terms o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>these derivatives ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs5e3\">Interest rat<span class=\"_ _0\"></span>e swaps<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5e4\">2023<span class=\"_ _287\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs5e5\">Pa<span class=\"_ _0\"></span>y fixed<span class=\"_ _92\"> </span>P<span class=\"_ _0\"></span>ay floating<span class=\"_ _30\"> </span><span class=\"ff17\">Pay fix<span class=\"_ _0\"></span>ed<span class=\"_ _98\"> </span>Pay floating<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5e6\">Aver<span class=\"_ _0\"></span>age fix<span class=\"_ _0\"></span>ed notional interes<span class=\"_ _0\"></span>t rat<span class=\"_ _0\"></span>e<span class=\"_ _288\"> </span><span class=\"ff15\">3.88%<span class=\"_ _9f\"> </span>5.52%<span class=\"_ _9f\"> </span><span class=\"ff16\">2.11%<span class=\"_ _19c\"> </span>4.31%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5e7\">Aver<span class=\"_ _0\"></span>age notional margin ov<span class=\"_ _0\"></span>er SONIA<span class=\"_ _289\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _12d\"> </span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5e8\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs5e9\">Notional principal value</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5ea\"> <span class=\"_ _c0\"> </span>SONIA swaps<span class=\"_ _294\"> </span><span class=\"ff15\">708.0<span class=\"_ _d5\"> </span>722.6<span class=\"_ _86\"> </span><span class=\"ff16\">1,578.1<span class=\"_ _d5\"> </span>377.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5eb\">708.0<span class=\"_ _d5\"> </span>722.6<span class=\"_ _86\"> </span><span class=\"ff16\">1,578.1<span class=\"_ _d5\"> </span>377.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs5ec\">Maturing</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5ed\"> <span class=\"_ _c0\"> </span>Within one year<span class=\"_ _295\"> </span><span class=\"ff15\">7.5<span class=\"_ _d5\"> </span>583.5<span class=\"_ _150\"> </span><span class=\"ff16\">351.6<span class=\"_ _d5\"> </span>288.0</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5ee\"> <span class=\"_ _c0\"> </span>Between one and two years<span class=\"_ _ec\"> </span><span class=\"ff15\">23.5<span class=\"_ _d5\"> </span>126.0<span class=\"_ _3a\"> </span><span class=\"ff16\">23.5<span class=\"_ _3a\"> </span>86.0</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5ef\"> <span class=\"_ _c0\"> </span>Between two and five year<span class=\"_ _0\"></span>s<span class=\"_ _269\"> </span><span class=\"ff15\">457.0<span class=\"_ _3a\"> </span>13.1<span class=\"_ _d5\"> </span><span class=\"ff16\">542.5<span class=\"_ _9e\"> </span>3.1</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5f0\"> <span class=\"_ _c0\"> </span>More than five years<span class=\"_ _296\"> </span><span class=\"ff15\">220.0<span class=\"_ _43\"> </span>-<span class=\"_ _c8\"> </span><span class=\"ff16\">660.5<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5f1\">708.0<span class=\"_ _d5\"> </span>722.6<span class=\"_ _86\"> </span><span class=\"ff16\">1,578.1<span class=\"_ _d5\"> </span>377.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5f2\">Fair v<span class=\"_ _0\"></span>alue<span class=\"_ _246\"> </span><span class=\"ff15\">15.2<span class=\"_ _d1\"> </span>0.9<span class=\"_ _150\"> </span><span class=\"ff16\">124.8<span class=\"_ _ff\"> </span></span></span>(2.9)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws2e gs5f3\">Currency<span class=\"_ _0\"></span> futures<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5f4\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h67 ff22 fs1 fc1 sc0 ls0 ws0 gs5f5\">US dollar futures<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5f6\">Aver<span class=\"_ _0\"></span>age future e<span class=\"_ _0\"></span>xchange r<span class=\"_ _1\"></span>ate<span class=\"_ _168\"> </span><span class=\"ff15\">1.22<span class=\"_ _9e\"> </span><span class=\"ff16\">1.07<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5f7\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5f8\">Notional principal value<span class=\"_ _297\"> </span><span class=\"ff15\">7.6<span class=\"_ _3a\"> </span><span class=\"ff16\">13.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs5f9\">Maturing</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5fa\"> <span class=\"_ _c0\"> </span>Within one year<span class=\"_ _1f1\"> </span><span class=\"ff15\">7.6<span class=\"_ _3a\"> </span><span class=\"ff16\">13.4</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5fb\"> <span class=\"_ _c0\"> </span>Between one and two years<span class=\"_ _222\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5fc\"> <span class=\"_ _c0\"> </span>Between two and five year<span class=\"_ _0\"></span>s<span class=\"_ _298\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs5fd\">7.6<span class=\"_ _3a\"> </span><span class=\"ff16\">13.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs5fe\">Fair v<span class=\"_ _0\"></span>alue<span class=\"_ _299\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.5</span></span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDerivativeFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-438": {
   "value": "(a<span class=\"_ _0\"></span>) <span class=\"_ _1\"></span> <span class=\"_ _45\"> </span>F<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value macro hedg<span class=\"_ _0\"></span>es<span class=\"_ _36a\"> </span>Background and hedging objectives<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue hedges of<span class=\"_ _0\"></span> portfolios of int<span class=\"_ _0\"></span>erest rate risk<span class=\"_ _0\"></span> (\u2018macro hedges<span class=\"_ _0\"></span>\u2019) arise fr<span class=\"_ _0\"></span>om its management of<span class=\"_ _0\"></span> the inter<span class=\"_ _0\"></span>est rate risk inherent in its <span class=\"_ _0\"></span>fixed rate lending and deposit<span class=\"_ _0\"></span> taking activities. <span class=\"_ _0\"></span>These activities would e<span class=\"_ _0\"></span>xpose the Group <span class=\"_ _0\"></span>to mov<span class=\"_ _0\"></span>ement in market<span class=\"_ _0\"></span> interest rates if<span class=\"_ _0\"></span> not hedged. This position arises naturally<span class=\"_ _0\"></span> wher<span class=\"_ _0\"></span>e fixed r<span class=\"_ _0\"></span>ate loans are funded <span class=\"_ _0\"></span>with floating or<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>ariable rate borro<span class=\"_ _0\"></span>wings, as in the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s securitisation transactions, but ma<span class=\"_ _0\"></span>y also arise <span class=\"_ _0\"></span>where r<span class=\"_ _0\"></span>etail deposit funding is used. <span class=\"_ _0\"></span>Where possible <span class=\"_ _0\"></span>the Group tak<span class=\"_ _0\"></span>es advantag<span class=\"_ _0\"></span>e of natural hedging between <span class=\"_ _0\"></span>fixed rate asse<span class=\"_ _0\"></span>ts and deposits, but it is unlikely<span class=\"_ _0\"></span> that a pr<span class=\"_ _0\"></span>ecise match for<span class=\"_ _1\"></span> value and t<span class=\"_ _0\"></span>enor of<span class=\"_ _0\"></span> the instruments could be achiev<span class=\"_ _0\"></span>ed leaving unmatched items on both sides. <span class=\"_ _0\"></span>This is re<span class=\"_ _0\"></span>ferred <span class=\"_ _0\"></span>to as repricing or<span class=\"_ _0\"></span> duration risk and is contr<span class=\"_ _0\"></span>olled within limits under <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s interest rate risk<span class=\"_ _0\"></span> management pr<span class=\"_ _0\"></span>ocess, described in note 63. In order<span class=\"_ _0\"></span> to manag<span class=\"_ _0\"></span>e these exposur<span class=\"_ _0\"></span>es, they<span class=\"_ _0\"></span> are hedged with <span class=\"_ _0\"></span>financial derivativ<span class=\"_ _0\"></span>es and form part of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _0\"></span>s portfolio hedging arrang<span class=\"_ _0\"></span>ements. Duration risk is monitor<span class=\"_ _0\"></span>ed regularly<span class=\"_ _0\"></span> to ensure mismatches or<span class=\"_ _0\"></span> gaps r<span class=\"_ _0\"></span>emain within limits set b<span class=\"_ _0\"></span>y policy<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>Responsibility<span class=\"_ _0\"></span> to dir<span class=\"_ _0\"></span>ect and over<span class=\"_ _0\"></span>see structural interest r<span class=\"_ _0\"></span>ate risk management has been delegat<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the Board <span class=\"_ _0\"></span>to the Ex<span class=\"_ _0\"></span>ecutive Risk Committee (\u2018ERC\u2019) and by<span class=\"_ _0\"></span> ERC to <span class=\"_ _0\"></span>the Asset<span class=\"_ _0\"></span> and Liability Committee (\u2018<span class=\"_ _2\"></span>ALCO\u2019). <span class=\"_ _0\"></span>A hedging str<span class=\"_ _0\"></span>ategy is de<span class=\"_ _0\"></span>veloped f<span class=\"_ _0\"></span>or each fix<span class=\"_ _0\"></span>ed product considering behavioural characteristics, such as <span class=\"_ _0\"></span>whether<span class=\"_ _0\"></span> a customer is lik<span class=\"_ _0\"></span>ely <span class=\"_ _0\"></span>to prepay<span class=\"_ _1\"></span> before contractual maturity<span class=\"_ _1\"></span>. This is r<span class=\"_ _0\"></span>eview<span class=\"_ _0\"></span>ed from time to time with any<span class=\"_ _0\"></span> changes agreed with AL<span class=\"_ _0\"></span>CO<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>In order<span class=\"_ _0\"></span> to manag<span class=\"_ _0\"></span>e potential exposure <span class=\"_ _0\"></span>to changes in inter<span class=\"_ _0\"></span>est rates betw<span class=\"_ _0\"></span>een the point at <span class=\"_ _0\"></span>which fixed r<span class=\"_ _0\"></span>ate products ar<span class=\"_ _0\"></span>e priced and the advance date, it ma<span class=\"_ _0\"></span>y be necessary<span class=\"_ _0\"></span> to undertak<span class=\"_ _0\"></span>e pre-hedging of<span class=\"_ _0\"></span> assets in the pipeline. Inter<span class=\"_ _1\"></span>est rate swaps used <span class=\"_ _0\"></span>to pre-hedge pipeline loan exposures, <span class=\"_ _0\"></span>which are not<span class=\"_ _0\"></span> ye<span class=\"_ _0\"></span>t recognised on <span class=\"_ _0\"></span>the balance sheet, can cause unmatched fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue costs or cr<span class=\"_ _0\"></span>edits to arise until both sides of<span class=\"_ _0\"></span> the hedge can be r<span class=\"_ _0\"></span>ecognised within <span class=\"_ _0\"></span>the interest rat<span class=\"_ _0\"></span>e portfolio hedging arrangement, g<span class=\"_ _0\"></span>enerally a <span class=\"_ _0\"></span>few<span class=\"_ _0\"></span> months after <span class=\"_ _0\"></span>the inception of<span class=\"_ _0\"></span> the derivativ<span class=\"_ _0\"></span>e contract.<span class=\"_ _36a\"> </span>In managing interest r<span class=\"_ _0\"></span>ate exposure, <span class=\"_ _1\"></span>T<span class=\"_ _1\"></span>reasury ma<span class=\"_ _0\"></span>y use inter<span class=\"_ _0\"></span>est rate s<span class=\"_ _0\"></span>waps, forw<span class=\"_ _0\"></span>ard rat<span class=\"_ _0\"></span>e agreements, sw<span class=\"_ _0\"></span>aptions or int<span class=\"_ _0\"></span>erest rate caps and floors. How<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>er<span class=\"_ _0\"></span>, interest<span class=\"_ _0\"></span> rate sw<span class=\"_ _0\"></span>aps are the most<span class=\"_ _0\"></span> generally<span class=\"_ _0\"></span> used instruments.<span class=\"_ _36a\"> </span>This policy<span class=\"_ _0\"></span> creates <span class=\"_ _0\"></span>two macr<span class=\"_ _0\"></span>o hedges:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The \u2018loan hedge\u2019 matching <span class=\"_ _0\"></span>fixed rat<span class=\"_ _0\"></span>e buy-to-let mortg<span class=\"_ _0\"></span>age assets, or<span class=\"_ _0\"></span> other <span class=\"_ _0\"></span>fixed rate assets, <span class=\"_ _0\"></span>with interest<span class=\"_ _0\"></span> rate sw<span class=\"_ _0\"></span>aps to conv<span class=\"_ _0\"></span>ert the interest r<span class=\"_ _1\"></span>eceivable to a floating r<span class=\"_ _0\"></span>ate<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The \u2018deposit hedg<span class=\"_ _0\"></span>e\u2019 matching <span class=\"_ _0\"></span>fixed rate deposits <span class=\"_ _0\"></span>with interest r<span class=\"_ _0\"></span>ate swaps <span class=\"_ _0\"></span>which operates in <span class=\"_ _0\"></span>the opposite direction, conv<span class=\"_ _0\"></span>erting the fixed rat<span class=\"_ _0\"></span>e interest pay<span class=\"_ _0\"></span>able to <span class=\"_ _0\"></span>floating rate amounts<span class=\"_ _36a\"> </span>During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2022 <span class=\"_ _0\"></span>the Group complet<span class=\"_ _0\"></span>ed the process o<span class=\"_ _0\"></span>f changing the principal st<span class=\"_ _0\"></span>erling refer<span class=\"_ _0\"></span>ence rate used in its interest r<span class=\"_ _0\"></span>ate risk management <span class=\"_ _0\"></span>framew<span class=\"_ _0\"></span>ork fr<span class=\"_ _0\"></span>om LIBOR to SONIA, with all hedges which r<span class=\"_ _0\"></span>efer<span class=\"_ _0\"></span>enced LIBOR transitioned t<span class=\"_ _0\"></span>o a SONIA basis. How<span class=\"_ _0\"></span>ever<span class=\"_ _2\"></span>, for administrativ<span class=\"_ _0\"></span>e purposes, the macr<span class=\"_ _0\"></span>o hedges continued to be divided int<span class=\"_ _0\"></span>o two sections, one including <span class=\"_ _0\"></span>the transitioned sw<span class=\"_ _0\"></span>aps and the other<span class=\"_ _0\"></span> those sw<span class=\"_ _0\"></span>aps which r<span class=\"_ _0\"></span>efer<span class=\"_ _0\"></span>enced SONIA at inception.<span class=\"_ _36a\"> </span>Through <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>, as assets and deposits matured and wer<span class=\"_ _0\"></span>e replaced b<span class=\"_ _0\"></span>y ne<span class=\"_ _0\"></span>w business, the <span class=\"_ _0\"></span>formally<span class=\"_ _0\"></span> LIBOR-linked element of<span class=\"_ _0\"></span> the hedges r<span class=\"_ _0\"></span>educed, and the originally SONIA-link<span class=\"_ _1\"></span>ed element increased and the tw<span class=\"_ _0\"></span>o sections of each hedg<span class=\"_ _0\"></span>e wer<span class=\"_ _0\"></span>e combined in the second half of the financial y<span class=\"_ _0\"></span>ear<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> the Group has continued <span class=\"_ _0\"></span>to hedge inter<span class=\"_ _0\"></span>est rate risk on <span class=\"_ _0\"></span>fixed rate CBILS and BBL<span class=\"_ _0\"></span>S exposures using SONIA-link<span class=\"_ _0\"></span>ed basis guarantee sw<span class=\"_ _0\"></span>aps, which ar<span class=\"_ _0\"></span>e included in the loan hedge.<span class=\"_ _36a\"> </span>The designation of<span class=\"_ _0\"></span> the macr<span class=\"_ _0\"></span>o hedges is updated, on a month-by<span class=\"_ _0\"></span>-month basis, using softwar<span class=\"_ _0\"></span>e which compares <span class=\"_ _0\"></span>the ov<span class=\"_ _0\"></span>erall tenor<span class=\"_ _1\"></span>, v<span class=\"_ _0\"></span>alue and rate positions in or<span class=\"_ _0\"></span>der that<span class=\"_ _0\"></span> the expected <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value mov<span class=\"_ _0\"></span>ement of<span class=\"_ _0\"></span> the designated sw<span class=\"_ _0\"></span>aps matches the expect<span class=\"_ _0\"></span>ed interest r<span class=\"_ _0\"></span>ate risk related mo<span class=\"_ _0\"></span>vement in <span class=\"_ _0\"></span>the fair<span class=\"_ _0\"></span> value o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the relev<span class=\"_ _0\"></span>ant assets or<span class=\"_ _0\"></span> liabilities as closely as possible o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>the designation period. T<span class=\"_ _0\"></span>he softwar<span class=\"_ _0\"></span>e applies regr<span class=\"_ _0\"></span>ession analysis t<span class=\"_ _0\"></span>echniques to <span class=\"_ _0\"></span>the potential impact of<span class=\"_ _0\"></span> changes in expected inter<span class=\"_ _0\"></span>est rates ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the designation period to maximise expected hedge e<span class=\"_ _0\"></span>ffectiveness on a pr<span class=\"_ _0\"></span>ospective basis. <span class=\"_ _0\"></span>The v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the portfolio of<span class=\"_ _0\"></span> loans or deposits selected is <span class=\"_ _0\"></span>then designated, as a monetary<span class=\"_ _0\"></span> amount of inter<span class=\"_ _0\"></span>est rate risk, as <span class=\"_ _0\"></span>the hedged item, <span class=\"_ _0\"></span>while the portfolio of<span class=\"_ _0\"></span> sw<span class=\"_ _0\"></span>aps selected are designated as the hedging instruments.<span class=\"_ _36a\"> </span>Any<span class=\"_ _0\"></span> swaps not select<span class=\"_ _0\"></span>ed in this process ar<span class=\"_ _0\"></span>e disclosed as derivativ<span class=\"_ _0\"></span>es not in hedging relationships. <span class=\"_ _1\"></span>These will generally<span class=\"_ _0\"></span> be swaps <span class=\"_ _0\"></span>taken out to pr<span class=\"_ _0\"></span>e-hedge <span class=\"_ _0\"></span>the pipeline of <span class=\"_ _0\"></span>fixed rate mortgag<span class=\"_ _0\"></span>e offers, <span class=\"_ _0\"></span>which will match <span class=\"_ _0\"></span>with the r<span class=\"_ _0\"></span>elated loans when the<span class=\"_ _0\"></span>y complet<span class=\"_ _0\"></span>e.<span class=\"_ _36a\"> </span>At <span class=\"_ _0\"></span>the end of each designation period <span class=\"_ _0\"></span>the Group <span class=\"_ _0\"></span>will assess the effectiv<span class=\"_ _0\"></span>eness of each hedg<span class=\"_ _0\"></span>e retr<span class=\"_ _0\"></span>ospectively<span class=\"_ _1\"></span>, based on fair <span class=\"_ _0\"></span>value movements (<span class=\"_ _0\"></span>relating <span class=\"_ _0\"></span>to interest r<span class=\"_ _0\"></span>ate risk components only<span class=\"_ _0\"></span>) which hav<span class=\"_ _0\"></span>e occurred in the period. Mo<span class=\"_ _0\"></span>vements ar<span class=\"_ _0\"></span>e compared t<span class=\"_ _0\"></span>o  pre-determined <span class=\"_ _0\"></span>test <span class=\"_ _0\"></span>thresholds using regr<span class=\"_ _0\"></span>ession techniques <span class=\"_ _0\"></span>to determine <span class=\"_ _0\"></span>whether <span class=\"_ _0\"></span>the hedge w<span class=\"_ _0\"></span>as effective in <span class=\"_ _0\"></span>the period.<span class=\"_ _36a\"> </span>Potential sour<span class=\"_ _0\"></span>ces of ine<span class=\"_ _0\"></span>ffectiveness<span class=\"_ _36a\"> </span>The Group has identified <span class=\"_ _0\"></span>the follo<span class=\"_ _0\"></span>wing possible sources of<span class=\"_ _0\"></span> hedge ineffectiv<span class=\"_ _0\"></span>eness in its portfolio hedges o<span class=\"_ _0\"></span>f inter<span class=\"_ _0\"></span>est rate risk:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The maturity pr<span class=\"_ _0\"></span>ofile of <span class=\"_ _0\"></span>the hedging instruments may<span class=\"_ _0\"></span> not exactly<span class=\"_ _0\"></span> match that of<span class=\"_ _0\"></span> the hedg<span class=\"_ _0\"></span>ed items, particularly <span class=\"_ _0\"></span>where hedged items settle early<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The use of deriv<span class=\"_ _0\"></span>atives as a hedge of<span class=\"_ _1\"></span> interest rate risk additionally<span class=\"_ _0\"></span> exposes the Gr<span class=\"_ _0\"></span>oup to <span class=\"_ _0\"></span>the derivative count<span class=\"_ _0\"></span>erparties\u2019 cr<span class=\"_ _0\"></span>edit risk, which is not matched in <span class=\"_ _0\"></span>the hedged item. <span class=\"_ _0\"></span>This risk is minimised by<span class=\"_ _0\"></span> transacting only<span class=\"_ _0\"></span> with high quality<span class=\"_ _0\"></span> counterparties and thr<span class=\"_ _0\"></span>ough collateralisation arrang<span class=\"_ _0\"></span>ements (as described in note 63)<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>The use of diff<span class=\"_ _0\"></span>erent discounting curves in measuring <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value chang<span class=\"_ _0\"></span>es in the hedged items and hedging instruments<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Difference in <span class=\"_ _0\"></span>the timing of<span class=\"_ _0\"></span> interest pa<span class=\"_ _0\"></span>yments on the hedged items and settlements on <span class=\"_ _0\"></span>the hedging instruments<span class=\"_ _36a\"> </span>These sources o<span class=\"_ _0\"></span>f ineff<span class=\"_ _0\"></span>ectiveness are minimised b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the portfolio matching process, <span class=\"_ _0\"></span>which seeks to mat<span class=\"_ _0\"></span>ch the terms o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the items as closely as possible.<span class=\"_ _36a\"> </span>In addition to <span class=\"_ _0\"></span>the hedging ineffectiveness described abo<span class=\"_ _0\"></span>ve, gr<span class=\"_ _0\"></span>oup profit <span class=\"_ _0\"></span>will also be affected by<span class=\"_ _1\"></span> the fair <span class=\"_ _0\"></span>value mo<span class=\"_ _0\"></span>vements of<span class=\"_ _0\"></span> interest rate sw<span class=\"_ _0\"></span>ap agreements <span class=\"_ _0\"></span>which wer<span class=\"_ _0\"></span>e entered int<span class=\"_ _0\"></span>o as part of <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019s int<span class=\"_ _0\"></span>erest rat<span class=\"_ _0\"></span>e risk hedging strategy<span class=\"_ _0\"></span> but failed t<span class=\"_ _0\"></span>o find a match in the hedging portfolio, particularly<span class=\"_ _0\"></span> those r<span class=\"_ _0\"></span>elating to the pr<span class=\"_ _1\"></span>e-hedging of the lending pipeline. Hedging Instruments<span class=\"_ _36a\"> </span>The hedging portfolios at 30 Sept<span class=\"_ _0\"></span>ember 2023 and 30 September<span class=\"_ _1\"></span> 2022 consist of a large number<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> sterling denominated sw<span class=\"_ _0\"></span>aps. In addition, ther<span class=\"_ _0\"></span>e are a small number<span class=\"_ _0\"></span> of Balance Guar<span class=\"_ _0\"></span>antee Swaps (\u2018BGS\u2019) in place at bo<span class=\"_ _0\"></span>th dates. Settlement on all sw<span class=\"_ _0\"></span>aps is generally<span class=\"_ _0\"></span> quarterly (<span class=\"_ _0\"></span>monthly <span class=\"_ _0\"></span>for BGS) <span class=\"_ _0\"></span>where:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>One payment is calculated based on a fix<span class=\"_ _0\"></span>ed rate of<span class=\"_ _0\"></span> interest and <span class=\"_ _0\"></span>the nominal v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the swap<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>An opposite payment is calculated based on the same nominal <span class=\"_ _0\"></span>value but using a <span class=\"_ _0\"></span>floating interest r<span class=\"_ _0\"></span>ate set at a fix<span class=\"_ _0\"></span>ed margin ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the SONIA r<span class=\"_ _0\"></span>eference r<span class=\"_ _0\"></span>ate<span class=\"_ _36a\"> </span>On the BGS <span class=\"_ _0\"></span>the nominal value o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the swap is link<span class=\"_ _0\"></span>ed to <span class=\"_ _0\"></span>the principal v<span class=\"_ _0\"></span>alue of a pool of<span class=\"_ _0\"></span> assets and reduces in line <span class=\"_ _0\"></span>with redemp<span class=\"_ _0\"></span>tions and repa<span class=\"_ _0\"></span>yments until maturity<span class=\"_ _0\"></span>. Other inter<span class=\"_ _0\"></span>est rate sw<span class=\"_ _0\"></span>aps have a <span class=\"_ _0\"></span>fixed nominal <span class=\"_ _0\"></span>value thr<span class=\"_ _1\"></span>oughout their lives.<span class=\"_ _36a\"> </span>The Group pa<span class=\"_ _0\"></span>ys fix<span class=\"_ _0\"></span>ed rate and r<span class=\"_ _0\"></span>eceives floating <span class=\"_ _0\"></span>when hedging exposures <span class=\"_ _0\"></span>from fix<span class=\"_ _0\"></span>ed rate assets (in <span class=\"_ _0\"></span>the loan hedge). Con<span class=\"_ _0\"></span>versely<span class=\"_ _1\"></span>, the Group pa<span class=\"_ _0\"></span>ys floating rate and r<span class=\"_ _1\"></span>eceives fixed rate <span class=\"_ _0\"></span>when hedging fix<span class=\"_ _0\"></span>ed rate deposits, in the deposit hedg<span class=\"_ _0\"></span>e.<span class=\"_ _36a\"> </span>The principal terms o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the hedging instruments are set out belo<span class=\"_ _0\"></span>w, analy<span class=\"_ _0\"></span>sed between <span class=\"_ _0\"></span>the two dir<span class=\"_ _0\"></span>ections of<span class=\"_ _0\"></span> the sw<span class=\"_ _0\"></span>ap.<span class=\"_ _36a\"> </span>2023<span class=\"_ _287\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>Deposit Hedge<span class=\"_ _92\"> </span>Loan Hedge<span class=\"_ _a3\"> </span><span class=\"ff17\">Deposit Hedge<span class=\"_ _98\"> </span>Loan Hedge<span class=\"_ _36a\"> </span></span>Aver<span class=\"_ _0\"></span>age fix<span class=\"_ _0\"></span>ed notional interes<span class=\"_ _0\"></span>t rat<span class=\"_ _0\"></span>e<span class=\"_ _288\"> </span><span class=\"ff15\">4.22%<span class=\"_ _9f\"> </span>1.77%<span class=\"_ _9f\"> </span><span class=\"ff16\">1.45%<span class=\"_ _19c\"> </span>0.99%<span class=\"_ _36a\"> </span></span></span>Aver<span class=\"_ _0\"></span>age notional margin ov<span class=\"_ _0\"></span>er SONIA<span class=\"_ _289\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _12d\"> </span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Notional principal value <span class=\"_ _c0\"> </span>SONIA BGS<span class=\"_ _28a\"> </span><span class=\"ff15\">-<span class=\"_ _d1\"> </span>31.6<span class=\"_ _a8\"> </span></span>-<span class=\"_ _d1\"> </span><span class=\"ff16\">47.0</span> <span class=\"_ _c0\"> </span>Other SONIA swaps<span class=\"_ _28b\"> </span><span class=\"ff15\">6,257.0<span class=\"_ _86\"> </span>7,781.8<span class=\"_ _12a\"> </span><span class=\"ff16\">4,286.0<span class=\"_ _86\"> </span>6,853.1<span class=\"_ _36a\"> </span></span></span>6,257.0<span class=\"_ _86\"> </span>7,813.4<span class=\"_ _12a\"> </span><span class=\"ff16\">4,286.0<span class=\"_ _86\"> </span>6,900.1<span class=\"_ _36a\"> </span></span>Maturing <span class=\"_ _c0\"> </span>Within one year<span class=\"_ _28c\"> </span><span class=\"ff15\">5,253.5<span class=\"_ _86\"> </span>1,616.3<span class=\"_ _12a\"> </span><span class=\"ff16\">3,097.0<span class=\"_ _86\"> </span>1,369.9</span></span> <span class=\"_ _c0\"> </span>Between one and two years<span class=\"_ _28d\"> </span><span class=\"ff15\">857.5<span class=\"_ _86\"> </span>1,238.0<span class=\"_ _d5\"> </span><span class=\"ff16\">987.5<span class=\"_ _86\"> </span>1,641.7</span></span> <span class=\"_ _c0\"> </span>Between two and five year<span class=\"_ _0\"></span>s<span class=\"_ _269\"> </span><span class=\"ff15\">146.0<span class=\"_ _12a\"> </span>4,959.1<span class=\"_ _150\"> </span><span class=\"ff16\">201.5<span class=\"_ _86\"> </span>3,886.0</span></span> <span class=\"_ _c0\"> </span>More than five years<span class=\"_ _183\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.5<span class=\"_ _36a\"> </span></span>6,257.0<span class=\"_ _86\"> </span>7,813.4<span class=\"_ _12a\"> </span><span class=\"ff16\">4,286.0<span class=\"_ _86\"> </span>6,900.1<span class=\"_ _36a\"> </span></span>Fair v<span class=\"_ _0\"></span>alue<span class=\"_ _246\"> </span><span class=\"ff15\">49.2<span class=\"_ _d5\"> </span>513.9<span class=\"_ _12c\"> </span></span>(98.2)<span class=\"_ _12b\"> </span><span class=\"ff16\">652.7<span class=\"_ _36a\"> </span></span>The v<span class=\"_ _0\"></span>alues included abov<span class=\"_ _0\"></span>e for<span class=\"_ _0\"></span> BGS are analy<span class=\"_ _0\"></span>sed by <span class=\"_ _0\"></span>their contr<span class=\"_ _0\"></span>actual maturity dates although, due <span class=\"_ _0\"></span>to the t<span class=\"_ _0\"></span>erms of <span class=\"_ _0\"></span>the instruments, it is likely<span class=\"_ _0\"></span> that <span class=\"_ _0\"></span>the balance outstanding will r<span class=\"_ _0\"></span>educe more quickly<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>The increased le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> hedging shown abo<span class=\"_ _0\"></span>ve arise fr<span class=\"_ _0\"></span>om the gr<span class=\"_ _0\"></span>owth in both the loan and deposit<span class=\"_ _0\"></span> books. The chang<span class=\"_ _0\"></span>es in fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue are a result o<span class=\"_ _0\"></span>f mov<span class=\"_ _0\"></span>es in market implied int<span class=\"_ _0\"></span>erest rates compar<span class=\"_ _1\"></span>ed to the rates on <span class=\"_ _0\"></span>the fixed legs o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the swaps.<span class=\"_ _36a\"> </span>Accounting impacts<span class=\"_ _36a\"> </span>Movements aff<span class=\"_ _0\"></span>ecting the portfolio <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value hedg<span class=\"_ _0\"></span>es during the y<span class=\"_ _0\"></span>ear ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>2023<span class=\"_ _1a4\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>Deposit hedge<span class=\"_ _10\"> </span>Loan hedge<span class=\"_ _74\"> </span><span class=\"ff17\">Deposit hedge<span class=\"_ _6a\"> </span>Loan hedg<span class=\"_ _0\"></span>e<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _97\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _51\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Hedging instruments<span class=\"_ _36a\"> </span>Interes<span class=\"_ _0\"></span>t rate swaps<span class=\"_ _36a\"> </span>Included in derivativ<span class=\"_ _0\"></span>e financial assets<span class=\"_ _28e\"> </span><span class=\"ff15\">76.2<span class=\"_ _3b\"> </span>519.0<span class=\"_ _9e\"> </span><span class=\"ff16\">0.3<span class=\"_ _3b\"> </span>652.7<span class=\"_ _36a\"> </span></span></span>Included in derivativ<span class=\"_ _0\"></span>e financial liabilities<span class=\"_ _28f\"> </span><span class=\"ff15\">(27.0)<span class=\"_ _b5\"> </span>(5.1)<span class=\"_ _bf\"> </span></span>(98.5)<span class=\"_ _19c\"> </span>-<span class=\"_ _36a\"> </span>49.2<span class=\"_ _3b\"> </span>513.9<span class=\"_ _12c\"> </span><span class=\"ff17\">(98.2)<span class=\"_ _3f\"> </span><span class=\"ff16\">652.7<span class=\"_ _36a\"> </span></span></span>Notional principal value<span class=\"_ _17a\"> </span><span class=\"ff15\">6,257.0<span class=\"_ _4c\"> </span>7,813.4<span class=\"_ _12a\"> </span><span class=\"ff16\">4,286.0<span class=\"_ _31\"> </span>6,900.1<span class=\"_ _36a\"> </span></span></span>Change in fair v<span class=\"_ _0\"></span>alue used in calculating hedge ineff<span class=\"_ _1\"></span>ectiveness<span class=\"_ _1a7\"> </span><span class=\"ff15\">77.7<span class=\"_ _3f\"> </span>(262.2)<span class=\"_ _bf\"> </span></span>(94.8)<span class=\"_ _77\"> </span><span class=\"ff16\">598.1<span class=\"_ _36a\"> </span></span>2023<span class=\"_ _1a4\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>Deposit hedge<span class=\"_ _10\"> </span>Loan hedge<span class=\"_ _74\"> </span><span class=\"ff17\">Deposit hedge<span class=\"_ _6a\"> </span>Loan hedg<span class=\"_ _0\"></span>e<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _97\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _51\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Hedged items<span class=\"_ _36a\"> </span>Fixed rate deposits<span class=\"_ _36a\"> </span>Monetary amount of risk r<span class=\"_ _0\"></span>elating to Re<span class=\"_ _0\"></span>tail Deposits<span class=\"_ _290\"> </span><span class=\"ff15\">5,758.1<span class=\"_ _1d6\"> </span>-<span class=\"_ _133\"> </span><span class=\"ff16\">3,986.4<span class=\"_ _84\"> </span></span></span>-<span class=\"_ _36a\"> </span>Fixed rate loans<span class=\"_ _36a\"> </span>Monetary amount of risk r<span class=\"_ _0\"></span>elating to Loans to Cust<span class=\"_ _0\"></span>omers<span class=\"_ _d2\"> </span><span class=\"ff15\">-<span class=\"_ _77\"> </span>8,043.5<span class=\"_ _43\"> </span></span>-<span class=\"_ _3f\"> </span><span class=\"ff16\">7,168.6<span class=\"_ _36a\"> </span></span>Accumulated amount of f<span class=\"_ _0\"></span>air value hedge adjus<span class=\"_ _0\"></span>tments included on balance sheet (notes 33 and 18)*<span class=\"_ _36a\"> </span>30.9<span class=\"_ _3f\"> </span>(379.3)<span class=\"_ _12c\"> </span><span class=\"ff16\">99.7<span class=\"_ _3f\"> </span><span class=\"ff17\">(559.9)<span class=\"_ _36a\"> </span></span></span>Of which: amounts relat<span class=\"_ _0\"></span>ed to discontinued hedging r<span class=\"_ _0\"></span>elationships <span class=\"ff16\"> </span>being amortised<span class=\"_ _36a\"> </span>(4.3)<span class=\"_ _3f\"> </span>108.2<span class=\"_ _ff\"> </span><span class=\"ff17\">(7.9)<span class=\"_ _67\"> </span><span class=\"ff16\">73.4<span class=\"_ _36a\"> </span></span></span>Change in fair v<span class=\"_ _0\"></span>alue used in recognising hedge ine<span class=\"_ _0\"></span>ffectiveness<span class=\"_ _12f\"> </span><span class=\"ff15\">(69.9)<span class=\"_ _3f\"> </span>238.5<span class=\"_ _150\"> </span><span class=\"ff16\">106.4<span class=\"_ _3f\"> </span></span></span>(583.0)<span class=\"_ _36a\"> </span>Hedge ineff<span class=\"_ _0\"></span>ectiveness recognised<span class=\"_ _36a\"> </span>Included in fair v<span class=\"_ _0\"></span>alue gains / (losses) in the profit and loss accoun<span class=\"_ _0\"></span>t (note 13)<span class=\"_ _1c1\"> </span><span class=\"ff15\">7.8<span class=\"_ _67\"> </span>(23.7)<span class=\"_ _291\"> </span><span class=\"ff16\">11.6<span class=\"_ _58\"> </span>15.1<span class=\"_ _36a\"> </span></span></span>* <span class=\"_ _25\"></span>Under the IA<span class=\"_ _0\"></span>S 39 rules relating to f<span class=\"_ _0\"></span>air v<span class=\"_ _0\"></span>alue hedge accounting for<span class=\"_ _0\"></span> portfolios of inter<span class=\"_ _0\"></span>est rate risk, the chang<span class=\"_ _0\"></span>e in the fair<span class=\"_ _0\"></span> value of<span class=\"_ _0\"></span> the hedged items attributable <span class=\"_ _0\"></span>to the hedged risk is shown as \u2018fair <span class=\"_ _0\"></span>value adjustments fr<span class=\"_ _0\"></span>om portfolio hedging\u2019 next t<span class=\"_ _0\"></span>o the carrying v<span class=\"_ _0\"></span>alue of the hedg<span class=\"_ _0\"></span>ed assets or liabilities in the appr<span class=\"_ _0\"></span>opriate note.<span class=\"_ _36a\"> </span>(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>F<span class=\"_ _1\"></span>air v<span class=\"_ _0\"></span>alue micro hedges<span class=\"_ _36a\"> </span>Background and hedging objectives<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s individual fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue hedges of<span class=\"_ _0\"></span> interest rat<span class=\"_ _0\"></span>e risk (\u2018micro hedges<span class=\"_ _0\"></span>\u2019) relate <span class=\"_ _0\"></span>to its long-<span class=\"_ _0\"></span>term fixed int<span class=\"_ _0\"></span>erest rate liabilities. <span class=\"_ _1\"></span>The structure of<span class=\"_ _0\"></span> these borr<span class=\"_ _0\"></span>owings exposes <span class=\"_ _0\"></span>the Group <span class=\"_ _0\"></span>to interest r<span class=\"_ _0\"></span>ate risk, in the ev<span class=\"_ _0\"></span>ent of<span class=\"_ _0\"></span> an adverse mov<span class=\"_ _0\"></span>ement in marke<span class=\"_ _0\"></span>t interest r<span class=\"_ _0\"></span>ates and during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> the decision w<span class=\"_ _0\"></span>as tak<span class=\"_ _0\"></span>en to hedge ag<span class=\"_ _0\"></span>ainst any <span class=\"_ _0\"></span>future inter<span class=\"_ _0\"></span>est rate mo<span class=\"_ _0\"></span>vements. The hedge <span class=\"_ _0\"></span>takes the <span class=\"_ _0\"></span>form of<span class=\"_ _0\"></span> a single interest r<span class=\"_ _0\"></span>ate swap <span class=\"_ _0\"></span>which is intended to be in place <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the expected <span class=\"_ _0\"></span>fixed rate period o<span class=\"_ _0\"></span>f the related borr<span class=\"_ _0\"></span>owing. <span class=\"_ _0\"></span>The t<span class=\"_ _0\"></span>erms of <span class=\"_ _0\"></span>the fixed r<span class=\"_ _0\"></span>ate leg of <span class=\"_ _0\"></span>the derivativ<span class=\"_ _0\"></span>e match the t<span class=\"_ _0\"></span>erms of <span class=\"_ _0\"></span>the borrowing as <span class=\"_ _0\"></span>far as possible and <span class=\"_ _0\"></span>the hedging relationship <span class=\"_ _0\"></span>was designated at <span class=\"_ _0\"></span>the point at which <span class=\"_ _0\"></span>the swap contr<span class=\"_ _0\"></span>act was ent<span class=\"_ _0\"></span>ered into. The hedging relationship is <span class=\"_ _0\"></span>tested f<span class=\"_ _0\"></span>or eff<span class=\"_ _0\"></span>ectiveness on a monthly basis b<span class=\"_ _0\"></span>y comparing <span class=\"_ _0\"></span>the movements in <span class=\"_ _0\"></span>the calculated fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the hedged item <span class=\"_ _0\"></span>to the fair<span class=\"_ _1\"></span> value mov<span class=\"_ _0\"></span>ement in the deriv<span class=\"_ _0\"></span>ative hedge.<span class=\"_ _36a\"> </span>Potential sour<span class=\"_ _0\"></span>ces of ine<span class=\"_ _0\"></span>ffectiveness<span class=\"_ _36a\"> </span>In its interest r<span class=\"_ _0\"></span>ate hedging for<span class=\"_ _0\"></span> individual items the Gr<span class=\"_ _0\"></span>oup seeks t<span class=\"_ _0\"></span>o minimise hedge ineffectiv<span class=\"_ _0\"></span>eness by aligning <span class=\"_ _0\"></span>the terms of<span class=\"_ _0\"></span> the hedging instrument as closely as possible <span class=\"_ _0\"></span>with those of<span class=\"_ _0\"></span> the hedg<span class=\"_ _0\"></span>ed item. The no<span class=\"_ _0\"></span>tional amount of <span class=\"_ _0\"></span>the derivativ<span class=\"_ _0\"></span>e matches that of<span class=\"_ _0\"></span> the hedg<span class=\"_ _0\"></span>ed item and settlements are due on <span class=\"_ _0\"></span>the same days and at<span class=\"_ _0\"></span> the same interv<span class=\"_ _0\"></span>als.<span class=\"_ _36a\"> </span>Nonetheless, the Gr<span class=\"_ _0\"></span>oup has identified the f<span class=\"_ _0\"></span>ollowing possible sour<span class=\"_ _0\"></span>ces of hedge ine<span class=\"_ _0\"></span>ffectiveness in its hedges o<span class=\"_ _0\"></span>f inter<span class=\"_ _0\"></span>est rate risk:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The use of deriv<span class=\"_ _0\"></span>atives as a hedge of<span class=\"_ _1\"></span> interest rate risk additionally<span class=\"_ _0\"></span> exposes the Gr<span class=\"_ _0\"></span>oup to <span class=\"_ _0\"></span>the derivative count<span class=\"_ _0\"></span>erparties\u2019 cr<span class=\"_ _0\"></span>edit risk, which is not matched in <span class=\"_ _0\"></span>the hedged item. <span class=\"_ _0\"></span>This risk is minimised by<span class=\"_ _0\"></span> transacting only<span class=\"_ _0\"></span> with high quality<span class=\"_ _0\"></span> counterparties and thr<span class=\"_ _0\"></span>ough collateralisation arrang<span class=\"_ _0\"></span>ements (as described in note 63)<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The small difference betw<span class=\"_ _0\"></span>een the fix<span class=\"_ _0\"></span>ed rate of<span class=\"_ _0\"></span> interest<span class=\"_ _0\"></span> charged on the hedg<span class=\"_ _0\"></span>ed item and the <span class=\"_ _0\"></span>fixed rate leg of<span class=\"_ _0\"></span> the deriv<span class=\"_ _0\"></span>ative, <span class=\"_ _0\"></span>where the impact of<span class=\"_ _0\"></span> discounting will mean that<span class=\"_ _0\"></span> movements in pr<span class=\"_ _0\"></span>esent v<span class=\"_ _0\"></span>alues of <span class=\"_ _0\"></span>the two <span class=\"_ _0\"></span>flows ar<span class=\"_ _0\"></span>e not exactly<span class=\"_ _0\"></span> parallel \u2022 <span class=\"_ _13\"> </span>The use of diff<span class=\"_ _0\"></span>erent discounting curves in measuring <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value chang<span class=\"_ _0\"></span>es in the hedged items and hedging instruments<span class=\"_ _36a\"> </span>Hedging instrument<span class=\"_ _36a\"> </span>The financial deriv<span class=\"_ _0\"></span>ative used in the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s individual fair <span class=\"_ _0\"></span>value hedge is a single sterling denominat<span class=\"_ _0\"></span>ed interest rat<span class=\"_ _0\"></span>e swap <span class=\"_ _0\"></span>with a notional v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> \u00a3150.0m.<span class=\"_ _36a\"> </span>Settlement on the s<span class=\"_ _0\"></span>wap is twice-<span class=\"_ _0\"></span>yearly<span class=\"_ _1\"></span>, on the same days as <span class=\"_ _0\"></span>those when inter<span class=\"_ _0\"></span>est payments on the hedg<span class=\"_ _0\"></span>ed item fall due. On settlement:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>The payment receiv<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup is calculated based on a fixed r<span class=\"_ _0\"></span>ate of int<span class=\"_ _0\"></span>erest of<span class=\"_ _0\"></span> 3.989% and <span class=\"_ _0\"></span>the notional v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the swap<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The opposite payment made by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup is calculated based on the same notional <span class=\"_ _0\"></span>value but using a <span class=\"_ _0\"></span>floating interest<span class=\"_ _0\"></span> rate set at the compound SONIA r<span class=\"_ _0\"></span>eference r<span class=\"_ _0\"></span>ate<span class=\"_ _36a\"> </span>The sw<span class=\"_ _0\"></span>ap matures on 25 September<span class=\"_ _1\"></span> 2026 (between two and fiv<span class=\"_ _0\"></span>e y<span class=\"_ _0\"></span>ears after <span class=\"_ _0\"></span>the balance sheet date<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span>Accounting impacts<span class=\"_ _36a\"> </span>Movements aff<span class=\"_ _0\"></span>ecting the micr<span class=\"_ _0\"></span>o fair<span class=\"_ _0\"></span> value hedg<span class=\"_ _0\"></span>es during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> are set out belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Hedging instruments<span class=\"_ _36a\"> </span>Interes<span class=\"_ _0\"></span>t rate swaps<span class=\"_ _36a\"> </span>Included in derivativ<span class=\"_ _0\"></span>e financial assets<span class=\"_ _205\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span>Included in derivativ<span class=\"_ _0\"></span>e financial liabilities<span class=\"_ _292\"> </span><span class=\"ff15\">(3.7)<span class=\"_ _16b\"> </span></span>-<span class=\"_ _36a\"> </span>(3.7)<span class=\"_ _16b\"> </span><span class=\"ff17\">-<span class=\"_ _36a\"> </span></span>Notional principal value<span class=\"_ _1ff\"> </span><span class=\"ff15\">150.0<span class=\"_ _a8\"> </span></span>-<span class=\"_ _36a\"> </span>Change in fair v<span class=\"_ _0\"></span>alue used in calculating hedge ineff<span class=\"_ _1\"></span>ectiveness<span class=\"_ _19d\"> </span><span class=\"ff15\">(3.7)<span class=\"_ _16b\"> </span></span>-<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Hedged items<span class=\"_ _36a\"> </span>Fixed rat<span class=\"_ _0\"></span>e borrowings<span class=\"_ _36a\"> </span>Corporat<span class=\"_ _0\"></span>e bond<span class=\"_ _21b\"> </span><span class=\"ff15\">(150.0)<span class=\"_ _16b\"> </span></span>-<span class=\"_ _36a\"> </span>Accumulated amount of f<span class=\"_ _0\"></span>air value hedge adjus<span class=\"_ _0\"></span>tments included in carrying value<span class=\"_ _106\"> </span><span class=\"ff15\">3.7<span class=\"_ _a8\"> </span></span>-<span class=\"_ _36a\"> </span>Of which: amounts relat<span class=\"_ _0\"></span>ed to discontinued hedging r<span class=\"_ _0\"></span>elationships being amortised<span class=\"_ _288\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span>Change in fair v<span class=\"_ _0\"></span>alue used in recognising hedge ine<span class=\"_ _0\"></span>ffectiveness<span class=\"_ _19d\"> </span><span class=\"ff15\">3.7<span class=\"_ _a8\"> </span></span>-<span class=\"_ _36a\"> </span>Hedge ineff<span class=\"_ _0\"></span>ectiveness recognised<span class=\"_ _36a\"> </span>Included in fair v<span class=\"_ _0\"></span>alue gains / (losses) in the profit and loss accoun<span class=\"_ _0\"></span>t (note 13)<span class=\"_ _293\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfHedgeAccountingExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-378": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs600\">27<span class=\"_ _2\"></span>.  Sundry asse<span class=\"_ _0\"></span>ts<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9c gs601\">(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gs602\">Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _a0\"> </span>2021<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs603\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs604\">Current assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs605\">Accrued inter<span class=\"_ _0\"></span>est income<span class=\"_ _1fe\"> </span><span class=\"ff15\">4.6<span class=\"_ _9e\"> </span><span class=\"ff16\">1.0<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs606\">T<span class=\"_ _1\"></span>rade receivables<span class=\"_ _1b6\"> </span><span class=\"ff15\">1.5<span class=\"_ _9e\"> </span><span class=\"ff16\">1.9<span class=\"_ _9e\"> </span>1.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs607\">CSA assets<span class=\"_ _29a\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _d1\"> </span><span class=\"ff16\">36.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs608\">CRDs<span class=\"_ _29b\"> </span><span class=\"ff15\">38.0<span class=\"_ _3a\"> </span><span class=\"ff16\">30.2<span class=\"_ _3a\"> </span>23.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs609\">Sovereign r<span class=\"_ _0\"></span>eceivables <span class=\"_ _29c\"> </span><span class=\"ff15\">0.1<span class=\"_ _9e\"> </span><span class=\"ff16\">0.3<span class=\"_ _9e\"> </span>0.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs60a\">Other receivables<span class=\"_ _1ce\"> </span><span class=\"ff15\">1.8<span class=\"_ _9e\"> </span><span class=\"ff16\">2.0<span class=\"_ _9e\"> </span>3.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs60b\">Sundry financial assets<span class=\"_ _1be\"> </span><span class=\"ff2c\">71<span class=\"_ _40\"> </span><span class=\"ff15\">46.0<span class=\"_ _3a\"> </span><span class=\"ff16\">35.4<span class=\"_ _3a\"> </span>65.7<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs60c\">Prepa<span class=\"_ _0\"></span>yments<span class=\"_ _228\"> </span><span class=\"ff15\">5.0<span class=\"_ _9e\"> </span><span class=\"ff16\">3.8<span class=\"_ _9e\"> </span>3.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs60d\">51.0<span class=\"_ _3a\"> </span><span class=\"ff16\">39.2<span class=\"_ _3a\"> </span>69.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs60e\">Cash ratio deposits (\u2018CRDs\u2019) ar<span class=\"_ _0\"></span>e non-interest<span class=\"_ _0\"></span>-bearing deposits lodged with <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England, based on the v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> the Bank\u2019<span class=\"_ _1\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs60f\">eligible liabilities. T<span class=\"_ _0\"></span>hese are r<span class=\"_ _0\"></span>equired t<span class=\"_ _0\"></span>o comply with r<span class=\"_ _0\"></span>egulatory<span class=\"_ _0\"></span> rules.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs610\">CSA<span class=\"_ _0\"></span> assets are deposits placed <span class=\"_ _0\"></span>with highly rat<span class=\"_ _0\"></span>ed banks to act as security<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _0\"></span>s derivativ<span class=\"_ _0\"></span>e financial liabilities.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs611\">Neither o<span class=\"_ _0\"></span>f these balances is accessible b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group at <span class=\"_ _0\"></span>the balance sheet date. <span class=\"_ _0\"></span>Theref<span class=\"_ _0\"></span>ore, <span class=\"_ _0\"></span>they ar<span class=\"_ _0\"></span>e included in sundry asse<span class=\"_ _0\"></span>ts rather </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs612\">than cash balances.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs613\">Sover<span class=\"_ _0\"></span>eign receiv<span class=\"_ _0\"></span>ables includes amounts receiv<span class=\"_ _0\"></span>able fr<span class=\"_ _0\"></span>om the UK Go<span class=\"_ _0\"></span>vernment under<span class=\"_ _0\"></span> the CBILS and BBLS schemes.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs614\">CRDs, CSA<span class=\"_ _0\"></span> assets, sov<span class=\"_ _0\"></span>ereign receiv<span class=\"_ _0\"></span>ables and accrued inter<span class=\"_ _0\"></span>est are consider<span class=\"_ _0\"></span>ed to be Stage 1 asse<span class=\"_ _0\"></span>ts for<span class=\"_ _0\"></span> IFRS 9 impairment purposes. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs615\">The probabilities o<span class=\"_ _0\"></span>f default o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the obligor institutions (<span class=\"_ _0\"></span>the UK Gov<span class=\"_ _0\"></span>ernment, Bank of England and major<span class=\"_ _1\"></span> banks) have been assessed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs616\">and are consider<span class=\"_ _0\"></span>ed to be so lo<span class=\"_ _0\"></span>w as to r<span class=\"_ _0\"></span>equire no significant<span class=\"_ _0\"></span> impairment provision.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9d gs617\">(b)  <span class=\"_ _ce\"> </span>The  Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs618\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs619\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs61a\">Current assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs61b\">Intra-gr<span class=\"_ _0\"></span>oup term deposit<span class=\"_ _1e1\"> </span><span class=\"ff15\">193.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs61c\">Amounts owed by Gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _29d\"> </span><span class=\"ff15\">35.1<span class=\"_ _3a\"> </span><span class=\"ff16\">39.1<span class=\"_ _3a\"> </span>73.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs61d\">Accrued inter<span class=\"_ _0\"></span>est income<span class=\"_ _1fe\"> </span><span class=\"ff15\">0.1<span class=\"_ _9e\"> </span><span class=\"ff16\">0.1<span class=\"_ _9e\"> </span>0.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs61e\">228.8<span class=\"_ _3a\"> </span><span class=\"ff16\">39.2<span class=\"_ _3a\"> </span>73.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs61f\">The intra-gr<span class=\"_ _0\"></span>oup cash deposits comprise a 100 day no<span class=\"_ _0\"></span>tice balance and a demand balance, both placed with <span class=\"_ _0\"></span>the Company\u2019<span class=\"_ _1\"></span>s subsidiary, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs620\">Paragon Bank<span class=\"_ _0\"></span> PL<span class=\"_ _0\"></span>C, for<span class=\"_ _0\"></span> onwar<span class=\"_ _0\"></span>d placement with <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs621\">The amounts ow<span class=\"_ _0\"></span>ed to the Compan<span class=\"_ _0\"></span>y b<span class=\"_ _0\"></span>y other<span class=\"_ _0\"></span> group entities ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be Stage 1 balances f<span class=\"_ _0\"></span>or IFRS 9 impairment purposes. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs622\">The PD of<span class=\"_ _0\"></span> the subsidiaries has been assessed in the cont<span class=\"_ _0\"></span>ext of<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s over<span class=\"_ _0\"></span>all funding and asset position, and is consider<span class=\"_ _0\"></span>ed to be </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs623\">so low as <span class=\"_ _0\"></span>to requir<span class=\"_ _0\"></span>e no significant impairment pr<span class=\"_ _0\"></span>ovision.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherAssetsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-439": {
   "value": "27<span class=\"_ _2\"></span>.  Sundry asse<span class=\"_ _0\"></span>ts<span class=\"_ _36a\"> </span>(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _a0\"> </span>2021<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Current assets<span class=\"_ _36a\"> </span>Accrued inter<span class=\"_ _0\"></span>est income<span class=\"_ _1fe\"> </span><span class=\"ff15\">4.6<span class=\"_ _9e\"> </span><span class=\"ff16\">1.0<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span>T<span class=\"_ _1\"></span>rade receivables<span class=\"_ _1b6\"> </span><span class=\"ff15\">1.5<span class=\"_ _9e\"> </span><span class=\"ff16\">1.9<span class=\"_ _9e\"> </span>1.3<span class=\"_ _36a\"> </span></span></span>CSA assets<span class=\"_ _29a\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _d1\"> </span><span class=\"ff16\">36.6<span class=\"_ _36a\"> </span></span>CRDs<span class=\"_ _29b\"> </span><span class=\"ff15\">38.0<span class=\"_ _3a\"> </span><span class=\"ff16\">30.2<span class=\"_ _3a\"> </span>23.7<span class=\"_ _36a\"> </span></span></span>Sovereign r<span class=\"_ _0\"></span>eceivables <span class=\"_ _29c\"> </span><span class=\"ff15\">0.1<span class=\"_ _9e\"> </span><span class=\"ff16\">0.3<span class=\"_ _9e\"> </span>0.9<span class=\"_ _36a\"> </span></span></span>Other receivables<span class=\"_ _1ce\"> </span><span class=\"ff15\">1.8<span class=\"_ _9e\"> </span><span class=\"ff16\">2.0<span class=\"_ _9e\"> </span>3.2<span class=\"_ _36a\"> </span></span></span>Sundry financial assets<span class=\"_ _1be\"> </span><span class=\"ff2c\">71<span class=\"_ _40\"> </span><span class=\"ff15\">46.0<span class=\"_ _3a\"> </span><span class=\"ff16\">35.4<span class=\"_ _3a\"> </span>65.7<span class=\"_ _36a\"> </span></span></span></span>Prepa<span class=\"_ _0\"></span>yments<span class=\"_ _228\"> </span><span class=\"ff15\">5.0<span class=\"_ _9e\"> </span><span class=\"ff16\">3.8<span class=\"_ _9e\"> </span>3.5<span class=\"_ _36a\"> </span></span></span>51.0<span class=\"_ _3a\"> </span><span class=\"ff16\">39.2<span class=\"_ _3a\"> </span>69.2<span class=\"_ _36a\"> </span></span>Cash ratio deposits (\u2018CRDs\u2019) ar<span class=\"_ _0\"></span>e non-interest<span class=\"_ _0\"></span>-bearing deposits lodged with <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England, based on the v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> the Bank\u2019<span class=\"_ _1\"></span>s eligible liabilities. T<span class=\"_ _0\"></span>hese are r<span class=\"_ _0\"></span>equired t<span class=\"_ _0\"></span>o comply with r<span class=\"_ _0\"></span>egulatory<span class=\"_ _0\"></span> rules.<span class=\"_ _36a\"> </span>CSA<span class=\"_ _0\"></span> assets are deposits placed <span class=\"_ _0\"></span>with highly rat<span class=\"_ _0\"></span>ed banks to act as security<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _0\"></span>s derivativ<span class=\"_ _0\"></span>e financial liabilities.<span class=\"_ _36a\"> </span>Neither o<span class=\"_ _0\"></span>f these balances is accessible b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group at <span class=\"_ _0\"></span>the balance sheet date. <span class=\"_ _0\"></span>Theref<span class=\"_ _0\"></span>ore, <span class=\"_ _0\"></span>they ar<span class=\"_ _0\"></span>e included in sundry asse<span class=\"_ _0\"></span>ts rather than cash balances.<span class=\"_ _36a\"> </span>Sover<span class=\"_ _0\"></span>eign receiv<span class=\"_ _0\"></span>ables includes amounts receiv<span class=\"_ _0\"></span>able fr<span class=\"_ _0\"></span>om the UK Go<span class=\"_ _0\"></span>vernment under<span class=\"_ _0\"></span> the CBILS and BBLS schemes.<span class=\"_ _36a\"> </span>CRDs, CSA<span class=\"_ _0\"></span> assets, sov<span class=\"_ _0\"></span>ereign receiv<span class=\"_ _0\"></span>ables and accrued inter<span class=\"_ _0\"></span>est are consider<span class=\"_ _0\"></span>ed to be Stage 1 asse<span class=\"_ _0\"></span>ts for<span class=\"_ _0\"></span> IFRS 9 impairment purposes. The probabilities o<span class=\"_ _0\"></span>f default o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the obligor institutions (<span class=\"_ _0\"></span>the UK Gov<span class=\"_ _0\"></span>ernment, Bank of England and major<span class=\"_ _1\"></span> banks) have been assessed and are consider<span class=\"_ _0\"></span>ed to be so lo<span class=\"_ _0\"></span>w as to r<span class=\"_ _0\"></span>equire no significant<span class=\"_ _0\"></span> impairment provision.<span class=\"_ _36a\"> </span>(b)  <span class=\"_ _ce\"> </span>The  Company<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Current assets<span class=\"_ _36a\"> </span>Intra-gr<span class=\"_ _0\"></span>oup term deposit<span class=\"_ _1e1\"> </span><span class=\"ff15\">193.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>Amounts owed by Gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _29d\"> </span><span class=\"ff15\">35.1<span class=\"_ _3a\"> </span><span class=\"ff16\">39.1<span class=\"_ _3a\"> </span>73.0<span class=\"_ _36a\"> </span></span></span>Accrued inter<span class=\"_ _0\"></span>est income<span class=\"_ _1fe\"> </span><span class=\"ff15\">0.1<span class=\"_ _9e\"> </span><span class=\"ff16\">0.1<span class=\"_ _9e\"> </span>0.1<span class=\"_ _36a\"> </span></span></span>228.8<span class=\"_ _3a\"> </span><span class=\"ff16\">39.2<span class=\"_ _3a\"> </span>73.1<span class=\"_ _36a\"> </span></span>The intra-gr<span class=\"_ _0\"></span>oup cash deposits comprise a 100 day no<span class=\"_ _0\"></span>tice balance and a demand balance, both placed with <span class=\"_ _0\"></span>the Company\u2019<span class=\"_ _1\"></span>s subsidiary, Paragon Bank<span class=\"_ _0\"></span> PL<span class=\"_ _0\"></span>C, for<span class=\"_ _0\"></span> onwar<span class=\"_ _0\"></span>d placement with <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England.<span class=\"_ _36a\"> </span>The amounts ow<span class=\"_ _0\"></span>ed to the Compan<span class=\"_ _0\"></span>y b<span class=\"_ _0\"></span>y other<span class=\"_ _0\"></span> group entities ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be Stage 1 balances f<span class=\"_ _0\"></span>or IFRS 9 impairment purposes. The PD of<span class=\"_ _0\"></span> the subsidiaries has been assessed in the cont<span class=\"_ _0\"></span>ext of<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s over<span class=\"_ _0\"></span>all funding and asset position, and is consider<span class=\"_ _0\"></span>ed to be so low as <span class=\"_ _0\"></span>to requir<span class=\"_ _0\"></span>e no significant impairment pr<span class=\"_ _0\"></span>ovision.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfPrepaymentsAndOtherAssetsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-379": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs625\">28. <span class=\"_ _96\"></span>Current tax asse<span class=\"_ _0\"></span>ts / liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs626\">Current <span class=\"_ _0\"></span>tax in the Gr<span class=\"_ _0\"></span>oup and the Company<span class=\"_ _0\"></span> repr<span class=\"_ _0\"></span>esents UK corporation <span class=\"_ _0\"></span>tax owed or<span class=\"_ _0\"></span> reco<span class=\"_ _0\"></span>verable.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTaxReceivablesAndPayablesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-380": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs628\">29<span class=\"_ _0\"></span>. <span class=\"_ _1c\"></span>Property<span class=\"_ _1\"></span>, plant and equipment<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9c gs629\">(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs62a\">Leased<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs62b\">assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs62c\">Land and </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs62d\">buildings<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs62e\">Plant and </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs62f\">machinery<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs630\">T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs631\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs632\">Cost </div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs633\">At 1 Oct<span class=\"_ _0\"></span>ober 2021<span class=\"_ _173\"> </span><span class=\"ff16\">62.9<span class=\"_ _3a\"> </span>35.8<span class=\"_ _f7\"> </span>13.4<span class=\"_ _150\"> </span>112.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs634\">Additions<span class=\"_ _246\"> </span><span class=\"ff16\">14.5<span class=\"_ _9e\"> </span>1.6<span class=\"_ _9e\"> </span>1.1<span class=\"_ _3a\"> </span>17.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs635\">Disposals<span class=\"_ _29e\"> </span>(5.2)<span class=\"_ _c8\"> </span>(1.7)<span class=\"_ _c8\"> </span>(0.5)<span class=\"_ _c8\"> </span>(7.4)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs636\">At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _29f\"> </span><span class=\"ff16\">72.2<span class=\"_ _3a\"> </span>35.7<span class=\"_ _3a\"> </span>14.0<span class=\"_ _150\"> </span>121.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs637\">Additions<span class=\"_ _246\"> </span><span class=\"ff16\">15.9<span class=\"_ _9e\"> </span>1.4<span class=\"_ _9e\"> </span>2.6<span class=\"_ _3a\"> </span>19.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs638\">Disposals<span class=\"_ _29e\"> </span>(6.6)<span class=\"_ _c8\"> </span>(0.1)<span class=\"_ _c8\"> </span>(1.9)<span class=\"_ _c8\"> </span>(8.6)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs639\">At 30 Sep<span class=\"_ _0\"></span>tember 2023<span class=\"_ _1d7\"> </span>81.5<span class=\"_ _3a\"> </span>37.0<span class=\"_ _3a\"> </span>14.7<span class=\"_ _d5\"> </span>133.2<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs63a\">Accumulated depr<span class=\"_ _0\"></span>eciation<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs63b\">At 1 Oct<span class=\"_ _0\"></span>ober 2021<span class=\"_ _173\"> </span><span class=\"ff16\">23.6<span class=\"_ _9e\"> </span>7.8<span class=\"_ _3a\"> </span>10.3<span class=\"_ _f7\"> </span>41.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs63c\">Charge f<span class=\"_ _0\"></span>or the year<span class=\"_ _2a0\"> </span><span class=\"ff16\">10.1<span class=\"_ _9e\"> </span>2.2<span class=\"_ _9e\"> </span>1.3<span class=\"_ _3a\"> </span>13.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs63d\">On disposals<span class=\"_ _2a1\"> </span>(3.1)<span class=\"_ _c8\"> </span>(1.2)<span class=\"_ _c8\"> </span>(0.5)<span class=\"_ _c8\"> </span>(4.8)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs63e\">At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _29f\"> </span><span class=\"ff16\">30.6<span class=\"_ _9e\"> </span>8.8<span class=\"_ _3a\"> </span>11.1<span class=\"_ _3a\"> </span>50.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs63f\">Charge f<span class=\"_ _0\"></span>or the year<span class=\"_ _2a0\"> </span><span class=\"ff16\">10.7<span class=\"_ _9e\"> </span>2.2<span class=\"_ _9e\"> </span>1.7<span class=\"_ _3a\"> </span>14.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs640\">On disposals<span class=\"_ _2a1\"> </span>(4.6)<span class=\"_ _c8\"> </span>(0.1)<span class=\"_ _c8\"> </span>(1.9)<span class=\"_ _c8\"> </span>(6.6)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs641\">At 30 Sep<span class=\"_ _0\"></span>tember 2023<span class=\"_ _1d7\"> </span>36.7<span class=\"_ _3a\"> </span>10.9<span class=\"_ _3a\"> </span>10.9<span class=\"_ _3a\"> </span>58.5<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs642\">Net book value<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs643\">At 30 Sep<span class=\"_ _0\"></span>tember 2023<span class=\"_ _1d7\"> </span>44.8<span class=\"_ _3a\"> </span>26.1<span class=\"_ _9e\"> </span>3.8<span class=\"_ _3a\"> </span>74.7<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs644\">At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _29f\"> </span><span class=\"ff16\">41.6<span class=\"_ _3a\"> </span>26.9<span class=\"_ _9e\"> </span>2.9<span class=\"_ _3a\"> </span>71.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs645\">At 30 Sept<span class=\"_ _0\"></span>ember 2021<span class=\"_ _29f\"> </span><span class=\"ff16\">39.3<span class=\"_ _3a\"> </span>28.0<span class=\"_ _9e\"> </span>3.1<span class=\"_ _3a\"> </span>70.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs646\">Land and buildings and plant and machinery sho<span class=\"_ _0\"></span>wn above ar<span class=\"_ _0\"></span>e used within <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s business. Leased assets includes \u00a331.3m </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs647\">in respect o<span class=\"_ _0\"></span>f assets leased <span class=\"_ _0\"></span>to customers under oper<span class=\"_ _0\"></span>ating leases (2022: \u00a331.4m), \u00a30<span class=\"_ _0\"></span>.5m of <span class=\"_ _0\"></span>vehicles leased <span class=\"_ _0\"></span>to employees under<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs648\">Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s green car<span class=\"_ _0\"></span> salary sacrifice scheme (2022: \u00a3nil) and \u00a313.<span class=\"_ _0\"></span>0m of assets a<span class=\"_ _0\"></span>vailable f<span class=\"_ _0\"></span>or hir<span class=\"_ _0\"></span>e (2022: \u00a310.2m).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs64a\">The carrying v<span class=\"_ _0\"></span>alues of<span class=\"_ _0\"></span> right of use o<span class=\"_ _0\"></span>f assets, in r<span class=\"_ _0\"></span>espect of leases <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>the Group is <span class=\"_ _0\"></span>the lessee, included in property<span class=\"_ _1\"></span>, plant and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs64b\">equipment are set<span class=\"_ _0\"></span> out below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs64c\">Leased  </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs64d\">assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs64e\">Land and </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs64f\">buildings<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs650\">Plant and </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs651\">machinery<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs652\">T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs653\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs654\">Cost </div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs655\">At 1 Oct<span class=\"_ _0\"></span>ober 2021<span class=\"_ _175\"> </span>-<span class=\"_ _d1\"> </span><span class=\"ff16\">11.5<span class=\"_ _9e\"> </span>1.5<span class=\"_ _f7\"> </span>13.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs656\">Additions<span class=\"_ _20e\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.0<span class=\"_ _9e\"> </span>0.4<span class=\"_ _9e\"> </span>1.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs657\">Disposals<span class=\"_ _251\"> </span>-<span class=\"_ _fb\"> </span>(0.9)<span class=\"_ _1db\"> </span>(0.1)<span class=\"_ _c8\"> </span>(1.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs658\">At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _259\"> </span>-<span class=\"_ _d1\"> </span><span class=\"ff16\">11.6<span class=\"_ _9e\"> </span>1.8<span class=\"_ _f7\"> </span>13.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs659\">Additions<span class=\"_ _1e3\"> </span><span class=\"ff16\">0.6<span class=\"_ _9e\"> </span>1.0<span class=\"_ _9e\"> </span>1.4<span class=\"_ _9e\"> </span>3.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs65a\">Disposals<span class=\"_ _251\"> </span>-<span class=\"_ _fb\"> </span>(0.1)<span class=\"_ _1db\"> </span>(0.4)<span class=\"_ _c8\"> </span>(0.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs65b\">At 30 Sep<span class=\"_ _0\"></span>tember 2023<span class=\"_ _25c\"> </span>0.6<span class=\"_ _cb\"> </span>12.5<span class=\"_ _9e\"> </span>2.8<span class=\"_ _3a\"> </span>15.9<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs65c\">Accumulated depr<span class=\"_ _0\"></span>eciation<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs65d\">At 1 Oct<span class=\"_ _0\"></span>ober 2021<span class=\"_ _175\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">3.0<span class=\"_ _9e\"> </span>0.7<span class=\"_ _9e\"> </span>3.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs65e\">Charge f<span class=\"_ _0\"></span>or the year<span class=\"_ _24f\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.6<span class=\"_ _9e\"> </span>0.5<span class=\"_ _9e\"> </span>2.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs65f\">On disposals<span class=\"_ _2a2\"> </span>-<span class=\"_ _fb\"> </span>(0.9)<span class=\"_ _c8\"> </span>(0.1)<span class=\"_ _c8\"> </span>(1.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs660\">At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _259\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">3.7<span class=\"_ _9e\"> </span>1.1<span class=\"_ _9e\"> </span>4.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs661\">Charge f<span class=\"_ _0\"></span>or the year<span class=\"_ _2d\"> </span><span class=\"ff16\">0.1<span class=\"_ _9e\"> </span>1.7<span class=\"_ _9e\"> </span>0.7<span class=\"_ _9e\"> </span>2.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs662\">On disposals<span class=\"_ _2a2\"> </span>-<span class=\"_ _fb\"> </span>(0.1)<span class=\"_ _c8\"> </span>(0.4)<span class=\"_ _c8\"> </span>(0.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs663\">At 30 Sep<span class=\"_ _0\"></span>tember 2023<span class=\"_ _25c\"> </span>0.1<span class=\"_ _d1\"> </span>5.3<span class=\"_ _9e\"> </span>1.4<span class=\"_ _d1\"> </span>6.8<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs664\">Net book value<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs665\">At 30 Sep<span class=\"_ _0\"></span>tember 2023<span class=\"_ _25c\"> </span>0.5<span class=\"_ _d1\"> </span>7.2<span class=\"_ _9e\"> </span>1.4<span class=\"_ _d1\"> </span>9.1<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs666\">At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _259\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">7.9<span class=\"_ _9e\"> </span>0.7<span class=\"_ _9e\"> </span>8.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs667\">At 30 Sept<span class=\"_ _0\"></span>ember 2021<span class=\"_ _259\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">8.5<span class=\"_ _9e\"> </span>0.8<span class=\"_ _9e\"> </span>9.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs668\">During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2018, <span class=\"_ _0\"></span>the Group enter<span class=\"_ _0\"></span>ed into a tr<span class=\"_ _0\"></span>ansaction with the P<span class=\"_ _0\"></span>aragon Pension Plan, e<span class=\"_ _0\"></span>ffectively<span class=\"_ _0\"></span> granting a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs669\">first charge o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> its freehold head o<span class=\"_ _0\"></span>ffice building as security <span class=\"_ _0\"></span>for its agr<span class=\"_ _0\"></span>eed contributions under <span class=\"_ _0\"></span>the reco<span class=\"_ _0\"></span>very plan. <span class=\"_ _1\"></span>The carrying value of<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs66a\">the assets subject t<span class=\"_ _0\"></span>o this charge <span class=\"_ _0\"></span>was \u00a316.8m (2022: \u00a317<span class=\"_ _2\"></span>.<span class=\"_ _0\"></span>1m).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9d gs66c\">(b)  <span class=\"_ _ce\"> </span>The  Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs66d\">The property<span class=\"_ _1\"></span>, plant and equipment balance of<span class=\"_ _0\"></span> the Company<span class=\"_ _0\"></span> repr<span class=\"_ _0\"></span>esents a right of use asse<span class=\"_ _0\"></span>t in respect of<span class=\"_ _1\"></span> a building leased from a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs66e\">fellow<span class=\"_ _0\"></span> group entity<span class=\"_ _1\"></span>. The carrying <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> this asset is set<span class=\"_ _0\"></span> out below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs66f\">Land and  </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs670\">buildings<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs671\">\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs672\">Cost </div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs673\">At 1 Oct<span class=\"_ _0\"></span>ober 2021, 30 September 2022 and 30 September 2023<span class=\"_ _2a3\"> </span><span class=\"ff16\">18.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs674\">Accumulated depr<span class=\"_ _0\"></span>eciation<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs675\">At 1 Oct<span class=\"_ _0\"></span>ober 2021<span class=\"_ _223\"> </span><span class=\"ff16\">2.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs676\">Charge f<span class=\"_ _0\"></span>or the year<span class=\"_ _15d\"> </span><span class=\"ff16\">1.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs677\">On disposals<span class=\"_ _2a4\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs678\">At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _2a5\"> </span><span class=\"ff16\">4.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs679\">Charge f<span class=\"_ _0\"></span>or the year<span class=\"_ _15d\"> </span><span class=\"ff16\">1.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs67a\">On disposals<span class=\"_ _2a4\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs67b\">At 30 Sep<span class=\"_ _0\"></span>tember 2023<span class=\"_ _2a6\"> </span>5.6<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs67c\">Net book value<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs67d\">At 30 Sep<span class=\"_ _0\"></span>tember 2023<span class=\"_ _2a7\"> </span>13.2<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs67e\">At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _2a8\"> </span><span class=\"ff16\">14.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs67f\">At 30 Sept<span class=\"_ _0\"></span>ember 2021<span class=\"_ _2a8\"> </span><span class=\"ff16\">16.0</span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfPropertyPlantAndEquipmentExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-440": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs681\">30. <span class=\"_ _96\"></span>Intangible assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs682\">Goodwill  </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs683\">(note 31)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs684\">Computer </div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs685\">software<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs686\">Other intangible </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs687\">assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs688\">T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs689\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs68a\">Cost </div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs68b\">At 1 Oct<span class=\"_ _0\"></span>ober 2021<span class=\"_ _1d1\"> </span><span class=\"ff16\">170.4<span class=\"_ _3a\"> </span>14.8<span class=\"_ _3a\"> </span>10.6<span class=\"_ _150\"> </span>195.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs68c\">Additions<span class=\"_ _20e\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.7<span class=\"_ _43\"> </span></span>-<span class=\"_ _9b\"> </span><span class=\"ff16\">1.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs68d\">Derecognition<span class=\"_ _178\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs68e\">At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _2a9\"> </span><span class=\"ff16\">170.4<span class=\"_ _3a\"> </span>16.5<span class=\"_ _3a\"> </span>10.6<span class=\"_ _150\"> </span>197.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs68f\">Additions<span class=\"_ _20e\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.6<span class=\"_ _103\"> </span>1.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs690\">Derecognition<span class=\"_ _2aa\"> </span>(7.6)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(8.1)<span class=\"_ _6c\"> </span>(15.7)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs691\">At 30 Sep<span class=\"_ _0\"></span>tember 2023<span class=\"_ _2ab\"> </span>162.8<span class=\"_ _3a\"> </span>18.1<span class=\"_ _9e\"> </span>2.5<span class=\"_ _d5\"> </span>183.4<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs692\">Accumulated amortisation and impairmen<span class=\"_ _0\"></span>t<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs693\">At 1 Oct<span class=\"_ _0\"></span>ober 2021<span class=\"_ _2ac\"> </span><span class=\"ff16\">6.0<span class=\"_ _3a\"> </span>11.4<span class=\"_ _9e\"> </span>7.9<span class=\"_ _3a\"> </span>25.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs694\">Amortisation charge f<span class=\"_ _1\"></span>or the year<span class=\"_ _2ad\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.2<span class=\"_ _9e\"> </span>0.8<span class=\"_ _9e\"> </span>2.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs695\">Derecognition<span class=\"_ _178\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs696\">At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _109\"> </span><span class=\"ff16\">6.0<span class=\"_ _f7\"> </span>12.6<span class=\"_ _9e\"> </span>8.7<span class=\"_ _3a\"> </span>27.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs697\">Amortisation charge f<span class=\"_ _1\"></span>or the year<span class=\"_ _2ad\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.1<span class=\"_ _9e\"> </span>0.7<span class=\"_ _9e\"> </span>1.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs698\">Derecognition<span class=\"_ _2aa\"> </span>(6.0)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(7.9)<span class=\"_ _6c\"> </span>(13.9)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs699\">At 30 Sep<span class=\"_ _0\"></span>tember 2023<span class=\"_ _1cb\"> </span>-<span class=\"_ _d1\"> </span>13.7<span class=\"_ _d1\"> </span>1.5<span class=\"_ _3a\"> </span>15.2<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs69a\">Net book value<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs69b\">At 30 Sep<span class=\"_ _0\"></span>tember 2023<span class=\"_ _2ab\"> </span>162.8<span class=\"_ _9e\"> </span>4.4<span class=\"_ _d1\"> </span>1.0<span class=\"_ _150\"> </span>168.2<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs69c\">At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _2a9\"> </span><span class=\"ff16\">164.4<span class=\"_ _9e\"> </span>3.9<span class=\"_ _9e\"> </span>1.9<span class=\"_ _150\"> </span>170.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs69d\">At 30 Sept<span class=\"_ _0\"></span>ember 2021<span class=\"_ _2a9\"> </span><span class=\"ff16\">164.4<span class=\"_ _9e\"> </span>3.4<span class=\"_ _9e\"> </span>2.7<span class=\"_ _150\"> </span>170.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs69e\">Other intangible assets comprise br<span class=\"_ _0\"></span>ands and the benefit of<span class=\"_ _0\"></span> business networks r<span class=\"_ _1\"></span>ecognised on the acquisition of businesses. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs69f\">Derecognitions abo<span class=\"_ _0\"></span>ve relat<span class=\"_ _0\"></span>e to the cessation o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the TBMC business (no<span class=\"_ _0\"></span>te 11).<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIntangibleAssetsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-474": {
   "value": "30. <span class=\"_ _96\"></span>Intangible assets<span class=\"_ _36a\"> </span>Goodwill  (note 31)<span class=\"_ _36a\"> </span>Computer software<span class=\"_ _36a\"> </span>Other intangible assets<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span>Cost At 1 Oct<span class=\"_ _0\"></span>ober 2021<span class=\"_ _1d1\"> </span><span class=\"ff16\">170.4<span class=\"_ _3a\"> </span>14.8<span class=\"_ _3a\"> </span>10.6<span class=\"_ _150\"> </span>195.8<span class=\"_ _36a\"> </span></span>Additions<span class=\"_ _20e\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.7<span class=\"_ _43\"> </span></span>-<span class=\"_ _9b\"> </span><span class=\"ff16\">1.7<span class=\"_ _36a\"> </span></span>Derecognition<span class=\"_ _178\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _2a9\"> </span><span class=\"ff16\">170.4<span class=\"_ _3a\"> </span>16.5<span class=\"_ _3a\"> </span>10.6<span class=\"_ _150\"> </span>197.5<span class=\"_ _36a\"> </span></span>Additions<span class=\"_ _20e\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.6<span class=\"_ _103\"> </span>1.6<span class=\"_ _36a\"> </span></span>Derecognition<span class=\"_ _2aa\"> </span>(7.6)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(8.1)<span class=\"_ _6c\"> </span>(15.7)<span class=\"_ _36a\"> </span>At 30 Sep<span class=\"_ _0\"></span>tember 2023<span class=\"_ _2ab\"> </span>162.8<span class=\"_ _3a\"> </span>18.1<span class=\"_ _9e\"> </span>2.5<span class=\"_ _d5\"> </span>183.4<span class=\"_ _36a\"> </span>Accumulated amortisation and impairmen<span class=\"_ _0\"></span>t<span class=\"_ _36a\"> </span>At 1 Oct<span class=\"_ _0\"></span>ober 2021<span class=\"_ _2ac\"> </span><span class=\"ff16\">6.0<span class=\"_ _3a\"> </span>11.4<span class=\"_ _9e\"> </span>7.9<span class=\"_ _3a\"> </span>25.3<span class=\"_ _36a\"> </span></span>Amortisation charge f<span class=\"_ _1\"></span>or the year<span class=\"_ _2ad\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.2<span class=\"_ _9e\"> </span>0.8<span class=\"_ _9e\"> </span>2.0<span class=\"_ _36a\"> </span></span>Derecognition<span class=\"_ _178\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _109\"> </span><span class=\"ff16\">6.0<span class=\"_ _f7\"> </span>12.6<span class=\"_ _9e\"> </span>8.7<span class=\"_ _3a\"> </span>27.3<span class=\"_ _36a\"> </span></span>Amortisation charge f<span class=\"_ _1\"></span>or the year<span class=\"_ _2ad\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.1<span class=\"_ _9e\"> </span>0.7<span class=\"_ _9e\"> </span>1.8<span class=\"_ _36a\"> </span></span>Derecognition<span class=\"_ _2aa\"> </span>(6.0)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(7.9)<span class=\"_ _6c\"> </span>(13.9)<span class=\"_ _36a\"> </span>At 30 Sep<span class=\"_ _0\"></span>tember 2023<span class=\"_ _1cb\"> </span>-<span class=\"_ _d1\"> </span>13.7<span class=\"_ _d1\"> </span>1.5<span class=\"_ _3a\"> </span>15.2<span class=\"_ _36a\"> </span>Net book value<span class=\"_ _36a\"> </span>At 30 Sep<span class=\"_ _0\"></span>tember 2023<span class=\"_ _2ab\"> </span>162.8<span class=\"_ _9e\"> </span>4.4<span class=\"_ _d1\"> </span>1.0<span class=\"_ _150\"> </span>168.2<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _2a9\"> </span><span class=\"ff16\">164.4<span class=\"_ _9e\"> </span>3.9<span class=\"_ _9e\"> </span>1.9<span class=\"_ _150\"> </span>170.2<span class=\"_ _36a\"> </span></span>At 30 Sept<span class=\"_ _0\"></span>ember 2021<span class=\"_ _2a9\"> </span><span class=\"ff16\">164.4<span class=\"_ _9e\"> </span>3.4<span class=\"_ _9e\"> </span>2.7<span class=\"_ _150\"> </span>170.5<span class=\"_ _36a\"> </span></span>Other intangible assets comprise br<span class=\"_ _0\"></span>ands and the benefit of<span class=\"_ _0\"></span> business networks r<span class=\"_ _1\"></span>ecognised on the acquisition of businesses. Derecognitions abo<span class=\"_ _0\"></span>ve relat<span class=\"_ _0\"></span>e to the cessation o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the TBMC business (no<span class=\"_ _0\"></span>te 11).<span class=\"_ _36a\"> </span>31. Goodwill<span class=\"_ _36a\"> </span>The goodwill carried in <span class=\"_ _0\"></span>the accounts is attributable to <span class=\"_ _0\"></span>three cash generating units (\u2018CGU\u2019<span class=\"_ _2\"></span>s), which hav<span class=\"_ _0\"></span>e not changed in <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span>. T<span class=\"_ _0\"></span>hese balances are r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>wed for<span class=\"_ _1\"></span> impairment annually, in accor<span class=\"_ _0\"></span>dance with <span class=\"_ _0\"></span>the requir<span class=\"_ _0\"></span>ements of IA<span class=\"_ _0\"></span>S 36 \u2013 \u2018Impairment of <span class=\"_ _1\"></span>Assets\u2019<span class=\"_ _2\"></span>. The balance is as analysed below:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>CGU<span class=\"_ _36a\"> </span>SME lending<span class=\"_ _284\"> </span><span class=\"ff15\">113.0<span class=\"_ _d5\"> </span></span>113.0<span class=\"_ _36a\"> </span>Development finance<span class=\"_ _33\"> </span><span class=\"ff15\">49.8<span class=\"_ _3a\"> </span><span class=\"ff16\">49.8<span class=\"_ _36a\"> </span></span></span>TBMC<span class=\"_ _2ae\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.6<span class=\"_ _36a\"> </span></span></span>162.8<span class=\"_ _d5\"> </span><span class=\"ff16\">164.4<span class=\"_ _36a\"> </span></span><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9c gs6ad\">(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>SME <span class=\"_ _96\"></span>lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6ae\">The goodwill carried in <span class=\"_ _0\"></span>the accounts relating t<span class=\"_ _0\"></span>o the SME lending CGU was r<span class=\"_ _0\"></span>ecognised on acquisitions in the <span class=\"_ _0\"></span>years ended  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6af\">30 September<span class=\"_ _0\"></span> 2016 and 30 September 2018.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6b0\">An impairment re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> undertaken at 30 September<span class=\"_ _1\"></span> 2023 indicated that no write do<span class=\"_ _0\"></span>wn was r<span class=\"_ _0\"></span>equired.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6b1\">The reco<span class=\"_ _0\"></span>verable amount o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the SME lending CGU used in this impairment testing is determined on a <span class=\"_ _0\"></span>value in use basis using pr<span class=\"_ _0\"></span>e-tax </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6b2\">cash flow<span class=\"_ _0\"></span> projections based on <span class=\"_ _0\"></span>financial budgets appro<span class=\"_ _0\"></span>ved by<span class=\"_ _1\"></span> the Board in Nov<span class=\"_ _0\"></span>ember 2023 co<span class=\"_ _0\"></span>vering a fiv<span class=\"_ _0\"></span>e-year<span class=\"_ _0\"></span> period. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6b3\">The ke<span class=\"_ _0\"></span>y assump<span class=\"_ _0\"></span>tions underlying the v<span class=\"_ _0\"></span>alue in use calculation for<span class=\"_ _0\"></span> the SME lending CGU are:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6b4\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Lev<span class=\"_ _0\"></span>el of business activity<span class=\"_ _1\"></span>, based on management expectations. <span class=\"_ _0\"></span>The for<span class=\"_ _0\"></span>ecast assumes a compound annual gr<span class=\"_ _0\"></span>owth rate (\u2018CA<span class=\"_ _0\"></span>GR\u2019) </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6b5\">for<span class=\"_ _0\"></span> new lending o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the fiv<span class=\"_ _0\"></span>e-year<span class=\"_ _0\"></span> period of<span class=\"_ _0\"></span> 14.<span class=\"_ _0\"></span>12%, compared <span class=\"_ _0\"></span>with 10.56% used in <span class=\"_ _0\"></span>the calculation at 30 September<span class=\"_ _0\"></span> 2022. The ne<span class=\"_ _0\"></span>w </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6b6\">lending for<span class=\"_ _0\"></span>ecasts are <span class=\"_ _0\"></span>the ke<span class=\"_ _0\"></span>y driver<span class=\"_ _1\"></span> for <span class=\"_ _0\"></span>the profit and cashflo<span class=\"_ _0\"></span>w f<span class=\"_ _0\"></span>orecasts. Cash flo<span class=\"_ _0\"></span>ws be<span class=\"_ _0\"></span>yond the <span class=\"_ _0\"></span>five-y<span class=\"_ _0\"></span>ear budget<span class=\"_ _0\"></span> are extrapolat<span class=\"_ _0\"></span>ed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6b7\">using a constant gro<span class=\"_ _0\"></span>wth rate of<span class=\"_ _0\"></span> 1.20% (2022: 1.54%) which does not e<span class=\"_ _0\"></span>xceed the long <span class=\"_ _0\"></span>term aver<span class=\"_ _0\"></span>age gro<span class=\"_ _0\"></span>wth rates for<span class=\"_ _1\"></span> the markets in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6b8\">which the business is activ<span class=\"_ _0\"></span>e</div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6b9\"> <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>Management have concluded <span class=\"_ _0\"></span>that the le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> activity assumed f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the purpose of <span class=\"_ _0\"></span>this for<span class=\"_ _0\"></span>ecast are r<span class=\"_ _0\"></span>easonable, based on past </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6ba\">experience and the curr<span class=\"_ _0\"></span>ent economic envir<span class=\"_ _0\"></span>onment<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6bb\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Discount rate, which is based on <span class=\"_ _0\"></span>third party<span class=\"_ _0\"></span> estimates of <span class=\"_ _0\"></span>the implied industry cost o<span class=\"_ _0\"></span>f capital. <span class=\"_ _0\"></span>The pre-<span class=\"_ _0\"></span>tax discount rate applied t<span class=\"_ _0\"></span>o </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6bc\">the cash flow<span class=\"_ _0\"></span> projection is 16.2% (2022: 14<span class=\"_ _0\"></span>.8%)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6bd\">As an illustration of<span class=\"_ _0\"></span> the sensitivity<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>this impairment test <span class=\"_ _0\"></span>to mov<span class=\"_ _0\"></span>ements in key<span class=\"_ _1\"></span> assumptions, the Group has calculated <span class=\"_ _0\"></span>that a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6be\">0.<span class=\"_ _0\"></span>0% gro<span class=\"_ _0\"></span>wth rate combined with an 11.5% reduction in pr<span class=\"_ _0\"></span>ofit le<span class=\"_ _0\"></span>vels w<span class=\"_ _0\"></span>ould eliminate the pr<span class=\"_ _0\"></span>ojected headroom of<span class=\"_ _0\"></span> \u00a359<span class=\"_ _0\"></span>.<span class=\"_ _0\"></span>1m. While such </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6bf\">movements ar<span class=\"_ _0\"></span>e not expect<span class=\"_ _0\"></span>ed by manag<span class=\"_ _0\"></span>ement, they<span class=\"_ _0\"></span> are consider<span class=\"_ _0\"></span>ed \u2018reasonably<span class=\"_ _0\"></span> possible\u2019 <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the purposes of<span class=\"_ _0\"></span> IAS 36. <span class=\"_ _0\"></span>A 0<span class=\"_ _0\"></span>.0% gr<span class=\"_ _0\"></span>owth </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6c0\">rate combined with an 14<span class=\"_ _0\"></span>.4% reduction in pr<span class=\"_ _0\"></span>ofit le<span class=\"_ _0\"></span>vels w<span class=\"_ _0\"></span>ould generate a <span class=\"_ _0\"></span>write down of<span class=\"_ _0\"></span> \u00a310.<span class=\"_ _0\"></span>0m. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6c1\">In the <span class=\"_ _0\"></span>testing carried out at 30 September<span class=\"_ _0\"></span> 2022, a 0.<span class=\"_ _0\"></span>0% growth r<span class=\"_ _0\"></span>ate combined with a 7<span class=\"_ _2\"></span>.5% reduction in pro<span class=\"_ _0\"></span>fit lev<span class=\"_ _0\"></span>els, would hav<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6c2\">eliminated the pr<span class=\"_ _0\"></span>ojected headroom at <span class=\"_ _0\"></span>that date of<span class=\"_ _0\"></span> \u00a345.3m. A<span class=\"_ _1\"></span> 0.0% gr<span class=\"_ _0\"></span>owth rate combined <span class=\"_ _0\"></span>with an 11.2% reduction in profit<span class=\"_ _0\"></span> levels <span class=\"_ _0\"></span>would </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6c3\">have g<span class=\"_ _0\"></span>enerated a write do<span class=\"_ _0\"></span>wn of \u00a310<span class=\"_ _0\"></span>.0m.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9d gs6c4\">(b)  <span class=\"_ _ce\"> </span>Development <span class=\"_ _96\"></span>finance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6c5\">The goodwill carried in <span class=\"_ _0\"></span>the accounts relating t<span class=\"_ _0\"></span>o the dev<span class=\"_ _0\"></span>elopment finance CGU <span class=\"_ _0\"></span>was first<span class=\"_ _0\"></span> recognised on a business acquisition in the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6c6\">year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2018. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6c7\">An impairment re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> undertaken at 30 September<span class=\"_ _1\"></span> 2023 indicated that no write do<span class=\"_ _0\"></span>wn was r<span class=\"_ _0\"></span>equired.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6c8\">The reco<span class=\"_ _0\"></span>verable amount o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the development <span class=\"_ _0\"></span>finance CGU used in this impairment <span class=\"_ _0\"></span>testing is determined on a v<span class=\"_ _0\"></span>alue in use basis using </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6c9\">pre-<span class=\"_ _0\"></span>tax cash flow<span class=\"_ _0\"></span> projections based on financial budg<span class=\"_ _0\"></span>ets appro<span class=\"_ _0\"></span>ved by<span class=\"_ _0\"></span> the Boar<span class=\"_ _0\"></span>d in November<span class=\"_ _0\"></span> 2023 covering a <span class=\"_ _0\"></span>five-y<span class=\"_ _0\"></span>ear period. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6ca\">The ke<span class=\"_ _0\"></span>y assump<span class=\"_ _0\"></span>tions underlying the v<span class=\"_ _0\"></span>alue in use calculation for<span class=\"_ _0\"></span> the de<span class=\"_ _0\"></span>velopment <span class=\"_ _0\"></span>finance CGU are:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6cb\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Lev<span class=\"_ _0\"></span>el of business activity<span class=\"_ _1\"></span>, based on management expectations. <span class=\"_ _0\"></span>The for<span class=\"_ _0\"></span>ecast assumes a CA<span class=\"_ _0\"></span>GR for<span class=\"_ _0\"></span> drawdo<span class=\"_ _0\"></span>wns over<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>five-y<span class=\"_ _0\"></span>ear </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6cc\">period of 11.<span class=\"_ _1\"></span>12%, compared with 8.<span class=\"_ _0\"></span>77% used in the calculation at 30 September<span class=\"_ _0\"></span> 2022. Cash flo<span class=\"_ _0\"></span>ws bey<span class=\"_ _0\"></span>ond the fiv<span class=\"_ _0\"></span>e-year<span class=\"_ _0\"></span> budget ar<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6cd\">extrapolated using a constant gr<span class=\"_ _0\"></span>owth rate o<span class=\"_ _0\"></span>f 1.2% (2022: 1.54%) <span class=\"_ _0\"></span>which does not exceed <span class=\"_ _0\"></span>the long-term a<span class=\"_ _0\"></span>verage gr<span class=\"_ _1\"></span>owth rate for<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6ce\">UK economy</div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6cf\"> <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>Management have concluded <span class=\"_ _0\"></span>that the le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> activity assumed f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the purpose of <span class=\"_ _0\"></span>this for<span class=\"_ _0\"></span>ecast are r<span class=\"_ _0\"></span>easonable, based on past </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6d0\">experience and the curr<span class=\"_ _0\"></span>ent economic envir<span class=\"_ _0\"></span>onment<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6d1\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Discount rate, which is based on <span class=\"_ _0\"></span>third party<span class=\"_ _0\"></span> estimates of <span class=\"_ _0\"></span>the implied industry cost o<span class=\"_ _0\"></span>f capital. <span class=\"_ _0\"></span>The pre-<span class=\"_ _0\"></span>tax discount rate applied t<span class=\"_ _0\"></span>o </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6d2\">the cash flow<span class=\"_ _0\"></span> projection is 15.<span class=\"_ _0\"></span>9% (2022: 14.4%)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6d3\">As an illustration of<span class=\"_ _0\"></span> the sensitivity<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>this impairment test <span class=\"_ _0\"></span>to mov<span class=\"_ _0\"></span>ements in key<span class=\"_ _1\"></span> assumptions, the Group has calculated <span class=\"_ _0\"></span>that a 1.07% </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6d4\">gro<span class=\"_ _0\"></span>wth rate combined with a 3.<span class=\"_ _1\"></span>1% reduction in pro<span class=\"_ _0\"></span>fit levels <span class=\"_ _0\"></span>would eliminate <span class=\"_ _0\"></span>the projected headr<span class=\"_ _0\"></span>oom of \u00a313.<span class=\"_ _0\"></span>9m. While such mo<span class=\"_ _0\"></span>vements </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6d5\">are not<span class=\"_ _0\"></span> expected by<span class=\"_ _0\"></span> management, the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e considered \u2018r<span class=\"_ _0\"></span>easonably possible<span class=\"_ _0\"></span>\u2019 for<span class=\"_ _0\"></span> the purposes of<span class=\"_ _0\"></span> IAS 36. <span class=\"_ _0\"></span>A<span class=\"_ _0\"></span> 0.<span class=\"_ _1\"></span>17% growth rate combined </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6d6\">with a 2.9% r<span class=\"_ _0\"></span>eduction in profit le<span class=\"_ _0\"></span>vels <span class=\"_ _0\"></span>would generate a <span class=\"_ _0\"></span>write down of<span class=\"_ _0\"></span> \u00a310.<span class=\"_ _0\"></span>0m.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs6d7\">On the basis of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>testing carried out at 30 September<span class=\"_ _0\"></span> 2022, management concluded <span class=\"_ _0\"></span>that no reasonably<span class=\"_ _0\"></span> possible change in the k<span class=\"_ _0\"></span>ey </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs6d8\">assumptions abov<span class=\"_ _0\"></span>e would cause <span class=\"_ _0\"></span>the reco<span class=\"_ _0\"></span>verable amount of<span class=\"_ _0\"></span> the de<span class=\"_ _0\"></span>velopment <span class=\"_ _0\"></span>finance CGU to fall belo<span class=\"_ _0\"></span>w <span class=\"_ _0\"></span>the balance sheet carrying v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws40 gs6d9\">(c<span class=\"_ _1\"></span>)  <span class=\"_ _ce\"> </span>TBMC<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6da\">During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> the Group announced <span class=\"_ _0\"></span>the closure o<span class=\"_ _0\"></span>f its <span class=\"_ _0\"></span>TBMC mortgage br<span class=\"_ _0\"></span>okerage business (<span class=\"_ _0\"></span>note 11), which corr<span class=\"_ _0\"></span>esponded to <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6db\">TBMC CGU. <span class=\"_ _0\"></span>The goodwill r<span class=\"_ _0\"></span>elating to <span class=\"_ _0\"></span>this CGU, which <span class=\"_ _0\"></span>was r<span class=\"_ _0\"></span>ecognised on an acquisition in December 2008 and impair<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> \u00a36.0m in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6dc\">2009, <span class=\"_ _0\"></span>was <span class=\"_ _0\"></span>therefor<span class=\"_ _0\"></span>e derecognised in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>, with the remaining net<span class=\"_ _0\"></span> goodwill of<span class=\"_ _0\"></span> \u00a31.6m expensed.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6dd\">An impairment re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> carried out in the pr<span class=\"_ _0\"></span>evious <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>, on the basis that <span class=\"_ _0\"></span>the business would continue <span class=\"_ _0\"></span>to operate, indicated no </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6de\">requir<span class=\"_ _0\"></span>ement for<span class=\"_ _1\"></span> additional impairment provision at 30 September<span class=\"_ _1\"></span> 2022.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIntangibleAssetsAndGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-441": {
   "value": "31. Goodwill<span class=\"_ _36a\"> </span>The goodwill carried in <span class=\"_ _0\"></span>the accounts is attributable to <span class=\"_ _0\"></span>three cash generating units (\u2018CGU\u2019<span class=\"_ _2\"></span>s), which hav<span class=\"_ _0\"></span>e not changed in <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span>. T<span class=\"_ _0\"></span>hese balances are r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>wed for<span class=\"_ _1\"></span> impairment annually, in accor<span class=\"_ _0\"></span>dance with <span class=\"_ _0\"></span>the requir<span class=\"_ _0\"></span>ements of IA<span class=\"_ _0\"></span>S 36 \u2013 \u2018Impairment of <span class=\"_ _1\"></span>Assets\u2019<span class=\"_ _2\"></span>. The balance is as analysed below:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>CGU<span class=\"_ _36a\"> </span>SME lending<span class=\"_ _284\"> </span><span class=\"ff15\">113.0<span class=\"_ _d5\"> </span></span>113.0<span class=\"_ _36a\"> </span>Development finance<span class=\"_ _33\"> </span><span class=\"ff15\">49.8<span class=\"_ _3a\"> </span><span class=\"ff16\">49.8<span class=\"_ _36a\"> </span></span></span>TBMC<span class=\"_ _2ae\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.6<span class=\"_ _36a\"> </span></span></span>162.8<span class=\"_ _d5\"> </span><span class=\"ff16\">164.4<span class=\"_ _36a\"> </span></span>(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>SME <span class=\"_ _96\"></span>lending<span class=\"_ _36a\"> </span>The goodwill carried in <span class=\"_ _0\"></span>the accounts relating t<span class=\"_ _0\"></span>o the SME lending CGU was r<span class=\"_ _0\"></span>ecognised on acquisitions in the <span class=\"_ _0\"></span>years ended  30 September<span class=\"_ _0\"></span> 2016 and 30 September 2018.<span class=\"_ _36a\"> </span>An impairment re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> undertaken at 30 September<span class=\"_ _1\"></span> 2023 indicated that no write do<span class=\"_ _0\"></span>wn was r<span class=\"_ _0\"></span>equired.<span class=\"_ _36a\"> </span>The reco<span class=\"_ _0\"></span>verable amount o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the SME lending CGU used in this impairment testing is determined on a <span class=\"_ _0\"></span>value in use basis using pr<span class=\"_ _0\"></span>e-tax cash flow<span class=\"_ _0\"></span> projections based on <span class=\"_ _0\"></span>financial budgets appro<span class=\"_ _0\"></span>ved by<span class=\"_ _1\"></span> the Board in Nov<span class=\"_ _0\"></span>ember 2023 co<span class=\"_ _0\"></span>vering a fiv<span class=\"_ _0\"></span>e-year<span class=\"_ _0\"></span> period. The ke<span class=\"_ _0\"></span>y assump<span class=\"_ _0\"></span>tions underlying the v<span class=\"_ _0\"></span>alue in use calculation for<span class=\"_ _0\"></span> the SME lending CGU are:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Lev<span class=\"_ _0\"></span>el of business activity<span class=\"_ _1\"></span>, based on management expectations. <span class=\"_ _0\"></span>The for<span class=\"_ _0\"></span>ecast assumes a compound annual gr<span class=\"_ _0\"></span>owth rate (\u2018CA<span class=\"_ _0\"></span>GR\u2019) for<span class=\"_ _0\"></span> new lending o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the fiv<span class=\"_ _0\"></span>e-year<span class=\"_ _0\"></span> period of<span class=\"_ _0\"></span> 14.<span class=\"_ _0\"></span>12%, compared <span class=\"_ _0\"></span>with 10.56% used in <span class=\"_ _0\"></span>the calculation at 30 September<span class=\"_ _0\"></span> 2022. The ne<span class=\"_ _0\"></span>w lending for<span class=\"_ _0\"></span>ecasts are <span class=\"_ _0\"></span>the ke<span class=\"_ _0\"></span>y driver<span class=\"_ _1\"></span> for <span class=\"_ _0\"></span>the profit and cashflo<span class=\"_ _0\"></span>w f<span class=\"_ _0\"></span>orecasts. Cash flo<span class=\"_ _0\"></span>ws be<span class=\"_ _0\"></span>yond the <span class=\"_ _0\"></span>five-y<span class=\"_ _0\"></span>ear budget<span class=\"_ _0\"></span> are extrapolat<span class=\"_ _0\"></span>ed using a constant gro<span class=\"_ _0\"></span>wth rate of<span class=\"_ _0\"></span> 1.20% (2022: 1.54%) which does not e<span class=\"_ _0\"></span>xceed the long <span class=\"_ _0\"></span>term aver<span class=\"_ _0\"></span>age gro<span class=\"_ _0\"></span>wth rates for<span class=\"_ _1\"></span> the markets in which the business is activ<span class=\"_ _0\"></span>e <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>Management have concluded <span class=\"_ _0\"></span>that the le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> activity assumed f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the purpose of <span class=\"_ _0\"></span>this for<span class=\"_ _0\"></span>ecast are r<span class=\"_ _0\"></span>easonable, based on past experience and the curr<span class=\"_ _0\"></span>ent economic envir<span class=\"_ _0\"></span>onment<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Discount rate, which is based on <span class=\"_ _0\"></span>third party<span class=\"_ _0\"></span> estimates of <span class=\"_ _0\"></span>the implied industry cost o<span class=\"_ _0\"></span>f capital. <span class=\"_ _0\"></span>The pre-<span class=\"_ _0\"></span>tax discount rate applied t<span class=\"_ _0\"></span>o the cash flow<span class=\"_ _0\"></span> projection is 16.2% (2022: 14<span class=\"_ _0\"></span>.8%)<span class=\"_ _36a\"> </span>As an illustration of<span class=\"_ _0\"></span> the sensitivity<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>this impairment test <span class=\"_ _0\"></span>to mov<span class=\"_ _0\"></span>ements in key<span class=\"_ _1\"></span> assumptions, the Group has calculated <span class=\"_ _0\"></span>that a 0.<span class=\"_ _0\"></span>0% gro<span class=\"_ _0\"></span>wth rate combined with an 11.5% reduction in pr<span class=\"_ _0\"></span>ofit le<span class=\"_ _0\"></span>vels w<span class=\"_ _0\"></span>ould eliminate the pr<span class=\"_ _0\"></span>ojected headroom of<span class=\"_ _0\"></span> \u00a359<span class=\"_ _0\"></span>.<span class=\"_ _0\"></span>1m. While such movements ar<span class=\"_ _0\"></span>e not expect<span class=\"_ _0\"></span>ed by manag<span class=\"_ _0\"></span>ement, they<span class=\"_ _0\"></span> are consider<span class=\"_ _0\"></span>ed \u2018reasonably<span class=\"_ _0\"></span> possible\u2019 <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the purposes of<span class=\"_ _0\"></span> IAS 36. <span class=\"_ _0\"></span>A 0<span class=\"_ _0\"></span>.0% gr<span class=\"_ _0\"></span>owth rate combined with an 14<span class=\"_ _0\"></span>.4% reduction in pr<span class=\"_ _0\"></span>ofit le<span class=\"_ _0\"></span>vels w<span class=\"_ _0\"></span>ould generate a <span class=\"_ _0\"></span>write down of<span class=\"_ _0\"></span> \u00a310.<span class=\"_ _0\"></span>0m. In the <span class=\"_ _0\"></span>testing carried out at 30 September<span class=\"_ _0\"></span> 2022, a 0.<span class=\"_ _0\"></span>0% growth r<span class=\"_ _0\"></span>ate combined with a 7<span class=\"_ _2\"></span>.5% reduction in pro<span class=\"_ _0\"></span>fit lev<span class=\"_ _0\"></span>els, would hav<span class=\"_ _0\"></span>e eliminated the pr<span class=\"_ _0\"></span>ojected headroom at <span class=\"_ _0\"></span>that date of<span class=\"_ _0\"></span> \u00a345.3m. A<span class=\"_ _1\"></span> 0.0% gr<span class=\"_ _0\"></span>owth rate combined <span class=\"_ _0\"></span>with an 11.2% reduction in profit<span class=\"_ _0\"></span> levels <span class=\"_ _0\"></span>would have g<span class=\"_ _0\"></span>enerated a write do<span class=\"_ _0\"></span>wn of \u00a310<span class=\"_ _0\"></span>.0m.<span class=\"_ _36a\"> </span>(b)  <span class=\"_ _ce\"> </span>Development <span class=\"_ _96\"></span>finance<span class=\"_ _36a\"> </span>The goodwill carried in <span class=\"_ _0\"></span>the accounts relating t<span class=\"_ _0\"></span>o the dev<span class=\"_ _0\"></span>elopment finance CGU <span class=\"_ _0\"></span>was first<span class=\"_ _0\"></span> recognised on a business acquisition in the year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2018. An impairment re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> undertaken at 30 September<span class=\"_ _1\"></span> 2023 indicated that no write do<span class=\"_ _0\"></span>wn was r<span class=\"_ _0\"></span>equired.<span class=\"_ _36a\"> </span>The reco<span class=\"_ _0\"></span>verable amount o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the development <span class=\"_ _0\"></span>finance CGU used in this impairment <span class=\"_ _0\"></span>testing is determined on a v<span class=\"_ _0\"></span>alue in use basis using pre-<span class=\"_ _0\"></span>tax cash flow<span class=\"_ _0\"></span> projections based on financial budg<span class=\"_ _0\"></span>ets appro<span class=\"_ _0\"></span>ved by<span class=\"_ _0\"></span> the Boar<span class=\"_ _0\"></span>d in November<span class=\"_ _0\"></span> 2023 covering a <span class=\"_ _0\"></span>five-y<span class=\"_ _0\"></span>ear period. The ke<span class=\"_ _0\"></span>y assump<span class=\"_ _0\"></span>tions underlying the v<span class=\"_ _0\"></span>alue in use calculation for<span class=\"_ _0\"></span> the de<span class=\"_ _0\"></span>velopment <span class=\"_ _0\"></span>finance CGU are:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Lev<span class=\"_ _0\"></span>el of business activity<span class=\"_ _1\"></span>, based on management expectations. <span class=\"_ _0\"></span>The for<span class=\"_ _0\"></span>ecast assumes a CA<span class=\"_ _0\"></span>GR for<span class=\"_ _0\"></span> drawdo<span class=\"_ _0\"></span>wns over<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>five-y<span class=\"_ _0\"></span>ear period of 11.<span class=\"_ _1\"></span>12%, compared with 8.<span class=\"_ _0\"></span>77% used in the calculation at 30 September<span class=\"_ _0\"></span> 2022. Cash flo<span class=\"_ _0\"></span>ws bey<span class=\"_ _0\"></span>ond the fiv<span class=\"_ _0\"></span>e-year<span class=\"_ _0\"></span> budget ar<span class=\"_ _0\"></span>e extrapolated using a constant gr<span class=\"_ _0\"></span>owth rate o<span class=\"_ _0\"></span>f 1.2% (2022: 1.54%) <span class=\"_ _0\"></span>which does not exceed <span class=\"_ _0\"></span>the long-term a<span class=\"_ _0\"></span>verage gr<span class=\"_ _1\"></span>owth rate for<span class=\"_ _0\"></span> the UK economy <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>Management have concluded <span class=\"_ _0\"></span>that the le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> activity assumed f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the purpose of <span class=\"_ _0\"></span>this for<span class=\"_ _0\"></span>ecast are r<span class=\"_ _0\"></span>easonable, based on past experience and the curr<span class=\"_ _0\"></span>ent economic envir<span class=\"_ _0\"></span>onment<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Discount rate, which is based on <span class=\"_ _0\"></span>third party<span class=\"_ _0\"></span> estimates of <span class=\"_ _0\"></span>the implied industry cost o<span class=\"_ _0\"></span>f capital. <span class=\"_ _0\"></span>The pre-<span class=\"_ _0\"></span>tax discount rate applied t<span class=\"_ _0\"></span>o the cash flow<span class=\"_ _0\"></span> projection is 15.<span class=\"_ _0\"></span>9% (2022: 14.4%)<span class=\"_ _36a\"> </span>As an illustration of<span class=\"_ _0\"></span> the sensitivity<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>this impairment test <span class=\"_ _0\"></span>to mov<span class=\"_ _0\"></span>ements in key<span class=\"_ _1\"></span> assumptions, the Group has calculated <span class=\"_ _0\"></span>that a 1.07% gro<span class=\"_ _0\"></span>wth rate combined with a 3.<span class=\"_ _1\"></span>1% reduction in pro<span class=\"_ _0\"></span>fit levels <span class=\"_ _0\"></span>would eliminate <span class=\"_ _0\"></span>the projected headr<span class=\"_ _0\"></span>oom of \u00a313.<span class=\"_ _0\"></span>9m. While such mo<span class=\"_ _0\"></span>vements are not<span class=\"_ _0\"></span> expected by<span class=\"_ _0\"></span> management, the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e considered \u2018r<span class=\"_ _0\"></span>easonably possible<span class=\"_ _0\"></span>\u2019 for<span class=\"_ _0\"></span> the purposes of<span class=\"_ _0\"></span> IAS 36. <span class=\"_ _0\"></span>A<span class=\"_ _0\"></span> 0.<span class=\"_ _1\"></span>17% growth rate combined with a 2.9% r<span class=\"_ _0\"></span>eduction in profit le<span class=\"_ _0\"></span>vels <span class=\"_ _0\"></span>would generate a <span class=\"_ _0\"></span>write down of<span class=\"_ _0\"></span> \u00a310.<span class=\"_ _0\"></span>0m.<span class=\"_ _36a\"> </span>On the basis of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>testing carried out at 30 September<span class=\"_ _0\"></span> 2022, management concluded <span class=\"_ _0\"></span>that no reasonably<span class=\"_ _0\"></span> possible change in the k<span class=\"_ _0\"></span>ey assumptions abov<span class=\"_ _0\"></span>e would cause <span class=\"_ _0\"></span>the reco<span class=\"_ _0\"></span>verable amount of<span class=\"_ _0\"></span> the de<span class=\"_ _0\"></span>velopment <span class=\"_ _0\"></span>finance CGU to fall belo<span class=\"_ _0\"></span>w <span class=\"_ _0\"></span>the balance sheet carrying v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span>(c<span class=\"_ _1\"></span>)  <span class=\"_ _ce\"> </span>TBMC<span class=\"_ _36a\"> </span>During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> the Group announced <span class=\"_ _0\"></span>the closure o<span class=\"_ _0\"></span>f its <span class=\"_ _0\"></span>TBMC mortgage br<span class=\"_ _0\"></span>okerage business (<span class=\"_ _0\"></span>note 11), which corr<span class=\"_ _0\"></span>esponded to <span class=\"_ _0\"></span>the TBMC CGU. <span class=\"_ _0\"></span>The goodwill r<span class=\"_ _0\"></span>elating to <span class=\"_ _0\"></span>this CGU, which <span class=\"_ _0\"></span>was r<span class=\"_ _0\"></span>ecognised on an acquisition in December 2008 and impair<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> \u00a36.0m in 2009, <span class=\"_ _0\"></span>was <span class=\"_ _0\"></span>therefor<span class=\"_ _0\"></span>e derecognised in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>, with the remaining net<span class=\"_ _0\"></span> goodwill of<span class=\"_ _0\"></span> \u00a31.6m expensed.<span class=\"_ _36a\"> </span>An impairment re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> carried out in the pr<span class=\"_ _0\"></span>evious <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>, on the basis that <span class=\"_ _0\"></span>the business would continue <span class=\"_ _0\"></span>to operate, indicated no requir<span class=\"_ _0\"></span>ement for<span class=\"_ _1\"></span> additional impairment provision at 30 September<span class=\"_ _1\"></span> 2022.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-381": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs6e0\">32. <span class=\"_ _1c\"></span>Inv<span class=\"_ _0\"></span>estment in subsidiary<span class=\"_ _0\"></span> undertakings<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6e1\">Shares in group </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6e2\">companies<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6e3\">Loans to group </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6e4\">companies<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6e5\">Loans to ESOP </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6e6\">T<span class=\"_ _0\"></span>rusts<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6e7\">T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6e8\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs6e9\">At 1 Oct<span class=\"_ _0\"></span>ober 2021<span class=\"_ _1d1\"> </span><span class=\"ff16\">638.7<span class=\"_ _d5\"> </span>339.5<span class=\"_ _9e\"> </span>0.3<span class=\"_ _150\"> </span>978.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs6ea\">Loans advanced<span class=\"_ _188\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">164.0<span class=\"_ _3a\"> </span>13.0<span class=\"_ _150\"> </span>177.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs6eb\">Loans repaid<span class=\"_ _2af\"> </span>-<span class=\"_ _84\"> </span>(246.5)<span class=\"_ _b7\"> </span>-<span class=\"_ _84\"> </span>(246.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs6ec\">Provision mov<span class=\"_ _0\"></span>ements<span class=\"_ _295\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _72\"> </span>(11.9)<span class=\"_ _6c\"> </span>(11.9)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs6ed\">At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _2a9\"> </span><span class=\"ff16\">638.7<span class=\"_ _d5\"> </span>257.0<span class=\"_ _11f\"> </span>1.4<span class=\"_ _d5\"> </span>897.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs6ee\">Loans advanced<span class=\"_ _188\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">8.0<span class=\"_ _9e\"> </span>8.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs6ef\">Loans repaid<span class=\"_ _2af\"> </span>-<span class=\"_ _84\"> </span>(107.0)<span class=\"_ _b7\"> </span>-<span class=\"_ _84\"> </span>(107.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs6f0\">Provision mov<span class=\"_ _0\"></span>ements<span class=\"_ _1bc\"> </span>(1.3)<span class=\"_ _16b\"> </span>-<span class=\"_ _16b\"> </span>(8.9)<span class=\"_ _6c\"> </span>(10.2)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs6f1\">At 30 Sept<span class=\"_ _0\"></span>ember 2023<span class=\"_ _2a9\"> </span><span class=\"ff15\">637.4<span class=\"_ _d5\"> </span>150.0<span class=\"_ _9e\"> </span>0.5<span class=\"_ _d5\"> </span>787.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6f2\">Loans <span class=\"_ _0\"></span>to group companies includes principally<span class=\"_ _0\"></span> investments in <span class=\"_ _0\"></span>the tier<span class=\"_ _0\"></span> 2 equity instruments issued b<span class=\"_ _0\"></span>y the Compan<span class=\"_ _0\"></span>y\u2019<span class=\"_ _1\"></span>s banking </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6f3\">subsidiary<span class=\"_ _0\"></span>, Parag<span class=\"_ _0\"></span>on Bank PL<span class=\"_ _0\"></span>C.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6f4\">During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 <span class=\"_ _0\"></span>the Company<span class=\"_ _0\"></span> received \u00a3262.5m in dividend income <span class=\"_ _0\"></span>from its subsidiaries (2022: \u00a3152.<span class=\"_ _0\"></span>7m) </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6f5\">and \u00a318.6m of<span class=\"_ _0\"></span> interest<span class=\"_ _0\"></span> on loans to gr<span class=\"_ _0\"></span>oup companies (2022: \u00a312.0m). </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6f6\">The Company\u2019<span class=\"_ _1\"></span>s subsidiaries, and the natur<span class=\"_ _0\"></span>e of its inter<span class=\"_ _0\"></span>est in them, ar<span class=\"_ _0\"></span>e shown in note 72.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs128b\">72. <span class=\"_ _f\"> </span>Details of subsidiary<span class=\"_ _1\"></span> undertakings<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs128c\">Subsidiary undertakings of<span class=\"_ _1\"></span> the Group at 30 September<span class=\"_ _0\"></span> 2023, wher<span class=\"_ _0\"></span>e the shar<span class=\"_ _0\"></span>e capital is held within the Gr<span class=\"_ _1\"></span>oup are shown below<span class=\"_ _0\"></span>. <span class=\"_ _0\"></span>The </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs128d\">holdings shown ar<span class=\"_ _0\"></span>e those held within <span class=\"_ _0\"></span>the Group. <span class=\"_ _0\"></span>The shar<span class=\"_ _0\"></span>eholdings of <span class=\"_ _0\"></span>the Company in <span class=\"_ _0\"></span>the direct subsidiaries list<span class=\"_ _0\"></span>ed below ar<span class=\"_ _0\"></span>e the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs128e\">same as those held b<span class=\"_ _0\"></span>y the Gr<span class=\"_ _0\"></span>oup, ex<span class=\"_ _0\"></span>cept that <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the shareholdings mark<span class=\"_ _0\"></span>ed * the Compan<span class=\"_ _0\"></span>y holds only<span class=\"_ _0\"></span> 7<span class=\"_ _0\"></span>4% of <span class=\"_ _0\"></span>the share capital. In </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs128f\">these cases, the r<span class=\"_ _0\"></span>emainder is held b<span class=\"_ _0\"></span>y other<span class=\"_ _0\"></span> group companies.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1290\">The issued share capital o<span class=\"_ _0\"></span>f all subsidiaries consists of<span class=\"_ _0\"></span> ordinary<span class=\"_ _0\"></span> share capital. </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1291\">Company<span class=\"_ _167\"> </span>Holding<span class=\"_ _6b\"> </span><span class=\"ff1e\">Principal activity<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1292\">Direct subsidiaries of P<span class=\"_ _0\"></span>aragon Banking Gr<span class=\"_ _0\"></span>oup PLC<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs1293\">Par<span class=\"_ _0\"></span>agon Bank PLC<span class=\"_ _357\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Deposit taking, residential mortgag<span class=\"_ _0\"></span>es and loan and vehicle finance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs1294\">Par<span class=\"_ _0\"></span>agon Car Finance Limited<span class=\"_ _146\"> </span><span class=\"ff16\">100%<span class=\"_ _c4\"> </span></span>V<span class=\"_ _0\"></span>ehicle finance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs1295\">Idem Capital Holdings Limited<span class=\"_ _102\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Intermediate holding compan<span class=\"_ _0\"></span>y<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs1296\">The Business Mortgage Compan<span class=\"_ _0\"></span>y Limited<span class=\"_ _12f\"> </span><span class=\"ff16\">100%<span class=\"_ _c4\"> </span></span>Mortgage br<span class=\"_ _0\"></span>ok<span class=\"_ _0\"></span>er<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs1297\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 12) PLC<span class=\"_ _26b\"> </span>100%*<span class=\"_ _1f\"> </span>Residential mortgag<span class=\"_ _0\"></span>es<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs1298\">Colonial Finance (UK) Limited<span class=\"_ _268\"> </span><span class=\"ff16\">100%<span class=\"_ _c4\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs1299\">Earlswood Finance Limit<span class=\"_ _0\"></span>ed<span class=\"_ _87\"> </span><span class=\"ff16\">100%<span class=\"_ _c4\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs129a\">Herbert (1) PLC<span class=\"_ _2e3\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs129b\">Herbert (2) PLC<span class=\"_ _2e3\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs129c\">Herbert (4) PLC<span class=\"_ _2e3\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs129d\">Herbert (5) PLC<span class=\"_ _2e3\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs129e\">Herbert (6) PLC<span class=\"_ _2e3\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs129f\">Herbert (7) PLC<span class=\"_ _2e3\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12a0\">Herbert (8) PLC<span class=\"_ _2e3\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12a1\">Herbert (9) PLC<span class=\"_ _2e3\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12a2\">Herbert (10) PLC<span class=\"_ _1a3\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12a3\">Par<span class=\"_ _0\"></span>agon Car Finance (1) Limited<span class=\"_ _196\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12a4\">Par<span class=\"_ _0\"></span>agon Dealer Finance Limited<span class=\"_ _358\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12a5\">Par<span class=\"_ _0\"></span>agon Loan Finance (No. 3) Limited<span class=\"_ _1a4\"> </span><span class=\"ff16\">100%<span class=\"_ _c4\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12a6\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 5) PLC<span class=\"_ _359\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12a7\">Par<span class=\"_ _0\"></span>agon Pension In<span class=\"_ _0\"></span>vestments GP Limit<span class=\"_ _0\"></span>ed<span class=\"_ _95\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12a8\">Par<span class=\"_ _0\"></span>agon Pension Plan T<span class=\"_ _2\"></span>rustees Limited<span class=\"_ _4f\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12a9\">Par<span class=\"_ _0\"></span>agon Per<span class=\"_ _0\"></span>sonal Finance (1) Limited<span class=\"_ _13f\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12aa\">Par<span class=\"_ _0\"></span>agon Third Funding Limited<span class=\"_ _17d\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12ab\">Par<span class=\"_ _0\"></span>agon V<span class=\"_ _1\"></span>ehicle Contracts Limited<span class=\"_ _2a\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12ac\">Universal Cr<span class=\"_ _0\"></span>edit Limited<span class=\"_ _1c7\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12ad\">Y<span class=\"_ _1\"></span>orkshire Freeholds Limit<span class=\"_ _0\"></span>ed<span class=\"_ _a6\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12ae\">Y<span class=\"_ _1\"></span>orkshire Leaseholds Limited<span class=\"_ _35a\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs12b0\">Direct and indirect subsidiaries of P<span class=\"_ _0\"></span>arag<span class=\"_ _0\"></span>on Bank PLC<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12b1\">Par<span class=\"_ _0\"></span>agon Finance PLC<span class=\"_ _35b\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Residential mortg<span class=\"_ _0\"></span>ages and asset administr<span class=\"_ _0\"></span>ation<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12b2\">Mortgage T<span class=\"_ _2\"></span>rust Limited<span class=\"_ _106\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Residential mortg<span class=\"_ _0\"></span>ages<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12b3\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es Limited<span class=\"_ _121\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Residential mortgag<span class=\"_ _0\"></span>es<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12b4\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (2010) Limited<span class=\"_ _35c\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Residential mortg<span class=\"_ _0\"></span>ages<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12b5\">Mortgage T<span class=\"_ _2\"></span>rust Services PLC<span class=\"_ _107\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Residen<span class=\"_ _0\"></span>tial mortgages and asset adminis<span class=\"_ _0\"></span>tration<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12b6\">Par<span class=\"_ _0\"></span>agon Second Funding Limited<span class=\"_ _18b\"> </span><span class=\"ff16\">100%<span class=\"_ _5c\"> </span></span>Residential mortgages and loan and v<span class=\"_ _0\"></span>ehicle finance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12b7\">Par<span class=\"_ _0\"></span>agon Asset Finance Limited<span class=\"_ _13a\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Holding company and portf<span class=\"_ _0\"></span>olio administra<span class=\"_ _0\"></span>tion<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12b8\">Par<span class=\"_ _0\"></span>agon Business Finance PLC<span class=\"_ _35d\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Asset finance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12b9\">Par<span class=\"_ _0\"></span>agon Commercial Finance Limited<span class=\"_ _147\"> </span><span class=\"ff16\">100%<span class=\"_ _c4\"> </span></span>Asset finance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12ba\">Par<span class=\"_ _0\"></span>agon Development Finance Limit<span class=\"_ _0\"></span>ed<span class=\"_ _61\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Development Finance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12bb\">Par<span class=\"_ _0\"></span>agon Development Finance Services Limited<span class=\"_ _82\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Development Finance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12bc\">Par<span class=\"_ _0\"></span>agon T<span class=\"_ _2\"></span>echnology Finance Limited<span class=\"_ _10d\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Asset finance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12bd\">PBAF Acquisitions Limited<span class=\"_ _1a9\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Residential mortgag<span class=\"_ _0\"></span>es and loan finance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12be\">Premier Asset Finance Limited<span class=\"_ _2ca\"> </span><span class=\"ff16\">100%<span class=\"_ _c4\"> </span></span>Asset finance brok<span class=\"_ _1\"></span>er<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12bf\">Specialist Fleet Services Limited<span class=\"_ _358\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Asset finance and contr<span class=\"_ _0\"></span>act hire<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12c0\">Collett T<span class=\"_ _1\"></span>ransport Services Limited<span class=\"_ _e4\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12c1\">Homer Management Limited<span class=\"_ _253\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12c2\">Lease Portf<span class=\"_ _0\"></span>olio Management Limited<span class=\"_ _13f\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12c3\">Par<span class=\"_ _0\"></span>agon Options PLC<span class=\"_ _35e\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs12c4\">Other indirect subsidiary undertakings<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12c5\">Moorg<span class=\"_ _0\"></span>ate Loan Servicing Limited<span class=\"_ _c3\"> </span><span class=\"ff16\">100%<span class=\"_ _5c\"> </span></span>Asset administration<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12c6\">Idem Capital Securities Limited<span class=\"_ _359\"> </span><span class=\"ff16\">100%<span class=\"_ _c4\"> </span></span>Asset inves<span class=\"_ _0\"></span>tment<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12c7\">Par<span class=\"_ _0\"></span>agon Per<span class=\"_ _0\"></span>sonal Finance Limited<span class=\"_ _f1\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Consumer loan finance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12c8\">Redbrick Survey and V<span class=\"_ _1\"></span>aluation Limited<span class=\"_ _4f\"> </span><span class=\"ff16\">100%<span class=\"_ _c4\"> </span></span>Surveyor<span class=\"_ _0\"></span>s and property consulting<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12c9\">Buy to Let Direct Limit<span class=\"_ _0\"></span>ed<span class=\"_ _35f\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12ca\">Moorg<span class=\"_ _0\"></span>ate Asset Administr<span class=\"_ _0\"></span>ation Limited<span class=\"_ _1aa\"> </span><span class=\"ff16\">100%<span class=\"_ _c4\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12cb\">TBMC Group Limited<span class=\"_ _2b1\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12cc\">The Business Mortgage Compan<span class=\"_ _0\"></span>y Services Limited<span class=\"_ _10e\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12cd\">The financial <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end of all <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019s subsidiary<span class=\"_ _1\"></span> companies is 30 September<span class=\"_ _0\"></span>. The<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e all register<span class=\"_ _0\"></span>ed in England and <span class=\"_ _0\"></span>Wales and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12ce\">operate in the UK<span class=\"_ _0\"></span> excep<span class=\"_ _0\"></span>t Paragon P<span class=\"_ _0\"></span>ension Investments GP<span class=\"_ _0\"></span> Limited, which is r<span class=\"_ _0\"></span>egistered in Sco<span class=\"_ _0\"></span>tland and operates in the UK.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12cf\">As part of<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s financing arrangements certain mortg<span class=\"_ _0\"></span>age and consumer loans originat<span class=\"_ _0\"></span>ed by P<span class=\"_ _0\"></span>aragon Mortgag<span class=\"_ _0\"></span>es (2010)  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12d0\">Limited and Mortgage <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>rust Limited have been sold <span class=\"_ _0\"></span>to special purpose entity companies, r<span class=\"_ _0\"></span>eferr<span class=\"_ _0\"></span>ed to as orphan SPEs, <span class=\"_ _0\"></span>which had </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12d1\">raised non-recour<span class=\"_ _0\"></span>se finance to <span class=\"_ _0\"></span>fund these pur<span class=\"_ _0\"></span>chases. The shar<span class=\"_ _0\"></span>es of<span class=\"_ _0\"></span> these companies are ultimat<span class=\"_ _0\"></span>ely beneficially<span class=\"_ _0\"></span> owned thr<span class=\"_ _0\"></span>ough </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12d2\">independent trusts, but <span class=\"_ _0\"></span>they<span class=\"_ _0\"></span> are consider<span class=\"_ _0\"></span>ed to be contr<span class=\"_ _0\"></span>olled by<span class=\"_ _0\"></span> the Group<span class=\"_ _0\"></span>, as defined by<span class=\"_ _0\"></span> IFRS 10, due to <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s exposures to <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12d3\">variable r<span class=\"_ _0\"></span>eturns fr<span class=\"_ _0\"></span>om the assets of<span class=\"_ _0\"></span> each entity and its ability<span class=\"_ _0\"></span> to dir<span class=\"_ _0\"></span>ect their<span class=\"_ _0\"></span> activities, within <span class=\"_ _0\"></span>the constraints imposed by<span class=\"_ _0\"></span> the lending </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12d4\">documents. Hence, the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e considered t<span class=\"_ _0\"></span>o be subsidiaries of <span class=\"_ _0\"></span>the Group. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12d6\">The principal companies party <span class=\"_ _0\"></span>to these arr<span class=\"_ _0\"></span>angements at 30 September<span class=\"_ _0\"></span> 2023 comprise:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs12d7\">Company<span class=\"_ _314\"> </span><span class=\"ff1e\">Principal activity<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12d8\">Par<span class=\"_ _0\"></span>agon Seventh Funding Limit<span class=\"_ _0\"></span>ed<span class=\"_ _26d\"> </span>Residential mortgages<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12d9\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 26) Holdings Limited<span class=\"_ _90\"> </span>Holding company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12da\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 26) PLC<span class=\"_ _ee\"> </span>Residential mortgages<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12db\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 27) Holdings Limited<span class=\"_ _90\"> </span>Holding company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12dc\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 27) PLC<span class=\"_ _ee\"> </span>Residential mortgages<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12dd\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 28) Holdings Limited<span class=\"_ _90\"> </span>Holding company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12de\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 28) PLC<span class=\"_ _ee\"> </span>Residential mortgages<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12df\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 29) Holdings Limited<span class=\"_ _90\"> </span>Holding company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12e0\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 29) PLC<span class=\"_ _ee\"> </span>Residential mortgages<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12e1\">Arianty Holdings Limited<span class=\"_ _360\"> </span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12e2\">Arianty No. 1 PLC<span class=\"_ _361\"> </span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12e3\">Par<span class=\"_ _0\"></span>agon Fifth Funding Limited<span class=\"_ _2e4\"> </span>Non-tr<span class=\"_ _0\"></span>ading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12e4\">Par<span class=\"_ _0\"></span>agon Sixth Funding Limited<span class=\"_ _1df\"> </span>Non-tr<span class=\"_ _0\"></span>ading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12e5\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 25) Holdings Limited<span class=\"_ _90\"> </span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12e6\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 25) PLC<span class=\"_ _ee\"> </span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12e7\">All these companies ar<span class=\"_ _0\"></span>e register<span class=\"_ _0\"></span>ed and operate in the UK.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12e8\">Earlswood Finance (No<span class=\"_ _0\"></span>. 3) Limited, a company limit<span class=\"_ _0\"></span>ed by guar<span class=\"_ _0\"></span>antee, is register<span class=\"_ _0\"></span>ed in England and W<span class=\"_ _1\"></span>ales and operates in the UK. It is </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12e9\">included in the consolidation as it is ultimately<span class=\"_ _0\"></span> controlled b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the parent company<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12ea\">The Parag<span class=\"_ _0\"></span>on Pension Partnership LP<span class=\"_ _0\"></span> is a limited partnership established under<span class=\"_ _0\"></span> Scots law<span class=\"_ _0\"></span>, in which contr<span class=\"_ _0\"></span>ol is v<span class=\"_ _0\"></span>ested in members </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12eb\">which are gr<span class=\"_ _0\"></span>oup companies. It is ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e considered t<span class=\"_ _0\"></span>o be a subsidiary entity<span class=\"_ _1\"></span>. The outside member<span class=\"_ _0\"></span> is the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s Pension Plan and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12ec\">the Plan\u2019<span class=\"_ _1\"></span>s rights to income <span class=\"_ _0\"></span>from the partner<span class=\"_ _0\"></span>ship are set out in <span class=\"_ _0\"></span>the partnership agreement. <span class=\"_ _1\"></span>Therefor<span class=\"_ _0\"></span>e, no minority inter<span class=\"_ _0\"></span>est arises. T<span class=\"_ _0\"></span>he </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12ed\">partnership is register<span class=\"_ _1\"></span>ed in Scotland and operates in the UK.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12ee\">The regist<span class=\"_ _0\"></span>ered office of<span class=\"_ _0\"></span> each of<span class=\"_ _0\"></span> the entities listed in <span class=\"_ _0\"></span>this note is the same as <span class=\"_ _0\"></span>that of <span class=\"_ _0\"></span>the Company<span class=\"_ _0\"></span> (note 1), ex<span class=\"_ _0\"></span>cept that <span class=\"_ _0\"></span>the register<span class=\"_ _0\"></span>ed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12ef\">office of<span class=\"_ _0\"></span> the Scottish entities is Citypoint, 65 Haymark<span class=\"_ _0\"></span>et <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>errace, Edinburgh, EH12 5HD. <span class=\"_ _1\"></span>All the entities listed above ar<span class=\"_ _0\"></span>e included in the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12f0\">consolidated accounts of<span class=\"_ _0\"></span> the Group<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs12f1\">Companies in liquidation<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12f2\">The f<span class=\"_ _0\"></span>ollowing legal subsidiaries of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup wer<span class=\"_ _0\"></span>e in liquidation at 30 September<span class=\"_ _0\"></span> 2023. The<span class=\"_ _0\"></span>y do no<span class=\"_ _0\"></span>t form part o<span class=\"_ _0\"></span>f the consolidation as </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12f3\">they<span class=\"_ _0\"></span> are consider<span class=\"_ _0\"></span>ed to be contr<span class=\"_ _0\"></span>olled by<span class=\"_ _0\"></span> the liquidator<span class=\"_ _1\"></span>. </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs12f4\">Company<span class=\"_ _167\"> </span>Holding<span class=\"_ _6b\"> </span><span class=\"ff1e\">Principal activity<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs12f5\">Direct subsidiaries of P<span class=\"_ _0\"></span>aragon Banking Gr<span class=\"_ _0\"></span>oup PLC<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12f6\">Moorg<span class=\"_ _0\"></span>ate Servicing Limited<span class=\"_ _121\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12f7\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 11) PLC<span class=\"_ _26b\"> </span>100% *<span class=\"_ _e\"> </span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12f8\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 13) PLC<span class=\"_ _26b\"> </span>100% *<span class=\"_ _e\"> </span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12f9\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 14) PLC<span class=\"_ _26b\"> </span>100% *<span class=\"_ _e\"> </span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12fa\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 15) PLC<span class=\"_ _26b\"> </span>100% *<span class=\"_ _e\"> </span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12fb\">Plymouth Funding Limited<span class=\"_ _89\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs12fc\">Direct and Indirect subsidiaries of P<span class=\"_ _0\"></span>arag<span class=\"_ _0\"></span>on Bank PLC<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12fd\">City Business Finance Limited<span class=\"_ _268\"> </span><span class=\"ff16\">100%<span class=\"_ _c4\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12fe\">Fineline Holdings Limited<span class=\"_ _1a6\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs12ff\">Fineline Media Finance Limited<span class=\"_ _103\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs1300\">PBAF (No.1) Limited<span class=\"_ _269\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs1301\">Stat<span class=\"_ _0\"></span>e Securities Holdings Limited<span class=\"_ _18b\"> </span><span class=\"ff16\">100%<span class=\"_ _48\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs1302\">Stat<span class=\"_ _0\"></span>e Security Limited<span class=\"_ _2b8\"> </span><span class=\"ff16\">100%<span class=\"_ _c4\"> </span></span>Non-trading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1303\">The shareholdings o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Company in each of<span class=\"_ _0\"></span> the dir<span class=\"_ _0\"></span>ect subsidiaries shown abo<span class=\"_ _0\"></span>ve is the same as <span class=\"_ _0\"></span>that of<span class=\"_ _0\"></span> the Group<span class=\"_ _0\"></span>, except <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1304\">companies marked * <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>the shareholding of<span class=\"_ _0\"></span> the company<span class=\"_ _0\"></span> is 7<span class=\"_ _0\"></span>4%. <span class=\"_ _0\"></span>The issued share capital of<span class=\"_ _0\"></span> each of<span class=\"_ _0\"></span> the companies listed abov<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1305\">consists of or<span class=\"_ _0\"></span>dinary shar<span class=\"_ _0\"></span>es only<span class=\"_ _1\"></span>.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSignificantInvestmentsInSubsidiariesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-475": {
   "value": "32. <span class=\"_ _1c\"></span>Inv<span class=\"_ _0\"></span>estment in subsidiary<span class=\"_ _0\"></span> undertakings<span class=\"_ _36a\"> </span>Shares in group companies<span class=\"_ _36a\"> </span>Loans to group companies<span class=\"_ _36a\"> </span>Loans to ESOP T<span class=\"_ _0\"></span>rusts<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span>At 1 Oct<span class=\"_ _0\"></span>ober 2021<span class=\"_ _1d1\"> </span><span class=\"ff16\">638.7<span class=\"_ _d5\"> </span>339.5<span class=\"_ _9e\"> </span>0.3<span class=\"_ _150\"> </span>978.5<span class=\"_ _36a\"> </span></span>Loans advanced<span class=\"_ _188\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">164.0<span class=\"_ _3a\"> </span>13.0<span class=\"_ _150\"> </span>177.0<span class=\"_ _36a\"> </span></span>Loans repaid<span class=\"_ _2af\"> </span>-<span class=\"_ _84\"> </span>(246.5)<span class=\"_ _b7\"> </span>-<span class=\"_ _84\"> </span>(246.5)<span class=\"_ _36a\"> </span>Provision mov<span class=\"_ _0\"></span>ements<span class=\"_ _295\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _72\"> </span>(11.9)<span class=\"_ _6c\"> </span>(11.9)<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _2a9\"> </span><span class=\"ff16\">638.7<span class=\"_ _d5\"> </span>257.0<span class=\"_ _11f\"> </span>1.4<span class=\"_ _d5\"> </span>897.1<span class=\"_ _36a\"> </span></span>Loans advanced<span class=\"_ _188\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">8.0<span class=\"_ _9e\"> </span>8.0<span class=\"_ _36a\"> </span></span>Loans repaid<span class=\"_ _2af\"> </span>-<span class=\"_ _84\"> </span>(107.0)<span class=\"_ _b7\"> </span>-<span class=\"_ _84\"> </span>(107.0)<span class=\"_ _36a\"> </span>Provision mov<span class=\"_ _0\"></span>ements<span class=\"_ _1bc\"> </span>(1.3)<span class=\"_ _16b\"> </span>-<span class=\"_ _16b\"> </span>(8.9)<span class=\"_ _6c\"> </span>(10.2)<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2023<span class=\"_ _2a9\"> </span><span class=\"ff15\">637.4<span class=\"_ _d5\"> </span>150.0<span class=\"_ _9e\"> </span>0.5<span class=\"_ _d5\"> </span>787.9<span class=\"_ _36a\"> </span></span>Loans <span class=\"_ _0\"></span>to group companies includes principally<span class=\"_ _0\"></span> investments in <span class=\"_ _0\"></span>the tier<span class=\"_ _0\"></span> 2 equity instruments issued b<span class=\"_ _0\"></span>y the Compan<span class=\"_ _0\"></span>y\u2019<span class=\"_ _1\"></span>s banking subsidiary<span class=\"_ _0\"></span>, Parag<span class=\"_ _0\"></span>on Bank PL<span class=\"_ _0\"></span>C.<span class=\"_ _36a\"> </span>During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 <span class=\"_ _0\"></span>the Company<span class=\"_ _0\"></span> received \u00a3262.5m in dividend income <span class=\"_ _0\"></span>from its subsidiaries (2022: \u00a3152.<span class=\"_ _0\"></span>7m) and \u00a318.6m of<span class=\"_ _0\"></span> interest<span class=\"_ _0\"></span> on loans to gr<span class=\"_ _0\"></span>oup companies (2022: \u00a312.0m). The Company\u2019<span class=\"_ _1\"></span>s subsidiaries, and the natur<span class=\"_ _0\"></span>e of its inter<span class=\"_ _0\"></span>est in them, ar<span class=\"_ _0\"></span>e shown in note 72.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInterestsInOtherEntitiesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-442": {
   "value": "32. <span class=\"_ _1c\"></span>Inv<span class=\"_ _0\"></span>estment in subsidiary<span class=\"_ _0\"></span> undertakings<span class=\"_ _36a\"> </span>Shares in group companies<span class=\"_ _36a\"> </span>Loans to group companies<span class=\"_ _36a\"> </span>Loans to ESOP T<span class=\"_ _0\"></span>rusts<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span>At 1 Oct<span class=\"_ _0\"></span>ober 2021<span class=\"_ _1d1\"> </span><span class=\"ff16\">638.7<span class=\"_ _d5\"> </span>339.5<span class=\"_ _9e\"> </span>0.3<span class=\"_ _150\"> </span>978.5<span class=\"_ _36a\"> </span></span>Loans advanced<span class=\"_ _188\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">164.0<span class=\"_ _3a\"> </span>13.0<span class=\"_ _150\"> </span>177.0<span class=\"_ _36a\"> </span></span>Loans repaid<span class=\"_ _2af\"> </span>-<span class=\"_ _84\"> </span>(246.5)<span class=\"_ _b7\"> </span>-<span class=\"_ _84\"> </span>(246.5)<span class=\"_ _36a\"> </span>Provision mov<span class=\"_ _0\"></span>ements<span class=\"_ _295\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _72\"> </span>(11.9)<span class=\"_ _6c\"> </span>(11.9)<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2022<span class=\"_ _2a9\"> </span><span class=\"ff16\">638.7<span class=\"_ _d5\"> </span>257.0<span class=\"_ _11f\"> </span>1.4<span class=\"_ _d5\"> </span>897.1<span class=\"_ _36a\"> </span></span>Loans advanced<span class=\"_ _188\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">8.0<span class=\"_ _9e\"> </span>8.0<span class=\"_ _36a\"> </span></span>Loans repaid<span class=\"_ _2af\"> </span>-<span class=\"_ _84\"> </span>(107.0)<span class=\"_ _b7\"> </span>-<span class=\"_ _84\"> </span>(107.0)<span class=\"_ _36a\"> </span>Provision mov<span class=\"_ _0\"></span>ements<span class=\"_ _1bc\"> </span>(1.3)<span class=\"_ _16b\"> </span>-<span class=\"_ _16b\"> </span>(8.9)<span class=\"_ _6c\"> </span>(10.2)<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2023<span class=\"_ _2a9\"> </span><span class=\"ff15\">637.4<span class=\"_ _d5\"> </span>150.0<span class=\"_ _9e\"> </span>0.5<span class=\"_ _d5\"> </span>787.9<span class=\"_ _36a\"> </span></span>Loans <span class=\"_ _0\"></span>to group companies includes principally<span class=\"_ _0\"></span> investments in <span class=\"_ _0\"></span>the tier<span class=\"_ _0\"></span> 2 equity instruments issued b<span class=\"_ _0\"></span>y the Compan<span class=\"_ _0\"></span>y\u2019<span class=\"_ _1\"></span>s banking subsidiary<span class=\"_ _0\"></span>, Parag<span class=\"_ _0\"></span>on Bank PL<span class=\"_ _0\"></span>C.<span class=\"_ _36a\"> </span>During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 <span class=\"_ _0\"></span>the Company<span class=\"_ _0\"></span> received \u00a3262.5m in dividend income <span class=\"_ _0\"></span>from its subsidiaries (2022: \u00a3152.<span class=\"_ _0\"></span>7m) and \u00a318.6m of<span class=\"_ _0\"></span> interest<span class=\"_ _0\"></span> on loans to gr<span class=\"_ _0\"></span>oup companies (2022: \u00a312.0m). The Company\u2019<span class=\"_ _1\"></span>s subsidiaries, and the natur<span class=\"_ _0\"></span>e of its inter<span class=\"_ _0\"></span>est in them, ar<span class=\"_ _0\"></span>e shown in note 72.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInvestmentsAccountedForUsingEquityMethodExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-382": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs6f8\">33. <span class=\"_ _1c\"></span>Re<span class=\"_ _0\"></span>tail deposits<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6f9\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s retail deposits, held b<span class=\"_ _0\"></span>y Par<span class=\"_ _0\"></span>agon Bank PL<span class=\"_ _0\"></span>C, <span class=\"_ _0\"></span>were r<span class=\"_ _0\"></span>eceived fr<span class=\"_ _1\"></span>om customers in the UK and are denominat<span class=\"_ _0\"></span>ed in sterling. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6fa\">The deposits comprise principally <span class=\"_ _0\"></span>term deposits, and notice and eas<span class=\"_ _0\"></span>y access accounts. <span class=\"_ _0\"></span>The method of<span class=\"_ _0\"></span> interest calculation on <span class=\"_ _0\"></span>these </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs6fb\">deposits is analysed as f<span class=\"_ _0\"></span>ollows:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6fc\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs6fd\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs6fe\">Fixed r<span class=\"_ _0\"></span>ate<span class=\"_ _21a\"> </span><span class=\"ff15\">8,690.2<span class=\"_ _86\"> </span><span class=\"ff16\">6,201.3<span class=\"_ _86\"> </span>5,466.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs6ff\">V<span class=\"_ _1\"></span>ariable rates<span class=\"_ _283\"> </span><span class=\"ff15\">4,575.1<span class=\"_ _86\"> </span><span class=\"ff16\">4,467.9<span class=\"_ _86\"> </span>3,834.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs700\">13,265.3<span class=\"_ _42\"> </span><span class=\"ff16\">10,669.2<span class=\"_ _86\"> </span>9,300.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs701\">The w<span class=\"_ _0\"></span>eighted aver<span class=\"_ _0\"></span>age interest<span class=\"_ _0\"></span> rate on retail deposits at<span class=\"_ _0\"></span> 30 September 2023, analy<span class=\"_ _0\"></span>sed by<span class=\"_ _0\"></span> charging method, w<span class=\"_ _0\"></span>as:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs702\">2023 <span class=\"_ _150\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs703\">%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _12d\"> </span>%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs704\">Fixed r<span class=\"_ _0\"></span>ate<span class=\"_ _221\"> </span><span class=\"ff15\">4.07<span class=\"_ _ff\"> </span><span class=\"ff16\">1.74<span class=\"_ _3a\"> </span>1.25<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs705\">V<span class=\"_ _1\"></span>ariable rates<span class=\"_ _1d2\"> </span><span class=\"ff15\">3.74<span class=\"_ _d4\"> </span><span class=\"ff16\">1.55<span class=\"_ _3a\"> </span>0.42<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs706\">All deposits<span class=\"_ _156\"> </span><span class=\"ff15\">3.95<span class=\"_ _ff\"> </span><span class=\"ff16\">1.66<span class=\"_ _3a\"> </span>0.91<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs707\">The contractual maturity<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>these deposits is analysed below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs708\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs709\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs70a\">Amounts repa<span class=\"_ _0\"></span>yable<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs70b\">In less than three months<span class=\"_ _2b0\"> </span><span class=\"ff15\">1,589.4<span class=\"_ _d5\"> </span><span class=\"ff16\">929.0<span class=\"_ _150\"> </span>789.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs70c\">In more than three mon<span class=\"_ _0\"></span>ths, but not more than one year<span class=\"_ _273\"> </span><span class=\"ff15\">5,193.7<span class=\"_ _86\"> </span><span class=\"ff16\">3,732.1<span class=\"_ _12a\"> </span>3,105.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs70d\">In more than one year<span class=\"_ _2\"></span>, but not more than two year<span class=\"_ _0\"></span>s<span class=\"_ _2b1\"> </span><span class=\"ff15\">1,643.0<span class=\"_ _86\"> </span><span class=\"ff16\">1,627.3<span class=\"_ _86\"> </span>1,580.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs70e\">In more than two y<span class=\"_ _0\"></span>ears, but not more than five y<span class=\"_ _0\"></span>ears<span class=\"_ _269\"> </span><span class=\"ff15\">631.8<span class=\"_ _150\"> </span><span class=\"ff16\">421.4<span class=\"_ _150\"> </span>507.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs70f\">T<span class=\"_ _2\"></span>otal term deposits<span class=\"_ _2b2\"> </span>9,057.9<span class=\"_ _86\"> </span><span class=\"ff16\">6,709.8<span class=\"_ _86\"> </span>5,981.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs710\">Repa<span class=\"_ _0\"></span>yable on demand<span class=\"_ _2b3\"> </span>4,207.4<span class=\"_ _86\"> </span><span class=\"ff16\">3,959.4<span class=\"_ _86\"> </span>3,318.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs711\">13,265.3<span class=\"_ _42\"> </span><span class=\"ff16\">10,669.2<span class=\"_ _86\"> </span>9,300.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs712\">Fair v<span class=\"_ _0\"></span>alue adjustments f<span class=\"_ _0\"></span>or portfolio hedging (note 26)<span class=\"_ _269\"> </span><span class=\"ff15\">(30.9)<span class=\"_ _bf\"> </span></span>(99.7)<span class=\"_ _1db\"> </span>(3.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs713\">13,234.4<span class=\"_ _42\"> </span><span class=\"ff16\">10,569.5<span class=\"_ _86\"> </span>9,297.4</span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDepositsFromCustomersExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-383": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs715\">34. <span class=\"_ _1c\"></span>Asset back<span class=\"_ _1\"></span>ed loan notes<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs716\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s asset backed loan no<span class=\"_ _0\"></span>tes are rated and publicly<span class=\"_ _1\"></span> listed and are secured on portfolios comprising <span class=\"_ _0\"></span>variable and <span class=\"_ _0\"></span>fixed rate </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs717\">mortgages. <span class=\"_ _0\"></span>The maturity<span class=\"_ _0\"></span> date of <span class=\"_ _0\"></span>the notes matches the maturity<span class=\"_ _1\"></span> date of the underlying assets. <span class=\"_ _1\"></span>The notes can be prepaid in part fr<span class=\"_ _1\"></span>om </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs718\">time to <span class=\"_ _0\"></span>time, but such prepa<span class=\"_ _0\"></span>yments are limited <span class=\"_ _0\"></span>to the net capital r<span class=\"_ _0\"></span>eceived fr<span class=\"_ _0\"></span>om borro<span class=\"_ _0\"></span>wers in r<span class=\"_ _0\"></span>espect of <span class=\"_ _0\"></span>the underlying assets. T<span class=\"_ _0\"></span>here is </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs719\">no requir<span class=\"_ _0\"></span>ement for<span class=\"_ _1\"></span> the Group to mak<span class=\"_ _0\"></span>e good any<span class=\"_ _0\"></span> shortfall on the no<span class=\"_ _0\"></span>tes out of<span class=\"_ _0\"></span> general funds. It is lik<span class=\"_ _0\"></span>ely <span class=\"_ _0\"></span>that a substantial proportion o<span class=\"_ _0\"></span>f </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs71a\">the notes will be r<span class=\"_ _0\"></span>epaid within <span class=\"_ _0\"></span>five <span class=\"_ _0\"></span>years.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs71b\">The Group also has an op<span class=\"_ _0\"></span>tion to r<span class=\"_ _0\"></span>epay all <span class=\"_ _0\"></span>the notes on any<span class=\"_ _0\"></span> issue at an earlier dat<span class=\"_ _0\"></span>e (the \u2018call date<span class=\"_ _1\"></span>\u2019), at their outstanding principal amount.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs71c\">During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 int<span class=\"_ _0\"></span>erest <span class=\"_ _0\"></span>was pay<span class=\"_ _0\"></span>able on the notes at a <span class=\"_ _0\"></span>fixed margin abo<span class=\"_ _0\"></span>ve the compounded St<span class=\"_ _0\"></span>erling </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs71d\">Overnight Interbank<span class=\"_ _0\"></span> A<span class=\"_ _0\"></span>verag<span class=\"_ _0\"></span>e Rate (\u2018SONIA<span class=\"_ _0\"></span>\u2019).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs71e\">All payments in r<span class=\"_ _0\"></span>espect of <span class=\"_ _0\"></span>the notes are r<span class=\"_ _0\"></span>equired <span class=\"_ _0\"></span>to be made in the curr<span class=\"_ _0\"></span>ency<span class=\"_ _0\"></span> in which the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e denominated.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs71f\">The Group publishes de<span class=\"_ _0\"></span>tailed information on the performance o<span class=\"_ _0\"></span>f all its note issues on <span class=\"_ _0\"></span>the Bond Invest<span class=\"_ _0\"></span>or Reporting section o<span class=\"_ _0\"></span>f its </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs720\">website at <span class=\"_ _0\"></span>www<span class=\"_ _0\"></span>.paragonbankinggroup<span class=\"_ _0\"></span>.co.uk. <span class=\"_ _0\"></span>A mor<span class=\"_ _0\"></span>e detailed description of<span class=\"_ _0\"></span> the securitisation structur<span class=\"_ _0\"></span>e under <span class=\"_ _0\"></span>which these notes ar<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs721\">issued is given in note 64<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs722\">Notes in issue at 30 September<span class=\"_ _1\"></span> 2023 and 30 September 2022, net of<span class=\"_ _0\"></span> any<span class=\"_ _0\"></span> held by <span class=\"_ _0\"></span>the Group, <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs723\">Issuer<span class=\"_ _2b4\"> </span>Maturity dat<span class=\"_ _0\"></span>e<span class=\"_ _58\"> </span>Call da<span class=\"_ _0\"></span>te<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs724\">Principal </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs725\">outstanding<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs726\">Av<span class=\"_ _0\"></span>erage </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs727\">inter<span class=\"_ _0\"></span>est margin<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs728\">2023<span class=\"_ _94\"> </span><span class=\"ff16\">2022<span class=\"_ _b8\"> </span></span>2023<span class=\"_ _88\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs729\">\u00a3m<span class=\"_ _50\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _86\"> </span></span>%<span class=\"_ _132\"> </span><span class=\"ff16\">%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs72a\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 25) PLC<span class=\"_ _137\"> </span>15/05/50<span class=\"_ _50\"> </span>15/05/23<span class=\"_ _3a\"> </span><span class=\"ff15\">-<span class=\"_ _77\"> </span><span class=\"ff16\">302.5<span class=\"_ _71\"> </span></span>-<span class=\"_ _1d4\"> </span><span class=\"ff16\">0.86<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs72b\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 26) PLC<span class=\"_ _137\"> </span>15/05/45<span class=\"_ _50\"> </span>15/08/24<span class=\"_ _132\"> </span><span class=\"ff15\">28.4<span class=\"_ _119\"> </span><span class=\"ff16\">107.9<span class=\"_ _88\"> </span></span>1.05<span class=\"_ _73\"> </span><span class=\"ff16\">1.05<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs72c\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 27) PLC\u2020<span class=\"_ _7a\"> </span>15/04/47<span class=\"_ _50\"> </span>15/10/25<span class=\"_ _3a\"> </span><span class=\"ff15\">-<span class=\"_ _bf\"> </span></span>-<span class=\"_ _bf\"> </span><span class=\"ff15\">-<span class=\"_ _bf\"> </span>-<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs72d\">Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 28) PLC\u2020<span class=\"_ _7a\"> </span>15/12/47<span class=\"_ _50\"> </span>15/12/25<span class=\"_ _3a\"> </span><span class=\"ff15\">-<span class=\"_ _bf\"> </span></span>-<span class=\"_ _bf\"> </span><span class=\"ff15\">-<span class=\"_ _bf\"> </span>-<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h1d ff3 fs10 fc1 sc0 ls0 ws0 gs72e\">\u2020</div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gs72f\">All notes issued by<span class=\"_ _0\"></span> Paragon Mortgages (No<span class=\"_ _0\"></span>. 27) and Paragon Mortgages (No. 28) <span class=\"_ _0\"></span>were r<span class=\"_ _0\"></span>etained by <span class=\"_ _0\"></span>the Group (see no<span class=\"_ _0\"></span>te 64).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs730\">The details of<span class=\"_ _0\"></span> the assets backing <span class=\"_ _0\"></span>these securities are giv<span class=\"_ _0\"></span>en in note 18.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs731\">During the <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>, on 15 May 2023, <span class=\"_ _0\"></span>the Group r<span class=\"_ _0\"></span>edeemed all of <span class=\"_ _0\"></span>the outstanding notes of<span class=\"_ _0\"></span> the Parag<span class=\"_ _0\"></span>on Mortgages (No. 25) PL<span class=\"_ _1\"></span>C </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs732\">securitisation at par<span class=\"_ _1\"></span>. The underlying assets <span class=\"_ _0\"></span>were subsequently<span class=\"_ _0\"></span> funded b<span class=\"_ _0\"></span>y other<span class=\"_ _0\"></span> group companies.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs733\">On 1 November<span class=\"_ _1\"></span> 2023, after the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end, a group company<span class=\"_ _1\"></span>, Paragon Mortgag<span class=\"_ _0\"></span>es (No. 29) PL<span class=\"_ _0\"></span>C, issued \u00a3855.<span class=\"_ _0\"></span>0m of sterling mortg<span class=\"_ _0\"></span>age </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs734\">backed <span class=\"_ _0\"></span>floating rate notes, analy<span class=\"_ _0\"></span>sed below<span class=\"_ _0\"></span>, at par<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs735\">Class<span class=\"_ _270\"> </span><span class=\"ff1e\">Fit<span class=\"_ _0\"></span>ch Rating<span class=\"_ _1c1\"> </span>Moody<span class=\"_ _15\"></span>\u2019<span class=\"_ _0\"></span>s rating<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs736\">Inter<span class=\"_ _0\"></span>est margin above </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs737\">compounded SONIA<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs738\">Principal value<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs739\">\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs73a\">A<span class=\"_ _2b5\"> </span>AAA<span class=\"_ _12f\"> </span>Aaa<span class=\"_ _13c\"> </span><span class=\"ff16\">1.20%<span class=\"_ _13d\"> </span><span class=\"ff15\">747.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs73b\">B<span class=\"_ _2b6\"> </span>AA<span class=\"_ _14a\"> </span>Aa1<span class=\"_ _1d5\"> </span><span class=\"ff16\">1.90%<span class=\"_ _2b7\"> </span><span class=\"ff15\">33.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gs73c\">C<span class=\"_ _2b8\"> </span><span class=\"ff17 ls18 ws5e\">A-<span class=\"_ _14a\"> </span></span><span class=\"ff17\">Aa2<span class=\"_ _1d5\"> </span></span>2.75%<span class=\"_ _2b7\"> </span><span class=\"ff15\">29.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gs73d\">D<span class=\"_ _2b9\"> </span><span class=\"ff17\">B+<span class=\"_ _ba\"> </span>A2<span class=\"_ _1d5\"> </span></span>3.80%<span class=\"_ _65\"> </span><span class=\"ff15\">45.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs73e\">855.0<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs73f\">All the abo<span class=\"_ _0\"></span>ve notes <span class=\"_ _0\"></span>were r<span class=\"_ _0\"></span>etained by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs740\">On 26 June 2019<span class=\"_ _1\"></span>, the Group disposed of<span class=\"_ _0\"></span> its beneficial interest<span class=\"_ _0\"></span> in the Parag<span class=\"_ _0\"></span>on Mortgages (No. 12) PL<span class=\"_ _1\"></span>C securitisation. At <span class=\"_ _0\"></span>that point, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs741\">the FRN liabilities wer<span class=\"_ _1\"></span>e derecognised by <span class=\"_ _0\"></span>the Group, although <span class=\"_ _0\"></span>the notes r<span class=\"_ _0\"></span>emain in issue. The Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s continuing involvement in <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs742\">transaction is described in note 53.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs744\">35. <span class=\"_ _1c\"></span>Bank borro<span class=\"_ _0\"></span>wings<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs745\">New<span class=\"_ _0\"></span> first mortgag<span class=\"_ _0\"></span>e loans may be <span class=\"_ _0\"></span>financed by<span class=\"_ _0\"></span> a secured bank loan, r<span class=\"_ _0\"></span>eferr<span class=\"_ _0\"></span>ed to as a \u2018war<span class=\"_ _0\"></span>ehouse facility\u2019<span class=\"_ _2f\"></span>. The Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s warehouse </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs746\">facilities may<span class=\"_ _0\"></span> also be used to acquir<span class=\"_ _0\"></span>e accounts from o<span class=\"_ _0\"></span>ther gr<span class=\"_ _0\"></span>oup companies to be held on a <span class=\"_ _0\"></span>temporary basis as part o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs747\">over<span class=\"_ _0\"></span>all management of<span class=\"_ _0\"></span> funding and liquidity<span class=\"_ _1\"></span>. Such internal transfers ar<span class=\"_ _0\"></span>e on a no gain / no loss basis.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs748\">These facilities ar<span class=\"_ _0\"></span>e drawn on <span class=\"_ _0\"></span>the completion or acquisition of<span class=\"_ _1\"></span> a mortgage and repayment o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>facilities is restricted <span class=\"_ _0\"></span>to the principal </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs749\">cash receiv<span class=\"_ _0\"></span>ed in respect of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>funded mortgages. L<span class=\"_ _0\"></span>oans held in war<span class=\"_ _0\"></span>ehouse facilities ar<span class=\"_ _0\"></span>e refinanced in <span class=\"_ _0\"></span>the mortgage back<span class=\"_ _0\"></span>ed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs74a\">securitisation market <span class=\"_ _0\"></span>when conditions are appr<span class=\"_ _0\"></span>opriate or<span class=\"_ _0\"></span> through int<span class=\"_ _0\"></span>ernal sales to access r<span class=\"_ _0\"></span>etail funding. Mor<span class=\"_ _0\"></span>e information on this </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs74b\">process is giv<span class=\"_ _0\"></span>en in note 64 and details of<span class=\"_ _0\"></span> assets held within <span class=\"_ _0\"></span>the war<span class=\"_ _0\"></span>ehouse facilities ar<span class=\"_ _0\"></span>e given in note 18. De<span class=\"_ _0\"></span>tails of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s bank </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs74c\">borro<span class=\"_ _0\"></span>wings are set out belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs74d\">2023<span class=\"_ _122\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs74e\">Principal </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs74f\">value<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs750\">Maximum </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs751\">available </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs752\">facility<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs753\">Carrying </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs754\">value<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs755\">Principal<span class=\"ff16\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs756\">value<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs757\">Maximum </div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs758\">av<span class=\"_ _0\"></span>ailable<span class=\"ff16\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs759\">facility<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs75a\">Carrying<span class=\"ff16\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs75b\">value<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs75c\">\u00a3m<span class=\"_ _a0\"> </span>\u00a3m<span class=\"_ _2c\"> </span>\u00a3m<span class=\"_ _a0\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _2c\"> </span>\u00a3m<span class=\"_ _2c\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs75d\">i) <span class=\"_ _27\"> </span>Par<span class=\"_ _0\"></span>agon Second Funding<span class=\"_ _cc\"> </span><span class=\"ff15\">-<span class=\"_ _b7\"> </span>-<span class=\"_ _b7\"> </span>-<span class=\"_ _9f\"> </span><span class=\"ff16\">416.0<span class=\"_ _6d\"> </span>416.0<span class=\"_ _86\"> </span>416.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs75e\">ii) <span class=\"_ _17\"> </span>Parag<span class=\"_ _0\"></span>on Seventh Funding<span class=\"_ _82\"> </span><span class=\"ff15\">-<span class=\"_ _5a\"> </span>-<span class=\"_ _b7\"> </span>-<span class=\"_ _9f\"> </span><span class=\"ff16\">170.0<span class=\"_ _6d\"> </span>450.0<span class=\"_ _86\"> </span>170.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs75f\">-<span class=\"_ _b7\"> </span>-<span class=\"_ _5a\"> </span>-<span class=\"_ _9f\"> </span><span class=\"ff16\">586.0<span class=\"_ _86\"> </span>866.0<span class=\"_ _6d\"> </span>586.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs760\">i) <span class=\"_ _9\"> </span> <span class=\"_ _3\"></span>The Par<span class=\"_ _0\"></span>agon Second F<span class=\"_ _0\"></span>unding w<span class=\"_ _0\"></span>arehouse w<span class=\"_ _0\"></span>as av<span class=\"_ _0\"></span>ailable for<span class=\"_ _0\"></span> further<span class=\"_ _0\"></span> drawings until 29 F<span class=\"_ _1\"></span>ebruary 2008 at which point it con<span class=\"_ _0\"></span>verted </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs761\">automatically <span class=\"_ _0\"></span>to a term loan and no <span class=\"_ _0\"></span>further dra<span class=\"_ _0\"></span>wings wer<span class=\"_ _0\"></span>e allowed. <span class=\"_ _1\"></span>The loan was r<span class=\"_ _0\"></span>epaid in full on 29 September<span class=\"_ _0\"></span> 2023. This loan </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs762\">was a sterling <span class=\"_ _0\"></span>facility pr<span class=\"_ _0\"></span>ovided t<span class=\"_ _0\"></span>o Paragon Second F<span class=\"_ _1\"></span>unding Limited by a consortium of<span class=\"_ _0\"></span> banks and w<span class=\"_ _0\"></span>as secured on all <span class=\"_ _0\"></span>the assets of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs763\">Paragon Second F<span class=\"_ _1\"></span>unding Limited, Paragon Car<span class=\"_ _0\"></span> Finance (1) Limited and Parag<span class=\"_ _0\"></span>on Personal Finance (1) Limited. Inter<span class=\"_ _0\"></span>est on this loan </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs764\">was pay<span class=\"_ _0\"></span>able monthly at 0<span class=\"_ _0\"></span>.704% abo<span class=\"_ _0\"></span>ve SONIA.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs765\">ii) <span class=\"_ _d\"> </span> <span class=\"_ _3\"></span>On 14 Nov<span class=\"_ _0\"></span>ember 2018, a \u00a3200<span class=\"_ _0\"></span>.0m <span class=\"_ _0\"></span>warehouse <span class=\"_ _0\"></span>funding facility<span class=\"_ _0\"></span> was agr<span class=\"_ _0\"></span>eed between P<span class=\"_ _0\"></span>aragon Sev<span class=\"_ _0\"></span>enth F<span class=\"_ _0\"></span>unding Limited and Bank </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs766\">of <span class=\"_ _1\"></span>America Merrill L<span class=\"_ _1\"></span>ynch. The facility<span class=\"_ _1\"></span> was secured o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> all the assets of<span class=\"_ _0\"></span> Paragon Se<span class=\"_ _0\"></span>venth F<span class=\"_ _1\"></span>unding Limited, with a 12 month </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs767\">commitment period. T<span class=\"_ _0\"></span>his was r<span class=\"_ _0\"></span>enew<span class=\"_ _0\"></span>ed for<span class=\"_ _0\"></span> 12 months on 24 October<span class=\"_ _0\"></span> 2019 and was incr<span class=\"_ _0\"></span>eased to \u00a3400<span class=\"_ _0\"></span>.0m and r<span class=\"_ _0\"></span>enewed <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> a further </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs768\">18 month commitment on 25 September<span class=\"_ _0\"></span> 2020. Inter<span class=\"_ _0\"></span>est w<span class=\"_ _0\"></span>as payable at 0<span class=\"_ _0\"></span>.60% o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> three month LIBOR <span class=\"_ _0\"></span>thereafter<span class=\"_ _0\"></span> up to  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs769\">8 November<span class=\"_ _1\"></span> 2021.</div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs76a\"> <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>On 8 November 2021, r<span class=\"_ _0\"></span>evisions <span class=\"_ _0\"></span>to the <span class=\"_ _0\"></span>facility <span class=\"_ _0\"></span>were agr<span class=\"_ _0\"></span>eed extending <span class=\"_ _0\"></span>the commitment period for<span class=\"_ _0\"></span> an initial 13-month period with <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs76b\">ability <span class=\"_ _0\"></span>to extend monthly<span class=\"_ _1\"></span>. The maximum drawing <span class=\"_ _0\"></span>was incr<span class=\"_ _0\"></span>eased to \u00a3450<span class=\"_ _0\"></span>.0m and the int<span class=\"_ _0\"></span>erest rat<span class=\"_ _0\"></span>e payable <span class=\"_ _0\"></span>was transitioned <span class=\"_ _0\"></span>to 0.5% </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs76c\">above SONIA. <span class=\"_ _0\"></span>The facility<span class=\"_ _0\"></span> expired on 2<span class=\"_ _0\"></span>4 July<span class=\"_ _0\"></span> 2023.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs76e\">36. <span class=\"_ _96\"></span>Retail bonds<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs76f\">The Group has one outstanding issue o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>etail bonds, issued under its Eur<span class=\"_ _0\"></span>o Medium <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>erm Note Programme. <span class=\"_ _0\"></span>These bonds are listed on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs770\">the London Stock<span class=\"_ _0\"></span> Exchange and matur<span class=\"_ _0\"></span>e on 28 <span class=\"_ _0\"></span>August 2024, but ar<span class=\"_ _0\"></span>e callable by<span class=\"_ _0\"></span> the Company<span class=\"_ _0\"></span> in certain circumstances. <span class=\"_ _0\"></span>The principal </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs771\">amount of<span class=\"_ _0\"></span> notes in issue at 30 September<span class=\"_ _0\"></span> 2023 is \u00a3112.5m (2022: \u00a3112.5m) and they<span class=\"_ _0\"></span> bear inter<span class=\"_ _1\"></span>est at a fixed rate o<span class=\"_ _0\"></span>f 6.<span class=\"_ _0\"></span>0% per annum. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs772\">The outstanding notes ar<span class=\"_ _0\"></span>e rated BBB by<span class=\"_ _0\"></span> Fitch Ratings.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs773\">The notes ar<span class=\"_ _0\"></span>e unsubordinated unsecur<span class=\"_ _0\"></span>ed liabilities of <span class=\"_ _0\"></span>the Company<span class=\"_ _0\"></span> and the amount included in the accounts o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Group and the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs774\">Company<span class=\"_ _0\"></span> in respect of<span class=\"_ _0\"></span> these bonds is \u00a3112.4m (2022: \u00a3112.3m), all of<span class=\"_ _0\"></span> which f<span class=\"_ _0\"></span>alls due within one y<span class=\"_ _0\"></span>ear (2022: \u00a3nil).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs776\">37<span class=\"_ _2\"></span>.  Corporate bonds<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs777\">On 25 March 2021 <span class=\"_ _0\"></span>the Company issued \u00a3150<span class=\"_ _0\"></span>.0m o<span class=\"_ _0\"></span>f Fixed Rat<span class=\"_ _0\"></span>e Callable Subordinated <span class=\"_ _0\"></span>Tier<span class=\"_ _0\"></span>-<span class=\"_ _0\"></span>2 Notes due 2031 at par<span class=\"_ _1\"></span>. These notes bear<span class=\"_ _1\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs778\">interest at<span class=\"_ _0\"></span> a rate of<span class=\"_ _0\"></span> 4.375% per annum until 25 Sep<span class=\"_ _0\"></span>tember 2026 after<span class=\"_ _0\"></span> which inter<span class=\"_ _1\"></span>est will be payable at a r<span class=\"_ _0\"></span>eset rate <span class=\"_ _0\"></span>which is 3.956% </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs779\">over<span class=\"_ _1\"></span> that payable on UK<span class=\"_ _0\"></span> Government bonds o<span class=\"_ _0\"></span>f similar<span class=\"_ _0\"></span> duration at that <span class=\"_ _0\"></span>time. T<span class=\"_ _0\"></span>hese notes are callable at <span class=\"_ _0\"></span>the option of<span class=\"_ _0\"></span> the Company<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs77a\">between 25 <span class=\"_ _0\"></span>June 2026 and 25 September<span class=\"_ _0\"></span> 2026 and may be called at<span class=\"_ _0\"></span> any <span class=\"_ _0\"></span>time in the e<span class=\"_ _0\"></span>vent of<span class=\"_ _0\"></span> certain tax or<span class=\"_ _0\"></span> regulatory<span class=\"_ _0\"></span> changes. <span class=\"_ _0\"></span>The </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs77b\">notes ar<span class=\"_ _0\"></span>e unsecured and subordinat<span class=\"_ _0\"></span>ed to all cr<span class=\"_ _0\"></span>editors of <span class=\"_ _0\"></span>the Company<span class=\"_ _1\"></span>. The notes <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e originally rated BB+ b<span class=\"_ _0\"></span>y Fitch and ar<span class=\"_ _0\"></span>e currently<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs77c\">rated BBB-, f<span class=\"_ _0\"></span>ollowing an upgrade on 7 Mar<span class=\"_ _0\"></span>ch 2022. The pr<span class=\"_ _0\"></span>oceeds of<span class=\"_ _0\"></span> the notes ar<span class=\"_ _0\"></span>e utilised in accordance <span class=\"_ _0\"></span>with the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s Green Bond </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs77d\">F<span class=\"_ _0\"></span>ramew<span class=\"_ _0\"></span>ork, which is av<span class=\"_ _0\"></span>ailable on its investor<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>ebsite.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs77e\">The carrying v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> corporate bonds in the accounts of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup at 30 September<span class=\"_ _0\"></span> 2023 w<span class=\"_ _0\"></span>as \u00a3145.8m (2022: \u00a3149.2m<span class=\"_ _0\"></span>), while the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs77f\">carrying v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the bonds in the accounts of<span class=\"_ _0\"></span> the Company<span class=\"_ _1\"></span> at 30 September 2023 w<span class=\"_ _0\"></span>as \u00a3149.<span class=\"_ _0\"></span>4m (2022: \u00a3149.2m<span class=\"_ _0\"></span>), with the diff<span class=\"_ _0\"></span>erence </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs780\">arising as a result o<span class=\"_ _0\"></span>f the hedging <span class=\"_ _0\"></span>treatment described in no<span class=\"_ _0\"></span>te 26.<span class=\"_ _36a\"> </span></div>38. <span class=\"_ _96\"></span>Central bank facilities<span class=\"_ _36a\"> </span>During the <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>, the Group has utilised <span class=\"_ _0\"></span>facilities pro<span class=\"_ _0\"></span>vided by <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England thr<span class=\"_ _0\"></span>ough its Sterling Monetary F<span class=\"_ _1\"></span>ramework. <span class=\"_ _1\"></span>These facilities enable either <span class=\"_ _0\"></span>funding or o<span class=\"_ _0\"></span>ff balance sheet liquidity<span class=\"_ _0\"></span> to be pr<span class=\"_ _0\"></span>ovided t<span class=\"_ _0\"></span>o Paragon Bank PL<span class=\"_ _1\"></span>C (\u2018Paragon Bank\u2019 or<span class=\"_ _0\"></span> \u2018the Bank\u2019) on the security of<span class=\"_ _1\"></span> eligible collateral, currently in <span class=\"_ _0\"></span>the form o<span class=\"_ _0\"></span>f designated pools of<span class=\"_ _0\"></span> the Bank\u2019<span class=\"_ _1\"></span>s first mortgag<span class=\"_ _0\"></span>e assets and/<span class=\"_ _0\"></span>or the r<span class=\"_ _0\"></span>etained Notes described in note 64, <span class=\"_ _0\"></span>with the amount a<span class=\"_ _0\"></span>vailable based on the <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the security<span class=\"_ _0\"></span> given, subject, <span class=\"_ _0\"></span>where appr<span class=\"_ _0\"></span>opriate, to a hair<span class=\"_ _0\"></span>cut.<span class=\"_ _36a\"> </span>Drawings under<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>erm Funding Scheme f<span class=\"_ _0\"></span>or SMEs (\u2018TFSME\u2019) have a maturity<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> four<span class=\"_ _0\"></span> y<span class=\"_ _0\"></span>ears and bear inter<span class=\"_ _0\"></span>est at BBR. <span class=\"_ _0\"></span>The aver<span class=\"_ _0\"></span>age remaining maturity<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s drawings is 25 months (2022: 37 months). <span class=\"_ _1\"></span>As these drawings w<span class=\"_ _0\"></span>ere pr<span class=\"_ _0\"></span>ovided at rates belo<span class=\"_ _0\"></span>w those available commer<span class=\"_ _0\"></span>cially<span class=\"_ _1\"></span>, by a go<span class=\"_ _0\"></span>vernment agenc<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, they<span class=\"_ _0\"></span> are account<span class=\"_ _0\"></span>ed for<span class=\"_ _0\"></span> under IA<span class=\"_ _0\"></span>S 20.<span class=\"_ _36a\"> </span>Drawings under<span class=\"_ _0\"></span> the Index<span class=\"_ _0\"></span>ed Long-<span class=\"_ _2\"></span>T<span class=\"_ _1\"></span>erm Repo Scheme (\u2018IL<span class=\"_ _2f\"></span>TR\u2019) have a maturity of<span class=\"_ _0\"></span> six months and a rate of<span class=\"_ _0\"></span> interest<span class=\"_ _0\"></span> set in an auction process. <span class=\"_ _0\"></span>The Gr<span class=\"_ _0\"></span>oup has not accessed the IL<span class=\"_ _2f\"></span>TR during the year<span class=\"_ _2\"></span>, but retains access to <span class=\"_ _0\"></span>this programme <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> liquidity purposes.<span class=\"_ _36a\"> </span>The amounts drawn under<span class=\"_ _0\"></span> these <span class=\"_ _0\"></span>facilities are set out<span class=\"_ _0\"></span> below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>TFSME<span class=\"_ _2ba\"> </span><span class=\"ff15\">2,750.0<span class=\"_ _86\"> </span></span>2,750.0<span class=\"_ _36a\"> </span>IL<span class=\"_ _1\"></span>TR<span class=\"_ _2bb\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal central bank f<span class=\"_ _0\"></span>acilities<span class=\"_ _2bc\"> </span><span class=\"ff15\">2,750.0<span class=\"_ _86\"> </span><span class=\"ff16\">2,750.0<span class=\"_ _36a\"> </span></span></span>All TF<span class=\"_ _0\"></span>SME borrowings fall due aft<span class=\"_ _0\"></span>er mor<span class=\"_ _0\"></span>e than one y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2022 all <span class=\"_ _1\"></span>TFSM<span class=\"_ _15\"></span>E borrowings <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e repaid and r<span class=\"_ _0\"></span>edrawn, extending <span class=\"_ _0\"></span>the maturity date <span class=\"_ _0\"></span>to  21 October 2025 <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the majority o<span class=\"_ _0\"></span>f drawings, <span class=\"_ _0\"></span>with \u00a35.2m falling due on 31 Mar<span class=\"_ _0\"></span>ch 2027<span class=\"_ _2\"></span>.<span class=\"_ _36a\"> </span>F<span class=\"_ _0\"></span>urther <span class=\"_ _0\"></span>first mortgage assets o<span class=\"_ _0\"></span>f the Bank<span class=\"_ _0\"></span> have been pr<span class=\"_ _0\"></span>e-positioned with the Bank<span class=\"_ _0\"></span> of England <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>future use in such schemes and eligible retained No<span class=\"_ _0\"></span>tes can also be used to support <span class=\"_ _0\"></span>this funding (not<span class=\"_ _0\"></span>e 64). T<span class=\"_ _0\"></span>he mortgage assets pledged in support<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>these drawings are set out<span class=\"_ _0\"></span> in note 17<span class=\"_ _2\"></span>.<span class=\"_ _36a\"> </span>The balances arising fr<span class=\"_ _0\"></span>om the <span class=\"_ _0\"></span>TFSME carried in the Group accounts ar<span class=\"_ _0\"></span>e shown below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>TFSME at IAS 20 carrying v<span class=\"_ _0\"></span>alue<span class=\"_ _2bd\"> </span><span class=\"ff15\">2,716.3<span class=\"_ _86\"> </span><span class=\"ff16\">2,700.2<span class=\"_ _36a\"> </span></span></span>Def<span class=\"_ _0\"></span>erred governmen<span class=\"_ _0\"></span>t assistance<span class=\"_ _2be\"> </span><span class=\"ff15\">33.7<span class=\"_ _3a\"> </span><span class=\"ff16\">49.8<span class=\"_ _36a\"> </span></span></span>2,750.0<span class=\"_ _86\"> </span><span class=\"ff16\">2,750.0<span class=\"_ _36a\"> </span></span>39<span class=\"_ _0\"></span>. <span class=\"_ _1c\"></span>Sale and repurchase agreements<span class=\"_ _36a\"> </span>F<span class=\"_ _0\"></span>rom <span class=\"_ _0\"></span>time to <span class=\"_ _0\"></span>time the Group ent<span class=\"_ _0\"></span>ers into short-term sale and r<span class=\"_ _0\"></span>epurchase agr<span class=\"_ _0\"></span>eements with highly-r<span class=\"_ _0\"></span>ated UK banks as part of<span class=\"_ _0\"></span> its liquidity management operations.<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2023 \u00a350<span class=\"_ _0\"></span>.0m w<span class=\"_ _0\"></span>as outstanding under such arr<span class=\"_ _0\"></span>angements (2022: \u00a3nil). T<span class=\"_ _0\"></span>he averag<span class=\"_ _0\"></span>e term of<span class=\"_ _0\"></span> the agr<span class=\"_ _0\"></span>eements was  3 months and the av<span class=\"_ _0\"></span>erage r<span class=\"_ _0\"></span>emaining term 2.8 months. <span class=\"_ _0\"></span>The av<span class=\"_ _0\"></span>erage inter<span class=\"_ _0\"></span>est rate pay<span class=\"_ _0\"></span>able was 0<span class=\"_ _0\"></span>.80% abov<span class=\"_ _0\"></span>e compounded SONIA.<span class=\"_ _36a\"> </span>The securities subject t<span class=\"_ _0\"></span>o the sale and repur<span class=\"_ _0\"></span>chase agreement<span class=\"_ _0\"></span> wer<span class=\"_ _0\"></span>e certain of <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s retained asset back<span class=\"_ _0\"></span>ed loan notes, described in note 64<span class=\"_ _36a\"> </span>52. <span class=\"_ _1c\"></span>Reconciliation of<span class=\"_ _0\"></span> net deb<span class=\"_ _0\"></span>t<span class=\"_ _36a\"> </span>(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span>Cash flows<span class=\"_ _36a\"> </span>Opening debt<span class=\"_ _36a\"> </span>Debt issued<span class=\"_ _36a\"> </span>Other <span class=\"_ _80\"> </span>Non-cash movements<span class=\"_ _36a\"> </span>Closing debt<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _97\"> </span>\u00a3m<span class=\"_ _51\"> </span>\u00a3m<span class=\"_ _97\"> </span>\u00a3m<span class=\"_ _51\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Asset back<span class=\"_ _0\"></span>ed loan notes<span class=\"_ _ec\"> </span><span class=\"ff15\">409.3<span class=\"_ _3d\"> </span>-<span class=\"_ _42\"> </span>(382.1)<span class=\"_ _6d\"> </span>0.8<span class=\"_ _58\"> </span>28.0<span class=\"_ _36a\"> </span></span>Bank borrowings<span class=\"_ _125\"> </span><span class=\"ff15\">586.0<span class=\"_ _1d6\"> </span>-<span class=\"_ _42\"> </span>(586.0)<span class=\"_ _9f\"> </span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _36a\"> </span></span>Corporat<span class=\"_ _0\"></span>e bonds<span class=\"_ _1b1\"> </span><span class=\"ff15\">149.2<span class=\"_ _3d\"> </span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _9f\"> </span>(3.4)<span class=\"_ _8e\"> </span>145.8<span class=\"_ _36a\"> </span></span>Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _1b9\"> </span><span class=\"ff15\">112.3<span class=\"_ _1d6\"> </span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _3d\"> </span>0.1<span class=\"_ _3b\"> </span>112.4<span class=\"_ _36a\"> </span></span>Central bank borr<span class=\"_ _0\"></span>owings<span class=\"_ _2e1\"> </span><span class=\"ff15\">2,750.0<span class=\"_ _1d6\"> </span>-<span class=\"_ _f7\"> </span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _3f\"> </span>2,750.0<span class=\"_ _36a\"> </span></span>Sale and repurchase agr<span class=\"_ _0\"></span>eements<span class=\"_ _1c7\"> </span><span class=\"ff15\">-<span class=\"_ _f8\"> </span>-<span class=\"_ _97\"> </span>50.0<span class=\"_ _1d6\"> </span>-<span class=\"_ _97\"> </span>50.0<span class=\"_ _36a\"> </span></span>Lease liabilities<span class=\"_ _1da\"> </span><span class=\"ff15\">9.0<span class=\"_ _1d6\"> </span>-<span class=\"_ _9f\"> </span>(2.4)<span class=\"_ _86\"> </span>2.3<span class=\"_ _b9\"> </span>8.9<span class=\"_ _36a\"> </span></span>Bank overdr<span class=\"_ _0\"></span>afts<span class=\"_ _2e2\"> </span><span class=\"ff15\">0.4<span class=\"_ _1d6\"> </span>-<span class=\"_ _12b\"> </span>(0.2)<span class=\"_ _19c\"> </span>-<span class=\"_ _3d\"> </span>0.2<span class=\"_ _36a\"> </span></span>Gross debt<span class=\"_ _18c\"> </span><span class=\"ff15\">4,016.2<span class=\"_ _3d\"> </span>-<span class=\"_ _67\"> </span>(920.7)<span class=\"_ _b5\"> </span>(0.2)<span class=\"_ _8d\"> </span>3,095.3<span class=\"_ _36a\"> </span></span>Cash<span class=\"_ _1bb\"> </span><span class=\"ff15\">(1,930.9)<span class=\"_ _9f\"> </span>-<span class=\"_ _b8\"> </span>(1,063.4)<span class=\"_ _9f\"> </span>-<span class=\"_ _c5\"> </span>(2,994.3)<span class=\"_ _36a\"> </span></span>Net debt<span class=\"_ _17a\"> </span><span class=\"ff15\">2,085.3<span class=\"_ _1d6\"> </span>-<span class=\"_ _b8\"> </span>(1,984.1)<span class=\"_ _b5\"> </span>(0.2)<span class=\"_ _8e\"> </span>101.0<span class=\"_ _36a\"> </span></span>30 September 2022<span class=\"_ _36a\"> </span>Asset back<span class=\"_ _0\"></span>ed loan notes<span class=\"_ _ec\"> </span><span class=\"ff16\">516.0<span class=\"_ _3d\"> </span></span>-<span class=\"_ _67\"> </span>(107.6)<span class=\"_ _6d\"> </span><span class=\"ff16\">0.9<span class=\"_ _3b\"> </span>409.3<span class=\"_ _36a\"> </span></span>Bank borrowings<span class=\"_ _125\"> </span><span class=\"ff16\">730.0<span class=\"_ _1d6\"> </span></span>-<span class=\"_ _67\"> </span>(144.6)<span class=\"_ _6d\"> </span><span class=\"ff16\">0.6<span class=\"_ _3b\"> </span>586.0<span class=\"_ _36a\"> </span></span>Corporat<span class=\"_ _0\"></span>e bonds<span class=\"_ _1b1\"> </span><span class=\"ff16\">149.0<span class=\"_ _3d\"> </span></span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _3d\"> </span><span class=\"ff16\">0.2<span class=\"_ _3b\"> </span>149.2<span class=\"_ _36a\"> </span></span>Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _1b9\"> </span><span class=\"ff16\">237.1<span class=\"_ _1d6\"> </span></span>-<span class=\"_ _67\"> </span>(125.0)<span class=\"_ _6d\"> </span><span class=\"ff16\">0.2<span class=\"_ _3b\"> </span>112.3<span class=\"_ _36a\"> </span></span>Central bank borr<span class=\"_ _0\"></span>owings<span class=\"_ _2e1\"> </span><span class=\"ff16\">2,819.0<span class=\"_ _1d6\"> </span></span>-<span class=\"_ _86\"> </span>(69.0)<span class=\"_ _19c\"> </span>-<span class=\"_ _3f\"> </span><span class=\"ff16\">2,750.0<span class=\"_ _36a\"> </span></span>Sale and repurchase agr<span class=\"_ _0\"></span>eements<span class=\"_ _1c7\"> </span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _f7\"> </span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _36a\"> </span>Lease liabilities<span class=\"_ _1da\"> </span><span class=\"ff16\">9.5<span class=\"_ _84\"> </span></span>-<span class=\"_ _9f\"> </span>(1.7)<span class=\"_ _86\"> </span><span class=\"ff16\">1.2<span class=\"_ _b9\"> </span>9.0<span class=\"_ _36a\"> </span></span>Bank overdr<span class=\"_ _0\"></span>afts<span class=\"_ _2e2\"> </span><span class=\"ff16\">0.3<span class=\"_ _1d6\"> </span></span>-<span class=\"_ _3d\"> </span><span class=\"ff16\">0.1<span class=\"_ _1d6\"> </span></span>-<span class=\"_ _3d\"> </span><span class=\"ff16\">0.4<span class=\"_ _36a\"> </span></span>Gross debt<span class=\"_ _18c\"> </span><span class=\"ff16\">4,460.9<span class=\"_ _1d6\"> </span></span>-<span class=\"_ _42\"> </span>(447.8)<span class=\"_ _6d\"> </span><span class=\"ff16\">3.1<span class=\"_ _31\"> </span>4,016.2<span class=\"_ _36a\"> </span></span>Cash<span class=\"_ _1bb\"> </span>(1,360.1)<span class=\"_ _19c\"> </span>-<span class=\"_ _42\"> </span>(570.8)<span class=\"_ _19c\"> </span>-<span class=\"_ _b8\"> </span>(1,930.9)<span class=\"_ _36a\"> </span>Net debt<span class=\"_ _17a\"> </span><span class=\"ff16\">3,100.8<span class=\"_ _1d6\"> </span></span>-<span class=\"_ _c5\"> </span>(1,018.6)<span class=\"_ _6d\"> </span><span class=\"ff16\">3.1<span class=\"_ _31\"> </span>2,085.3<span class=\"_ _36a\"> </span></span>Other non-cash chang<span class=\"_ _0\"></span>es shown abov<span class=\"_ _0\"></span>e repr<span class=\"_ _0\"></span>esent:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>EIR adjustments relating to the spr<span class=\"_ _0\"></span>eading of<span class=\"_ _0\"></span> initial costs of <span class=\"_ _0\"></span>the facilities concerned<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Inception of ne<span class=\"_ _0\"></span>w lease assets under<span class=\"_ _0\"></span> IFRS 16<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Hedging fair <span class=\"_ _0\"></span>value adjustments on <span class=\"_ _0\"></span>the corporate bond (not<span class=\"_ _0\"></span>e 26)<span class=\"_ _36a\"> </span>(b)  <span class=\"_ _ce\"> </span>The  Company<span class=\"_ _0\"></span> Cash flows<span class=\"_ _36a\"> </span>Opening debt<span class=\"_ _36a\"> </span>Debt issued<span class=\"_ _36a\"> </span>Other <span class=\"_ _47\"> </span>Non-cash movements Closing debt<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _6c\"> </span>\u00a3m<span class=\"_ _bf\"> </span>\u00a3m<span class=\"_ _6c\"> </span>\u00a3m<span class=\"_ _6c\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Corporat<span class=\"_ _0\"></span>e bonds<span class=\"_ _2e3\"> </span><span class=\"ff15\">149.2<span class=\"_ _cb\"> </span>-<span class=\"_ _40\"> </span>-<span class=\"_ _1db\"> </span>0.2<span class=\"_ _44\"> </span>149.4<span class=\"_ _36a\"> </span></span>Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _185\"> </span><span class=\"ff15\">112.3<span class=\"_ _cb\"> </span>-<span class=\"_ _40\"> </span>-<span class=\"_ _1db\"> </span>0.1<span class=\"_ _44\"> </span>112.4<span class=\"_ _36a\"> </span></span>Lease liabilities<span class=\"_ _2e4\"> </span><span class=\"ff15\">15.0<span class=\"_ _cb\"> </span>-<span class=\"_ _1d6\"> </span>(1.3)<span class=\"_ _1d6\"> </span>-<span class=\"_ _6c\"> </span>13.7<span class=\"_ _36a\"> </span></span>Gross debt<span class=\"_ _183\"> </span><span class=\"ff15\">276.5<span class=\"_ _cb\"> </span>-<span class=\"_ _1d6\"> </span>(1.3)<span class=\"_ _b9\"> </span>0.3<span class=\"_ _44\"> </span>275.5<span class=\"_ _36a\"> </span></span>Cash<span class=\"_ _1ab\"> </span><span class=\"ff15\">(19.7)<span class=\"_ _84\"> </span>-<span class=\"_ _1d6\"> </span>(7.9)<span class=\"_ _84\"> </span>-<span class=\"_ _51\"> </span>(27.6)<span class=\"_ _36a\"> </span></span>Net debt<span class=\"_ _1b9\"> </span><span class=\"ff15\">256.8<span class=\"_ _cb\"> </span>-<span class=\"_ _1d6\"> </span>(9.2)<span class=\"_ _b9\"> </span>0.3<span class=\"_ _44\"> </span>247.9<span class=\"_ _36a\"> </span></span>30 September 2022<span class=\"_ _36a\"> </span>Corporat<span class=\"_ _0\"></span>e bonds<span class=\"_ _2e3\"> </span><span class=\"ff16\">149.0<span class=\"_ _cb\"> </span></span>-<span class=\"_ _40\"> </span>-<span class=\"_ _c8\"> </span><span class=\"ff16\">0.2<span class=\"_ _44\"> </span>149.2<span class=\"_ _36a\"> </span></span>Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _185\"> </span><span class=\"ff16\">237.1<span class=\"_ _cb\"> </span></span>-<span class=\"_ _58\"> </span>(125.0)<span class=\"_ _133\"> </span><span class=\"ff16\">0.2<span class=\"_ _44\"> </span>112.3<span class=\"_ _36a\"> </span></span>Lease liabilities<span class=\"_ _2e4\"> </span><span class=\"ff16\">16.3<span class=\"_ _cb\"> </span></span>-<span class=\"_ _1d6\"> </span>(1.3)<span class=\"_ _291\"> </span>-<span class=\"_ _6c\"> </span><span class=\"ff16\">15.0<span class=\"_ _36a\"> </span></span>Gross debt<span class=\"_ _183\"> </span><span class=\"ff16\">402.4<span class=\"_ _cb\"> </span></span>-<span class=\"_ _58\"> </span>(126.3)<span class=\"_ _133\"> </span><span class=\"ff16\">0.4<span class=\"_ _44\"> </span>276.5<span class=\"_ _36a\"> </span></span>Cash<span class=\"_ _1ab\"> </span>(19.6)<span class=\"_ _291\"> </span>-<span class=\"_ _1d6\"> </span>(0.1)<span class=\"_ _84\"> </span>-<span class=\"_ _b9\"> </span>(19.7)<span class=\"_ _36a\"> </span>Net debt<span class=\"_ _1b9\"> </span><span class=\"ff16\">382.8<span class=\"_ _cb\"> </span></span>-<span class=\"_ _58\"> </span>(126.4)<span class=\"_ _133\"> </span><span class=\"ff16\">0.4<span class=\"_ _44\"> </span>256.8<span class=\"_ _36a\"> </span></span>Non-cash changes shown abo<span class=\"_ _0\"></span>ve repr<span class=\"_ _1\"></span>esent EI<span class=\"_ _15\"></span>R adjustments relating t<span class=\"_ _0\"></span>o the spreading o<span class=\"_ _0\"></span>f initial costs of<span class=\"_ _0\"></span> the bonds.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBorrowingsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-476": {
   "value": "34. <span class=\"_ _1c\"></span>Asset back<span class=\"_ _1\"></span>ed loan notes<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s asset backed loan no<span class=\"_ _0\"></span>tes are rated and publicly<span class=\"_ _1\"></span> listed and are secured on portfolios comprising <span class=\"_ _0\"></span>variable and <span class=\"_ _0\"></span>fixed rate mortgages. <span class=\"_ _0\"></span>The maturity<span class=\"_ _0\"></span> date of <span class=\"_ _0\"></span>the notes matches the maturity<span class=\"_ _1\"></span> date of the underlying assets. <span class=\"_ _1\"></span>The notes can be prepaid in part fr<span class=\"_ _1\"></span>om time to <span class=\"_ _0\"></span>time, but such prepa<span class=\"_ _0\"></span>yments are limited <span class=\"_ _0\"></span>to the net capital r<span class=\"_ _0\"></span>eceived fr<span class=\"_ _0\"></span>om borro<span class=\"_ _0\"></span>wers in r<span class=\"_ _0\"></span>espect of <span class=\"_ _0\"></span>the underlying assets. T<span class=\"_ _0\"></span>here is no requir<span class=\"_ _0\"></span>ement for<span class=\"_ _1\"></span> the Group to mak<span class=\"_ _0\"></span>e good any<span class=\"_ _0\"></span> shortfall on the no<span class=\"_ _0\"></span>tes out of<span class=\"_ _0\"></span> general funds. It is lik<span class=\"_ _0\"></span>ely <span class=\"_ _0\"></span>that a substantial proportion o<span class=\"_ _0\"></span>f the notes will be r<span class=\"_ _0\"></span>epaid within <span class=\"_ _0\"></span>five <span class=\"_ _0\"></span>years.<span class=\"_ _36a\"> </span>The Group also has an op<span class=\"_ _0\"></span>tion to r<span class=\"_ _0\"></span>epay all <span class=\"_ _0\"></span>the notes on any<span class=\"_ _0\"></span> issue at an earlier dat<span class=\"_ _0\"></span>e (the \u2018call date<span class=\"_ _1\"></span>\u2019), at their outstanding principal amount.<span class=\"_ _36a\"> </span>During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 int<span class=\"_ _0\"></span>erest <span class=\"_ _0\"></span>was pay<span class=\"_ _0\"></span>able on the notes at a <span class=\"_ _0\"></span>fixed margin abo<span class=\"_ _0\"></span>ve the compounded St<span class=\"_ _0\"></span>erling Overnight Interbank<span class=\"_ _0\"></span> A<span class=\"_ _0\"></span>verag<span class=\"_ _0\"></span>e Rate (\u2018SONIA<span class=\"_ _0\"></span>\u2019).<span class=\"_ _36a\"> </span>All payments in r<span class=\"_ _0\"></span>espect of <span class=\"_ _0\"></span>the notes are r<span class=\"_ _0\"></span>equired <span class=\"_ _0\"></span>to be made in the curr<span class=\"_ _0\"></span>ency<span class=\"_ _0\"></span> in which the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e denominated.<span class=\"_ _36a\"> </span>The Group publishes de<span class=\"_ _0\"></span>tailed information on the performance o<span class=\"_ _0\"></span>f all its note issues on <span class=\"_ _0\"></span>the Bond Invest<span class=\"_ _0\"></span>or Reporting section o<span class=\"_ _0\"></span>f its website at <span class=\"_ _0\"></span>www<span class=\"_ _0\"></span>.paragonbankinggroup<span class=\"_ _0\"></span>.co.uk. <span class=\"_ _0\"></span>A mor<span class=\"_ _0\"></span>e detailed description of<span class=\"_ _0\"></span> the securitisation structur<span class=\"_ _0\"></span>e under <span class=\"_ _0\"></span>which these notes ar<span class=\"_ _0\"></span>e issued is given in note 64<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>Notes in issue at 30 September<span class=\"_ _1\"></span> 2023 and 30 September 2022, net of<span class=\"_ _0\"></span> any<span class=\"_ _0\"></span> held by <span class=\"_ _0\"></span>the Group, <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span>Issuer<span class=\"_ _2b4\"> </span>Maturity dat<span class=\"_ _0\"></span>e<span class=\"_ _58\"> </span>Call da<span class=\"_ _0\"></span>te<span class=\"_ _36a\"> </span>Principal outstanding<span class=\"_ _36a\"> </span>Av<span class=\"_ _0\"></span>erage inter<span class=\"_ _0\"></span>est margin<span class=\"_ _36a\"> </span>2023<span class=\"_ _94\"> </span><span class=\"ff16\">2022<span class=\"_ _b8\"> </span></span>2023<span class=\"_ _88\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _50\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _86\"> </span></span>%<span class=\"_ _132\"> </span><span class=\"ff16\">%<span class=\"_ _36a\"> </span></span>Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 25) PLC<span class=\"_ _137\"> </span>15/05/50<span class=\"_ _50\"> </span>15/05/23<span class=\"_ _3a\"> </span><span class=\"ff15\">-<span class=\"_ _77\"> </span><span class=\"ff16\">302.5<span class=\"_ _71\"> </span></span>-<span class=\"_ _1d4\"> </span><span class=\"ff16\">0.86<span class=\"_ _36a\"> </span></span></span>Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 26) PLC<span class=\"_ _137\"> </span>15/05/45<span class=\"_ _50\"> </span>15/08/24<span class=\"_ _132\"> </span><span class=\"ff15\">28.4<span class=\"_ _119\"> </span><span class=\"ff16\">107.9<span class=\"_ _88\"> </span></span>1.05<span class=\"_ _73\"> </span><span class=\"ff16\">1.05<span class=\"_ _36a\"> </span></span></span>Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 27) PLC\u2020<span class=\"_ _7a\"> </span>15/04/47<span class=\"_ _50\"> </span>15/10/25<span class=\"_ _3a\"> </span><span class=\"ff15\">-<span class=\"_ _bf\"> </span></span>-<span class=\"_ _bf\"> </span><span class=\"ff15\">-<span class=\"_ _bf\"> </span>-<span class=\"_ _36a\"> </span></span>Par<span class=\"_ _0\"></span>agon Mortgag<span class=\"_ _0\"></span>es (No. 28) PLC\u2020<span class=\"_ _7a\"> </span>15/12/47<span class=\"_ _50\"> </span>15/12/25<span class=\"_ _3a\"> </span><span class=\"ff15\">-<span class=\"_ _bf\"> </span></span>-<span class=\"_ _bf\"> </span><span class=\"ff15\">-<span class=\"_ _bf\"> </span>-<span class=\"_ _36a\"> </span></span>\u2020All notes issued by<span class=\"_ _0\"></span> Paragon Mortgages (No<span class=\"_ _0\"></span>. 27) and Paragon Mortgages (No. 28) <span class=\"_ _0\"></span>were r<span class=\"_ _0\"></span>etained by <span class=\"_ _0\"></span>the Group (see no<span class=\"_ _0\"></span>te 64).<span class=\"_ _36a\"> </span>The details of<span class=\"_ _0\"></span> the assets backing <span class=\"_ _0\"></span>these securities are giv<span class=\"_ _0\"></span>en in note 18.<span class=\"_ _36a\"> </span>During the <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>, on 15 May 2023, <span class=\"_ _0\"></span>the Group r<span class=\"_ _0\"></span>edeemed all of <span class=\"_ _0\"></span>the outstanding notes of<span class=\"_ _0\"></span> the Parag<span class=\"_ _0\"></span>on Mortgages (No. 25) PL<span class=\"_ _1\"></span>C securitisation at par<span class=\"_ _1\"></span>. The underlying assets <span class=\"_ _0\"></span>were subsequently<span class=\"_ _0\"></span> funded b<span class=\"_ _0\"></span>y other<span class=\"_ _0\"></span> group companies.<span class=\"_ _36a\"> </span>On 1 November<span class=\"_ _1\"></span> 2023, after the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end, a group company<span class=\"_ _1\"></span>, Paragon Mortgag<span class=\"_ _0\"></span>es (No. 29) PL<span class=\"_ _0\"></span>C, issued \u00a3855.<span class=\"_ _0\"></span>0m of sterling mortg<span class=\"_ _0\"></span>age backed <span class=\"_ _0\"></span>floating rate notes, analy<span class=\"_ _0\"></span>sed below<span class=\"_ _0\"></span>, at par<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>Class<span class=\"_ _270\"> </span><span class=\"ff1e\">Fit<span class=\"_ _0\"></span>ch Rating<span class=\"_ _1c1\"> </span>Moody<span class=\"_ _15\"></span>\u2019<span class=\"_ _0\"></span>s rating<span class=\"_ _36a\"> </span></span>Inter<span class=\"_ _0\"></span>est margin above compounded SONIA<span class=\"_ _36a\"> </span>Principal value<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _36a\"> </span>A<span class=\"_ _2b5\"> </span>AAA<span class=\"_ _12f\"> </span>Aaa<span class=\"_ _13c\"> </span><span class=\"ff16\">1.20%<span class=\"_ _13d\"> </span><span class=\"ff15\">747.0<span class=\"_ _36a\"> </span></span></span>B<span class=\"_ _2b6\"> </span>AA<span class=\"_ _14a\"> </span>Aa1<span class=\"_ _1d5\"> </span><span class=\"ff16\">1.90%<span class=\"_ _2b7\"> </span><span class=\"ff15\">33.7<span class=\"_ _36a\"> </span></span></span>C<span class=\"_ _2b8\"> </span><span class=\"ff17 ls18 ws5e\">A-<span class=\"_ _14a\"> </span></span><span class=\"ff17\">Aa2<span class=\"_ _1d5\"> </span></span>2.75%<span class=\"_ _2b7\"> </span><span class=\"ff15\">29.3<span class=\"_ _36a\"> </span></span>D<span class=\"_ _2b9\"> </span><span class=\"ff17\">B+<span class=\"_ _ba\"> </span>A2<span class=\"_ _1d5\"> </span></span>3.80%<span class=\"_ _65\"> </span><span class=\"ff15\">45.0<span class=\"_ _36a\"> </span></span>855.0<span class=\"_ _36a\"> </span>All the abo<span class=\"_ _0\"></span>ve notes <span class=\"_ _0\"></span>were r<span class=\"_ _0\"></span>etained by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup.<span class=\"_ _36a\"> </span>On 26 June 2019<span class=\"_ _1\"></span>, the Group disposed of<span class=\"_ _0\"></span> its beneficial interest<span class=\"_ _0\"></span> in the Parag<span class=\"_ _0\"></span>on Mortgages (No. 12) PL<span class=\"_ _1\"></span>C securitisation. At <span class=\"_ _0\"></span>that point, the FRN liabilities wer<span class=\"_ _1\"></span>e derecognised by <span class=\"_ _0\"></span>the Group, although <span class=\"_ _0\"></span>the notes r<span class=\"_ _0\"></span>emain in issue. The Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s continuing involvement in <span class=\"_ _0\"></span>the transaction is described in note 53.<span class=\"_ _36a\"> </span>36. <span class=\"_ _96\"></span>Retail bonds<span class=\"_ _36a\"> </span>The Group has one outstanding issue o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>etail bonds, issued under its Eur<span class=\"_ _0\"></span>o Medium <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>erm Note Programme. <span class=\"_ _0\"></span>These bonds are listed on the London Stock<span class=\"_ _0\"></span> Exchange and matur<span class=\"_ _0\"></span>e on 28 <span class=\"_ _0\"></span>August 2024, but ar<span class=\"_ _0\"></span>e callable by<span class=\"_ _0\"></span> the Company<span class=\"_ _0\"></span> in certain circumstances. <span class=\"_ _0\"></span>The principal amount of<span class=\"_ _0\"></span> notes in issue at 30 September<span class=\"_ _0\"></span> 2023 is \u00a3112.5m (2022: \u00a3112.5m) and they<span class=\"_ _0\"></span> bear inter<span class=\"_ _1\"></span>est at a fixed rate o<span class=\"_ _0\"></span>f 6.<span class=\"_ _0\"></span>0% per annum. The outstanding notes ar<span class=\"_ _0\"></span>e rated BBB by<span class=\"_ _0\"></span> Fitch Ratings.<span class=\"_ _36a\"> </span>The notes ar<span class=\"_ _0\"></span>e unsubordinated unsecur<span class=\"_ _0\"></span>ed liabilities of <span class=\"_ _0\"></span>the Company<span class=\"_ _0\"></span> and the amount included in the accounts o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Group and the Company<span class=\"_ _0\"></span> in respect of<span class=\"_ _0\"></span> these bonds is \u00a3112.4m (2022: \u00a3112.3m), all of<span class=\"_ _0\"></span> which f<span class=\"_ _0\"></span>alls due within one y<span class=\"_ _0\"></span>ear (2022: \u00a3nil).<span class=\"_ _36a\"> </span>37<span class=\"_ _2\"></span>.  Corporate bonds<span class=\"_ _36a\"> </span>On 25 March 2021 <span class=\"_ _0\"></span>the Company issued \u00a3150<span class=\"_ _0\"></span>.0m o<span class=\"_ _0\"></span>f Fixed Rat<span class=\"_ _0\"></span>e Callable Subordinated <span class=\"_ _0\"></span>Tier<span class=\"_ _0\"></span>-<span class=\"_ _0\"></span>2 Notes due 2031 at par<span class=\"_ _1\"></span>. These notes bear<span class=\"_ _1\"></span> interest at<span class=\"_ _0\"></span> a rate of<span class=\"_ _0\"></span> 4.375% per annum until 25 Sep<span class=\"_ _0\"></span>tember 2026 after<span class=\"_ _0\"></span> which inter<span class=\"_ _1\"></span>est will be payable at a r<span class=\"_ _0\"></span>eset rate <span class=\"_ _0\"></span>which is 3.956% over<span class=\"_ _1\"></span> that payable on UK<span class=\"_ _0\"></span> Government bonds o<span class=\"_ _0\"></span>f similar<span class=\"_ _0\"></span> duration at that <span class=\"_ _0\"></span>time. T<span class=\"_ _0\"></span>hese notes are callable at <span class=\"_ _0\"></span>the option of<span class=\"_ _0\"></span> the Company<span class=\"_ _0\"></span> between 25 <span class=\"_ _0\"></span>June 2026 and 25 September<span class=\"_ _0\"></span> 2026 and may be called at<span class=\"_ _0\"></span> any <span class=\"_ _0\"></span>time in the e<span class=\"_ _0\"></span>vent of<span class=\"_ _0\"></span> certain tax or<span class=\"_ _0\"></span> regulatory<span class=\"_ _0\"></span> changes. <span class=\"_ _0\"></span>The notes ar<span class=\"_ _0\"></span>e unsecured and subordinat<span class=\"_ _0\"></span>ed to all cr<span class=\"_ _0\"></span>editors of <span class=\"_ _0\"></span>the Company<span class=\"_ _1\"></span>. The notes <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e originally rated BB+ b<span class=\"_ _0\"></span>y Fitch and ar<span class=\"_ _0\"></span>e currently<span class=\"_ _0\"></span> rated BBB-, f<span class=\"_ _0\"></span>ollowing an upgrade on 7 Mar<span class=\"_ _0\"></span>ch 2022. The pr<span class=\"_ _0\"></span>oceeds of<span class=\"_ _0\"></span> the notes ar<span class=\"_ _0\"></span>e utilised in accordance <span class=\"_ _0\"></span>with the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s Green Bond F<span class=\"_ _0\"></span>ramew<span class=\"_ _0\"></span>ork, which is av<span class=\"_ _0\"></span>ailable on its investor<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>ebsite.<span class=\"_ _36a\"> </span>The carrying v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> corporate bonds in the accounts of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup at 30 September<span class=\"_ _0\"></span> 2023 w<span class=\"_ _0\"></span>as \u00a3145.8m (2022: \u00a3149.2m<span class=\"_ _0\"></span>), while the carrying v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the bonds in the accounts of<span class=\"_ _0\"></span> the Company<span class=\"_ _1\"></span> at 30 September 2023 w<span class=\"_ _0\"></span>as \u00a3149.<span class=\"_ _0\"></span>4m (2022: \u00a3149.2m<span class=\"_ _0\"></span>), with the diff<span class=\"_ _0\"></span>erence arising as a result o<span class=\"_ _0\"></span>f the hedging <span class=\"_ _0\"></span>treatment described in no<span class=\"_ _0\"></span>te 26.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDebtSecuritiesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-443": {
   "value": "34. Asset backed loan notes The Group\u2019s asset backed loan notes are rated and publicly listed and are secured on portfolios comprising variable and fixed rate mortgages. The maturity date of the notes matches the maturity date of the underlying assets. The notes can be prepaid in part from time to time, but such prepayments are limited to the net capital received from borrowers in respect of the underlying assets. There is no requirement for the Group to make good any shortfall on the notes out of general funds. It is likely that a substantial proportion of the notes will be repaid within five years. The Group also has an option to repay all the notes on any issue at an earlier date (the \u2018call date\u2019), at their outstanding principal amount. During the year ended 30 September 2023 interest was payable on the notes at a fixed margin above the compounded Sterling Overnight Interbank Average Rate (\u2018SONIA\u2019). All payments in respect of the notes are required to be made in the currency in which they are denominated. The Group publishes detailed information on the performance of all its note issues on the Bond Investor Reporting section of its website at www.paragonbankinggroup.co.uk. A more detailed description of the securitisation structure under which these notes are issued is given in note 64. Notes in issue at 30 September 2023 and 30 September 2022, net of any held by the Group, were: Issuer Maturity date Call date Principal outstanding Average interest margin 2023 2022 2023 2022 \u00a3m \u00a3m % % Paragon Mortgages (No. 25) PLC 15/05/50 15/05/23 - 302.5 - 0.86 Paragon Mortgages (No. 26) PLC 15/05/45 15/08/24 28.4 107.9 1.05 1.05 Paragon Mortgages (No. 27) PLC\u2020 15/04/47 15/10/25 - - - - Paragon Mortgages (No. 28) PLC\u2020 15/12/47 15/12/25 - - - - \u2020All notes issued by Paragon Mortgages (No. 27) and Paragon Mortgages (No. 28) were retained by the Group (see note 64). The details of the assets backing these securities are given in note 18. During the year, on 15 May 2023, the Group redeemed all of the outstanding notes of the Paragon Mortgages (No. 25) PLC securitisation at par. The underlying assets were subsequently funded by other group companies. On 1 November 2023, after the year end, a group company, Paragon Mortgages (No. 29) PLC, issued \u00a3855.0m of sterling mortgage backed floating rate notes, analysed below, at par. Class Fitch Rating Moody\u2019s rating Interest margin above compounded SONIA Principal value \u00a3m A AAA Aaa 1.20% 747.0 B AA Aa1 1.90% 33.7 C A- Aa2 2.75% 29.3 D B+ A2 3.80% 45.0 855.0 All the above notes were retained by the Group. On 26 June 2019, the Group disposed of its beneficial interest in the Paragon Mortgages (No. 12) PLC securitisation. At that point, the FRN liabilities were derecognised by the Group, although the notes remain in issue. The Group\u2019s continuing involvement in the transaction is described in note 53. ",
   "dimensions": {
    "concept": "paragon:DisclosureOfAssetBackedLoanNotes",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-444": {
   "value": "35. <span class=\"_ _1c\"></span>Bank borro<span class=\"_ _0\"></span>wings<span class=\"_ _36a\"> </span>New<span class=\"_ _0\"></span> first mortgag<span class=\"_ _0\"></span>e loans may be <span class=\"_ _0\"></span>financed by<span class=\"_ _0\"></span> a secured bank loan, r<span class=\"_ _0\"></span>eferr<span class=\"_ _0\"></span>ed to as a \u2018war<span class=\"_ _0\"></span>ehouse facility\u2019<span class=\"_ _2f\"></span>. The Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s warehouse facilities may<span class=\"_ _0\"></span> also be used to acquir<span class=\"_ _0\"></span>e accounts from o<span class=\"_ _0\"></span>ther gr<span class=\"_ _0\"></span>oup companies to be held on a <span class=\"_ _0\"></span>temporary basis as part o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s over<span class=\"_ _0\"></span>all management of<span class=\"_ _0\"></span> funding and liquidity<span class=\"_ _1\"></span>. Such internal transfers ar<span class=\"_ _0\"></span>e on a no gain / no loss basis.<span class=\"_ _36a\"> </span>These facilities ar<span class=\"_ _0\"></span>e drawn on <span class=\"_ _0\"></span>the completion or acquisition of<span class=\"_ _1\"></span> a mortgage and repayment o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>facilities is restricted <span class=\"_ _0\"></span>to the principal cash receiv<span class=\"_ _0\"></span>ed in respect of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>funded mortgages. L<span class=\"_ _0\"></span>oans held in war<span class=\"_ _0\"></span>ehouse facilities ar<span class=\"_ _0\"></span>e refinanced in <span class=\"_ _0\"></span>the mortgage back<span class=\"_ _0\"></span>ed securitisation market <span class=\"_ _0\"></span>when conditions are appr<span class=\"_ _0\"></span>opriate or<span class=\"_ _0\"></span> through int<span class=\"_ _0\"></span>ernal sales to access r<span class=\"_ _0\"></span>etail funding. Mor<span class=\"_ _0\"></span>e information on this process is giv<span class=\"_ _0\"></span>en in note 64 and details of<span class=\"_ _0\"></span> assets held within <span class=\"_ _0\"></span>the war<span class=\"_ _0\"></span>ehouse facilities ar<span class=\"_ _0\"></span>e given in note 18. De<span class=\"_ _0\"></span>tails of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s bank borro<span class=\"_ _0\"></span>wings are set out belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span>2023<span class=\"_ _122\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>Principal value<span class=\"_ _36a\"> </span>Maximum available facility<span class=\"_ _36a\"> </span>Carrying value<span class=\"_ _36a\"> </span>Principal<span class=\"ff16\"> </span>value<span class=\"_ _36a\"> </span>Maximum av<span class=\"_ _0\"></span>ailable<span class=\"ff16\"> </span>facility<span class=\"_ _36a\"> </span>Carrying<span class=\"ff16\"> </span>value<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _a0\"> </span>\u00a3m<span class=\"_ _2c\"> </span>\u00a3m<span class=\"_ _a0\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _2c\"> </span>\u00a3m<span class=\"_ _2c\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>i) <span class=\"_ _27\"> </span>Par<span class=\"_ _0\"></span>agon Second Funding<span class=\"_ _cc\"> </span><span class=\"ff15\">-<span class=\"_ _b7\"> </span>-<span class=\"_ _b7\"> </span>-<span class=\"_ _9f\"> </span><span class=\"ff16\">416.0<span class=\"_ _6d\"> </span>416.0<span class=\"_ _86\"> </span>416.0<span class=\"_ _36a\"> </span></span></span>ii) <span class=\"_ _17\"> </span>Parag<span class=\"_ _0\"></span>on Seventh Funding<span class=\"_ _82\"> </span><span class=\"ff15\">-<span class=\"_ _5a\"> </span>-<span class=\"_ _b7\"> </span>-<span class=\"_ _9f\"> </span><span class=\"ff16\">170.0<span class=\"_ _6d\"> </span>450.0<span class=\"_ _86\"> </span>170.0<span class=\"_ _36a\"> </span></span></span>-<span class=\"_ _b7\"> </span>-<span class=\"_ _5a\"> </span>-<span class=\"_ _9f\"> </span><span class=\"ff16\">586.0<span class=\"_ _86\"> </span>866.0<span class=\"_ _6d\"> </span>586.0<span class=\"_ _36a\"> </span></span>i) <span class=\"_ _9\"> </span> <span class=\"_ _3\"></span>The Par<span class=\"_ _0\"></span>agon Second F<span class=\"_ _0\"></span>unding w<span class=\"_ _0\"></span>arehouse w<span class=\"_ _0\"></span>as av<span class=\"_ _0\"></span>ailable for<span class=\"_ _0\"></span> further<span class=\"_ _0\"></span> drawings until 29 F<span class=\"_ _1\"></span>ebruary 2008 at which point it con<span class=\"_ _0\"></span>verted automatically <span class=\"_ _0\"></span>to a term loan and no <span class=\"_ _0\"></span>further dra<span class=\"_ _0\"></span>wings wer<span class=\"_ _0\"></span>e allowed. <span class=\"_ _1\"></span>The loan was r<span class=\"_ _0\"></span>epaid in full on 29 September<span class=\"_ _0\"></span> 2023. This loan was a sterling <span class=\"_ _0\"></span>facility pr<span class=\"_ _0\"></span>ovided t<span class=\"_ _0\"></span>o Paragon Second F<span class=\"_ _1\"></span>unding Limited by a consortium of<span class=\"_ _0\"></span> banks and w<span class=\"_ _0\"></span>as secured on all <span class=\"_ _0\"></span>the assets of Paragon Second F<span class=\"_ _1\"></span>unding Limited, Paragon Car<span class=\"_ _0\"></span> Finance (1) Limited and Parag<span class=\"_ _0\"></span>on Personal Finance (1) Limited. Inter<span class=\"_ _0\"></span>est on this loan was pay<span class=\"_ _0\"></span>able monthly at 0<span class=\"_ _0\"></span>.704% abo<span class=\"_ _0\"></span>ve SONIA.<span class=\"_ _36a\"> </span>ii) <span class=\"_ _d\"> </span> <span class=\"_ _3\"></span>On 14 Nov<span class=\"_ _0\"></span>ember 2018, a \u00a3200<span class=\"_ _0\"></span>.0m <span class=\"_ _0\"></span>warehouse <span class=\"_ _0\"></span>funding facility<span class=\"_ _0\"></span> was agr<span class=\"_ _0\"></span>eed between P<span class=\"_ _0\"></span>aragon Sev<span class=\"_ _0\"></span>enth F<span class=\"_ _0\"></span>unding Limited and Bank of <span class=\"_ _1\"></span>America Merrill L<span class=\"_ _1\"></span>ynch. The facility<span class=\"_ _1\"></span> was secured o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> all the assets of<span class=\"_ _0\"></span> Paragon Se<span class=\"_ _0\"></span>venth F<span class=\"_ _1\"></span>unding Limited, with a 12 month commitment period. T<span class=\"_ _0\"></span>his was r<span class=\"_ _0\"></span>enew<span class=\"_ _0\"></span>ed for<span class=\"_ _0\"></span> 12 months on 24 October<span class=\"_ _0\"></span> 2019 and was incr<span class=\"_ _0\"></span>eased to \u00a3400<span class=\"_ _0\"></span>.0m and r<span class=\"_ _0\"></span>enewed <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> a further 18 month commitment on 25 September<span class=\"_ _0\"></span> 2020. Inter<span class=\"_ _0\"></span>est w<span class=\"_ _0\"></span>as payable at 0<span class=\"_ _0\"></span>.60% o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> three month LIBOR <span class=\"_ _0\"></span>thereafter<span class=\"_ _0\"></span> up to  8 November<span class=\"_ _1\"></span> 2021. <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>On 8 November 2021, r<span class=\"_ _0\"></span>evisions <span class=\"_ _0\"></span>to the <span class=\"_ _0\"></span>facility <span class=\"_ _0\"></span>were agr<span class=\"_ _0\"></span>eed extending <span class=\"_ _0\"></span>the commitment period for<span class=\"_ _0\"></span> an initial 13-month period with <span class=\"_ _0\"></span>the ability <span class=\"_ _0\"></span>to extend monthly<span class=\"_ _1\"></span>. The maximum drawing <span class=\"_ _0\"></span>was incr<span class=\"_ _0\"></span>eased to \u00a3450<span class=\"_ _0\"></span>.0m and the int<span class=\"_ _0\"></span>erest rat<span class=\"_ _0\"></span>e payable <span class=\"_ _0\"></span>was transitioned <span class=\"_ _0\"></span>to 0.5% above SONIA. <span class=\"_ _0\"></span>The facility<span class=\"_ _0\"></span> expired on 2<span class=\"_ _0\"></span>4 July<span class=\"_ _0\"></span> 2023.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDepositsFromBanksExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-491": {
   "value": "36. <span class=\"_ _96\"></span>Retail bonds<span class=\"_ _36a\"> </span>The Group has one outstanding issue o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>etail bonds, issued under its Eur<span class=\"_ _0\"></span>o Medium <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>erm Note Programme. <span class=\"_ _0\"></span>These bonds are listed on the London Stock<span class=\"_ _0\"></span> Exchange and matur<span class=\"_ _0\"></span>e on 28 <span class=\"_ _0\"></span>August 2024, but ar<span class=\"_ _0\"></span>e callable by<span class=\"_ _0\"></span> the Company<span class=\"_ _0\"></span> in certain circumstances. <span class=\"_ _0\"></span>The principal amount of<span class=\"_ _0\"></span> notes in issue at 30 September<span class=\"_ _0\"></span> 2023 is \u00a3112.5m (2022: \u00a3112.5m) and they<span class=\"_ _0\"></span> bear inter<span class=\"_ _1\"></span>est at a fixed rate o<span class=\"_ _0\"></span>f 6.<span class=\"_ _0\"></span>0% per annum. The outstanding notes ar<span class=\"_ _0\"></span>e rated BBB by<span class=\"_ _0\"></span> Fitch Ratings.<span class=\"_ _36a\"> </span>The notes ar<span class=\"_ _0\"></span>e unsubordinated unsecur<span class=\"_ _0\"></span>ed liabilities of <span class=\"_ _0\"></span>the Company<span class=\"_ _0\"></span> and the amount included in the accounts o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Group and the Company<span class=\"_ _0\"></span> in respect of<span class=\"_ _0\"></span> these bonds is \u00a3112.4m (2022: \u00a3112.3m), all of<span class=\"_ _0\"></span> which f<span class=\"_ _0\"></span>alls due within one y<span class=\"_ _0\"></span>ear (2022: \u00a3nil).<span class=\"_ _36a\"> </span>37<span class=\"_ _2\"></span>.  Corporate bonds<span class=\"_ _36a\"> </span>On 25 March 2021 <span class=\"_ _0\"></span>the Company issued \u00a3150<span class=\"_ _0\"></span>.0m o<span class=\"_ _0\"></span>f Fixed Rat<span class=\"_ _0\"></span>e Callable Subordinated <span class=\"_ _0\"></span>Tier<span class=\"_ _0\"></span>-<span class=\"_ _0\"></span>2 Notes due 2031 at par<span class=\"_ _1\"></span>. These notes bear<span class=\"_ _1\"></span> interest at<span class=\"_ _0\"></span> a rate of<span class=\"_ _0\"></span> 4.375% per annum until 25 Sep<span class=\"_ _0\"></span>tember 2026 after<span class=\"_ _0\"></span> which inter<span class=\"_ _1\"></span>est will be payable at a r<span class=\"_ _0\"></span>eset rate <span class=\"_ _0\"></span>which is 3.956% over<span class=\"_ _1\"></span> that payable on UK<span class=\"_ _0\"></span> Government bonds o<span class=\"_ _0\"></span>f similar<span class=\"_ _0\"></span> duration at that <span class=\"_ _0\"></span>time. T<span class=\"_ _0\"></span>hese notes are callable at <span class=\"_ _0\"></span>the option of<span class=\"_ _0\"></span> the Company<span class=\"_ _0\"></span> between 25 <span class=\"_ _0\"></span>June 2026 and 25 September<span class=\"_ _0\"></span> 2026 and may be called at<span class=\"_ _0\"></span> any <span class=\"_ _0\"></span>time in the e<span class=\"_ _0\"></span>vent of<span class=\"_ _0\"></span> certain tax or<span class=\"_ _0\"></span> regulatory<span class=\"_ _0\"></span> changes. <span class=\"_ _0\"></span>The notes ar<span class=\"_ _0\"></span>e unsecured and subordinat<span class=\"_ _0\"></span>ed to all cr<span class=\"_ _0\"></span>editors of <span class=\"_ _0\"></span>the Company<span class=\"_ _1\"></span>. The notes <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e originally rated BB+ b<span class=\"_ _0\"></span>y Fitch and ar<span class=\"_ _0\"></span>e currently<span class=\"_ _0\"></span> rated BBB-, f<span class=\"_ _0\"></span>ollowing an upgrade on 7 Mar<span class=\"_ _0\"></span>ch 2022. The pr<span class=\"_ _0\"></span>oceeds of<span class=\"_ _0\"></span> the notes ar<span class=\"_ _0\"></span>e utilised in accordance <span class=\"_ _0\"></span>with the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s Green Bond F<span class=\"_ _0\"></span>ramew<span class=\"_ _0\"></span>ork, which is av<span class=\"_ _0\"></span>ailable on its investor<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>ebsite.<span class=\"_ _36a\"> </span>The carrying v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> corporate bonds in the accounts of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup at 30 September<span class=\"_ _0\"></span> 2023 w<span class=\"_ _0\"></span>as \u00a3145.8m (2022: \u00a3149.2m<span class=\"_ _0\"></span>), while the carrying v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the bonds in the accounts of<span class=\"_ _0\"></span> the Company<span class=\"_ _1\"></span> at 30 September 2023 w<span class=\"_ _0\"></span>as \u00a3149.<span class=\"_ _0\"></span>4m (2022: \u00a3149.2m<span class=\"_ _0\"></span>), with the diff<span class=\"_ _0\"></span>erence arising as a result o<span class=\"_ _0\"></span>f the hedging <span class=\"_ _0\"></span>treatment described in no<span class=\"_ _0\"></span>te 26.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSubordinatedLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-445": {
   "value": "36. Retail bonds The Group has one outstanding issue of retail bonds, issued under its Euro Medium Term Note Programme. These bonds are listed on the London Stock Exchange and mature on 28 August 2024, but are callable by the Company in certain circumstances. The principal amount of notes in issue at 30 September 2023 is \u00a3112.5m (2022: \u00a3112.5m) and they bear interest at a fixed rate of 6.0% per annum. The outstanding notes are rated BBB by Fitch Ratings. The notes are unsubordinated unsecured liabilities of the Company and the amount included in the accounts of the Group and the Company in respect of these bonds is \u00a3112.4m (2022: \u00a3112.3m), all of which falls due within one year (2022: \u00a3nil). ",
   "dimensions": {
    "concept": "paragon:DisclosureOfRetailBonds",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-446": {
   "value": "37.  Corporate bonds On 25 March 2021 the Company issued \u00a3150.0m of Fixed Rate Callable Subordinated Tier-2 Notes due 2031 at par. These notes bear interest at a rate of 4.375% per annum until 25 September 2026 after which interest will be payable at a reset rate which is 3.956% over that payable on UK Government bonds of similar duration at that time. These notes are callable at the option of the Company between 25 June 2026 and 25 September 2026 and may be called at any time in the event of certain tax or regulatory changes. The notes are unsecured and subordinated to all creditors of the Company. The notes were originally rated BB+ by Fitch and are currently rated BBB-, following an upgrade on 7 March 2022. The proceeds of the notes are utilised in accordance with the Group\u2019s Green Bond Framework, which is available on its investor website. The carrying value of corporate bonds in the accounts of the Group at 30 September 2023 was \u00a3145.8m (2022: \u00a3149.2m), while the carrying value of the bonds in the accounts of the Company at 30 September 2023 was \u00a3149.4m (2022: \u00a3149.2m), with the difference arising as a result of the hedging treatment described in note 26. ",
   "dimensions": {
    "concept": "paragon:DisclosureOfCorporateBonds",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-447": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws32 gs782\">38. <span class=\"_ _96\"></span>Central bank facilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs783\">During the <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>, the Group has utilised <span class=\"_ _0\"></span>facilities pro<span class=\"_ _0\"></span>vided by <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England thr<span class=\"_ _0\"></span>ough its Sterling Monetary F<span class=\"_ _1\"></span>ramework. <span class=\"_ _1\"></span>These </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs784\">facilities enable either <span class=\"_ _0\"></span>funding or o<span class=\"_ _0\"></span>ff balance sheet liquidity<span class=\"_ _0\"></span> to be pr<span class=\"_ _0\"></span>ovided t<span class=\"_ _0\"></span>o Paragon Bank PL<span class=\"_ _1\"></span>C (\u2018Paragon Bank\u2019 or<span class=\"_ _0\"></span> \u2018the Bank\u2019) on the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs785\">security of<span class=\"_ _1\"></span> eligible collateral, currently in <span class=\"_ _0\"></span>the form o<span class=\"_ _0\"></span>f designated pools of<span class=\"_ _0\"></span> the Bank\u2019<span class=\"_ _1\"></span>s first mortgag<span class=\"_ _0\"></span>e assets and/<span class=\"_ _0\"></span>or the r<span class=\"_ _0\"></span>etained Notes </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs786\">described in note 64, <span class=\"_ _0\"></span>with the amount a<span class=\"_ _0\"></span>vailable based on the <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the security<span class=\"_ _0\"></span> given, subject, <span class=\"_ _0\"></span>where appr<span class=\"_ _0\"></span>opriate, to a hair<span class=\"_ _0\"></span>cut.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs787\">Drawings under<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>erm Funding Scheme f<span class=\"_ _0\"></span>or SMEs (\u2018TFSME\u2019) have a maturity<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> four<span class=\"_ _0\"></span> y<span class=\"_ _0\"></span>ears and bear inter<span class=\"_ _0\"></span>est at BBR. <span class=\"_ _0\"></span>The aver<span class=\"_ _0\"></span>age </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs788\">remaining maturity<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s drawings is 25 months (2022: 37 months). <span class=\"_ _1\"></span>As these drawings w<span class=\"_ _0\"></span>ere pr<span class=\"_ _0\"></span>ovided at rates belo<span class=\"_ _0\"></span>w those </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs789\">available commer<span class=\"_ _0\"></span>cially<span class=\"_ _1\"></span>, by a go<span class=\"_ _0\"></span>vernment agenc<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, they<span class=\"_ _0\"></span> are account<span class=\"_ _0\"></span>ed for<span class=\"_ _0\"></span> under IA<span class=\"_ _0\"></span>S 20.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs78a\">Drawings under<span class=\"_ _0\"></span> the Index<span class=\"_ _0\"></span>ed Long-<span class=\"_ _2\"></span>T<span class=\"_ _1\"></span>erm Repo Scheme (\u2018IL<span class=\"_ _2f\"></span>TR\u2019) have a maturity of<span class=\"_ _0\"></span> six months and a rate of<span class=\"_ _0\"></span> interest<span class=\"_ _0\"></span> set in an auction </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs78b\">process. <span class=\"_ _0\"></span>The Gr<span class=\"_ _0\"></span>oup has not accessed the IL<span class=\"_ _2f\"></span>TR during the year<span class=\"_ _2\"></span>, but retains access to <span class=\"_ _0\"></span>this programme <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> liquidity purposes.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs78c\">The amounts drawn under<span class=\"_ _0\"></span> these <span class=\"_ _0\"></span>facilities are set out<span class=\"_ _0\"></span> below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs78d\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs78e\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gs78f\">TFSME<span class=\"_ _2ba\"> </span><span class=\"ff15\">2,750.0<span class=\"_ _86\"> </span></span>2,750.0<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs790\">IL<span class=\"_ _1\"></span>TR<span class=\"_ _2bb\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs791\">T<span class=\"_ _2\"></span>otal central bank f<span class=\"_ _0\"></span>acilities<span class=\"_ _2bc\"> </span><span class=\"ff15\">2,750.0<span class=\"_ _86\"> </span><span class=\"ff16\">2,750.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs792\">All TF<span class=\"_ _0\"></span>SME borrowings fall due aft<span class=\"_ _0\"></span>er mor<span class=\"_ _0\"></span>e than one y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs793\">During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2022 all <span class=\"_ _1\"></span>TFSM<span class=\"_ _15\"></span>E borrowings <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e repaid and r<span class=\"_ _0\"></span>edrawn, extending <span class=\"_ _0\"></span>the maturity date <span class=\"_ _0\"></span>to  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs794\">21 October 2025 <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the majority o<span class=\"_ _0\"></span>f drawings, <span class=\"_ _0\"></span>with \u00a35.2m falling due on 31 Mar<span class=\"_ _0\"></span>ch 2027<span class=\"_ _2\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs795\">F<span class=\"_ _0\"></span>urther <span class=\"_ _0\"></span>first mortgage assets o<span class=\"_ _0\"></span>f the Bank<span class=\"_ _0\"></span> have been pr<span class=\"_ _0\"></span>e-positioned with the Bank<span class=\"_ _0\"></span> of England <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>future use in such schemes and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs796\">eligible retained No<span class=\"_ _0\"></span>tes can also be used to support <span class=\"_ _0\"></span>this funding (not<span class=\"_ _0\"></span>e 64). T<span class=\"_ _0\"></span>he mortgage assets pledged in support<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>these drawings </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs797\">are set out<span class=\"_ _0\"></span> in note 17<span class=\"_ _2\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs798\">The balances arising fr<span class=\"_ _0\"></span>om the <span class=\"_ _0\"></span>TFSME carried in the Group accounts ar<span class=\"_ _0\"></span>e shown below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs799\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs79a\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs79b\">TFSME at IAS 20 carrying v<span class=\"_ _0\"></span>alue<span class=\"_ _2bd\"> </span><span class=\"ff15\">2,716.3<span class=\"_ _86\"> </span><span class=\"ff16\">2,700.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs79c\">Def<span class=\"_ _0\"></span>erred governmen<span class=\"_ _0\"></span>t assistance<span class=\"_ _2be\"> </span><span class=\"ff15\">33.7<span class=\"_ _3a\"> </span><span class=\"ff16\">49.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs79d\">2,750.0<span class=\"_ _86\"> </span><span class=\"ff16\">2,750.0<span class=\"_ _36a\"> </span></span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGovernmentGrantsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-477": {
   "value": "38. Central bank facilities During the year, the Group has utilised facilities provided by the Bank of England through its Sterling Monetary Framework. These facilities enable either funding or off balance sheet liquidity to be provided to Paragon Bank PLC (\u2018Paragon Bank\u2019 or \u2018the Bank\u2019) on the security of eligible collateral, currently in the form of designated pools of the Bank\u2019s first mortgage assets and/or the retained Notes described in note 64, with the amount available based on the value of the security given, subject, where appropriate, to a haircut. Drawings under the Term Funding Scheme for SMEs (\u2018TFSME\u2019) have a maturity of four years and bear interest at BBR. The average remaining maturity of the Group\u2019s drawings is 25 months (2022: 37 months). As these drawings were provided at rates below those available commercially, by a government agency, they are accounted for under IAS 20. Drawings under the Indexed Long-Term Repo Scheme (\u2018ILTR\u2019) have a maturity of six months and a rate of interest set in an auction process. The Group has not accessed the ILTR during the year, but retains access to this programme for liquidity purposes. The amounts drawn under these facilities are set out below. 2023 2022 \u00a3m \u00a3m TFSME 2,750.0 2,750.0 ILTR - - Total central bank facilities 2,750.0 2,750.0 All TFSME borrowings fall due after more than one year. During the year ended 30 September 2022 all TFSME borrowings were repaid and redrawn, extending the maturity date to  21 October 2025 for the majority of drawings, with \u00a35.2m falling due on 31 March 2027. Further first mortgage assets of the Bank have been pre-positioned with the Bank of England for future use in such schemes and eligible retained Notes can also be used to support this funding (note 64). The mortgage assets pledged in support of these drawings are set out in note 17. The balances arising from the TFSME carried in the Group accounts are shown below. 2023 2022 \u00a3m \u00a3m TFSME at IAS 20 carrying value 2,716.3 2,700.2 Deferred government assistance 33.7 49.8 2,750.0 2,750.0 ",
   "dimensions": {
    "concept": "paragon:DisclosureOfCentralBankFacilities",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-478": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs79f\">39<span class=\"_ _0\"></span>. <span class=\"_ _1c\"></span>Sale and repurchase agreements<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7a0\">F<span class=\"_ _0\"></span>rom <span class=\"_ _0\"></span>time to <span class=\"_ _0\"></span>time the Group ent<span class=\"_ _0\"></span>ers into short-term sale and r<span class=\"_ _0\"></span>epurchase agr<span class=\"_ _0\"></span>eements with highly-r<span class=\"_ _0\"></span>ated UK banks as part of<span class=\"_ _0\"></span> its liquidity </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7a1\">management operations.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7a2\">At 30 Sept<span class=\"_ _0\"></span>ember 2023 \u00a350<span class=\"_ _0\"></span>.0m w<span class=\"_ _0\"></span>as outstanding under such arr<span class=\"_ _0\"></span>angements (2022: \u00a3nil). T<span class=\"_ _0\"></span>he averag<span class=\"_ _0\"></span>e term of<span class=\"_ _0\"></span> the agr<span class=\"_ _0\"></span>eements was  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7a3\">3 months and the av<span class=\"_ _0\"></span>erage r<span class=\"_ _0\"></span>emaining term 2.8 months. <span class=\"_ _0\"></span>The av<span class=\"_ _0\"></span>erage inter<span class=\"_ _0\"></span>est rate pay<span class=\"_ _0\"></span>able was 0<span class=\"_ _0\"></span>.80% abov<span class=\"_ _0\"></span>e compounded SONIA.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7a4\">The securities subject t<span class=\"_ _0\"></span>o the sale and repur<span class=\"_ _0\"></span>chase agreement<span class=\"_ _0\"></span> wer<span class=\"_ _0\"></span>e certain of <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s retained asset back<span class=\"_ _0\"></span>ed loan notes, described </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7a5\">in note 64<span class=\"_ _36a\"> </span>.<span class=\"_ _36a\"> </span></div>During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2020<span class=\"_ _0\"></span>, the Gr<span class=\"_ _0\"></span>oup entered into a back<span class=\"_ _1\"></span>-to-back long / short sale and repur<span class=\"_ _0\"></span>chase (\u2018repo<span class=\"_ _1\"></span>\u2019) transaction with a UK<span class=\"_ _0\"></span> bank which continued <span class=\"_ _0\"></span>throughout <span class=\"_ _0\"></span>the current <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>. This pr<span class=\"_ _0\"></span>ovides \u00a3150<span class=\"_ _0\"></span>.0m of<span class=\"_ _0\"></span> liquidity (2022: \u00a3150<span class=\"_ _0\"></span>.0m<span class=\"_ _0\"></span>), utilising \u00a326.5m of <span class=\"_ _0\"></span>the loan notes shown abo<span class=\"_ _0\"></span>ve, but does not<span class=\"_ _0\"></span> appear on the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s balance sheet.<span class=\"_ _36a\"> </span>The Group has also ent<span class=\"_ _0\"></span>ered into short-<span class=\"_ _0\"></span>term repo <span class=\"_ _0\"></span>transactions fr<span class=\"_ _0\"></span>om time-to-<span class=\"_ _0\"></span>time, most recently<span class=\"_ _0\"></span> during the curr<span class=\"_ _0\"></span>ent year<span class=\"_ _2\"></span>, and maintains the capability <span class=\"_ _0\"></span>to access the r<span class=\"_ _0\"></span>epo market <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> liquidity purposes. <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>ransactions in place at 30 September 2023 utilised \u00a358.5m of<span class=\"_ _1\"></span> the loan notes shown abo<span class=\"_ _0\"></span>ve (2022: \u00a3nil).<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRepurchaseAndReverseRepurchaseAgreementsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-384": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs7a7\">40. <span class=\"_ _15\"></span>Sundry liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9c gs7a8\">(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7a9\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7aa\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs7ab\">Current liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7ac\">Accrued inter<span class=\"_ _0\"></span>est<span class=\"_ _2bf\"> </span><span class=\"ff15\">156.7<span class=\"_ _3a\"> </span><span class=\"ff16\">42.2<span class=\"_ _3a\"> </span>22.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7ad\">T<span class=\"_ _1\"></span>rade creditor<span class=\"_ _0\"></span>s<span class=\"_ _205\"> </span><span class=\"ff15\">1.6<span class=\"_ _d1\"> </span><span class=\"ff16\">0.7<span class=\"_ _9e\"> </span>1.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7ae\">CSA liabilities<span class=\"_ _248\"> </span><span class=\"ff15\">383.4<span class=\"_ _d5\"> </span><span class=\"ff16\">388.6<span class=\"_ _9e\"> </span>0.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7af\">Purchase of own shares (not<span class=\"_ _0\"></span>e 47)<span class=\"_ _27f\"> </span><span class=\"ff15\">-<span class=\"_ _d1\"> </span><span class=\"ff16\">10.8<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7b0\">Other accruals <span class=\"_ _1c2\"> </span><span class=\"ff15\">35.6<span class=\"_ _3a\"> </span><span class=\"ff16\">35.9<span class=\"_ _f7\"> </span>32.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7b1\">Sundry financial liabilities at amortised cost<span class=\"_ _2a9\"> </span><span class=\"ff15\">577.3<span class=\"_ _d5\"> </span><span class=\"ff16\">478.2<span class=\"_ _3a\"> </span>56.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7b2\">Contingent c<span class=\"_ _0\"></span>onsideration (note 41)<span class=\"_ _219\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>4.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7b3\">Sundry financial liabilities<span class=\"_ _2c0\"> </span><span class=\"ff15\">577.3<span class=\"_ _d5\"> </span><span class=\"ff16\">480.4<span class=\"_ _3a\"> </span>61.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7b4\">Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _152\"> </span><span class=\"ff15\">2.6<span class=\"_ _9e\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>1.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7b5\">Def<span class=\"_ _0\"></span>erred income<span class=\"_ _247\"> </span><span class=\"ff15\">5.9<span class=\"_ _d1\"> </span><span class=\"ff16\">3.7<span class=\"_ _9e\"> </span>3.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7b6\">Conduct (note 43)<span class=\"_ _2c1\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7b7\">Other tax<span class=\"_ _0\"></span>ation and social security<span class=\"_ _2c2\"> </span><span class=\"ff15\">4.1<span class=\"_ _9e\"> </span><span class=\"ff16\">3.7<span class=\"_ _9e\"> </span>2.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7b8\">589.9<span class=\"_ _d5\"> </span><span class=\"ff16\">490.0<span class=\"_ _3a\"> </span>68.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs7b9\">Non-current liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7ba\">Accrued inter<span class=\"_ _0\"></span>est<span class=\"_ _1ce\"> </span><span class=\"ff15\">31.5<span class=\"_ _3a\"> </span><span class=\"ff16\">13.0<span class=\"_ _9e\"> </span>9.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7bb\">Sundry financial liabilities at amortised cost<span class=\"_ _29f\"> </span><span class=\"ff15\">31.5<span class=\"_ _cb\"> </span><span class=\"ff16\">13.0<span class=\"_ _9e\"> </span>9.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7bc\">Contingent c<span class=\"_ _0\"></span>onsideration (note 41)<span class=\"_ _219\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7bd\">Sundry financial liabilities<span class=\"_ _25a\"> </span><span class=\"ff15\">31.5<span class=\"_ _3a\"> </span><span class=\"ff16\">13.0<span class=\"_ _3a\"> </span>12.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7be\">Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _152\"> </span><span class=\"ff15\">6.3<span class=\"_ _9e\"> </span><span class=\"ff16\">6.8<span class=\"_ _9e\"> </span>8.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7bf\">Def<span class=\"_ _0\"></span>erred income<span class=\"_ _2c1\"> </span><span class=\"ff15\">3.5<span class=\"_ _9e\"> </span><span class=\"ff16\">3.3<span class=\"_ _9e\"> </span>1.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7c0\">41.3<span class=\"_ _3a\"> </span><span class=\"ff16\">23.1<span class=\"_ _3a\"> </span>22.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7c1\">T<span class=\"_ _2\"></span>otal sundry financial liabilities at amortised cost<span class=\"_ _1a2\"> </span><span class=\"ff15\">608.8<span class=\"_ _d5\"> </span><span class=\"ff16\">491.2<span class=\"_ _3a\"> </span>66.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7c2\">T<span class=\"_ _2\"></span>otal sundry financial liabilities at fair value<span class=\"_ _1d1\"> </span><span class=\"ff15\">-<span class=\"_ _9b\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>7.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7c3\">T<span class=\"_ _2\"></span>otal other sundry liabilities<span class=\"_ _2c3\"> </span><span class=\"ff15\">22.4<span class=\"_ _3a\"> </span><span class=\"ff16\">19.7<span class=\"_ _3a\"> </span>17.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs7c4\">T<span class=\"_ _2\"></span>otal sundry liabilities<span class=\"_ _2c4\"> </span><span class=\"ff15\">631.2<span class=\"_ _d5\"> </span><span class=\"ff16\">513.1<span class=\"_ _3a\"> </span>90.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs7c5\">CSA<span class=\"_ _0\"></span> liabilities repr<span class=\"_ _0\"></span>esent collateral r<span class=\"_ _0\"></span>eceived in respect<span class=\"_ _0\"></span> of inter<span class=\"_ _0\"></span>est rate s<span class=\"_ _0\"></span>wap agreements and ar<span class=\"_ _0\"></span>e described further<span class=\"_ _0\"></span> in notes 26 and 63.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherCurrentLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-502": {
   "value": "40. <span class=\"_ _15\"></span>Sundry liabilities<span class=\"_ _36a\"> </span>(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Current liabilities<span class=\"_ _36a\"> </span>Accrued inter<span class=\"_ _0\"></span>est<span class=\"_ _2bf\"> </span><span class=\"ff15\">156.7<span class=\"_ _3a\"> </span><span class=\"ff16\">42.2<span class=\"_ _3a\"> </span>22.2<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _1\"></span>rade creditor<span class=\"_ _0\"></span>s<span class=\"_ _205\"> </span><span class=\"ff15\">1.6<span class=\"_ _d1\"> </span><span class=\"ff16\">0.7<span class=\"_ _9e\"> </span>1.4<span class=\"_ _36a\"> </span></span></span>CSA liabilities<span class=\"_ _248\"> </span><span class=\"ff15\">383.4<span class=\"_ _d5\"> </span><span class=\"ff16\">388.6<span class=\"_ _9e\"> </span>0.2<span class=\"_ _36a\"> </span></span></span>Purchase of own shares (not<span class=\"_ _0\"></span>e 47)<span class=\"_ _27f\"> </span><span class=\"ff15\">-<span class=\"_ _d1\"> </span><span class=\"ff16\">10.8<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span>Other accruals <span class=\"_ _1c2\"> </span><span class=\"ff15\">35.6<span class=\"_ _3a\"> </span><span class=\"ff16\">35.9<span class=\"_ _f7\"> </span>32.9<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities at amortised cost<span class=\"_ _2a9\"> </span><span class=\"ff15\">577.3<span class=\"_ _d5\"> </span><span class=\"ff16\">478.2<span class=\"_ _3a\"> </span>56.7<span class=\"_ _36a\"> </span></span></span>Contingent c<span class=\"_ _0\"></span>onsideration (note 41)<span class=\"_ _219\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>4.6<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities<span class=\"_ _2c0\"> </span><span class=\"ff15\">577.3<span class=\"_ _d5\"> </span><span class=\"ff16\">480.4<span class=\"_ _3a\"> </span>61.3<span class=\"_ _36a\"> </span></span></span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _152\"> </span><span class=\"ff15\">2.6<span class=\"_ _9e\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>1.5<span class=\"_ _36a\"> </span></span></span>Def<span class=\"_ _0\"></span>erred income<span class=\"_ _247\"> </span><span class=\"ff15\">5.9<span class=\"_ _d1\"> </span><span class=\"ff16\">3.7<span class=\"_ _9e\"> </span>3.3<span class=\"_ _36a\"> </span></span></span>Conduct (note 43)<span class=\"_ _2c1\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>Other tax<span class=\"_ _0\"></span>ation and social security<span class=\"_ _2c2\"> </span><span class=\"ff15\">4.1<span class=\"_ _9e\"> </span><span class=\"ff16\">3.7<span class=\"_ _9e\"> </span>2.5<span class=\"_ _36a\"> </span></span></span>589.9<span class=\"_ _d5\"> </span><span class=\"ff16\">490.0<span class=\"_ _3a\"> </span>68.6<span class=\"_ _36a\"> </span></span>Non-current liabilities<span class=\"_ _36a\"> </span>Accrued inter<span class=\"_ _0\"></span>est<span class=\"_ _1ce\"> </span><span class=\"ff15\">31.5<span class=\"_ _3a\"> </span><span class=\"ff16\">13.0<span class=\"_ _9e\"> </span>9.5<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities at amortised cost<span class=\"_ _29f\"> </span><span class=\"ff15\">31.5<span class=\"_ _cb\"> </span><span class=\"ff16\">13.0<span class=\"_ _9e\"> </span>9.5<span class=\"_ _36a\"> </span></span></span>Contingent c<span class=\"_ _0\"></span>onsideration (note 41)<span class=\"_ _219\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.9<span class=\"_ _36a\"> </span></span>Sundry financial liabilities<span class=\"_ _25a\"> </span><span class=\"ff15\">31.5<span class=\"_ _3a\"> </span><span class=\"ff16\">13.0<span class=\"_ _3a\"> </span>12.4<span class=\"_ _36a\"> </span></span></span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _152\"> </span><span class=\"ff15\">6.3<span class=\"_ _9e\"> </span><span class=\"ff16\">6.8<span class=\"_ _9e\"> </span>8.0<span class=\"_ _36a\"> </span></span></span>Def<span class=\"_ _0\"></span>erred income<span class=\"_ _2c1\"> </span><span class=\"ff15\">3.5<span class=\"_ _9e\"> </span><span class=\"ff16\">3.3<span class=\"_ _9e\"> </span>1.7<span class=\"_ _36a\"> </span></span></span>41.3<span class=\"_ _3a\"> </span><span class=\"ff16\">23.1<span class=\"_ _3a\"> </span>22.1<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal sundry financial liabilities at amortised cost<span class=\"_ _1a2\"> </span><span class=\"ff15\">608.8<span class=\"_ _d5\"> </span><span class=\"ff16\">491.2<span class=\"_ _3a\"> </span>66.2<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal sundry financial liabilities at fair value<span class=\"_ _1d1\"> </span><span class=\"ff15\">-<span class=\"_ _9b\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>7.5<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal other sundry liabilities<span class=\"_ _2c3\"> </span><span class=\"ff15\">22.4<span class=\"_ _3a\"> </span><span class=\"ff16\">19.7<span class=\"_ _3a\"> </span>17.0<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal sundry liabilities<span class=\"_ _2c4\"> </span><span class=\"ff15\">631.2<span class=\"_ _d5\"> </span><span class=\"ff16\">513.1<span class=\"_ _3a\"> </span>90.7<span class=\"_ _36a\"> </span></span></span>CSA<span class=\"_ _0\"></span> liabilities repr<span class=\"_ _0\"></span>esent collateral r<span class=\"_ _0\"></span>eceived in respect<span class=\"_ _0\"></span> of inter<span class=\"_ _0\"></span>est rate s<span class=\"_ _0\"></span>wap agreements and ar<span class=\"_ _0\"></span>e described further<span class=\"_ _0\"></span> in notes 26 and 63.<span class=\"_ _36a\"> </span>(b)  <span class=\"_ _ce\"> </span>The  Company<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Current liabilities<span class=\"_ _36a\"> </span>Amounts owed to Gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _1a5\"> </span><span class=\"ff15\">24.0<span class=\"_ _cb\"> </span><span class=\"ff16\">23.2<span class=\"_ _f7\"> </span>22.6<span class=\"_ _36a\"> </span></span></span>Accrued inter<span class=\"_ _0\"></span>est<span class=\"_ _1c2\"> </span><span class=\"ff15\">0.7<span class=\"_ _d1\"> </span><span class=\"ff16\">0.7<span class=\"_ _9e\"> </span>2.0<span class=\"_ _36a\"> </span></span></span>Purchase of own shares (not<span class=\"_ _0\"></span>e 47)<span class=\"_ _27f\"> </span><span class=\"ff15\">-<span class=\"_ _d1\"> </span><span class=\"ff16\">10.8<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span>Other financial liabilities<span class=\"_ _2c5\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.4<span class=\"_ _9e\"> </span>1.0<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities at amortised cost<span class=\"_ _29f\"> </span><span class=\"ff15\">24.7<span class=\"_ _cb\"> </span><span class=\"ff16\">36.1<span class=\"_ _f7\"> </span>25.6<span class=\"_ _36a\"> </span></span></span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _152\"> </span><span class=\"ff15\">1.3<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _9e\"> </span>1.3<span class=\"_ _36a\"> </span></span></span>26.0<span class=\"_ _3a\"> </span><span class=\"ff16\">37.4<span class=\"_ _3a\"> </span>26.9<span class=\"_ _36a\"> </span></span>Non-current liabilities<span class=\"_ _36a\"> </span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _23d\"> </span><span class=\"ff15\">12.4<span class=\"_ _3a\"> </span><span class=\"ff16\">13.7<span class=\"_ _3a\"> </span>15.0<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal sundry liabilities<span class=\"_ _218\"> </span><span class=\"ff15\">38.4<span class=\"_ _3a\"> </span><span class=\"ff16\">51.1<span class=\"_ _f7\"> </span>41.9<span class=\"_ _36a\"> </span></span></span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAccruedExpensesAndOtherLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-492": {
   "value": "40. <span class=\"_ _15\"></span>Sundry liabilities<span class=\"_ _36a\"> </span>(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Current liabilities<span class=\"_ _36a\"> </span>Accrued inter<span class=\"_ _0\"></span>est<span class=\"_ _2bf\"> </span><span class=\"ff15\">156.7<span class=\"_ _3a\"> </span><span class=\"ff16\">42.2<span class=\"_ _3a\"> </span>22.2<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _1\"></span>rade creditor<span class=\"_ _0\"></span>s<span class=\"_ _205\"> </span><span class=\"ff15\">1.6<span class=\"_ _d1\"> </span><span class=\"ff16\">0.7<span class=\"_ _9e\"> </span>1.4<span class=\"_ _36a\"> </span></span></span>CSA liabilities<span class=\"_ _248\"> </span><span class=\"ff15\">383.4<span class=\"_ _d5\"> </span><span class=\"ff16\">388.6<span class=\"_ _9e\"> </span>0.2<span class=\"_ _36a\"> </span></span></span>Purchase of own shares (not<span class=\"_ _0\"></span>e 47)<span class=\"_ _27f\"> </span><span class=\"ff15\">-<span class=\"_ _d1\"> </span><span class=\"ff16\">10.8<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span>Other accruals <span class=\"_ _1c2\"> </span><span class=\"ff15\">35.6<span class=\"_ _3a\"> </span><span class=\"ff16\">35.9<span class=\"_ _f7\"> </span>32.9<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities at amortised cost<span class=\"_ _2a9\"> </span><span class=\"ff15\">577.3<span class=\"_ _d5\"> </span><span class=\"ff16\">478.2<span class=\"_ _3a\"> </span>56.7<span class=\"_ _36a\"> </span></span></span>Contingent c<span class=\"_ _0\"></span>onsideration (note 41)<span class=\"_ _219\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>4.6<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities<span class=\"_ _2c0\"> </span><span class=\"ff15\">577.3<span class=\"_ _d5\"> </span><span class=\"ff16\">480.4<span class=\"_ _3a\"> </span>61.3<span class=\"_ _36a\"> </span></span></span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _152\"> </span><span class=\"ff15\">2.6<span class=\"_ _9e\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>1.5<span class=\"_ _36a\"> </span></span></span>Def<span class=\"_ _0\"></span>erred income<span class=\"_ _247\"> </span><span class=\"ff15\">5.9<span class=\"_ _d1\"> </span><span class=\"ff16\">3.7<span class=\"_ _9e\"> </span>3.3<span class=\"_ _36a\"> </span></span></span>Conduct (note 43)<span class=\"_ _2c1\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>Other tax<span class=\"_ _0\"></span>ation and social security<span class=\"_ _2c2\"> </span><span class=\"ff15\">4.1<span class=\"_ _9e\"> </span><span class=\"ff16\">3.7<span class=\"_ _9e\"> </span>2.5<span class=\"_ _36a\"> </span></span></span>589.9<span class=\"_ _d5\"> </span><span class=\"ff16\">490.0<span class=\"_ _3a\"> </span>68.6<span class=\"_ _36a\"> </span></span>Non-current liabilities<span class=\"_ _36a\"> </span>Accrued inter<span class=\"_ _0\"></span>est<span class=\"_ _1ce\"> </span><span class=\"ff15\">31.5<span class=\"_ _3a\"> </span><span class=\"ff16\">13.0<span class=\"_ _9e\"> </span>9.5<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities at amortised cost<span class=\"_ _29f\"> </span><span class=\"ff15\">31.5<span class=\"_ _cb\"> </span><span class=\"ff16\">13.0<span class=\"_ _9e\"> </span>9.5<span class=\"_ _36a\"> </span></span></span>Contingent c<span class=\"_ _0\"></span>onsideration (note 41)<span class=\"_ _219\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.9<span class=\"_ _36a\"> </span></span>Sundry financial liabilities<span class=\"_ _25a\"> </span><span class=\"ff15\">31.5<span class=\"_ _3a\"> </span><span class=\"ff16\">13.0<span class=\"_ _3a\"> </span>12.4<span class=\"_ _36a\"> </span></span></span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _152\"> </span><span class=\"ff15\">6.3<span class=\"_ _9e\"> </span><span class=\"ff16\">6.8<span class=\"_ _9e\"> </span>8.0<span class=\"_ _36a\"> </span></span></span>Def<span class=\"_ _0\"></span>erred income<span class=\"_ _2c1\"> </span><span class=\"ff15\">3.5<span class=\"_ _9e\"> </span><span class=\"ff16\">3.3<span class=\"_ _9e\"> </span>1.7<span class=\"_ _36a\"> </span></span></span>41.3<span class=\"_ _3a\"> </span><span class=\"ff16\">23.1<span class=\"_ _3a\"> </span>22.1<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal sundry financial liabilities at amortised cost<span class=\"_ _1a2\"> </span><span class=\"ff15\">608.8<span class=\"_ _d5\"> </span><span class=\"ff16\">491.2<span class=\"_ _3a\"> </span>66.2<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal sundry financial liabilities at fair value<span class=\"_ _1d1\"> </span><span class=\"ff15\">-<span class=\"_ _9b\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>7.5<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal other sundry liabilities<span class=\"_ _2c3\"> </span><span class=\"ff15\">22.4<span class=\"_ _3a\"> </span><span class=\"ff16\">19.7<span class=\"_ _3a\"> </span>17.0<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal sundry liabilities<span class=\"_ _2c4\"> </span><span class=\"ff15\">631.2<span class=\"_ _d5\"> </span><span class=\"ff16\">513.1<span class=\"_ _3a\"> </span>90.7<span class=\"_ _36a\"> </span></span></span>CSA<span class=\"_ _0\"></span> liabilities repr<span class=\"_ _0\"></span>esent collateral r<span class=\"_ _0\"></span>eceived in respect<span class=\"_ _0\"></span> of inter<span class=\"_ _0\"></span>est rate s<span class=\"_ _0\"></span>wap agreements and ar<span class=\"_ _0\"></span>e described further<span class=\"_ _0\"></span> in notes 26 and 63.<span class=\"_ _36a\"> </span>(b)  <span class=\"_ _ce\"> </span>The  Company<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Current liabilities<span class=\"_ _36a\"> </span>Amounts owed to Gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _1a5\"> </span><span class=\"ff15\">24.0<span class=\"_ _cb\"> </span><span class=\"ff16\">23.2<span class=\"_ _f7\"> </span>22.6<span class=\"_ _36a\"> </span></span></span>Accrued inter<span class=\"_ _0\"></span>est<span class=\"_ _1c2\"> </span><span class=\"ff15\">0.7<span class=\"_ _d1\"> </span><span class=\"ff16\">0.7<span class=\"_ _9e\"> </span>2.0<span class=\"_ _36a\"> </span></span></span>Purchase of own shares (not<span class=\"_ _0\"></span>e 47)<span class=\"_ _27f\"> </span><span class=\"ff15\">-<span class=\"_ _d1\"> </span><span class=\"ff16\">10.8<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span>Other financial liabilities<span class=\"_ _2c5\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.4<span class=\"_ _9e\"> </span>1.0<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities at amortised cost<span class=\"_ _29f\"> </span><span class=\"ff15\">24.7<span class=\"_ _cb\"> </span><span class=\"ff16\">36.1<span class=\"_ _f7\"> </span>25.6<span class=\"_ _36a\"> </span></span></span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _152\"> </span><span class=\"ff15\">1.3<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _9e\"> </span>1.3<span class=\"_ _36a\"> </span></span></span>26.0<span class=\"_ _3a\"> </span><span class=\"ff16\">37.4<span class=\"_ _3a\"> </span>26.9<span class=\"_ _36a\"> </span></span>Non-current liabilities<span class=\"_ _36a\"> </span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _23d\"> </span><span class=\"ff15\">12.4<span class=\"_ _3a\"> </span><span class=\"ff16\">13.7<span class=\"_ _3a\"> </span>15.0<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal sundry liabilities<span class=\"_ _218\"> </span><span class=\"ff15\">38.4<span class=\"_ _3a\"> </span><span class=\"ff16\">51.1<span class=\"_ _f7\"> </span>41.9<span class=\"_ _36a\"> </span></span></span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDeferredIncomeExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-479": {
   "value": "40. <span class=\"_ _15\"></span>Sundry liabilities<span class=\"_ _36a\"> </span>(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Current liabilities<span class=\"_ _36a\"> </span>Accrued inter<span class=\"_ _0\"></span>est<span class=\"_ _2bf\"> </span><span class=\"ff15\">156.7<span class=\"_ _3a\"> </span><span class=\"ff16\">42.2<span class=\"_ _3a\"> </span>22.2<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _1\"></span>rade creditor<span class=\"_ _0\"></span>s<span class=\"_ _205\"> </span><span class=\"ff15\">1.6<span class=\"_ _d1\"> </span><span class=\"ff16\">0.7<span class=\"_ _9e\"> </span>1.4<span class=\"_ _36a\"> </span></span></span>CSA liabilities<span class=\"_ _248\"> </span><span class=\"ff15\">383.4<span class=\"_ _d5\"> </span><span class=\"ff16\">388.6<span class=\"_ _9e\"> </span>0.2<span class=\"_ _36a\"> </span></span></span>Purchase of own shares (not<span class=\"_ _0\"></span>e 47)<span class=\"_ _27f\"> </span><span class=\"ff15\">-<span class=\"_ _d1\"> </span><span class=\"ff16\">10.8<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span>Other accruals <span class=\"_ _1c2\"> </span><span class=\"ff15\">35.6<span class=\"_ _3a\"> </span><span class=\"ff16\">35.9<span class=\"_ _f7\"> </span>32.9<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities at amortised cost<span class=\"_ _2a9\"> </span><span class=\"ff15\">577.3<span class=\"_ _d5\"> </span><span class=\"ff16\">478.2<span class=\"_ _3a\"> </span>56.7<span class=\"_ _36a\"> </span></span></span>Contingent c<span class=\"_ _0\"></span>onsideration (note 41)<span class=\"_ _219\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>4.6<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities<span class=\"_ _2c0\"> </span><span class=\"ff15\">577.3<span class=\"_ _d5\"> </span><span class=\"ff16\">480.4<span class=\"_ _3a\"> </span>61.3<span class=\"_ _36a\"> </span></span></span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _152\"> </span><span class=\"ff15\">2.6<span class=\"_ _9e\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>1.5<span class=\"_ _36a\"> </span></span></span>Def<span class=\"_ _0\"></span>erred income<span class=\"_ _247\"> </span><span class=\"ff15\">5.9<span class=\"_ _d1\"> </span><span class=\"ff16\">3.7<span class=\"_ _9e\"> </span>3.3<span class=\"_ _36a\"> </span></span></span>Conduct (note 43)<span class=\"_ _2c1\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>Other tax<span class=\"_ _0\"></span>ation and social security<span class=\"_ _2c2\"> </span><span class=\"ff15\">4.1<span class=\"_ _9e\"> </span><span class=\"ff16\">3.7<span class=\"_ _9e\"> </span>2.5<span class=\"_ _36a\"> </span></span></span>589.9<span class=\"_ _d5\"> </span><span class=\"ff16\">490.0<span class=\"_ _3a\"> </span>68.6<span class=\"_ _36a\"> </span></span>Non-current liabilities<span class=\"_ _36a\"> </span>Accrued inter<span class=\"_ _0\"></span>est<span class=\"_ _1ce\"> </span><span class=\"ff15\">31.5<span class=\"_ _3a\"> </span><span class=\"ff16\">13.0<span class=\"_ _9e\"> </span>9.5<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities at amortised cost<span class=\"_ _29f\"> </span><span class=\"ff15\">31.5<span class=\"_ _cb\"> </span><span class=\"ff16\">13.0<span class=\"_ _9e\"> </span>9.5<span class=\"_ _36a\"> </span></span></span>Contingent c<span class=\"_ _0\"></span>onsideration (note 41)<span class=\"_ _219\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.9<span class=\"_ _36a\"> </span></span>Sundry financial liabilities<span class=\"_ _25a\"> </span><span class=\"ff15\">31.5<span class=\"_ _3a\"> </span><span class=\"ff16\">13.0<span class=\"_ _3a\"> </span>12.4<span class=\"_ _36a\"> </span></span></span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _152\"> </span><span class=\"ff15\">6.3<span class=\"_ _9e\"> </span><span class=\"ff16\">6.8<span class=\"_ _9e\"> </span>8.0<span class=\"_ _36a\"> </span></span></span>Def<span class=\"_ _0\"></span>erred income<span class=\"_ _2c1\"> </span><span class=\"ff15\">3.5<span class=\"_ _9e\"> </span><span class=\"ff16\">3.3<span class=\"_ _9e\"> </span>1.7<span class=\"_ _36a\"> </span></span></span>41.3<span class=\"_ _3a\"> </span><span class=\"ff16\">23.1<span class=\"_ _3a\"> </span>22.1<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal sundry financial liabilities at amortised cost<span class=\"_ _1a2\"> </span><span class=\"ff15\">608.8<span class=\"_ _d5\"> </span><span class=\"ff16\">491.2<span class=\"_ _3a\"> </span>66.2<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal sundry financial liabilities at fair value<span class=\"_ _1d1\"> </span><span class=\"ff15\">-<span class=\"_ _9b\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>7.5<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal other sundry liabilities<span class=\"_ _2c3\"> </span><span class=\"ff15\">22.4<span class=\"_ _3a\"> </span><span class=\"ff16\">19.7<span class=\"_ _3a\"> </span>17.0<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal sundry liabilities<span class=\"_ _2c4\"> </span><span class=\"ff15\">631.2<span class=\"_ _d5\"> </span><span class=\"ff16\">513.1<span class=\"_ _3a\"> </span>90.7<span class=\"_ _36a\"> </span></span></span>CSA<span class=\"_ _0\"></span> liabilities repr<span class=\"_ _0\"></span>esent collateral r<span class=\"_ _0\"></span>eceived in respect<span class=\"_ _0\"></span> of inter<span class=\"_ _0\"></span>est rate s<span class=\"_ _0\"></span>wap agreements and ar<span class=\"_ _0\"></span>e described further<span class=\"_ _0\"></span> in notes 26 and 63.<span class=\"_ _36a\"> </span>(b)  <span class=\"_ _ce\"> </span>The  Company<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Current liabilities<span class=\"_ _36a\"> </span>Amounts owed to Gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _1a5\"> </span><span class=\"ff15\">24.0<span class=\"_ _cb\"> </span><span class=\"ff16\">23.2<span class=\"_ _f7\"> </span>22.6<span class=\"_ _36a\"> </span></span></span>Accrued inter<span class=\"_ _0\"></span>est<span class=\"_ _1c2\"> </span><span class=\"ff15\">0.7<span class=\"_ _d1\"> </span><span class=\"ff16\">0.7<span class=\"_ _9e\"> </span>2.0<span class=\"_ _36a\"> </span></span></span>Purchase of own shares (not<span class=\"_ _0\"></span>e 47)<span class=\"_ _27f\"> </span><span class=\"ff15\">-<span class=\"_ _d1\"> </span><span class=\"ff16\">10.8<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span>Other financial liabilities<span class=\"_ _2c5\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.4<span class=\"_ _9e\"> </span>1.0<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities at amortised cost<span class=\"_ _29f\"> </span><span class=\"ff15\">24.7<span class=\"_ _cb\"> </span><span class=\"ff16\">36.1<span class=\"_ _f7\"> </span>25.6<span class=\"_ _36a\"> </span></span></span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _152\"> </span><span class=\"ff15\">1.3<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _9e\"> </span>1.3<span class=\"_ _36a\"> </span></span></span>26.0<span class=\"_ _3a\"> </span><span class=\"ff16\">37.4<span class=\"_ _3a\"> </span>26.9<span class=\"_ _36a\"> </span></span>Non-current liabilities<span class=\"_ _36a\"> </span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _23d\"> </span><span class=\"ff15\">12.4<span class=\"_ _3a\"> </span><span class=\"ff16\">13.7<span class=\"_ _3a\"> </span>15.0<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal sundry liabilities<span class=\"_ _218\"> </span><span class=\"ff15\">38.4<span class=\"_ _3a\"> </span><span class=\"ff16\">51.1<span class=\"_ _f7\"> </span>41.9<span class=\"_ _36a\"> </span></span></span>41. <span class=\"_ _b3\"> </span>Contingent consideration<span class=\"_ _36a\"> </span>The contingent consider<span class=\"_ _0\"></span>ation represents consider<span class=\"_ _0\"></span>ation payable in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> corporate acquisitions which is dependent on <span class=\"_ _0\"></span>the performance of<span class=\"_ _0\"></span> the acquir<span class=\"_ _0\"></span>ed businesses. Movements in <span class=\"_ _0\"></span>the balance are set out<span class=\"_ _0\"></span> below<span class=\"_ _0\"></span>. 2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>At 1 Oct<span class=\"_ _0\"></span>ober 2022<span class=\"_ _1ef\"> </span><span class=\"ff15\">2.2<span class=\"_ _9e\"> </span><span class=\"ff16\">7.5<span class=\"_ _36a\"> </span></span></span>Pa<span class=\"_ _0\"></span>yments<span class=\"_ _2c6\"> </span><span class=\"ff15\">(1.5)<span class=\"_ _1db\"> </span></span>(4.6)<span class=\"_ _36a\"> </span>Rev<span class=\"_ _0\"></span>aluation <span class=\"_ _2c7\"> </span><span class=\"ff15\">(0.7)<span class=\"_ _1db\"> </span></span>(0.8)<span class=\"_ _36a\"> </span>Unwind of discounting (note 5)<span class=\"_ _1ec\"> </span><span class=\"ff15\">-<span class=\"_ _9b\"> </span><span class=\"ff16\">0.1<span class=\"_ _36a\"> </span></span></span>At 30 Sept<span class=\"_ _0\"></span>ember 2023 (note 40)<span class=\"_ _2bc\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _36a\"> </span></span></span>The write do<span class=\"_ _0\"></span>wns above <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e the r<span class=\"_ _0\"></span>esult of <span class=\"_ _0\"></span>the finalisation of<span class=\"_ _0\"></span> the contingent<span class=\"_ _0\"></span> consideration liability based on actual business <span class=\"_ _0\"></span>volumes.<span class=\"_ _36a\"> </span>42. <span class=\"_ _1c\"></span>L<span class=\"_ _0\"></span>ease pay<span class=\"_ _0\"></span>ables<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s lease liabilities arise under <span class=\"_ _0\"></span>the leasing arrangements described in note 54<span class=\"_ _0\"></span>. Related right of<span class=\"_ _0\"></span> use assets ar<span class=\"_ _0\"></span>e shown in note 29<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _180\"> </span>The Company<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span></span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Leasing liabilities falling due:<span class=\"_ _36a\"> </span>In more than five y<span class=\"_ _0\"></span>ears<span class=\"_ _1be\"> </span><span class=\"ff15\">0.5<span class=\"_ _9e\"> </span><span class=\"ff16\">1.1<span class=\"_ _9e\"> </span></span>6.7<span class=\"_ _9e\"> </span><span class=\"ff16\">8.2<span class=\"_ _36a\"> </span></span></span>In more than two but less than five y<span class=\"_ _0\"></span>ears<span class=\"_ _2b4\"> </span><span class=\"ff15\">3.4<span class=\"_ _d1\"> </span><span class=\"ff16\">3.8<span class=\"_ _11f\"> </span></span>4.3<span class=\"_ _d1\"> </span><span class=\"ff16\">4.2<span class=\"_ _36a\"> </span></span></span>In more than one year but less than tw<span class=\"_ _0\"></span>o years<span class=\"_ _171\"> </span><span class=\"ff15\">2.4<span class=\"_ _9e\"> </span><span class=\"ff16\">1.9<span class=\"_ _9e\"> </span></span>1.4<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _36a\"> </span></span></span>In more than one year (not<span class=\"_ _0\"></span>e 40)<span class=\"_ _2c8\"> </span><span class=\"ff15\">6.3<span class=\"_ _9e\"> </span><span class=\"ff16\">6.8<span class=\"_ _3a\"> </span></span>12.4<span class=\"_ _3a\"> </span><span class=\"ff16\">13.7<span class=\"_ _36a\"> </span></span></span>In less than one year (note 40)<span class=\"_ _26d\"> </span><span class=\"ff15\">2.6<span class=\"_ _d1\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span></span>1.3<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _36a\"> </span></span></span>8.9<span class=\"_ _9e\"> </span><span class=\"ff16\">9.0<span class=\"_ _3a\"> </span></span>13.7<span class=\"_ _3a\"> </span><span class=\"ff16\">15.0<span class=\"_ _36a\"> </span></span>43. Conduct<span class=\"_ _36a\"> </span>The Group<span class=\"_ _0\"></span>, as a participant in the financial services industry<span class=\"_ _1\"></span>, is exposed to a high le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> regulatory<span class=\"_ _0\"></span> supervision, which could in the ev<span class=\"_ _0\"></span>ent of conduct <span class=\"_ _0\"></span>failures e<span class=\"_ _0\"></span>xpose it to <span class=\"_ _0\"></span>financial liabilities. The Gr<span class=\"_ _0\"></span>oup maintains a strong compliance and conduct <span class=\"_ _0\"></span>framew<span class=\"_ _0\"></span>ork, supervised by<span class=\"_ _0\"></span> the second line compliance function, <span class=\"_ _0\"></span>to mitigate <span class=\"_ _0\"></span>the risk, although it is impossible to eliminate it entir<span class=\"_ _0\"></span>ely<span class=\"_ _1\"></span>. The regulat<span class=\"_ _0\"></span>ory envir<span class=\"_ _0\"></span>onment continues to de<span class=\"_ _0\"></span>velop, <span class=\"_ _0\"></span>through r<span class=\"_ _0\"></span>egulatory policies, legislativ<span class=\"_ _0\"></span>e rules and court rulings, and while <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s assessment is that it<span class=\"_ _0\"></span> currently<span class=\"_ _0\"></span> has no material potential liability <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> conduct issues, this is based on our<span class=\"_ _0\"></span> current interpr<span class=\"_ _0\"></span>etation of<span class=\"_ _0\"></span> requir<span class=\"_ _0\"></span>ements and hence further<span class=\"_ _0\"></span> liabilities may arise as <span class=\"_ _0\"></span>these dev<span class=\"_ _0\"></span>elop over<span class=\"_ _0\"></span> time.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-448": {
   "value": "40. <span class=\"_ _15\"></span>Sundry liabilities<span class=\"_ _36a\"> </span>(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Current liabilities<span class=\"_ _36a\"> </span>Accrued inter<span class=\"_ _0\"></span>est<span class=\"_ _2bf\"> </span><span class=\"ff15\">156.7<span class=\"_ _3a\"> </span><span class=\"ff16\">42.2<span class=\"_ _3a\"> </span>22.2<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _1\"></span>rade creditor<span class=\"_ _0\"></span>s<span class=\"_ _205\"> </span><span class=\"ff15\">1.6<span class=\"_ _d1\"> </span><span class=\"ff16\">0.7<span class=\"_ _9e\"> </span>1.4<span class=\"_ _36a\"> </span></span></span>CSA liabilities<span class=\"_ _248\"> </span><span class=\"ff15\">383.4<span class=\"_ _d5\"> </span><span class=\"ff16\">388.6<span class=\"_ _9e\"> </span>0.2<span class=\"_ _36a\"> </span></span></span>Purchase of own shares (not<span class=\"_ _0\"></span>e 47)<span class=\"_ _27f\"> </span><span class=\"ff15\">-<span class=\"_ _d1\"> </span><span class=\"ff16\">10.8<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span>Other accruals <span class=\"_ _1c2\"> </span><span class=\"ff15\">35.6<span class=\"_ _3a\"> </span><span class=\"ff16\">35.9<span class=\"_ _f7\"> </span>32.9<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities at amortised cost<span class=\"_ _2a9\"> </span><span class=\"ff15\">577.3<span class=\"_ _d5\"> </span><span class=\"ff16\">478.2<span class=\"_ _3a\"> </span>56.7<span class=\"_ _36a\"> </span></span></span>Contingent c<span class=\"_ _0\"></span>onsideration (note 41)<span class=\"_ _219\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>4.6<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities<span class=\"_ _2c0\"> </span><span class=\"ff15\">577.3<span class=\"_ _d5\"> </span><span class=\"ff16\">480.4<span class=\"_ _3a\"> </span>61.3<span class=\"_ _36a\"> </span></span></span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _152\"> </span><span class=\"ff15\">2.6<span class=\"_ _9e\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>1.5<span class=\"_ _36a\"> </span></span></span>Def<span class=\"_ _0\"></span>erred income<span class=\"_ _247\"> </span><span class=\"ff15\">5.9<span class=\"_ _d1\"> </span><span class=\"ff16\">3.7<span class=\"_ _9e\"> </span>3.3<span class=\"_ _36a\"> </span></span></span>Conduct (note 43)<span class=\"_ _2c1\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>Other tax<span class=\"_ _0\"></span>ation and social security<span class=\"_ _2c2\"> </span><span class=\"ff15\">4.1<span class=\"_ _9e\"> </span><span class=\"ff16\">3.7<span class=\"_ _9e\"> </span>2.5<span class=\"_ _36a\"> </span></span></span>589.9<span class=\"_ _d5\"> </span><span class=\"ff16\">490.0<span class=\"_ _3a\"> </span>68.6<span class=\"_ _36a\"> </span></span>Non-current liabilities<span class=\"_ _36a\"> </span>Accrued inter<span class=\"_ _0\"></span>est<span class=\"_ _1ce\"> </span><span class=\"ff15\">31.5<span class=\"_ _3a\"> </span><span class=\"ff16\">13.0<span class=\"_ _9e\"> </span>9.5<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities at amortised cost<span class=\"_ _29f\"> </span><span class=\"ff15\">31.5<span class=\"_ _cb\"> </span><span class=\"ff16\">13.0<span class=\"_ _9e\"> </span>9.5<span class=\"_ _36a\"> </span></span></span>Contingent c<span class=\"_ _0\"></span>onsideration (note 41)<span class=\"_ _219\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.9<span class=\"_ _36a\"> </span></span>Sundry financial liabilities<span class=\"_ _25a\"> </span><span class=\"ff15\">31.5<span class=\"_ _3a\"> </span><span class=\"ff16\">13.0<span class=\"_ _3a\"> </span>12.4<span class=\"_ _36a\"> </span></span></span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _152\"> </span><span class=\"ff15\">6.3<span class=\"_ _9e\"> </span><span class=\"ff16\">6.8<span class=\"_ _9e\"> </span>8.0<span class=\"_ _36a\"> </span></span></span>Def<span class=\"_ _0\"></span>erred income<span class=\"_ _2c1\"> </span><span class=\"ff15\">3.5<span class=\"_ _9e\"> </span><span class=\"ff16\">3.3<span class=\"_ _9e\"> </span>1.7<span class=\"_ _36a\"> </span></span></span>41.3<span class=\"_ _3a\"> </span><span class=\"ff16\">23.1<span class=\"_ _3a\"> </span>22.1<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal sundry financial liabilities at amortised cost<span class=\"_ _1a2\"> </span><span class=\"ff15\">608.8<span class=\"_ _d5\"> </span><span class=\"ff16\">491.2<span class=\"_ _3a\"> </span>66.2<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal sundry financial liabilities at fair value<span class=\"_ _1d1\"> </span><span class=\"ff15\">-<span class=\"_ _9b\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>7.5<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal other sundry liabilities<span class=\"_ _2c3\"> </span><span class=\"ff15\">22.4<span class=\"_ _3a\"> </span><span class=\"ff16\">19.7<span class=\"_ _3a\"> </span>17.0<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal sundry liabilities<span class=\"_ _2c4\"> </span><span class=\"ff15\">631.2<span class=\"_ _d5\"> </span><span class=\"ff16\">513.1<span class=\"_ _3a\"> </span>90.7<span class=\"_ _36a\"> </span></span></span>CSA<span class=\"_ _0\"></span> liabilities repr<span class=\"_ _0\"></span>esent collateral r<span class=\"_ _0\"></span>eceived in respect<span class=\"_ _0\"></span> of inter<span class=\"_ _0\"></span>est rate s<span class=\"_ _0\"></span>wap agreements and ar<span class=\"_ _0\"></span>e described further<span class=\"_ _0\"></span> in notes 26 and 63.<span class=\"_ _36a\"> </span>(b)  <span class=\"_ _ce\"> </span>The  Company<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Current liabilities<span class=\"_ _36a\"> </span>Amounts owed to Gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _1a5\"> </span><span class=\"ff15\">24.0<span class=\"_ _cb\"> </span><span class=\"ff16\">23.2<span class=\"_ _f7\"> </span>22.6<span class=\"_ _36a\"> </span></span></span>Accrued inter<span class=\"_ _0\"></span>est<span class=\"_ _1c2\"> </span><span class=\"ff15\">0.7<span class=\"_ _d1\"> </span><span class=\"ff16\">0.7<span class=\"_ _9e\"> </span>2.0<span class=\"_ _36a\"> </span></span></span>Purchase of own shares (not<span class=\"_ _0\"></span>e 47)<span class=\"_ _27f\"> </span><span class=\"ff15\">-<span class=\"_ _d1\"> </span><span class=\"ff16\">10.8<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _36a\"> </span>Other financial liabilities<span class=\"_ _2c5\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.4<span class=\"_ _9e\"> </span>1.0<span class=\"_ _36a\"> </span></span></span>Sundry financial liabilities at amortised cost<span class=\"_ _29f\"> </span><span class=\"ff15\">24.7<span class=\"_ _cb\"> </span><span class=\"ff16\">36.1<span class=\"_ _f7\"> </span>25.6<span class=\"_ _36a\"> </span></span></span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _152\"> </span><span class=\"ff15\">1.3<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _9e\"> </span>1.3<span class=\"_ _36a\"> </span></span></span>26.0<span class=\"_ _3a\"> </span><span class=\"ff16\">37.4<span class=\"_ _3a\"> </span>26.9<span class=\"_ _36a\"> </span></span>Non-current liabilities<span class=\"_ _36a\"> </span>Lease pay<span class=\"_ _0\"></span>ables (note 42)<span class=\"_ _23d\"> </span><span class=\"ff15\">12.4<span class=\"_ _3a\"> </span><span class=\"ff16\">13.7<span class=\"_ _3a\"> </span>15.0<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal sundry liabilities<span class=\"_ _218\"> </span><span class=\"ff15\">38.4<span class=\"_ _3a\"> </span><span class=\"ff16\">51.1<span class=\"_ _f7\"> </span>41.9<span class=\"_ _36a\"> </span></span></span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherNoncurrentLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-385": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs7c7\">41. <span class=\"_ _b3\"> </span>Contingent consideration<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7c8\">The contingent consider<span class=\"_ _0\"></span>ation represents consider<span class=\"_ _0\"></span>ation payable in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> corporate acquisitions which is dependent on <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7c9\">performance of<span class=\"_ _0\"></span> the acquir<span class=\"_ _0\"></span>ed businesses. Movements in <span class=\"_ _0\"></span>the balance are set out<span class=\"_ _0\"></span> below<span class=\"_ _0\"></span>. </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7ca\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7cb\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7cc\">At 1 Oct<span class=\"_ _0\"></span>ober 2022<span class=\"_ _1ef\"> </span><span class=\"ff15\">2.2<span class=\"_ _9e\"> </span><span class=\"ff16\">7.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7cd\">Pa<span class=\"_ _0\"></span>yments<span class=\"_ _2c6\"> </span><span class=\"ff15\">(1.5)<span class=\"_ _1db\"> </span></span>(4.6)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7ce\">Rev<span class=\"_ _0\"></span>aluation <span class=\"_ _2c7\"> </span><span class=\"ff15\">(0.7)<span class=\"_ _1db\"> </span></span>(0.8)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7cf\">Unwind of discounting (note 5)<span class=\"_ _1ec\"> </span><span class=\"ff15\">-<span class=\"_ _9b\"> </span><span class=\"ff16\">0.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7d0\">At 30 Sept<span class=\"_ _0\"></span>ember 2023 (note 40)<span class=\"_ _2bc\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7d1\">The write do<span class=\"_ _0\"></span>wns above <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e the r<span class=\"_ _0\"></span>esult of <span class=\"_ _0\"></span>the finalisation of<span class=\"_ _0\"></span> the contingent<span class=\"_ _0\"></span> consideration liability based on actual business <span class=\"_ _0\"></span>volumes.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws9f gs7e0\">43. Conduct<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7e1\">The Group<span class=\"_ _0\"></span>, as a participant in the financial services industry<span class=\"_ _1\"></span>, is exposed to a high le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> regulatory<span class=\"_ _0\"></span> supervision, which could in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7e2\">the ev<span class=\"_ _0\"></span>ent of conduct <span class=\"_ _0\"></span>failures e<span class=\"_ _0\"></span>xpose it to <span class=\"_ _0\"></span>financial liabilities. The Gr<span class=\"_ _0\"></span>oup maintains a strong compliance and conduct <span class=\"_ _0\"></span>framew<span class=\"_ _0\"></span>ork, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7e3\">supervised by<span class=\"_ _0\"></span> the second line compliance function, <span class=\"_ _0\"></span>to mitigate <span class=\"_ _0\"></span>the risk, although it is impossible to eliminate it entir<span class=\"_ _0\"></span>ely<span class=\"_ _1\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7e4\">The regulat<span class=\"_ _0\"></span>ory envir<span class=\"_ _0\"></span>onment continues to de<span class=\"_ _0\"></span>velop, <span class=\"_ _0\"></span>through r<span class=\"_ _0\"></span>egulatory policies, legislativ<span class=\"_ _0\"></span>e rules and court rulings, and while <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7e5\">assessment is that it<span class=\"_ _0\"></span> currently<span class=\"_ _0\"></span> has no material potential liability <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> conduct issues, this is based on our<span class=\"_ _0\"></span> current interpr<span class=\"_ _0\"></span>etation of<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7e6\">requir<span class=\"_ _0\"></span>ements and hence further<span class=\"_ _0\"></span> liabilities may arise as <span class=\"_ _0\"></span>these dev<span class=\"_ _0\"></span>elop over<span class=\"_ _0\"></span> time.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfContingentLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-386": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs7d3\">42. <span class=\"_ _1c\"></span>L<span class=\"_ _0\"></span>ease pay<span class=\"_ _0\"></span>ables<span class=\"_ _36a\"> </span></div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs7d4\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s lease liabilities arise under <span class=\"_ _0\"></span>the leasing arrangements described in note 54<span class=\"_ _0\"></span>. Related right of<span class=\"_ _0\"></span> use assets ar<span class=\"_ _0\"></span>e shown in note 29<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7d5\">The Group<span class=\"_ _180\"> </span>The Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7d6\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span></span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7d7\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs7d8\">Leasing liabilities falling due:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7d9\">In more than five y<span class=\"_ _0\"></span>ears<span class=\"_ _1be\"> </span><span class=\"ff15\">0.5<span class=\"_ _9e\"> </span><span class=\"ff16\">1.1<span class=\"_ _9e\"> </span></span>6.7<span class=\"_ _9e\"> </span><span class=\"ff16\">8.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7da\">In more than two but less than five y<span class=\"_ _0\"></span>ears<span class=\"_ _2b4\"> </span><span class=\"ff15\">3.4<span class=\"_ _d1\"> </span><span class=\"ff16\">3.8<span class=\"_ _11f\"> </span></span>4.3<span class=\"_ _d1\"> </span><span class=\"ff16\">4.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7db\">In more than one year but less than tw<span class=\"_ _0\"></span>o years<span class=\"_ _171\"> </span><span class=\"ff15\">2.4<span class=\"_ _9e\"> </span><span class=\"ff16\">1.9<span class=\"_ _9e\"> </span></span>1.4<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7dc\">In more than one year (not<span class=\"_ _0\"></span>e 40)<span class=\"_ _2c8\"> </span><span class=\"ff15\">6.3<span class=\"_ _9e\"> </span><span class=\"ff16\">6.8<span class=\"_ _3a\"> </span></span>12.4<span class=\"_ _3a\"> </span><span class=\"ff16\">13.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7dd\">In less than one year (note 40)<span class=\"_ _26d\"> </span><span class=\"ff15\">2.6<span class=\"_ _d1\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span></span>1.3<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7de\">8.9<span class=\"_ _9e\"> </span><span class=\"ff16\">9.0<span class=\"_ _3a\"> </span></span>13.7<span class=\"_ _3a\"> </span><span class=\"ff16\">15.0<span class=\"_ _36a\"> </span></span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfMaturityAnalysisOfOperatingLeasePaymentsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-387": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws2f gs7e8\">44. <span class=\"_ _1c\"></span>Def<span class=\"_ _0\"></span>erred tax<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9c gs7e9\">(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs7ea\">The net def<span class=\"_ _0\"></span>erred tax liability<span class=\"_ _0\"></span> / (asset) <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> which pr<span class=\"_ _0\"></span>ovision has been made and the mo<span class=\"_ _0\"></span>vements in that balance ar<span class=\"_ _0\"></span>e analysed as <span class=\"_ _0\"></span>follows:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7eb\">Opening<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7ec\">balance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs7ed\">Profit and loss<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7ee\">charge / (cr<span class=\"_ _0\"></span>edit)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7ef\">Charge / (cr<span class=\"_ _0\"></span>edit) </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7f0\">to equity<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7f1\">Closing<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7f2\">balance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7f3\">Current<span class=\"_ _a0\"> </span>Prior<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7f4\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7f5\">Y<span class=\"_ _1\"></span>ear ended 30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7f6\">Accelerat<span class=\"_ _0\"></span>ed tax depr<span class=\"_ _0\"></span>eciation <span class=\"_ _19e\"> </span><span class=\"ff15\">(6.9)<span class=\"_ _1db\"> </span>(5.0)<span class=\"_ _72\"> </span>3.6<span class=\"_ _43\"> </span>-<span class=\"_ _fb\"> </span>(8.3)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7f7\">Retir<span class=\"_ _0\"></span>ement benefit obliga<span class=\"_ _0\"></span>tions<span class=\"_ _13f\"> </span><span class=\"ff15\">0.5<span class=\"_ _d1\"> </span>1.8<span class=\"_ _43\"> </span>-<span class=\"_ _9b\"> </span>0.8<span class=\"_ _9e\"> </span>3.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7f8\">Inter<span class=\"_ _0\"></span>est ra<span class=\"_ _0\"></span>te hedging<span class=\"_ _277\"> </span><span class=\"ff15\">53.2<span class=\"_ _291\"> </span>(20.4)<span class=\"_ _16b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _d1\"> </span>32.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7f9\">Loans and other derivativ<span class=\"_ _0\"></span>es<span class=\"_ _2a\"> </span><span class=\"ff15\">2.2<span class=\"_ _72\"> </span>(0.8)<span class=\"_ _16b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span>1.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7fa\">Share based paymen<span class=\"_ _0\"></span>ts <span class=\"_ _13a\"> </span><span class=\"ff15\">(3.7)<span class=\"_ _1db\"> </span>(2.8)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(1.0)<span class=\"_ _1db\"> </span>(7.5)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7fb\">T<span class=\"_ _1\"></span>ax losses<span class=\"_ _255\"> </span><span class=\"ff15\">(0.1)<span class=\"_ _72\"> </span>0.1<span class=\"_ _ff\"> </span>(3.0)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(3.0)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7fc\">Other timing differ<span class=\"_ _0\"></span>ences <span class=\"_ _fe\"> </span><span class=\"ff15\">(0.8)<span class=\"_ _276\"> </span>(0.2)<span class=\"_ _ff\"> </span>0.2<span class=\"_ _43\"> </span>-<span class=\"_ _fb\"> </span>(0.8)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs7fd\">T<span class=\"_ _2\"></span>otal<span class=\"_ _2c9\"> </span><span class=\"ff15\">44.4<span class=\"_ _291\"> </span>(27.3)<span class=\"_ _ff\"> </span>0.8<span class=\"_ _72\"> </span>(0.2)<span class=\"_ _12c\"> </span>17.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs7fe\">Y<span class=\"_ _1\"></span>ear ended 30 September 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs7ff\">Accelerat<span class=\"_ _0\"></span>ed tax depr<span class=\"_ _0\"></span>eciation <span class=\"_ _19e\"> </span>(5.9)<span class=\"_ _c8\"> </span>(2.9)<span class=\"_ _ff\"> </span><span class=\"ff16\">1.9<span class=\"_ _43\"> </span></span>-<span class=\"_ _fb\"> </span>(6.9)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs800\">Retir<span class=\"_ _0\"></span>ement benefit obliga<span class=\"_ _0\"></span>tions<span class=\"_ _19a\"> </span>(4.4)<span class=\"_ _ff\"> </span><span class=\"ff16\">1.3<span class=\"_ _43\"> </span></span>-<span class=\"_ _9b\"> </span><span class=\"ff16\">3.6<span class=\"_ _9e\"> </span>0.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs801\">Inter<span class=\"_ _0\"></span>est ra<span class=\"_ _0\"></span>te hedging<span class=\"_ _107\"> </span>(2.2)<span class=\"_ _291\"> </span><span class=\"ff16\">55.4<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _d1\"> </span><span class=\"ff16\">53.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs802\">Loans and other derivativ<span class=\"_ _0\"></span>es<span class=\"_ _2a\"> </span><span class=\"ff16\">2.9<span class=\"_ _ff\"> </span></span>(0.6)<span class=\"_ _c8\"> </span>(0.1)<span class=\"_ _16b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs803\">Share based paymen<span class=\"_ _0\"></span>ts <span class=\"_ _2ca\"> </span>(5.2)<span class=\"_ _ff\"> </span><span class=\"ff16\">0.2<span class=\"_ _ff\"> </span></span>(0.5)<span class=\"_ _ff\"> </span><span class=\"ff16\">1.8<span class=\"_ _d4\"> </span></span>(3.7)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs804\">T<span class=\"_ _1\"></span>ax losses<span class=\"_ _255\"> </span>(0.4)<span class=\"_ _ff\"> </span><span class=\"ff16\">0.4<span class=\"_ _ff\"> </span></span>(0.1)<span class=\"_ _b7\"> </span>-<span class=\"_ _fb\"> </span>(0.1)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs805\">Other timing differ<span class=\"_ _0\"></span>ences <span class=\"_ _2cb\"> </span><span class=\"ff16\">0.8<span class=\"_ _ff\"> </span></span>(0.3)<span class=\"_ _c8\"> </span>(1.3)<span class=\"_ _16b\"> </span>-<span class=\"_ _16b\"> </span>(0.8)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs806\">(14.4)<span class=\"_ _12c\"> </span><span class=\"ff16\">53.5<span class=\"_ _ff\"> </span></span>(0.1)<span class=\"_ _ff\"> </span><span class=\"ff16\">5.4<span class=\"_ _f7\"> </span>44.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs807\">Balances in respect o<span class=\"_ _0\"></span>f inter<span class=\"_ _0\"></span>est rate hedging in the <span class=\"_ _0\"></span>table abov<span class=\"_ _0\"></span>e relate <span class=\"_ _0\"></span>to derivatives hedging int<span class=\"_ _0\"></span>erest rate risk<span class=\"_ _0\"></span> in the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s loan and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs808\">deposit books and relat<span class=\"_ _0\"></span>ed pipelines, and fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue accounting adjustments.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs809\">The tempor<span class=\"_ _0\"></span>ary differ<span class=\"_ _0\"></span>ences shown abo<span class=\"_ _0\"></span>ve have been pr<span class=\"_ _0\"></span>ovided at <span class=\"_ _0\"></span>the rate pr<span class=\"_ _0\"></span>evailing <span class=\"_ _0\"></span>when the Gr<span class=\"_ _0\"></span>oup anticipates these <span class=\"_ _0\"></span>temporary </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs80a\">differ<span class=\"_ _0\"></span>ences to r<span class=\"_ _0\"></span>everse. In <span class=\"_ _0\"></span>the ev<span class=\"_ _0\"></span>ent that <span class=\"_ _0\"></span>the temporary<span class=\"_ _0\"></span> differ<span class=\"_ _0\"></span>ences actually r<span class=\"_ _0\"></span>everse in diff<span class=\"_ _0\"></span>erent periods a cr<span class=\"_ _0\"></span>edit or char<span class=\"_ _0\"></span>ge will arise in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs80b\">a futur<span class=\"_ _0\"></span>e period to r<span class=\"_ _0\"></span>eflect the differ<span class=\"_ _0\"></span>ence. <span class=\"_ _0\"></span>The timing of<span class=\"_ _0\"></span> re<span class=\"_ _0\"></span>versal of<span class=\"_ _0\"></span> tempor<span class=\"_ _0\"></span>ary differ<span class=\"_ _0\"></span>ences will be affect<span class=\"_ _0\"></span>ed by bo<span class=\"_ _0\"></span>th matters within <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs80c\">Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s control (<span class=\"_ _0\"></span>e.g. the <span class=\"_ _0\"></span>timing and nature of<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>efinancing of certain portf<span class=\"_ _0\"></span>olios) and matters outside <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019s contr<span class=\"_ _1\"></span>ol  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs80d\">(e.g<span class=\"_ _0\"></span>. the timing o<span class=\"_ _0\"></span>f the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s contributions to the defined benefit pension scheme<span class=\"_ _0\"></span>). </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs80e\">If <span class=\"_ _0\"></span>temporary diff<span class=\"_ _0\"></span>erences r<span class=\"_ _0\"></span>ever<span class=\"_ _0\"></span>se within Parag<span class=\"_ _0\"></span>on Bank PL<span class=\"_ _0\"></span>C in a period in which it is subject <span class=\"_ _0\"></span>to the banking sur<span class=\"_ _0\"></span>charge, <span class=\"_ _0\"></span>then the impact </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs80f\">of <span class=\"_ _0\"></span>the re<span class=\"_ _0\"></span>versal <span class=\"_ _0\"></span>will be at an effective <span class=\"_ _0\"></span>tax rate <span class=\"_ _0\"></span>that includes the banking sur<span class=\"_ _0\"></span>charge t<span class=\"_ _0\"></span>o some extent.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs810\">In addition to <span class=\"_ _0\"></span>the temporary<span class=\"_ _0\"></span> differ<span class=\"_ _0\"></span>ences, the Group has <span class=\"_ _0\"></span>tax losses of<span class=\"_ _0\"></span> \u00a33.7m (2022: \u00a33.0m<span class=\"_ _0\"></span>) in entities whose curr<span class=\"_ _0\"></span>ent taxable pr<span class=\"_ _0\"></span>ofits are </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs811\">insufficient to support<span class=\"_ _0\"></span> the recognition o<span class=\"_ _0\"></span>f a deferr<span class=\"_ _0\"></span>ed tax asset.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9d gs813\">(b)  <span class=\"_ _ce\"> </span>The  Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs814\">The net def<span class=\"_ _0\"></span>erred tax (<span class=\"_ _0\"></span>asset) / liability <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> which pr<span class=\"_ _0\"></span>ovision has been made, and the mo<span class=\"_ _0\"></span>vements in that balance ar<span class=\"_ _0\"></span>e analysed as <span class=\"_ _0\"></span>follows:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs815\">Opening<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs816\">balance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs817\">Profit and loss<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs818\">charge / (cr<span class=\"_ _0\"></span>edit)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs819\">Charge / (cr<span class=\"_ _0\"></span>edit) </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs81a\">to equity<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs81b\">Closing<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs81c\">balance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs81d\">Current<span class=\"_ _a0\"> </span>Prior<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs81e\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs81f\">Y<span class=\"_ _1\"></span>ear ended 30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs820\">Accelerat<span class=\"_ _0\"></span>ed tax depr<span class=\"_ _0\"></span>eciation <span class=\"_ _2cc\"> </span><span class=\"ff15\">0.1<span class=\"_ _43\"> </span>-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span>0.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs821\">T<span class=\"_ _1\"></span>ax losses carried f<span class=\"_ _0\"></span>orward<span class=\"_ _103\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _fb\"> </span>(1.7)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(1.7)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs822\">Other timing differ<span class=\"_ _0\"></span>ences <span class=\"_ _142\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs823\">T<span class=\"_ _2\"></span>otal<span class=\"_ _23f\"> </span><span class=\"ff15\">0.1<span class=\"_ _a8\"> </span>-<span class=\"_ _fb\"> </span>(1.7)<span class=\"_ _16b\"> </span>-<span class=\"_ _fb\"> </span>(1.6)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs824\">Y<span class=\"_ _1\"></span>ear ended 30 September 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs825\">Accelerat<span class=\"_ _0\"></span>ed tax depr<span class=\"_ _0\"></span>eciation <span class=\"_ _2cd\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.1<span class=\"_ _43\"> </span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs826\">T<span class=\"_ _1\"></span>ax losses carried f<span class=\"_ _0\"></span>orward<span class=\"_ _103\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs827\">Other timing differ<span class=\"_ _0\"></span>ences <span class=\"_ _2cb\"> </span><span class=\"ff16\">1.8<span class=\"_ _43\"> </span></span>-<span class=\"_ _fb\"> </span>(1.8)<span class=\"_ _16b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff16 fs1 fc1 sc0 ls0 ws0 gs828\">1.8<span class=\"_ _9e\"> </span>0.1<span class=\"_ _ff\"> </span><span class=\"ff17\">(1.8)<span class=\"_ _16b\"> </span>-<span class=\"_ _a8\"> </span></span>0.1</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDeferredTaxesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-388": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs82a\">45. <span class=\"_ _1c\"></span>Called-up share capital<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs82b\">The share capital o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Company consists of<span class=\"_ _0\"></span> a single class of<span class=\"_ _0\"></span> \u00a31 ordinary<span class=\"_ _0\"></span> shares.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs82c\">Movements in <span class=\"_ _0\"></span>the issued share capital in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear <span class=\"_ _0\"></span>were:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs82d\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs82e\">Number<span class=\"_ _44\"> </span><span class=\"ff17\">Number<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs82f\">Ordinary shares </div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs830\">At 1 Oct<span class=\"_ _0\"></span>ober 2022<span class=\"_ _2ce\"> </span><span class=\"ff15\">241,409,624<span class=\"_ _20\"> </span><span class=\"ff16\">262,495,185<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs831\">Shares issued<span class=\"_ _2cf\"> </span><span class=\"ff15\">160,833<span class=\"_ _b5\"> </span><span class=\"ff16\">386,039<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs832\">Shares cancelled<span class=\"_ _212\"> </span><span class=\"ff15\">(12,870,044)<span class=\"_ _48\"> </span></span>(21,471,600)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs833\">At 30 Sept<span class=\"_ _0\"></span>ember 2023<span class=\"_ _2d0\"> </span><span class=\"ff15\">228,700,413<span class=\"_ _20\"> </span><span class=\"ff16\">241,409,624<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs834\">During the <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>, the Company<span class=\"_ _0\"></span> issued 160,833 shar<span class=\"_ _0\"></span>es (2022: 386,039) <span class=\"_ _0\"></span>to satisfy options gr<span class=\"_ _0\"></span>anted under Shar<span class=\"_ _0\"></span>esave schemes <span class=\"_ _0\"></span>for a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs835\">consideration of<span class=\"_ _0\"></span> \u00a3534,954 (2022: \u00a31,309<span class=\"_ _0\"></span>,525). </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs836\">On 24 Nov<span class=\"_ _0\"></span>ember 2021, 12,<span class=\"_ _1\"></span>100,834 shares, held in <span class=\"_ _0\"></span>treasury<span class=\"_ _0\"></span> at 30 September<span class=\"_ _0\"></span> 2021, wer<span class=\"_ _0\"></span>e cancelled. On 8 September<span class=\"_ _0\"></span> 2022 a further<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs837\">9,370<span class=\"_ _0\"></span>,7<span class=\"_ _0\"></span>66 shares, purchased int<span class=\"_ _0\"></span>o treasury<span class=\"_ _1\"></span> during the year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2022 wer<span class=\"_ _0\"></span>e also cancelled.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs838\">On 1 June 2023, 12,870<span class=\"_ _0\"></span>,044 o<span class=\"_ _0\"></span>f the shar<span class=\"_ _1\"></span>es held in treasury at<span class=\"_ _0\"></span> that date <span class=\"_ _0\"></span>were cancelled (<span class=\"_ _0\"></span>note 47).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 wsa0 gs83a\">46. Reserv<span class=\"_ _0\"></span>es<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9c gs83b\">(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs83c\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs83d\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs83e\">Share premium acc<span class=\"_ _0\"></span>ount <span class=\"_ _1cc\"> </span><span class=\"ff15\">71.4<span class=\"_ _3a\"> </span><span class=\"ff16\">71.1<span class=\"_ _3a\"> </span>70.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs83f\">Capital redemption r<span class=\"_ _0\"></span>eserve<span class=\"_ _24b\"> </span><span class=\"ff15\">12.9<span class=\"_ _cb\"> </span><span class=\"ff16\">71.8<span class=\"_ _f7\"> </span>50.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs840\">Merger r<span class=\"_ _0\"></span>eserve <span class=\"_ _22d\"> </span><span class=\"ff15\">(70.2)<span class=\"_ _bf\"> </span></span>(70.2)<span class=\"_ _6c\"> </span>(70.2)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs841\">Profit and loss account <span class=\"_ _1e8\"> </span><span class=\"ff15\">1,243.4<span class=\"_ _86\"> </span><span class=\"ff16\">1,151.2<span class=\"_ _86\"> </span>1,005.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs842\">1,257.5<span class=\"_ _86\"> </span><span class=\"ff16\">1,223.9<span class=\"_ _86\"> </span>1,056.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9d gs843\">(b)  <span class=\"_ _ce\"> </span>The  Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs844\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs845\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs846\">Share premium acc<span class=\"_ _0\"></span>ount <span class=\"_ _1cc\"> </span><span class=\"ff15\">71.4<span class=\"_ _3a\"> </span><span class=\"ff16\">71.1<span class=\"_ _3a\"> </span>70.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs847\">Capital redemption r<span class=\"_ _0\"></span>eserve<span class=\"_ _24b\"> </span><span class=\"ff15\">12.9<span class=\"_ _cb\"> </span><span class=\"ff16\">71.8<span class=\"_ _f7\"> </span>50.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs848\">Merger r<span class=\"_ _0\"></span>eserve <span class=\"_ _22d\"> </span><span class=\"ff15\">(23.7)<span class=\"_ _bf\"> </span></span>(23.7)<span class=\"_ _6c\"> </span>(23.7)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs849\">Profit and loss account <span class=\"_ _23d\"> </span><span class=\"ff15\">521.8<span class=\"_ _150\"> </span><span class=\"ff16\">326.3<span class=\"_ _150\"> </span>358.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs84a\">582.4<span class=\"_ _d5\"> </span><span class=\"ff16\">445.5<span class=\"_ _150\"> </span>455.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs84b\">The share pr<span class=\"_ _0\"></span>emium account and capital r<span class=\"_ _0\"></span>edemption reserv<span class=\"_ _0\"></span>e are non-distributable reserv<span class=\"_ _0\"></span>es which ar<span class=\"_ _0\"></span>e requir<span class=\"_ _0\"></span>ed by<span class=\"_ _1\"></span>, and operate under </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs84c\">the pro<span class=\"_ _0\"></span>visions of, UK<span class=\"_ _0\"></span> company la<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs84d\">The merger<span class=\"_ _0\"></span> reserv<span class=\"_ _0\"></span>e arose, due <span class=\"_ _0\"></span>to the pr<span class=\"_ _0\"></span>ovisions of<span class=\"_ _0\"></span> UK company<span class=\"_ _0\"></span> law at <span class=\"_ _0\"></span>the time, on a gr<span class=\"_ _0\"></span>oup restructuring on 12 May<span class=\"_ _0\"></span> 1989 when <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs84e\">Company<span class=\"_ _0\"></span> became the parent<span class=\"_ _0\"></span> entity of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs84f\">On 28 March 2023 <span class=\"_ _0\"></span>the High Court confirmed the cancellation of<span class=\"_ _0\"></span> the Company\u2019<span class=\"_ _2\"></span>s capital redemption reserv<span class=\"_ _0\"></span>e, follo<span class=\"_ _0\"></span>wing shareholder<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs850\">appro<span class=\"_ _0\"></span>val at <span class=\"_ _0\"></span>the A<span class=\"_ _0\"></span>GM on 1 March 2023. <span class=\"_ _0\"></span>This reserv<span class=\"_ _0\"></span>e had arisen on the cancellation of<span class=\"_ _0\"></span> ordinary<span class=\"_ _0\"></span> shares <span class=\"_ _0\"></span>which had been purchased in <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs851\">market and held in <span class=\"_ _0\"></span>treasury<span class=\"_ _1\"></span>. The balance outstanding on <span class=\"_ _0\"></span>the capital redemption r<span class=\"_ _0\"></span>eserve at <span class=\"_ _0\"></span>that time <span class=\"_ _0\"></span>was tr<span class=\"_ _0\"></span>ansferred <span class=\"_ _0\"></span>to the pr<span class=\"_ _0\"></span>ofit and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs852\">loss account.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfShareCapitalReservesAndOtherEquityInterestExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-449": {
   "value": "45. <span class=\"_ _1c\"></span>Called-up share capital<span class=\"_ _36a\"> </span>The share capital o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Company consists of<span class=\"_ _0\"></span> a single class of<span class=\"_ _0\"></span> \u00a31 ordinary<span class=\"_ _0\"></span> shares.<span class=\"_ _36a\"> </span>Movements in <span class=\"_ _0\"></span>the issued share capital in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear <span class=\"_ _0\"></span>were:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>Number<span class=\"_ _44\"> </span><span class=\"ff17\">Number<span class=\"_ _36a\"> </span></span>Ordinary shares At 1 Oct<span class=\"_ _0\"></span>ober 2022<span class=\"_ _2ce\"> </span><span class=\"ff15\">241,409,624<span class=\"_ _20\"> </span><span class=\"ff16\">262,495,185<span class=\"_ _36a\"> </span></span></span>Shares issued<span class=\"_ _2cf\"> </span><span class=\"ff15\">160,833<span class=\"_ _b5\"> </span><span class=\"ff16\">386,039<span class=\"_ _36a\"> </span></span></span>Shares cancelled<span class=\"_ _212\"> </span><span class=\"ff15\">(12,870,044)<span class=\"_ _48\"> </span></span>(21,471,600)<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2023<span class=\"_ _2d0\"> </span><span class=\"ff15\">228,700,413<span class=\"_ _20\"> </span><span class=\"ff16\">241,409,624<span class=\"_ _36a\"> </span></span></span>During the <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>, the Company<span class=\"_ _0\"></span> issued 160,833 shar<span class=\"_ _0\"></span>es (2022: 386,039) <span class=\"_ _0\"></span>to satisfy options gr<span class=\"_ _0\"></span>anted under Shar<span class=\"_ _0\"></span>esave schemes <span class=\"_ _0\"></span>for a consideration of<span class=\"_ _0\"></span> \u00a3534,954 (2022: \u00a31,309<span class=\"_ _0\"></span>,525). On 24 Nov<span class=\"_ _0\"></span>ember 2021, 12,<span class=\"_ _1\"></span>100,834 shares, held in <span class=\"_ _0\"></span>treasury<span class=\"_ _0\"></span> at 30 September<span class=\"_ _0\"></span> 2021, wer<span class=\"_ _0\"></span>e cancelled. On 8 September<span class=\"_ _0\"></span> 2022 a further<span class=\"_ _0\"></span> 9,370<span class=\"_ _0\"></span>,7<span class=\"_ _0\"></span>66 shares, purchased int<span class=\"_ _0\"></span>o treasury<span class=\"_ _1\"></span> during the year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2022 wer<span class=\"_ _0\"></span>e also cancelled.<span class=\"_ _36a\"> </span>On 1 June 2023, 12,870<span class=\"_ _0\"></span>,044 o<span class=\"_ _0\"></span>f the shar<span class=\"_ _1\"></span>es held in treasury at<span class=\"_ _0\"></span> that date <span class=\"_ _0\"></span>were cancelled (<span class=\"_ _0\"></span>note 47).<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIssuedCapitalExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-450": {
   "value": "46. Reserv<span class=\"_ _0\"></span>es<span class=\"_ _36a\"> </span>(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Share premium acc<span class=\"_ _0\"></span>ount <span class=\"_ _1cc\"> </span><span class=\"ff15\">71.4<span class=\"_ _3a\"> </span><span class=\"ff16\">71.1<span class=\"_ _3a\"> </span>70.1<span class=\"_ _36a\"> </span></span></span>Capital redemption r<span class=\"_ _0\"></span>eserve<span class=\"_ _24b\"> </span><span class=\"ff15\">12.9<span class=\"_ _cb\"> </span><span class=\"ff16\">71.8<span class=\"_ _f7\"> </span>50.3<span class=\"_ _36a\"> </span></span></span>Merger r<span class=\"_ _0\"></span>eserve <span class=\"_ _22d\"> </span><span class=\"ff15\">(70.2)<span class=\"_ _bf\"> </span></span>(70.2)<span class=\"_ _6c\"> </span>(70.2)<span class=\"_ _36a\"> </span>Profit and loss account <span class=\"_ _1e8\"> </span><span class=\"ff15\">1,243.4<span class=\"_ _86\"> </span><span class=\"ff16\">1,151.2<span class=\"_ _86\"> </span>1,005.9<span class=\"_ _36a\"> </span></span></span>1,257.5<span class=\"_ _86\"> </span><span class=\"ff16\">1,223.9<span class=\"_ _86\"> </span>1,056.1<span class=\"_ _36a\"> </span></span>(b)  <span class=\"_ _ce\"> </span>The  Company<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Share premium acc<span class=\"_ _0\"></span>ount <span class=\"_ _1cc\"> </span><span class=\"ff15\">71.4<span class=\"_ _3a\"> </span><span class=\"ff16\">71.1<span class=\"_ _3a\"> </span>70.1<span class=\"_ _36a\"> </span></span></span>Capital redemption r<span class=\"_ _0\"></span>eserve<span class=\"_ _24b\"> </span><span class=\"ff15\">12.9<span class=\"_ _cb\"> </span><span class=\"ff16\">71.8<span class=\"_ _f7\"> </span>50.3<span class=\"_ _36a\"> </span></span></span>Merger r<span class=\"_ _0\"></span>eserve <span class=\"_ _22d\"> </span><span class=\"ff15\">(23.7)<span class=\"_ _bf\"> </span></span>(23.7)<span class=\"_ _6c\"> </span>(23.7)<span class=\"_ _36a\"> </span>Profit and loss account <span class=\"_ _23d\"> </span><span class=\"ff15\">521.8<span class=\"_ _150\"> </span><span class=\"ff16\">326.3<span class=\"_ _150\"> </span>358.9<span class=\"_ _36a\"> </span></span></span>582.4<span class=\"_ _d5\"> </span><span class=\"ff16\">445.5<span class=\"_ _150\"> </span>455.6<span class=\"_ _36a\"> </span></span>The share pr<span class=\"_ _0\"></span>emium account and capital r<span class=\"_ _0\"></span>edemption reserv<span class=\"_ _0\"></span>e are non-distributable reserv<span class=\"_ _0\"></span>es which ar<span class=\"_ _0\"></span>e requir<span class=\"_ _0\"></span>ed by<span class=\"_ _1\"></span>, and operate under the pro<span class=\"_ _0\"></span>visions of, UK<span class=\"_ _0\"></span> company la<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span>The merger<span class=\"_ _0\"></span> reserv<span class=\"_ _0\"></span>e arose, due <span class=\"_ _0\"></span>to the pr<span class=\"_ _0\"></span>ovisions of<span class=\"_ _0\"></span> UK company<span class=\"_ _0\"></span> law at <span class=\"_ _0\"></span>the time, on a gr<span class=\"_ _0\"></span>oup restructuring on 12 May<span class=\"_ _0\"></span> 1989 when <span class=\"_ _0\"></span>the Company<span class=\"_ _0\"></span> became the parent<span class=\"_ _0\"></span> entity of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup.<span class=\"_ _36a\"> </span>On 28 March 2023 <span class=\"_ _0\"></span>the High Court confirmed the cancellation of<span class=\"_ _0\"></span> the Company\u2019<span class=\"_ _2\"></span>s capital redemption reserv<span class=\"_ _0\"></span>e, follo<span class=\"_ _0\"></span>wing shareholder<span class=\"_ _0\"></span> appro<span class=\"_ _0\"></span>val at <span class=\"_ _0\"></span>the A<span class=\"_ _0\"></span>GM on 1 March 2023. <span class=\"_ _0\"></span>This reserv<span class=\"_ _0\"></span>e had arisen on the cancellation of<span class=\"_ _0\"></span> ordinary<span class=\"_ _0\"></span> shares <span class=\"_ _0\"></span>which had been purchased in <span class=\"_ _0\"></span>the market and held in <span class=\"_ _0\"></span>treasury<span class=\"_ _1\"></span>. The balance outstanding on <span class=\"_ _0\"></span>the capital redemption r<span class=\"_ _0\"></span>eserve at <span class=\"_ _0\"></span>that time <span class=\"_ _0\"></span>was tr<span class=\"_ _0\"></span>ansferred <span class=\"_ _0\"></span>to the pr<span class=\"_ _0\"></span>ofit and loss account.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfReservesAndOtherEquityInterestExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-389": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs854\">47<span class=\"_ _2f\"></span>.  Own shares<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs855\">The Group<span class=\"_ _180\"> </span>The Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs856\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span></span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs857\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs858\">T<span class=\"_ _0\"></span>reasury shares<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs859\">Opening balance<span class=\"_ _24f\"> </span><span class=\"ff15\">18.2<span class=\"_ _3a\"> </span><span class=\"ff16\">60.7<span class=\"_ _3a\"> </span></span>18.2<span class=\"_ _3a\"> </span><span class=\"ff16\">60.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs85a\">Shares purchased<span class=\"_ _17a\"> </span><span class=\"ff15\">111.5<span class=\"_ _3a\"> </span><span class=\"ff16\">66.9<span class=\"_ _150\"> </span></span>111.5<span class=\"_ _3a\"> </span><span class=\"ff16\">66.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs85b\">Options ex<span class=\"_ _0\"></span>ercised<span class=\"_ _174\"> </span><span class=\"ff15\">(8.4)<span class=\"_ _16b\"> </span></span>-<span class=\"_ _fb\"> </span><span class=\"ff15\">(8.4)<span class=\"_ _16b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs85c\">Shares cancelled<span class=\"_ _2d1\"> </span><span class=\"ff15\">(67.3)<span class=\"_ _110\"> </span></span>(109.4)<span class=\"_ _6c\"> </span><span class=\"ff15\">(67.3)<span class=\"_ _b6\"> </span></span>(109.4)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs85d\">Closing balance<span class=\"_ _2d2\"> </span><span class=\"ff15\">54.0<span class=\"_ _3a\"> </span><span class=\"ff16\">18.2<span class=\"_ _3a\"> </span></span>54.0<span class=\"_ _3a\"> </span><span class=\"ff16\">18.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs85e\">ESOP shares<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs85f\">Opening balance<span class=\"_ _24f\"> </span><span class=\"ff15\">19.0<span class=\"_ _3a\"> </span><span class=\"ff16\">16.0<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs860\">Shares purchased<span class=\"_ _237\"> </span><span class=\"ff15\">9.0<span class=\"_ _cb\"> </span><span class=\"ff16\">12.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs861\">Options ex<span class=\"_ _0\"></span>ercised<span class=\"_ _174\"> </span><span class=\"ff15\">(6.4)<span class=\"_ _1db\"> </span></span>(9.6)<span class=\"_ _16b\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs862\">Closing balance<span class=\"_ _2d2\"> </span><span class=\"ff15\">21.6<span class=\"_ _3a\"> </span><span class=\"ff16\">19.0<span class=\"_ _43\"> </span></span>-<span class=\"_ _209\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs863\">Irrevocable authority t<span class=\"_ _0\"></span>o purchase<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs864\">Opening balance<span class=\"_ _24f\"> </span><span class=\"ff15\">10.8<span class=\"_ _43\"> </span></span>-<span class=\"_ _40\"> </span><span class=\"ff15\">10.8<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs865\">Given in year<span class=\"_ _db\"> </span><span class=\"ff15\">-<span class=\"_ _d1\"> </span><span class=\"ff16\">10.8<span class=\"_ _43\"> </span></span>-<span class=\"_ _d1\"> </span><span class=\"ff16\">10.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs866\">Expiring / utilised in year<span class=\"_ _25f\"> </span><span class=\"ff15\">(10.8)<span class=\"_ _fb\"> </span></span>-<span class=\"_ _72\"> </span><span class=\"ff15\">(10.8)<span class=\"_ _16b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs867\">Closing balance<span class=\"_ _2d3\"> </span><span class=\"ff15\">-<span class=\"_ _d1\"> </span><span class=\"ff16\">10.8<span class=\"_ _43\"> </span></span>-<span class=\"_ _40\"> </span><span class=\"ff16\">10.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs868\">T<span class=\"_ _2\"></span>otal closing balance<span class=\"_ _1b9\"> </span><span class=\"ff15\">75.6<span class=\"_ _3a\"> </span><span class=\"ff16\">48.0<span class=\"_ _3a\"> </span></span>54.0<span class=\"_ _3a\"> </span><span class=\"ff16\">29.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs869\">T<span class=\"_ _2\"></span>otal opening balance<span class=\"_ _1be\"> </span><span class=\"ff15\">48.0<span class=\"_ _cb\"> </span><span class=\"ff16\">76.7<span class=\"_ _f7\"> </span></span>29.0<span class=\"_ _3a\"> </span><span class=\"ff16\">60.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs86a\">At 30 Sept<span class=\"_ _0\"></span>ember 2023 the number<span class=\"_ _1\"></span> of the Company\u2019<span class=\"_ _2\"></span>s own shares held in tr<span class=\"_ _0\"></span>easury <span class=\"_ _0\"></span>was 10<span class=\"_ _0\"></span>,07<span class=\"_ _1\"></span>4,002 (2022: 3,640<span class=\"_ _0\"></span>,519). <span class=\"_ _0\"></span>These shares had </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs86b\">a nominal v<span class=\"_ _0\"></span>alue of \u00a310<span class=\"_ _0\"></span>,07<span class=\"_ _1\"></span>4,002 (2022: \u00a33,<span class=\"_ _0\"></span>640,519). <span class=\"_ _1\"></span>These shares do not qualify<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> dividends.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs86c\">The ESOP<span class=\"_ _0\"></span> shares ar<span class=\"_ _0\"></span>e held in trust f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the benefit of emplo<span class=\"_ _0\"></span>yees ex<span class=\"_ _0\"></span>ercising <span class=\"_ _0\"></span>their options under<span class=\"_ _0\"></span> the Compan<span class=\"_ _0\"></span>y\u2019<span class=\"_ _0\"></span>s share op<span class=\"_ _0\"></span>tion schemes and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs86d\">awar<span class=\"_ _0\"></span>ds under <span class=\"_ _0\"></span>the Paragon PSP<span class=\"_ _0\"></span> and Deferr<span class=\"_ _0\"></span>ed Share Bonus Plan. <span class=\"_ _0\"></span>The trust<span class=\"_ _0\"></span>ees\u2019 costs are included in <span class=\"_ _0\"></span>the operating expenses of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs86e\">At 30 Sept<span class=\"_ _0\"></span>ember 2023, the <span class=\"_ _0\"></span>trust held 4,<span class=\"_ _0\"></span>009,<span class=\"_ _0\"></span>490 ordinary shar<span class=\"_ _0\"></span>es (2022: 3,879<span class=\"_ _0\"></span>,<span class=\"_ _0\"></span>160) with a nominal <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> \u00a34,<span class=\"_ _0\"></span>009,490 (2022: \u00a33,879<span class=\"_ _1\"></span>,160<span class=\"_ _0\"></span>) </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs86f\">and a market <span class=\"_ _1\"></span>value of \u00a319<span class=\"_ _0\"></span>,727<span class=\"_ _2\"></span>,084 (2022: \u00a315,314,<span class=\"_ _0\"></span>924). Options, or<span class=\"_ _0\"></span> other shar<span class=\"_ _0\"></span>e-based awar<span class=\"_ _0\"></span>ds, w<span class=\"_ _0\"></span>ere outstanding against all o<span class=\"_ _0\"></span>f these </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs870\">shares at 30 Sep<span class=\"_ _0\"></span>tember 2023 (2022: all). <span class=\"_ _0\"></span>The dividends on all of<span class=\"_ _0\"></span> these shar<span class=\"_ _0\"></span>es have been <span class=\"_ _0\"></span>waived (2022: all).</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTreasurySharesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-451": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs872\">48. <span class=\"_ _96\"></span>Equity<span class=\"_ _1\"></span> dividend<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs873\">Amounts recognised as distributions <span class=\"_ _0\"></span>to equity shar<span class=\"_ _0\"></span>eholders in the Gr<span class=\"_ _0\"></span>oup and the Company<span class=\"_ _0\"></span> in the period:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs874\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span></span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs875\">Per share<span class=\"_ _140\"> </span><span class=\"ff17\">Per share<span class=\"_ _40\"> </span></span>\u00a3m<span class=\"_ _9e\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h67 ff22 fs1 fc1 sc0 ls0 ws0 gs876\">Equity dividends on ordinary shares<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs877\">Final dividend for the pre<span class=\"_ _0\"></span>vious year<span class=\"_ _2d4\"> </span><span class=\"ff15\"><span>19.2</span>p<span class=\"_ _d5\"> </span><span class=\"ff16\"><span>18.9</span>p<span class=\"_ _d5\"> </span></span>43.7<span class=\"_ _3a\"> </span><span class=\"ff16\">46.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs878\">Interim dividend f<span class=\"_ _0\"></span>or the current year<span class=\"_ _25d\"> </span><span class=\"ff15\"><span>11.0</span>p<span class=\"_ _cb\"> </span><span class=\"ff16\"><span>9.4</span>p<span class=\"_ _d5\"> </span></span>24.2<span class=\"_ _3a\"> </span><span class=\"ff16\">22.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs879\"><span>30.2</span>p<span class=\"_ _d5\"> </span><span class=\"ff16\"><span>28.3</span>p<span class=\"_ _d5\"> </span></span>67.9<span class=\"_ _3a\"> </span><span class=\"ff16\">68.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs87a\">Amounts paid and proposed in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> the y<span class=\"_ _0\"></span>ear:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs87b\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span></span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs87c\">Per share<span class=\"_ _140\"> </span><span class=\"ff17\">Per share<span class=\"_ _40\"> </span></span>\u00a3m<span class=\"_ _9e\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs87d\">Interim dividend f<span class=\"_ _0\"></span>or the current year <span class=\"_ _2b5\"> </span><span class=\"ff15\">11.0p<span class=\"_ _cb\"> </span><span class=\"ff16\">9.4p<span class=\"_ _d5\"> </span></span>24.2<span class=\"_ _3a\"> </span><span class=\"ff16\">22.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs87e\">Proposed final dividend f<span class=\"_ _0\"></span>or the current year<span class=\"_ _17d\"> </span><span class=\"ff15\"><span>26.4</span>p<span class=\"_ _d5\"> </span><span class=\"ff16\"><span>19.2</span>p<span class=\"_ _d5\"> </span></span><span>56.7</span><span class=\"_ _3a\"> </span><span class=\"ff16\"><span>44.9<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs87f\">37.4p<span class=\"_ _d5\"> </span><span class=\"ff16\">28.6p<span class=\"_ _d5\"> </span></span>80.9<span class=\"_ _3a\"> </span><span class=\"ff16\">67.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs880\">The proposed <span class=\"_ _0\"></span>final dividend for<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2023 will be paid on 8 March 202<span class=\"_ _0\"></span>4, subject to appr<span class=\"_ _0\"></span>ov<span class=\"_ _0\"></span>al at the <span class=\"_ _0\"></span>AGM<span class=\"_ _0\"></span>, with </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs881\">a recor<span class=\"_ _0\"></span>d date of<span class=\"_ _0\"></span> 2 F<span class=\"_ _0\"></span>ebruary 2024<span class=\"_ _0\"></span>. The dividend <span class=\"_ _0\"></span>will be recognised in <span class=\"_ _0\"></span>the accounts when it is paid.<span class=\"_ _36a\"> </span></div>(c<span class=\"_ _1\"></span>)  <span class=\"_ _29\"> </span>Dividend and distribution policy<span class=\"_ _36a\"> </span>The Company<span class=\"_ _0\"></span> is committed to a long<span class=\"_ _0\"></span>-term sustainable dividend policy<span class=\"_ _1\"></span>. Ordinarily<span class=\"_ _1\"></span>, dividends will increase in line with earnings, subject<span class=\"_ _0\"></span> to the r<span class=\"_ _0\"></span>equirements of<span class=\"_ _0\"></span> the business and <span class=\"_ _0\"></span>the availability<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> cash resour<span class=\"_ _0\"></span>ces. The Boar<span class=\"_ _0\"></span>d re<span class=\"_ _0\"></span>views <span class=\"_ _0\"></span>the policy<span class=\"_ _0\"></span> at least twice a <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> in advance of<span class=\"_ _0\"></span> announcing its results, <span class=\"_ _0\"></span>taking into account the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s strategy, capital r<span class=\"_ _1\"></span>equirements, principal risks and the objective o<span class=\"_ _0\"></span>f enhancing shareholder v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span>In determining the le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> dividend for<span class=\"_ _1\"></span> any y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>, the Board expects t<span class=\"_ _0\"></span>o follow<span class=\"_ _0\"></span> the dividend polic<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, but will also <span class=\"_ _0\"></span>take into account <span class=\"_ _0\"></span>the lev<span class=\"_ _0\"></span>el of av<span class=\"_ _0\"></span>ailable retained earnings in <span class=\"_ _0\"></span>the Company<span class=\"_ _1\"></span>, its cash resources and <span class=\"_ _0\"></span>the cash and capital requir<span class=\"_ _0\"></span>ements inherent in its business plans. In addition to <span class=\"_ _0\"></span>the payment of<span class=\"_ _0\"></span> dividends, the Boar<span class=\"_ _0\"></span>d may also consider<span class=\"_ _0\"></span> whether<span class=\"_ _1\"></span> it is appropriate to apply<span class=\"_ _0\"></span> excess capital in <span class=\"_ _0\"></span>the market pur<span class=\"_ _1\"></span>chase of the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s shares.<span class=\"_ _36a\"> </span>The distributable reserv<span class=\"_ _0\"></span>es of <span class=\"_ _0\"></span>the Company<span class=\"_ _0\"></span> comprise its profit and loss account<span class=\"_ _0\"></span> balance (note 46) and, other<span class=\"_ _0\"></span> than <span class=\"_ _0\"></span>the regulatory<span class=\"_ _0\"></span> requir<span class=\"_ _0\"></span>ement to r<span class=\"_ _0\"></span>etain an appropriat<span class=\"_ _0\"></span>e level o<span class=\"_ _0\"></span>f capital in Parag<span class=\"_ _0\"></span>on Bank PL<span class=\"_ _0\"></span>C, ther<span class=\"_ _0\"></span>e are no r<span class=\"_ _0\"></span>estrictions pre<span class=\"_ _0\"></span>venting pr<span class=\"_ _0\"></span>ofits elsewher<span class=\"_ _0\"></span>e in the Group <span class=\"_ _0\"></span>from being distributed <span class=\"_ _0\"></span>to the par<span class=\"_ _0\"></span>ent.<span class=\"_ _36a\"> </span>Since the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2018, <span class=\"_ _0\"></span>the Company<span class=\"_ _0\"></span> has adopted a policy<span class=\"_ _0\"></span> of pa<span class=\"_ _0\"></span>ying out appro<span class=\"_ _0\"></span>ximately 40% of<span class=\"_ _0\"></span> its basic earnings per shar<span class=\"_ _0\"></span>e as dividend (a dividend co<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> ratio of ar<span class=\"_ _0\"></span>ound 2.5 times<span class=\"_ _0\"></span>), in the absence of<span class=\"_ _0\"></span> any<span class=\"_ _0\"></span> idiosyncratic f<span class=\"_ _0\"></span>actors which might mak<span class=\"_ _0\"></span>e such a dividend inappropriate. <span class=\"_ _1\"></span>This policy is r<span class=\"_ _0\"></span>eview<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the Board at least<span class=\"_ _0\"></span> annually<span class=\"_ _0\"></span>. The Compan<span class=\"_ _0\"></span>y considers it has access <span class=\"_ _0\"></span>to sufficient cash resour<span class=\"_ _0\"></span>ces to pa<span class=\"_ _0\"></span>y dividends at <span class=\"_ _0\"></span>this level and <span class=\"_ _0\"></span>that its distributable reserv<span class=\"_ _0\"></span>es are abundant <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>this purpose.<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>o provide gr<span class=\"_ _0\"></span>eater <span class=\"_ _0\"></span>transparenc<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, the Boar<span class=\"_ _0\"></span>d also adopted a policy<span class=\"_ _0\"></span> of pa<span class=\"_ _0\"></span>ying an interim dividend in each y<span class=\"_ _0\"></span>ear equiv<span class=\"_ _0\"></span>alent to half<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the preceding <span class=\"_ _0\"></span>final dividend in the absence of<span class=\"_ _0\"></span> any <span class=\"_ _0\"></span>factors which might<span class=\"_ _0\"></span> make such a distribution inappr<span class=\"_ _0\"></span>opriate. F<span class=\"_ _1\"></span>or the curr<span class=\"_ _0\"></span>ent year<span class=\"_ _2\"></span>, based on its re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s capital position and forecasts, and <span class=\"_ _0\"></span>taking account of<span class=\"_ _0\"></span> Covid-relat<span class=\"_ _0\"></span>ed impacts on the relativ<span class=\"_ _0\"></span>e size of<span class=\"_ _0\"></span> interim and final dividends in r<span class=\"_ _0\"></span>ecent y<span class=\"_ _0\"></span>ears and the desir<span class=\"_ _0\"></span>e to normalise the ong<span class=\"_ _0\"></span>oing relationship betw<span class=\"_ _0\"></span>een the half-<span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> and final payments, the Board concluded <span class=\"_ _0\"></span>that a one-off enhancement<span class=\"_ _0\"></span> to the int<span class=\"_ _0\"></span>erim dividend could be made. It ther<span class=\"_ _0\"></span>efore declar<span class=\"_ _0\"></span>ed an interim dividend f<span class=\"_ _0\"></span>or the y<span class=\"_ _0\"></span>ear of<span class=\"_ _0\"></span> 11.0p per<span class=\"_ _0\"></span> share (2022: 9<span class=\"_ _0\"></span>.4p per shar<span class=\"_ _0\"></span>e). <span class=\"_ _0\"></span>The Boar<span class=\"_ _0\"></span>d also confirmed that the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s normal approach of pa<span class=\"_ _0\"></span>ying an interim dividend of 50% o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the preceding <span class=\"_ _0\"></span>year\u2019<span class=\"_ _1\"></span>s final dividend would continue <span class=\"_ _0\"></span>to apply in <span class=\"_ _0\"></span>future <span class=\"_ _0\"></span>years.<span class=\"_ _36a\"> </span>The appropriat<span class=\"_ _0\"></span>e level o<span class=\"_ _0\"></span>f final dividend <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the current <span class=\"_ _1\"></span>year w<span class=\"_ _0\"></span>as considered b<span class=\"_ _0\"></span>y the Boar<span class=\"_ _0\"></span>d in light of<span class=\"_ _0\"></span> economic and regulatory<span class=\"_ _0\"></span> dev<span class=\"_ _0\"></span>elopments in the y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>, and the v<span class=\"_ _0\"></span>arious potential paths for<span class=\"_ _0\"></span> the UK<span class=\"_ _0\"></span> economy<span class=\"_ _0\"></span>. In particular <span class=\"_ _0\"></span>the lev<span class=\"_ _0\"></span>els of pr<span class=\"_ _0\"></span>ovision in <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s loan portfolios and the po<span class=\"_ _0\"></span>tential for<span class=\"_ _0\"></span> further<span class=\"_ _0\"></span> pro<span class=\"_ _0\"></span>vision under str<span class=\"_ _0\"></span>ess in the ev<span class=\"_ _0\"></span>ent of<span class=\"_ _0\"></span> a worsening UK<span class=\"_ _0\"></span> economic position wer<span class=\"_ _0\"></span>e considered b<span class=\"_ _0\"></span>y the Board. <span class=\"_ _0\"></span>These w<span class=\"_ _0\"></span>ere compar<span class=\"_ _0\"></span>ed to <span class=\"_ _0\"></span>the regulatory<span class=\"_ _0\"></span> capital position at the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end along with the capital impacts o<span class=\"_ _0\"></span>f str<span class=\"_ _0\"></span>ess testing carried out as part of<span class=\"_ _0\"></span> the ICAAP<span class=\"_ _0\"></span> and for<span class=\"_ _0\"></span>ecasting processes, and <span class=\"_ _0\"></span>the potential impacts of<span class=\"_ _0\"></span> ongoing dev<span class=\"_ _0\"></span>elopments in the r<span class=\"_ _0\"></span>egulatory regime <span class=\"_ _0\"></span>for capital including <span class=\"_ _0\"></span>the introduction in <span class=\"_ _0\"></span>the UK of<span class=\"_ _0\"></span> Basel 3.<span class=\"_ _0\"></span>1. The Board particularly<span class=\"_ _0\"></span> considered <span class=\"_ _0\"></span>the appropriateness o<span class=\"_ _0\"></span>f including net losses r<span class=\"_ _0\"></span>elating to <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value adjustments <span class=\"_ _0\"></span>from hedging in the calculation of an<span class=\"_ _0\"></span>y dividend or<span class=\"_ _0\"></span> distribution, as these primarily<span class=\"_ _0\"></span> result <span class=\"_ _0\"></span>from the r<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>ersal of<span class=\"_ _0\"></span> gains recor<span class=\"_ _0\"></span>ded in earlier <span class=\"_ _0\"></span>years <span class=\"_ _0\"></span>which wer<span class=\"_ _0\"></span>e disregar<span class=\"_ _0\"></span>ded, at the <span class=\"_ _0\"></span>time, for<span class=\"_ _0\"></span> the purpose of<span class=\"_ _1\"></span> determining dividends. Given the size of<span class=\"_ _0\"></span> such adjustments in the period, <span class=\"_ _0\"></span>the Board concluded that <span class=\"_ _0\"></span>their inclusion <span class=\"_ _0\"></span>was not consistent<span class=\"_ _0\"></span> with its ov<span class=\"_ _0\"></span>erarching aim of<span class=\"_ _1\"></span> delivering a sustainable dividend which gro<span class=\"_ _0\"></span>ws with <span class=\"_ _0\"></span>the earnings of <span class=\"_ _0\"></span>the business.<span class=\"_ _36a\"> </span>On the basis of<span class=\"_ _0\"></span> this analy<span class=\"_ _0\"></span>sis the Board concluded <span class=\"_ _0\"></span>that a to<span class=\"_ _0\"></span>tal dividend of ar<span class=\"_ _0\"></span>ound 40% of earnings e<span class=\"_ _0\"></span>xcluding fair<span class=\"_ _1\"></span> value items could be paid.<span class=\"_ _36a\"> </span>The Board <span class=\"_ _0\"></span>will ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e propose a final dividend <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear of<span class=\"_ _1\"></span> 26.4p per share (2022: 19<span class=\"_ _0\"></span>.2p per shar<span class=\"_ _0\"></span>e) <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> approv<span class=\"_ _0\"></span>al at the 2024 <span class=\"_ _1\"></span>AGM, making a total dividend <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the y<span class=\"_ _0\"></span>ear o<span class=\"_ _0\"></span>f 37<span class=\"_ _2\"></span>.4p per shar<span class=\"_ _0\"></span>e (2022: 28.6p per shar<span class=\"_ _1\"></span>e).<span class=\"_ _36a\"> </span>During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> the share buy<span class=\"_ _0\"></span>-back progr<span class=\"_ _0\"></span>amme announced during the 2022 financial <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> was comple<span class=\"_ _0\"></span>ted under an irr<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>ocable authority put in place in Sep<span class=\"_ _0\"></span>tember 2022. <span class=\"_ _0\"></span>A<span class=\"_ _0\"></span> share buy-back pr<span class=\"_ _1\"></span>ogramme for <span class=\"_ _0\"></span>the current <span class=\"_ _0\"></span>financial y<span class=\"_ _0\"></span>ear<span class=\"_ _0\"></span>, for<span class=\"_ _1\"></span> up to \u00a350.<span class=\"_ _0\"></span>0m of or<span class=\"_ _0\"></span>dinary shares <span class=\"_ _0\"></span>was authorised at <span class=\"_ _0\"></span>the time of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s 2022 results announcement. <span class=\"_ _0\"></span>This w<span class=\"_ _0\"></span>as extended t<span class=\"_ _0\"></span>o \u00a3100.<span class=\"_ _0\"></span>0m in June 2022. <span class=\"_ _0\"></span>The amount expended in these pr<span class=\"_ _0\"></span>ogrammes in <span class=\"_ _0\"></span>the year<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>as \u00a311<span class=\"_ _15\"></span>1.5m (note 4<span class=\"_ _0\"></span>7) and the shar<span class=\"_ _0\"></span>e buy-back w<span class=\"_ _0\"></span>as completed befor<span class=\"_ _0\"></span>e the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end.<span class=\"_ _36a\"> </span>As part of<span class=\"_ _0\"></span> its consideration of capital described abo<span class=\"_ _0\"></span>ve <span class=\"_ _0\"></span>the Board of<span class=\"_ _0\"></span> Directors authorised a ne<span class=\"_ _0\"></span>w buy-back<span class=\"_ _0\"></span> of up <span class=\"_ _0\"></span>to \u00a350.<span class=\"_ _0\"></span>0m to commence shortly after<span class=\"_ _0\"></span> the announcement o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the 2023 results. <span class=\"_ _0\"></span>All shares acquir<span class=\"_ _0\"></span>ed in buy-back pr<span class=\"_ _0\"></span>ogrammes are initially<span class=\"_ _0\"></span> held in tr<span class=\"_ _0\"></span>easury<span class=\"_ _0\"></span>. The direct<span class=\"_ _0\"></span>ors have consider<span class=\"_ _0\"></span>ed the distributable r<span class=\"_ _0\"></span>esources of<span class=\"_ _0\"></span> the Company<span class=\"_ _0\"></span> and concluded that <span class=\"_ _0\"></span>these distributions are appr<span class=\"_ _0\"></span>opriate.<span class=\"_ _36a\"> </span>The most r<span class=\"_ _0\"></span>ecent policy r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>w<span class=\"_ _0\"></span>, in November<span class=\"_ _0\"></span> 2023, also confirmed the existing dividend polic<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>would continue to apply<span class=\"_ _0\"></span> for<span class=\"_ _1\"></span> future periods, subject to <span class=\"_ _0\"></span>the impact of<span class=\"_ _0\"></span> any <span class=\"_ _0\"></span>future e<span class=\"_ _0\"></span>vents, and the Boar<span class=\"_ _0\"></span>d will consider<span class=\"_ _0\"></span> the appr<span class=\"_ _0\"></span>opriateness and scale of an<span class=\"_ _0\"></span>y interim dividend in the context<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s results and the operating and economic en<span class=\"_ _0\"></span>vironment at <span class=\"_ _0\"></span>the time. Shar<span class=\"_ _0\"></span>e buy-backs will be consider<span class=\"_ _0\"></span>ed where ex<span class=\"_ _0\"></span>cess capital has arisen, either oper<span class=\"_ _0\"></span>ationally or<span class=\"_ _0\"></span> as a result of<span class=\"_ _0\"></span> changed r<span class=\"_ _0\"></span>egulatory r<span class=\"_ _0\"></span>equirements<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDividendsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-480": {
   "value": "19200000",
   "decimals": 4,
   "dimensions": {
    "concept": "paragon:FinalDividendForThePreviousYear",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP/xbrli:shares"
   }
  },
  "fact-483": {
   "value": "18900000",
   "decimals": 4,
   "dimensions": {
    "concept": "paragon:FinalDividendForThePreviousYear",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP/xbrli:shares"
   }
  },
  "fact-481": {
   "value": "11000000",
   "decimals": 4,
   "dimensions": {
    "concept": "paragon:InterimDividendForTheCurrentYear",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP/xbrli:shares"
   }
  },
  "fact-484": {
   "value": "9400000",
   "decimals": 4,
   "dimensions": {
    "concept": "paragon:InterimDividendForTheCurrentYear",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP/xbrli:shares"
   }
  },
  "fact-482": {
   "value": "30.2",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DividendsRecognisedAsDistributionsToOwnersPerShare",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP/xbrli:shares"
   }
  },
  "fact-485": {
   "value": "28.3",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DividendsRecognisedAsDistributionsToOwnersPerShare",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP/xbrli:shares"
   }
  },
  "fact-493": {
   "value": "0.264",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DividendsProposedOrDeclaredBeforeFinancialStatementsAuthorisedForIssueButNotRecognisedAsDistributionToOwnersPerShare",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP/xbrli:shares"
   }
  },
  "fact-494": {
   "value": "0.192",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DividendsProposedOrDeclaredBeforeFinancialStatementsAuthorisedForIssueButNotRecognisedAsDistributionToOwnersPerShare",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP/xbrli:shares"
   }
  },
  "fact-495": {
   "value": "56700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsProposedOrDeclaredBeforeFinancialStatementsAuthorisedForIssueButNotRecognisedAsDistributionToOwners",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-496": {
   "value": "44900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsProposedOrDeclaredBeforeFinancialStatementsAuthorisedForIssueButNotRecognisedAsDistributionToOwners",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2021-10-01T00:00:00/2022-10-01T00:00:00",
    "unit": "iso4217:GBP"
   }
  },
  "fact-452": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs883\">49<span class=\"_ _0\"></span>. <span class=\"_ _1c\"></span>Net cash flo<span class=\"_ _0\"></span>w<span class=\"_ _0\"></span> from operating activities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9c gs884\">(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs885\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs886\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs887\">Profit bef<span class=\"_ _0\"></span>ore tax<span class=\"_ _2d5\"> </span><span class=\"ff15\">199.9<span class=\"_ _d5\"> </span><span class=\"ff16\">417.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs888\">Non-cash items included in pr<span class=\"_ _0\"></span>ofit and other adjustments:</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs889\"> <span class=\"_ _c0\"> </span>Depreciation of operating pr<span class=\"_ _0\"></span>operty<span class=\"_ _1\"></span>, plant and equipment<span class=\"_ _124\"> </span><span class=\"ff15\">4.0<span class=\"_ _9e\"> </span><span class=\"ff16\">3.5</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs88a\"> <span class=\"_ _c0\"> </span>(Profit) on disposal of operating property<span class=\"_ _2\"></span>, plant and equipment<span class=\"_ _1b1\"> </span><span class=\"ff15\">(0.1)<span class=\"_ _1db\"> </span></span>(0.1)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs88b\"> <span class=\"_ _c0\"> </span>Amortisation and derecognition of intangible assets  <span class=\"_ _176\"> </span><span class=\"ff15\">3.6<span class=\"_ _d1\"> </span><span class=\"ff16\">2.0</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs88c\"> <span class=\"_ _c0\"> </span>Non-cash movements on borrowings<span class=\"_ _23c\"> </span><span class=\"ff15\">(2.5)<span class=\"_ _ff\"> </span><span class=\"ff16\">1.9</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs88d\"> <span class=\"_ _c0\"> </span>Impairment losses on loans to customers<span class=\"_ _1cc\"> </span><span class=\"ff15\">18.0<span class=\"_ _3a\"> </span><span class=\"ff16\">14.0</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs88e\"> <span class=\"_ _c0\"> </span>Charge for share based r<span class=\"_ _0\"></span>emuneration<span class=\"_ _1a1\"> </span><span class=\"ff15\">9.6<span class=\"_ _d1\"> </span><span class=\"ff16\">9.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs88f\">Net (increase) / decr<span class=\"_ _0\"></span>ease in operating assets: </div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs890\"> <span class=\"_ _c0\"> </span>Assets held for leasing<span class=\"_ _29b\"> </span><span class=\"ff15\">(2.7)<span class=\"_ _1db\"> </span></span>(2.3)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs891\"> <span class=\"_ _c0\"> </span>Loans to customers<span class=\"_ _2d6\"> </span><span class=\"ff15\">(682.0)<span class=\"_ _110\"> </span></span>(821.6)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs892\"> <span class=\"_ _c0\"> </span>Derivative financial instruments<span class=\"_ _1e6\"> </span><span class=\"ff15\">163.6<span class=\"_ _133\"> </span></span>(734.8)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs893\"> <span class=\"_ _c0\"> </span>Fair value of portfolio hedg<span class=\"_ _0\"></span>es<span class=\"_ _248\"> </span><span class=\"ff15\">(180.6)<span class=\"_ _12b\"> </span><span class=\"ff16\">565.4</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs894\"> <span class=\"_ _c0\"> </span>Other receivables<span class=\"_ _201\"> </span><span class=\"ff15\">(15.0)<span class=\"_ _291\"> </span><span class=\"ff16\">22.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs895\">Net increase / (decr<span class=\"_ _0\"></span>ease) in operating liabilities:</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs896\"> <span class=\"_ _c0\"> </span>Retail deposits<span class=\"_ _1dc\"> </span><span class=\"ff15\">2,596.1<span class=\"_ _86\"> </span><span class=\"ff16\">1,368.8</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs897\"> <span class=\"_ _c0\"> </span>Derivative financial instruments<span class=\"_ _2d7\"> </span><span class=\"ff15\">(62.2)<span class=\"_ _291\"> </span><span class=\"ff16\">58.2</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs898\"> <span class=\"_ _c0\"> </span>Fair value of portfolio hedg<span class=\"_ _0\"></span>es<span class=\"_ _1ac\"> </span><span class=\"ff15\">68.8<span class=\"_ _291\"> </span></span>(96.7)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs899\"> <span class=\"_ _c0\"> </span>Other liabilities<span class=\"_ _1f9\"> </span><span class=\"ff15\">128.3<span class=\"_ _d5\"> </span><span class=\"ff16\">416.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs89a\">Cash genera<span class=\"_ _0\"></span>ted by opera<span class=\"_ _0\"></span>tions<span class=\"_ _228\"> </span><span class=\"ff15\">2,246.8<span class=\"_ _86\"> </span><span class=\"ff16\">1,225.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs89b\">Income tax<span class=\"_ _1\"></span>es (paid)<span class=\"_ _2d8\"> </span><span class=\"ff15\">(75.1)<span class=\"_ _bf\"> </span></span>(56.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs89c\">2,171.7<span class=\"_ _86\"> </span><span class=\"ff16\">1,168.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs89d\">Cash flow<span class=\"_ _0\"></span>s relating <span class=\"_ _0\"></span>to plant and equipment held f<span class=\"_ _0\"></span>or leasing under<span class=\"_ _0\"></span> operating leases are classified as operating cash <span class=\"_ _0\"></span>flows.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9d gs89f\">(b)  <span class=\"_ _ce\"> </span>The  Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8a0\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8a1\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs8a2\">Profit bef<span class=\"_ _0\"></span>ore tax<span class=\"_ _2d5\"> </span><span class=\"ff15\">255.5<span class=\"_ _d5\"> </span><span class=\"ff16\">133.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs8a3\">Non-cash items included in pr<span class=\"_ _0\"></span>ofit and other adjustments:</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8a4\"> <span class=\"_ _c0\"> </span>Depreciation on property<span class=\"_ _1\"></span>, plant and equipment<span class=\"_ _2d9\"> </span><span class=\"ff15\">1.4<span class=\"_ _9e\"> </span><span class=\"ff16\">1.4</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8a5\"> <span class=\"_ _c0\"> </span>Non-cash movements on borrowings<span class=\"_ _2da\"> </span><span class=\"ff15\">0.3<span class=\"_ _9e\"> </span><span class=\"ff16\">0.4</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8a6\"> <span class=\"_ _c0\"> </span>Impairment provision on inves<span class=\"_ _0\"></span>tments in subsidiaries<span class=\"_ _2db\"> </span><span class=\"ff15\">10.2<span class=\"_ _3a\"> </span><span class=\"ff16\">11.9</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8a7\"> <span class=\"_ _c0\"> </span>Charge for share based r<span class=\"_ _0\"></span>emuneration<span class=\"_ _1a1\"> </span><span class=\"ff15\">9.6<span class=\"_ _d1\"> </span><span class=\"ff16\">9.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs8a8\">Net (increase) / decr<span class=\"_ _0\"></span>ease in operating assets: </div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8a9\"> <span class=\"_ _c0\"> </span>Other receivables<span class=\"_ _166\"> </span><span class=\"ff15\">(189.6)<span class=\"_ _12c\"> </span><span class=\"ff16\">33.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs8aa\">Net (decrease) in oper<span class=\"_ _0\"></span>ating liabilities:</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8ab\"> <span class=\"_ _c0\"> </span>Other liabilities<span class=\"_ _1f1\"> </span><span class=\"ff15\">(0.6)<span class=\"_ _1db\"> </span></span>(0.3)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8ac\">Cash genera<span class=\"_ _0\"></span>ted by opera<span class=\"_ _0\"></span>tions<span class=\"_ _2dc\"> </span><span class=\"ff15\">86.8<span class=\"_ _d5\"> </span><span class=\"ff16\">190.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8ad\">Income tax<span class=\"_ _1\"></span>es (paid) / received<span class=\"_ _2bc\"> </span><span class=\"ff15\">(0.8)<span class=\"_ _72\"> </span><span class=\"ff16\">1.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8ae\">86.0<span class=\"_ _d5\"> </span><span class=\"ff16\">191.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs8b0\">50. <span class=\"_ _96\"></span>Net cash flo<span class=\"_ _0\"></span>w <span class=\"_ _0\"></span>from in<span class=\"_ _0\"></span>vesting activities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8b1\">The Group<span class=\"_ _180\"> </span>The Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8b2\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span></span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8b3\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8b4\">Proceeds fr<span class=\"_ _0\"></span>om sales of operating pr<span class=\"_ _0\"></span>operty<span class=\"_ _1\"></span>, plant and equipment<span class=\"_ _10b\"> </span><span class=\"ff15\">0.1<span class=\"_ _9e\"> </span><span class=\"ff16\">0.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8b5\">Purchases of oper<span class=\"_ _0\"></span>ating property<span class=\"_ _2\"></span>, plant and equipment<span class=\"_ _b1\"> </span><span class=\"ff15\">(1.6)<span class=\"_ _1db\"> </span></span>(1.3)<span class=\"_ _b7\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8b6\">Purchases of int<span class=\"_ _0\"></span>angible assets<span class=\"_ _28e\"> </span><span class=\"ff15\">(1.6)<span class=\"_ _276\"> </span></span>(1.7)<span class=\"_ _b7\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8b7\">Advances of loans to subsidiary undert<span class=\"_ _0\"></span>akings<span class=\"_ _1a8\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _10b\"> </span><span class=\"ff15\">-<span class=\"_ _84\"> </span></span>(177.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8b8\">Repa<span class=\"_ _0\"></span>yment of loans by subsidiary entities<span class=\"_ _2dd\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _d1\"> </span><span class=\"ff15\">99.0<span class=\"_ _d5\"> </span><span class=\"ff16\">246.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs8b9\">Net cash (utilised) / gener<span class=\"_ _0\"></span>ated by in<span class=\"_ _0\"></span>vesting activities<span class=\"_ _2b7\"> </span><span class=\"ff15\">(3.1)<span class=\"_ _1db\"> </span><span class=\"ff17\">(2.4)<span class=\"_ _12c\"> </span></span>99.0<span class=\"_ _3a\"> </span><span class=\"ff16\">69.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws32 gs8bb\">51. <span class=\"_ _5\"> </span>Net cash flow<span class=\"_ _0\"></span> from financing activities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8bc\">The Group<span class=\"_ _180\"> </span>The Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8bd\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span></span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8be\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8bf\">Shares issued (note 45)<span class=\"_ _2de\"> </span><span class=\"ff15\">0.5<span class=\"_ _9e\"> </span><span class=\"ff16\">1.4<span class=\"_ _9e\"> </span></span>0.5<span class=\"_ _d1\"> </span><span class=\"ff16\">1.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8c0\">Dividends paid (note 48)<span class=\"_ _2df\"> </span><span class=\"ff15\">(67.9)<span class=\"_ _bf\"> </span></span>(68.9)<span class=\"_ _6c\"> </span><span class=\"ff15\">(67.9)<span class=\"_ _bf\"> </span></span>(68.9)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8c1\">Repa<span class=\"_ _0\"></span>yment of asset back<span class=\"_ _0\"></span>ed floating ra<span class=\"_ _0\"></span>te notes<span class=\"_ _f0\"> </span><span class=\"ff15\">(382.1)<span class=\"_ _110\"> </span></span>(107.6)<span class=\"_ _16b\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8c2\">Repa<span class=\"_ _0\"></span>yment of ret<span class=\"_ _0\"></span>ail bond<span class=\"_ _167\"> </span><span class=\"ff15\">-<span class=\"_ _84\"> </span></span>(125.0)<span class=\"_ _b7\"> </span><span class=\"ff15\">-<span class=\"_ _84\"> </span></span>(125.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8c3\">Movement on cen<span class=\"_ _0\"></span>tral bank facilities<span class=\"_ _fa\"> </span><span class=\"ff15\">-<span class=\"_ _1c1\"> </span></span>(69.0)<span class=\"_ _b7\"> </span><span class=\"ff15\">-<span class=\"_ _209\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8c4\">Movement on other bank f<span class=\"_ _0\"></span>acilities<span class=\"_ _106\"> </span><span class=\"ff15\">(586.0)<span class=\"_ _b6\"> </span></span>(144.6)<span class=\"_ _16b\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8c5\">Movement on sale and r<span class=\"_ _0\"></span>epurchase agreements<span class=\"_ _2a\"> </span><span class=\"ff15\">50.0<span class=\"_ _43\"> </span></span>-<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8c6\">Capital element of lease pa<span class=\"_ _0\"></span>yments<span class=\"_ _2b1\"> </span><span class=\"ff15\">(2.4)<span class=\"_ _c8\"> </span></span>(1.7)<span class=\"_ _1db\"> </span><span class=\"ff15\">(1.3)<span class=\"_ _c8\"> </span></span>(1.3)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8c7\">Purchase of own shares (not<span class=\"_ _0\"></span>e 47)<span class=\"_ _2d4\"> </span><span class=\"ff15\">(120.5)<span class=\"_ _bf\"> </span></span>(79.5)<span class=\"_ _b6\"> </span><span class=\"ff15\">(111.5)<span class=\"_ _6c\"> </span></span>(66.9)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8c8\">Exer<span class=\"_ _0\"></span>cise of share awar<span class=\"_ _0\"></span>ds<span class=\"_ _2e0\"> </span><span class=\"ff15\">3.4<span class=\"_ _ff\"> </span></span>(0.7)<span class=\"_ _ff\"> </span><span class=\"ff15\">3.1<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs8c9\">Net cash (utilised) by financing activities<span class=\"_ _17e\"> </span><span class=\"ff15\">(1,105.0)<span class=\"_ _b6\"> </span><span class=\"ff17\">(595.6)<span class=\"_ _b6\"> </span></span>(177.1)<span class=\"_ _b6\"> </span><span class=\"ff17\">(260.7)<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs8cb\">52. <span class=\"_ _1c\"></span>Reconciliation of<span class=\"_ _0\"></span> net deb<span class=\"_ _0\"></span>t<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9c gs8cc\">(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs8cd\">Cash flows<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8ce\">Opening </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8cf\">debt<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8d0\">Debt </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8d1\">issued<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8d2\">Other <span class=\"_ _80\"> </span>Non-cash </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8d3\">movements<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8d4\">Closing </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8d5\">debt<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8d6\">\u00a3m<span class=\"_ _97\"> </span>\u00a3m<span class=\"_ _51\"> </span>\u00a3m<span class=\"_ _97\"> </span>\u00a3m<span class=\"_ _51\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8d7\">30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8d8\">Asset back<span class=\"_ _0\"></span>ed loan notes<span class=\"_ _ec\"> </span><span class=\"ff15\">409.3<span class=\"_ _3d\"> </span>-<span class=\"_ _42\"> </span>(382.1)<span class=\"_ _6d\"> </span>0.8<span class=\"_ _58\"> </span>28.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8d9\">Bank borrowings<span class=\"_ _125\"> </span><span class=\"ff15\">586.0<span class=\"_ _1d6\"> </span>-<span class=\"_ _42\"> </span>(586.0)<span class=\"_ _9f\"> </span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8da\">Corporat<span class=\"_ _0\"></span>e bonds<span class=\"_ _1b1\"> </span><span class=\"ff15\">149.2<span class=\"_ _3d\"> </span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _9f\"> </span>(3.4)<span class=\"_ _8e\"> </span>145.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8db\">Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _1b9\"> </span><span class=\"ff15\">112.3<span class=\"_ _1d6\"> </span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _3d\"> </span>0.1<span class=\"_ _3b\"> </span>112.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8dc\">Central bank borr<span class=\"_ _0\"></span>owings<span class=\"_ _2e1\"> </span><span class=\"ff15\">2,750.0<span class=\"_ _1d6\"> </span>-<span class=\"_ _f7\"> </span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _3f\"> </span>2,750.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8dd\">Sale and repurchase agr<span class=\"_ _0\"></span>eements<span class=\"_ _1c7\"> </span><span class=\"ff15\">-<span class=\"_ _f8\"> </span>-<span class=\"_ _97\"> </span>50.0<span class=\"_ _1d6\"> </span>-<span class=\"_ _97\"> </span>50.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8de\">Lease liabilities<span class=\"_ _1da\"> </span><span class=\"ff15\">9.0<span class=\"_ _1d6\"> </span>-<span class=\"_ _9f\"> </span>(2.4)<span class=\"_ _86\"> </span>2.3<span class=\"_ _b9\"> </span>8.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8df\">Bank overdr<span class=\"_ _0\"></span>afts<span class=\"_ _2e2\"> </span><span class=\"ff15\">0.4<span class=\"_ _1d6\"> </span>-<span class=\"_ _12b\"> </span>(0.2)<span class=\"_ _19c\"> </span>-<span class=\"_ _3d\"> </span>0.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8e0\">Gross debt<span class=\"_ _18c\"> </span><span class=\"ff15\">4,016.2<span class=\"_ _3d\"> </span>-<span class=\"_ _67\"> </span>(920.7)<span class=\"_ _b5\"> </span>(0.2)<span class=\"_ _8d\"> </span>3,095.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8e1\">Cash<span class=\"_ _1bb\"> </span><span class=\"ff15\">(1,930.9)<span class=\"_ _9f\"> </span>-<span class=\"_ _b8\"> </span>(1,063.4)<span class=\"_ _9f\"> </span>-<span class=\"_ _c5\"> </span>(2,994.3)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs8e2\">Net debt<span class=\"_ _17a\"> </span><span class=\"ff15\">2,085.3<span class=\"_ _1d6\"> </span>-<span class=\"_ _b8\"> </span>(1,984.1)<span class=\"_ _b5\"> </span>(0.2)<span class=\"_ _8e\"> </span>101.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs8e3\">30 September 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs8e4\">Asset back<span class=\"_ _0\"></span>ed loan notes<span class=\"_ _ec\"> </span><span class=\"ff16\">516.0<span class=\"_ _3d\"> </span></span>-<span class=\"_ _67\"> </span>(107.6)<span class=\"_ _6d\"> </span><span class=\"ff16\">0.9<span class=\"_ _3b\"> </span>409.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs8e5\">Bank borrowings<span class=\"_ _125\"> </span><span class=\"ff16\">730.0<span class=\"_ _1d6\"> </span></span>-<span class=\"_ _67\"> </span>(144.6)<span class=\"_ _6d\"> </span><span class=\"ff16\">0.6<span class=\"_ _3b\"> </span>586.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs8e6\">Corporat<span class=\"_ _0\"></span>e bonds<span class=\"_ _1b1\"> </span><span class=\"ff16\">149.0<span class=\"_ _3d\"> </span></span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _3d\"> </span><span class=\"ff16\">0.2<span class=\"_ _3b\"> </span>149.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs8e7\">Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _1b9\"> </span><span class=\"ff16\">237.1<span class=\"_ _1d6\"> </span></span>-<span class=\"_ _67\"> </span>(125.0)<span class=\"_ _6d\"> </span><span class=\"ff16\">0.2<span class=\"_ _3b\"> </span>112.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs8e8\">Central bank borr<span class=\"_ _0\"></span>owings<span class=\"_ _2e1\"> </span><span class=\"ff16\">2,819.0<span class=\"_ _1d6\"> </span></span>-<span class=\"_ _86\"> </span>(69.0)<span class=\"_ _19c\"> </span>-<span class=\"_ _3f\"> </span><span class=\"ff16\">2,750.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs8e9\">Sale and repurchase agr<span class=\"_ _0\"></span>eements<span class=\"_ _1c7\"> </span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _f7\"> </span>-<span class=\"_ _f8\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs8ea\">Lease liabilities<span class=\"_ _1da\"> </span><span class=\"ff16\">9.5<span class=\"_ _84\"> </span></span>-<span class=\"_ _9f\"> </span>(1.7)<span class=\"_ _86\"> </span><span class=\"ff16\">1.2<span class=\"_ _b9\"> </span>9.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs8eb\">Bank overdr<span class=\"_ _0\"></span>afts<span class=\"_ _2e2\"> </span><span class=\"ff16\">0.3<span class=\"_ _1d6\"> </span></span>-<span class=\"_ _3d\"> </span><span class=\"ff16\">0.1<span class=\"_ _1d6\"> </span></span>-<span class=\"_ _3d\"> </span><span class=\"ff16\">0.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs8ec\">Gross debt<span class=\"_ _18c\"> </span><span class=\"ff16\">4,460.9<span class=\"_ _1d6\"> </span></span>-<span class=\"_ _42\"> </span>(447.8)<span class=\"_ _6d\"> </span><span class=\"ff16\">3.1<span class=\"_ _31\"> </span>4,016.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs8ed\">Cash<span class=\"_ _1bb\"> </span>(1,360.1)<span class=\"_ _19c\"> </span>-<span class=\"_ _42\"> </span>(570.8)<span class=\"_ _19c\"> </span>-<span class=\"_ _b8\"> </span>(1,930.9)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs8ee\">Net debt<span class=\"_ _17a\"> </span><span class=\"ff16\">3,100.8<span class=\"_ _1d6\"> </span></span>-<span class=\"_ _c5\"> </span>(1,018.6)<span class=\"_ _6d\"> </span><span class=\"ff16\">3.1<span class=\"_ _31\"> </span>2,085.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs8ef\">Other non-cash chang<span class=\"_ _0\"></span>es shown abov<span class=\"_ _0\"></span>e repr<span class=\"_ _0\"></span>esent:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs8f0\">\u2022 <span class=\"_ _13\"> </span>EIR adjustments relating to the spr<span class=\"_ _0\"></span>eading of<span class=\"_ _0\"></span> initial costs of <span class=\"_ _0\"></span>the facilities concerned<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs8f1\">\u2022 <span class=\"_ _13\"> </span>Inception of ne<span class=\"_ _0\"></span>w lease assets under<span class=\"_ _0\"></span> IFRS 16<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs8f2\">\u2022 <span class=\"_ _13\"> </span>Hedging fair <span class=\"_ _0\"></span>value adjustments on <span class=\"_ _0\"></span>the corporate bond (not<span class=\"_ _0\"></span>e 26)<span class=\"_ _36a\"> </span></div>(b)  <span class=\"_ _ce\"> </span>The  Company<span class=\"_ _0\"></span> Cash flows<span class=\"_ _36a\"> </span>Opening debt<span class=\"_ _36a\"> </span>Debt issued<span class=\"_ _36a\"> </span>Other <span class=\"_ _47\"> </span>Non-cash movements Closing debt<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _6c\"> </span>\u00a3m<span class=\"_ _bf\"> </span>\u00a3m<span class=\"_ _6c\"> </span>\u00a3m<span class=\"_ _6c\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Corporat<span class=\"_ _0\"></span>e bonds<span class=\"_ _2e3\"> </span><span class=\"ff15\">149.2<span class=\"_ _cb\"> </span>-<span class=\"_ _40\"> </span>-<span class=\"_ _1db\"> </span>0.2<span class=\"_ _44\"> </span>149.4<span class=\"_ _36a\"> </span></span>Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _185\"> </span><span class=\"ff15\">112.3<span class=\"_ _cb\"> </span>-<span class=\"_ _40\"> </span>-<span class=\"_ _1db\"> </span>0.1<span class=\"_ _44\"> </span>112.4<span class=\"_ _36a\"> </span></span>Lease liabilities<span class=\"_ _2e4\"> </span><span class=\"ff15\">15.0<span class=\"_ _cb\"> </span>-<span class=\"_ _1d6\"> </span>(1.3)<span class=\"_ _1d6\"> </span>-<span class=\"_ _6c\"> </span>13.7<span class=\"_ _36a\"> </span></span>Gross debt<span class=\"_ _183\"> </span><span class=\"ff15\">276.5<span class=\"_ _cb\"> </span>-<span class=\"_ _1d6\"> </span>(1.3)<span class=\"_ _b9\"> </span>0.3<span class=\"_ _44\"> </span>275.5<span class=\"_ _36a\"> </span></span>Cash<span class=\"_ _1ab\"> </span><span class=\"ff15\">(19.7)<span class=\"_ _84\"> </span>-<span class=\"_ _1d6\"> </span>(7.9)<span class=\"_ _84\"> </span>-<span class=\"_ _51\"> </span>(27.6)<span class=\"_ _36a\"> </span></span>Net debt<span class=\"_ _1b9\"> </span><span class=\"ff15\">256.8<span class=\"_ _cb\"> </span>-<span class=\"_ _1d6\"> </span>(9.2)<span class=\"_ _b9\"> </span>0.3<span class=\"_ _44\"> </span>247.9<span class=\"_ _36a\"> </span></span>30 September 2022<span class=\"_ _36a\"> </span>Corporat<span class=\"_ _0\"></span>e bonds<span class=\"_ _2e3\"> </span><span class=\"ff16\">149.0<span class=\"_ _cb\"> </span></span>-<span class=\"_ _40\"> </span>-<span class=\"_ _c8\"> </span><span class=\"ff16\">0.2<span class=\"_ _44\"> </span>149.2<span class=\"_ _36a\"> </span></span>Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _185\"> </span><span class=\"ff16\">237.1<span class=\"_ _cb\"> </span></span>-<span class=\"_ _58\"> </span>(125.0)<span class=\"_ _133\"> </span><span class=\"ff16\">0.2<span class=\"_ _44\"> </span>112.3<span class=\"_ _36a\"> </span></span>Lease liabilities<span class=\"_ _2e4\"> </span><span class=\"ff16\">16.3<span class=\"_ _cb\"> </span></span>-<span class=\"_ _1d6\"> </span>(1.3)<span class=\"_ _291\"> </span>-<span class=\"_ _6c\"> </span><span class=\"ff16\">15.0<span class=\"_ _36a\"> </span></span>Gross debt<span class=\"_ _183\"> </span><span class=\"ff16\">402.4<span class=\"_ _cb\"> </span></span>-<span class=\"_ _58\"> </span>(126.3)<span class=\"_ _133\"> </span><span class=\"ff16\">0.4<span class=\"_ _44\"> </span>276.5<span class=\"_ _36a\"> </span></span>Cash<span class=\"_ _1ab\"> </span>(19.6)<span class=\"_ _291\"> </span>-<span class=\"_ _1d6\"> </span>(0.1)<span class=\"_ _84\"> </span>-<span class=\"_ _b9\"> </span>(19.7)<span class=\"_ _36a\"> </span>Net debt<span class=\"_ _1b9\"> </span><span class=\"ff16\">382.8<span class=\"_ _cb\"> </span></span>-<span class=\"_ _58\"> </span>(126.4)<span class=\"_ _133\"> </span><span class=\"ff16\">0.4<span class=\"_ _44\"> </span>256.8<span class=\"_ _36a\"> </span></span>Non-cash changes shown abo<span class=\"_ _0\"></span>ve repr<span class=\"_ _1\"></span>esent EI<span class=\"_ _15\"></span>R adjustments relating t<span class=\"_ _0\"></span>o the spreading o<span class=\"_ _0\"></span>f initial costs of<span class=\"_ _0\"></span> the bonds",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCashFlowStatementExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-390": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs8f4\">53. <span class=\"_ _1c\"></span>Unconsolidated structured entities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs8f5\">F<span class=\"_ _1\"></span>ollowing the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s disposal of its r<span class=\"_ _0\"></span>esidual interest in <span class=\"_ _0\"></span>the Paragon Mortg<span class=\"_ _0\"></span>ages (No. 12) PL<span class=\"_ _1\"></span>C securitisation in June 2019, it<span class=\"_ _0\"></span> ceased to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs8f6\">consolidate the assets and liabilities o<span class=\"_ _0\"></span>f the entity<span class=\"_ _1\"></span>. The e<span class=\"_ _0\"></span>xternal securitisation borrowings r<span class=\"_ _1\"></span>emain in place with their <span class=\"_ _0\"></span>terms unchanged </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs8f7\">and the Gr<span class=\"_ _0\"></span>oup continues to act as administrat<span class=\"_ _0\"></span>or<span class=\"_ _0\"></span>, for<span class=\"_ _1\"></span> which it charges a f<span class=\"_ _0\"></span>ee. It has no other e<span class=\"_ _0\"></span>xposure <span class=\"_ _0\"></span>to the pr<span class=\"_ _0\"></span>ofitability of<span class=\"_ _0\"></span> the deal, no </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs8f8\">exposure <span class=\"_ _0\"></span>to credit<span class=\"_ _0\"></span> risk, other <span class=\"_ _0\"></span>than on the r<span class=\"_ _0\"></span>ecoverability<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> its quarterly <span class=\"_ _0\"></span>fee, and no obligation to mak<span class=\"_ _0\"></span>e further<span class=\"_ _0\"></span> contribution to <span class=\"_ _0\"></span>the entity<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs8f9\">F<span class=\"_ _1\"></span>ee income from servicing arrangements o<span class=\"_ _0\"></span>f \u00a31.3m is included in thir<span class=\"_ _0\"></span>d party servicing <span class=\"_ _0\"></span>fees (no<span class=\"_ _0\"></span>te 8) (2022: \u00a31.4m) and \u00a30<span class=\"_ _0\"></span>.5m is included </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs8fa\">in other deb<span class=\"_ _0\"></span>tors in respect o<span class=\"_ _0\"></span>f unpaid f<span class=\"_ _0\"></span>ees at the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end (2022: \u00a30.2m<span class=\"_ _0\"></span>). Outstanding collection monies due to the structur<span class=\"_ _0\"></span>ed entity o<span class=\"_ _0\"></span>f </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs8fb\">\u00a30.<span class=\"_ _1\"></span>1m are included in other<span class=\"_ _0\"></span> creditors at 30 Sep<span class=\"_ _0\"></span>tember 2023 (2022: \u00a30<span class=\"_ _0\"></span>.<span class=\"_ _0\"></span>1m).</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfUnconsolidatedStructuredEntitiesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-391": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws2f gs927\">55. <span class=\"_ _41\"></span>Related party<span class=\"_ _0\"></span> transactions<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9c gs928\">(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>The <span class=\"_ _15\"></span>Group<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs929\">During the <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>, certain directors of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup wer<span class=\"_ _0\"></span>e beneficially<span class=\"_ _0\"></span> interested in savings deposits made <span class=\"_ _0\"></span>with Parag<span class=\"_ _0\"></span>on Bank, on the same </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs92a\">terms as w<span class=\"_ _0\"></span>ere av<span class=\"_ _0\"></span>ailable to members o<span class=\"_ _0\"></span>f the public. Deposits o<span class=\"_ _0\"></span>f \u00a3720<span class=\"_ _0\"></span>,000 <span class=\"_ _0\"></span>were outstanding at <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear end (2022: \u00a3779<span class=\"_ _0\"></span>,000<span class=\"_ _0\"></span>), and the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs92b\">maximum amounts outstanding during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> totalled \u00a3771,<span class=\"_ _0\"></span>000 (2022: \u00a3793,000).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs92c\">The Parag<span class=\"_ _0\"></span>on Pension Plan (the \u2018Plan<span class=\"_ _0\"></span>\u2019) is a related party<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the Group. <span class=\"_ _1\"></span>T<span class=\"_ _1\"></span>ransactions with the Plan ar<span class=\"_ _0\"></span>e described in note 60<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs92d\">The Group had no o<span class=\"_ _0\"></span>ther <span class=\"_ _0\"></span>transactions with r<span class=\"_ _0\"></span>elated parties other <span class=\"_ _0\"></span>than the k<span class=\"_ _0\"></span>ey<span class=\"_ _0\"></span> management compensation disclosed in note 58.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9d gs92e\">(b)  <span class=\"_ _ce\"> </span>The  Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs92f\">During the <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>, the parent compan<span class=\"_ _0\"></span>y enter<span class=\"_ _0\"></span>ed into transactions <span class=\"_ _0\"></span>with its subsidiaries, which ar<span class=\"_ _0\"></span>e related parties. Manag<span class=\"_ _0\"></span>ement services </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs930\">wer<span class=\"_ _0\"></span>e provided <span class=\"_ _0\"></span>to the Compan<span class=\"_ _0\"></span>y by<span class=\"_ _0\"></span> one of<span class=\"_ _0\"></span> its subsidiaries and the Company<span class=\"_ _0\"></span> granted aw<span class=\"_ _0\"></span>ards to emplo<span class=\"_ _0\"></span>yees of<span class=\"_ _0\"></span> subsidiary undertakings </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs931\">under <span class=\"_ _0\"></span>the share based payment<span class=\"_ _0\"></span> arrangements described in note 59<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs932\">Details of<span class=\"_ _0\"></span> the Company\u2019<span class=\"_ _1\"></span>s investments in subsidiaries and <span class=\"_ _0\"></span>the income derived fr<span class=\"_ _0\"></span>om them ar<span class=\"_ _0\"></span>e shown in notes 32 and 72.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs933\">Outstanding current account balances <span class=\"_ _0\"></span>with subsidiaries are sho<span class=\"_ _0\"></span>wn in notes 27 and 40.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs934\">During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> the Company<span class=\"_ _0\"></span> incurred inter<span class=\"_ _0\"></span>est costs of<span class=\"_ _0\"></span> \u00a31.5m in respect of<span class=\"_ _0\"></span> borro<span class=\"_ _0\"></span>wings from its subsidiaries (2022: \u00a31.<span class=\"_ _0\"></span>0m).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs34c\">The Company<span class=\"_ _0\"></span> leased an office building fr<span class=\"_ _0\"></span>om a subsidiary entity<span class=\"_ _0\"></span> (note 54(b<span class=\"_ _0\"></span>)). Finance charges r<span class=\"_ _0\"></span>ecognised in respect o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>this lease wer<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs34d\">\u00a30.4m (2022: \u00a30<span class=\"_ _0\"></span>.4m).</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTransactionsBetweenRelatedPartiesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-392": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs936\">56. <span class=\"_ _1c\"></span>Country<span class=\"_ _0\"></span>-by<span class=\"_ _0\"></span>-country r<span class=\"_ _0\"></span>eporting<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs937\">The Capital Requir<span class=\"_ _0\"></span>ements (Country-b<span class=\"_ _0\"></span>y-Country<span class=\"_ _0\"></span> Reporting) Regulations 2013 came into eff<span class=\"_ _0\"></span>ect on 1 <span class=\"_ _0\"></span>January 2014 and place certain </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs938\">reporting obligations on <span class=\"_ _0\"></span>financial institutions that ar<span class=\"_ _0\"></span>e within <span class=\"_ _0\"></span>the scope of CRD IV<span class=\"_ _2\"></span>. The objective o<span class=\"_ _0\"></span>f the country<span class=\"_ _0\"></span>-by-country<span class=\"_ _0\"></span> reporting </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs939\">requir<span class=\"_ _0\"></span>ements is to pr<span class=\"_ _0\"></span>ovide incr<span class=\"_ _0\"></span>eased transpar<span class=\"_ _0\"></span>ency r<span class=\"_ _0\"></span>egar<span class=\"_ _0\"></span>ding the source o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>financial institution\u2019<span class=\"_ _1\"></span>s income and the locations of<span class=\"_ _0\"></span>  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs93a\">its operations. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs93b\">Paragon Banking Gr<span class=\"_ _0\"></span>oup PL<span class=\"_ _0\"></span>C is a UK r<span class=\"_ _0\"></span>egistered entity<span class=\"_ _1\"></span>. Details of its subsidiaries ar<span class=\"_ _0\"></span>e given in note 72 and <span class=\"_ _0\"></span>the activities of <span class=\"_ _0\"></span>the Group ar<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs93c\">described in section A2. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs93d\">The activities of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup, described as requir<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the Regulations <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear ended 30 September<span class=\"_ _1\"></span> 2023 were:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs93e\">United Kingdom<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs93f\">\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs940\">Y<span class=\"_ _1\"></span>ear ended 30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs941\">T<span class=\"_ _2\"></span>otal operating income<span class=\"_ _2f2\"> </span><span class=\"ff15\">466.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs942\">Profit bef<span class=\"_ _0\"></span>ore ta<span class=\"_ _0\"></span>x<span class=\"_ _15e\"> </span><span class=\"ff15\">199.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs943\">Corporation t<span class=\"_ _0\"></span>ax paid<span class=\"_ _2f3\"> </span><span class=\"ff15\">75.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs944\">Public subsidies received<span class=\"_ _2a6\"> </span><span class=\"ff15\">-<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs945\">Aver<span class=\"_ _0\"></span>age number of full time equivalen<span class=\"_ _0\"></span>t employees<span class=\"_ _221\"> </span><span class=\"ff15\">1,435<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs946\">United Kingdom<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs947\">\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs948\">Y<span class=\"_ _1\"></span>ear ended 30 September 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs949\">T<span class=\"_ _2\"></span>otal operating income<span class=\"_ _2f2\"> </span><span class=\"ff16\">393.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs94a\">Profit bef<span class=\"_ _0\"></span>ore ta<span class=\"_ _0\"></span>x<span class=\"_ _15e\"> </span><span class=\"ff16\">417.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs94b\">Corporation t<span class=\"_ _0\"></span>ax paid<span class=\"_ _2f3\"> </span><span class=\"ff16\">56.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs94c\">Public subsidies received<span class=\"_ _2a6\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs94d\">Aver<span class=\"_ _0\"></span>age number of full time equivalen<span class=\"_ _0\"></span>t employees<span class=\"_ _221\"> </span><span class=\"ff16\">1,397<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs94e\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s participation in Bank of<span class=\"_ _0\"></span> England funding schemes is set out in not<span class=\"_ _0\"></span>e 38.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGeographicalAreasExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-393": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 wsa2 gs950\">57<span class=\"_ _2\"></span>. Employ<span class=\"_ _0\"></span>ees<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs951\">The av<span class=\"_ _0\"></span>erage number<span class=\"_ _0\"></span> of persons (including dir<span class=\"_ _0\"></span>ectors) emplo<span class=\"_ _0\"></span>yed b<span class=\"_ _0\"></span>y the Gr<span class=\"_ _0\"></span>oup during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>as 1,527 (2022: 1,498). The number<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs952\">employees at<span class=\"_ _0\"></span> the end of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year <span class=\"_ _0\"></span>was 1,522 (2022: 1,503).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs953\">Costs incurred during <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear in r<span class=\"_ _0\"></span>espect of <span class=\"_ _0\"></span>these employees <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs954\">2023<span class=\"_ _a0\"> </span>2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _a0\"> </span>2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs955\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs956\">Share based remuner<span class=\"_ _0\"></span>ation<span class=\"_ _2df\"> </span><span class=\"ff15\">9.6<span class=\"_ _260\"> </span><span class=\"ff16\">9.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs957\">Other wages and salaries<span class=\"_ _125\"> </span><span class=\"ff15\">84.6<span class=\"_ _153\"> </span><span class=\"ff16\">81.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs958\">T<span class=\"_ _2\"></span>otal wages and salaries<span class=\"_ _241\"> </span><span class=\"ff15\">94.2<span class=\"_ _d2\"> </span><span class=\"ff16\">91.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs959\">National Insurance on shar<span class=\"_ _0\"></span>e based remuner<span class=\"_ _0\"></span>ation<span class=\"_ _2cd\"> </span><span class=\"ff15\">1.9<span class=\"_ _103\"> </span><span class=\"ff16\">0.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs95a\">Other social security costs<span class=\"_ _2f4\"> </span><span class=\"ff15\">10.2<span class=\"_ _103\"> </span><span class=\"ff16\">9.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs95b\">T<span class=\"_ _2\"></span>otal social security costs<span class=\"_ _24e\"> </span><span class=\"ff15\">12.1<span class=\"_ _153\"> </span><span class=\"ff16\">10.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs95c\">Defined benefit pension cos<span class=\"_ _0\"></span>t<span class=\"_ _ef\"> </span><span class=\"ff15\">0.5<span class=\"_ _260\"> </span><span class=\"ff16\">0.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs95d\">Other pension costs<span class=\"_ _280\"> </span><span class=\"ff15\">4.7<span class=\"_ _103\"> </span><span class=\"ff16\">4.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs95e\">T<span class=\"_ _2\"></span>otal pension costs<span class=\"_ _2bf\"> </span><span class=\"ff15\">5.2<span class=\"_ _103\"> </span><span class=\"ff16\">5.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs95f\">T<span class=\"_ _2\"></span>otal employment costs<span class=\"_ _2f5\"> </span><span class=\"ff15\">111.5<span class=\"_ _f1\"> </span><span class=\"ff16\">106.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs960\">Of which<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs961\">Included in operating e<span class=\"_ _0\"></span>xpenses (note 9)<span class=\"_ _b4\"> </span><span class=\"ff15\">108.3<span class=\"_ _f1\"> </span><span class=\"ff16\">103.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs962\">Included in maintenance cos<span class=\"_ _0\"></span>ts (note 6)<span class=\"_ _2f6\"> </span><span class=\"ff15\">3.2<span class=\"_ _103\"> </span><span class=\"ff16\">2.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs963\">111.5<span class=\"_ _f1\"> </span><span class=\"ff16\">106.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs964\">Details of<span class=\"_ _0\"></span> the pension schemes operated b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group are giv<span class=\"_ _0\"></span>en in note 60<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs965\">The Company<span class=\"_ _0\"></span> has no employees. De<span class=\"_ _0\"></span>tails of <span class=\"_ _0\"></span>the directors<span class=\"_ _0\"></span>\u2019 remuneration ar<span class=\"_ _0\"></span>e given in not<span class=\"_ _0\"></span>e 58. </div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInformationAboutEmployeesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-394": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs967\">58. <span class=\"_ _96\"></span>Ke<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span> management remuner<span class=\"_ _0\"></span>ation<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs968\">Ke<span class=\"_ _0\"></span>y manag<span class=\"_ _0\"></span>ement<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs969\">The ke<span class=\"_ _0\"></span>y manag<span class=\"_ _0\"></span>ement personnel of<span class=\"_ _0\"></span> the Group and <span class=\"_ _0\"></span>the Company<span class=\"_ _1\"></span>, as defined by IAS 2<span class=\"_ _0\"></span>4 \u2013 Related Party<span class=\"_ _0\"></span> T<span class=\"_ _2f\"></span>ransactions\u2019<span class=\"_ _2\"></span>, are consider<span class=\"_ _0\"></span>ed by </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs96a\">the Group <span class=\"_ _0\"></span>to be the members of<span class=\"_ _1\"></span> its Executive Committees and the members o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Board of<span class=\"_ _0\"></span> Directors o<span class=\"_ _0\"></span>f the Compan<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>. T<span class=\"_ _0\"></span>he details of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs96b\">ke<span class=\"_ _0\"></span>y management<span class=\"_ _0\"></span> remuneration r<span class=\"_ _0\"></span>equired b<span class=\"_ _0\"></span>y IAS 24 ar<span class=\"_ _0\"></span>e set out belo<span class=\"_ _0\"></span>w. F<span class=\"_ _1\"></span>or persons joining or<span class=\"_ _1\"></span> leaving the executiv<span class=\"_ _0\"></span>e committees in the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs96c\">year<span class=\"_ _1\"></span>, all remuneration <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the twelv<span class=\"_ _0\"></span>e months is shown.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs96d\">2023<span class=\"_ _a0\"> </span>2023<span class=\"_ _7d\"> </span><span class=\"ff16\">2022<span class=\"_ _5a\"> </span>2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs96e\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _2f7\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _8c\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs96f\">Salaries and fees<span class=\"_ _2f8\"> </span><span class=\"ff15\">5.3<span class=\"_ _25e\"> </span><span class=\"ff16\">4.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs970\">Cash amount of bonus <span class=\"_ _2f9\"> </span><span class=\"ff15\">3.3<span class=\"_ _25e\"> </span><span class=\"ff16\">3.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs971\">Social security costs<span class=\"_ _2ab\"> </span><span class=\"ff15\">1.2<span class=\"_ _a6\"> </span><span class=\"ff16\">1.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs972\">Short-t<span class=\"_ _0\"></span>erm employee benefits<span class=\"_ _265\"> </span><span class=\"ff15\">9.8<span class=\"_ _273\"> </span><span class=\"ff16\">8.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs973\">Post<span class=\"_ _1\"></span>-employment benefits<span class=\"_ _2fa\"> </span><span class=\"ff15\">0.5<span class=\"_ _273\"> </span><span class=\"ff16\">0.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs974\">IFRS 2 cos<span class=\"_ _0\"></span>t in respect of k<span class=\"_ _0\"></span>ey management<span class=\"_ _26b\"> </span><span class=\"ff15\">4.3<span class=\"_ _a6\"> </span><span class=\"ff16\">4.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs975\">National Insurance ther<span class=\"_ _0\"></span>eon<span class=\"_ _138\"> </span><span class=\"ff15\">1.0<span class=\"_ _a6\"> </span><span class=\"ff16\">1.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs976\">Share based paymen<span class=\"_ _0\"></span>t<span class=\"_ _2fb\"> </span><span class=\"ff15\">5.3<span class=\"_ _273\"> </span><span class=\"ff16\">5.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs977\">15.6<span class=\"_ _89\"> </span><span class=\"ff16\">14.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs978\">Post-emplo<span class=\"_ _0\"></span>yment benefits shown abo<span class=\"_ _0\"></span>ve include pension allow<span class=\"_ _0\"></span>ances, contributions to defined contribution pension schemes or<span class=\"_ _0\"></span> costs </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs979\">of accrual under<span class=\"_ _1\"></span> the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s defined benefit pension plan. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs97a\">Social security costs paid in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> key<span class=\"_ _1\"></span> management are requir<span class=\"_ _0\"></span>ed to be included in <span class=\"_ _0\"></span>this note by<span class=\"_ _0\"></span> IAS 24<span class=\"_ _0\"></span>, but do not fall <span class=\"_ _0\"></span>within the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs97b\">scope of <span class=\"_ _0\"></span>the disclosures in <span class=\"_ _0\"></span>the Annual R<span class=\"_ _0\"></span>eport on Remuneration. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs97c\">Costs in respect o<span class=\"_ _0\"></span>f shar<span class=\"_ _0\"></span>e awards sho<span class=\"_ _0\"></span>wn in the <span class=\"_ _0\"></span>Annual Report on R<span class=\"_ _0\"></span>emuneration are det<span class=\"_ _0\"></span>ermined on a different basis <span class=\"_ _0\"></span>to the IFRS 2 </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs97d\">charge shown abo<span class=\"_ _0\"></span>ve.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs97e\">Directors<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs97f\">The information in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> the remuner<span class=\"_ _0\"></span>ation of <span class=\"_ _0\"></span>the directors o<span class=\"_ _0\"></span>f the Compan<span class=\"_ _0\"></span>y r<span class=\"_ _0\"></span>equired <span class=\"_ _0\"></span>to be disclosed in the notes <span class=\"_ _0\"></span>to the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs980\">Company\u2019<span class=\"_ _1\"></span>s accounts by Schedule 5 <span class=\"_ _0\"></span>to the Larg<span class=\"_ _0\"></span>e and Medium-sized Companies and Groups (A<span class=\"_ _0\"></span>ccounts and Reports) R<span class=\"_ _0\"></span>egulations </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs981\">2008, as applicable to quot<span class=\"_ _0\"></span>ed companies, is set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs982\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs983\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs984\">Aggrega<span class=\"_ _0\"></span>te amount of remuner<span class=\"_ _0\"></span>ation <span class=\"_ _231\"> </span><span class=\"ff15\">3.7<span class=\"_ _9e\"> </span><span class=\"ff16\">3.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs985\">Pension allow<span class=\"_ _0\"></span>ances <span class=\"_ _216\"> </span><span class=\"ff15\">0.1<span class=\"_ _9e\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs986\">Gains on ex<span class=\"_ _0\"></span>ercise of share options<span class=\"_ _228\"> </span><span class=\"ff15\">0.7<span class=\"_ _9e\"> </span><span class=\"ff16\">5.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs987\">In the <span class=\"_ _0\"></span>table above, r<span class=\"_ _0\"></span>emuneration includes the cash amount o<span class=\"_ _0\"></span>f bonuses and <span class=\"_ _0\"></span>the value o<span class=\"_ _0\"></span>f benefits in kind. It ex<span class=\"_ _0\"></span>cludes any<span class=\"_ _0\"></span> amounts </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs988\">receiv<span class=\"_ _0\"></span>able under shar<span class=\"_ _0\"></span>e-based payment arrang<span class=\"_ _0\"></span>ements. Wher<span class=\"_ _0\"></span>e a monetary amount of<span class=\"_ _1\"></span> salary is paid in shares based on the mark<span class=\"_ _0\"></span>et price </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs989\">at the pa<span class=\"_ _0\"></span>yment date, this is included.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs98a\">No director<span class=\"_ _0\"></span> accrued benefits under<span class=\"_ _0\"></span> either a defined benefit or<span class=\"_ _1\"></span> defined contribution pension scheme in the y<span class=\"_ _0\"></span>ear<span class=\"_ _0\"></span>, nor did an<span class=\"_ _0\"></span>y dir<span class=\"_ _0\"></span>ector </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs98b\">receiv<span class=\"_ _0\"></span>e benefits under long<span class=\"_ _0\"></span>-term incentive schemes, other<span class=\"_ _1\"></span> than in the form o<span class=\"_ _0\"></span>f shar<span class=\"_ _0\"></span>e awar<span class=\"_ _0\"></span>ds.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs98c\">F<span class=\"_ _0\"></span>urther inf<span class=\"_ _0\"></span>ormation about the remuner<span class=\"_ _0\"></span>ation of individual dir<span class=\"_ _0\"></span>ectors is pr<span class=\"_ _0\"></span>ovided in the <span class=\"_ _1\"></span>Annual Report on Remuneration in section B7<span class=\"_ _2\"></span>.2.2.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInformationAboutKeyManagementPersonnelExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-395": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs98e\">59<span class=\"_ _0\"></span>. <span class=\"_ _1c\"></span>Share based remuneration<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs98f\">During the <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>, the Group had <span class=\"_ _0\"></span>various shar<span class=\"_ _0\"></span>e based payment arrangements <span class=\"_ _0\"></span>with employ<span class=\"_ _0\"></span>ees. The<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e accounted f<span class=\"_ _0\"></span>or by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs990\">the Company<span class=\"_ _0\"></span> as shown below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs991\">The effect o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the share based payment arr<span class=\"_ _0\"></span>angements on the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s profit is shown in note 57<span class=\"_ _2\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs992\">F<span class=\"_ _0\"></span>urther details o<span class=\"_ _0\"></span>f shar<span class=\"_ _0\"></span>e based payment arrangements ar<span class=\"_ _0\"></span>e given in <span class=\"_ _0\"></span>the Annual R<span class=\"_ _0\"></span>eport on Remuneration in section B7<span class=\"_ _2\"></span>.2.2.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs993\">A summary<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the number<span class=\"_ _0\"></span> of shar<span class=\"_ _0\"></span>e awar<span class=\"_ _0\"></span>ds outstanding under each scheme at 30 Sep<span class=\"_ _0\"></span>tember 2023 and at 30 Sept<span class=\"_ _0\"></span>ember 2022 is set </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs994\">out below<span class=\"_ _1\"></span>. </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs995\">Number<span class=\"_ _44\"> </span><span class=\"ff17\">Number<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs996\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs997\">(a) <span class=\"_ _5\"> </span>Sharesa<span class=\"_ _0\"></span>ve Plan<span class=\"_ _2fc\"> </span><span class=\"ff15\">3,077,077<span class=\"_ _8e\"> </span><span class=\"ff16\">3,613,777<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs998\">(b) <span class=\"_ _d\"> </span>Performance Shar<span class=\"_ _0\"></span>e Plan<span class=\"_ _229\"> </span><span class=\"ff15\">5,365,646<span class=\"_ _8e\"> </span><span class=\"ff16\">4,834,871<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs999\">(c) <span class=\"_ _21\"> </span>Company Share Option Plan<span class=\"_ _1ed\"> </span><span class=\"ff15\">56,591<span class=\"_ _d8\"> </span><span class=\"ff16\">87,716<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs99a\">(d) <span class=\"_ _d\"> </span>Deferred Bonus Plan<span class=\"_ _2d0\"> </span><span class=\"ff15\">1,123,936<span class=\"_ _8e\"> </span><span class=\"ff16\">1,155,638<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs99b\">(e) <span class=\"_ _b3\"> </span>Restricted St<span class=\"_ _0\"></span>ock Units<span class=\"_ _23b\"> </span><span class=\"ff15\">412,676<span class=\"_ _b5\"> </span><span class=\"ff16\">616,709<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs99c\">10,035,926<span class=\"_ _1e\"> </span><span class=\"ff16\">10,308,711<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs99d\">F<span class=\"_ _1\"></span>ollowing the y<span class=\"_ _0\"></span>ear end, <span class=\"_ _0\"></span>the Remuneration Committee agr<span class=\"_ _0\"></span>eed the amounts of<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>ariable remuneration in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year <span class=\"_ _0\"></span>to be </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs99e\">satisfied in the f<span class=\"_ _0\"></span>orm of shar<span class=\"_ _0\"></span>e-based awar<span class=\"_ _0\"></span>ds. T<span class=\"_ _0\"></span>hese awar<span class=\"_ _0\"></span>ds will be granted, <span class=\"_ _0\"></span>following <span class=\"_ _0\"></span>the approv<span class=\"_ _0\"></span>al of <span class=\"_ _0\"></span>these accounts, based on the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs99f\">amounts appro<span class=\"_ _0\"></span>ved and marke<span class=\"_ _0\"></span>t pricing data at the date of<span class=\"_ _1\"></span> grant.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9c gs9a0\">(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>Sharesav<span class=\"_ _0\"></span>e <span class=\"_ _96\"></span>plan<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9a1\">The Group oper<span class=\"_ _0\"></span>ates an All Emplo<span class=\"_ _0\"></span>yee Shar<span class=\"_ _0\"></span>e Option (\u2018Sharesav<span class=\"_ _0\"></span>e\u2019) plan. Gr<span class=\"_ _0\"></span>ants under this scheme <span class=\"_ _1\"></span>vest, in the normal course, after<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9a2\">completion of<span class=\"_ _0\"></span> the appropriat<span class=\"_ _0\"></span>e service period and subject to a savings r<span class=\"_ _0\"></span>equirement.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9a3\">A r<span class=\"_ _0\"></span>econciliation of<span class=\"_ _0\"></span> movements in <span class=\"_ _0\"></span>the number and <span class=\"_ _0\"></span>weighted av<span class=\"_ _0\"></span>erage ex<span class=\"_ _0\"></span>ercise price of<span class=\"_ _0\"></span> Sharesa<span class=\"_ _0\"></span>ve options ov<span class=\"_ _0\"></span>er \u00a31 or<span class=\"_ _0\"></span>dinary shar<span class=\"_ _0\"></span>es </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9a4\">during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 and <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear ended 30 September<span class=\"_ _1\"></span> 2022 is shown below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9a5\">2023<span class=\"_ _a0\"> </span>2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _a0\"> </span>2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9a6\">Number <span class=\"_ _11\"> </span><span class=\"ws30\">Weight<span class=\"_ _0\"></span>ed aver<span class=\"_ _0\"></span>age </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9a7\">ex<span class=\"_ _0\"></span>ercise price<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs9a8\">Number<span class=\"ff16\"> <span class=\"_ _18e\"> </span></span>W<span class=\"_ _0\"></span>eighted av<span class=\"_ _0\"></span>erage </div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs9a9\">ex<span class=\"_ _0\"></span>ercise price<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9aa\">p<span class=\"_ _2fd\"> </span><span class=\"ff16\">p<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs9ab\">Options outstanding<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9ac\">At 1 Oct<span class=\"_ _0\"></span>ober 2022<span class=\"_ _185\"> </span><span class=\"ff15\">3,613,777<span class=\"_ _12b\"> </span>318.46<span class=\"_ _28\"> </span><span class=\"ff16\">3,561,675<span class=\"_ _133\"> </span>306.89<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9ad\">Grant<span class=\"_ _0\"></span>ed in the year<span class=\"_ _125\"> </span><span class=\"ff15\">1,235,757<span class=\"_ _133\"> </span>400.40<span class=\"_ _2fe\"> </span><span class=\"ff16\">737,978<span class=\"_ _12b\"> </span>391.20<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9ae\">Exer<span class=\"_ _0\"></span>cised or surrendered in the y<span class=\"_ _0\"></span>ear<span class=\"_ _144\"> </span><span class=\"ff15\">(1,579,263)<span class=\"_ _132\"> </span>285.67<span class=\"_ _73\"> </span></span>(386,039)<span class=\"_ _132\"> </span><span class=\"ff16\">339.22<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9af\">Lapsed during the year<span class=\"_ _195\"> </span><span class=\"ff15\">(193,194)<span class=\"_ _71\"> </span>357.44<span class=\"_ _140\"> </span></span>(299,837)<span class=\"_ _132\"> </span><span class=\"ff16\">333.10<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9b0\">At 30 Sept<span class=\"_ _0\"></span>ember 2023<span class=\"_ _2ff\"> </span><span class=\"ff15\">3,077,077<span class=\"_ _12b\"> </span>365.76<span class=\"_ _c5\"> </span><span class=\"ff16\">3,613,777<span class=\"_ _12b\"> </span>318.46<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9b1\">Options ex<span class=\"_ _0\"></span>ercisable<span class=\"_ _28c\"> </span><span class=\"ff15\">439,546<span class=\"_ _12b\"> </span>279.43<span class=\"_ _2fe\"> </span><span class=\"ff16\">109,654<span class=\"_ _12b\"> </span>359.92<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9b2\">The w<span class=\"_ _0\"></span>eighted aver<span class=\"_ _0\"></span>age remaining contractual lif<span class=\"_ _0\"></span>e of op<span class=\"_ _0\"></span>tions outstanding at 30 September<span class=\"_ _0\"></span> 2023 was 32.8 months (2022: 27<span class=\"_ _2\"></span>.0 months<span class=\"_ _0\"></span>). </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9b3\">The w<span class=\"_ _0\"></span>eighted aver<span class=\"_ _0\"></span>age market<span class=\"_ _0\"></span> price at exer<span class=\"_ _0\"></span>cise for<span class=\"_ _0\"></span> share options e<span class=\"_ _0\"></span>xer<span class=\"_ _0\"></span>cised in the y<span class=\"_ _0\"></span>ear <span class=\"_ _0\"></span>was 515.86p (2022: 507<span class=\"_ _2\"></span>.07p<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9b5\">Options are outstanding under<span class=\"_ _1\"></span> the Sharesav<span class=\"_ _0\"></span>e plans to pur<span class=\"_ _0\"></span>chase ordinary shar<span class=\"_ _0\"></span>es as f<span class=\"_ _0\"></span>ollows:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9b6\">Gran<span class=\"_ _0\"></span>t date<span class=\"_ _2df\"> </span>Period e<span class=\"_ _0\"></span>xercisable<span class=\"_ _14c\"> </span>Exercise price<span class=\"_ _50\"> </span>Number<span class=\"_ _44\"> </span><span class=\"ff17\">Number<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9b7\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9b8\">28/07/2017<span class=\"_ _2e1\"> </span>01/09/2022 to 01/03/2023<span class=\"_ _b5\"> </span><span class=\"ff16\">341.76p<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _150\"> </span></span>1,403<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9b9\">31/07/2018<span class=\"_ _2e1\"> </span>01/09/2023 to 01/03/2024<span class=\"_ _b5\"> </span><span class=\"ff16\">408.80p<span class=\"_ _d5\"> </span><span class=\"ff15\">2,933<span class=\"_ _d8\"> </span></span>20,391<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9ba\">30/07/2019<span class=\"_ _2e1\"> </span>01/09/2022 to 01/03/2023<span class=\"_ _b5\"> </span><span class=\"ff16\">360.16p<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _b5\"> </span></span>108,251<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9bb\">30/07/2019<span class=\"_ _2e1\"> </span>01/09/2024 to 01/03/2025<span class=\"_ _b5\"> </span><span class=\"ff16\">360.16p<span class=\"_ _d5\"> </span><span class=\"ff15\">4,577<span class=\"_ _d5\"> </span></span>4,577<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9bc\">29/07/2020<span class=\"_ _2e1\"> </span>01/09/2023 to 01/03/2024<span class=\"_ _b5\"> </span><span class=\"ff16\">278.56p<span class=\"_ _44\"> </span><span class=\"ff15\">436,613<span class=\"_ _3f\"> </span></span>1,925,599<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9bd\">29/07/2020<span class=\"_ _2e1\"> </span>01/09/2025 to 01/03/2026<span class=\"_ _b5\"> </span><span class=\"ff16\">278.56p<span class=\"_ _44\"> </span><span class=\"ff15\">449,263<span class=\"_ _300\"> </span></span>478,876<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9be\">28/07/2021<span class=\"_ _2e1\"> </span>01/09/2024 to 01/03/2025<span class=\"_ _b5\"> </span><span class=\"ff16\">424.00p<span class=\"_ _44\"> </span><span class=\"ff15\">257,591<span class=\"_ _300\"> </span></span>278,279<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9bf\">28/07/2021<span class=\"_ _2e1\"> </span>01/09/2026 to 01/03/2027<span class=\"_ _b5\"> </span><span class=\"ff16\">424.00p<span class=\"_ _132\"> </span><span class=\"ff15\">54,118<span class=\"_ _97\"> </span></span>63,315<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9c0\">27/07/2022<span class=\"_ _2e1\"> </span>01/09/2025 to 01/03/2026<span class=\"_ _b5\"> </span><span class=\"ff16\">391.20p<span class=\"_ _44\"> </span><span class=\"ff15\">528,429<span class=\"_ _300\"> </span></span>622,064<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9c1\">27/07/2022<span class=\"_ _2e1\"> </span>01/09/2027 to 01/03/2028<span class=\"_ _b5\"> </span><span class=\"ff16\">391.20p<span class=\"_ _44\"> </span><span class=\"ff15\">108,722<span class=\"_ _300\"> </span></span>111,022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9c2\">15/09/2023<span class=\"_ _2e1\"> </span>01/10/2026 to 01/04/2027<span class=\"_ _b5\"> </span><span class=\"ff16\">400.40p<span class=\"_ _88\"> </span><span class=\"ff15\">1,022,746<span class=\"_ _10b\"> </span></span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9c3\">15/09/2023<span class=\"_ _2e1\"> </span>01/10/2028 to 01/04/2029<span class=\"_ _b5\"> </span><span class=\"ff16\">400.40p<span class=\"_ _44\"> </span><span class=\"ff15\">212,085<span class=\"_ _10b\"> </span></span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9c4\">3,077,077<span class=\"_ _8e\"> </span><span class=\"ff16\">3,613,777<span class=\"_ _36a\"> </span></span></div><div class=\"t m6 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9c5\">An option holder has <span class=\"_ _0\"></span>the legal right <span class=\"_ _0\"></span>to a payment holiday<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> up to tw<span class=\"_ _0\"></span>elve months without<span class=\"_ _0\"></span> forfeiting <span class=\"_ _0\"></span>their rights. In such cases <span class=\"_ _0\"></span>the exer<span class=\"_ _0\"></span>cise </div><div class=\"t m6 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9c6\">period would be de<span class=\"_ _0\"></span>ferred <span class=\"_ _0\"></span>for an equiv<span class=\"_ _0\"></span>alent period of<span class=\"_ _0\"></span> time and ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e options might be ex<span class=\"_ _0\"></span>ercised later<span class=\"_ _0\"></span> than <span class=\"_ _0\"></span>the date shown abov<span class=\"_ _0\"></span>e. </div><div class=\"t m6 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9c7\">In the e<span class=\"_ _0\"></span>vent of<span class=\"_ _0\"></span> the death or<span class=\"_ _0\"></span> redundancy<span class=\"_ _1\"></span> of the emplo<span class=\"_ _0\"></span>yee, options may<span class=\"_ _0\"></span> be exer<span class=\"_ _0\"></span>cised early and <span class=\"_ _0\"></span>the exer<span class=\"_ _0\"></span>cise period may<span class=\"_ _0\"></span> also start or </div><div class=\"t m6 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9c8\">end later <span class=\"_ _0\"></span>than stated abov<span class=\"_ _0\"></span>e (options ma<span class=\"_ _0\"></span>y be ex<span class=\"_ _0\"></span>ercised up <span class=\"_ _0\"></span>to twelv<span class=\"_ _0\"></span>e months after <span class=\"_ _0\"></span>the holder\u2019<span class=\"_ _1\"></span>s decease). <span class=\"_ _0\"></span>Awar<span class=\"_ _0\"></span>ds lapse on cessation of </div><div class=\"t m6 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9c9\">employment, other<span class=\"_ _0\"></span> than in \u2019<span class=\"_ _0\"></span>good leav<span class=\"_ _0\"></span>er\u2019 circumstances.<span class=\"_ _36a\"> </span></div><div class=\"t m6 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9ca\">The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> options granted is determined using a <span class=\"_ _0\"></span>trinomial model. Details of <span class=\"_ _0\"></span>the awar<span class=\"_ _0\"></span>ds made in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 </div><div class=\"t m6 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9cb\">and the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2022, ar<span class=\"_ _0\"></span>e shown below<span class=\"_ _1\"></span>. </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9cc\">Gran<span class=\"_ _0\"></span>t date<span class=\"_ _126\"> </span>15/09/23<span class=\"_ _55\"> </span>15/09/23<span class=\"_ _7f\"> </span><span class=\"ff17\">27/07/22<span class=\"_ _140\"> </span>27/07/22<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9cd\">Number of awar<span class=\"_ _0\"></span>ds granted<span class=\"_ _2b1\"> </span><span class=\"ff15\">1,203,672<span class=\"_ _b5\"> </span>212,085<span class=\"_ _b5\"> </span><span class=\"ff16\">623,122<span class=\"_ _300\"> </span>114,856<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9ce\">Mark<span class=\"_ _0\"></span>et price at date of gr<span class=\"_ _0\"></span>ant<span class=\"_ _105\"> </span><span class=\"ff15\">506.5p<span class=\"_ _71\"> </span>506.5p<span class=\"_ _d8\"> </span><span class=\"ff16\">527.0p<span class=\"_ _132\"> </span>527.0p<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9cf\">Contractual lif<span class=\"_ _1\"></span>e (years)<span class=\"_ _2ab\"> </span><span class=\"ff15\">3.5<span class=\"_ _9e\"> </span>5.5<span class=\"_ _d1\"> </span><span class=\"ff16\">3.5<span class=\"_ _9e\"> </span>5.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9d0\">Fair v<span class=\"_ _0\"></span>alue per share at dat<span class=\"_ _0\"></span>e of grant (\u00a3)<span class=\"_ _16a\"> </span><span class=\"ff15\">1.10<span class=\"_ _3a\"> </span>1.09<span class=\"_ _3a\"> </span><span class=\"ff16\">1.34<span class=\"_ _f7\"> </span>1.06<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs9d1\">Inputs to valua<span class=\"_ _0\"></span>tion model<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9d2\">Expected volatility<span class=\"_ _18c\"> </span><span class=\"ff15\">31.02%<span class=\"_ _86\"> </span>35.67%<span class=\"_ _86\"> </span><span class=\"ff16\">39.36%<span class=\"_ _6d\"> </span>33.75%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9d3\">Expected lif<span class=\"_ _0\"></span>e at grant da<span class=\"_ _0\"></span>te (year<span class=\"_ _0\"></span>s)<span class=\"_ _301\"> </span><span class=\"ff15\">3.43<span class=\"_ _3a\"> </span>5.42<span class=\"_ _3a\"> </span><span class=\"ff16\">3.42<span class=\"_ _3a\"> </span>5.43<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9d4\">Risk<span class=\"_ _0\"></span>-free int<span class=\"_ _0\"></span>erest r<span class=\"_ _0\"></span>ate<span class=\"_ _167\"> </span><span class=\"ff15\">4.64%<span class=\"_ _9f\"> </span>4.39%<span class=\"_ _9f\"> </span><span class=\"ff16\">1.69%<span class=\"_ _19c\"> </span>1.74%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9d5\">Expected annual dividend yield<span class=\"_ _302\"> </span><span class=\"ff15\">5.96%<span class=\"_ _9f\"> </span>5.96%<span class=\"_ _9f\"> </span><span class=\"ff16\">5.37%<span class=\"_ _9f\"> </span>5.37%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs9d6\">Expected annual departures<span class=\"_ _303\"> </span><span class=\"ff15\">5.00%<span class=\"_ _9f\"> </span>5.00%<span class=\"_ _9f\"> </span><span class=\"ff16\">5.00%<span class=\"_ _9f\"> </span>5.00%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9d7\">The expected <span class=\"_ _0\"></span>volatility<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the share price used in determining <span class=\"_ _0\"></span>the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue for<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>three-y<span class=\"_ _0\"></span>ear schemes is based on <span class=\"_ _0\"></span>the annualised </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9d8\">standard de<span class=\"_ _0\"></span>viation of daily<span class=\"_ _0\"></span> changes in price ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the thr<span class=\"_ _0\"></span>ee year<span class=\"_ _0\"></span>s preceding the gr<span class=\"_ _0\"></span>ant date. T<span class=\"_ _0\"></span>he five-<span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> schemes use share price data </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws17 gs9d9\">for<span class=\"_ _0\"></span> the <span class=\"_ _15\"></span>preceding five y<span class=\"_ _0\"></span>ears.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs9db\">(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Par<span class=\"_ _0\"></span>agon Perf<span class=\"_ _0\"></span>ormance Share Plan (\u2018PSP\u2019)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9dc\">PSP aw<span class=\"_ _0\"></span>ards ar<span class=\"_ _0\"></span>e made annually <span class=\"_ _0\"></span>to executiv<span class=\"_ _0\"></span>e directors and o<span class=\"_ _0\"></span>ther senior<span class=\"_ _0\"></span> employees as part<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>their <span class=\"_ _0\"></span>variable r<span class=\"_ _0\"></span>emuneration. T<span class=\"_ _0\"></span>he grantees, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9dd\">and the <span class=\"_ _0\"></span>values of<span class=\"_ _0\"></span> their<span class=\"_ _0\"></span> grants, are appr<span class=\"_ _0\"></span>ov<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the Remuneration Committee. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs9de\">These awar<span class=\"_ _0\"></span>ds are <span class=\"_ _0\"></span>the principal means of deliv<span class=\"_ _0\"></span>ering deferr<span class=\"_ _0\"></span>ed v<span class=\"_ _0\"></span>ariable remuneration <span class=\"_ _0\"></span>to executiv<span class=\"_ _0\"></span>e directors and Mat<span class=\"_ _0\"></span>erial Risk T<span class=\"_ _2\"></span>akers </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs9df\">(\u2018MRT\u2019<span class=\"_ _1\"></span>s) in accordance <span class=\"_ _0\"></span>with regulatory<span class=\"_ _0\"></span> remuneration r<span class=\"_ _0\"></span>equirements, although <span class=\"_ _0\"></span>these are not <span class=\"_ _0\"></span>the only emplo<span class=\"_ _0\"></span>yees t<span class=\"_ _0\"></span>o receive such aw<span class=\"_ _0\"></span>ards.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9e0\">Awar<span class=\"_ _0\"></span>ds under <span class=\"_ _0\"></span>this plan comprise a right to acquir<span class=\"_ _0\"></span>e ordinary<span class=\"_ _0\"></span> shares in <span class=\"_ _0\"></span>the Company <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> nil or nominal payment and ar<span class=\"_ _1\"></span>e subject to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9e1\">performance criteria measur<span class=\"_ _0\"></span>ed over<span class=\"_ _0\"></span> a thr<span class=\"_ _0\"></span>ee y<span class=\"_ _0\"></span>ear period beginning <span class=\"_ _0\"></span>with the financial <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> including the date of<span class=\"_ _0\"></span> grant (the \u2018t<span class=\"_ _0\"></span>est period\u2019).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9e2\">Awar<span class=\"_ _0\"></span>ds v<span class=\"_ _0\"></span>est on the date on <span class=\"_ _0\"></span>which the Remuner<span class=\"_ _0\"></span>ation Committee determines the e<span class=\"_ _0\"></span>xtent to <span class=\"_ _0\"></span>which the performance conditions ha<span class=\"_ _0\"></span>ve </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9e3\">been satisfied. F<span class=\"_ _1\"></span>or employees, o<span class=\"_ _0\"></span>ther <span class=\"_ _0\"></span>than the ex<span class=\"_ _0\"></span>ecutive director<span class=\"_ _0\"></span>s and other emplo<span class=\"_ _0\"></span>yees identified as MRT<span class=\"_ _2\"></span>s for<span class=\"_ _0\"></span> regulatory<span class=\"_ _0\"></span> purposes, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9e4\">awar<span class=\"_ _0\"></span>ds may be e<span class=\"_ _0\"></span>xer<span class=\"_ _0\"></span>cised from <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>esting date to <span class=\"_ _0\"></span>the day bef<span class=\"_ _0\"></span>ore <span class=\"_ _0\"></span>the tenth anniver<span class=\"_ _0\"></span>sary of<span class=\"_ _0\"></span> the grant dat<span class=\"_ _0\"></span>e. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9e5\">Executiv<span class=\"_ _0\"></span>e directors<span class=\"_ _0\"></span>\u2019 awar<span class=\"_ _0\"></span>ds made in 2020 and 2021 are ex<span class=\"_ _0\"></span>ercisable <span class=\"_ _0\"></span>from the <span class=\"_ _0\"></span>time of <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s fifth results announcement<span class=\"_ _0\"></span> after <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9e6\">date of<span class=\"_ _0\"></span> the grant <span class=\"_ _0\"></span>to the day<span class=\"_ _0\"></span> befor<span class=\"_ _0\"></span>e the <span class=\"_ _0\"></span>tenth anniversary<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the grant date. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9e7\">V<span class=\"_ _0\"></span>ested aw<span class=\"_ _0\"></span>ards made to <span class=\"_ _0\"></span>the executiv<span class=\"_ _0\"></span>e director<span class=\"_ _0\"></span>s and other MRT<span class=\"_ _2\"></span>s in December 2022 become ex<span class=\"_ _0\"></span>ercisable in annual instalments </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9e8\">between <span class=\"_ _0\"></span>the end of <span class=\"_ _0\"></span>the test period and <span class=\"_ _0\"></span>the seventh anniv<span class=\"_ _0\"></span>ersary o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the grant date. <span class=\"_ _0\"></span>The maximum deferral period is based on <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9e9\">regulatory<span class=\"_ _0\"></span> classification of<span class=\"_ _0\"></span> the individual MRT<span class=\"_ _1\"></span>. The lat<span class=\"_ _0\"></span>est possible exer<span class=\"_ _0\"></span>cise date is the <span class=\"_ _0\"></span>tenth anniversary<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the grant date.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9ea\">Where perf<span class=\"_ _0\"></span>ormance conditions are not met<span class=\"_ _0\"></span> in full, awar<span class=\"_ _0\"></span>ds lapse at the point at<span class=\"_ _0\"></span> which the det<span class=\"_ _0\"></span>ermination is made. Aw<span class=\"_ _0\"></span>ards <span class=\"_ _0\"></span>will also lapse </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9eb\">on cessation of emplo<span class=\"_ _0\"></span>yment during the <span class=\"_ _0\"></span>test period, other<span class=\"_ _0\"></span> than in \u2018g<span class=\"_ _0\"></span>ood leaver\u2019 cir<span class=\"_ _0\"></span>cumstances. Malus and clawback pr<span class=\"_ _0\"></span>ovisions apply <span class=\"_ _0\"></span>to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9ec\">awar<span class=\"_ _0\"></span>ds granted under<span class=\"_ _0\"></span> the PSP<span class=\"_ _0\"></span> as detailed in the Dir<span class=\"_ _0\"></span>ectors\u2019 R<span class=\"_ _0\"></span>emuneration Policy<span class=\"_ _1\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9ee\">The conditional entitlements outstanding under<span class=\"_ _0\"></span> this scheme at 30 September<span class=\"_ _0\"></span> 2023 and 30 September<span class=\"_ _0\"></span> 2022 wer<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9ef\">Gran<span class=\"_ _0\"></span>t date<span class=\"_ _2df\"> </span>Period e<span class=\"_ _0\"></span>xercisable<span class=\"_ _14b\"> </span>Number<span class=\"_ _b5\"> </span><span class=\"ff17\">Number<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9f0\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs9f1\">28/02/2013<span class=\"_ _266\"> </span>28/02/2016 to 27/02/2023</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs9f2\">\u2020<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9f3\">-<span class=\"_ _150\"> </span><span class=\"ff16\">4,578<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs9f4\">10/12/2013<span class=\"_ _266\"> </span>10/12/2016 to 09/12/2023</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs9f5\">\u2020<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9f6\">2,132<span class=\"_ _150\"> </span><span class=\"ff16\">2,132<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs9f7\">18/12/2014<span class=\"_ _266\"> </span>18/12/2017 to 17/12/2024</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs9f8\">\u2020<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9f9\">5,005<span class=\"_ _150\"> </span><span class=\"ff16\">5,005<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs9fa\">22/12/2015<span class=\"_ _266\"> </span>22/12/2018 to 21/12/2025</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs9fb\">\u2020<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9fc\">10,473<span class=\"_ _d8\"> </span><span class=\"ff16\">10,473<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs9fd\">01/12/2016<span class=\"_ _266\"> </span>01/12/2019 to 30/11/2026</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs9fe\">\u2020<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs9ff\">33,493<span class=\"_ _d8\"> </span><span class=\"ff16\">34,894<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa00\">08/12/2017<span class=\"_ _266\"> </span>03/12/2020 to 07/12/2027</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa01\">\u2020<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa02\">29,675<span class=\"_ _d8\"> </span><span class=\"ff16\">50,268<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa03\">14/12/2018<span class=\"_ _266\"> </span>14/12/2021 to 13/12/2028</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa04\">\u2020<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa05\">61,952<span class=\"_ _b5\"> </span><span class=\"ff16\">155,092<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa06\">06/07/2020<span class=\"_ _266\"> </span>06/12/2022 t<span class=\"_ _0\"></span>o 05/07/2030</div><div class=\"t m0 h81 ff17 fs2 fc1 sc0 ls0 ws0 gsa07\">\u03c8<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa08\">114,169<span class=\"_ _8e\"> </span><span class=\"ff16\">1,144,820<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa09\">06/07/2020<span class=\"_ _2b5\"> </span>07/12/2024* to 05/07/2030</div><div class=\"t m0 h81 ff17 fs2 fc1 sc0 ls0 ws0 gsa0a\">\u03c8<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa0b\">509,192<span class=\"_ _b5\"> </span><span class=\"ff16\">509,192<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa0c\">11/12/2020<span class=\"_ _1c7\"> </span>07/12/2023* to 10/12/2030</div><div class=\"t m0 h81 ff17 fs2 fc1 sc0 ls0 ws0 gsa0d\">\u03c6<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa0e\">1,074,596<span class=\"_ _8e\"> </span><span class=\"ff16\">1,122,904<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa0f\">11/12/2020<span class=\"_ _1c7\"> </span>07/12/2025* to 10/12/2030</div><div class=\"t m0 h81 ff17 fs2 fc1 sc0 ls0 ws0 gsa10\">\u03c6<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa11\">385,707<span class=\"_ _b5\"> </span><span class=\"ff16\">385,707<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa12\">15/12/2021<span class=\"_ _1c7\"> </span>07/12/2024* to 14/12/2031</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa13\">\u03b4<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa14\">1,034,343<span class=\"_ _8e\"> </span><span class=\"ff16\">1,069,870<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa15\">15/12/2021<span class=\"_ _1c7\"> </span>07/12/2026* to 14/12/2031</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa16\">\u03b4<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa17\">339,936<span class=\"_ _b5\"> </span><span class=\"ff16\">339,936<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa18\">16/12/2022<span class=\"_ _288\"> </span>07/12/2025* to 15/12/2032</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa19\">\u03bb<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa1a\">932,315<span class=\"_ _10b\"> </span><span class=\"ff17\">-<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa1b\">16/12/2022<span class=\"_ _288\"> </span>07/12/2026* to 15/12/2032</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa1c\">\u03bb<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa1d\">259,233<span class=\"_ _10b\"> </span><span class=\"ff17\">-<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa1e\">16/12/2022<span class=\"_ _288\"> </span>07/12/2027* to 15/12/2032</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa1f\">\u03bb<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa20\">268,683<span class=\"_ _10b\"> </span><span class=\"ff17\">-<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa21\">16/12/2022<span class=\"_ _288\"> </span>07/12/2028* to 15/12/2032</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa22\">\u03bb<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa23\">148,229<span class=\"_ _10b\"> </span><span class=\"ff17\">-<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa24\">16/12/2022<span class=\"_ _288\"> </span>07/12/2029* to 15/12/2032</div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa25\">\u03bb<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa26\">156,513<span class=\"_ _10b\"> </span><span class=\"ff17\">-<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa27\">5,365,646<span class=\"_ _8e\"> </span><span class=\"ff16\">4,834,871<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa28\">*  </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa29\">Estimated date. <span class=\"_ _68\"> </span> </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa2a\">\u2020 </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa2b\"> <span class=\"_ _25\"></span>  <span class=\"_ _3\"></span>These awards, <span class=\"_ _0\"></span>which wer<span class=\"_ _0\"></span>e conditional on the achiev<span class=\"_ _0\"></span>ement of performance-based criteria, <span class=\"_ _0\"></span>vested bef<span class=\"_ _0\"></span>ore the start o<span class=\"_ _0\"></span>f the financial <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>. Any r<span class=\"_ _0\"></span>eduction in </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa2c\">entitlements resulting fr<span class=\"_ _0\"></span>om the application of<span class=\"_ _0\"></span> those criteria is r<span class=\"_ _0\"></span>eflected in the numbers abov<span class=\"_ _0\"></span>e.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h83 ff17 fs9 fc1 sc0 ls0 ws0 gsa2d\">\u03c8 </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa2e\">These awar<span class=\"_ _0\"></span>ds wer<span class=\"_ _0\"></span>e subject to performance criteria, assessed o<span class=\"_ _0\"></span>ver a period o<span class=\"_ _0\"></span>f thr<span class=\"_ _0\"></span>ee financial y<span class=\"_ _0\"></span>ears, starting with the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> of grant.</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa2f\">    \u2022 <span class=\"_ _96\"></span>   <span class=\"_ _25\"></span>25% <span class=\"_ _0\"></span>to a T<span class=\"_ _2\"></span>otal Shareholder R<span class=\"_ _0\"></span>eturn (\u2018TSR\u2019) test based on a ranking o<span class=\"_ _0\"></span>f the Compan<span class=\"_ _0\"></span>y\u2019<span class=\"_ _0\"></span>s TSR against<span class=\"_ _0\"></span> those of a compar<span class=\"_ _0\"></span>ator gr<span class=\"_ _0\"></span>oup of UK listed <span class=\"_ _0\"></span>financial services </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa30\">companies, determined at the date o<span class=\"_ _0\"></span>f grant. <span class=\"_ _0\"></span>This tranche <span class=\"_ _0\"></span>vests in full f<span class=\"_ _0\"></span>or upper<span class=\"_ _0\"></span> quartile performance, 25% vests <span class=\"_ _0\"></span>for median perf<span class=\"_ _0\"></span>ormance and vesting betw<span class=\"_ _0\"></span>een </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa31\">those points is determined on a straight line basis</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa32\">    \u2022 <span class=\"_ _96\"></span>   <span class=\"_ _25\"></span>25% <span class=\"_ _0\"></span>to an EPS test. <span class=\"_ _0\"></span>This tranche <span class=\"_ _0\"></span>vests in full if basic EPS <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the third <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> of the <span class=\"_ _0\"></span>test period is at least 67<span class=\"_ _1\"></span>.0p, 25% <span class=\"_ _0\"></span>vesting if EPS in <span class=\"_ _0\"></span>this year<span class=\"_ _0\"></span> is 60.<span class=\"_ _0\"></span>0p and vesting </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa33\">between those points on a str<span class=\"_ _0\"></span>aight line basis</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa34\">    \u2022 <span class=\"_ _96\"></span>   <span class=\"_ _25\"></span>25% <span class=\"_ _0\"></span>to a risk test. <span class=\"_ _0\"></span>The risk condition comprises tw<span class=\"_ _0\"></span>o components. 50% of the risk<span class=\"_ _0\"></span> element is based on an assessment by <span class=\"_ _0\"></span>the CRO of <span class=\"_ _0\"></span>the six key<span class=\"_ _0\"></span> measures of<span class=\"_ _0\"></span> </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa35\">the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _0\"></span>s risk appetite: r<span class=\"_ _0\"></span>egulatory br<span class=\"_ _0\"></span>eaches; customer service performance; conduct; operational risk<span class=\"_ _0\"></span> incidents; capital and liquidity; and credit losses. <span class=\"_ _0\"></span>The </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa36\">remaining 50% is based on a strategic risk<span class=\"_ _0\"></span> assessment reflecting the manag<span class=\"_ _0\"></span>ement of risk as it<span class=\"_ _0\"></span> impacts on the delivery<span class=\"_ _0\"></span> of the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s medium term strategy<span class=\"_ _1\"></span>. </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa37\">F<span class=\"_ _0\"></span>ollowing the R<span class=\"_ _0\"></span>emuneration Committee\u2019<span class=\"_ _1\"></span>s assessment, the tranche <span class=\"_ _0\"></span>will vest be<span class=\"_ _0\"></span>tween 0% and 100%</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa38\">    \u2022 <span class=\"_ _96\"></span>   <span class=\"_ _25\"></span>12.5% of<span class=\"_ _0\"></span> the grant is det<span class=\"_ _0\"></span>ermined based on a customer service condition. <span class=\"_ _0\"></span>This condition is based on the performance of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup against its most significant </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa39\">customer service metrics including insight<span class=\"_ _0\"></span> feedback on k<span class=\"_ _0\"></span>ey pr<span class=\"_ _0\"></span>oduct lines and complaint levels. <span class=\"_ _1\"></span>The Remuneration Committee will determine <span class=\"_ _0\"></span>the extent to <span class=\"_ _0\"></span>which </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa3a\">the condition has been met between 0% and 100%. 50% of<span class=\"_ _0\"></span> this <span class=\"_ _0\"></span>tranche will v<span class=\"_ _0\"></span>est for<span class=\"_ _0\"></span> on-target perf<span class=\"_ _0\"></span>ormance, below a 25% thr<span class=\"_ _0\"></span>eshold no v<span class=\"_ _0\"></span>esting will occur</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa3b\">    \u2022 <span class=\"_ _96\"></span>   <span class=\"_ _25\"></span>12.5% of<span class=\"_ _0\"></span> the grant is det<span class=\"_ _0\"></span>ermined based on a people test. T<span class=\"_ _0\"></span>he people test is based on the perf<span class=\"_ _0\"></span>ormance of the Gr<span class=\"_ _0\"></span>oup against its most significant emplo<span class=\"_ _0\"></span>yment </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa3c\">metrics including employee eng<span class=\"_ _0\"></span>agement, voluntary<span class=\"_ _0\"></span> attrition and gender<span class=\"_ _0\"></span> diversity le<span class=\"_ _0\"></span>vels. T<span class=\"_ _0\"></span>he Remuneration Committee will de<span class=\"_ _0\"></span>termine the extent <span class=\"_ _0\"></span>to which the </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa3d\">condition has been met between 0% and 100%. 50% of<span class=\"_ _0\"></span> this <span class=\"_ _0\"></span>tranche will v<span class=\"_ _0\"></span>est for<span class=\"_ _0\"></span> on-target perf<span class=\"_ _0\"></span>ormance below a 25% <span class=\"_ _0\"></span>threshold no v<span class=\"_ _0\"></span>esting will occur</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa3e\">    \u2022 <span class=\"_ _96\"></span>   <span class=\"_ _25\"></span>Due <span class=\"_ _0\"></span>to the v<span class=\"_ _0\"></span>olatility of<span class=\"_ _0\"></span> the share price at <span class=\"_ _0\"></span>the time of<span class=\"_ _0\"></span> grant, the Remuneration Committ<span class=\"_ _0\"></span>ee could have adjusted the <span class=\"_ _0\"></span>vesting lev<span class=\"_ _0\"></span>els at the <span class=\"_ _0\"></span>vesting date if it belie<span class=\"_ _0\"></span>ved </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa3f\">that the use of<span class=\"_ _0\"></span> this share price had cr<span class=\"_ _0\"></span>eated a potential <span class=\"_ _0\"></span>windfall gain</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa40\">     <span class=\"_ _3\"></span>An \u2018underpin\u2019 condition also operates, such that <span class=\"_ _0\"></span>the Remuneration Committee has t<span class=\"_ _0\"></span>o be satisfied with the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s underlying financial performance over<span class=\"_ _0\"></span> the </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa41\">performance period. <span class=\"_ _0\"></span>An individual performance condition relating t<span class=\"_ _0\"></span>o the grantee<span class=\"_ _0\"></span>\u2019<span class=\"_ _0\"></span>s performance in the final <span class=\"_ _0\"></span>financial year<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the test period also applies.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h83 ff17 fs9 fc1 sc0 ls0 ws0 gsa42\">\u03c6 </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa43\">These awar<span class=\"_ _0\"></span>ds are subject <span class=\"_ _0\"></span>to performance criteria, similar <span class=\"_ _0\"></span>to those described at <span class=\"ff17\">\u03c8</span> abov<span class=\"_ _0\"></span>e, except <span class=\"_ _0\"></span>that:</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa44\">    \u2022 <span class=\"_ _96\"></span> <span class=\"_ _25\"></span>   <span class=\"_ _3\"></span>Under the EPS condition full <span class=\"_ _0\"></span>vesting occurs if EPS <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the third <span class=\"_ _0\"></span>year o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>test period is at least 66.0p<span class=\"_ _0\"></span>, 25% vesting if<span class=\"_ _0\"></span> EPS in this y<span class=\"_ _0\"></span>ear is 58.0p and <span class=\"_ _0\"></span>vesting </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa45\">between those points on a str<span class=\"_ _0\"></span>aight line basis</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa46\">    \u2022 <span class=\"_ _96\"></span>  <span class=\"_ _0\"></span>The ability of<span class=\"_ _0\"></span> the Remuneration Committ<span class=\"_ _0\"></span>ee to adjust specifically <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>windfall gains w<span class=\"_ _0\"></span>as not a condition of <span class=\"_ _0\"></span>this grant<span class=\"_ _36a\"> </span></div><div class=\"t m0 h83 ff17 fs9 fc1 sc0 ls0 ws0 gsa47\">\u03b4  </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa48\">These awar<span class=\"_ _0\"></span>ds are subject <span class=\"_ _0\"></span>to performance criteria, similar <span class=\"_ _0\"></span>to those described at <span class=\"ff17\">\u03c6</span> abov<span class=\"_ _0\"></span>e except <span class=\"_ _0\"></span>that:</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa49\">    \u2022 <span class=\"_ _96\"></span> <span class=\"_ _25\"></span>   <span class=\"_ _3\"></span>Under the EPS condition full <span class=\"_ _0\"></span>vesting occurs if EPS <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the third <span class=\"_ _0\"></span>year o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>test period is at least 72.0p<span class=\"_ _0\"></span>, 25% vesting if<span class=\"_ _0\"></span> EPS in this y<span class=\"_ _0\"></span>ear is 63.0p and <span class=\"_ _0\"></span>vesting </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa4a\">between those points on a str<span class=\"_ _0\"></span>aight line basis</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa4b\">    \u2022 <span class=\"_ _96\"></span>  Under<span class=\"_ _0\"></span> the risk condition, the k<span class=\"_ _0\"></span>ey measur<span class=\"_ _0\"></span>es component cov<span class=\"_ _0\"></span>ers: regulatory<span class=\"_ _0\"></span> breaches; conduct; operational incidents; capital and liquidity; and credit<span class=\"_ _0\"></span> losses<span class=\"_ _36a\"> </span></div><div class=\"t m0 h83 ff17 fs9 fc1 sc0 ls0 ws0 gsa4c\">\u03bb  </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa4d\">These awar<span class=\"_ _0\"></span>ds are subject <span class=\"_ _0\"></span>to performance criteria, similar <span class=\"_ _0\"></span>to those described at <span class=\"ff17\">\u03b4</span> abov<span class=\"_ _0\"></span>e except <span class=\"_ _0\"></span>that:</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa4e\">    \u2022 <span class=\"_ _96\"></span>   <span class=\"_ _25\"></span>Under<span class=\"_ _0\"></span> the EPS condition full <span class=\"_ _0\"></span>vesting occurs if EPS <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the third <span class=\"_ _0\"></span>year o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>test period is at least 88.<span class=\"_ _0\"></span>1p, 25% v<span class=\"_ _0\"></span>esting if EPS in this <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> is 74<span class=\"_ _0\"></span>.4p and vesting </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa4f\">between those points on a str<span class=\"_ _0\"></span>aight line basis</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa50\">    \u2022 <span class=\"_ _96\"></span>  <span class=\"_ _0\"></span>The risk condition relates <span class=\"_ _0\"></span>to 20% of <span class=\"_ _0\"></span>the grant, the customer<span class=\"_ _0\"></span> service condition applies to 10% of<span class=\"_ _0\"></span> the grant and <span class=\"_ _0\"></span>the people condition relates to 10% o<span class=\"_ _0\"></span>f the grant</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa51\">    \u2022 <span class=\"_ _96\"></span>  <span class=\"_ _0\"></span>The 25% and 50% vesting <span class=\"_ _0\"></span>thresholds no longer<span class=\"_ _0\"></span> apply t<span class=\"_ _0\"></span>o the customer service and people conditions</div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa52\">    \u2022 <span class=\"_ _96\"></span>   <span class=\"_ _25\"></span>10% of<span class=\"_ _0\"></span> the grant r<span class=\"_ _0\"></span>elates to a climate condition. <span class=\"_ _0\"></span>The climate condition is based on the perf<span class=\"_ _0\"></span>ormance of the Gr<span class=\"_ _0\"></span>oup against its most significant climate-r<span class=\"_ _0\"></span>elated </div><div class=\"t m0 h82 ff3 fs9 fc1 sc0 ls0 ws0 gsa53\">targets, including <span class=\"_ _0\"></span>the development of<span class=\"_ _0\"></span> syst<span class=\"_ _0\"></span>ems to quantify and manag<span class=\"_ _0\"></span>e its climate-related impacts.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa54\">On exer<span class=\"_ _0\"></span>cise, holders of<span class=\"_ _0\"></span> awar<span class=\"_ _0\"></span>ds granted between F<span class=\"_ _1\"></span>ebruary 2013 and December<span class=\"_ _0\"></span> 2021 receiv<span class=\"_ _0\"></span>e a payment equivalent<span class=\"_ _0\"></span> to the dividends </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa55\">accruing on the <span class=\"_ _0\"></span>vested shar<span class=\"_ _0\"></span>es during the v<span class=\"_ _0\"></span>esting period. No such payment is made in r<span class=\"_ _0\"></span>espect of a<span class=\"_ _0\"></span>wards gr<span class=\"_ _0\"></span>anted at other<span class=\"_ _0\"></span> dates.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa57\">The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> awards gr<span class=\"_ _0\"></span>anted under <span class=\"_ _0\"></span>the PSP is det<span class=\"_ _0\"></span>ermined using a Monte Carlo simulation model, to <span class=\"_ _0\"></span>take account of<span class=\"_ _0\"></span> the eff<span class=\"_ _0\"></span>ect of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa58\">the market based condition. F<span class=\"_ _2\"></span>air v<span class=\"_ _0\"></span>alues are calculated separately<span class=\"_ _1\"></span> for grant elements <span class=\"_ _0\"></span>which became ex<span class=\"_ _0\"></span>ercisable at differ<span class=\"_ _0\"></span>ent dates t<span class=\"_ _0\"></span>o </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa59\">allow <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the impact of<span class=\"_ _0\"></span> dividends. T<span class=\"_ _0\"></span>he principal inputs to this model <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> grants made in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 and <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa5a\">year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2022 are shown belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa5b\">Gran<span class=\"_ _0\"></span>t date<span class=\"_ _243\"> </span>16/12/22<span class=\"_ _140\"> </span><span class=\"ff17\">15/12/21<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa5c\">Mark<span class=\"_ _0\"></span>et price at date of gr<span class=\"_ _0\"></span>ant<span class=\"_ _169\"> </span><span class=\"ff15\">541.5p<span class=\"_ _132\"> </span><span class=\"ff16\">549.0p<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa5d\">Contractual lif<span class=\"_ _1\"></span>e (years)<span class=\"_ _304\"> </span><span class=\"ff15\">10.0<span class=\"_ _3a\"> </span><span class=\"ff16\">10.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa5e\">Expected volatility<span class=\"_ _201\"> </span><span class=\"ff15\">40.54%<span class=\"_ _86\"> </span><span class=\"ff16\">38.13%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa5f\">Risk<span class=\"_ _0\"></span>-free int<span class=\"_ _0\"></span>erest r<span class=\"_ _0\"></span>ate<span class=\"_ _212\"> </span><span class=\"ff15\">3.27%<span class=\"_ _9f\"> </span><span class=\"ff16\">0.53%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa60\">Expected annual dividend yield<span class=\"_ _1ca\"> </span><span class=\"ff15\">5.28%<span class=\"_ _2c\"> </span></span><span class=\"ls2d wsa3\">N<span class=\"_ _15\"></span>/A<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsa61\">F<span class=\"_ _1\"></span>or all the abov<span class=\"_ _0\"></span>e grants no departures ar<span class=\"_ _0\"></span>e expected and grant<span class=\"_ _0\"></span>ees are expected <span class=\"_ _0\"></span>to exer<span class=\"_ _0\"></span>cise awar<span class=\"_ _0\"></span>ds at the earliest opportunity<span class=\"_ _1\"></span>. The </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsa62\">expected <span class=\"_ _0\"></span>volatility is based on <span class=\"_ _0\"></span>the annualised standard de<span class=\"_ _0\"></span>viation of daily<span class=\"_ _0\"></span> changes in price ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the thr<span class=\"_ _0\"></span>ee year<span class=\"_ _0\"></span>s preceding the gr<span class=\"_ _0\"></span>ant date. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsa63\">F<span class=\"_ _1\"></span>or the purposes of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>valuation, non-mark<span class=\"_ _0\"></span>et conditions are assumed <span class=\"_ _0\"></span>to be achiev<span class=\"_ _0\"></span>ed 100% although this is unlikely<span class=\"_ _0\"></span> to occur<span class=\"_ _1\"></span> in practice.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa64\">The number<span class=\"_ _0\"></span> of aw<span class=\"_ _0\"></span>ards granted and <span class=\"_ _0\"></span>their <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>values <span class=\"_ _0\"></span>for IFRS 2 purposes ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa65\">Gran<span class=\"_ _0\"></span>t date<span class=\"_ _120\"> </span>16/12/22<span class=\"_ _302\"> </span>15/12/21<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa66\">Time to ex<span class=\"_ _0\"></span>ercise<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa67\">(Y<span class=\"_ _1\"></span>ears)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa68\">Number of awards<span class=\"_ _86\"> </span>IFR<span class=\"_ _0\"></span>S 2 fair value<span class=\"_ _1d4\"> </span><span class=\"ff17\">Number of awards<span class=\"_ _71\"> </span>IFRS 2 fair v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gsa69\">3<span class=\"_ _28d\"> </span><span class=\"ff15\">926,721<span class=\"_ _1d3\"> </span>423.32p<span class=\"_ _f4\"> </span></span>1,071,597<span class=\"_ _f6\"> </span>504.50p<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gsa6a\">4<span class=\"_ _28d\"> </span><span class=\"ff15\">259,233<span class=\"_ _1d3\"> </span>404.23p<span class=\"_ _148\"> </span><span class=\"ff17\">-<span class=\"_ _13d\"> </span>-<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gsa6b\">5<span class=\"_ _28d\"> </span><span class=\"ff15\">268,683<span class=\"_ _1d3\"> </span>385.55p<span class=\"_ _bc\"> </span></span>339,936<span class=\"_ _1d3\"> </span>504.50p<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gsa6c\">6<span class=\"_ _28d\"> </span><span class=\"ff15\">148,229<span class=\"_ _1d3\"> </span>367.43p<span class=\"_ _148\"> </span><span class=\"ff17\">-<span class=\"_ _13d\"> </span>-<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gsa6d\">7<span class=\"_ _28d\"> </span><span class=\"ff15\">156,513<span class=\"_ _1d3\"> </span>349.93p<span class=\"_ _148\"> </span><span class=\"ff17\">-<span class=\"_ _13d\"> </span>-<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa6e\">1,759,379<span class=\"_ _28f\"> </span><span class=\"ff16\">1,411,533<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsa6f\">(c<span class=\"_ _1\"></span>)  <span class=\"_ _29\"> </span>Company Share Option Plan (\u2018CSOP\u2019)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa70\">Befor<span class=\"_ _0\"></span>e its amendment at the 2023 <span class=\"_ _0\"></span>AGM<span class=\"_ _0\"></span>, the PSP<span class=\"_ _0\"></span> included a tax advantag<span class=\"_ _0\"></span>ed element under <span class=\"_ _0\"></span>which CSOP options could be gr<span class=\"_ _0\"></span>anted. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa71\">The CSOPs may<span class=\"_ _0\"></span> be exer<span class=\"_ _1\"></span>cised alongside their accompanying PSPs based upon <span class=\"_ _0\"></span>the exer<span class=\"_ _0\"></span>cise price that <span class=\"_ _0\"></span>was set at<span class=\"_ _0\"></span> the grant date. Each </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa72\">employee ma<span class=\"_ _0\"></span>y be grant<span class=\"_ _0\"></span>ed up to a maximum t<span class=\"_ _0\"></span>otal v<span class=\"_ _0\"></span>alue of \u00a330<span class=\"_ _0\"></span>,000 of<span class=\"_ _1\"></span> tax benefitted options. No new<span class=\"_ _0\"></span> CSOP aw<span class=\"_ _0\"></span>ards <span class=\"_ _0\"></span>were made in <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa73\">years ended 30 Sept<span class=\"_ _0\"></span>ember 2023 or<span class=\"_ _0\"></span> 30 September 2022, and <span class=\"_ _0\"></span>the current PSP<span class=\"_ _1\"></span> contains no provision to mak<span class=\"_ _0\"></span>e CSOP<span class=\"_ _0\"></span> grants.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa74\">A r<span class=\"_ _0\"></span>econciliation of<span class=\"_ _0\"></span> movements in <span class=\"_ _0\"></span>the number and <span class=\"_ _0\"></span>weighted av<span class=\"_ _0\"></span>erage ex<span class=\"_ _0\"></span>ercise price of<span class=\"_ _0\"></span> CSOP op<span class=\"_ _0\"></span>tions over<span class=\"_ _0\"></span> \u00a31 ordinary<span class=\"_ _0\"></span> shares during <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa75\">year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2023 and the y<span class=\"_ _0\"></span>ear ended 30 Sept<span class=\"_ _0\"></span>ember 2022 is shown belo<span class=\"_ _0\"></span>w<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa76\">2023<span class=\"_ _a0\"> </span>2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _a0\"> </span>2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa77\">Number <span class=\"_ _11\"> </span><span class=\"ws30\">Weight<span class=\"_ _0\"></span>ed aver<span class=\"_ _0\"></span>age </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa78\">ex<span class=\"_ _0\"></span>ercise price<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa79\">Number<span class=\"ff16\"> <span class=\"_ _18e\"> </span></span>W<span class=\"_ _0\"></span>eighted av<span class=\"_ _0\"></span>erage </div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsa7a\">ex<span class=\"_ _0\"></span>ercise price<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa7b\">p<span class=\"_ _2fd\"> </span><span class=\"ff16\">p<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsa7c\">Options outstanding<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa7d\">At 1 Oct<span class=\"_ _0\"></span>ober 2022<span class=\"_ _18c\"> </span><span class=\"ff15\">87,716<span class=\"_ _12b\"> </span>406.31<span class=\"_ _2fe\"> </span><span class=\"ff16\">241,574<span class=\"_ _12b\"> </span>403.66<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa7e\">Exer<span class=\"_ _0\"></span>cised or surrendered in the y<span class=\"_ _0\"></span>ear<span class=\"_ _16a\"> </span><span class=\"ff15\">(28,715)<span class=\"_ _12b\"> </span>408.25<span class=\"_ _88\"> </span></span>(148,680)<span class=\"_ _12b\"> </span><span class=\"ff16\">402.14<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa7f\">Lapsed during the year<span class=\"_ _2c9\"> </span><span class=\"ff15\">(2,410)<span class=\"_ _133\"> </span>477.76<span class=\"_ _12a\"> </span></span>(5,178)<span class=\"_ _12b\"> </span><span class=\"ff16\">402.37<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa80\">At 30 Sept<span class=\"_ _0\"></span>ember 2023<span class=\"_ _305\"> </span><span class=\"ff15\">56,591<span class=\"_ _12b\"> </span>402.29<span class=\"_ _86\"> </span><span class=\"ff16\">87,716<span class=\"_ _12b\"> </span>406.31<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa81\">Options ex<span class=\"_ _0\"></span>ercisable<span class=\"_ _1e0\"> </span><span class=\"ff15\">56,591<span class=\"_ _133\"> </span>402.29<span class=\"_ _6d\"> </span><span class=\"ff16\">87,716<span class=\"_ _12b\"> </span>406.31<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa82\">The w<span class=\"_ _0\"></span>eighted aver<span class=\"_ _0\"></span>age remaining contractual lif<span class=\"_ _0\"></span>e of op<span class=\"_ _0\"></span>tions outstanding at 30 September<span class=\"_ _0\"></span> 2023 was 49<span class=\"_ _0\"></span>.9 months (2022: 66.2 months<span class=\"_ _0\"></span>). </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa83\">The w<span class=\"_ _0\"></span>eighted aver<span class=\"_ _0\"></span>age market<span class=\"_ _0\"></span> price at exer<span class=\"_ _0\"></span>cise for<span class=\"_ _0\"></span> share options e<span class=\"_ _0\"></span>xer<span class=\"_ _0\"></span>cised in the y<span class=\"_ _0\"></span>ear <span class=\"_ _0\"></span>was 563.98p<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa85\">The entitlements outstanding under<span class=\"_ _0\"></span> this scheme at 30 September<span class=\"_ _0\"></span> 2023 and 30 September<span class=\"_ _0\"></span> 2022 wer<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa86\">Gran<span class=\"_ _0\"></span>t date<span class=\"_ _2df\"> </span>Period e<span class=\"_ _0\"></span>xercisable<span class=\"_ _14c\"> </span>Exercise price<span class=\"_ _50\"> </span>Number<span class=\"_ _44\"> </span><span class=\"ff17\">Number<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa87\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa88\">01/12/2016<span class=\"_ _2e1\"> </span>01/12/2019 to 30/11/2026<span class=\"_ _b5\"> </span><span class=\"ff16\">361.88p<span class=\"_ _132\"> </span><span class=\"ff15\">21,732<span class=\"_ _97\"> </span></span>22,802<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa89\">08/12/2017<span class=\"_ _2e1\"> </span>08/12/2020 to 07/12/2027<span class=\"_ _b5\"> </span><span class=\"ff16\">477.76p<span class=\"_ _132\"> </span><span class=\"ff15\">13,409<span class=\"_ _97\"> </span></span>20,557<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa8a\">14/12/2018<span class=\"_ _2e1\"> </span>14/12/2021 to 13/12/2028<span class=\"_ _b5\"> </span><span class=\"ff16\">396.04p<span class=\"_ _132\"> </span><span class=\"ff15\">21,450<span class=\"_ _97\"> </span></span>44,357<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa8b\">56,591<span class=\"_ _d8\"> </span><span class=\"ff16\">87,716<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa8c\">These awar<span class=\"_ _0\"></span>ds, which <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e conditional on the achiev<span class=\"_ _0\"></span>ement of<span class=\"_ _0\"></span> performance-based criteria, v<span class=\"_ _0\"></span>ested befor<span class=\"_ _0\"></span>e the start of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>financial year<span class=\"_ _2\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa8d\">Any<span class=\"_ _0\"></span> reduction in entitlements resulting <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the application of <span class=\"_ _0\"></span>those criteria is reflect<span class=\"_ _0\"></span>ed in the numbers abov<span class=\"_ _0\"></span>e.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa8e\">No separate f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value w<span class=\"_ _0\"></span>as attributed to <span class=\"_ _0\"></span>the CSOP op<span class=\"_ _0\"></span>tions for<span class=\"_ _0\"></span> IFRS 2 purposes as the IFRS 2 market <span class=\"_ _0\"></span>values f<span class=\"_ _0\"></span>or the CSOP<span class=\"_ _1\"></span> and PSP </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa8f\">combined will equate <span class=\"_ _0\"></span>to that calculated <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the PSP<span class=\"_ _0\"></span> without allowing <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the CSOP<span class=\"_ _2\"></span>. The benefit <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the CSOP is in r<span class=\"_ _0\"></span>elation to <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa90\">employees<span class=\"_ _0\"></span>\u2019 tax position, <span class=\"_ _0\"></span>which does not affect <span class=\"_ _0\"></span>the IFRS 2 charge.</div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsa91\"> (d) <span class=\"_ _27\"> </span>Deferred Bonus awards<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa92\">During the curr<span class=\"_ _0\"></span>ent financial <span class=\"_ _0\"></span>year <span class=\"_ _0\"></span>this plan has been used to de<span class=\"_ _0\"></span>fer annual bonus aw<span class=\"_ _0\"></span>ards <span class=\"_ _0\"></span>for e<span class=\"_ _0\"></span>xecutive dir<span class=\"_ _0\"></span>ectors and certain other<span class=\"_ _0\"></span>  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa93\">MRT<span class=\"_ _2\"></span>s to meet deferr<span class=\"_ _0\"></span>al levels r<span class=\"_ _0\"></span>equired b<span class=\"_ _0\"></span>y r<span class=\"_ _0\"></span>egulatory r<span class=\"_ _0\"></span>emuneration rules. <span class=\"_ _0\"></span>The plan has also been used to <span class=\"_ _0\"></span>facilitate other long<span class=\"_ _0\"></span>-term </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa94\">incentive arrang<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls5 ws0 gsa95\">Befor<span class=\"_ _0\"></span>e the curr<span class=\"_ _0\"></span>ent financial y<span class=\"_ _0\"></span>ear such plans <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e generally used <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the deferr<span class=\"_ _0\"></span>al in shares of<span class=\"_ _0\"></span> annual bonus awar<span class=\"_ _0\"></span>ds made to ex<span class=\"_ _0\"></span>ecutive </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls5 ws0 gsa96\">directors and certain o<span class=\"_ _0\"></span>ther senior<span class=\"_ _0\"></span> managers (\u2018<span class=\"_ _0\"></span>executiv<span class=\"_ _0\"></span>e awar<span class=\"_ _0\"></span>ds\u2019). <span class=\"_ _0\"></span>Additionally in 2020 a one-o<span class=\"_ _0\"></span>ff aw<span class=\"_ _0\"></span>ard w<span class=\"_ _0\"></span>as made on an all-employ<span class=\"_ _0\"></span>ee basis.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa97\">Awar<span class=\"_ _0\"></span>ds under <span class=\"_ _0\"></span>these plans comprise a right to acquir<span class=\"_ _0\"></span>e ordinary<span class=\"_ _0\"></span> shares in <span class=\"_ _0\"></span>the Company <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> nil or nominal payment. <span class=\"_ _1\"></span>The conditional </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsa98\">entitlements outstanding under <span class=\"_ _0\"></span>these plans at 30 September<span class=\"_ _0\"></span> 2023 and 30 September<span class=\"_ _0\"></span> 2022 wer<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa99\">Gran<span class=\"_ _0\"></span>t date<span class=\"_ _2df\"> </span>Period e<span class=\"_ _0\"></span>xercisable<span class=\"_ _14b\"> </span>Number<span class=\"_ _b5\"> </span><span class=\"ff17\">Number<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsa9a\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa9b\">10/12/2013<span class=\"_ _2e1\"> </span>10/12/2016 to 09/12/2023<span class=\"_ _306\"> </span><span class=\"ff15\">-<span class=\"_ _d8\"> </span><span class=\"ff16\">55,302<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa9c\">18/12/2014<span class=\"_ _2e1\"> </span>18/12/2017 to 17/12/2024<span class=\"_ _f0\"> </span><span class=\"ff15\">52,888<span class=\"_ _d8\"> </span><span class=\"ff16\">52,888<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa9d\">22/12/2015<span class=\"_ _2e1\"> </span>22/12/2018 to 21/12/2025<span class=\"_ _f0\"> </span><span class=\"ff15\">60,042<span class=\"_ _d8\"> </span><span class=\"ff16\">60,042<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa9e\">14/12/2018<span class=\"_ _2e1\"> </span>14/12/2021 to 13/12/2028<span class=\"_ _306\"> </span><span class=\"ff15\">-<span class=\"_ _d8\"> </span><span class=\"ff16\">26,437<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsa9f\">12/12/2019<span class=\"_ _2e1\"> </span>12/12/2022 to 11/12/2029<span class=\"_ _306\"> </span><span class=\"ff15\">-<span class=\"_ _b5\"> </span><span class=\"ff16\">108,701<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaa0\">11/12/2020<span class=\"_ _2e1\"> </span>11/12/2023 to 10/12/2030<span class=\"_ _279\"> </span><span class=\"ff15\">382,334<span class=\"_ _b5\"> </span><span class=\"ff16\">382,334<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaa1\">11/12/2020 \u2020<span class=\"_ _106\"> </span>11/12/2023 to 01/06/2024<span class=\"_ _279\"> </span><span class=\"ff15\">206,135<span class=\"_ _b5\"> </span><span class=\"ff16\">224,981<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaa2\">15/12/2021<span class=\"_ _2e1\"> </span>15/12/2024 to 10/12/2031<span class=\"_ _279\"> </span><span class=\"ff15\">244,953<span class=\"_ _b5\"> </span><span class=\"ff16\">244,953<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaa3\">16/12/2022<span class=\"_ _106\"> </span>07/12/2023 * to 15/12/2032<span class=\"_ _f1\"> </span><span class=\"ff15\">5,011<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaa4\">16/12/2022<span class=\"_ _106\"> </span>07/12/2024 * to 15/12/2032<span class=\"_ _279\"> </span><span class=\"ff15\">104,089<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaa5\">16/12/2022<span class=\"_ _106\"> </span>07/12/2025 * to 15/12/2032<span class=\"_ _f0\"> </span><span class=\"ff15\">14,742<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaa6\">16/12/2022<span class=\"_ _106\"> </span>07/12/2026 * to 15/12/2032<span class=\"_ _f0\"> </span><span class=\"ff15\">15,565<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaa7\">16/12/2022<span class=\"_ _106\"> </span>07/12/2027 * to 15/12/2032<span class=\"_ _f0\"> </span><span class=\"ff15\">16,018<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaa8\">16/12/2022<span class=\"_ _106\"> </span>07/12/2028 * to 15/12/2032<span class=\"_ _f0\"> </span><span class=\"ff15\">10,775<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaa9\">16/12/2022<span class=\"_ _106\"> </span>07/12/2029 * to 15/12/2032<span class=\"_ _f0\"> </span><span class=\"ff15\">11,384<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsaaa\">1,123,936<span class=\"_ _8e\"> </span><span class=\"ff16\">1,155,638<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gsaab\">* Estimated date </div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 wsa4 gsaac\">\u2020 All-employee awar<span class=\"_ _0\"></span>d<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsaad\">Awar<span class=\"_ _0\"></span>ds made to e<span class=\"_ _0\"></span>xecutive dir<span class=\"_ _0\"></span>ectors and other<span class=\"_ _0\"></span> MRT<span class=\"_ _2\"></span>s in December 2022 become exer<span class=\"_ _0\"></span>cisable in annual instalments after<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsaae\">announcement of<span class=\"_ _0\"></span> each year\u2019<span class=\"_ _2\"></span>s results from <span class=\"_ _0\"></span>the thir<span class=\"_ _0\"></span>d anniversary<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the grant t<span class=\"_ _0\"></span>o the sev<span class=\"_ _0\"></span>enth anniversary<span class=\"_ _1\"></span>. The maximum def<span class=\"_ _0\"></span>erral for<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsaaf\">each employee depends on <span class=\"_ _0\"></span>the regulatory<span class=\"_ _1\"></span> classification of the individual MRT<span class=\"_ _2\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsab0\">Exer<span class=\"_ _0\"></span>cise arrangements f<span class=\"_ _0\"></span>or grants made <span class=\"_ _0\"></span>to other<span class=\"_ _0\"></span> employees in December<span class=\"_ _0\"></span> 2022 are individually<span class=\"_ _0\"></span> structured at<span class=\"_ _0\"></span> the discre<span class=\"_ _0\"></span>tion of <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsab1\">Remuneration Committee at<span class=\"_ _0\"></span> the point of<span class=\"_ _0\"></span> grant.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsab2\">All of <span class=\"_ _0\"></span>these awar<span class=\"_ _0\"></span>ds will lapse if<span class=\"_ _0\"></span> the grantee ceases emplo<span class=\"_ _0\"></span>yment with <span class=\"_ _0\"></span>the Group bef<span class=\"_ _0\"></span>ore the gr<span class=\"_ _0\"></span>ant becomes exer<span class=\"_ _0\"></span>cisable, other<span class=\"_ _0\"></span> than in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsab3\">\u2018good lea<span class=\"_ _0\"></span>ver\u2019 cir<span class=\"_ _0\"></span>cumstances.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsab5\">The Deferr<span class=\"_ _0\"></span>ed Bonus shares grant<span class=\"_ _0\"></span>ed in 2021 and earlier <span class=\"_ _0\"></span>years under<span class=\"_ _0\"></span> the ex<span class=\"_ _0\"></span>ecutive aw<span class=\"_ _0\"></span>ards can be ex<span class=\"_ _0\"></span>ercised fr<span class=\"_ _0\"></span>om the <span class=\"_ _0\"></span>third anniver<span class=\"_ _0\"></span>sary </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsab6\">of <span class=\"_ _0\"></span>the awar<span class=\"_ _0\"></span>d date (<span class=\"_ _0\"></span>or other<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>esting date determined by<span class=\"_ _0\"></span> the R<span class=\"_ _0\"></span>emuneration Committee) until <span class=\"_ _0\"></span>the day<span class=\"_ _0\"></span> before <span class=\"_ _0\"></span>the tenth anniv<span class=\"_ _0\"></span>ersary of<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsab7\">date of<span class=\"_ _0\"></span> grant.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsab8\">The all-employ<span class=\"_ _0\"></span>ee awar<span class=\"_ _0\"></span>ds will <span class=\"_ _0\"></span>vest on the <span class=\"_ _0\"></span>third anniv<span class=\"_ _0\"></span>ersary of<span class=\"_ _0\"></span> the grant<span class=\"_ _0\"></span> date and the shar<span class=\"_ _0\"></span>es will be automatically<span class=\"_ _0\"></span> transferr<span class=\"_ _0\"></span>ed to <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsab9\">participants as soon as reasonably<span class=\"_ _0\"></span> practicable ther<span class=\"_ _0\"></span>eafter<span class=\"_ _1\"></span>. The period ex<span class=\"_ _0\"></span>ercisable sho<span class=\"_ _0\"></span>wn above <span class=\"_ _0\"></span>therefor<span class=\"_ _0\"></span>e illustrates <span class=\"_ _0\"></span>the latest date by<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsaba\">which it is anticipated that<span class=\"_ _0\"></span> these transf<span class=\"_ _0\"></span>ers will ha<span class=\"_ _0\"></span>ve been made. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsabb\">In the e<span class=\"_ _0\"></span>vent of<span class=\"_ _0\"></span> death or r<span class=\"_ _0\"></span>edundancy<span class=\"_ _0\"></span> the all-employ<span class=\"_ _0\"></span>ee awar<span class=\"_ _0\"></span>ds may <span class=\"_ _0\"></span>vest early<span class=\"_ _1\"></span>. Aw<span class=\"_ _0\"></span>ards lapse on <span class=\"_ _0\"></span>the cessation of emplo<span class=\"_ _0\"></span>yment, other <span class=\"_ _0\"></span>than </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsabc\">in \u2018good lea<span class=\"_ _0\"></span>ver\u2019 cir<span class=\"_ _0\"></span>cumstances. Except in <span class=\"_ _0\"></span>these regar<span class=\"_ _0\"></span>ds the all-employ<span class=\"_ _0\"></span>ee awar<span class=\"_ _0\"></span>ds operate in the same <span class=\"_ _0\"></span>way<span class=\"_ _1\"></span> as the executive a<span class=\"_ _0\"></span>wards.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsabd\">The Deferr<span class=\"_ _0\"></span>ed Bonus shares grant<span class=\"_ _0\"></span>ed between December<span class=\"_ _0\"></span> 2016 and December 2021 accrue dividends ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>esting period, unlike </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsabe\">earlier gr<span class=\"_ _0\"></span>ants which accrued dividends until the point o<span class=\"_ _0\"></span>f ex<span class=\"_ _0\"></span>ercise. <span class=\"_ _0\"></span>Aw<span class=\"_ _0\"></span>ards granted in December<span class=\"_ _0\"></span> 2022 do not include the right<span class=\"_ _0\"></span> to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsabf\">payment in lieu of<span class=\"_ _0\"></span> dividend. T<span class=\"_ _0\"></span>he fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of Def<span class=\"_ _0\"></span>erred Bonus aw<span class=\"_ _0\"></span>ards issued in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>as determined using a Black-<span class=\"_ _0\"></span>Scholes Merton </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsac0\">model and allows <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> these dividend arrangements.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsac1\">Details of<span class=\"_ _0\"></span> the inputs to <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>aluation model for<span class=\"_ _0\"></span> awar<span class=\"_ _0\"></span>ds made in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 and <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear ended  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsac2\">30 September<span class=\"_ _0\"></span> 2022 are shown belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsac3\">Gran<span class=\"_ _0\"></span>t date<span class=\"_ _307\"> </span>16/12/22<span class=\"_ _18f\"> </span>15/12/21<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsac4\">Mark<span class=\"_ _0\"></span>et price at date of gr<span class=\"_ _0\"></span>ant<span class=\"_ _1fd\"> </span><span class=\"ff15\">541.5p<span class=\"_ _c7\"> </span>549.0p<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsac5\">Expected annual dividend yield<span class=\"_ _2a3\"> </span><span class=\"ff15\">5.28%<span class=\"_ _26c\"> </span><span class=\"ls2e wsa5\">N<span class=\"_ _15\"></span>/A<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsac6\">No departures ar<span class=\"_ _0\"></span>e expected f<span class=\"_ _0\"></span>or grantees under<span class=\"_ _1\"></span> this plan, except <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> grants under <span class=\"_ _0\"></span>the all-employee gr<span class=\"_ _0\"></span>ant in 2020, <span class=\"_ _0\"></span>where a departur<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsac7\">rate of<span class=\"_ _0\"></span> 7<span class=\"_ _2\"></span>.5% per annum is expected. Grantees ar<span class=\"_ _0\"></span>e assumed to ex<span class=\"_ _0\"></span>ercise <span class=\"_ _0\"></span>their aw<span class=\"_ _0\"></span>ards at <span class=\"_ _0\"></span>the earliest possible opportunity<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsac8\">The number<span class=\"_ _0\"></span> of aw<span class=\"_ _0\"></span>ards granted and <span class=\"_ _0\"></span>their <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>values <span class=\"_ _0\"></span>for IFRS2 purposes ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsac9\">Gran<span class=\"_ _0\"></span>t date<span class=\"_ _120\"> </span>16/12/22<span class=\"_ _302\"> </span>15/12/21<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsaca\">Time to ex<span class=\"_ _0\"></span>ercise<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsacb\">(Y<span class=\"_ _1\"></span>ears)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsacc\">Number of awards<span class=\"_ _86\"> </span>IFR<span class=\"_ _0\"></span>S 2 fair value<span class=\"_ _1d4\"> </span><span class=\"ff17\">Number of awards<span class=\"_ _71\"> </span>IFRS 2 fair v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gsacd\">1<span class=\"_ _293\"> </span><span class=\"ff15\">5,011<span class=\"_ _82\"> </span>513.6p<span class=\"_ _308\"> </span><span class=\"ff17\">-<span class=\"_ _13d\"> </span>-<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gsace\">2<span class=\"_ _28d\"> </span><span class=\"ff15\">104,089<span class=\"_ _82\"> </span>487.2p<span class=\"_ _308\"> </span><span class=\"ff17\">-<span class=\"_ _93\"> </span>-<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gsacf\">3<span class=\"_ _ec\"> </span><span class=\"ff15\">14,742<span class=\"_ _82\"> </span>462.2p<span class=\"_ _82\"> </span></span>244,953<span class=\"_ _3e\"> </span>549.0p<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gsad0\">4<span class=\"_ _ec\"> </span><span class=\"ff15\">15,565<span class=\"_ _82\"> </span>438.4p<span class=\"_ _308\"> </span><span class=\"ff17\">-<span class=\"_ _93\"> </span>-<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gsad1\">5<span class=\"_ _ec\"> </span><span class=\"ff15\">16,018<span class=\"_ _82\"> </span>415.9p<span class=\"_ _308\"> </span><span class=\"ff17\">-<span class=\"_ _93\"> </span>-<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gsad2\">6<span class=\"_ _ec\"> </span><span class=\"ff15\">10,775<span class=\"_ _82\"> </span>394.5p<span class=\"_ _308\"> </span><span class=\"ff17\">-<span class=\"_ _93\"> </span>-<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gsad3\">7<span class=\"_ _ec\"> </span><span class=\"ff15\">11,384<span class=\"_ _82\"> </span>374.2p<span class=\"_ _308\"> </span><span class=\"ff17\">-<span class=\"_ _93\"> </span>-<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsad4\">177,584<span class=\"_ _293\"> </span><span class=\"ff16\">244,953<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsad5\">(e<span class=\"_ _1\"></span>)  <span class=\"_ _29\"> </span>Restricted S<span class=\"_ _0\"></span>tock Units (\u2018RSUs\u2019) </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsad6\">Between <span class=\"_ _0\"></span>the 2016 and 2022 financial y<span class=\"_ _0\"></span>ears, the Compan<span class=\"_ _0\"></span>y permitted certain employ<span class=\"_ _0\"></span>ees to elect <span class=\"_ _0\"></span>to receiv<span class=\"_ _0\"></span>e RSU awar<span class=\"_ _0\"></span>ds instead of<span class=\"_ _0\"></span> PSP </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsad7\">awar<span class=\"_ _0\"></span>ds. F<span class=\"_ _1\"></span>ollowing the appro<span class=\"_ _0\"></span>val of<span class=\"_ _0\"></span> the new<span class=\"_ _0\"></span> PSP at<span class=\"_ _0\"></span> the 2023 <span class=\"_ _0\"></span>AGM the Compan<span class=\"_ _0\"></span>y no longer<span class=\"_ _1\"></span> has the capacity t<span class=\"_ _0\"></span>o make new<span class=\"_ _0\"></span> RSU awar<span class=\"_ _0\"></span>ds. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsad8\">F<span class=\"_ _1\"></span>or RSU awar<span class=\"_ _0\"></span>ds to <span class=\"_ _0\"></span>vest, the gr<span class=\"_ _0\"></span>antee\u2019<span class=\"_ _1\"></span>s personal performance must be satisfactory<span class=\"_ _1\"></span> during the financial y<span class=\"_ _0\"></span>ear pr<span class=\"_ _0\"></span>eceding the <span class=\"_ _0\"></span>vesting date. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsad9\">In addition, a risk based performance condition, assessed against<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s risk management metrics and, <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the July<span class=\"_ _1\"></span> 2020 grant </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsada\">only<span class=\"_ _0\"></span>, against its strategic manag<span class=\"_ _0\"></span>ement of<span class=\"_ _0\"></span> risk for<span class=\"_ _0\"></span> the medium <span class=\"_ _0\"></span>term, considered o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>esting period, must also be met. <span class=\"_ _0\"></span>The level <span class=\"_ _0\"></span>to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsadb\">which this condition is met <span class=\"_ _0\"></span>will be determined by<span class=\"_ _0\"></span> the R<span class=\"_ _0\"></span>emuneration Committee and v<span class=\"_ _0\"></span>esting lev<span class=\"_ _0\"></span>els scaled back as appropriate.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsadc\">In addition, in the financial <span class=\"_ _1\"></span>year ended 30 September<span class=\"_ _0\"></span> 2022, a one-off<span class=\"_ _0\"></span> RSU grant with a <span class=\"_ _0\"></span>four<span class=\"_ _0\"></span>-year<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>esting period was made <span class=\"_ _0\"></span>to certain </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsadd\">employees designat<span class=\"_ _0\"></span>ed as MRT<span class=\"_ _2\"></span>s.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsade\">The conditional entitlements outstanding under<span class=\"_ _0\"></span> this scheme at 30 September<span class=\"_ _0\"></span> 2023 and 30 September<span class=\"_ _0\"></span> 2022 wer<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsadf\">Gran<span class=\"_ _0\"></span>t date<span class=\"_ _2df\"> </span>Period e<span class=\"_ _0\"></span>xercisable<span class=\"_ _14b\"> </span>Number<span class=\"_ _b5\"> </span><span class=\"ff17\">Number<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsae0\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsae1\">06/07/2020<span class=\"_ _2e1\"> </span>06/12/2022 to 05/07/2030<span class=\"_ _306\"> </span><span class=\"ff15\">-<span class=\"_ _b5\"> </span><span class=\"ff16\">190,960<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsae2\">11/12/2020<span class=\"_ _266\"> </span>11/12/2023* to 10/12/2030<span class=\"_ _f0\"> </span><span class=\"ff15\">30,193<span class=\"_ _97\"> </span><span class=\"ff16\">30,193<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsae3\">15/12/2021<span class=\"_ _266\"> </span>07/12/2024* to 15/12/2031<span class=\"_ _f0\"> </span><span class=\"ff15\">26,603<span class=\"_ _97\"> </span><span class=\"ff16\">26,603<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsae4\">15/12/2021<span class=\"_ _266\"> </span>07/12/2025* to 15/12/2031<span class=\"_ _279\"> </span><span class=\"ff15\">355,880<span class=\"_ _b5\"> </span><span class=\"ff16\">368,953<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsae5\">412,676<span class=\"_ _b5\"> </span><span class=\"ff16\">616,709<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gsae6\">* Estimated date<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsae8\">The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> RSU awards issued in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear ended 30 Sept<span class=\"_ _0\"></span>ember 2022 <span class=\"_ _0\"></span>was determined using a Black<span class=\"_ _0\"></span>-Scholes Merton model. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsae9\">Details of<span class=\"_ _0\"></span> the awar<span class=\"_ _0\"></span>ds made in that <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> are sho<span class=\"_ _0\"></span>wn below<span class=\"_ _0\"></span>. No awar<span class=\"_ _0\"></span>ds wer<span class=\"_ _0\"></span>e made in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsaea\">Gran<span class=\"_ _0\"></span>t date<span class=\"_ _307\"> </span>15/12/21<span class=\"_ _18f\"> </span>15/12/21<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaeb\">Number of awar<span class=\"_ _0\"></span>ds granted<span class=\"_ _230\"> </span><span class=\"ff15\">368,953<span class=\"_ _a2\"> </span>26,603<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaec\">Mark<span class=\"_ _0\"></span>et price at date of gr<span class=\"_ _0\"></span>ant<span class=\"_ _1fd\"> </span><span class=\"ff15\">549.0p<span class=\"_ _c7\"> </span>549.0p<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaed\">Contractual lif<span class=\"_ _1\"></span>e (years)<span class=\"_ _208\"> </span><span class=\"ff15\">4.0<span class=\"_ _ad\"> </span>3.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsaee\">Fair v<span class=\"_ _0\"></span>alue per share at dat<span class=\"_ _0\"></span>e of grant<span class=\"_ _27e\"> </span><span class=\"ff15\">549.0p<span class=\"_ _c7\"> </span>549.0p<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsaef\">F<span class=\"_ _1\"></span>or all of <span class=\"_ _0\"></span>these grants no departures ar<span class=\"_ _0\"></span>e expected.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSharebasedPaymentArrangementsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-396": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gsaf1\">60. <span class=\"_ _15\"></span>Retir<span class=\"_ _0\"></span>ement benefit obligations<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsaf2\">(a<span class=\"_ _0\"></span>) <span class=\"_ _1\"></span> <span class=\"_ _45\"> </span>Defined benefit plan \u2013 description<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsaf3\">The Group oper<span class=\"_ _0\"></span>ates a funded defined benefit pension scheme in <span class=\"_ _0\"></span>the UK, the Par<span class=\"_ _0\"></span>agon Pension Plan (the \u2018Plan<span class=\"_ _0\"></span>\u2019). T<span class=\"_ _0\"></span>he Plan assets are held </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsaf4\">in a separate fund, administ<span class=\"_ _0\"></span>ered by<span class=\"_ _0\"></span> a corporate <span class=\"_ _0\"></span>trustee, to meet long<span class=\"_ _0\"></span>-term pension liabilities t<span class=\"_ _0\"></span>o past and present emplo<span class=\"_ _0\"></span>yees. <span class=\"_ _0\"></span>The T<span class=\"_ _2f\"></span>rustee<span class=\"_ _15\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsaf5\">of <span class=\"_ _0\"></span>the Plan is requir<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> law <span class=\"_ _0\"></span>to act in the best inter<span class=\"_ _0\"></span>ests of<span class=\"_ _0\"></span> the Plan\u2019<span class=\"_ _2\"></span>s beneficiaries and is responsible for<span class=\"_ _0\"></span> the in<span class=\"_ _0\"></span>vestment policy<span class=\"_ _0\"></span> adopted in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsaf6\">respect o<span class=\"_ _0\"></span>f the Plan<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s assets. The appointment o<span class=\"_ _0\"></span>f dir<span class=\"_ _0\"></span>ectors to <span class=\"_ _0\"></span>the T<span class=\"_ _2\"></span>rustee is determined b<span class=\"_ _0\"></span>y the Plan<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s trust documentation. T<span class=\"_ _0\"></span>he Group has </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsaf7\">a policy<span class=\"_ _0\"></span> that one thir<span class=\"_ _0\"></span>d of<span class=\"_ _0\"></span> all directors of<span class=\"_ _1\"></span> the T<span class=\"_ _2\"></span>rustee should be nominated by<span class=\"_ _0\"></span> active and pensioner<span class=\"_ _0\"></span> members of <span class=\"_ _0\"></span>the Plan.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls6 ws0 gsaf8\">Employ<span class=\"_ _0\"></span>ee contributions and benefits<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsaf9\">The scheme w<span class=\"_ _0\"></span>as closed to ne<span class=\"_ _0\"></span>w entrants in F<span class=\"_ _1\"></span>ebruary 2002. Emplo<span class=\"_ _0\"></span>yees who ar<span class=\"_ _0\"></span>e members of<span class=\"_ _0\"></span> the Plan are entitled <span class=\"_ _0\"></span>to receiv<span class=\"_ _0\"></span>e a pension </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsafa\">of 1/60 o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>their final basic annual salary<span class=\"_ _0\"></span> per <span class=\"_ _1\"></span>year of<span class=\"_ _0\"></span> service up to 30 <span class=\"_ _0\"></span>June 2021. <span class=\"_ _0\"></span>After <span class=\"_ _0\"></span>that date further<span class=\"_ _1\"></span> accrual is at a rate of 1/70 or<span class=\"_ _0\"></span> 1/75 </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsafb\">of capped <span class=\"_ _0\"></span>final salary depending on <span class=\"_ _0\"></span>the level o<span class=\"_ _0\"></span>f contributions. <span class=\"_ _0\"></span>After<span class=\"_ _0\"></span> 1 July<span class=\"_ _1\"></span> 2021 employee contributions wer<span class=\"_ _1\"></span>e either 5% or 8% of<span class=\"_ _0\"></span> capped </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsafc\">salary<span class=\"_ _0\"></span>. Befor<span class=\"_ _0\"></span>e that date all activ<span class=\"_ _0\"></span>e members contributed at a rate o<span class=\"_ _0\"></span>f 5% of<span class=\"_ _0\"></span> salary<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsafd\">Benefits accrued befor<span class=\"_ _0\"></span>e 1 July<span class=\"_ _0\"></span> 2021 may<span class=\"_ _0\"></span> be accessed from <span class=\"_ _0\"></span>the age of<span class=\"_ _0\"></span> 60 without an<span class=\"_ _0\"></span>y r<span class=\"_ _0\"></span>eduction for<span class=\"_ _0\"></span> early payment. Bene<span class=\"_ _0\"></span>fits accruing after </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsafe\">1 July<span class=\"_ _0\"></span> 2021 may<span class=\"_ _0\"></span> be accessed without penalty<span class=\"_ _0\"></span> fr<span class=\"_ _0\"></span>om the age of<span class=\"_ _0\"></span> 65.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsaff\">Dependants of Plan member<span class=\"_ _0\"></span>s are eligible f<span class=\"_ _0\"></span>or a dependant\u2019<span class=\"_ _1\"></span>s pension and the payment o<span class=\"_ _0\"></span>f a lump sum in <span class=\"_ _0\"></span>the event o<span class=\"_ _0\"></span>f death in service.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls6 ws0 gsb00\">Actuarial risks<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb01\">The principal actuarial risks t<span class=\"_ _0\"></span>o which the Plan is e<span class=\"_ _0\"></span>xposed are:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff3 fs1 fc1 sc0 ls6 ws47 gsb02\">\u2022 <span class=\"_ _13\"> </span><span class=\"ff4 ws57\"> Investment <span class=\"_ _f\"> </span>risk</span><span class=\"ws0\"> \u2013 The pr<span class=\"_ _1\"></span>esent value of<span class=\"_ _0\"></span> the defined benefit<span class=\"_ _0\"></span> liabilities is calculated using a discount rate set b<span class=\"_ _0\"></span>y r<span class=\"_ _0\"></span>eference <span class=\"_ _0\"></span>to high </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb03\">quality corporat<span class=\"_ _0\"></span>e bond yields. If<span class=\"_ _0\"></span> plan assets underperform corporate bonds, <span class=\"_ _0\"></span>this will r<span class=\"_ _0\"></span>educe the surplus. <span class=\"_ _0\"></span>The strategic allocation </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb04\">of asse<span class=\"_ _0\"></span>ts under <span class=\"_ _0\"></span>the Plan is currently<span class=\"_ _0\"></span> weighted <span class=\"_ _0\"></span>towar<span class=\"_ _0\"></span>ds equity asse<span class=\"_ _0\"></span>ts and diversified gro<span class=\"_ _0\"></span>wth funds as its liability<span class=\"_ _0\"></span> profile is r<span class=\"_ _0\"></span>elatively </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb05\">immature, and it is e<span class=\"_ _0\"></span>xpected that <span class=\"_ _0\"></span>these asset classes will, o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>the long term, outperf<span class=\"_ _0\"></span>orm gilts and corporate bonds. In consultation </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb06\">with the Company<span class=\"_ _1\"></span>, the <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>rustee keeps the allocation of<span class=\"_ _0\"></span> the Plan<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s investments under r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>w to manag<span class=\"_ _0\"></span>e this risk on a long<span class=\"_ _0\"></span>-term basis<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff3 fs1 fc1 sc0 ls6 ws47 gsb07\">\u2022 <span class=\"_ _13\"> </span><span class=\"ff4 ls5 ws50\"> Interest <span class=\"_ _f\"> </span>risk<span class=\"ff3 ws0\"> \u2013 A<span class=\"_ _0\"></span> fall in corporat<span class=\"_ _0\"></span>e bond yields <span class=\"_ _0\"></span>would reduce <span class=\"_ _0\"></span>the discount rate used in <span class=\"_ _0\"></span>valuing the Plan liabilities and incr<span class=\"_ _0\"></span>ease the <span class=\"_ _0\"></span>value </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls5 ws0 gsb08\">of <span class=\"_ _0\"></span>the Plan liabilities. T<span class=\"_ _0\"></span>he Plan assets would also be e<span class=\"_ _0\"></span>xpected to incr<span class=\"_ _0\"></span>ease, to <span class=\"_ _0\"></span>the extent that<span class=\"_ _0\"></span> bond assets are held, but <span class=\"_ _0\"></span>this would no<span class=\"_ _0\"></span>t be </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls5 ws0 gsb09\">expected t<span class=\"_ _0\"></span>o fully mat<span class=\"_ _0\"></span>ch the increase in liabilities, giv<span class=\"_ _0\"></span>en the <span class=\"_ _0\"></span>weighting to<span class=\"_ _0\"></span>wards equity<span class=\"_ _0\"></span> assets and diversified gr<span class=\"_ _1\"></span>owth funds noted abov<span class=\"_ _0\"></span>e<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff3 fs1 fc1 sc0 ls6 ws47 gsb0a\">\u2022 <span class=\"_ _13\"> </span><span class=\"ff4 ls0 ws16\"> Inflation <span class=\"_ _b\"> </span>risk<span class=\"ff3 ws0\"> \u2013 Pensions in payment ar<span class=\"_ _0\"></span>e increased annually<span class=\"_ _0\"></span> in line with the RPI or<span class=\"_ _1\"></span> the Consumer Price Index (\u2018CPI\u2019) <span class=\"_ _0\"></span>for  </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb0b\">Guaranteed Minimum Pensions built<span class=\"_ _0\"></span> up since 1988. Pensions built up since 5 <span class=\"_ _0\"></span>April 2006 are capped at 2.5% and pensions built up </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb0c\">befor<span class=\"_ _0\"></span>e 6 April 2006 ar<span class=\"_ _0\"></span>e capped at 5%. F<span class=\"_ _1\"></span>or employ<span class=\"_ _0\"></span>ees who hav<span class=\"_ _0\"></span>e left the Company<span class=\"_ _0\"></span> but hav<span class=\"_ _0\"></span>e deferred pensions, <span class=\"_ _0\"></span>these also re<span class=\"_ _0\"></span>value </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb0d\">over<span class=\"_ _1\"></span> the period to r<span class=\"_ _0\"></span>etirement pr<span class=\"_ _0\"></span>edominantly in line <span class=\"_ _0\"></span>with RPI. T<span class=\"_ _0\"></span>herefor<span class=\"_ _0\"></span>e, an increase in inflation <span class=\"_ _0\"></span>would also incr<span class=\"_ _0\"></span>ease the <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb0e\">pension liabilities. T<span class=\"_ _0\"></span>he Plan assets would also be e<span class=\"_ _0\"></span>xpected to incr<span class=\"_ _0\"></span>ease, to <span class=\"_ _0\"></span>the extent that <span class=\"_ _0\"></span>they<span class=\"_ _0\"></span> are link<span class=\"_ _0\"></span>ed to inflation, but <span class=\"_ _0\"></span>this may<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb0f\">not fully<span class=\"_ _0\"></span> match the incr<span class=\"_ _0\"></span>ease in liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff3 fs1 fc1 sc0 ls6 ws47 gsb10\">\u2022 <span class=\"_ _13\"> </span><span class=\"ff4 ws57\"> Longevity<span class=\"_ _0\"></span> <span class=\"_ _f\"> </span>risk<span class=\"ff3 ws0\"> \u2013 The <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the Plan surplus is calculated b<span class=\"_ _0\"></span>y r<span class=\"_ _0\"></span>efer<span class=\"_ _0\"></span>ence to the best<span class=\"_ _0\"></span> estimate of <span class=\"_ _0\"></span>the mortality rat<span class=\"_ _0\"></span>e among Plan </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb11\">members both during and after<span class=\"_ _0\"></span> employment. <span class=\"_ _0\"></span>An increase in <span class=\"_ _0\"></span>the life expectancy<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the members w<span class=\"_ _0\"></span>ould reduce <span class=\"_ _0\"></span>the surplus in the Plan<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff3 fs1 fc1 sc0 ls6 ws51 gsb12\">\u2022  <span class=\"_ _193\"></span><span class=\"ff4 ws0\">Salary risk<span class=\"ff3\"> \u2013 The <span class=\"_ _0\"></span>valuation of<span class=\"_ _0\"></span> the Plan assumes a le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> futur<span class=\"_ _0\"></span>e salary incr<span class=\"_ _0\"></span>eases based on the expected rat<span class=\"_ _0\"></span>e of inflation. Should <span class=\"_ _0\"></span>the </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb13\">salaries of Plan member<span class=\"_ _0\"></span>s increase at a higher<span class=\"_ _0\"></span> rate, then <span class=\"_ _0\"></span>the surplus will be lo<span class=\"_ _0\"></span>wer<span class=\"_ _1\"></span>. F<span class=\"_ _0\"></span>or service fr<span class=\"_ _0\"></span>om 1 <span class=\"_ _0\"></span>July 2021, a 2.5% cap on individual </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb14\">pensionable salary applies, mitigating <span class=\"_ _0\"></span>this risk<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb15\">The risks r<span class=\"_ _0\"></span>elating to death in service payments ar<span class=\"_ _0\"></span>e insured <span class=\"_ _0\"></span>with an external insurance company<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb17\">As a result o<span class=\"_ _0\"></span>f the Plan ha<span class=\"_ _0\"></span>ving been closed to ne<span class=\"_ _0\"></span>w entrants since F<span class=\"_ _1\"></span>ebruary 2002, the service cost<span class=\"_ _0\"></span> as a percentage o<span class=\"_ _0\"></span>f pensionable salaries </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb18\">is expected t<span class=\"_ _0\"></span>o increase as the a<span class=\"_ _0\"></span>verage ag<span class=\"_ _0\"></span>e of activ<span class=\"_ _0\"></span>e members rises ov<span class=\"_ _0\"></span>er time. Ho<span class=\"_ _0\"></span>wev<span class=\"_ _0\"></span>er<span class=\"_ _1\"></span>, the membership is expected t<span class=\"_ _0\"></span>o reduce so that </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb19\">the service cost in monetary<span class=\"_ _0\"></span> terms will gr<span class=\"_ _0\"></span>adually r<span class=\"_ _0\"></span>educe. The chang<span class=\"_ _0\"></span>es referr<span class=\"_ _1\"></span>ed to above <span class=\"_ _0\"></span>will also reduce <span class=\"_ _0\"></span>this cost going f<span class=\"_ _0\"></span>orward.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls6 ws0 gsb1a\">Actuarial <span class=\"_ _0\"></span>valuation and reco<span class=\"_ _0\"></span>very<span class=\"_ _0\"></span> plan<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb1b\">The most r<span class=\"_ _0\"></span>ecent full actuarial v<span class=\"_ _0\"></span>aluation of<span class=\"_ _0\"></span> the Plan\u2019<span class=\"_ _2\"></span>s liabilities, obtained by <span class=\"_ _0\"></span>the T<span class=\"_ _2\"></span>rustee, w<span class=\"_ _0\"></span>as carried out at 31 March 2022, b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>Aon </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb1c\">Solutions UK Limited, <span class=\"_ _0\"></span>the Plan\u2019<span class=\"_ _1\"></span>s independent actuary and completed in <span class=\"_ _0\"></span>the current <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>. This sho<span class=\"_ _0\"></span>wed that <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the Plan\u2019<span class=\"_ _1\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb1d\">liabilities on a buy-out basis in accor<span class=\"_ _0\"></span>dance with section 224 of<span class=\"_ _0\"></span> the P<span class=\"_ _0\"></span>ensions Act<span class=\"_ _0\"></span> 2004, the le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> assets which <span class=\"_ _0\"></span>would be requir<span class=\"_ _0\"></span>ed to buy<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb1e\">insurance policies f<span class=\"_ _0\"></span>or benefits earned <span class=\"_ _0\"></span>to the <span class=\"_ _0\"></span>valuation date, <span class=\"_ _0\"></span>was \u00a3195.5m, with a shortfall ag<span class=\"_ _0\"></span>ainst the assets of<span class=\"_ _0\"></span> \u00a344.2m (2019: \u00a385.<span class=\"_ _0\"></span>0m). </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb1f\">The deficit on <span class=\"_ _0\"></span>the T<span class=\"_ _2\"></span>echnical Basis, the basis agr<span class=\"_ _0\"></span>eed by<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>T<span class=\"_ _1\"></span>rustee as being appropriat<span class=\"_ _0\"></span>e to meet member<span class=\"_ _0\"></span> benefits, assuming the plan </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb20\">continues as a going concern, w<span class=\"_ _0\"></span>as \u00a35.<span class=\"_ _0\"></span>1m (2019: \u00a318.2m). <span class=\"_ _0\"></span>This <span class=\"_ _0\"></span>valuation f<span class=\"_ _0\"></span>orms the basis of<span class=\"_ _0\"></span> the IAS 19 <span class=\"_ _0\"></span>valuation.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb21\">F<span class=\"_ _1\"></span>ollowing the agreement o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the 2022 actuarial valuation, <span class=\"_ _0\"></span>the T<span class=\"_ _2f\"></span>rustee put in place a revised r<span class=\"_ _0\"></span>ecovery<span class=\"_ _1\"></span> plan. On current for<span class=\"_ _0\"></span>ecasts the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb22\">T<span class=\"_ _2\"></span>rustee\u2019<span class=\"_ _1\"></span>s recov<span class=\"_ _0\"></span>ery plan <span class=\"_ _0\"></span>would meet <span class=\"_ _0\"></span>the statutory funding objectiv<span class=\"_ _0\"></span>e by<span class=\"_ _0\"></span> 31 July<span class=\"_ _0\"></span> 2025. T<span class=\"_ _0\"></span>he re<span class=\"_ _0\"></span>vised recov<span class=\"_ _0\"></span>ery plan continues <span class=\"_ _0\"></span>to include </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb23\">a Pension F<span class=\"_ _1\"></span>unding Partnership (\u2018PFP\u2019) arrangement effectiv<span class=\"_ _0\"></span>ely granting <span class=\"_ _0\"></span>the Plan a first char<span class=\"_ _0\"></span>ge ov<span class=\"_ _0\"></span>er the Gr<span class=\"_ _1\"></span>oup\u2019<span class=\"_ _1\"></span>s head office building </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb24\">as security <span class=\"_ _0\"></span>for pa<span class=\"_ _0\"></span>yments under <span class=\"_ _0\"></span>the plan (note 29). No amount<span class=\"_ _0\"></span> is included in the Plan assets in r<span class=\"_ _0\"></span>espect of <span class=\"_ _0\"></span>the building, which r<span class=\"_ _0\"></span>emains </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb25\">within the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s Property<span class=\"_ _0\"></span>, Plant and Equipment balance (<span class=\"_ _0\"></span>note 29) but <span class=\"_ _0\"></span>this arrangement pr<span class=\"_ _0\"></span>ovides the Plan <span class=\"_ _0\"></span>with additional security in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb26\">a stress e<span class=\"_ _0\"></span>vent.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsb27\">(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Defined benefit plan \u2013 <span class=\"_ _0\"></span>financial impact<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb28\">F<span class=\"_ _1\"></span>or accounting purposes, the <span class=\"_ _0\"></span>valuation at 31 Mar<span class=\"_ _0\"></span>ch 2022 was updat<span class=\"_ _0\"></span>ed to 30 September<span class=\"_ _0\"></span> 2023 in accordance <span class=\"_ _0\"></span>with the r<span class=\"_ _0\"></span>equirements of<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb29\">IAS 19 (r<span class=\"_ _0\"></span>evised) b<span class=\"_ _0\"></span>y Mer<span class=\"_ _0\"></span>cer<span class=\"_ _1\"></span>, the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s independent consulting actuary.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsb2a\">The major<span class=\"_ _0\"></span> categories of<span class=\"_ _0\"></span> assets in the Plan at 30 September<span class=\"_ _1\"></span> 2023, 30 September 2022 and 30 September<span class=\"_ _0\"></span> 2021 and their<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues wer<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsb2b\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsb2c\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb2d\">Cash and cash equivalents<span class=\"_ _2f5\"> </span><span class=\"ff15\">0.6<span class=\"_ _9e\"> </span><span class=\"ff16\">0.7<span class=\"_ _3a\"> </span>17.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb2e\">Equity instrumen<span class=\"_ _0\"></span>ts<span class=\"_ _309\"> </span><span class=\"ff15\">44.8<span class=\"_ _3a\"> </span><span class=\"ff16\">56.6<span class=\"_ _3a\"> </span>73.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb2f\">Debt instruments<span class=\"_ _30a\"> </span><span class=\"ff15\">56.6<span class=\"_ _3a\"> </span><span class=\"ff16\">47.4<span class=\"_ _3a\"> </span>54.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsb30\">T<span class=\"_ _2\"></span>otal fair value of Plan assets<span class=\"_ _27f\"> </span>102.0<span class=\"_ _150\"> </span><span class=\"ff16\">104.7<span class=\"_ _150\"> </span>145.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb31\">Present v<span class=\"_ _0\"></span>alue of Plan liabilities<span class=\"_ _2af\"> </span><span class=\"ff15\">(89.3)<span class=\"_ _6c\"> </span></span>(97.6)<span class=\"_ _b6\"> </span>(155.6)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb32\">Surplus / (deficit) in the Plan<span class=\"_ _23e\"> </span><span class=\"ff15\">12.7<span class=\"_ _9e\"> </span><span class=\"ff16\">7.1<span class=\"_ _12c\"> </span></span></span>(10.3)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb33\">The Group has r<span class=\"_ _0\"></span>ecognised the surplus as an asset<span class=\"_ _0\"></span> at the balance sheet date as it<span class=\"_ _0\"></span> anticipates being able to access economic benefits </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb34\">at least as great<span class=\"_ _0\"></span> as the carrying v<span class=\"_ _0\"></span>alue. Howe<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> such assets are eliminat<span class=\"_ _0\"></span>ed from capital <span class=\"_ _0\"></span>for r<span class=\"_ _0\"></span>egulatory<span class=\"_ _0\"></span> purposes (note 61).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb35\">At 30 Sept<span class=\"_ _0\"></span>ember 2023 the Plan asse<span class=\"_ _0\"></span>ts wer<span class=\"_ _0\"></span>e invested in a div<span class=\"_ _0\"></span>ersified portfolio <span class=\"_ _0\"></span>that consisted primarily of<span class=\"_ _1\"></span> equity and debt investments. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb36\">The majority o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the equities held by <span class=\"_ _0\"></span>the Plan are in de<span class=\"_ _0\"></span>veloped mark<span class=\"_ _0\"></span>ets. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb37\">The Plan also has a benchmark allocation of<span class=\"_ _0\"></span> 28% of<span class=\"_ _0\"></span> total assets <span class=\"_ _0\"></span>to Liability Driv<span class=\"_ _0\"></span>en Investments (\u2018LDI\u2019). <span class=\"_ _0\"></span>These inv<span class=\"_ _0\"></span>estments are used </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb38\">to meet a hedging <span class=\"_ _0\"></span>target of<span class=\"_ _0\"></span> 60% of<span class=\"_ _0\"></span> the inter<span class=\"_ _0\"></span>est and inflation risks faced b<span class=\"_ _0\"></span>y the Plan. During <span class=\"_ _0\"></span>the market<span class=\"_ _0\"></span> turmoil encounter<span class=\"_ _0\"></span>ed during </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb39\">September<span class=\"_ _0\"></span> / October 2022 <span class=\"_ _0\"></span>the assets of <span class=\"_ _0\"></span>the Plan pro<span class=\"_ _0\"></span>ved themselv<span class=\"_ _0\"></span>es to be r<span class=\"_ _0\"></span>obust in pro<span class=\"_ _0\"></span>tecting the members<span class=\"_ _0\"></span>\u2019 interests, <span class=\"_ _0\"></span>with no </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb3a\">requir<span class=\"_ _0\"></span>ement to either<span class=\"_ _0\"></span> divest <span class=\"_ _0\"></span>from LDI nor<span class=\"_ _0\"></span> to r<span class=\"_ _0\"></span>educe the hedge r<span class=\"_ _0\"></span>atio in place. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb3b\">T<span class=\"_ _2\"></span>owards <span class=\"_ _0\"></span>the end of<span class=\"_ _0\"></span> the y<span class=\"_ _0\"></span>ear ended 30 Sep<span class=\"_ _0\"></span>tember 2021 <span class=\"_ _0\"></span>the Plan disposed of its holdings in r<span class=\"_ _0\"></span>eal estate funds, <span class=\"_ _0\"></span>following a r<span class=\"_ _0\"></span>eview<span class=\"_ _0\"></span> of its </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb3c\">investment str<span class=\"_ _0\"></span>ategy<span class=\"_ _0\"></span>. <span class=\"_ _0\"></span>At the 2021 <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end these <span class=\"_ _0\"></span>were in <span class=\"_ _0\"></span>the process of<span class=\"_ _0\"></span> rein<span class=\"_ _0\"></span>vestment in other<span class=\"_ _0\"></span> asset classes, with part<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the proceeds </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb3d\">held in cash at the balance sheet<span class=\"_ _0\"></span> date.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb3e\">During October 2018, <span class=\"_ _0\"></span>the High Court made a ruling in the Llo<span class=\"_ _0\"></span>yds Banking Gr<span class=\"_ _0\"></span>oup Pension Scheme GMP (\u2018Guaranteed Minimum </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb3f\">Pension<span class=\"_ _0\"></span>\u2019) equalisation case, which effectiv<span class=\"_ _0\"></span>ely dir<span class=\"_ _0\"></span>ects defined benefit pension schemes t<span class=\"_ _0\"></span>o change their<span class=\"_ _0\"></span> rules to equalise <span class=\"_ _0\"></span>the benefits </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb40\">of male and <span class=\"_ _0\"></span>female members f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the effects of<span class=\"_ _0\"></span> GMPs for<span class=\"_ _0\"></span> employees <span class=\"_ _0\"></span>who w<span class=\"_ _0\"></span>ere, at one <span class=\"_ _0\"></span>time, contracted out of<span class=\"_ _0\"></span> state schemes. T<span class=\"_ _0\"></span>he </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb41\">Court did not specify<span class=\"_ _0\"></span> a single method which schemes should emplo<span class=\"_ _0\"></span>y and hence the impact<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>this on the Plan will no<span class=\"_ _0\"></span>t be certain until </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb42\">the T<span class=\"_ _2f\"></span>rustee has determined which method should be adopted and detailed calculations ha<span class=\"_ _0\"></span>ve been performed <span class=\"_ _0\"></span>to ev<span class=\"_ _0\"></span>aluate the impact, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb43\">as the impact on members <span class=\"_ _0\"></span>will v<span class=\"_ _0\"></span>ary <span class=\"_ _0\"></span>from person <span class=\"_ _0\"></span>to person.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb44\">The estimated effect<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>this ruling was account<span class=\"_ _0\"></span>ed for<span class=\"_ _0\"></span> in the accounts of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup for<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2019 as a \u2018past </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb45\">service cost'<span class=\"_ _2\"></span>. This estimat<span class=\"_ _0\"></span>e is based on one permissible method, method C2. F<span class=\"_ _1\"></span>ollowing the y<span class=\"_ _0\"></span>ear end, <span class=\"_ _0\"></span>the T<span class=\"_ _2\"></span>rustee, with <span class=\"_ _0\"></span>the consent of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb46\">the Company<span class=\"_ _1\"></span>, chose to adopt an alternative appr<span class=\"_ _0\"></span>oach, method B. How<span class=\"_ _0\"></span>ever<span class=\"_ _1\"></span>, the accounting impact of<span class=\"_ _1\"></span> this is likely <span class=\"_ _0\"></span>to be minimal. Once </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb47\">detailed calculations are perf<span class=\"_ _0\"></span>ormed it is possible that <span class=\"_ _0\"></span>the final impact may<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>ary due <span class=\"_ _0\"></span>to idiosyncratic impacts on individual members, or<span class=\"_ _1\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb48\">due to <span class=\"_ _0\"></span>the development<span class=\"_ _0\"></span> of a <span class=\"_ _0\"></span>wider legal and accounting consensus on <span class=\"_ _0\"></span>the proper<span class=\"_ _0\"></span> interpre<span class=\"_ _0\"></span>tation of <span class=\"_ _0\"></span>the courts\u2019 r<span class=\"_ _0\"></span>equirements as further<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb49\">cases are determined.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb4b\">The mov<span class=\"_ _0\"></span>ement in the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the Plan assets during <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span> was as f<span class=\"_ _0\"></span>ollows:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsb4c\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsb4d\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb4e\">At 1 Oct<span class=\"_ _0\"></span>ober 2022<span class=\"_ _1f6\"> </span><span class=\"ff15\">104.7<span class=\"_ _d5\"> </span><span class=\"ff16\">145.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb4f\">Inter<span class=\"_ _0\"></span>est on Plan assets<span class=\"_ _30b\"> </span><span class=\"ff15\">5.2<span class=\"_ _9e\"> </span><span class=\"ff16\">2.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsb50\">Cash flows</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb51\"> <span class=\"_ _c0\"> </span>Contributions by the Group<span class=\"_ _151\"> </span><span class=\"ff15\">3.9<span class=\"_ _9e\"> </span><span class=\"ff16\">4.0</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb52\"> <span class=\"_ _c0\"> </span>Contributions by Plan members<span class=\"_ _205\"> </span><span class=\"ff15\">0.2<span class=\"_ _d1\"> </span><span class=\"ff16\">0.2</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb53\"> <span class=\"_ _c0\"> </span>Benefits paid<span class=\"_ _22e\"> </span><span class=\"ff15\">(3.6)<span class=\"_ _1db\"> </span></span>(3.8)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb54\"> <span class=\"_ _c0\"> </span>Administration expenses paid<span class=\"_ _1ac\"> </span><span class=\"ff15\">(0.6)<span class=\"_ _1db\"> </span></span>(0.8)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsb55\">Remeasur<span class=\"_ _0\"></span>ement (loss) / gain</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb56\"> <span class=\"_ _c0\"> </span>Return on Plan assets (ex<span class=\"_ _0\"></span>cluding amounts included in interes<span class=\"_ _0\"></span>t)<span class=\"_ _185\"> </span><span class=\"ff15\">(7.8)<span class=\"_ _bf\"> </span></span>(43.1)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb57\">At 30 Sept<span class=\"_ _0\"></span>ember 2023<span class=\"_ _30c\"> </span><span class=\"ff15\">102.0<span class=\"_ _d5\"> </span><span class=\"ff16\">104.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb58\">The actual re<span class=\"_ _0\"></span>turn on Plan assets in the <span class=\"_ _0\"></span>year ended 30 Sep<span class=\"_ _0\"></span>tember 2023 <span class=\"_ _0\"></span>was a loss of<span class=\"_ _0\"></span> \u00a32.6m (2022: loss of<span class=\"_ _0\"></span> \u00a340.2m<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb59\">The mov<span class=\"_ _0\"></span>ement in the pr<span class=\"_ _0\"></span>esent v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the Plan liabilities during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> was as <span class=\"_ _0\"></span>follows:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsb5a\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsb5b\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb5c\">At 1 Oct<span class=\"_ _0\"></span>ober 2022<span class=\"_ _27b\"> </span><span class=\"ff15\">97.6<span class=\"_ _d5\"> </span><span class=\"ff16\">155.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb5d\">Current service cos<span class=\"_ _0\"></span>t<span class=\"_ _21e\"> </span><span class=\"ff15\">0.5<span class=\"_ _9e\"> </span><span class=\"ff16\">0.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb5e\">Pas<span class=\"_ _0\"></span>t service cost<span class=\"_ _30d\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb5f\">Funding cost<span class=\"_ _30e\"> </span><span class=\"ff15\">4.8<span class=\"_ _9e\"> </span><span class=\"ff16\">3.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsb60\">Cash flows</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb61\"> <span class=\"_ _c0\"> </span>Contributions by Plan members<span class=\"_ _205\"> </span><span class=\"ff15\">0.2<span class=\"_ _d1\"> </span><span class=\"ff16\">0.2</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb62\"> <span class=\"_ _c0\"> </span>Benefits paid<span class=\"_ _22e\"> </span><span class=\"ff15\">(3.6)<span class=\"_ _1db\"> </span></span>(3.8)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsb63\">Remeasur<span class=\"_ _0\"></span>ement loss / (gain)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb64\"> <span class=\"_ _c0\"> </span>Arising from demographic assumptions<span class=\"_ _244\"> </span><span class=\"ff15\">(0.9)<span class=\"_ _72\"> </span><span class=\"ff16\">2.2</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb65\"> <span class=\"_ _c0\"> </span>Arising from financial assumptions<span class=\"_ _30f\"> </span><span class=\"ff15\">(11.1)<span class=\"_ _bf\"> </span></span>(61.9)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb66\"> <span class=\"_ _c0\"> </span>Arising from experience adjustments<span class=\"_ _310\"> </span><span class=\"ff15\">1.8<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb67\">At 30 Sept<span class=\"_ _0\"></span>ember 2023<span class=\"_ _311\"> </span><span class=\"ff15\">89.3<span class=\"_ _3a\"> </span><span class=\"ff16\">97.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb68\">The liabilities of<span class=\"_ _0\"></span> the Plan ar<span class=\"_ _0\"></span>e measured by<span class=\"_ _0\"></span> discounting the best estimate o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>future cash flo<span class=\"_ _0\"></span>ws to be paid out<span class=\"_ _0\"></span> by <span class=\"_ _0\"></span>the Plan using the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb69\">Projected Unit me<span class=\"_ _0\"></span>thod. This amount<span class=\"_ _0\"></span> is reflected in <span class=\"_ _0\"></span>the liability in <span class=\"_ _0\"></span>the balance sheet. The Pr<span class=\"_ _0\"></span>ojected Unit method is an accrued benefits </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb6a\">valuation method in <span class=\"_ _0\"></span>which the Plan liabilities ar<span class=\"_ _0\"></span>e calculated based on service up until the <span class=\"_ _0\"></span>valuation date allowing <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> future salary<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb6b\">gro<span class=\"_ _0\"></span>wth until the date of<span class=\"_ _0\"></span> retir<span class=\"_ _0\"></span>ement, withdra<span class=\"_ _0\"></span>wal or death, as appr<span class=\"_ _1\"></span>opriate. The futur<span class=\"_ _0\"></span>e service rate is then calculat<span class=\"_ _0\"></span>ed as the contribution </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb6c\">rate r<span class=\"_ _0\"></span>equired t<span class=\"_ _0\"></span>o fund the service accruing o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the next <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> again allowing f<span class=\"_ _0\"></span>or futur<span class=\"_ _1\"></span>e salary growth. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb6d\">Liabilities for<span class=\"_ _0\"></span> benefits accruing f<span class=\"_ _0\"></span>or service up <span class=\"_ _0\"></span>to 1 July<span class=\"_ _0\"></span> 2021 are calculated separ<span class=\"_ _0\"></span>ately <span class=\"_ _0\"></span>from those accruing in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> service after </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb6e\">that date.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb70\">The major<span class=\"_ _0\"></span> weighted a<span class=\"_ _0\"></span>verage assump<span class=\"_ _0\"></span>tions used by <span class=\"_ _0\"></span>the actuary <span class=\"_ _0\"></span>were (in nominal <span class=\"_ _0\"></span>terms):<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsb71\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsb72\">In determining net pension cos<span class=\"_ _0\"></span>t for the year</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb73\"> <span class=\"_ _c0\"> </span>Discount rate<span class=\"_ _312\"> </span><span class=\"ff15\">5.00%<span class=\"_ _9f\"> </span><span class=\"ff16\">2.00%<span class=\"_ _9f\"> </span>1.75%</span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsb74\"> <span class=\"_ _c0\"> </span>Rate of compensation increase:</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb75\"> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Pre 1 July 2021 accrual<span class=\"_ _1c0\"> </span><span class=\"ff15\">3.55%<span class=\"_ _9f\"> </span><span class=\"ff16\">3.40%<span class=\"_ _9f\"> </span>2.95%</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb76\"> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Post 1 July 2021 accrual<span class=\"_ _313\"> </span><span class=\"ff15\">2.50%<span class=\"_ _9f\"> </span><span class=\"ff16\">2.50%<span class=\"_ _9f\"> </span>2.50%</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb77\"> <span class=\"_ _c0\"> </span>Rate of price inflation<span class=\"_ _314\"> </span><span class=\"ff15\">3.55%<span class=\"_ _9f\"> </span><span class=\"ff16\">3.40%<span class=\"_ _9f\"> </span>2.95%</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb78\"> <span class=\"_ _c0\"> </span>Rate of increase of pensions<span class=\"_ _2a1\"> </span><span class=\"ff15\">3.25%<span class=\"_ _9f\"> </span><span class=\"ff16\">3.15%<span class=\"_ _19c\"> </span>2.85%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsb79\">In determining benefit oblig<span class=\"_ _0\"></span>ations</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb7a\"> <span class=\"_ _c0\"> </span>Discount rate<span class=\"_ _312\"> </span><span class=\"ff15\">5.55%<span class=\"_ _9f\"> </span><span class=\"ff16\">5.00%<span class=\"_ _9f\"> </span>2.00%</span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsb7b\"> <span class=\"_ _c0\"> </span>Rate of compensation increase:</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb7c\"> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Pre 1 July 2021 accrual<span class=\"_ _1c0\"> </span><span class=\"ff15\">3.25%<span class=\"_ _9f\"> </span><span class=\"ff16\">3.55%<span class=\"_ _9f\"> </span>3.40%</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb7d\"> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Post 1 July 2021 accrual<span class=\"_ _313\"> </span><span class=\"ff15\">2.50%<span class=\"_ _9f\"> </span><span class=\"ff16\">2.50%<span class=\"_ _9f\"> </span>2.50%</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb7e\"> <span class=\"_ _c0\"> </span>Rate of price inflation<span class=\"_ _314\"> </span><span class=\"ff15\">3.25%<span class=\"_ _9f\"> </span><span class=\"ff16\">3.55%<span class=\"_ _9f\"> </span>3.40%</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb7f\"> <span class=\"_ _c0\"> </span>Rate of increase of pensions<span class=\"_ _2a1\"> </span><span class=\"ff15\">3.00%<span class=\"_ _9f\"> </span><span class=\"ff16\">3.25%<span class=\"_ _19c\"> </span>3.15%</span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsb80\"> <span class=\"_ _c0\"> </span>Further life expectancy at ag<span class=\"_ _0\"></span>e 60</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb81\"> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Male member aged 60<span class=\"_ _246\"> </span><span class=\"ff15\">27<span class=\"_ _b7\"> </span><span class=\"ff16\">27<span class=\"_ _5a\"> </span>28</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb82\"> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Female member aged 60<span class=\"_ _178\"> </span><span class=\"ff15\">29<span class=\"_ _b7\"> </span><span class=\"ff16\">29<span class=\"_ _b7\"> </span>29</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb83\"> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Male member aged 40<span class=\"_ _246\"> </span><span class=\"ff15\">29<span class=\"_ _b7\"> </span><span class=\"ff16\">29<span class=\"_ _5a\"> </span>29</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb84\"> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Female member aged 40<span class=\"_ _178\"> </span><span class=\"ff15\">31<span class=\"_ _b7\"> </span><span class=\"ff16\">31<span class=\"_ _b7\"> </span>31<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb85\">In the 2023 <span class=\"_ _0\"></span>valuation the base mortality<span class=\"_ _1\"></span> table used was <span class=\"_ _0\"></span>the standard S3PMA/S3PF<span class=\"_ _1\"></span>A_M (All) Y<span class=\"_ _2\"></span>ear of<span class=\"_ _0\"></span> Birth table, <span class=\"_ _0\"></span>with future </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb86\">impro<span class=\"_ _0\"></span>vements project<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the CMI 2022 projection model with a 1.5% per<span class=\"_ _0\"></span> annum long-t<span class=\"_ _0\"></span>erm improv<span class=\"_ _0\"></span>ement rate.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb87\">In the 2022 <span class=\"_ _0\"></span>valuation the base mortality<span class=\"_ _1\"></span> table used was <span class=\"_ _0\"></span>the standard S3PMA/S3PF<span class=\"_ _1\"></span>A_M (All) Y<span class=\"_ _2\"></span>ear of<span class=\"_ _0\"></span> Birth table, <span class=\"_ _0\"></span>with future </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb88\">impro<span class=\"_ _0\"></span>vements project<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the CMI 2021 projection model with a 1.5% per<span class=\"_ _0\"></span> annum long-t<span class=\"_ _0\"></span>erm improv<span class=\"_ _0\"></span>ement rate.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb89\">In the 2021 <span class=\"_ _0\"></span>valuation the base mortality<span class=\"_ _1\"></span> table used was <span class=\"_ _0\"></span>the standard S3 P<span class=\"_ _1\"></span>A (All) <span class=\"_ _0\"></span>Y<span class=\"_ _2\"></span>ear of Birth <span class=\"_ _0\"></span>table, with futur<span class=\"_ _0\"></span>e impro<span class=\"_ _0\"></span>vements </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb8a\">projected using <span class=\"_ _0\"></span>the CMI 2020 projection model with a 1.5% per<span class=\"_ _0\"></span> annum long-t<span class=\"_ _0\"></span>erm improv<span class=\"_ _0\"></span>ement rate.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb8b\">The amounts charged in <span class=\"_ _0\"></span>the consolidated income statement in r<span class=\"_ _0\"></span>espect of <span class=\"_ _0\"></span>the Plan are:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gsb8c\">Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsb8d\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb8e\">Current service cos<span class=\"_ _0\"></span>t<span class=\"_ _21e\"> </span><span class=\"ff15\">0.5<span class=\"_ _9e\"> </span><span class=\"ff16\">0.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb8f\">Pas<span class=\"_ _0\"></span>t service cost<span class=\"_ _30d\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb90\">T<span class=\"_ _2\"></span>otal service cost<span class=\"_ _197\"> </span><span class=\"ff2c\">57<span class=\"_ _a8\"> </span><span class=\"ff15\">0.5<span class=\"_ _d1\"> </span><span class=\"ff16\">0.9<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb91\">Administra<span class=\"_ _0\"></span>tion expenses<span class=\"_ _315\"> </span><span class=\"ff15\">0.6<span class=\"_ _9e\"> </span><span class=\"ff16\">0.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb92\">Included within operating e<span class=\"_ _0\"></span>xpenses <span class=\"_ _231\"> </span><span class=\"ff15\">1.1<span class=\"_ _9e\"> </span><span class=\"ff16\">1.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb93\">Funding cost of Plan liabilities<span class=\"_ _316\"> </span><span class=\"ff15\">4.8<span class=\"_ _9e\"> </span><span class=\"ff16\">3.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb94\">Inter<span class=\"_ _0\"></span>est on Plan assets <span class=\"_ _297\"> </span><span class=\"ff15\">(5.2)<span class=\"_ _1db\"> </span></span>(2.9)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb95\">Net inter<span class=\"_ _0\"></span>est (income) / expense<span class=\"_ _1c0\"> </span><span class=\"ff22\">4 / 5<span class=\"_ _ff\"> </span><span class=\"ff15\">(0.4)<span class=\"_ _ff\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb96\">Components of defined benefit c<span class=\"_ _0\"></span>osts recognised in pr<span class=\"_ _0\"></span>ofit or loss<span class=\"_ _2f8\"> </span><span class=\"ff15\">0.7<span class=\"_ _9e\"> </span><span class=\"ff16\">1.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsb98\">The amounts recognised in <span class=\"_ _0\"></span>the consolidated statement of<span class=\"_ _0\"></span> comprehensiv<span class=\"_ _0\"></span>e income in respect of<span class=\"_ _1\"></span> the Plan are:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsb99\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsb9a\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb9b\">Return on Plan assets (e<span class=\"_ _0\"></span>xcluding amounts included in in<span class=\"_ _0\"></span>terest)<span class=\"_ _b4\"> </span><span class=\"ff15\">(7.8)<span class=\"_ _6c\"> </span></span>(43.1)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsb9c\">Actuarial gains / (losses)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb9d\"> <span class=\"_ _c0\"> </span>Arising from demographic assumptions<span class=\"_ _164\"> </span><span class=\"ff15\">0.9<span class=\"_ _72\"> </span></span>(2.2)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb9e\"> <span class=\"_ _c0\"> </span>Arising from financial assumptions<span class=\"_ _2bf\"> </span><span class=\"ff15\">11.1<span class=\"_ _cb\"> </span><span class=\"ff16\">61.9</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsb9f\"> <span class=\"_ _c0\"> </span>Arising from experience adjustments<span class=\"_ _202\"> </span><span class=\"ff15\">(1.8)<span class=\"_ _1db\"> </span></span>(1.3)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsba0\">T<span class=\"_ _2\"></span>otal actuarial gain<span class=\"_ _317\"> </span><span class=\"ff15\">2.4<span class=\"_ _3a\"> </span><span class=\"ff16\">15.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsba1\">T<span class=\"_ _1\"></span>ax thereon<span class=\"_ _1f0\"> </span><span class=\"ff15\">(0.8)<span class=\"_ _1db\"> </span></span>(3.7)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsba2\">Net actuarial gain<span class=\"_ _1dd\"> </span><span class=\"ff15\">1.6<span class=\"_ _3a\"> </span><span class=\"ff16\">11.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsba3\">Of <span class=\"_ _0\"></span>the remeasur<span class=\"_ _0\"></span>ement movements r<span class=\"_ _0\"></span>eflected abo<span class=\"_ _0\"></span>ve:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsba4\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The return on plan assets <span class=\"_ _0\"></span>to 30 September<span class=\"_ _0\"></span> 2023 reflects a gener<span class=\"_ _0\"></span>al reduction in asset <span class=\"_ _0\"></span>values in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear<span class=\"_ _0\"></span>, though not<span class=\"_ _0\"></span> as marked as<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsba5\">that seen in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2022 which saw sharp <span class=\"_ _0\"></span>falls in global inv<span class=\"_ _0\"></span>estment v<span class=\"_ _0\"></span>alues over<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> especially ar<span class=\"_ _0\"></span>ound<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsba6\">the y<span class=\"_ _0\"></span>ear end, including <span class=\"_ _0\"></span>the effect on the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s portfolio of its LDI hedging strategy<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsba7\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>In the y<span class=\"_ _0\"></span>ear ended 30 September<span class=\"_ _1\"></span> 2023 the changes in demographic assumptions r<span class=\"_ _0\"></span>eflect the updating of<span class=\"_ _0\"></span> the maturity<span class=\"_ _0\"></span> tables used <span class=\"_ _0\"></span>to<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsba8\">the most recent <span class=\"_ _1\"></span>versions, which show<span class=\"_ _0\"></span> a general r<span class=\"_ _0\"></span>eduction in the expectancy<span class=\"_ _0\"></span> compared <span class=\"_ _0\"></span>to the pr<span class=\"_ _0\"></span>evious editions.</div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsba9\"> <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>The change in demographic assumptions in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2022 resulted <span class=\"_ _0\"></span>from the adop<span class=\"_ _0\"></span>tion of ne<span class=\"_ _0\"></span>w mortality<span class=\"_ _36a\"> </span><span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbaa\">tables which: included an adjustment <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the impact of<span class=\"_ _0\"></span> Covid as w<span class=\"_ _0\"></span>ell as a change in the <span class=\"_ _0\"></span>tables used; included an allowance <span class=\"_ _0\"></span>for<span class=\"_ _36a\"> </span><span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbab\">updated commutation factor<span class=\"_ _0\"></span>s; updated the assumed age diff<span class=\"_ _0\"></span>erence between member<span class=\"_ _0\"></span>s and their<span class=\"_ _0\"></span> partners; and adopted differ<span class=\"_ _0\"></span>ent<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gsbac\">proportion-married assumptions, all to follow<span class=\"_ _0\"></span> the T<span class=\"_ _2\"></span>rustee\u2019<span class=\"_ _1\"></span>s assumptions for the 2022 triennial valuation.<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbad\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The change in financial assumptions in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear ended 30 September<span class=\"_ _0\"></span> 2023 re<span class=\"_ _0\"></span>flects principally a continuation of<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>ecent upwar<span class=\"_ _0\"></span>d<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbae\">trend in bond <span class=\"_ _0\"></span>yields, which has not been mat<span class=\"_ _0\"></span>ched by long<span class=\"_ _0\"></span>-term inflation expectations implied b<span class=\"_ _0\"></span>y gilt rat<span class=\"_ _0\"></span>es.</div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbaf\"> <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>The movement in <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span> ended 30 September 2022 re<span class=\"_ _0\"></span>flected principally <span class=\"_ _0\"></span>the sharp increase in corporate bond <span class=\"_ _0\"></span>yields, which<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbb0\">are used <span class=\"_ _0\"></span>to determine the discount<span class=\"_ _0\"></span> applied in the calculation of<span class=\"_ _0\"></span> the pension liability<span class=\"_ _1\"></span>. The differ<span class=\"_ _0\"></span>ence between Fix<span class=\"_ _0\"></span>ed Interest and<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbb1\">Indexed-Link<span class=\"_ _0\"></span>ed Gilt yields, <span class=\"_ _0\"></span>which is used to <span class=\"_ _0\"></span>forecast<span class=\"_ _0\"></span> market-implied inflation, incr<span class=\"_ _0\"></span>eased far<span class=\"_ _0\"></span> less and so only partially<span class=\"_ _0\"></span> mitigated  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbb2\">this movement.<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbb3\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The experience adjustments in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 r<span class=\"_ _0\"></span>epresent <span class=\"_ _0\"></span>the impact of<span class=\"_ _0\"></span> actual UK inflation in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> on<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbb4\">expected benefits, <span class=\"_ _0\"></span>which is more significant <span class=\"_ _0\"></span>than in pre<span class=\"_ _0\"></span>vious years due <span class=\"_ _0\"></span>to the inflation le<span class=\"_ _0\"></span>vels r<span class=\"_ _0\"></span>ecorded in the period.</div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbb5\"> <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>The experience adjustments in 2022 arose on the adop<span class=\"_ _0\"></span>tion of <span class=\"_ _0\"></span>the draft 2022 Plan v<span class=\"_ _0\"></span>aluation as the basis of<span class=\"_ _1\"></span> the IAS 19 v<span class=\"_ _0\"></span>aluation. This<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbb6\">means that <span class=\"_ _0\"></span>the actual pay rises, r<span class=\"_ _0\"></span>esignations, re<span class=\"_ _0\"></span>tirements and deaths of<span class=\"_ _0\"></span> members since March 2019 <span class=\"_ _0\"></span>were accur<span class=\"_ _0\"></span>ately r<span class=\"_ _0\"></span>epresented<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gsbb7\">rather<span class=\"_ _0\"></span> than projected. This exer<span class=\"_ _0\"></span>cise takes place triennially<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsbb8\">(c<span class=\"_ _1\"></span>)  <span class=\"_ _29\"> </span>Defined benefit plan \u2013 future cash flow<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbb9\">The sensitivity o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the valuation o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the defined benefit obligation t<span class=\"_ _0\"></span>o the principal assumptions disclosed abov<span class=\"_ _0\"></span>e at 30 September<span class=\"_ _0\"></span> 2023,<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbba\">calculating the obligation on <span class=\"_ _0\"></span>the same basis as used in determining the IA<span class=\"_ _0\"></span>S 19 v<span class=\"_ _0\"></span>alue, is as follow<span class=\"_ _0\"></span>s:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsbbb\">Assumption<span class=\"_ _250\"> </span>Increase in assumption<span class=\"_ _6c\"> </span>Impact on scheme liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsbbc\">2023<span class=\"_ _1c1\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsbbd\">Discount r<span class=\"_ _0\"></span>ate<span class=\"_ _314\"> </span>0.1% per annum<span class=\"_ _3d\"> </span><span class=\"ff15\">(1.6)%<span class=\"_ _150\"> </span></span>(1.7)%<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsbbe\">Rate of infla<span class=\"_ _0\"></span>tion*<span class=\"_ _e9\"> </span>0.1% per annum<span class=\"_ _1db\"> </span><span class=\"ff15\">1.6%<span class=\"_ _1c1\"> </span><span class=\"ff16\">1.7%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsbbf\">Rate of salary gr<span class=\"_ _0\"></span>owth<span class=\"_ _318\"> </span>0.1% per annum<span class=\"_ _1db\"> </span><span class=\"ff15\">0.4%<span class=\"_ _1c1\"> </span><span class=\"ff16\">0.4%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsbc0\">Rates of mort<span class=\"_ _0\"></span>ality<span class=\"_ _177\"> </span>1 year of life expect<span class=\"_ _0\"></span>ancy<span class=\"_ _1db\"> </span><span class=\"ff15\">2.5%<span class=\"_ _1c1\"> </span><span class=\"ff16\">2.9%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gsbc1\">* maintaining a 0.<span class=\"_ _0\"></span>0% assumption for r<span class=\"_ _0\"></span>eal salary gr<span class=\"_ _0\"></span>owth<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbc2\">The sensitivity analy<span class=\"_ _0\"></span>sis presented abo<span class=\"_ _0\"></span>ve may<span class=\"_ _0\"></span> not be r<span class=\"_ _0\"></span>epresentative o<span class=\"_ _0\"></span>f an actual futur<span class=\"_ _0\"></span>e change in <span class=\"_ _0\"></span>the defined benefit obligation as<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbc3\">it is unlikely<span class=\"_ _0\"></span> that chang<span class=\"_ _0\"></span>es in assumptions w<span class=\"_ _0\"></span>ould occur in isolation, as some of<span class=\"_ _0\"></span> the assumptions <span class=\"_ _0\"></span>will be correlated. <span class=\"_ _0\"></span>Ther<span class=\"_ _0\"></span>e has been<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbc4\">no change in the me<span class=\"_ _0\"></span>thod of pr<span class=\"_ _0\"></span>eparing the analysis <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>that adopted in pr<span class=\"_ _0\"></span>evious y<span class=\"_ _0\"></span>ears. <span class=\"_ _0\"></span>The impacts of equiv<span class=\"_ _0\"></span>alent decreases in<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbc5\">assumptions are br<span class=\"_ _0\"></span>oadly equal and opposit<span class=\"_ _0\"></span>e to the e<span class=\"_ _0\"></span>ffects of <span class=\"_ _0\"></span>the increases sho<span class=\"_ _0\"></span>wn above.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbc6\">In conjunction with <span class=\"_ _0\"></span>the T<span class=\"_ _2\"></span>rustee, the Gr<span class=\"_ _0\"></span>oup has continued to conduct asset<span class=\"_ _0\"></span>-liability r<span class=\"_ _0\"></span>eview<span class=\"_ _0\"></span>s of <span class=\"_ _0\"></span>the Plan. T<span class=\"_ _0\"></span>hese studies are used t<span class=\"_ _0\"></span>o<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbc7\">assist the <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>rustee and the Group <span class=\"_ _0\"></span>to determine <span class=\"_ _0\"></span>the optimal long-term asse<span class=\"_ _0\"></span>t allocation with r<span class=\"_ _0\"></span>egard <span class=\"_ _0\"></span>to the structur<span class=\"_ _0\"></span>e of liabilities <span class=\"_ _0\"></span>within<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbc8\">the Plan. T<span class=\"_ _0\"></span>he results of<span class=\"_ _0\"></span> the studies ar<span class=\"_ _0\"></span>e used to assist <span class=\"_ _0\"></span>the T<span class=\"_ _2\"></span>rustee in managing the <span class=\"_ _0\"></span>volatility<span class=\"_ _0\"></span> in the underlying inv<span class=\"_ _0\"></span>estment performance<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbc9\">and risk of<span class=\"_ _0\"></span> a significant increase in <span class=\"_ _0\"></span>the scheme deficit by<span class=\"_ _0\"></span> pro<span class=\"_ _0\"></span>viding information used to det<span class=\"_ _0\"></span>ermine the inv<span class=\"_ _0\"></span>estment strategy o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Plan.<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbcb\">There ha<span class=\"_ _0\"></span>ve been no changes in <span class=\"_ _0\"></span>the processes b<span class=\"_ _0\"></span>y which <span class=\"_ _0\"></span>the Plan manages its risks <span class=\"_ _0\"></span>from pre<span class=\"_ _0\"></span>vious periods.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbcc\">F<span class=\"_ _1\"></span>ollowing a revie<span class=\"_ _0\"></span>w of<span class=\"_ _0\"></span> the Plan<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s investment strategy<span class=\"_ _1\"></span>, the current <span class=\"_ _0\"></span>target asse<span class=\"_ _0\"></span>t allocations for<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ending 30 September 202<span class=\"_ _0\"></span>4 are </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbcd\">50% gro<span class=\"_ _0\"></span>wth assets (primarily equities<span class=\"_ _0\"></span>), and 50% matching assets (primarily<span class=\"_ _1\"></span> bonds) which includes LDI balances, with <span class=\"_ _0\"></span>the hedge ratio </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gsbce\">rising to 75%.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbcf\">F<span class=\"_ _1\"></span>ollowing the finalisation of<span class=\"_ _0\"></span> the Mar<span class=\"_ _0\"></span>ch 2022 v<span class=\"_ _0\"></span>aluation, the agr<span class=\"_ _0\"></span>eed rate of emplo<span class=\"_ _0\"></span>yer<span class=\"_ _0\"></span> contribution reduced <span class=\"_ _0\"></span>to 12.5% of capped </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbd0\">pensionable salary <span class=\"_ _0\"></span>from 15 Mar<span class=\"_ _0\"></span>ch 2023, having been 25% since 1 July<span class=\"_ _1\"></span> 2021, and 32.0% previously<span class=\"_ _1\"></span>. An additional contribution <span class=\"_ _0\"></span>for de<span class=\"_ _0\"></span>ficit </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbd1\">reduction of<span class=\"_ _0\"></span> \u00a31.9m pa<span class=\"_ _0\"></span>yable ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the nine-month period ending on 30 November<span class=\"_ _0\"></span> 2023, and an additional contribution of<span class=\"_ _0\"></span> \u00a32.5m per </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbd2\">annum, payable monthly<span class=\"_ _0\"></span> fr<span class=\"_ _0\"></span>om 1 December 2023 <span class=\"_ _0\"></span>were also agr<span class=\"_ _0\"></span>eed. <span class=\"_ _0\"></span>These include amounts payable under<span class=\"_ _0\"></span> the PRP<span class=\"_ _0\"></span> and replace <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbd3\">\u00a32.5m contribution for<span class=\"_ _0\"></span> deficit r<span class=\"_ _0\"></span>eduction included in the pr<span class=\"_ _0\"></span>evious funding plan. <span class=\"_ _0\"></span>The Gr<span class=\"_ _0\"></span>oup continues to mak<span class=\"_ _0\"></span>e an additional \u00a30.4m per<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbd4\">annum contribution in respect o<span class=\"_ _0\"></span>f the Plan<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s running costs, payable monthly<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbd5\">The present<span class=\"_ _0\"></span> best estimate of <span class=\"_ _0\"></span>the contributions to be made <span class=\"_ _0\"></span>to the Plan b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ending 30 September<span class=\"_ _0\"></span> 2024 is \u00a33.9m. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbd6\">The av<span class=\"_ _0\"></span>erage durations of<span class=\"_ _0\"></span> the discounted benefit<span class=\"_ _0\"></span> obligations in the Plan at <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear end ar<span class=\"_ _0\"></span>e shown in the <span class=\"_ _0\"></span>table below:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsbd7\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsbd8\">Y<span class=\"_ _1\"></span>ears<span class=\"_ _84\"> </span><span class=\"ff17\">Y<span class=\"_ _0\"></span>ears<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsbd9\">Category of member<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsbda\">Active members<span class=\"_ _319\"> </span><span class=\"ff15\">18<span class=\"_ _b7\"> </span><span class=\"ff16\">21<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsbdb\">Def<span class=\"_ _0\"></span>erred pensioners<span class=\"_ _21e\"> </span><span class=\"ff15\">18<span class=\"_ _b7\"> </span><span class=\"ff16\">21<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsbdc\">Current pensioner<span class=\"_ _0\"></span>s<span class=\"_ _2cf\"> </span><span class=\"ff15\">11<span class=\"_ _5a\"> </span><span class=\"ff16\">12<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsbdd\">All members<span class=\"_ _2ee\"> </span><span class=\"ff15\">16<span class=\"_ _5a\"> </span><span class=\"ff16\">18<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbde\">The principal cause of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>variations in the period is <span class=\"_ _0\"></span>the significant increase in <span class=\"_ _0\"></span>the discount rate <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span>-on-year<span class=\"_ _2\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsbdf\">(d) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Defined contribution arrang<span class=\"_ _0\"></span>ements<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbe0\">The Group sponsor<span class=\"_ _0\"></span>s a defined contribution (W<span class=\"_ _0\"></span>orksave<span class=\"_ _0\"></span>) pension scheme, open to all emplo<span class=\"_ _0\"></span>yees who ar<span class=\"_ _0\"></span>e not members of<span class=\"_ _0\"></span> the Plan. <span class=\"_ _0\"></span>The </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbe1\">Group completed <span class=\"_ _0\"></span>the auto-enrolment<span class=\"_ _0\"></span> process mandated b<span class=\"_ _0\"></span>y the UK<span class=\"_ _0\"></span> Government<span class=\"_ _0\"></span> in November<span class=\"_ _0\"></span> 2013, using this scheme. Since <span class=\"_ _0\"></span>the year<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbe2\">ended 30 September<span class=\"_ _0\"></span> 2020 the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s contribution to <span class=\"_ _0\"></span>the scheme for<span class=\"_ _0\"></span> those emplo<span class=\"_ _0\"></span>yees making the maximum 6% contribution has </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbe3\">been 10% of salary<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbe4\">The Group also sponsor<span class=\"_ _0\"></span>s a number of<span class=\"_ _0\"></span> other<span class=\"_ _0\"></span> defined contribution pension plans relating <span class=\"_ _0\"></span>to acquired entities and mak<span class=\"_ _0\"></span>es contributions </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbe5\">to these schemes in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> employees.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbe6\">The assets of<span class=\"_ _0\"></span> these schemes ar<span class=\"_ _0\"></span>e not Group asse<span class=\"_ _0\"></span>ts and are held separately<span class=\"_ _0\"></span> fr<span class=\"_ _0\"></span>om those of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup, under <span class=\"_ _0\"></span>the control of<span class=\"_ _0\"></span> independent </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbe7\">trustees. Contributions made by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup to <span class=\"_ _0\"></span>these schemes in the y<span class=\"_ _0\"></span>ear ended 30 Sept<span class=\"_ _0\"></span>ember 2023, <span class=\"_ _0\"></span>which repr<span class=\"_ _0\"></span>esent the t<span class=\"_ _0\"></span>otal cost </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbe8\">charged against<span class=\"_ _0\"></span> income, wer<span class=\"_ _0\"></span>e \u00a34.7m (2022: \u00a34<span class=\"_ _0\"></span>.<span class=\"_ _0\"></span>1m) (<span class=\"_ _0\"></span>note 57).</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEmployeeBenefitsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-453": {
   "value": "(a<span class=\"_ _0\"></span>) <span class=\"_ _1\"></span> <span class=\"_ _45\"> </span>Defined benefit plan \u2013 description<span class=\"_ _36a\"> </span>The Group oper<span class=\"_ _0\"></span>ates a funded defined benefit pension scheme in <span class=\"_ _0\"></span>the UK, the Par<span class=\"_ _0\"></span>agon Pension Plan (the \u2018Plan<span class=\"_ _0\"></span>\u2019). T<span class=\"_ _0\"></span>he Plan assets are held in a separate fund, administ<span class=\"_ _0\"></span>ered by<span class=\"_ _0\"></span> a corporate <span class=\"_ _0\"></span>trustee, to meet long<span class=\"_ _0\"></span>-term pension liabilities t<span class=\"_ _0\"></span>o past and present emplo<span class=\"_ _0\"></span>yees. <span class=\"_ _0\"></span>The T<span class=\"_ _2f\"></span>rustee<span class=\"_ _15\"></span> of <span class=\"_ _0\"></span>the Plan is requir<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> law <span class=\"_ _0\"></span>to act in the best inter<span class=\"_ _0\"></span>ests of<span class=\"_ _0\"></span> the Plan\u2019<span class=\"_ _2\"></span>s beneficiaries and is responsible for<span class=\"_ _0\"></span> the in<span class=\"_ _0\"></span>vestment policy<span class=\"_ _0\"></span> adopted in respect o<span class=\"_ _0\"></span>f the Plan<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s assets. The appointment o<span class=\"_ _0\"></span>f dir<span class=\"_ _0\"></span>ectors to <span class=\"_ _0\"></span>the T<span class=\"_ _2\"></span>rustee is determined b<span class=\"_ _0\"></span>y the Plan<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s trust documentation. T<span class=\"_ _0\"></span>he Group has a policy<span class=\"_ _0\"></span> that one thir<span class=\"_ _0\"></span>d of<span class=\"_ _0\"></span> all directors of<span class=\"_ _1\"></span> the T<span class=\"_ _2\"></span>rustee should be nominated by<span class=\"_ _0\"></span> active and pensioner<span class=\"_ _0\"></span> members of <span class=\"_ _0\"></span>the Plan.<span class=\"_ _36a\"> </span>Employ<span class=\"_ _0\"></span>ee contributions and benefits<span class=\"_ _36a\"> </span>The scheme w<span class=\"_ _0\"></span>as closed to ne<span class=\"_ _0\"></span>w entrants in F<span class=\"_ _1\"></span>ebruary 2002. Emplo<span class=\"_ _0\"></span>yees who ar<span class=\"_ _0\"></span>e members of<span class=\"_ _0\"></span> the Plan are entitled <span class=\"_ _0\"></span>to receiv<span class=\"_ _0\"></span>e a pension of 1/60 o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>their final basic annual salary<span class=\"_ _0\"></span> per <span class=\"_ _1\"></span>year of<span class=\"_ _0\"></span> service up to 30 <span class=\"_ _0\"></span>June 2021. <span class=\"_ _0\"></span>After <span class=\"_ _0\"></span>that date further<span class=\"_ _1\"></span> accrual is at a rate of 1/70 or<span class=\"_ _0\"></span> 1/75 of capped <span class=\"_ _0\"></span>final salary depending on <span class=\"_ _0\"></span>the level o<span class=\"_ _0\"></span>f contributions. <span class=\"_ _0\"></span>After<span class=\"_ _0\"></span> 1 July<span class=\"_ _1\"></span> 2021 employee contributions wer<span class=\"_ _1\"></span>e either 5% or 8% of<span class=\"_ _0\"></span> capped salary<span class=\"_ _0\"></span>. Befor<span class=\"_ _0\"></span>e that date all activ<span class=\"_ _0\"></span>e members contributed at a rate o<span class=\"_ _0\"></span>f 5% of<span class=\"_ _0\"></span> salary<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>Benefits accrued befor<span class=\"_ _0\"></span>e 1 July<span class=\"_ _0\"></span> 2021 may<span class=\"_ _0\"></span> be accessed from <span class=\"_ _0\"></span>the age of<span class=\"_ _0\"></span> 60 without an<span class=\"_ _0\"></span>y r<span class=\"_ _0\"></span>eduction for<span class=\"_ _0\"></span> early payment. Bene<span class=\"_ _0\"></span>fits accruing after 1 July<span class=\"_ _0\"></span> 2021 may<span class=\"_ _0\"></span> be accessed without penalty<span class=\"_ _0\"></span> fr<span class=\"_ _0\"></span>om the age of<span class=\"_ _0\"></span> 65.<span class=\"_ _36a\"> </span>Dependants of Plan member<span class=\"_ _0\"></span>s are eligible f<span class=\"_ _0\"></span>or a dependant\u2019<span class=\"_ _1\"></span>s pension and the payment o<span class=\"_ _0\"></span>f a lump sum in <span class=\"_ _0\"></span>the event o<span class=\"_ _0\"></span>f death in service.<span class=\"_ _36a\"> </span>Actuarial risks<span class=\"_ _36a\"> </span>The principal actuarial risks t<span class=\"_ _0\"></span>o which the Plan is e<span class=\"_ _0\"></span>xposed are:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span><span class=\"ff4 ws57\"> Investment <span class=\"_ _f\"> </span>risk</span><span class=\"ws0\"> \u2013 The pr<span class=\"_ _1\"></span>esent value of<span class=\"_ _0\"></span> the defined benefit<span class=\"_ _0\"></span> liabilities is calculated using a discount rate set b<span class=\"_ _0\"></span>y r<span class=\"_ _0\"></span>eference <span class=\"_ _0\"></span>to high </span>quality corporat<span class=\"_ _0\"></span>e bond yields. If<span class=\"_ _0\"></span> plan assets underperform corporate bonds, <span class=\"_ _0\"></span>this will r<span class=\"_ _0\"></span>educe the surplus. <span class=\"_ _0\"></span>The strategic allocation of asse<span class=\"_ _0\"></span>ts under <span class=\"_ _0\"></span>the Plan is currently<span class=\"_ _0\"></span> weighted <span class=\"_ _0\"></span>towar<span class=\"_ _0\"></span>ds equity asse<span class=\"_ _0\"></span>ts and diversified gro<span class=\"_ _0\"></span>wth funds as its liability<span class=\"_ _0\"></span> profile is r<span class=\"_ _0\"></span>elatively immature, and it is e<span class=\"_ _0\"></span>xpected that <span class=\"_ _0\"></span>these asset classes will, o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>the long term, outperf<span class=\"_ _0\"></span>orm gilts and corporate bonds. In consultation with the Company<span class=\"_ _1\"></span>, the <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>rustee keeps the allocation of<span class=\"_ _0\"></span> the Plan<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s investments under r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>w to manag<span class=\"_ _0\"></span>e this risk on a long<span class=\"_ _0\"></span>-term basis<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span><span class=\"ff4 ls5 ws50\"> Interest <span class=\"_ _f\"> </span>risk<span class=\"ff3 ws0\"> \u2013 A<span class=\"_ _0\"></span> fall in corporat<span class=\"_ _0\"></span>e bond yields <span class=\"_ _0\"></span>would reduce <span class=\"_ _0\"></span>the discount rate used in <span class=\"_ _0\"></span>valuing the Plan liabilities and incr<span class=\"_ _0\"></span>ease the <span class=\"_ _0\"></span>value </span></span>of <span class=\"_ _0\"></span>the Plan liabilities. T<span class=\"_ _0\"></span>he Plan assets would also be e<span class=\"_ _0\"></span>xpected to incr<span class=\"_ _0\"></span>ease, to <span class=\"_ _0\"></span>the extent that<span class=\"_ _0\"></span> bond assets are held, but <span class=\"_ _0\"></span>this would no<span class=\"_ _0\"></span>t be expected t<span class=\"_ _0\"></span>o fully mat<span class=\"_ _0\"></span>ch the increase in liabilities, giv<span class=\"_ _0\"></span>en the <span class=\"_ _0\"></span>weighting to<span class=\"_ _0\"></span>wards equity<span class=\"_ _0\"></span> assets and diversified gr<span class=\"_ _1\"></span>owth funds noted abov<span class=\"_ _0\"></span>e<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span><span class=\"ff4 ls0 ws16\"> Inflation <span class=\"_ _b\"> </span>risk<span class=\"ff3 ws0\"> \u2013 Pensions in payment ar<span class=\"_ _0\"></span>e increased annually<span class=\"_ _0\"></span> in line with the RPI or<span class=\"_ _1\"></span> the Consumer Price Index (\u2018CPI\u2019) <span class=\"_ _0\"></span>for  </span></span>Guaranteed Minimum Pensions built<span class=\"_ _0\"></span> up since 1988. Pensions built up since 5 <span class=\"_ _0\"></span>April 2006 are capped at 2.5% and pensions built up befor<span class=\"_ _0\"></span>e 6 April 2006 ar<span class=\"_ _0\"></span>e capped at 5%. F<span class=\"_ _1\"></span>or employ<span class=\"_ _0\"></span>ees who hav<span class=\"_ _0\"></span>e left the Company<span class=\"_ _0\"></span> but hav<span class=\"_ _0\"></span>e deferred pensions, <span class=\"_ _0\"></span>these also re<span class=\"_ _0\"></span>value over<span class=\"_ _1\"></span> the period to r<span class=\"_ _0\"></span>etirement pr<span class=\"_ _0\"></span>edominantly in line <span class=\"_ _0\"></span>with RPI. T<span class=\"_ _0\"></span>herefor<span class=\"_ _0\"></span>e, an increase in inflation <span class=\"_ _0\"></span>would also incr<span class=\"_ _0\"></span>ease the <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the pension liabilities. T<span class=\"_ _0\"></span>he Plan assets would also be e<span class=\"_ _0\"></span>xpected to incr<span class=\"_ _0\"></span>ease, to <span class=\"_ _0\"></span>the extent that <span class=\"_ _0\"></span>they<span class=\"_ _0\"></span> are link<span class=\"_ _0\"></span>ed to inflation, but <span class=\"_ _0\"></span>this may<span class=\"_ _0\"></span> not fully<span class=\"_ _0\"></span> match the incr<span class=\"_ _0\"></span>ease in liabilities<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span><span class=\"ff4 ws57\"> Longevity<span class=\"_ _0\"></span> <span class=\"_ _f\"> </span>risk<span class=\"ff3 ws0\"> \u2013 The <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the Plan surplus is calculated b<span class=\"_ _0\"></span>y r<span class=\"_ _0\"></span>efer<span class=\"_ _0\"></span>ence to the best<span class=\"_ _0\"></span> estimate of <span class=\"_ _0\"></span>the mortality rat<span class=\"_ _0\"></span>e among Plan </span></span>members both during and after<span class=\"_ _0\"></span> employment. <span class=\"_ _0\"></span>An increase in <span class=\"_ _0\"></span>the life expectancy<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the members w<span class=\"_ _0\"></span>ould reduce <span class=\"_ _0\"></span>the surplus in the Plan<span class=\"_ _36a\"> </span>\u2022  <span class=\"_ _193\"></span><span class=\"ff4 ws0\">Salary risk<span class=\"ff3\"> \u2013 The <span class=\"_ _0\"></span>valuation of<span class=\"_ _0\"></span> the Plan assumes a le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> futur<span class=\"_ _0\"></span>e salary incr<span class=\"_ _0\"></span>eases based on the expected rat<span class=\"_ _0\"></span>e of inflation. Should <span class=\"_ _0\"></span>the </span></span>salaries of Plan member<span class=\"_ _0\"></span>s increase at a higher<span class=\"_ _0\"></span> rate, then <span class=\"_ _0\"></span>the surplus will be lo<span class=\"_ _0\"></span>wer<span class=\"_ _1\"></span>. F<span class=\"_ _0\"></span>or service fr<span class=\"_ _0\"></span>om 1 <span class=\"_ _0\"></span>July 2021, a 2.5% cap on individual pensionable salary applies, mitigating <span class=\"_ _0\"></span>this risk<span class=\"_ _36a\"> </span>The risks r<span class=\"_ _0\"></span>elating to death in service payments ar<span class=\"_ _0\"></span>e insured <span class=\"_ _0\"></span>with an external insurance company<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>Page 285<span class=\"_ _36a\"> </span>The Accounts<span class=\"_ _36a\"> </span>As a result o<span class=\"_ _0\"></span>f the Plan ha<span class=\"_ _0\"></span>ving been closed to ne<span class=\"_ _0\"></span>w entrants since F<span class=\"_ _1\"></span>ebruary 2002, the service cost<span class=\"_ _0\"></span> as a percentage o<span class=\"_ _0\"></span>f pensionable salaries is expected t<span class=\"_ _0\"></span>o increase as the a<span class=\"_ _0\"></span>verage ag<span class=\"_ _0\"></span>e of activ<span class=\"_ _0\"></span>e members rises ov<span class=\"_ _0\"></span>er time. Ho<span class=\"_ _0\"></span>wev<span class=\"_ _0\"></span>er<span class=\"_ _1\"></span>, the membership is expected t<span class=\"_ _0\"></span>o reduce so that the service cost in monetary<span class=\"_ _0\"></span> terms will gr<span class=\"_ _0\"></span>adually r<span class=\"_ _0\"></span>educe. The chang<span class=\"_ _0\"></span>es referr<span class=\"_ _1\"></span>ed to above <span class=\"_ _0\"></span>will also reduce <span class=\"_ _0\"></span>this cost going f<span class=\"_ _0\"></span>orward.<span class=\"_ _36a\"> </span>Actuarial <span class=\"_ _0\"></span>valuation and reco<span class=\"_ _0\"></span>very<span class=\"_ _0\"></span> plan<span class=\"_ _36a\"> </span>The most r<span class=\"_ _0\"></span>ecent full actuarial v<span class=\"_ _0\"></span>aluation of<span class=\"_ _0\"></span> the Plan\u2019<span class=\"_ _2\"></span>s liabilities, obtained by <span class=\"_ _0\"></span>the T<span class=\"_ _2\"></span>rustee, w<span class=\"_ _0\"></span>as carried out at 31 March 2022, b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>Aon Solutions UK Limited, <span class=\"_ _0\"></span>the Plan\u2019<span class=\"_ _1\"></span>s independent actuary and completed in <span class=\"_ _0\"></span>the current <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>. This sho<span class=\"_ _0\"></span>wed that <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the Plan\u2019<span class=\"_ _1\"></span>s liabilities on a buy-out basis in accor<span class=\"_ _0\"></span>dance with section 224 of<span class=\"_ _0\"></span> the P<span class=\"_ _0\"></span>ensions Act<span class=\"_ _0\"></span> 2004, the le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> assets which <span class=\"_ _0\"></span>would be requir<span class=\"_ _0\"></span>ed to buy<span class=\"_ _0\"></span> insurance policies f<span class=\"_ _0\"></span>or benefits earned <span class=\"_ _0\"></span>to the <span class=\"_ _0\"></span>valuation date, <span class=\"_ _0\"></span>was \u00a3195.5m, with a shortfall ag<span class=\"_ _0\"></span>ainst the assets of<span class=\"_ _0\"></span> \u00a344.2m (2019: \u00a385.<span class=\"_ _0\"></span>0m). The deficit on <span class=\"_ _0\"></span>the T<span class=\"_ _2\"></span>echnical Basis, the basis agr<span class=\"_ _0\"></span>eed by<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>T<span class=\"_ _1\"></span>rustee as being appropriat<span class=\"_ _0\"></span>e to meet member<span class=\"_ _0\"></span> benefits, assuming the plan continues as a going concern, w<span class=\"_ _0\"></span>as \u00a35.<span class=\"_ _0\"></span>1m (2019: \u00a318.2m). <span class=\"_ _0\"></span>This <span class=\"_ _0\"></span>valuation f<span class=\"_ _0\"></span>orms the basis of<span class=\"_ _0\"></span> the IAS 19 <span class=\"_ _0\"></span>valuation.<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>ollowing the agreement o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the 2022 actuarial valuation, <span class=\"_ _0\"></span>the T<span class=\"_ _2f\"></span>rustee put in place a revised r<span class=\"_ _0\"></span>ecovery<span class=\"_ _1\"></span> plan. On current for<span class=\"_ _0\"></span>ecasts the T<span class=\"_ _2\"></span>rustee\u2019<span class=\"_ _1\"></span>s recov<span class=\"_ _0\"></span>ery plan <span class=\"_ _0\"></span>would meet <span class=\"_ _0\"></span>the statutory funding objectiv<span class=\"_ _0\"></span>e by<span class=\"_ _0\"></span> 31 July<span class=\"_ _0\"></span> 2025. T<span class=\"_ _0\"></span>he re<span class=\"_ _0\"></span>vised recov<span class=\"_ _0\"></span>ery plan continues <span class=\"_ _0\"></span>to include a Pension F<span class=\"_ _1\"></span>unding Partnership (\u2018PFP\u2019) arrangement effectiv<span class=\"_ _0\"></span>ely granting <span class=\"_ _0\"></span>the Plan a first char<span class=\"_ _0\"></span>ge ov<span class=\"_ _0\"></span>er the Gr<span class=\"_ _1\"></span>oup\u2019<span class=\"_ _1\"></span>s head office building as security <span class=\"_ _0\"></span>for pa<span class=\"_ _0\"></span>yments under <span class=\"_ _0\"></span>the plan (note 29). No amount<span class=\"_ _0\"></span> is included in the Plan assets in r<span class=\"_ _0\"></span>espect of <span class=\"_ _0\"></span>the building, which r<span class=\"_ _0\"></span>emains within the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s Property<span class=\"_ _0\"></span>, Plant and Equipment balance (<span class=\"_ _0\"></span>note 29) but <span class=\"_ _0\"></span>this arrangement pr<span class=\"_ _0\"></span>ovides the Plan <span class=\"_ _0\"></span>with additional security in a stress e<span class=\"_ _0\"></span>vent.<span class=\"_ _36a\"> </span>(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Defined benefit plan \u2013 <span class=\"_ _0\"></span>financial impact<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>or accounting purposes, the <span class=\"_ _0\"></span>valuation at 31 Mar<span class=\"_ _0\"></span>ch 2022 was updat<span class=\"_ _0\"></span>ed to 30 September<span class=\"_ _0\"></span> 2023 in accordance <span class=\"_ _0\"></span>with the r<span class=\"_ _0\"></span>equirements of<span class=\"_ _0\"></span> IAS 19 (r<span class=\"_ _0\"></span>evised) b<span class=\"_ _0\"></span>y Mer<span class=\"_ _0\"></span>cer<span class=\"_ _1\"></span>, the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s independent consulting actuary.<span class=\"_ _36a\"> </span>The major<span class=\"_ _0\"></span> categories of<span class=\"_ _0\"></span> assets in the Plan at 30 September<span class=\"_ _1\"></span> 2023, 30 September 2022 and 30 September<span class=\"_ _0\"></span> 2021 and their<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues wer<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Cash and cash equivalents<span class=\"_ _2f5\"> </span><span class=\"ff15\">0.6<span class=\"_ _9e\"> </span><span class=\"ff16\">0.7<span class=\"_ _3a\"> </span>17.1<span class=\"_ _36a\"> </span></span></span>Equity instrumen<span class=\"_ _0\"></span>ts<span class=\"_ _309\"> </span><span class=\"ff15\">44.8<span class=\"_ _3a\"> </span><span class=\"ff16\">56.6<span class=\"_ _3a\"> </span>73.4<span class=\"_ _36a\"> </span></span></span>Debt instruments<span class=\"_ _30a\"> </span><span class=\"ff15\">56.6<span class=\"_ _3a\"> </span><span class=\"ff16\">47.4<span class=\"_ _3a\"> </span>54.8<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal fair value of Plan assets<span class=\"_ _27f\"> </span>102.0<span class=\"_ _150\"> </span><span class=\"ff16\">104.7<span class=\"_ _150\"> </span>145.3<span class=\"_ _36a\"> </span></span>Present v<span class=\"_ _0\"></span>alue of Plan liabilities<span class=\"_ _2af\"> </span><span class=\"ff15\">(89.3)<span class=\"_ _6c\"> </span></span>(97.6)<span class=\"_ _b6\"> </span>(155.6)<span class=\"_ _36a\"> </span>Surplus / (deficit) in the Plan<span class=\"_ _23e\"> </span><span class=\"ff15\">12.7<span class=\"_ _9e\"> </span><span class=\"ff16\">7.1<span class=\"_ _12c\"> </span></span></span>(10.3)<span class=\"_ _36a\"> </span>The Group has r<span class=\"_ _0\"></span>ecognised the surplus as an asset<span class=\"_ _0\"></span> at the balance sheet date as it<span class=\"_ _0\"></span> anticipates being able to access economic benefits at least as great<span class=\"_ _0\"></span> as the carrying v<span class=\"_ _0\"></span>alue. Howe<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> such assets are eliminat<span class=\"_ _0\"></span>ed from capital <span class=\"_ _0\"></span>for r<span class=\"_ _0\"></span>egulatory<span class=\"_ _0\"></span> purposes (note 61).<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2023 the Plan asse<span class=\"_ _0\"></span>ts wer<span class=\"_ _0\"></span>e invested in a div<span class=\"_ _0\"></span>ersified portfolio <span class=\"_ _0\"></span>that consisted primarily of<span class=\"_ _1\"></span> equity and debt investments. The majority o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the equities held by <span class=\"_ _0\"></span>the Plan are in de<span class=\"_ _0\"></span>veloped mark<span class=\"_ _0\"></span>ets. The Plan also has a benchmark allocation of<span class=\"_ _0\"></span> 28% of<span class=\"_ _0\"></span> total assets <span class=\"_ _0\"></span>to Liability Driv<span class=\"_ _0\"></span>en Investments (\u2018LDI\u2019). <span class=\"_ _0\"></span>These inv<span class=\"_ _0\"></span>estments are used to meet a hedging <span class=\"_ _0\"></span>target of<span class=\"_ _0\"></span> 60% of<span class=\"_ _0\"></span> the inter<span class=\"_ _0\"></span>est and inflation risks faced b<span class=\"_ _0\"></span>y the Plan. During <span class=\"_ _0\"></span>the market<span class=\"_ _0\"></span> turmoil encounter<span class=\"_ _0\"></span>ed during September<span class=\"_ _0\"></span> / October 2022 <span class=\"_ _0\"></span>the assets of <span class=\"_ _0\"></span>the Plan pro<span class=\"_ _0\"></span>ved themselv<span class=\"_ _0\"></span>es to be r<span class=\"_ _0\"></span>obust in pro<span class=\"_ _0\"></span>tecting the members<span class=\"_ _0\"></span>\u2019 interests, <span class=\"_ _0\"></span>with no requir<span class=\"_ _0\"></span>ement to either<span class=\"_ _0\"></span> divest <span class=\"_ _0\"></span>from LDI nor<span class=\"_ _0\"></span> to r<span class=\"_ _0\"></span>educe the hedge r<span class=\"_ _0\"></span>atio in place. T<span class=\"_ _2\"></span>owards <span class=\"_ _0\"></span>the end of<span class=\"_ _0\"></span> the y<span class=\"_ _0\"></span>ear ended 30 Sep<span class=\"_ _0\"></span>tember 2021 <span class=\"_ _0\"></span>the Plan disposed of its holdings in r<span class=\"_ _0\"></span>eal estate funds, <span class=\"_ _0\"></span>following a r<span class=\"_ _0\"></span>eview<span class=\"_ _0\"></span> of its investment str<span class=\"_ _0\"></span>ategy<span class=\"_ _0\"></span>. <span class=\"_ _0\"></span>At the 2021 <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end these <span class=\"_ _0\"></span>were in <span class=\"_ _0\"></span>the process of<span class=\"_ _0\"></span> rein<span class=\"_ _0\"></span>vestment in other<span class=\"_ _0\"></span> asset classes, with part<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the proceeds held in cash at the balance sheet<span class=\"_ _0\"></span> date.<span class=\"_ _36a\"> </span>During October 2018, <span class=\"_ _0\"></span>the High Court made a ruling in the Llo<span class=\"_ _0\"></span>yds Banking Gr<span class=\"_ _0\"></span>oup Pension Scheme GMP (\u2018Guaranteed Minimum Pension<span class=\"_ _0\"></span>\u2019) equalisation case, which effectiv<span class=\"_ _0\"></span>ely dir<span class=\"_ _0\"></span>ects defined benefit pension schemes t<span class=\"_ _0\"></span>o change their<span class=\"_ _0\"></span> rules to equalise <span class=\"_ _0\"></span>the benefits of male and <span class=\"_ _0\"></span>female members f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the effects of<span class=\"_ _0\"></span> GMPs for<span class=\"_ _0\"></span> employees <span class=\"_ _0\"></span>who w<span class=\"_ _0\"></span>ere, at one <span class=\"_ _0\"></span>time, contracted out of<span class=\"_ _0\"></span> state schemes. T<span class=\"_ _0\"></span>he Court did not specify<span class=\"_ _0\"></span> a single method which schemes should emplo<span class=\"_ _0\"></span>y and hence the impact<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>this on the Plan will no<span class=\"_ _0\"></span>t be certain until the T<span class=\"_ _2f\"></span>rustee has determined which method should be adopted and detailed calculations ha<span class=\"_ _0\"></span>ve been performed <span class=\"_ _0\"></span>to ev<span class=\"_ _0\"></span>aluate the impact, as the impact on members <span class=\"_ _0\"></span>will v<span class=\"_ _0\"></span>ary <span class=\"_ _0\"></span>from person <span class=\"_ _0\"></span>to person.<span class=\"_ _36a\"> </span>The estimated effect<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>this ruling was account<span class=\"_ _0\"></span>ed for<span class=\"_ _0\"></span> in the accounts of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup for<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2019 as a \u2018past service cost'<span class=\"_ _2\"></span>. This estimat<span class=\"_ _0\"></span>e is based on one permissible method, method C2. F<span class=\"_ _1\"></span>ollowing the y<span class=\"_ _0\"></span>ear end, <span class=\"_ _0\"></span>the T<span class=\"_ _2\"></span>rustee, with <span class=\"_ _0\"></span>the consent of the Company<span class=\"_ _1\"></span>, chose to adopt an alternative appr<span class=\"_ _0\"></span>oach, method B. How<span class=\"_ _0\"></span>ever<span class=\"_ _1\"></span>, the accounting impact of<span class=\"_ _1\"></span> this is likely <span class=\"_ _0\"></span>to be minimal. Once detailed calculations are perf<span class=\"_ _0\"></span>ormed it is possible that <span class=\"_ _0\"></span>the final impact may<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>ary due <span class=\"_ _0\"></span>to idiosyncratic impacts on individual members, or<span class=\"_ _1\"></span> due to <span class=\"_ _0\"></span>the development<span class=\"_ _0\"></span> of a <span class=\"_ _0\"></span>wider legal and accounting consensus on <span class=\"_ _0\"></span>the proper<span class=\"_ _0\"></span> interpre<span class=\"_ _0\"></span>tation of <span class=\"_ _0\"></span>the courts\u2019 r<span class=\"_ _0\"></span>equirements as further<span class=\"_ _0\"></span> cases are determined.<span class=\"_ _36a\"> </span>Page 286<span class=\"_ _36a\"> </span>The mov<span class=\"_ _0\"></span>ement in the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the Plan assets during <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span> was as f<span class=\"_ _0\"></span>ollows:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>At 1 Oct<span class=\"_ _0\"></span>ober 2022<span class=\"_ _1f6\"> </span><span class=\"ff15\">104.7<span class=\"_ _d5\"> </span><span class=\"ff16\">145.3<span class=\"_ _36a\"> </span></span></span>Inter<span class=\"_ _0\"></span>est on Plan assets<span class=\"_ _30b\"> </span><span class=\"ff15\">5.2<span class=\"_ _9e\"> </span><span class=\"ff16\">2.9<span class=\"_ _36a\"> </span></span></span>Cash flows <span class=\"_ _c0\"> </span>Contributions by the Group<span class=\"_ _151\"> </span><span class=\"ff15\">3.9<span class=\"_ _9e\"> </span><span class=\"ff16\">4.0</span></span> <span class=\"_ _c0\"> </span>Contributions by Plan members<span class=\"_ _205\"> </span><span class=\"ff15\">0.2<span class=\"_ _d1\"> </span><span class=\"ff16\">0.2</span></span> <span class=\"_ _c0\"> </span>Benefits paid<span class=\"_ _22e\"> </span><span class=\"ff15\">(3.6)<span class=\"_ _1db\"> </span></span>(3.8) <span class=\"_ _c0\"> </span>Administration expenses paid<span class=\"_ _1ac\"> </span><span class=\"ff15\">(0.6)<span class=\"_ _1db\"> </span></span>(0.8)<span class=\"_ _36a\"> </span>Remeasur<span class=\"_ _0\"></span>ement (loss) / gain <span class=\"_ _c0\"> </span>Return on Plan assets (ex<span class=\"_ _0\"></span>cluding amounts included in interes<span class=\"_ _0\"></span>t)<span class=\"_ _185\"> </span><span class=\"ff15\">(7.8)<span class=\"_ _bf\"> </span></span>(43.1)<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2023<span class=\"_ _30c\"> </span><span class=\"ff15\">102.0<span class=\"_ _d5\"> </span><span class=\"ff16\">104.7<span class=\"_ _36a\"> </span></span></span>The actual re<span class=\"_ _0\"></span>turn on Plan assets in the <span class=\"_ _0\"></span>year ended 30 Sep<span class=\"_ _0\"></span>tember 2023 <span class=\"_ _0\"></span>was a loss of<span class=\"_ _0\"></span> \u00a32.6m (2022: loss of<span class=\"_ _0\"></span> \u00a340.2m<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span>The mov<span class=\"_ _0\"></span>ement in the pr<span class=\"_ _0\"></span>esent v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the Plan liabilities during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> was as <span class=\"_ _0\"></span>follows:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>At 1 Oct<span class=\"_ _0\"></span>ober 2022<span class=\"_ _27b\"> </span><span class=\"ff15\">97.6<span class=\"_ _d5\"> </span><span class=\"ff16\">155.6<span class=\"_ _36a\"> </span></span></span>Current service cos<span class=\"_ _0\"></span>t<span class=\"_ _21e\"> </span><span class=\"ff15\">0.5<span class=\"_ _9e\"> </span><span class=\"ff16\">0.9<span class=\"_ _36a\"> </span></span></span>Pas<span class=\"_ _0\"></span>t service cost<span class=\"_ _30d\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span>Funding cost<span class=\"_ _30e\"> </span><span class=\"ff15\">4.8<span class=\"_ _9e\"> </span><span class=\"ff16\">3.1<span class=\"_ _36a\"> </span></span></span>Cash flows <span class=\"_ _c0\"> </span>Contributions by Plan members<span class=\"_ _205\"> </span><span class=\"ff15\">0.2<span class=\"_ _d1\"> </span><span class=\"ff16\">0.2</span></span> <span class=\"_ _c0\"> </span>Benefits paid<span class=\"_ _22e\"> </span><span class=\"ff15\">(3.6)<span class=\"_ _1db\"> </span></span>(3.8)<span class=\"_ _36a\"> </span>Remeasur<span class=\"_ _0\"></span>ement loss / (gain) <span class=\"_ _c0\"> </span>Arising from demographic assumptions<span class=\"_ _244\"> </span><span class=\"ff15\">(0.9)<span class=\"_ _72\"> </span><span class=\"ff16\">2.2</span></span> <span class=\"_ _c0\"> </span>Arising from financial assumptions<span class=\"_ _30f\"> </span><span class=\"ff15\">(11.1)<span class=\"_ _bf\"> </span></span>(61.9) <span class=\"_ _c0\"> </span>Arising from experience adjustments<span class=\"_ _310\"> </span><span class=\"ff15\">1.8<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _36a\"> </span></span></span>At 30 Sept<span class=\"_ _0\"></span>ember 2023<span class=\"_ _311\"> </span><span class=\"ff15\">89.3<span class=\"_ _3a\"> </span><span class=\"ff16\">97.6<span class=\"_ _36a\"> </span></span></span>The liabilities of<span class=\"_ _0\"></span> the Plan ar<span class=\"_ _0\"></span>e measured by<span class=\"_ _0\"></span> discounting the best estimate o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>future cash flo<span class=\"_ _0\"></span>ws to be paid out<span class=\"_ _0\"></span> by <span class=\"_ _0\"></span>the Plan using the Projected Unit me<span class=\"_ _0\"></span>thod. This amount<span class=\"_ _0\"></span> is reflected in <span class=\"_ _0\"></span>the liability in <span class=\"_ _0\"></span>the balance sheet. The Pr<span class=\"_ _0\"></span>ojected Unit method is an accrued benefits valuation method in <span class=\"_ _0\"></span>which the Plan liabilities ar<span class=\"_ _0\"></span>e calculated based on service up until the <span class=\"_ _0\"></span>valuation date allowing <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> future salary<span class=\"_ _0\"></span> gro<span class=\"_ _0\"></span>wth until the date of<span class=\"_ _0\"></span> retir<span class=\"_ _0\"></span>ement, withdra<span class=\"_ _0\"></span>wal or death, as appr<span class=\"_ _1\"></span>opriate. The futur<span class=\"_ _0\"></span>e service rate is then calculat<span class=\"_ _0\"></span>ed as the contribution rate r<span class=\"_ _0\"></span>equired t<span class=\"_ _0\"></span>o fund the service accruing o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the next <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> again allowing f<span class=\"_ _0\"></span>or futur<span class=\"_ _1\"></span>e salary growth. Liabilities for<span class=\"_ _0\"></span> benefits accruing f<span class=\"_ _0\"></span>or service up <span class=\"_ _0\"></span>to 1 July<span class=\"_ _0\"></span> 2021 are calculated separ<span class=\"_ _0\"></span>ately <span class=\"_ _0\"></span>from those accruing in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> service after that date.<span class=\"_ _36a\"> </span>Page 287<span class=\"_ _36a\"> </span>The Accounts<span class=\"_ _36a\"> </span>The major<span class=\"_ _0\"></span> weighted a<span class=\"_ _0\"></span>verage assump<span class=\"_ _0\"></span>tions used by <span class=\"_ _0\"></span>the actuary <span class=\"_ _0\"></span>were (in nominal <span class=\"_ _0\"></span>terms):<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>In determining net pension cos<span class=\"_ _0\"></span>t for the year <span class=\"_ _c0\"> </span>Discount rate<span class=\"_ _312\"> </span><span class=\"ff15\">5.00%<span class=\"_ _9f\"> </span><span class=\"ff16\">2.00%<span class=\"_ _9f\"> </span>1.75%</span></span> <span class=\"_ _c0\"> </span>Rate of compensation increase: <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Pre 1 July 2021 accrual<span class=\"_ _1c0\"> </span><span class=\"ff15\">3.55%<span class=\"_ _9f\"> </span><span class=\"ff16\">3.40%<span class=\"_ _9f\"> </span>2.95%</span></span> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Post 1 July 2021 accrual<span class=\"_ _313\"> </span><span class=\"ff15\">2.50%<span class=\"_ _9f\"> </span><span class=\"ff16\">2.50%<span class=\"_ _9f\"> </span>2.50%</span></span> <span class=\"_ _c0\"> </span>Rate of price inflation<span class=\"_ _314\"> </span><span class=\"ff15\">3.55%<span class=\"_ _9f\"> </span><span class=\"ff16\">3.40%<span class=\"_ _9f\"> </span>2.95%</span></span> <span class=\"_ _c0\"> </span>Rate of increase of pensions<span class=\"_ _2a1\"> </span><span class=\"ff15\">3.25%<span class=\"_ _9f\"> </span><span class=\"ff16\">3.15%<span class=\"_ _19c\"> </span>2.85%<span class=\"_ _36a\"> </span></span></span>In determining benefit oblig<span class=\"_ _0\"></span>ations <span class=\"_ _c0\"> </span>Discount rate<span class=\"_ _312\"> </span><span class=\"ff15\">5.55%<span class=\"_ _9f\"> </span><span class=\"ff16\">5.00%<span class=\"_ _9f\"> </span>2.00%</span></span> <span class=\"_ _c0\"> </span>Rate of compensation increase: <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Pre 1 July 2021 accrual<span class=\"_ _1c0\"> </span><span class=\"ff15\">3.25%<span class=\"_ _9f\"> </span><span class=\"ff16\">3.55%<span class=\"_ _9f\"> </span>3.40%</span></span> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Post 1 July 2021 accrual<span class=\"_ _313\"> </span><span class=\"ff15\">2.50%<span class=\"_ _9f\"> </span><span class=\"ff16\">2.50%<span class=\"_ _9f\"> </span>2.50%</span></span> <span class=\"_ _c0\"> </span>Rate of price inflation<span class=\"_ _314\"> </span><span class=\"ff15\">3.25%<span class=\"_ _9f\"> </span><span class=\"ff16\">3.55%<span class=\"_ _9f\"> </span>3.40%</span></span> <span class=\"_ _c0\"> </span>Rate of increase of pensions<span class=\"_ _2a1\"> </span><span class=\"ff15\">3.00%<span class=\"_ _9f\"> </span><span class=\"ff16\">3.25%<span class=\"_ _19c\"> </span>3.15%</span></span> <span class=\"_ _c0\"> </span>Further life expectancy at ag<span class=\"_ _0\"></span>e 60 <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Male member aged 60<span class=\"_ _246\"> </span><span class=\"ff15\">27<span class=\"_ _b7\"> </span><span class=\"ff16\">27<span class=\"_ _5a\"> </span>28</span></span> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Female member aged 60<span class=\"_ _178\"> </span><span class=\"ff15\">29<span class=\"_ _b7\"> </span><span class=\"ff16\">29<span class=\"_ _b7\"> </span>29</span></span> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Male member aged 40<span class=\"_ _246\"> </span><span class=\"ff15\">29<span class=\"_ _b7\"> </span><span class=\"ff16\">29<span class=\"_ _5a\"> </span>29</span></span> <span class=\"_ _c0\"> </span> <span class=\"_ _49\"> </span>Female member aged 40<span class=\"_ _178\"> </span><span class=\"ff15\">31<span class=\"_ _b7\"> </span><span class=\"ff16\">31<span class=\"_ _b7\"> </span>31<span class=\"_ _36a\"> </span></span></span>In the 2023 <span class=\"_ _0\"></span>valuation the base mortality<span class=\"_ _1\"></span> table used was <span class=\"_ _0\"></span>the standard S3PMA/S3PF<span class=\"_ _1\"></span>A_M (All) Y<span class=\"_ _2\"></span>ear of<span class=\"_ _0\"></span> Birth table, <span class=\"_ _0\"></span>with future impro<span class=\"_ _0\"></span>vements project<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the CMI 2022 projection model with a 1.5% per<span class=\"_ _0\"></span> annum long-t<span class=\"_ _0\"></span>erm improv<span class=\"_ _0\"></span>ement rate.<span class=\"_ _36a\"> </span>In the 2022 <span class=\"_ _0\"></span>valuation the base mortality<span class=\"_ _1\"></span> table used was <span class=\"_ _0\"></span>the standard S3PMA/S3PF<span class=\"_ _1\"></span>A_M (All) Y<span class=\"_ _2\"></span>ear of<span class=\"_ _0\"></span> Birth table, <span class=\"_ _0\"></span>with future impro<span class=\"_ _0\"></span>vements project<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the CMI 2021 projection model with a 1.5% per<span class=\"_ _0\"></span> annum long-t<span class=\"_ _0\"></span>erm improv<span class=\"_ _0\"></span>ement rate.<span class=\"_ _36a\"> </span>In the 2021 <span class=\"_ _0\"></span>valuation the base mortality<span class=\"_ _1\"></span> table used was <span class=\"_ _0\"></span>the standard S3 P<span class=\"_ _1\"></span>A (All) <span class=\"_ _0\"></span>Y<span class=\"_ _2\"></span>ear of Birth <span class=\"_ _0\"></span>table, with futur<span class=\"_ _0\"></span>e impro<span class=\"_ _0\"></span>vements projected using <span class=\"_ _0\"></span>the CMI 2020 projection model with a 1.5% per<span class=\"_ _0\"></span> annum long-t<span class=\"_ _0\"></span>erm improv<span class=\"_ _0\"></span>ement rate.<span class=\"_ _36a\"> </span>The amounts charged in <span class=\"_ _0\"></span>the consolidated income statement in r<span class=\"_ _0\"></span>espect of <span class=\"_ _0\"></span>the Plan are:<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Current service cos<span class=\"_ _0\"></span>t<span class=\"_ _21e\"> </span><span class=\"ff15\">0.5<span class=\"_ _9e\"> </span><span class=\"ff16\">0.9<span class=\"_ _36a\"> </span></span></span>Pas<span class=\"_ _0\"></span>t service cost<span class=\"_ _30d\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal service cost<span class=\"_ _197\"> </span><span class=\"ff2c\">57<span class=\"_ _a8\"> </span><span class=\"ff15\">0.5<span class=\"_ _d1\"> </span><span class=\"ff16\">0.9<span class=\"_ _36a\"> </span></span></span></span>Administra<span class=\"_ _0\"></span>tion expenses<span class=\"_ _315\"> </span><span class=\"ff15\">0.6<span class=\"_ _9e\"> </span><span class=\"ff16\">0.8<span class=\"_ _36a\"> </span></span></span>Included within operating e<span class=\"_ _0\"></span>xpenses <span class=\"_ _231\"> </span><span class=\"ff15\">1.1<span class=\"_ _9e\"> </span><span class=\"ff16\">1.7<span class=\"_ _36a\"> </span></span></span>Funding cost of Plan liabilities<span class=\"_ _316\"> </span><span class=\"ff15\">4.8<span class=\"_ _9e\"> </span><span class=\"ff16\">3.1<span class=\"_ _36a\"> </span></span></span>Inter<span class=\"_ _0\"></span>est on Plan assets <span class=\"_ _297\"> </span><span class=\"ff15\">(5.2)<span class=\"_ _1db\"> </span></span>(2.9)<span class=\"_ _36a\"> </span>Net inter<span class=\"_ _0\"></span>est (income) / expense<span class=\"_ _1c0\"> </span><span class=\"ff22\">4 / 5<span class=\"_ _ff\"> </span><span class=\"ff15\">(0.4)<span class=\"_ _ff\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span></span>Components of defined benefit c<span class=\"_ _0\"></span>osts recognised in pr<span class=\"_ _0\"></span>ofit or loss<span class=\"_ _2f8\"> </span><span class=\"ff15\">0.7<span class=\"_ _9e\"> </span><span class=\"ff16\">1.9<span class=\"_ _36a\"> </span></span></span>The amounts recognised in <span class=\"_ _0\"></span>the consolidated statement of<span class=\"_ _0\"></span> comprehensiv<span class=\"_ _0\"></span>e income in respect of<span class=\"_ _1\"></span> the Plan are:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Return on Plan assets (e<span class=\"_ _0\"></span>xcluding amounts included in in<span class=\"_ _0\"></span>terest)<span class=\"_ _b4\"> </span><span class=\"ff15\">(7.8)<span class=\"_ _6c\"> </span></span>(43.1)<span class=\"_ _36a\"> </span>Actuarial gains / (losses) <span class=\"_ _c0\"> </span>Arising from demographic assumptions<span class=\"_ _164\"> </span><span class=\"ff15\">0.9<span class=\"_ _72\"> </span></span>(2.2) <span class=\"_ _c0\"> </span>Arising from financial assumptions<span class=\"_ _2bf\"> </span><span class=\"ff15\">11.1<span class=\"_ _cb\"> </span><span class=\"ff16\">61.9</span></span> <span class=\"_ _c0\"> </span>Arising from experience adjustments<span class=\"_ _202\"> </span><span class=\"ff15\">(1.8)<span class=\"_ _1db\"> </span></span>(1.3)<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal actuarial gain<span class=\"_ _317\"> </span><span class=\"ff15\">2.4<span class=\"_ _3a\"> </span><span class=\"ff16\">15.3<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _1\"></span>ax thereon<span class=\"_ _1f0\"> </span><span class=\"ff15\">(0.8)<span class=\"_ _1db\"> </span></span>(3.7)<span class=\"_ _36a\"> </span>Net actuarial gain<span class=\"_ _1dd\"> </span><span class=\"ff15\">1.6<span class=\"_ _3a\"> </span><span class=\"ff16\">11.6<span class=\"_ _36a\"> </span></span></span>Of <span class=\"_ _0\"></span>the remeasur<span class=\"_ _0\"></span>ement movements r<span class=\"_ _0\"></span>eflected abo<span class=\"_ _0\"></span>ve:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The return on plan assets <span class=\"_ _0\"></span>to 30 September<span class=\"_ _0\"></span> 2023 reflects a gener<span class=\"_ _0\"></span>al reduction in asset <span class=\"_ _0\"></span>values in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear<span class=\"_ _0\"></span>, though not<span class=\"_ _0\"></span> as marked as<span class=\"_ _36a\"> </span>that seen in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2022 which saw sharp <span class=\"_ _0\"></span>falls in global inv<span class=\"_ _0\"></span>estment v<span class=\"_ _0\"></span>alues over<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> especially ar<span class=\"_ _0\"></span>ound<span class=\"_ _36a\"> </span>the y<span class=\"_ _0\"></span>ear end, including <span class=\"_ _0\"></span>the effect on the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s portfolio of its LDI hedging strategy<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>In the y<span class=\"_ _0\"></span>ear ended 30 September<span class=\"_ _1\"></span> 2023 the changes in demographic assumptions r<span class=\"_ _0\"></span>eflect the updating of<span class=\"_ _0\"></span> the maturity<span class=\"_ _0\"></span> tables used <span class=\"_ _0\"></span>to<span class=\"_ _36a\"> </span>the most recent <span class=\"_ _1\"></span>versions, which show<span class=\"_ _0\"></span> a general r<span class=\"_ _0\"></span>eduction in the expectancy<span class=\"_ _0\"></span> compared <span class=\"_ _0\"></span>to the pr<span class=\"_ _0\"></span>evious editions. <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>The change in demographic assumptions in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2022 resulted <span class=\"_ _0\"></span>from the adop<span class=\"_ _0\"></span>tion of ne<span class=\"_ _0\"></span>w mortality<span class=\"_ _36a\"> </span>tables which: included an adjustment <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the impact of<span class=\"_ _0\"></span> Covid as w<span class=\"_ _0\"></span>ell as a change in the <span class=\"_ _0\"></span>tables used; included an allowance <span class=\"_ _0\"></span>for<span class=\"_ _36a\"> </span>updated commutation factor<span class=\"_ _0\"></span>s; updated the assumed age diff<span class=\"_ _0\"></span>erence between member<span class=\"_ _0\"></span>s and their<span class=\"_ _0\"></span> partners; and adopted differ<span class=\"_ _0\"></span>ent<span class=\"_ _36a\"> </span>proportion-married assumptions, all to follow<span class=\"_ _0\"></span> the T<span class=\"_ _2\"></span>rustee\u2019<span class=\"_ _1\"></span>s assumptions for the 2022 triennial valuation.<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The change in financial assumptions in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear ended 30 September<span class=\"_ _0\"></span> 2023 re<span class=\"_ _0\"></span>flects principally a continuation of<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>ecent upwar<span class=\"_ _0\"></span>d<span class=\"_ _36a\"> </span>trend in bond <span class=\"_ _0\"></span>yields, which has not been mat<span class=\"_ _0\"></span>ched by long<span class=\"_ _0\"></span>-term inflation expectations implied b<span class=\"_ _0\"></span>y gilt rat<span class=\"_ _0\"></span>es. <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>The movement in <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span> ended 30 September 2022 re<span class=\"_ _0\"></span>flected principally <span class=\"_ _0\"></span>the sharp increase in corporate bond <span class=\"_ _0\"></span>yields, which<span class=\"_ _36a\"> </span>are used <span class=\"_ _0\"></span>to determine the discount<span class=\"_ _0\"></span> applied in the calculation of<span class=\"_ _0\"></span> the pension liability<span class=\"_ _1\"></span>. The differ<span class=\"_ _0\"></span>ence between Fix<span class=\"_ _0\"></span>ed Interest and<span class=\"_ _36a\"> </span>Indexed-Link<span class=\"_ _0\"></span>ed Gilt yields, <span class=\"_ _0\"></span>which is used to <span class=\"_ _0\"></span>forecast<span class=\"_ _0\"></span> market-implied inflation, incr<span class=\"_ _0\"></span>eased far<span class=\"_ _0\"></span> less and so only partially<span class=\"_ _0\"></span> mitigated this movement.<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The experience adjustments in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2023 r<span class=\"_ _0\"></span>epresent <span class=\"_ _0\"></span>the impact of<span class=\"_ _0\"></span> actual UK inflation in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> on<span class=\"_ _36a\"> </span>expected benefits, <span class=\"_ _0\"></span>which is more significant <span class=\"_ _0\"></span>than in pre<span class=\"_ _0\"></span>vious years due <span class=\"_ _0\"></span>to the inflation le<span class=\"_ _0\"></span>vels r<span class=\"_ _0\"></span>ecorded in the period. <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>The experience adjustments in 2022 arose on the adop<span class=\"_ _0\"></span>tion of <span class=\"_ _0\"></span>the draft 2022 Plan v<span class=\"_ _0\"></span>aluation as the basis of<span class=\"_ _1\"></span> the IAS 19 v<span class=\"_ _0\"></span>aluation. This<span class=\"_ _36a\"> </span>means that <span class=\"_ _0\"></span>the actual pay rises, r<span class=\"_ _0\"></span>esignations, re<span class=\"_ _0\"></span>tirements and deaths of<span class=\"_ _0\"></span> members since March 2019 <span class=\"_ _0\"></span>were accur<span class=\"_ _0\"></span>ately r<span class=\"_ _0\"></span>epresented<span class=\"_ _36a\"> </span>rather<span class=\"_ _0\"></span> than projected. This exer<span class=\"_ _0\"></span>cise takes place triennially<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>(c<span class=\"_ _1\"></span>)  <span class=\"_ _29\"> </span>Defined benefit plan \u2013 future cash flow<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span>The sensitivity o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the valuation o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the defined benefit obligation t<span class=\"_ _0\"></span>o the principal assumptions disclosed abov<span class=\"_ _0\"></span>e at 30 September<span class=\"_ _0\"></span> 2023,<span class=\"_ _36a\"> </span>calculating the obligation on <span class=\"_ _0\"></span>the same basis as used in determining the IA<span class=\"_ _0\"></span>S 19 v<span class=\"_ _0\"></span>alue, is as follow<span class=\"_ _0\"></span>s:<span class=\"_ _36a\"> </span>Assumption<span class=\"_ _250\"> </span>Increase in assumption<span class=\"_ _6c\"> </span>Impact on scheme liabilities<span class=\"_ _36a\"> </span>2023<span class=\"_ _1c1\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>Discount r<span class=\"_ _0\"></span>ate<span class=\"_ _314\"> </span>0.1% per annum<span class=\"_ _3d\"> </span><span class=\"ff15\">(1.6)%<span class=\"_ _150\"> </span></span>(1.7)%<span class=\"_ _36a\"> </span>Rate of infla<span class=\"_ _0\"></span>tion*<span class=\"_ _e9\"> </span>0.1% per annum<span class=\"_ _1db\"> </span><span class=\"ff15\">1.6%<span class=\"_ _1c1\"> </span><span class=\"ff16\">1.7%<span class=\"_ _36a\"> </span></span></span>Rate of salary gr<span class=\"_ _0\"></span>owth<span class=\"_ _318\"> </span>0.1% per annum<span class=\"_ _1db\"> </span><span class=\"ff15\">0.4%<span class=\"_ _1c1\"> </span><span class=\"ff16\">0.4%<span class=\"_ _36a\"> </span></span></span>Rates of mort<span class=\"_ _0\"></span>ality<span class=\"_ _177\"> </span>1 year of life expect<span class=\"_ _0\"></span>ancy<span class=\"_ _1db\"> </span><span class=\"ff15\">2.5%<span class=\"_ _1c1\"> </span><span class=\"ff16\">2.9%<span class=\"_ _36a\"> </span></span></span>* maintaining a 0.<span class=\"_ _0\"></span>0% assumption for r<span class=\"_ _0\"></span>eal salary gr<span class=\"_ _0\"></span>owth<span class=\"_ _36a\"> </span>The sensitivity analy<span class=\"_ _0\"></span>sis presented abo<span class=\"_ _0\"></span>ve may<span class=\"_ _0\"></span> not be r<span class=\"_ _0\"></span>epresentative o<span class=\"_ _0\"></span>f an actual futur<span class=\"_ _0\"></span>e change in <span class=\"_ _0\"></span>the defined benefit obligation as<span class=\"_ _36a\"> </span>it is unlikely<span class=\"_ _0\"></span> that chang<span class=\"_ _0\"></span>es in assumptions w<span class=\"_ _0\"></span>ould occur in isolation, as some of<span class=\"_ _0\"></span> the assumptions <span class=\"_ _0\"></span>will be correlated. <span class=\"_ _0\"></span>Ther<span class=\"_ _0\"></span>e has been<span class=\"_ _36a\"> </span>no change in the me<span class=\"_ _0\"></span>thod of pr<span class=\"_ _0\"></span>eparing the analysis <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>that adopted in pr<span class=\"_ _0\"></span>evious y<span class=\"_ _0\"></span>ears. <span class=\"_ _0\"></span>The impacts of equiv<span class=\"_ _0\"></span>alent decreases in<span class=\"_ _36a\"> </span>assumptions are br<span class=\"_ _0\"></span>oadly equal and opposit<span class=\"_ _0\"></span>e to the e<span class=\"_ _0\"></span>ffects of <span class=\"_ _0\"></span>the increases sho<span class=\"_ _0\"></span>wn above.<span class=\"_ _36a\"> </span>In conjunction with <span class=\"_ _0\"></span>the T<span class=\"_ _2\"></span>rustee, the Gr<span class=\"_ _0\"></span>oup has continued to conduct asset<span class=\"_ _0\"></span>-liability r<span class=\"_ _0\"></span>eview<span class=\"_ _0\"></span>s of <span class=\"_ _0\"></span>the Plan. T<span class=\"_ _0\"></span>hese studies are used t<span class=\"_ _0\"></span>o<span class=\"_ _36a\"> </span>assist the <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>rustee and the Group <span class=\"_ _0\"></span>to determine <span class=\"_ _0\"></span>the optimal long-term asse<span class=\"_ _0\"></span>t allocation with r<span class=\"_ _0\"></span>egard <span class=\"_ _0\"></span>to the structur<span class=\"_ _0\"></span>e of liabilities <span class=\"_ _0\"></span>within<span class=\"_ _36a\"> </span>the Plan. T<span class=\"_ _0\"></span>he results of<span class=\"_ _0\"></span> the studies ar<span class=\"_ _0\"></span>e used to assist <span class=\"_ _0\"></span>the T<span class=\"_ _2\"></span>rustee in managing the <span class=\"_ _0\"></span>volatility<span class=\"_ _0\"></span> in the underlying inv<span class=\"_ _0\"></span>estment performance<span class=\"_ _36a\"> </span>and risk of<span class=\"_ _0\"></span> a significant increase in <span class=\"_ _0\"></span>the scheme deficit by<span class=\"_ _0\"></span> pro<span class=\"_ _0\"></span>viding information used to det<span class=\"_ _0\"></span>ermine the inv<span class=\"_ _0\"></span>estment strategy o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Plan.<span class=\"_ _36a\"> </span>There ha<span class=\"_ _0\"></span>ve been no changes in <span class=\"_ _0\"></span>the processes b<span class=\"_ _0\"></span>y which <span class=\"_ _0\"></span>the Plan manages its risks <span class=\"_ _0\"></span>from pre<span class=\"_ _0\"></span>vious periods.<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>ollowing a revie<span class=\"_ _0\"></span>w of<span class=\"_ _0\"></span> the Plan<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s investment strategy<span class=\"_ _1\"></span>, the current <span class=\"_ _0\"></span>target asse<span class=\"_ _0\"></span>t allocations for<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ending 30 September 202<span class=\"_ _0\"></span>4 are 50% gro<span class=\"_ _0\"></span>wth assets (primarily equities<span class=\"_ _0\"></span>), and 50% matching assets (primarily<span class=\"_ _1\"></span> bonds) which includes LDI balances, with <span class=\"_ _0\"></span>the hedge ratio rising to 75%.<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>ollowing the finalisation of<span class=\"_ _0\"></span> the Mar<span class=\"_ _0\"></span>ch 2022 v<span class=\"_ _0\"></span>aluation, the agr<span class=\"_ _0\"></span>eed rate of emplo<span class=\"_ _0\"></span>yer<span class=\"_ _0\"></span> contribution reduced <span class=\"_ _0\"></span>to 12.5% of capped pensionable salary <span class=\"_ _0\"></span>from 15 Mar<span class=\"_ _0\"></span>ch 2023, having been 25% since 1 July<span class=\"_ _1\"></span> 2021, and 32.0% previously<span class=\"_ _1\"></span>. An additional contribution <span class=\"_ _0\"></span>for de<span class=\"_ _0\"></span>ficit reduction of<span class=\"_ _0\"></span> \u00a31.9m pa<span class=\"_ _0\"></span>yable ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the nine-month period ending on 30 November<span class=\"_ _0\"></span> 2023, and an additional contribution of<span class=\"_ _0\"></span> \u00a32.5m per annum, payable monthly<span class=\"_ _0\"></span> fr<span class=\"_ _0\"></span>om 1 December 2023 <span class=\"_ _0\"></span>were also agr<span class=\"_ _0\"></span>eed. <span class=\"_ _0\"></span>These include amounts payable under<span class=\"_ _0\"></span> the PRP<span class=\"_ _0\"></span> and replace <span class=\"_ _0\"></span>the \u00a32.5m contribution for<span class=\"_ _0\"></span> deficit r<span class=\"_ _0\"></span>eduction included in the pr<span class=\"_ _0\"></span>evious funding plan. <span class=\"_ _0\"></span>The Gr<span class=\"_ _0\"></span>oup continues to mak<span class=\"_ _0\"></span>e an additional \u00a30.4m per<span class=\"_ _0\"></span> annum contribution in respect o<span class=\"_ _0\"></span>f the Plan<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s running costs, payable monthly<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>The present<span class=\"_ _0\"></span> best estimate of <span class=\"_ _0\"></span>the contributions to be made <span class=\"_ _0\"></span>to the Plan b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group in the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ending 30 September<span class=\"_ _0\"></span> 2024 is \u00a33.9m. The av<span class=\"_ _0\"></span>erage durations of<span class=\"_ _0\"></span> the discounted benefit<span class=\"_ _0\"></span> obligations in the Plan at <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear end ar<span class=\"_ _0\"></span>e shown in the <span class=\"_ _0\"></span>table below:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>Y<span class=\"_ _1\"></span>ears<span class=\"_ _84\"> </span><span class=\"ff17\">Y<span class=\"_ _0\"></span>ears<span class=\"_ _36a\"> </span></span>Category of member<span class=\"_ _36a\"> </span>Active members<span class=\"_ _319\"> </span><span class=\"ff15\">18<span class=\"_ _b7\"> </span><span class=\"ff16\">21<span class=\"_ _36a\"> </span></span></span>Def<span class=\"_ _0\"></span>erred pensioners<span class=\"_ _21e\"> </span><span class=\"ff15\">18<span class=\"_ _b7\"> </span><span class=\"ff16\">21<span class=\"_ _36a\"> </span></span></span>Current pensioner<span class=\"_ _0\"></span>s<span class=\"_ _2cf\"> </span><span class=\"ff15\">11<span class=\"_ _5a\"> </span><span class=\"ff16\">12<span class=\"_ _36a\"> </span></span></span>All members<span class=\"_ _2ee\"> </span><span class=\"ff15\">16<span class=\"_ _5a\"> </span><span class=\"ff16\">18<span class=\"_ _36a\"> </span></span></span>The principal cause of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>variations in the period is <span class=\"_ _0\"></span>the significant increase in <span class=\"_ _0\"></span>the discount rate <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span>-on-year<span class=\"_ _2\"></span>.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDefinedBenefitPlansExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-454": {
   "value": "(d) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Defined contribution arrang<span class=\"_ _0\"></span>ements<span class=\"_ _36a\"> </span>The Group sponsor<span class=\"_ _0\"></span>s a defined contribution (W<span class=\"_ _0\"></span>orksave<span class=\"_ _0\"></span>) pension scheme, open to all emplo<span class=\"_ _0\"></span>yees who ar<span class=\"_ _0\"></span>e not members of<span class=\"_ _0\"></span> the Plan. <span class=\"_ _0\"></span>The Group completed <span class=\"_ _0\"></span>the auto-enrolment<span class=\"_ _0\"></span> process mandated b<span class=\"_ _0\"></span>y the UK<span class=\"_ _0\"></span> Government<span class=\"_ _0\"></span> in November<span class=\"_ _0\"></span> 2013, using this scheme. Since <span class=\"_ _0\"></span>the year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2020 the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s contribution to <span class=\"_ _0\"></span>the scheme for<span class=\"_ _0\"></span> those emplo<span class=\"_ _0\"></span>yees making the maximum 6% contribution has been 10% of salary<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>The Group also sponsor<span class=\"_ _0\"></span>s a number of<span class=\"_ _0\"></span> other<span class=\"_ _0\"></span> defined contribution pension plans relating <span class=\"_ _0\"></span>to acquired entities and mak<span class=\"_ _0\"></span>es contributions to these schemes in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> employees.<span class=\"_ _36a\"> </span>The assets of<span class=\"_ _0\"></span> these schemes ar<span class=\"_ _0\"></span>e not Group asse<span class=\"_ _0\"></span>ts and are held separately<span class=\"_ _0\"></span> fr<span class=\"_ _0\"></span>om those of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup, under <span class=\"_ _0\"></span>the control of<span class=\"_ _0\"></span> independent trustees. Contributions made by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup to <span class=\"_ _0\"></span>these schemes in the y<span class=\"_ _0\"></span>ear ended 30 Sept<span class=\"_ _0\"></span>ember 2023, <span class=\"_ _0\"></span>which repr<span class=\"_ _0\"></span>esent the t<span class=\"_ _0\"></span>otal cost charged against<span class=\"_ _0\"></span> income, wer<span class=\"_ _0\"></span>e \u00a34.7m (2022: \u00a34<span class=\"_ _0\"></span>.<span class=\"_ _0\"></span>1m) (<span class=\"_ _0\"></span>note 57).",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDefinedContributionPlansExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-397": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gsbea\">61. <span class=\"_ _b3\"> </span>Capital management<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbeb\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s objectives in managing capital ar<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbec\">\u2022 <span class=\"_ _13\"> </span>T<span class=\"_ _1\"></span>o ensure <span class=\"_ _0\"></span>that the Gr<span class=\"_ _0\"></span>oup has sufficient capital to meet<span class=\"_ _0\"></span> its operational requir<span class=\"_ _0\"></span>ements and strategic objectives<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbed\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>T<span class=\"_ _1\"></span>o safeguard <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s ability t<span class=\"_ _0\"></span>o continue as a going concern, so that it can continue <span class=\"_ _0\"></span>to pro<span class=\"_ _0\"></span>vide returns <span class=\"_ _0\"></span>to shareholder<span class=\"_ _0\"></span>s and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbee\">benefits for<span class=\"_ _1\"></span> other stakeholders<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbef\">\u2022 <span class=\"_ _13\"> </span>T<span class=\"_ _1\"></span>o pro<span class=\"_ _0\"></span>vide an adequate return <span class=\"_ _0\"></span>to shareholders b<span class=\"_ _0\"></span>y pricing pr<span class=\"_ _0\"></span>oducts and services commensurately<span class=\"_ _0\"></span> with the le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> risk<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbf0\">\u2022 <span class=\"_ _13\"> </span>T<span class=\"_ _1\"></span>o ensure <span class=\"_ _0\"></span>that sufficient regulatory<span class=\"_ _1\"></span> capital is available to meet an<span class=\"_ _0\"></span>y externally<span class=\"_ _1\"></span> imposed requirements<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbf1\">The pro<span class=\"_ _0\"></span>tection of <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s capital base and its long-term <span class=\"_ _0\"></span>viability ar<span class=\"_ _0\"></span>e ke<span class=\"_ _0\"></span>y strategic priorities.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbf2\">The Group se<span class=\"_ _0\"></span>ts its targe<span class=\"_ _0\"></span>t amount of capital in pr<span class=\"_ _0\"></span>oportion to risk, a<span class=\"_ _0\"></span>vailability<span class=\"_ _0\"></span> and cost. The Gr<span class=\"_ _0\"></span>oup manages the capital structur<span class=\"_ _1\"></span>e and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbf3\">makes adjustments <span class=\"_ _0\"></span>to it in the light o<span class=\"_ _0\"></span>f changes in economic conditions and <span class=\"_ _0\"></span>the risk characteristics of<span class=\"_ _0\"></span> the underlying assets, ha<span class=\"_ _0\"></span>ving </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbf4\">particular r<span class=\"_ _0\"></span>egard <span class=\"_ _0\"></span>to the r<span class=\"_ _0\"></span>elative costs and av<span class=\"_ _0\"></span>ailability o<span class=\"_ _0\"></span>f debt and equity<span class=\"_ _0\"></span> finance at any<span class=\"_ _1\"></span> given time. In order<span class=\"_ _0\"></span> to maintain or<span class=\"_ _0\"></span> adjust the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbf5\">capital structure <span class=\"_ _0\"></span>the Group may<span class=\"_ _0\"></span> adjust the amount<span class=\"_ _0\"></span> of dividends paid <span class=\"_ _0\"></span>to shareholders, r<span class=\"_ _0\"></span>eturn capital to shar<span class=\"_ _0\"></span>eholders, issue new<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbf6\">shares, issue or<span class=\"_ _0\"></span> redeem other<span class=\"_ _1\"></span> capital instruments, such as retail or corporat<span class=\"_ _0\"></span>e bonds, or sell assets <span class=\"_ _0\"></span>to reduce debt. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbf7\">The Group is subject<span class=\"_ _0\"></span> to r<span class=\"_ _0\"></span>egulatory capital rules imposed b<span class=\"_ _0\"></span>y the PR<span class=\"_ _0\"></span>A on a consolidated basis as a gr<span class=\"_ _0\"></span>oup containing an authorised </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbf8\">bank. T<span class=\"_ _0\"></span>his is discussed further belo<span class=\"_ _0\"></span>w<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9c gsbf9\">(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>Regulatory<span class=\"_ _0\"></span> <span class=\"_ _96\"></span>capital<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbfa\">The Group is subject<span class=\"_ _0\"></span> to supervision by<span class=\"_ _0\"></span> the PRA<span class=\"_ _1\"></span> on a consolidated basis, as a group containing an authorised bank. F<span class=\"_ _1\"></span>or regulatory<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbfb\">purposes the Company<span class=\"_ _0\"></span> is designated as a CRR consolidation entity<span class=\"_ _1\"></span>, as defined by <span class=\"_ _0\"></span>the PRA rulebook. <span class=\"_ _1\"></span>As part of this supervision <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbfc\">regulator<span class=\"_ _0\"></span> will issue a <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>otal Capital Requir<span class=\"_ _0\"></span>ement (\u2018TCR\u2019) se<span class=\"_ _0\"></span>tting the amount of<span class=\"_ _0\"></span> regulatory<span class=\"_ _0\"></span> capital relativ<span class=\"_ _0\"></span>e to its <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>otal Risk Exposure </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbfd\">(\u2018TRE\u2019) which <span class=\"_ _0\"></span>the Group is r<span class=\"_ _0\"></span>equired t<span class=\"_ _0\"></span>o hold at all times, in order<span class=\"_ _1\"></span> to safeguard depositor<span class=\"_ _0\"></span>s from loss in <span class=\"_ _0\"></span>the ev<span class=\"_ _0\"></span>ent of se<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span>e losses being </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbfe\">incurred b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group. <span class=\"_ _0\"></span>This requir<span class=\"_ _0\"></span>ement is set in accor<span class=\"_ _0\"></span>dance with the int<span class=\"_ _0\"></span>ernational Basel 3 rules, issued by <span class=\"_ _0\"></span>the Basel Committee </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsbff\">on Banking Supervision (\u2018BCBS\u2019), which, <span class=\"_ _0\"></span>following the implementation o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the Financial Services Act 2021 on 1 <span class=\"_ _1\"></span>January 2022, are </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gsc00\">implemented through the PRA<span class=\"_ _0\"></span> Rulebook.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc01\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s regulatory<span class=\"_ _0\"></span> capital is monitored b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Board, its Risk and Compliance Committee and b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Executive Risk<span class=\"_ _0\"></span>  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc02\">Committee (\u2018ERC\u2019) and the <span class=\"_ _0\"></span>Asset and Liability<span class=\"_ _0\"></span> Committee, which ensur<span class=\"_ _0\"></span>e that appr<span class=\"_ _0\"></span>opriate action is tak<span class=\"_ _0\"></span>en to ensur<span class=\"_ _0\"></span>e compliance  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc03\">with the r<span class=\"_ _0\"></span>egulator\u2019<span class=\"_ _1\"></span>s requirements. <span class=\"_ _0\"></span>The futur<span class=\"_ _0\"></span>e regulatory<span class=\"_ _0\"></span> capital requir<span class=\"_ _0\"></span>ement is also consider<span class=\"_ _0\"></span>ed as part of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s for<span class=\"_ _0\"></span>ecasting  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc04\">and strategic planning pr<span class=\"_ _0\"></span>ocess.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsc05\">The Group has elect<span class=\"_ _0\"></span>ed to tak<span class=\"_ _0\"></span>e advantag<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the IFRS 9 transitional arrangements set<span class=\"_ _0\"></span> out in Article 4<span class=\"_ _0\"></span>73a of <span class=\"_ _0\"></span>the CRR, which allow<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsc06\">capital impact of<span class=\"_ _0\"></span> expected credit losses <span class=\"_ _0\"></span>to be phased in ov<span class=\"_ _0\"></span>er a <span class=\"_ _0\"></span>five-y<span class=\"_ _0\"></span>ear period. <span class=\"_ _0\"></span>The phase-in factor<span class=\"_ _0\"></span>s applying to tr<span class=\"_ _0\"></span>ansition adjustments </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsc07\">will allow <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> a 95% add back to CET1 capital and Risk <span class=\"_ _1\"></span>Weighted <span class=\"_ _0\"></span>Assets (\u2018RW<span class=\"_ _0\"></span>A<span class=\"_ _1\"></span>\u2019) in the financial <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2019<span class=\"_ _1\"></span>, reducing </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsc08\">to 85%, 70%, 50% and 25% for<span class=\"_ _1\"></span> the financial y<span class=\"_ _0\"></span>ears ending in 2020 to 2023, <span class=\"_ _0\"></span>with full r<span class=\"_ _0\"></span>ecognition of <span class=\"_ _0\"></span>the impact on CET1 capital in the 2024 </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws17 gsc09\">financial year<span class=\"_ _1\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc0a\">As part of<span class=\"_ _0\"></span> the regulat<span class=\"_ _0\"></span>ory r<span class=\"_ _0\"></span>esponse to Covid, <span class=\"_ _1\"></span>Article 473a was r<span class=\"_ _0\"></span>evised <span class=\"_ _0\"></span>to extend the <span class=\"_ _0\"></span>transitional arrangements <span class=\"_ _0\"></span>for S<span class=\"_ _0\"></span>tage 1 and Stage 2 </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc0b\">impairment pro<span class=\"_ _0\"></span>visions created in <span class=\"_ _0\"></span>the financial <span class=\"_ _0\"></span>year ended 30 Sep<span class=\"_ _0\"></span>tember 2020 and <span class=\"_ _0\"></span>the financial y<span class=\"_ _0\"></span>ear ended 30 Sep<span class=\"_ _0\"></span>tember 2021, <span class=\"_ _0\"></span>while </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc0c\">maintaining the <span class=\"_ _0\"></span>transitional arrangements <span class=\"_ _0\"></span>for impairment pr<span class=\"_ _0\"></span>ovisions cr<span class=\"_ _0\"></span>eated befor<span class=\"_ _0\"></span>e those <span class=\"_ _0\"></span>years. In or<span class=\"_ _0\"></span>der t<span class=\"_ _0\"></span>o increase institutions' </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc0d\">lending capacity in <span class=\"_ _0\"></span>the short term, <span class=\"_ _0\"></span>the EU determined that <span class=\"_ _0\"></span>these additional pro<span class=\"_ _0\"></span>visions should be phased into capital over<span class=\"_ _1\"></span> the financial </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc0e\">years ending 30 Sept<span class=\"_ _0\"></span>ember 2022 t<span class=\"_ _0\"></span>o 30 September 202<span class=\"_ _0\"></span>4, rather<span class=\"_ _0\"></span> than recognising <span class=\"_ _0\"></span>the reduction in capital immediately<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc0f\">Where <span class=\"_ _0\"></span>these reliefs ar<span class=\"_ _0\"></span>e tak<span class=\"_ _0\"></span>en, firms are also r<span class=\"_ _0\"></span>equired <span class=\"_ _0\"></span>to disclose their<span class=\"_ _0\"></span> capital positions calculated as if <span class=\"_ _0\"></span>the reliefs <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e not av<span class=\"_ _0\"></span>ailable </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc10\">(the \u2018fully loaded\u2019 basis<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc11\">The tables belo<span class=\"_ _0\"></span>w demonstrate <span class=\"_ _0\"></span>that at 30 September<span class=\"_ _0\"></span> 2023 the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s total regulatory<span class=\"_ _0\"></span> capital of<span class=\"_ _0\"></span> \u00a31,338.9m (2022: \u00a31,371.8m) </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc12\">exceeded <span class=\"_ _0\"></span>the amounts requir<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the regulat<span class=\"_ _0\"></span>or<span class=\"_ _0\"></span>, including \u00a3673.4m (2022: \u00a3660.<span class=\"_ _0\"></span>6m) in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> its T<span class=\"_ _1\"></span>CR, which is comprised of <span class=\"_ _0\"></span>fixed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc13\">and v<span class=\"_ _0\"></span>ariable elements (amounts not subject<span class=\"_ _0\"></span> to audit).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc14\">The to<span class=\"_ _0\"></span>tal regulatory<span class=\"_ _0\"></span> capital at 30 September<span class=\"_ _0\"></span> 2023 on the fully<span class=\"_ _0\"></span> loaded basis of<span class=\"_ _0\"></span> \u00a31,325.4m (2022: \u00a31,346.0m<span class=\"_ _0\"></span>) was in e<span class=\"_ _0\"></span>xcess of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>TCR o<span class=\"_ _0\"></span>f </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc15\">\u00a3672.2m (2022: \u00a3658.4m) on <span class=\"_ _0\"></span>the same basis (amounts not subject<span class=\"_ _0\"></span> to audit).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc17\">At 30 Sept<span class=\"_ _0\"></span>ember 2023, the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s T<span class=\"_ _0\"></span>CR repr<span class=\"_ _0\"></span>esented 8.8% of <span class=\"_ _0\"></span>TRE (2022: 8.8%).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc18\">The CRR also requir<span class=\"_ _0\"></span>es firms <span class=\"_ _0\"></span>to hold additional capital buffers, including a Capital Conserv<span class=\"_ _0\"></span>ation Buffer (\u2018CCoB\u2019) o<span class=\"_ _0\"></span>f 2.5% of<span class=\"_ _0\"></span> TRE (<span class=\"_ _0\"></span>at </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc19\">30 September<span class=\"_ _0\"></span> 2023) (2022: 2.5%) and a Counter<span class=\"_ _0\"></span>-cyclical Capital Buffer<span class=\"_ _1\"></span> (\u2018CCyB\u2019), currently 2.<span class=\"_ _0\"></span>0% of <span class=\"_ _0\"></span>TRE (2022: 0.<span class=\"_ _0\"></span>0%). T<span class=\"_ _0\"></span>he UK CCyB </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc1a\">increased <span class=\"_ _0\"></span>to 1.0% of<span class=\"_ _0\"></span> <span class=\"_ _0\"></span>TRE from December<span class=\"_ _0\"></span> 2022 and to 2.<span class=\"_ _0\"></span>0% of<span class=\"_ _0\"></span> TRE <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>July 2023. <span class=\"_ _0\"></span>This is expected <span class=\"_ _0\"></span>to be its long term rat<span class=\"_ _0\"></span>e in a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc1b\">standard risk en<span class=\"_ _0\"></span>vironment. Firm specific buffers ma<span class=\"_ _0\"></span>y also be r<span class=\"_ _0\"></span>equired.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc1c\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s regulatory<span class=\"_ _0\"></span> capital differs fr<span class=\"_ _1\"></span>om its equity as certain adjustments are r<span class=\"_ _0\"></span>equired by<span class=\"_ _0\"></span> the PRA<span class=\"_ _1\"></span> Rulebook or the r<span class=\"_ _0\"></span>egulator<span class=\"_ _1\"></span>.  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc1d\">A r<span class=\"_ _0\"></span>econciliation of<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s equity <span class=\"_ _0\"></span>to its regulatory<span class=\"_ _0\"></span> capital determined in accor<span class=\"_ _0\"></span>dance with the PRA<span class=\"_ _1\"></span> Rulebook at  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc1e\">30 September<span class=\"_ _0\"></span> 2023 is set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc1f\">Regulat<span class=\"_ _0\"></span>ory basis<span class=\"_ _c1\"> </span>Fully loaded basis<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gsc20\">Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _a0\"> </span></span>2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc21\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc22\">T<span class=\"_ _2\"></span>otal equity<span class=\"_ _240\"> </span><span class=\"ff15\">1,410.6<span class=\"_ _12a\"> </span><span class=\"ff16\">1,417.3<span class=\"_ _86\"> </span></span>1,410.6<span class=\"_ _86\"> </span><span class=\"ff16\">1,417.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h27 ff25 fs1 fc1 sc0 ls0 ws0 gsc23\">Deductions<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc24\">Proposed final dividend<span class=\"_ _17d\"> </span><span class=\"ff2c\">48<span class=\"_ _1c1\"> </span><span class=\"ff15\">(56.7)<span class=\"_ _133\"> </span></span></span> (44.9)<span class=\"_ _6c\"> </span><span class=\"ff15\">(56.7)<span class=\"_ _b9\"> </span></span> (44.9)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc25\">IFRS 9 tr<span class=\"_ _0\"></span>ansitional relief<span class=\"_ _102\"> </span><span class=\"ff34\">*<span class=\"_ _16b\"> </span><span class=\"ff15\">13.5<span class=\"_ _cb\"> </span><span class=\"ff16\">25.8<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span></span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc26\">Intangible assets<span class=\"_ _31a\"> </span><span class=\"ff2c\">30<span class=\"_ _1d6\"> </span><span class=\"ff15\">(168.2)<span class=\"_ _b6\"> </span></span></span>(170.2)<span class=\"_ _b6\"> </span><span class=\"ff15\">(168.2)<span class=\"_ _b6\"> </span></span>(170.2)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc27\">Pension surplus net of def<span class=\"_ _1\"></span>erred tax<span class=\"_ _cd\"> </span><span class=\"ff2c\">60<span class=\"_ _31b\"> </span><span class=\"ff15\">(9.6)<span class=\"_ _1db\"> </span></span></span>(5.3)<span class=\"_ _c8\"> </span><span class=\"ff15\">(9.6)<span class=\"_ _1db\"> </span></span>(5.3)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc28\">Prudent valua<span class=\"_ _0\"></span>tion adjustments<span class=\"_ _147\"> </span><span class=\"ff34\">\u00a7<span class=\"_ _31c\"> </span><span class=\"ff15\">(0.6)<span class=\"_ _1db\"> </span></span></span>(0.9)<span class=\"_ _c8\"> </span><span class=\"ff15\">(0.6)<span class=\"_ _1db\"> </span></span>(0.9)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc29\">Insufficient cover<span class=\"_ _1\"></span>age<span class=\"_ _16a\"> </span><span class=\"ff35\">\u03c8<span class=\"_ _5a\"> </span><span class=\"ff15\">(0.1)<span class=\"_ _1db\"> </span></span></span>(0.0)<span class=\"_ _c8\"> </span><span class=\"ff15\">(0.1)<span class=\"_ _1db\"> </span></span>(0.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc2a\">Common Equity Tier 1 (\u2018CET1\u2019) capit<span class=\"_ _0\"></span>al <span class=\"_ _306\"> </span>1,188.9<span class=\"_ _86\"> </span><span class=\"ff16\">1,221.8<span class=\"_ _12a\"> </span></span>1,175.4<span class=\"_ _86\"> </span><span class=\"ff16\">1,196.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc2b\">Other Tier 1 capital<span class=\"_ _24f\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _10b\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc2c\">T<span class=\"_ _2\"></span>otal Tier 1 capital<span class=\"_ _1be\"> </span>1,188.9<span class=\"_ _86\"> </span><span class=\"ff16\">1,221.8<span class=\"_ _12a\"> </span></span>1,175.4<span class=\"_ _86\"> </span><span class=\"ff16\">1,196.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc2d\">Corporat<span class=\"_ _0\"></span>e bond<span class=\"_ _266\"> </span><span class=\"ff2c\">37<span class=\"_ _c8\"> </span><span class=\"ff15\">150.0<span class=\"_ _d5\"> </span><span class=\"ff16\">150.0<span class=\"_ _150\"> </span></span>150.0<span class=\"_ _150\"> </span><span class=\"ff16\">150.0<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc2e\">Eligibility cap<span class=\"_ _28f\"> </span><span class=\"ff35\">\u0424<span class=\"_ _f4\"> </span><span class=\"ff15\">-<span class=\"_ _209\"> </span></span></span>-<span class=\"_ _10b\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc2f\">T<span class=\"_ _2\"></span>otal Tier 2 capital<span class=\"_ _259\"> </span>150.0<span class=\"_ _d5\"> </span><span class=\"ff16\">150.0<span class=\"_ _150\"> </span></span>150.0<span class=\"_ _150\"> </span><span class=\"ff16\">150.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc30\">T<span class=\"_ _2\"></span>otal regulatory capital (\u2018TRC<span class=\"_ _15\"></span>\u2019)<span class=\"_ _2b1\"> </span>1,338.9<span class=\"_ _86\"> </span><span class=\"ff16\">1,371.8<span class=\"_ _12a\"> </span></span>1,325.4<span class=\"_ _86\"> </span><span class=\"ff16\">1,346.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gsc31\">*  </div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gsc32\">Firms are permitted <span class=\"_ _0\"></span>to phase in the impact of<span class=\"_ _0\"></span> IFRS 9 transition as described above.<span class=\"_ _36a\"> </span></div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gsc33\">\u00a7<span class=\"_ _36a\"> </span></div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gsc34\">F<span class=\"_ _0\"></span>or capital purposes, assets and liabilities held at <span class=\"_ _0\"></span>fair v<span class=\"_ _0\"></span>alue, such as the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s derivatives, are requir<span class=\"_ _0\"></span>ed to be <span class=\"_ _0\"></span>valued on a more conserv<span class=\"_ _0\"></span>ative basis than the mark<span class=\"_ _0\"></span>et v<span class=\"_ _0\"></span>alue basis </div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gsc35\">set out in IFRS 13. This diff<span class=\"_ _0\"></span>erence is repr<span class=\"_ _0\"></span>esented by <span class=\"_ _0\"></span>the prudent valuation adjustment<span class=\"_ _0\"></span> above, calculated using the \u2018Simplified <span class=\"_ _0\"></span>Approach<span class=\"_ _0\"></span>\u2019 set out in the PRA<span class=\"_ _0\"></span> Rulebook.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h86 ff35 fs1 fc1 sc0 ls0 ws0 gsc36\">\u03c8<span class=\"_ _36a\"> </span></div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls1 ws0 gsc37\">Regulatory<span class=\"_ _0\"></span> deduction where ther<span class=\"_ _0\"></span>e is insufficient cover<span class=\"_ _0\"></span>age for<span class=\"_ _0\"></span> non-performing exposures r<span class=\"_ _0\"></span>equired under <span class=\"_ _0\"></span>Article 47(<span class=\"_ _0\"></span>c) of<span class=\"_ _0\"></span> the CRR. This r<span class=\"_ _0\"></span>equirement r<span class=\"_ _0\"></span>emained in force in <span class=\"_ _0\"></span>the UK, at the </div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls1 ws0 gsc38\">year end, under<span class=\"_ _0\"></span> the Br<span class=\"_ _0\"></span>exit arrangements but w<span class=\"_ _0\"></span>as remov<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the PRA with e<span class=\"_ _0\"></span>ffect from 14 No<span class=\"_ _0\"></span>vember 2023. <span class=\"_ _0\"></span>The amount requir<span class=\"_ _0\"></span>ed at 30 September 2022 <span class=\"_ _0\"></span>was less than \u00a30<span class=\"_ _0\"></span>.<span class=\"_ _0\"></span>1m.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h86 ff35 fs1 fc1 sc0 ls0 ws0 gsc39\">\u0424 </div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gsc3a\">The PRA<span class=\"_ _0\"></span> Rulebook restricts the amount o<span class=\"_ _0\"></span>f tier<span class=\"_ _0\"></span> 2 capital which is eligible for<span class=\"_ _0\"></span> regulatory<span class=\"_ _0\"></span> purposes to 25% of<span class=\"_ _0\"></span> T<span class=\"_ _0\"></span>CR. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc3c\">The <span class=\"_ _0\"></span>TRE amount calculated under <span class=\"_ _0\"></span>the PRA<span class=\"_ _0\"></span> Rulebook frame<span class=\"_ _0\"></span>work against <span class=\"_ _0\"></span>which this capital is held, <span class=\"_ _0\"></span>which includes Risk W<span class=\"_ _1\"></span>eighted Asset </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc3d\">(\u2018RW<span class=\"_ _0\"></span>A<span class=\"_ _1\"></span>\u2019) amounts for cr<span class=\"_ _0\"></span>edit risk, and the pr<span class=\"_ _0\"></span>oportion of<span class=\"_ _0\"></span> these assets <span class=\"_ _0\"></span>which that capital r<span class=\"_ _0\"></span>epresents, ar<span class=\"_ _0\"></span>e calculated as shown below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc3e\">Regulat<span class=\"_ _0\"></span>ory basis<span class=\"_ _c1\"> </span>Fully loaded basis<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc3f\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span></span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc40\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h27 ff23 fs1 fc1 sc0 ls0 ws0 gsc41\">Credit risk<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc42\">Balance sheet assets<span class=\"_ _31d\"> </span><span class=\"ff15\">6,784.2<span class=\"_ _86\"> </span><span class=\"ff16\">6,652.1<span class=\"_ _12a\"> </span></span>6,784.3<span class=\"_ _86\"> </span><span class=\"ff16\">6,652.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc43\">Off balance sheet<span class=\"_ _126\"> </span><span class=\"ff15\">87.2<span class=\"_ _3a\"> </span><span class=\"ff16\">85.4<span class=\"_ _3a\"> </span></span>87.2<span class=\"_ _3a\"> </span><span class=\"ff16\">85.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc44\">IFRS 9 tr<span class=\"_ _0\"></span>ansitional relief<span class=\"_ _2a9\"> </span><span class=\"ff15\">13.5<span class=\"_ _3a\"> </span><span class=\"ff16\">25.8<span class=\"_ _43\"> </span></span>-<span class=\"_ _209\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc45\">T<span class=\"_ _2\"></span>otal credit risk<span class=\"_ _19d\"> </span><span class=\"ff15\">6,884.9<span class=\"_ _86\"> </span><span class=\"ff16\">6,763.3<span class=\"_ _12a\"> </span></span>6,871.5<span class=\"_ _86\"> </span><span class=\"ff16\">6,737.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc46\">Operational risk<span class=\"_ _31e\"> </span><span class=\"ff15\">740.2<span class=\"_ _d5\"> </span><span class=\"ff16\">633.1<span class=\"_ _150\"> </span></span>740.2<span class=\"_ _d5\"> </span><span class=\"ff16\">633.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc47\">Mark<span class=\"_ _0\"></span>et risk<span class=\"_ _29e\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _10b\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc48\">Other<span class=\"_ _31f\"> </span><span class=\"ff15\">43.6<span class=\"_ _d5\"> </span><span class=\"ff16\">118.6<span class=\"_ _3a\"> </span></span>43.6<span class=\"_ _150\"> </span><span class=\"ff16\">118.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc49\">T<span class=\"_ _2\"></span>otal risk exposure amount (\u2018TRE\u2019)<span class=\"_ _320\"> </span>7,668.7<span class=\"_ _86\"> </span><span class=\"ff16\">7,515.0<span class=\"_ _12a\"> </span></span>7,655.3<span class=\"_ _86\"> </span><span class=\"ff16\">7,489.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsc4a\">Solvency r<span class=\"_ _0\"></span>atios<span class=\"_ _1b2\"> </span><span class=\"ff16\">%<span class=\"_ _12d\"> </span>%<span class=\"_ _43\"> </span>%<span class=\"_ _12d\"> </span>%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff16 fs1 fc1 sc0 ls0 ws0 gsc4b\">CET1<span class=\"_ _2b3\"> </span><span class=\"ff15\">15.5<span class=\"_ _3a\"> </span></span>16.3<span class=\"_ _3a\"> </span><span class=\"ff15\">15.4<span class=\"_ _3a\"> </span></span>16.0<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls1b ws61 gsc4c\">TRC<span class=\"_ _321\"> </span><span class=\"ff15 ls0 ws0\">17.5<span class=\"_ _3a\"> </span><span class=\"ff16\">18.3<span class=\"_ _3a\"> </span></span>17.3<span class=\"_ _3a\"> </span><span class=\"ff16\">18.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gsc4d\">This table is not subject<span class=\"_ _0\"></span> to audit<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc4e\">The risk <span class=\"_ _0\"></span>weightings for<span class=\"_ _1\"></span> credit risk exposur<span class=\"_ _0\"></span>es are currently<span class=\"_ _1\"></span> calculated using the Standardised <span class=\"_ _0\"></span>Approach (\u2018S<span class=\"_ _0\"></span>A<span class=\"_ _1\"></span>\u2019). The Basic Indicator<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc4f\">Approach is used <span class=\"_ _0\"></span>for oper<span class=\"_ _0\"></span>ational risk.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsc51\">Le<span class=\"_ _0\"></span>verage r<span class=\"_ _0\"></span>atio<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc52\">The table belo<span class=\"_ _0\"></span>w show<span class=\"_ _0\"></span>s the calculation of<span class=\"_ _0\"></span> the UK le<span class=\"_ _0\"></span>verag<span class=\"_ _0\"></span>e ratio, based on the consolidated balance shee<span class=\"_ _0\"></span>t assets adjusted as shown. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc53\">The PRA<span class=\"_ _0\"></span> has proposed a minimum UK<span class=\"_ _0\"></span> lever<span class=\"_ _0\"></span>age ratio of<span class=\"_ _0\"></span> 3.25% for<span class=\"_ _0\"></span> UK firms <span class=\"_ _0\"></span>with retail deposits o<span class=\"_ _0\"></span>f ov<span class=\"_ _0\"></span>er \u00a350<span class=\"_ _0\"></span>.0 billion. In addition, in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc54\">October 2021 <span class=\"_ _0\"></span>the PRA<span class=\"_ _0\"></span> stated its expectation that all o<span class=\"_ _0\"></span>ther UK <span class=\"_ _0\"></span>firms, should manage their<span class=\"_ _1\"></span> leverage risk so <span class=\"_ _0\"></span>that this r<span class=\"_ _0\"></span>atio does not </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc55\">ordinarily<span class=\"_ _0\"></span> fall below<span class=\"_ _0\"></span> 3.25%.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gsc56\">Note<span class=\"_ _19c\"> </span><span class=\"ff15\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc57\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc58\">T<span class=\"_ _2\"></span>otal balance sheet assets<span class=\"_ _322\"> </span><span class=\"ff15\">18,420.2<span class=\"_ _42\"> </span><span class=\"ff16\">16,653.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc59\">Add: <span class=\"_ _19\"> </span>Credit f<span class=\"_ _0\"></span>air value adjustments on loans to cus<span class=\"_ _0\"></span>tomers<span class=\"_ _2b6\"> </span><span class=\"ff2c\">18<span class=\"_ _1d6\"> </span><span class=\"ff15\">379.3<span class=\"_ _d5\"> </span><span class=\"ff16\">559.9</span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc5a\"> <span class=\"_ _16\"> </span>Debit fair value adjustments on r<span class=\"_ _0\"></span>etail deposits<span class=\"_ _199\"> </span><span class=\"ff2c\">33<span class=\"_ _f8\"> </span><span class=\"ff15\">30.9<span class=\"_ _3a\"> </span><span class=\"ff16\">99.7<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc5b\">Adjusted balance sheet asse<span class=\"_ _0\"></span>ts<span class=\"_ _323\"> </span><span class=\"ff15\">18,830.4<span class=\"_ _42\"> </span><span class=\"ff16\">17,313.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc5c\">Less: <span class=\"_ _7\"> </span>Deriv<span class=\"_ _0\"></span>ative assets<span class=\"_ _1f3\"> </span><span class=\"ff2c\">26<span class=\"_ _9f\"> </span><span class=\"ff15\">(615.4)<span class=\"_ _b6\"> </span></span></span>(779.0)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc5d\"> <span class=\"_ _16\"> </span>Central bank deposits<span class=\"_ _154\"> </span><span class=\"ff2c\">17<span class=\"_ _b5\"> </span><span class=\"ff15\">(2,783.3)<span class=\"_ _1d4\"> </span></span></span>(1,612.5)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc5e\"> <span class=\"_ _16\"> </span>CRDs<span class=\"_ _324\"> </span><span class=\"ff2c\">27<span class=\"_ _2c\"> </span><span class=\"ff15\">(38.0)<span class=\"_ _bf\"> </span></span></span>(30.2)</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc5f\"> <span class=\"_ _16\"> </span>Accrued interest on sover<span class=\"_ _0\"></span>eign exposures<span class=\"_ _1e1\"> </span><span class=\"ff15\">(4.2)<span class=\"_ _1db\"> </span></span>(1.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc60\">On balance sheet items <span class=\"_ _eb\"> </span><span class=\"ff15\">15,389.5<span class=\"_ _42\"> </span><span class=\"ff16\">14,890.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc61\">Less: Intangible assets<span class=\"_ _e7\"> </span><span class=\"ff2c\">30<span class=\"_ _9f\"> </span><span class=\"ff15\">(168.2)<span class=\"_ _b6\"> </span></span></span>(170.2)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc62\">Pension surplus<span class=\"_ _1c8\"> </span><span class=\"ff2c\">60<span class=\"_ _2c\"> </span><span class=\"ff15\">(12.7)<span class=\"_ _1db\"> </span></span></span>(7.1)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc63\">T<span class=\"_ _2\"></span>otal on balance sheet exposures<span class=\"_ _ea\"> </span>15,208.6<span class=\"_ _42\"> </span><span class=\"ff16\">14,713.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc64\">Regulat<span class=\"_ _0\"></span>ory exposure f<span class=\"_ _0\"></span>or derivatives<span class=\"_ _1e7\"> </span><span class=\"ff15\">179.6<span class=\"_ _d5\"> </span><span class=\"ff16\">434.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsc65\">T<span class=\"_ _2\"></span>otal derivative exposur<span class=\"_ _0\"></span>es<span class=\"_ _20b\"> </span><span class=\"ff15\">179.9<span class=\"_ _150\"> </span><span class=\"ff16\">434.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc66\">Post off<span class=\"_ _1\"></span>er pipeline at gross notional amount<span class=\"_ _325\"> </span><span class=\"ff15\">993.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,307.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc67\">Adjustment to c<span class=\"_ _0\"></span>onvert to cr<span class=\"_ _0\"></span>edit equivalent amoun<span class=\"_ _0\"></span>ts<span class=\"_ _1b2\"> </span><span class=\"ff15\">(815.7)<span class=\"_ _1d4\"> </span></span>(1,094.1)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsc68\">Off balance sheet items<span class=\"_ _214\"> </span><span class=\"ff15\">177.6<span class=\"_ _d5\"> </span><span class=\"ff16\">213.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc69\">Tier 1 capital<span class=\"_ _22e\"> </span><span class=\"ff15\">1,188.9<span class=\"_ _86\"> </span><span class=\"ff16\">1,221.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc6a\">T<span class=\"_ _2\"></span>otal leverage e<span class=\"_ _0\"></span>xposure bef<span class=\"_ _0\"></span>ore IFRS 9 relief<span class=\"_ _286\"> </span>15,565.8<span class=\"_ _67\"> </span><span class=\"ff16\">15,361.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc6b\">IFRS 9 relie<span class=\"_ _0\"></span>f<span class=\"_ _217\"> </span><span class=\"ff15\">13.5<span class=\"_ _3a\"> </span><span class=\"ff16\">25.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc6c\">T<span class=\"_ _2\"></span>otal leverage e<span class=\"_ _0\"></span>xposure<span class=\"_ _298\"> </span>15,579.3<span class=\"_ _67\"> </span><span class=\"ff16\">15,387.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsc6d\">UK lever<span class=\"_ _0\"></span>age ra<span class=\"_ _0\"></span>tio<span class=\"_ _21e\"> </span><span class=\"ff15\">7.6%<span class=\"_ _2c\"> </span><span class=\"ff16\">7.9%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gsc6e\">This table is not subject<span class=\"_ _0\"></span> to audit<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc6f\">The fully<span class=\"_ _0\"></span> loaded lev<span class=\"_ _0\"></span>erage ratio is calculated as <span class=\"_ _0\"></span>follows<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc70\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc71\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc72\">Fully loaded Tier 1 capital <span class=\"_ _e8\"> </span><span class=\"ff15\">1,175.4<span class=\"_ _86\"> </span><span class=\"ff16\">1,196.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc73\">T<span class=\"_ _2\"></span>otal leverage e<span class=\"_ _0\"></span>xposure bef<span class=\"_ _0\"></span>ore IFRS 9 r<span class=\"_ _0\"></span>elief<span class=\"_ _154\"> </span><span class=\"ff15\">15,565.8<span class=\"_ _42\"> </span><span class=\"ff16\">15,361.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc74\">Fully loaded UK lever<span class=\"_ _0\"></span>age exposure<span class=\"_ _248\"> </span><span class=\"ff15\">7.6%<span class=\"_ _276\"> </span><span class=\"ff16\">7.8%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gsc75\">This table is not subject<span class=\"_ _0\"></span> to audit.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc76\">F<span class=\"_ _1\"></span>ollowing regulatory<span class=\"_ _0\"></span> changes introduced <span class=\"_ _0\"></span>from 1 <span class=\"_ _0\"></span>January 2022, <span class=\"_ _0\"></span>the Group calculates r<span class=\"_ _0\"></span>egulatory e<span class=\"_ _0\"></span>xposure on derivativ<span class=\"_ _0\"></span>es using the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc77\">Standardised <span class=\"_ _1\"></span>Approach for<span class=\"_ _0\"></span> Counterparty Cr<span class=\"_ _0\"></span>edit Risk (\u2018SA<span class=\"_ _0\"></span>-CCR\u2019), which includes elements based on <span class=\"_ _0\"></span>the market <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> derivativ<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc78\">assets adjusted f<span class=\"_ _0\"></span>or collateral, amongst<span class=\"_ _0\"></span> other <span class=\"_ _0\"></span>things, and based on potential futur<span class=\"_ _0\"></span>e exposure in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> all derivatives held.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc79\">The UK le<span class=\"_ _0\"></span>verage r<span class=\"_ _0\"></span>atio is prescribed by<span class=\"_ _1\"></span> the PRA and diff<span class=\"_ _0\"></span>ers from <span class=\"_ _0\"></span>the lev<span class=\"_ _0\"></span>erage ratio defined b<span class=\"_ _0\"></span>y Basel due <span class=\"_ _0\"></span>to the ex<span class=\"_ _0\"></span>clusion of centr<span class=\"_ _0\"></span>al </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc7a\">bank balances fr<span class=\"_ _0\"></span>om exposures.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsc7c\">Capital requirements in subsidiary<span class=\"_ _0\"></span> entities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc7d\">The regulat<span class=\"_ _0\"></span>ory capital disclosur<span class=\"_ _0\"></span>es in these financial statements r<span class=\"_ _0\"></span>elate only <span class=\"_ _0\"></span>to the consolidat<span class=\"_ _0\"></span>ed position for<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup. Individual </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc7e\">entities within <span class=\"_ _0\"></span>the Group ar<span class=\"_ _0\"></span>e also subject to supervision on a standalone basis. <span class=\"_ _0\"></span>All such entities complied with <span class=\"_ _0\"></span>the requir<span class=\"_ _0\"></span>ements to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gsc7f\">which they<span class=\"_ _0\"></span> wer<span class=\"_ _0\"></span>e subject <span class=\"_ _15\"></span>during the year<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsc80\">(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Re<span class=\"_ _0\"></span>turn on tangible equity (\u2018R<span class=\"_ _0\"></span>o<span class=\"_ _2\"></span>TE\u2019)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc81\">Ro<span class=\"_ _2\"></span>TE is a measure of<span class=\"_ _0\"></span> an entity\u2019<span class=\"_ _1\"></span>s profitability<span class=\"_ _0\"></span> used by in<span class=\"_ _0\"></span>vestors. R<span class=\"_ _0\"></span>o<span class=\"_ _2\"></span>TE is defined by <span class=\"_ _0\"></span>the Group by<span class=\"_ _0\"></span> comparing the pr<span class=\"_ _0\"></span>ofit after<span class=\"_ _0\"></span> tax f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc82\">year<span class=\"_ _1\"></span>, adjusted for<span class=\"_ _0\"></span> amortisation charged on intangible assets, <span class=\"_ _0\"></span>to the av<span class=\"_ _0\"></span>erage of<span class=\"_ _0\"></span> the opening and closing equity<span class=\"_ _0\"></span> positions, excluding </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc83\">intangible assets and goodwill.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc84\">It effectiv<span class=\"_ _0\"></span>ely r<span class=\"_ _0\"></span>eflects a return on equity<span class=\"_ _0\"></span> as if all intangible assets ar<span class=\"_ _0\"></span>e eliminated immediately<span class=\"_ _0\"></span> against reserv<span class=\"_ _0\"></span>es. As <span class=\"_ _0\"></span>this is similar <span class=\"_ _0\"></span>to the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc85\">approach used <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the capital of <span class=\"_ _0\"></span>financial institutions it is widely<span class=\"_ _0\"></span> used in the sector<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc86\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s consolidated Ro<span class=\"_ _2\"></span>TE for<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2023 is derived as follo<span class=\"_ _0\"></span>ws:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gsc87\">Note<span class=\"_ _19c\"> </span><span class=\"ff15\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc88\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc89\">Profit f<span class=\"_ _0\"></span>or the year after t<span class=\"_ _0\"></span>ax<span class=\"_ _211\"> </span><span class=\"ff15\">153.9<span class=\"_ _d5\"> </span><span class=\"ff16\">313.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc8a\">Amortisation and derecognition of in<span class=\"_ _0\"></span>tangible assets<span class=\"_ _1b4\"> </span><span class=\"ff2c\">30<span class=\"_ _31b\"> </span><span class=\"ff15\">3.6<span class=\"_ _9e\"> </span><span class=\"ff16\">2.0<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc8b\">Adjusted pr<span class=\"_ _0\"></span>ofit<span class=\"_ _1ef\"> </span><span class=\"ff15\">157.5<span class=\"_ _d5\"> </span><span class=\"ff16\">315.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsc8c\">Divided by<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc8d\">Opening equity<span class=\"_ _326\"> </span><span class=\"ff15\">1,417.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,241.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc8e\">Opening intangible assets<span class=\"_ _325\"> </span><span class=\"ff2c\">30<span class=\"_ _9f\"> </span><span class=\"ff15\">(170.2)<span class=\"_ _b6\"> </span></span></span>(170.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc8f\">Opening tangible equity<span class=\"_ _285\"> </span><span class=\"ff15\">1,247.1<span class=\"_ _12a\"> </span><span class=\"ff16\">1,071.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc90\">Closing equity<span class=\"_ _2d5\"> </span><span class=\"ff15\">1,410.6<span class=\"_ _12a\"> </span><span class=\"ff16\">1,417.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc91\">Closing intangible assets<span class=\"_ _2c4\"> </span><span class=\"ff2c\">30<span class=\"_ _9f\"> </span><span class=\"ff15\">(168.2)<span class=\"_ _110\"> </span></span></span>(170.2)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc92\">Closing tangible equity<span class=\"_ _307\"> </span><span class=\"ff15\">1,242.4<span class=\"_ _86\"> </span><span class=\"ff16\">1,247.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc93\">Aver<span class=\"_ _0\"></span>age tangible equity<span class=\"_ _22c\"> </span><span class=\"ff15\">1,244.7<span class=\"_ _12a\"> </span><span class=\"ff16\">1,159.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsc94\">Return on T<span class=\"_ _2\"></span>angible Equity<span class=\"_ _285\"> </span><span class=\"ff15\">12.7%<span class=\"_ _9f\"> </span><span class=\"ff16\">27.2%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 he ff3 fs2 fc1 sc0 ls0 ws0 gsc95\">This table is not subject<span class=\"_ _0\"></span> to audit<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsc96\">(c<span class=\"_ _1\"></span>)  <span class=\"_ _29\"> </span>Dividend and distribution policy<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc97\">The Company<span class=\"_ _0\"></span> is committed to a long<span class=\"_ _0\"></span>-term sustainable dividend policy<span class=\"_ _1\"></span>. Ordinarily<span class=\"_ _1\"></span>, dividends will increase in line with earnings, subject<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc98\">to the r<span class=\"_ _0\"></span>equirements of<span class=\"_ _0\"></span> the business and <span class=\"_ _0\"></span>the availability<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> cash resour<span class=\"_ _0\"></span>ces. The Boar<span class=\"_ _0\"></span>d re<span class=\"_ _0\"></span>views <span class=\"_ _0\"></span>the policy<span class=\"_ _0\"></span> at least twice a <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc99\">advance of<span class=\"_ _0\"></span> announcing its results, <span class=\"_ _0\"></span>taking into account the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s strategy, capital r<span class=\"_ _1\"></span>equirements, principal risks and the objective o<span class=\"_ _0\"></span>f </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws30 gsc9a\">enhancing shareholder v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc9b\">In determining the le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> dividend for<span class=\"_ _1\"></span> any y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>, the Board expects t<span class=\"_ _0\"></span>o follow<span class=\"_ _0\"></span> the dividend polic<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, but will also <span class=\"_ _0\"></span>take into account <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc9c\">lev<span class=\"_ _0\"></span>el of av<span class=\"_ _0\"></span>ailable retained earnings in <span class=\"_ _0\"></span>the Company<span class=\"_ _1\"></span>, its cash resources and <span class=\"_ _0\"></span>the cash and capital requir<span class=\"_ _0\"></span>ements inherent in its business </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc9d\">plans. In addition to <span class=\"_ _0\"></span>the payment of<span class=\"_ _0\"></span> dividends, the Boar<span class=\"_ _0\"></span>d may also consider<span class=\"_ _0\"></span> whether<span class=\"_ _1\"></span> it is appropriate to apply<span class=\"_ _0\"></span> excess capital in <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc9e\">market pur<span class=\"_ _1\"></span>chase of the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s shares.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc9f\">The distributable reserv<span class=\"_ _0\"></span>es of <span class=\"_ _0\"></span>the Company<span class=\"_ _0\"></span> comprise its profit and loss account<span class=\"_ _0\"></span> balance (note 46) and, other<span class=\"_ _0\"></span> than <span class=\"_ _0\"></span>the regulatory<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsca0\">requir<span class=\"_ _0\"></span>ement to r<span class=\"_ _0\"></span>etain an appropriat<span class=\"_ _0\"></span>e level o<span class=\"_ _0\"></span>f capital in Parag<span class=\"_ _0\"></span>on Bank PL<span class=\"_ _0\"></span>C, ther<span class=\"_ _0\"></span>e are no r<span class=\"_ _0\"></span>estrictions pre<span class=\"_ _0\"></span>venting pr<span class=\"_ _0\"></span>ofits elsewher<span class=\"_ _0\"></span>e in the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsca1\">Group <span class=\"_ _0\"></span>from being distributed <span class=\"_ _0\"></span>to the par<span class=\"_ _0\"></span>ent.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsca2\">Since the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2018, <span class=\"_ _0\"></span>the Company<span class=\"_ _0\"></span> has adopted a policy<span class=\"_ _0\"></span> of pa<span class=\"_ _0\"></span>ying out appro<span class=\"_ _0\"></span>ximately 40% of<span class=\"_ _0\"></span> its basic earnings </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsca3\">per shar<span class=\"_ _0\"></span>e as dividend (a dividend co<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> ratio of ar<span class=\"_ _0\"></span>ound 2.5 times<span class=\"_ _0\"></span>), in the absence of<span class=\"_ _0\"></span> any<span class=\"_ _0\"></span> idiosyncratic f<span class=\"_ _0\"></span>actors which might mak<span class=\"_ _0\"></span>e such a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsca4\">dividend inappropriate. <span class=\"_ _1\"></span>This policy is r<span class=\"_ _0\"></span>eview<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the Board at least<span class=\"_ _0\"></span> annually<span class=\"_ _0\"></span>. The Compan<span class=\"_ _0\"></span>y considers it has access <span class=\"_ _0\"></span>to sufficient cash </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsca5\">resour<span class=\"_ _0\"></span>ces to pa<span class=\"_ _0\"></span>y dividends at <span class=\"_ _0\"></span>this level and <span class=\"_ _0\"></span>that its distributable reserv<span class=\"_ _0\"></span>es are abundant <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>this purpose.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsca6\">T<span class=\"_ _2\"></span>o provide gr<span class=\"_ _0\"></span>eater <span class=\"_ _0\"></span>transparenc<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, the Boar<span class=\"_ _0\"></span>d also adopted a policy<span class=\"_ _0\"></span> of pa<span class=\"_ _0\"></span>ying an interim dividend in each y<span class=\"_ _0\"></span>ear equiv<span class=\"_ _0\"></span>alent to half<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsca7\">preceding <span class=\"_ _0\"></span>final dividend in the absence of<span class=\"_ _0\"></span> any <span class=\"_ _0\"></span>factors which might<span class=\"_ _0\"></span> make such a distribution inappr<span class=\"_ _0\"></span>opriate. F<span class=\"_ _1\"></span>or the curr<span class=\"_ _0\"></span>ent year<span class=\"_ _2\"></span>, based </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsca8\">on its re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s capital position and forecasts, and <span class=\"_ _0\"></span>taking account of<span class=\"_ _0\"></span> Covid-relat<span class=\"_ _0\"></span>ed impacts on the relativ<span class=\"_ _0\"></span>e size of<span class=\"_ _0\"></span> interim </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsca9\">and final dividends in r<span class=\"_ _0\"></span>ecent y<span class=\"_ _0\"></span>ears and the desir<span class=\"_ _0\"></span>e to normalise the ong<span class=\"_ _0\"></span>oing relationship betw<span class=\"_ _0\"></span>een the half-<span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> and final payments, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscaa\">the Board concluded <span class=\"_ _0\"></span>that a one-off enhancement<span class=\"_ _0\"></span> to the int<span class=\"_ _0\"></span>erim dividend could be made. It ther<span class=\"_ _0\"></span>efore declar<span class=\"_ _0\"></span>ed an interim dividend f<span class=\"_ _0\"></span>or </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscab\">the y<span class=\"_ _0\"></span>ear of<span class=\"_ _0\"></span> 11.0p per<span class=\"_ _0\"></span> share (2022: 9<span class=\"_ _0\"></span>.4p per shar<span class=\"_ _0\"></span>e). <span class=\"_ _0\"></span>The Boar<span class=\"_ _0\"></span>d also confirmed that the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s normal approach of pa<span class=\"_ _0\"></span>ying an interim </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscac\">dividend of 50% o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the preceding <span class=\"_ _0\"></span>year\u2019<span class=\"_ _1\"></span>s final dividend would continue <span class=\"_ _0\"></span>to apply in <span class=\"_ _0\"></span>future <span class=\"_ _0\"></span>years.<span class=\"_ _36a\"> </span></div>The appropriat<span class=\"_ _0\"></span>e level o<span class=\"_ _0\"></span>f final dividend <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the current <span class=\"_ _1\"></span>year w<span class=\"_ _0\"></span>as considered b<span class=\"_ _0\"></span>y the Boar<span class=\"_ _0\"></span>d in light of<span class=\"_ _0\"></span> economic and regulatory<span class=\"_ _0\"></span> dev<span class=\"_ _0\"></span>elopments in the y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>, and the v<span class=\"_ _0\"></span>arious potential paths for<span class=\"_ _0\"></span> the UK<span class=\"_ _0\"></span> economy<span class=\"_ _0\"></span>. In particular <span class=\"_ _0\"></span>the lev<span class=\"_ _0\"></span>els of pr<span class=\"_ _0\"></span>ovision in <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s loan portfolios and the po<span class=\"_ _0\"></span>tential for<span class=\"_ _0\"></span> further<span class=\"_ _0\"></span> pro<span class=\"_ _0\"></span>vision under str<span class=\"_ _0\"></span>ess in the ev<span class=\"_ _0\"></span>ent of<span class=\"_ _0\"></span> a worsening UK<span class=\"_ _0\"></span> economic position wer<span class=\"_ _0\"></span>e considered b<span class=\"_ _0\"></span>y the Board. <span class=\"_ _0\"></span>These w<span class=\"_ _0\"></span>ere compar<span class=\"_ _0\"></span>ed to <span class=\"_ _0\"></span>the regulatory<span class=\"_ _0\"></span> capital position at the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end along with the capital impacts o<span class=\"_ _0\"></span>f str<span class=\"_ _0\"></span>ess testing carried out as part of<span class=\"_ _0\"></span> the ICAAP<span class=\"_ _0\"></span> and for<span class=\"_ _0\"></span>ecasting processes, and <span class=\"_ _0\"></span>the potential impacts of<span class=\"_ _0\"></span> ongoing dev<span class=\"_ _0\"></span>elopments in the r<span class=\"_ _0\"></span>egulatory regime <span class=\"_ _0\"></span>for capital including <span class=\"_ _0\"></span>the introduction in <span class=\"_ _0\"></span>the UK of<span class=\"_ _0\"></span> Basel 3.<span class=\"_ _0\"></span>1. The Board particularly<span class=\"_ _0\"></span> considered <span class=\"_ _0\"></span>the appropriateness o<span class=\"_ _0\"></span>f including net losses r<span class=\"_ _0\"></span>elating to <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value adjustments <span class=\"_ _0\"></span>from hedging in the calculation of an<span class=\"_ _0\"></span>y dividend or<span class=\"_ _0\"></span> distribution, as these primarily<span class=\"_ _0\"></span> result <span class=\"_ _0\"></span>from the r<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>ersal of<span class=\"_ _0\"></span> gains recor<span class=\"_ _0\"></span>ded in earlier <span class=\"_ _0\"></span>years <span class=\"_ _0\"></span>which wer<span class=\"_ _0\"></span>e disregar<span class=\"_ _0\"></span>ded, at the <span class=\"_ _0\"></span>time, for<span class=\"_ _0\"></span> the purpose of<span class=\"_ _1\"></span> determining dividends. Given the size of<span class=\"_ _0\"></span> such adjustments in the period, <span class=\"_ _0\"></span>the Board concluded that <span class=\"_ _0\"></span>their inclusion <span class=\"_ _0\"></span>was not consistent<span class=\"_ _0\"></span> with its ov<span class=\"_ _0\"></span>erarching aim of<span class=\"_ _1\"></span> delivering a sustainable dividend which gro<span class=\"_ _0\"></span>ws with <span class=\"_ _0\"></span>the earnings of <span class=\"_ _0\"></span>the business.<span class=\"_ _36a\"> </span>On the basis of<span class=\"_ _0\"></span> this analy<span class=\"_ _0\"></span>sis the Board concluded <span class=\"_ _0\"></span>that a to<span class=\"_ _0\"></span>tal dividend of ar<span class=\"_ _0\"></span>ound 40% of earnings e<span class=\"_ _0\"></span>xcluding fair<span class=\"_ _1\"></span> value items could be paid.<span class=\"_ _36a\"> </span>The Board <span class=\"_ _0\"></span>will ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e propose a final dividend <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear of<span class=\"_ _1\"></span> 26.4p per share (2022: 19<span class=\"_ _0\"></span>.2p per shar<span class=\"_ _0\"></span>e) <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> approv<span class=\"_ _0\"></span>al at the 2024 <span class=\"_ _1\"></span>AGM, making a total dividend <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the y<span class=\"_ _0\"></span>ear o<span class=\"_ _0\"></span>f 37<span class=\"_ _2\"></span>.4p per shar<span class=\"_ _0\"></span>e (2022: 28.6p per shar<span class=\"_ _1\"></span>e).<span class=\"_ _36a\"> </span>During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> the share buy<span class=\"_ _0\"></span>-back progr<span class=\"_ _0\"></span>amme announced during the 2022 financial <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> was comple<span class=\"_ _0\"></span>ted under an irr<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>ocable authority put in place in Sep<span class=\"_ _0\"></span>tember 2022. <span class=\"_ _0\"></span>A<span class=\"_ _0\"></span> share buy-back pr<span class=\"_ _1\"></span>ogramme for <span class=\"_ _0\"></span>the current <span class=\"_ _0\"></span>financial y<span class=\"_ _0\"></span>ear<span class=\"_ _0\"></span>, for<span class=\"_ _1\"></span> up to \u00a350.<span class=\"_ _0\"></span>0m of or<span class=\"_ _0\"></span>dinary shares <span class=\"_ _0\"></span>was authorised at <span class=\"_ _0\"></span>the time of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s 2022 results announcement. <span class=\"_ _0\"></span>This w<span class=\"_ _0\"></span>as extended t<span class=\"_ _0\"></span>o \u00a3100.<span class=\"_ _0\"></span>0m in June 2022. <span class=\"_ _0\"></span>The amount expended in these pr<span class=\"_ _0\"></span>ogrammes in <span class=\"_ _0\"></span>the year<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>as \u00a311<span class=\"_ _15\"></span>1.5m (note 4<span class=\"_ _0\"></span>7) and the shar<span class=\"_ _0\"></span>e buy-back w<span class=\"_ _0\"></span>as completed befor<span class=\"_ _0\"></span>e the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end.<span class=\"_ _36a\"> </span>As part of<span class=\"_ _0\"></span> its consideration of capital described abo<span class=\"_ _0\"></span>ve <span class=\"_ _0\"></span>the Board of<span class=\"_ _0\"></span> Directors authorised a ne<span class=\"_ _0\"></span>w buy-back<span class=\"_ _0\"></span> of up <span class=\"_ _0\"></span>to \u00a350.<span class=\"_ _0\"></span>0m to commence shortly after<span class=\"_ _0\"></span> the announcement o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the 2023 results. <span class=\"_ _0\"></span>All shares acquir<span class=\"_ _0\"></span>ed in buy-back pr<span class=\"_ _0\"></span>ogrammes are initially<span class=\"_ _0\"></span> held in tr<span class=\"_ _0\"></span>easury<span class=\"_ _0\"></span>. The direct<span class=\"_ _0\"></span>ors have consider<span class=\"_ _0\"></span>ed the distributable r<span class=\"_ _0\"></span>esources of<span class=\"_ _0\"></span> the Company<span class=\"_ _0\"></span> and concluded that <span class=\"_ _0\"></span>these distributions are appr<span class=\"_ _0\"></span>opriate.<span class=\"_ _36a\"> </span>The most r<span class=\"_ _0\"></span>ecent policy r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>w<span class=\"_ _0\"></span>, in November<span class=\"_ _0\"></span> 2023, also confirmed the existing dividend polic<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>would continue to apply<span class=\"_ _0\"></span> for<span class=\"_ _1\"></span> future periods, subject to <span class=\"_ _0\"></span>the impact of<span class=\"_ _0\"></span> any <span class=\"_ _0\"></span>future e<span class=\"_ _0\"></span>vents, and the Boar<span class=\"_ _0\"></span>d will consider<span class=\"_ _0\"></span> the appr<span class=\"_ _0\"></span>opriateness and scale of an<span class=\"_ _0\"></span>y interim dividend in the context<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s results and the operating and economic en<span class=\"_ _0\"></span>vironment at <span class=\"_ _0\"></span>the time. Shar<span class=\"_ _0\"></span>e buy-backs will be consider<span class=\"_ _0\"></span>ed where ex<span class=\"_ _0\"></span>cess capital has arisen, either oper<span class=\"_ _0\"></span>ationally or<span class=\"_ _0\"></span> as a result of<span class=\"_ _0\"></span> changed r<span class=\"_ _0\"></span>egulatory r<span class=\"_ _0\"></span>equirements<span class=\"_ _36a\"> </span>.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfObjectivesPoliciesAndProcessesForManagingCapitalExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-455": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gscae\">62. <span class=\"_ _96\"></span>Financial risk management<span class=\"_ _36a\"> </span></div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscaf\">The principal risks arising fr<span class=\"_ _0\"></span>om the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s exposure to <span class=\"_ _0\"></span>financial instruments are cr<span class=\"_ _0\"></span>edit risk, liquidity risk and mark<span class=\"_ _0\"></span>et risk  </div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscb0\">(particularly<span class=\"_ _0\"></span> interest r<span class=\"_ _0\"></span>ate risk and a limited amount of<span class=\"_ _0\"></span> currency<span class=\"_ _1\"></span> risk). The nature and e<span class=\"_ _0\"></span>xtent of <span class=\"_ _0\"></span>these risks are discussed in no<span class=\"_ _0\"></span>tes  </div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscb1\">63 to 65 r<span class=\"_ _0\"></span>espectively<span class=\"_ _1\"></span>. </div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscb2\">The Board has a Risk<span class=\"_ _0\"></span> and Compliance Committee, consisting of <span class=\"_ _0\"></span>the Chair o<span class=\"_ _0\"></span>f the Boar<span class=\"_ _0\"></span>d and the non-ex<span class=\"_ _0\"></span>ecutive dir<span class=\"_ _0\"></span>ectors, which is </div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscb3\">responsible <span class=\"_ _0\"></span>for pr<span class=\"_ _0\"></span>oviding o<span class=\"_ _0\"></span>versight and challenge <span class=\"_ _0\"></span>to the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s risk management arrangements. Ex<span class=\"_ _0\"></span>ecutive responsibility<span class=\"_ _1\"></span> for <span class=\"_ _0\"></span>the </div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscb4\">over<span class=\"_ _0\"></span>sight and operation of<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s risk management <span class=\"_ _0\"></span>framework<span class=\"_ _0\"></span> is delegated to <span class=\"_ _0\"></span>the ERC. ERC discharges its duties <span class=\"_ _0\"></span>through a </div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscb5\">number o<span class=\"_ _0\"></span>f sub-committees and escalates issues of<span class=\"_ _0\"></span> concern to <span class=\"_ _0\"></span>the Risk and Compliance Committee <span class=\"_ _0\"></span>where appr<span class=\"_ _0\"></span>opriate.<span class=\"_ _36a\"> </span></div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls6 ws0 gscb6\">The Credit<span class=\"_ _0\"></span> Committee and AL<span class=\"_ _1\"></span>CO are sub-committees of<span class=\"_ _0\"></span> the ERC which monit<span class=\"_ _0\"></span>or performance ag<span class=\"_ _0\"></span>ainst the risk appetites se<span class=\"_ _0\"></span>t by<span class=\"_ _0\"></span> the Board </div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls6 ws0 gscb7\">and make r<span class=\"_ _0\"></span>ecommendations for<span class=\"_ _0\"></span> changes in risk appetit<span class=\"_ _0\"></span>e where appr<span class=\"_ _0\"></span>opriate. <span class=\"_ _0\"></span>They<span class=\"_ _0\"></span> also re<span class=\"_ _0\"></span>view and, <span class=\"_ _0\"></span>where authorised <span class=\"_ _0\"></span>to do so, agr<span class=\"_ _0\"></span>ee or </div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls6 ws0 gscb8\">amend policies for<span class=\"_ _0\"></span> managing each of<span class=\"_ _0\"></span> these risks, <span class=\"_ _0\"></span>which are summarised in the r<span class=\"_ _0\"></span>elev<span class=\"_ _0\"></span>ant note. <span class=\"_ _0\"></span>The Corporate Go<span class=\"_ _0\"></span>vernance Statement in </div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls6 ws0 gscb9\">section B3 (which is not<span class=\"_ _0\"></span> subject to audit) pr<span class=\"_ _0\"></span>ovides further<span class=\"_ _0\"></span> detail on the oper<span class=\"_ _0\"></span>ations of <span class=\"_ _0\"></span>these committees. </div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls6 ws0 gscba\">The financial risk manag<span class=\"_ _0\"></span>ement policies have r<span class=\"_ _0\"></span>emained unchanged <span class=\"_ _0\"></span>throughout <span class=\"_ _0\"></span>the year<span class=\"_ _0\"></span> and since the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end. T<span class=\"_ _0\"></span>he position discussed in </div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls6 ws0 gscbb\">notes 63 t<span class=\"_ _0\"></span>o 65 is materially similar<span class=\"_ _0\"></span> to <span class=\"_ _0\"></span>that existing thr<span class=\"_ _0\"></span>oughout the <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>. </div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gscbd\">63. <span class=\"_ _96\"></span>Credit risk<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscbe\">The assets of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup and the Company<span class=\"_ _0\"></span> which ar<span class=\"_ _0\"></span>e subject to cr<span class=\"_ _0\"></span>edit risk ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gscbf\">The Group<span class=\"_ _180\"> </span>The Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gscc0\">Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _a0\"> </span></span>2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gscc1\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gscc2\">Financial assets at amortised cos<span class=\"_ _0\"></span>t<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gscc3\">Loans to customer<span class=\"_ _0\"></span>s<span class=\"_ _2b4\"> </span><span class=\"ff2c\">18<span class=\"_ _12a\"> </span><span class=\"ff15\">14,874.3<span class=\"_ _42\"> </span><span class=\"ff16\">14,210.3<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span></span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gscc4\">T<span class=\"_ _1\"></span>rade receivables<span class=\"_ _26f\"> </span><span class=\"ff2c\">27<span class=\"_ _9b\"> </span><span class=\"ff15\">1.5<span class=\"_ _9e\"> </span><span class=\"ff16\">1.9<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span></span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gscc5\">Intra-gr<span class=\"_ _0\"></span>oup cash deposits<span class=\"_ _153\"> </span><span class=\"ff2c\">27<span class=\"_ _10b\"> </span><span class=\"ff15\">-<span class=\"_ _18b\"> </span>193.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gscc6\">Amounts owed by Gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _64\"> </span><span class=\"ff2c\">27<span class=\"_ _10b\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span></span>-<span class=\"_ _d1\"> </span><span class=\"ff15\">35.1<span class=\"_ _3a\"> </span><span class=\"ff16\">39.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gscc7\">Cash<span class=\"_ _1b1\"> </span><span class=\"ff2c\">17<span class=\"_ _133\"> </span><span class=\"ff15\">2,994.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,930.9<span class=\"_ _3a\"> </span></span>27.6<span class=\"_ _3a\"> </span><span class=\"ff16\">19.7<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gscc8\">CRDs<span class=\"_ _2df\"> </span><span class=\"ff2c\">27<span class=\"_ _40\"> </span><span class=\"ff15\">38.0<span class=\"_ _3a\"> </span><span class=\"ff16\">30.2<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span></span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gscc9\">Accrued inter<span class=\"_ _0\"></span>est income<span class=\"_ _252\"> </span><span class=\"ff2c\">27<span class=\"_ _9b\"> </span><span class=\"ff15\">4.6<span class=\"_ _9e\"> </span><span class=\"ff16\">1.0<span class=\"_ _9e\"> </span></span>0.1<span class=\"_ _9e\"> </span><span class=\"ff16\">0.1<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gscca\">17,912.7<span class=\"_ _42\"> </span><span class=\"ff16\">16,174.3<span class=\"_ _150\"> </span></span>256.4<span class=\"_ _3a\"> </span><span class=\"ff16\">58.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsccb\">Financial assets at f<span class=\"_ _0\"></span>air value<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsccc\">Derivativ<span class=\"_ _0\"></span>e financial assets<span class=\"_ _c3\"> </span><span class=\"ff2c\">26<span class=\"_ _cb\"> </span><span class=\"ff15\">615.4<span class=\"_ _d5\"> </span><span class=\"ff16\">779.0<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span></span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsccd\">Maximum exposur<span class=\"_ _0\"></span>e to credit risk<span class=\"_ _273\"> </span>18,528.1<span class=\"_ _42\"> </span><span class=\"ff16\">16,953.3<span class=\"_ _150\"> </span></span>256.4<span class=\"_ _3a\"> </span><span class=\"ff16\">58.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscce\">While this maximum exposur<span class=\"_ _0\"></span>e repr<span class=\"_ _0\"></span>esents the potential loss <span class=\"_ _0\"></span>which might hav<span class=\"_ _0\"></span>e to be accounted <span class=\"_ _0\"></span>for b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group, <span class=\"_ _0\"></span>the terms on which </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsccf\">a significant proportion o<span class=\"_ _0\"></span>f the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s loan assets are funded, described under<span class=\"_ _0\"></span> Liquidity Risk in no<span class=\"_ _0\"></span>te 64, limit the amount<span class=\"_ _0\"></span> of principal </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscd0\">repa<span class=\"_ _0\"></span>yments on the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s securitised and war<span class=\"_ _0\"></span>ehouse borro<span class=\"_ _0\"></span>wings in cases of capital losses on assets, consider<span class=\"_ _0\"></span>ably r<span class=\"_ _0\"></span>educing the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscd1\">effective shar<span class=\"_ _1\"></span>eholder v<span class=\"_ _0\"></span>alue at risk.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscd2\">All financial assets at amortised cost ar<span class=\"_ _0\"></span>e subject t<span class=\"_ _0\"></span>o the requir<span class=\"_ _0\"></span>ements of<span class=\"_ _0\"></span> IFRS 9 relating to impairment.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscd3\">F<span class=\"_ _0\"></span>urther inf<span class=\"_ _0\"></span>ormation on the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s exposure <span class=\"_ _0\"></span>to credit risk<span class=\"_ _0\"></span> by asse<span class=\"_ _0\"></span>t type, including the cr<span class=\"_ _0\"></span>edit quality<span class=\"_ _0\"></span> of assets and an<span class=\"_ _0\"></span>y potential </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscd4\">concentrations of<span class=\"_ _0\"></span> credit risk, is set out<span class=\"_ _0\"></span> below <span class=\"_ _0\"></span>for:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gscd5\">\u2022 <span class=\"_ _1b\"> </span>Loans to customers<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscd6\">\u2022 <span class=\"_ _13\"> </span>Cash balances (including CSA assets, CRDs and accrued int<span class=\"_ _0\"></span>erest)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscd7\">\u2022 <span class=\"_ _13\"> </span>T<span class=\"_ _1\"></span>rade receiv<span class=\"_ _0\"></span>ables<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws1b gscd8\">\u2022 <span class=\"_ _13\"> </span>Derivative financial assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws21 gscd9\">Loans to customers<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscda\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s credit risk is primarily<span class=\"_ _1\"></span> attributable to its loans to customers and its business objectiv<span class=\"_ _0\"></span>es rely<span class=\"_ _0\"></span> on maintaining a high-quality </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscdb\">customer base and place str<span class=\"_ _0\"></span>ong emphasis on prudent cr<span class=\"_ _0\"></span>edit management, both at <span class=\"_ _0\"></span>the time of<span class=\"_ _0\"></span> acquiring or underwriting a ne<span class=\"_ _0\"></span>w loan, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscdc\">where r<span class=\"_ _0\"></span>obust lending criteria are applied, and <span class=\"_ _0\"></span>throughout <span class=\"_ _0\"></span>the loan\u2019<span class=\"_ _1\"></span>s life.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscdd\">Primary r<span class=\"_ _0\"></span>esponsibility <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the management of<span class=\"_ _0\"></span> credit risk<span class=\"_ _0\"></span> relating <span class=\"_ _0\"></span>to lending activities across <span class=\"_ _0\"></span>the Group lies with <span class=\"_ _0\"></span>the Credit Committ<span class=\"_ _0\"></span>ee. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscde\">The Credit<span class=\"_ _0\"></span> Committee, which r<span class=\"_ _0\"></span>eports to the ERC<span class=\"_ _0\"></span>, is made up of senior<span class=\"_ _1\"></span> employees, drawn fr<span class=\"_ _0\"></span>om financial and risk <span class=\"_ _0\"></span>functions </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscdf\">independent of<span class=\"_ _0\"></span> the underwriting process. It<span class=\"_ _0\"></span> is chaired by<span class=\"_ _0\"></span> the Cr<span class=\"_ _0\"></span>edit Risk Dir<span class=\"_ _0\"></span>ector<span class=\"_ _1\"></span>. Its key<span class=\"_ _0\"></span> responsibilities include setting and r<span class=\"_ _0\"></span>eviewing </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsce0\">credit polic<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, controlling applicant quality<span class=\"_ _1\"></span>, tracking account performance ag<span class=\"_ _0\"></span>ainst targ<span class=\"_ _0\"></span>ets, agreeing pr<span class=\"_ _0\"></span>oduct criteria and lending </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsce1\">guidelines and monitoring performance and <span class=\"_ _0\"></span>trends.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsce2\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s underwriting philosophy is based on sophisticat<span class=\"_ _0\"></span>ed individual credit assessment supported b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the automated efficiencies </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsce3\">of statistically<span class=\"_ _0\"></span>-based ev<span class=\"_ _0\"></span>aluation models. Information on each applicant is combined with data <span class=\"_ _0\"></span>taken <span class=\"_ _0\"></span>from cr<span class=\"_ _0\"></span>edit ref<span class=\"_ _0\"></span>erence agencies </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsce4\">and other e<span class=\"_ _0\"></span>xternal sources <span class=\"_ _0\"></span>to pro<span class=\"_ _0\"></span>vide a complete credit pictur<span class=\"_ _0\"></span>e of<span class=\"_ _0\"></span> the applicant and the borr<span class=\"_ _1\"></span>owing requested. Ke<span class=\"_ _0\"></span>y inf<span class=\"_ _0\"></span>ormation </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsce5\">is v<span class=\"_ _0\"></span>alidated thr<span class=\"_ _0\"></span>ough a combination of documentation and statistical data <span class=\"_ _0\"></span>which collectively<span class=\"_ _0\"></span> provides e<span class=\"_ _0\"></span>vidence of<span class=\"_ _0\"></span> the applicant\u2019<span class=\"_ _1\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsce6\">ability and <span class=\"_ _0\"></span>willingness to pay<span class=\"_ _1\"></span> the amount contracted under <span class=\"_ _0\"></span>the loan agreement. Similarly<span class=\"_ _1\"></span>, where asse<span class=\"_ _0\"></span>ts form part of<span class=\"_ _0\"></span> the security<span class=\"_ _0\"></span> to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsce7\">support the loan, r<span class=\"_ _0\"></span>obust asset <span class=\"_ _0\"></span>valuation pr<span class=\"_ _0\"></span>ocesses ensure appropriat<span class=\"_ _0\"></span>e risk mitigation is in place. E<span class=\"_ _0\"></span>ven so, in assessing cr<span class=\"_ _0\"></span>edit risk, an </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsce8\">applicant\u2019<span class=\"_ _1\"></span>s ability and propensity<span class=\"_ _0\"></span> to r<span class=\"_ _0\"></span>epay<span class=\"_ _0\"></span> the loan remain <span class=\"_ _0\"></span>the principal factors in <span class=\"_ _0\"></span>the decision to lend, e<span class=\"_ _0\"></span>ven <span class=\"_ _0\"></span>where the Gr<span class=\"_ _0\"></span>oup w<span class=\"_ _0\"></span>ould </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsce9\">have security<span class=\"_ _0\"></span> on the pr<span class=\"_ _0\"></span>oposed loan.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscea\">In considering whether<span class=\"_ _0\"></span> to acquir<span class=\"_ _0\"></span>e pools of<span class=\"_ _0\"></span> loan assets, the Gr<span class=\"_ _0\"></span>oup will undertake a due dilig<span class=\"_ _0\"></span>ence exer<span class=\"_ _0\"></span>cise on the underlying loan </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsceb\">accounts. Such assets are g<span class=\"_ _0\"></span>enerally not<span class=\"_ _0\"></span> fully perf<span class=\"_ _0\"></span>orming and are off<span class=\"_ _0\"></span>ered at a discount <span class=\"_ _0\"></span>to their<span class=\"_ _0\"></span> current balance. <span class=\"_ _1\"></span>The Group\u2019<span class=\"_ _2\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscec\">procedur<span class=\"_ _0\"></span>es may<span class=\"_ _0\"></span> include inspection of original loan documents, <span class=\"_ _0\"></span>verification of<span class=\"_ _0\"></span> security and <span class=\"_ _0\"></span>the examination of <span class=\"_ _0\"></span>the credit status </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsced\">of borr<span class=\"_ _0\"></span>ow<span class=\"_ _0\"></span>ers. Current and historic cash <span class=\"_ _0\"></span>flow data <span class=\"_ _0\"></span>will also be examined. <span class=\"_ _0\"></span>The objective of<span class=\"_ _0\"></span> the ex<span class=\"_ _0\"></span>ercise is <span class=\"_ _0\"></span>to establish, to a le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscee\">confidence similar <span class=\"_ _0\"></span>to that pr<span class=\"_ _0\"></span>ovided b<span class=\"_ _0\"></span>y the underwriting pr<span class=\"_ _0\"></span>ocess, that <span class=\"_ _0\"></span>the assets will g<span class=\"_ _0\"></span>enerate sufficient cash flo<span class=\"_ _0\"></span>ws to r<span class=\"_ _0\"></span>ecov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscef\">Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s investment and gener<span class=\"_ _0\"></span>ate an appropriate r<span class=\"_ _0\"></span>eturn without e<span class=\"_ _0\"></span>xposing the Gr<span class=\"_ _0\"></span>oup to material operational or<span class=\"_ _0\"></span> conduct risks. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscf1\">This section sets out information r<span class=\"_ _0\"></span>elev<span class=\"_ _0\"></span>ant to assessing <span class=\"_ _0\"></span>the credit risk<span class=\"_ _0\"></span> inherent in <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s loans to customers balances. It is set out<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gscf2\">in the following subsections:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscf3\">\u2022 <span class=\"_ _13\"> </span>T<span class=\"_ _1\"></span>ypes of lending and r<span class=\"_ _0\"></span>elated security<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscf4\">\u2022 <span class=\"_ _13\"> </span>Overall cr<span class=\"_ _0\"></span>edit grading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscf5\">\u2022 <span class=\"_ _13\"> </span>Credit characteristics of<span class=\"_ _1\"></span> particular portfolios<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscf6\">\u2022 <span class=\"_ _13\"> </span>Arrears performance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscf7\">\u2022 <span class=\"_ _13\"> </span>Acquired assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h51 ff29 fs1 fc1 sc0 ls0 ws0 gscf8\">T<span class=\"_ _1\"></span>ypes of lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscf9\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s balance sheet loan assets at 30 September<span class=\"_ _1\"></span> 2023 are analysed as follo<span class=\"_ _0\"></span>ws:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gscfa\">2023<span class=\"_ _287\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gscfb\">\u00a3m<span class=\"_ _209\"> </span>%<span class=\"_ _f8\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _209\"> </span>%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gscfc\">Buy-t<span class=\"_ _0\"></span>o-let mortgages<span class=\"_ _2e4\"> </span><span class=\"ff15\">12,720.1<span class=\"_ _84\"> </span>85.6%<span class=\"_ _55\"> </span><span class=\"ff16\">12,086.0<span class=\"_ _291\"> </span>85.1%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gscfd\">Owner-occupied mortg<span class=\"_ _0\"></span>ages<span class=\"_ _195\"> </span><span class=\"ff15\">27.7<span class=\"_ _1c1\"> </span>0.1%<span class=\"_ _1d6\"> </span><span class=\"ff16\">36.4<span class=\"_ _72\"> </span>0.2%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gscfe\">T<span class=\"_ _2\"></span>otal first charg<span class=\"_ _0\"></span>e residential mortg<span class=\"_ _0\"></span>ages<span class=\"_ _102\"> </span><span class=\"ff15\">12,747.8<span class=\"_ _84\"> </span>85.7%<span class=\"_ _55\"> </span><span class=\"ff16\">12,122.4<span class=\"_ _291\"> </span>85.3%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gscff\">Second charge mortg<span class=\"_ _0\"></span>age loans<span class=\"_ _f9\"> </span><span class=\"ff15\">154.5<span class=\"_ _72\"> </span>1.0%<span class=\"_ _b9\"> </span><span class=\"ff16\">206.3<span class=\"_ _72\"> </span>1.4%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsd00\">Loans secured on residen<span class=\"_ _0\"></span>tial property<span class=\"_ _144\"> </span><span class=\"ff15\">12,902.3<span class=\"_ _1d6\"> </span>86.7%<span class=\"_ _55\"> </span><span class=\"ff16\">12,328.7<span class=\"_ _291\"> </span>86.7%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd01\">Development finance<span class=\"_ _1d7\"> </span><span class=\"ff15\">747.8<span class=\"_ _1c1\"> </span>5.0%<span class=\"_ _b9\"> </span><span class=\"ff16\">719.9<span class=\"_ _72\"> </span>5.1%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd02\">Loans secured on property<span class=\"_ _16d\"> </span>13,650.1<span class=\"_ _84\"> </span>91.7%<span class=\"_ _55\"> </span><span class=\"ff16\">13,048.6<span class=\"_ _291\"> </span>91.8%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd03\">Asset finance loans<span class=\"_ _11a\"> </span><span class=\"ff15\">559.1<span class=\"_ _1c1\"> </span>3.8%<span class=\"_ _b9\"> </span><span class=\"ff16\">498.8<span class=\"_ _72\"> </span>3.5%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd04\">Motor finance loans<span class=\"_ _2e2\"> </span><span class=\"ff15\">297.7<span class=\"_ _72\"> </span>2.0%<span class=\"_ _b9\"> </span><span class=\"ff16\">261.3<span class=\"_ _72\"> </span>1.8%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd05\">Aircr<span class=\"_ _0\"></span>aft mortgages<span class=\"_ _20a\"> </span><span class=\"ff15\">26.9<span class=\"_ _72\"> </span>0.2%<span class=\"_ _1d6\"> </span><span class=\"ff16\">33.7<span class=\"_ _72\"> </span>0.3%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd06\">Secured RLS and CBILS<span class=\"_ _327\"> </span><span class=\"ff15\">50.5<span class=\"_ _1c1\"> </span>0.4%<span class=\"_ _84\"> </span><span class=\"ff16\">65.1<span class=\"_ _72\"> </span>0.4%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd07\">Structured lending<span class=\"_ _259\"> </span><span class=\"ff15\">169.0<span class=\"_ _72\"> </span>1.1%<span class=\"_ _b9\"> </span><span class=\"ff16\">178.7<span class=\"_ _72\"> </span>1.3%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd08\">Invoice finance<span class=\"_ _1a5\"> </span><span class=\"ff15\">31.7<span class=\"_ _1c1\"> </span>0.2%<span class=\"_ _1d6\"> </span><span class=\"ff16\">25.7<span class=\"_ _72\"> </span>0.2%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd09\">T<span class=\"_ _2\"></span>otal secured loans<span class=\"_ _2ab\"> </span>14,785.0<span class=\"_ _84\"> </span>99.4%<span class=\"_ _55\"> </span><span class=\"ff16\">14,111.9<span class=\"_ _84\"> </span>99.3%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd0a\">Prof<span class=\"_ _0\"></span>essions finance<span class=\"_ _2a0\"> </span><span class=\"ff15\">52.2<span class=\"_ _1c1\"> </span>0.4%<span class=\"_ _84\"> </span><span class=\"ff16\">60.9<span class=\"_ _72\"> </span>0.4%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd0b\">Unsecured RLS, CBILS and BBLS<span class=\"_ _108\"> </span><span class=\"ff15\">16.7<span class=\"_ _72\"> </span>0.1%<span class=\"_ _84\"> </span><span class=\"ff16\">22.9<span class=\"_ _1c1\"> </span>0.2%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd0c\">Other unsecured commer<span class=\"_ _0\"></span>cial loans<span class=\"_ _328\"> </span><span class=\"ff15\">20.4<span class=\"_ _1c1\"> </span>0.1%<span class=\"_ _84\"> </span><span class=\"ff16\">14.6<span class=\"_ _72\"> </span>0.1%<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd0d\">T<span class=\"_ _2\"></span>otal loans to customers<span class=\"_ _28e\"> </span>14,874.3<span class=\"_ _b9\"> </span>100.0%<span class=\"_ _55\"> </span><span class=\"ff16\">14,210.3<span class=\"_ _133\"> </span>100.0%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd0e\">First and second charge mortg<span class=\"_ _0\"></span>ages are secur<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> charges ov<span class=\"_ _0\"></span>er r<span class=\"_ _0\"></span>esidential properties in England and <span class=\"_ _0\"></span>W<span class=\"_ _0\"></span>ales, or similar<span class=\"_ _0\"></span> Scottish or<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd0f\">Northern Irish securities. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd10\">Dev<span class=\"_ _0\"></span>elopment finance loans are secur<span class=\"_ _1\"></span>ed by a first char<span class=\"_ _0\"></span>ge (<span class=\"_ _0\"></span>or similar<span class=\"_ _0\"></span> Scottish security) o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the dev<span class=\"_ _0\"></span>elopment property<span class=\"_ _0\"></span> and v<span class=\"_ _0\"></span>arious </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd11\">charges o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>the build. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd12\">Asset finance loans and mot<span class=\"_ _0\"></span>or finance loans ar<span class=\"_ _1\"></span>e effectively secur<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the financed asset, <span class=\"_ _0\"></span>while aircr<span class=\"_ _0\"></span>aft mortgages ar<span class=\"_ _0\"></span>e secured by<span class=\"_ _0\"></span> a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd13\">charge on <span class=\"_ _0\"></span>the aircraft <span class=\"_ _0\"></span>funded.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd14\">Structured lending and in<span class=\"_ _0\"></span>voice finance balances ar<span class=\"_ _0\"></span>e effectively<span class=\"_ _1\"></span> secured over<span class=\"_ _0\"></span> the assets o<span class=\"_ _0\"></span>f the cust<span class=\"_ _0\"></span>omer<span class=\"_ _0\"></span>, with security<span class=\"_ _0\"></span> enhanced by<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd15\">maintaining balances at a lev<span class=\"_ _0\"></span>el less than the <span class=\"_ _0\"></span>total amount of<span class=\"_ _0\"></span> the security<span class=\"_ _0\"></span> (the advance per<span class=\"_ _0\"></span>centage<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd16\">Prof<span class=\"_ _0\"></span>essions finance balances ar<span class=\"_ _0\"></span>e generally short<span class=\"_ _0\"></span> term unsecur<span class=\"_ _0\"></span>ed loans made to firms o<span class=\"_ _0\"></span>f lawy<span class=\"_ _0\"></span>ers and accountants for<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>orking  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd17\">capital purposes.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd18\">Loans made under<span class=\"_ _0\"></span> the R<span class=\"_ _0\"></span>ecovery<span class=\"_ _0\"></span> Loan Scheme (\u2018RL<span class=\"_ _0\"></span>S\u2019), the Corona<span class=\"_ _0\"></span>virus Business Interruption Loan Scheme (\u2018CBILS\u2019) and <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd19\">Bounce Back Loan Scheme (\u2018BBL<span class=\"_ _0\"></span>S\u2019) have <span class=\"_ _0\"></span>the benefit of<span class=\"_ _0\"></span> a guarantee underwritten by<span class=\"_ _0\"></span> the UK<span class=\"_ _0\"></span> Government.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd1a\">Other unsecur<span class=\"_ _0\"></span>ed consumer loans include unsecur<span class=\"_ _0\"></span>ed loans either adv<span class=\"_ _0\"></span>anced by<span class=\"_ _0\"></span> group companies or<span class=\"_ _0\"></span> acquired <span class=\"_ _0\"></span>from their<span class=\"_ _0\"></span> originators at </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd1b\">a discount. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd1d\">There ar<span class=\"_ _0\"></span>e no significant concentrations of<span class=\"_ _0\"></span> credit<span class=\"_ _0\"></span> risk to individual counterparties due <span class=\"_ _0\"></span>to the larg<span class=\"_ _0\"></span>e number of<span class=\"_ _0\"></span> customers included in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd1e\">the portfolios. <span class=\"_ _0\"></span>All lending is to customers <span class=\"_ _0\"></span>within the UK. <span class=\"_ _0\"></span>The t<span class=\"_ _0\"></span>otal gross carrying <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s loans to customers due fr<span class=\"_ _0\"></span>om </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd1f\">customers with <span class=\"_ _0\"></span>total portfolio e<span class=\"_ _0\"></span>xposures ov<span class=\"_ _0\"></span>er \u00a310<span class=\"_ _0\"></span>.0m is analy<span class=\"_ _0\"></span>sed below b<span class=\"_ _0\"></span>y pr<span class=\"_ _0\"></span>oduct type.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd20\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd21\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd22\">Buy-t<span class=\"_ _0\"></span>o-let mortgages<span class=\"_ _1fa\"> </span><span class=\"ff15\">149.6<span class=\"_ _d5\"> </span><span class=\"ff16\">151.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd23\">Development finance<span class=\"_ _30c\"> </span><span class=\"ff15\">390.6<span class=\"_ _150\"> </span><span class=\"ff16\">306.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd24\">Structured lending<span class=\"_ _1f9\"> </span><span class=\"ff15\">160.3<span class=\"_ _d5\"> </span><span class=\"ff16\">179.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd25\">Asset finance<span class=\"_ _329\"> </span><span class=\"ff15\">24.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd26\">725.1<span class=\"_ _d5\"> </span><span class=\"ff16\">638.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd27\">The thr<span class=\"_ _0\"></span>eshold of<span class=\"_ _0\"></span> \u00a310.0m is used int<span class=\"_ _0\"></span>ernally f<span class=\"_ _0\"></span>or monitoring lar<span class=\"_ _0\"></span>ge exposures. </div><div class=\"t m0 h51 ff29 fs1 fc1 sc0 ls0 ws0 gsd28\">Credit grading<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd29\">An analysis of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s loans to customers by<span class=\"_ _0\"></span> absolute lev<span class=\"_ _0\"></span>el of cr<span class=\"_ _0\"></span>edit risk at 30 Sept<span class=\"_ _0\"></span>ember 2023 is set out belo<span class=\"_ _0\"></span>w<span class=\"_ _0\"></span>. The analy<span class=\"_ _0\"></span>sed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd2a\">amount repr<span class=\"_ _0\"></span>esents gross carrying amount.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd2b\">Stage 1<span class=\"_ _86\"> </span>Stage 2<span class=\"_ _86\"> </span>Stage 3<span class=\"_ _2c\"> </span>POCI<span class=\"_ _a0\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd2c\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd2d\">30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd2e\">V<span class=\"_ _0\"></span>ery low risk<span class=\"_ _1ae\"> </span><span class=\"ff15\">11,393.7<span class=\"_ _cb\"> </span>23.0<span class=\"_ _9e\"> </span>1.9<span class=\"_ _9e\"> </span>6.6<span class=\"_ _42\"> </span>11,425.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd2f\">Low risk<span class=\"_ _2b1\"> </span><span class=\"ff15\">2,236.4<span class=\"_ _150\"> </span>395.5<span class=\"_ _3a\"> </span>73.8<span class=\"_ _9e\"> </span>2.5<span class=\"_ _12a\"> </span>2,708.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd30\">Moderat<span class=\"_ _0\"></span>e risk<span class=\"_ _257\"> </span><span class=\"ff15\">157.1<span class=\"_ _d5\"> </span>147.3<span class=\"_ _9e\"> </span>9.7<span class=\"_ _9e\"> </span>1.8<span class=\"_ _d5\"> </span>315.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd31\">High risk<span class=\"_ _138\"> </span><span class=\"ff15\">34.0<span class=\"_ _d5\"> </span>113.3<span class=\"_ _3a\"> </span>13.6<span class=\"_ _9e\"> </span>3.2<span class=\"_ _d5\"> </span>164.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd32\">V<span class=\"_ _0\"></span>ery high risk<span class=\"_ _32a\"> </span><span class=\"ff15\">37.7<span class=\"_ _3a\"> </span>63.3<span class=\"_ _d5\"> </span>104.1<span class=\"_ _9e\"> </span>9.3<span class=\"_ _d5\"> </span>214.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd33\">Not graded<span class=\"_ _2d4\"> </span><span class=\"ff15\">113.4<span class=\"_ _9e\"> </span>2.4<span class=\"_ _9e\"> </span>2.9<span class=\"_ _9e\"> </span>1.4<span class=\"_ _d5\"> </span>120.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd34\">T<span class=\"_ _2\"></span>otal gross carrying amount<span class=\"_ _ad\"> </span><span class=\"ff15\">13,972.3<span class=\"_ _150\"> </span>744.8<span class=\"_ _d5\"> </span>206.0<span class=\"_ _3a\"> </span>24.8<span class=\"_ _42\"> </span>14,947.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd35\">Impairment<span class=\"_ _2d4\"> </span><span class=\"ff15\">(19.6)<span class=\"_ _1db\"> </span>(9.4)<span class=\"_ _bf\"> </span>(39.8)<span class=\"_ _1db\"> </span>(4.8)<span class=\"_ _6c\"> </span>(73.6)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd36\">T<span class=\"_ _2\"></span>otal loans to customers<span class=\"_ _5e\"> </span><span class=\"ff15\">13,952.7<span class=\"_ _d5\"> </span>735.4<span class=\"_ _d5\"> </span>166.2<span class=\"_ _3a\"> </span>20.0<span class=\"_ _42\"> </span>14,874.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd37\">30 September 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsd38\">V<span class=\"_ _0\"></span>ery low risk<span class=\"_ _1ae\"> </span><span class=\"ff16\">10,270.3<span class=\"_ _d5\"> </span>846.7<span class=\"_ _9e\"> </span>1.1<span class=\"_ _9e\"> </span>9.2<span class=\"_ _67\"> </span>11,127.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsd39\">Low risk<span class=\"_ _2b1\"> </span><span class=\"ff16\">1,563.9<span class=\"_ _150\"> </span>932.0<span class=\"_ _f7\"> </span>63.6<span class=\"_ _9e\"> </span>1.9<span class=\"_ _86\"> </span>2,561.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsd3a\">Moderat<span class=\"_ _0\"></span>e risk<span class=\"_ _257\"> </span><span class=\"ff16\">118.6<span class=\"_ _150\"> </span>114.1<span class=\"_ _9e\"> </span>4.3<span class=\"_ _9e\"> </span>2.5<span class=\"_ _150\"> </span>239.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsd3b\">High risk<span class=\"_ _138\"> </span><span class=\"ff16\">35.0<span class=\"_ _3a\"> </span>34.6<span class=\"_ _9e\"> </span>9.7<span class=\"_ _9e\"> </span>4.1<span class=\"_ _f7\"> </span>83.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsd3c\">V<span class=\"_ _0\"></span>ery high risk<span class=\"_ _32a\"> </span><span class=\"ff16\">44.4<span class=\"_ _3a\"> </span>35.1<span class=\"_ _3a\"> </span>42.2<span class=\"_ _9e\"> </span>9.3<span class=\"_ _150\"> </span>131.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsd3d\">Not graded<span class=\"_ _2d4\"> </span><span class=\"ff16\">124.8<span class=\"_ _9e\"> </span>1.1<span class=\"_ _11f\"> </span>3.5<span class=\"_ _9e\"> </span>1.8<span class=\"_ _d5\"> </span>131.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsd3e\">T<span class=\"_ _2\"></span>otal gross carrying amount<span class=\"_ _179\"> </span><span class=\"ff16\">12,157.0<span class=\"_ _86\"> </span>1,963.6<span class=\"_ _d5\"> </span>124.4<span class=\"_ _f7\"> </span>28.8<span class=\"_ _67\"> </span>14,273.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsd3f\">Impairment<span class=\"_ _2d4\"> </span>(25.5)<span class=\"_ _c8\"> </span>(8.0)<span class=\"_ _6c\"> </span>(28.5)<span class=\"_ _c8\"> </span>(1.5)<span class=\"_ _6c\"> </span>(63.5)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsd40\">T<span class=\"_ _2\"></span>otal loans to customers<span class=\"_ _5e\"> </span><span class=\"ff16\">12,131.5<span class=\"_ _86\"> </span>1,955.6<span class=\"_ _3a\"> </span>95.9<span class=\"_ _3a\"> </span>27.3<span class=\"_ _67\"> </span>14,210.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls5 ws0 gsd41\">Gradings abov<span class=\"_ _0\"></span>e are based on cr<span class=\"_ _0\"></span>edit scorecar<span class=\"_ _0\"></span>ds or internally<span class=\"_ _0\"></span> assigned risk ratings as appr<span class=\"_ _0\"></span>opriate for<span class=\"_ _0\"></span> the individual asset<span class=\"_ _0\"></span> class. These </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls5 ws0 gsd42\">measures ar<span class=\"_ _0\"></span>e calibrated acr<span class=\"_ _0\"></span>oss product <span class=\"_ _0\"></span>types and used internally <span class=\"_ _0\"></span>to monitor <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s overall cr<span class=\"_ _0\"></span>edit risk pr<span class=\"_ _0\"></span>ofile against its risk appetite.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls5 ws0 gsd43\">These gradings r<span class=\"_ _0\"></span>epresent curr<span class=\"_ _0\"></span>ent credit quality<span class=\"_ _0\"></span> on an absolute basis and this ma<span class=\"_ _0\"></span>y r<span class=\"_ _0\"></span>esult in assets in higher IFRS 9 stages <span class=\"_ _0\"></span>with low risk </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls5 ws0 gsd44\">grades, especially <span class=\"_ _0\"></span>where a case qualifies <span class=\"_ _0\"></span>through br<span class=\"_ _0\"></span>eaching, for<span class=\"_ _1\"></span> example, an arrears thr<span class=\"_ _0\"></span>eshold but is making regular<span class=\"_ _0\"></span> payments. <span class=\"_ _0\"></span>This will </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls5 ws0 gsd45\">apply especially<span class=\"_ _0\"></span> to Stag<span class=\"_ _0\"></span>e 3 cases reported in not<span class=\"_ _0\"></span>e 22, other <span class=\"_ _0\"></span>than those shown as \u2018r<span class=\"_ _0\"></span>ealisations\u2019<span class=\"_ _2f\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls5 ws0 gsd46\">Examples of lo<span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span> risk cases in higher IFRS 9 stages include <span class=\"_ _0\"></span>fully up-to-dat<span class=\"_ _0\"></span>e receiver<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> rent cases; accounts <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>the customer is </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls5 ws0 gsd47\">in arrears on <span class=\"_ _0\"></span>their account <span class=\"_ _0\"></span>with the Gr<span class=\"_ _0\"></span>oup but up to date on accounts <span class=\"_ _0\"></span>with other<span class=\"_ _0\"></span> lenders, creating an o<span class=\"_ _0\"></span>verall positive cr<span class=\"_ _0\"></span>edit rating; and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls5 ws0 gsd48\">accounts wher<span class=\"_ _0\"></span>e the default on <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s loan has yet<span class=\"_ _0\"></span> to impact on <span class=\"_ _0\"></span>the external credit scor<span class=\"_ _1\"></span>e.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd49\">A small pr<span class=\"_ _0\"></span>oportion of<span class=\"_ _0\"></span> the loan book (2023: 0<span class=\"_ _0\"></span>.8%, 2022: 0.<span class=\"_ _0\"></span>9%) is classed as \u2018not graded\u2019 abov<span class=\"_ _0\"></span>e. This r<span class=\"_ _0\"></span>ating generally<span class=\"_ _0\"></span> relates <span class=\"_ _0\"></span>to loans  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd4a\">that have been <span class=\"_ _0\"></span>fully underwritten at<span class=\"_ _0\"></span> origination but wher<span class=\"_ _0\"></span>e the customer<span class=\"_ _0\"></span> falls outside the aut<span class=\"_ _0\"></span>omated assessment techniques used </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd4b\">post-completion.<span class=\"_ _36a\"> </span> </div><div class=\"t m0 h51 ff29 fs1 fc1 sc0 ls0 ws0 gsd4d\">Credit characteristics b<span class=\"_ _0\"></span>y portf<span class=\"_ _0\"></span>olio<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff20 fs1 fc1 sc0 ls0 ws0 gsd4e\">L<span class=\"_ _0\"></span>oans secured on residential pr<span class=\"_ _0\"></span>operty<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd4f\">First mortgage loans ha<span class=\"_ _0\"></span>ve a contractual <span class=\"_ _0\"></span>term of up <span class=\"_ _0\"></span>to thirty<span class=\"_ _0\"></span> y<span class=\"_ _0\"></span>ears and second charge mortgag<span class=\"_ _0\"></span>e loans up to <span class=\"_ _0\"></span>twenty <span class=\"_ _0\"></span>five <span class=\"_ _0\"></span>years. In all </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd50\">cases the customer<span class=\"_ _0\"></span> is entitled to settle <span class=\"_ _0\"></span>the loan at any<span class=\"_ _0\"></span> point and in most cases early se<span class=\"_ _0\"></span>ttlement does tak<span class=\"_ _0\"></span>e place. All customers on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd51\">these accounts are r<span class=\"_ _0\"></span>equired <span class=\"_ _0\"></span>to make monthly<span class=\"_ _0\"></span> payments.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd52\">An analysis of<span class=\"_ _0\"></span> the index<span class=\"_ _0\"></span>ed Loan-<span class=\"_ _0\"></span>to-V<span class=\"_ _1\"></span>alue (\u2018L<span class=\"_ _2f\"></span>TV\u2019) ratio for<span class=\"_ _0\"></span> those loan accounts secured on r<span class=\"_ _0\"></span>esidential property<span class=\"_ _0\"></span> by<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue at  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd53\">30 September<span class=\"_ _0\"></span> 2023 is set out below<span class=\"_ _1\"></span>. L<span class=\"_ _2\"></span>TVs <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> second charge mortgages ar<span class=\"_ _1\"></span>e calculated allowing for<span class=\"_ _0\"></span> the inter<span class=\"_ _0\"></span>est of <span class=\"_ _0\"></span>the first char<span class=\"_ _0\"></span>ge </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd54\">holder<span class=\"_ _1\"></span>, based on the most recent <span class=\"_ _0\"></span>first charge amount held b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group, <span class=\"_ _0\"></span>while for<span class=\"_ _0\"></span> acquired accounts <span class=\"_ _0\"></span>the effect of<span class=\"_ _0\"></span> any<span class=\"_ _0\"></span> discount on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd55\">purchase is allo<span class=\"_ _0\"></span>wed for<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd56\">First char<span class=\"_ _0\"></span>ge mortgages<span class=\"_ _291\"> </span>Second charge mortg<span class=\"_ _0\"></span>ages<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd57\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span></span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd58\">%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _12d\"> </span></span>%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsd59\">Loan to value r<span class=\"_ _0\"></span>atio<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd5a\">Less than 70%<span class=\"_ _32b\"> </span><span class=\"ff15\">72.7<span class=\"_ _3a\"> </span><span class=\"ff16\">89.2<span class=\"_ _3a\"> </span></span>94.6<span class=\"_ _3a\"> </span><span class=\"ff16\">95.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd5b\">70% to 80%<span class=\"_ _32c\"> </span><span class=\"ff15\">23.8<span class=\"_ _9e\"> </span><span class=\"ff16\">9.4<span class=\"_ _9e\"> </span></span>3.2<span class=\"_ _d1\"> </span><span class=\"ff16\">2.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd5c\">80% to 90%<span class=\"_ _dd\"> </span><span class=\"ff15\">2.5<span class=\"_ _d1\"> </span><span class=\"ff16\">0.4<span class=\"_ _9e\"> </span></span>0.9<span class=\"_ _9e\"> </span><span class=\"ff16\">0.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd5d\">90% to 100%<span class=\"_ _32c\"> </span><span class=\"ff15\">0.2<span class=\"_ _9e\"> </span><span class=\"ff16\">0.3<span class=\"_ _9e\"> </span></span>0.3<span class=\"_ _d1\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd5e\">Over 100%<span class=\"_ _1c3\"> </span><span class=\"ff15\">0.8<span class=\"_ _9e\"> </span><span class=\"ff16\">0.7<span class=\"_ _9e\"> </span></span>1.0<span class=\"_ _d1\"> </span><span class=\"ff16\">1.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd5f\">100.0<span class=\"_ _d5\"> </span><span class=\"ff16\">100.0<span class=\"_ _150\"> </span></span>100.0<span class=\"_ _d5\"> </span><span class=\"ff16\">100.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsd60\">Av<span class=\"_ _0\"></span>erage L<span class=\"_ _2\"></span>TV ratio<span class=\"_ _177\"> </span><span class=\"ff15\">62.7<span class=\"_ _3a\"> </span><span class=\"ff16\">57.8<span class=\"_ _3a\"> </span></span>52.3<span class=\"_ _3a\"> </span><span class=\"ff16\">50.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h67 ff22 fs1 fc1 sc0 ls0 ws0 gsd61\">Of which:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd62\">Buy-t<span class=\"_ _0\"></span>o-let<span class=\"_ _27f\"> </span><span class=\"ff15\">62.8<span class=\"_ _3a\"> </span><span class=\"ff16\">57.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd63\">Owner-occupied<span class=\"_ _2f6\"> </span><span class=\"ff15\">39.0<span class=\"_ _cb\"> </span><span class=\"ff16\">37.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd64\">The regionally<span class=\"_ _0\"></span> index<span class=\"_ _0\"></span>ed L<span class=\"_ _2\"></span>TV<span class=\"_ _0\"></span>s shown abo<span class=\"_ _0\"></span>ve are aff<span class=\"_ _0\"></span>ected by<span class=\"_ _0\"></span> changes in house prices, with <span class=\"_ _0\"></span>the Nationwide house price index, for<span class=\"_ _1\"></span> the UK </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd65\">as a whole, r<span class=\"_ _0\"></span>egistering an annual decrease of<span class=\"_ _1\"></span> 5.3% in the year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2023 (2022: increase of<span class=\"_ _0\"></span> 9<span class=\"_ _0\"></span>.5%).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd66\">The geographical distribution o<span class=\"_ _0\"></span>f the Gr<span class=\"_ _1\"></span>oup\u2019<span class=\"_ _1\"></span>s residential mortgage assets b<span class=\"_ _0\"></span>y gr<span class=\"_ _0\"></span>oss carrying v<span class=\"_ _0\"></span>alue is set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd67\">First char<span class=\"_ _0\"></span>ge<span class=\"_ _cf\"> </span>Second charge<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd68\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span></span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd69\">%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _12d\"> </span></span>%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd6a\">East Anglia<span class=\"_ _1c3\"> </span><span class=\"ff15\">3.3<span class=\"_ _d1\"> </span><span class=\"ff16\">3.3<span class=\"_ _9e\"> </span></span>3.4<span class=\"_ _9e\"> </span><span class=\"ff16\">3.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd6b\">East Midlands<span class=\"_ _28a\"> </span><span class=\"ff15\">5.9<span class=\"_ _9e\"> </span><span class=\"ff16\">5.7<span class=\"_ _9e\"> </span></span>6.2<span class=\"_ _9e\"> </span><span class=\"ff16\">6.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd6c\">Great<span class=\"_ _0\"></span>er London<span class=\"_ _32d\"> </span><span class=\"ff15\">18.2<span class=\"_ _3a\"> </span><span class=\"ff16\">18.2<span class=\"_ _9e\"> </span></span>7.4<span class=\"_ _9e\"> </span><span class=\"ff16\">7.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd6d\">North<span class=\"_ _2fb\"> </span><span class=\"ff15\">3.5<span class=\"_ _d1\"> </span><span class=\"ff16\">3.3<span class=\"_ _9e\"> </span></span>4.2<span class=\"_ _9e\"> </span><span class=\"ff16\">4.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd6e\">North W<span class=\"_ _0\"></span>est<span class=\"_ _219\"> </span><span class=\"ff15\">10.3<span class=\"_ _3a\"> </span><span class=\"ff16\">10.3<span class=\"_ _9e\"> </span></span>7.5<span class=\"_ _9e\"> </span><span class=\"ff16\">7.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd6f\">South East<span class=\"_ _32e\"> </span><span class=\"ff15\">30.6<span class=\"_ _3a\"> </span><span class=\"ff16\">31.2<span class=\"_ _3a\"> </span></span>37.8<span class=\"_ _3a\"> </span><span class=\"ff16\">38.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd70\">South W<span class=\"_ _0\"></span>est<span class=\"_ _2af\"> </span><span class=\"ff15\">9.0<span class=\"_ _9e\"> </span><span class=\"ff16\">8.8<span class=\"_ _9e\"> </span></span>8.4<span class=\"_ _d1\"> </span><span class=\"ff16\">8.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd71\">W<span class=\"_ _0\"></span>est Midlands<span class=\"_ _2aa\"> </span><span class=\"ff15\">6.2<span class=\"_ _d1\"> </span><span class=\"ff16\">5.9<span class=\"_ _9e\"> </span></span>7.3<span class=\"_ _9e\"> </span><span class=\"ff16\">7.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd72\">Y<span class=\"_ _1\"></span>orkshire and Humberside<span class=\"_ _125\"> </span><span class=\"ff15\">7.4<span class=\"_ _9e\"> </span><span class=\"ff16\">7.8<span class=\"_ _9e\"> </span></span>6.2<span class=\"_ _9e\"> </span><span class=\"ff16\">6.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd73\">T<span class=\"_ _2\"></span>otal England<span class=\"_ _318\"> </span><span class=\"ff15\">94.4<span class=\"_ _3a\"> </span><span class=\"ff16\">94.5<span class=\"_ _3a\"> </span></span>88.4<span class=\"_ _3a\"> </span><span class=\"ff16\">89.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd74\">Northern Ireland<span class=\"_ _123\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.1<span class=\"_ _9e\"> </span></span>2.3<span class=\"_ _d1\"> </span><span class=\"ff16\">2.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd75\">Scotland<span class=\"_ _286\"> </span><span class=\"ff15\">2.5<span class=\"_ _d1\"> </span><span class=\"ff16\">2.3<span class=\"_ _9e\"> </span></span>5.5<span class=\"_ _9e\"> </span><span class=\"ff16\">5.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd76\">W<span class=\"_ _0\"></span>ales<span class=\"_ _32f\"> </span><span class=\"ff15\">3.1<span class=\"_ _9e\"> </span><span class=\"ff16\">3.1<span class=\"_ _9e\"> </span></span>3.8<span class=\"_ _d1\"> </span><span class=\"ff16\">3.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd77\">100.0<span class=\"_ _d5\"> </span><span class=\"ff16\">100.0<span class=\"_ _150\"> </span></span>100.0<span class=\"_ _d5\"> </span><span class=\"ff16\">100.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff20 fs1 fc1 sc0 ls0 ws2e gsd79\">Developmen<span class=\"_ _0\"></span>t finance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd7a\">Dev<span class=\"_ _0\"></span>elopment finance loans hav<span class=\"_ _0\"></span>e an averag<span class=\"_ _0\"></span>e term of<span class=\"_ _0\"></span> 26 months (2022: 24 months). Settlement<span class=\"_ _0\"></span> of principal and accrued inter<span class=\"_ _0\"></span>est tak<span class=\"_ _0\"></span>es </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd7b\">place either on <span class=\"_ _0\"></span>the sale of <span class=\"_ _0\"></span>the dev<span class=\"_ _0\"></span>elopment, or units <span class=\"_ _0\"></span>within it, where appr<span class=\"_ _0\"></span>opriate, or<span class=\"_ _0\"></span> on the re<span class=\"_ _0\"></span>financing of <span class=\"_ _0\"></span>the property<span class=\"_ _0\"></span> follo<span class=\"_ _0\"></span>wing its </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd7c\">completion. T<span class=\"_ _0\"></span>he customer is no<span class=\"_ _0\"></span>t normally r<span class=\"_ _0\"></span>equired t<span class=\"_ _0\"></span>o make payments during <span class=\"_ _0\"></span>the term of<span class=\"_ _0\"></span> the loan. <span class=\"_ _0\"></span>The loans ar<span class=\"_ _0\"></span>e secured by<span class=\"_ _0\"></span> a legal </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd7d\">charge o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>the site and/<span class=\"_ _0\"></span>or pr<span class=\"_ _0\"></span>operty <span class=\"_ _0\"></span>together<span class=\"_ _0\"></span> with other<span class=\"_ _0\"></span> charges and <span class=\"_ _0\"></span>warranties r<span class=\"_ _0\"></span>elated to <span class=\"_ _0\"></span>the build.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd7e\">As customers are no<span class=\"_ _0\"></span>t requir<span class=\"_ _0\"></span>ed to mak<span class=\"_ _0\"></span>e payments during the lif<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the loan, arrears and past due measur<span class=\"_ _0\"></span>es cannot be used <span class=\"_ _0\"></span>to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd7f\">monitor cr<span class=\"_ _0\"></span>edit risk. Instead, cases ar<span class=\"_ _0\"></span>e monitored on an individual basis against<span class=\"_ _0\"></span> the costs and progr<span class=\"_ _0\"></span>ess in the agr<span class=\"_ _0\"></span>eed dev<span class=\"_ _0\"></span>elopment </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd80\">programme b<span class=\"_ _0\"></span>y manag<span class=\"_ _0\"></span>ement and Credit Risk. <span class=\"_ _0\"></span>The av<span class=\"_ _0\"></span>erage loan t<span class=\"_ _0\"></span>o gross dev<span class=\"_ _0\"></span>elopment v<span class=\"_ _0\"></span>alue (\u2018L<span class=\"_ _2f\"></span>TGDV\u2019) r<span class=\"_ _0\"></span>atio for<span class=\"_ _0\"></span> the portfolio at<span class=\"_ _0\"></span> year<span class=\"_ _0\"></span> end, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd81\">a measure of<span class=\"_ _0\"></span> security co<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, is analysed below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd82\">2023<span class=\"_ _a0\"> </span>2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _a0\"> </span>2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd83\">By value<span class=\"_ _1e\"> </span>By number<span class=\"_ _d6\"> </span><span class=\"ff17\">By value<span class=\"_ _31\"> </span>By number<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd84\">%<span class=\"_ _43\"> </span>%<span class=\"_ _12d\"> </span><span class=\"ff16\">%<span class=\"_ _43\"> </span>%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls2f wsa7 gsd85\">LT<span class=\"_ _15\"></span>G<span class=\"_ _96\"></span>D<span class=\"_ _15\"></span>V<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd86\">50% or less<span class=\"_ _2a2\"> </span><span class=\"ff15\">8.2<span class=\"_ _9e\"> </span>6.1<span class=\"_ _9e\"> </span><span class=\"ff16\">7.9<span class=\"_ _9e\"> </span>5.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd87\">50% to 60%<span class=\"_ _32c\"> </span><span class=\"ff15\">17.3<span class=\"_ _3a\"> </span>21.7<span class=\"_ _3a\"> </span><span class=\"ff16\">17.0<span class=\"_ _3a\"> </span>21.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd88\">60% to 65%<span class=\"_ _32c\"> </span><span class=\"ff15\">37.7<span class=\"_ _3a\"> </span>33.0<span class=\"_ _3a\"> </span><span class=\"ff16\">45.0<span class=\"_ _3a\"> </span>39.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd89\">65% to 70%<span class=\"_ _32c\"> </span><span class=\"ff15\">25.5<span class=\"_ _3a\"> </span>27.4<span class=\"_ _3a\"> </span><span class=\"ff16\">22.2<span class=\"_ _3a\"> </span>27.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd8a\">70% to 75%<span class=\"_ _32e\"> </span><span class=\"ff15\">5.8<span class=\"_ _9e\"> </span>7.4<span class=\"_ _9e\"> </span><span class=\"ff16\">5.8<span class=\"_ _9e\"> </span>6.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd8b\">Over 75%<span class=\"_ _23a\"> </span><span class=\"ff15\">5.5<span class=\"_ _d1\"> </span>4.4<span class=\"_ _9e\"> </span><span class=\"ff16\">2.1<span class=\"_ _9e\"> </span>0.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd8c\">100.0<span class=\"_ _d5\"> </span>100.0<span class=\"_ _150\"> </span><span class=\"ff16\">100.0<span class=\"_ _d5\"> </span>100.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd8d\">The av<span class=\"_ _0\"></span>erage L<span class=\"_ _2f\"></span>TGD<span class=\"_ _0\"></span>V co<span class=\"_ _0\"></span>ver at<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year end <span class=\"_ _0\"></span>was 63.<span class=\"_ _1\"></span>1% (2022: 62.1%).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd8e\">L<span class=\"_ _2f\"></span>TGDV<span class=\"_ _1\"></span> is calculated by comparing <span class=\"_ _0\"></span>the current expected end o<span class=\"_ _0\"></span>f t<span class=\"_ _0\"></span>erm exposure <span class=\"_ _0\"></span>with the latest estimate o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>value o<span class=\"_ _0\"></span>f the comple<span class=\"_ _0\"></span>ted </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd8f\">dev<span class=\"_ _0\"></span>elopment based on survey<span class=\"_ _0\"></span>ors\u2019 r<span class=\"_ _0\"></span>eports. T<span class=\"_ _0\"></span>he focus on r<span class=\"_ _0\"></span>esidential property<span class=\"_ _0\"></span> development<span class=\"_ _0\"></span> within the portf<span class=\"_ _0\"></span>olio means that asset <span class=\"_ _0\"></span>values </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd90\">will generally<span class=\"_ _0\"></span> move in line <span class=\"_ _0\"></span>with the UK r<span class=\"_ _1\"></span>esidential property mark<span class=\"_ _0\"></span>et.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd91\">At 30 Sept<span class=\"_ _0\"></span>ember 2023, the de<span class=\"_ _0\"></span>velopment <span class=\"_ _0\"></span>finance portfolio comprised 230 accounts (2022: 276) <span class=\"_ _0\"></span>with a total carrying <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> \u00a37<span class=\"_ _0\"></span>47<span class=\"_ _2\"></span>.8m </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd92\">(2022: \u00a3719.<span class=\"_ _0\"></span>9m). Of<span class=\"_ _0\"></span> these accounts only<span class=\"_ _0\"></span> 15 wer<span class=\"_ _0\"></span>e included in Stage 2 at 30 Sept<span class=\"_ _0\"></span>ember 2023 (2022: nine<span class=\"_ _0\"></span>), with tw<span class=\"_ _0\"></span>elve accounts </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd93\">classified as Stage 3 (2022: nil). In addition, one acquir<span class=\"_ _0\"></span>ed account had been classified as POCI (2022: one). <span class=\"_ _0\"></span>An allow<span class=\"_ _0\"></span>ance for<span class=\"_ _0\"></span> this loss </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd94\">was made in <span class=\"_ _0\"></span>the IFRS 3 fair <span class=\"_ _0\"></span>value calculation.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsd95\">The geographical distribution o<span class=\"_ _0\"></span>f the Gr<span class=\"_ _1\"></span>oup\u2019<span class=\"_ _1\"></span>s development <span class=\"_ _0\"></span>finance loans by gr<span class=\"_ _0\"></span>oss carrying v<span class=\"_ _0\"></span>alue is set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd96\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsd97\">%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd98\">East Anglia<span class=\"_ _330\"> </span><span class=\"ff15\">4.4<span class=\"_ _9e\"> </span><span class=\"ff16\">2.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd99\">East Midlands<span class=\"_ _2e8\"> </span><span class=\"ff15\">11.8<span class=\"_ _3a\"> </span><span class=\"ff16\">11.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd9a\">Great<span class=\"_ _0\"></span>er London<span class=\"_ _331\"> </span><span class=\"ff15\">11.8<span class=\"_ _3a\"> </span><span class=\"ff16\">10.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd9b\">North<span class=\"_ _332\"> </span><span class=\"ff15\">0.8<span class=\"_ _9e\"> </span><span class=\"ff16\">1.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd9c\">North W<span class=\"_ _0\"></span>est<span class=\"_ _333\"> </span><span class=\"ff15\">0.4<span class=\"_ _9e\"> </span><span class=\"ff16\">0.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd9d\">South East<span class=\"_ _334\"> </span><span class=\"ff15\">34.0<span class=\"_ _3a\"> </span><span class=\"ff16\">46.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd9e\">South W<span class=\"_ _0\"></span>est<span class=\"_ _30e\"> </span><span class=\"ff15\">21.3<span class=\"_ _cb\"> </span><span class=\"ff16\">13.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsd9f\">W<span class=\"_ _0\"></span>est Midlands<span class=\"_ _335\"> </span><span class=\"ff15\">6.2<span class=\"_ _9e\"> </span><span class=\"ff16\">7.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsda0\">Y<span class=\"_ _1\"></span>orkshire and Humberside<span class=\"_ _2fc\"> </span><span class=\"ff15\">6.6<span class=\"_ _9e\"> </span><span class=\"ff16\">6.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsda1\">T<span class=\"_ _2\"></span>otal England<span class=\"_ _336\"> </span><span class=\"ff15\">97.3<span class=\"_ _3a\"> </span><span class=\"ff16\">98.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsda2\">Northern Ireland<span class=\"_ _1fb\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsda3\">Scotland<span class=\"_ _337\"> </span><span class=\"ff15\">2.7<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsda4\">W<span class=\"_ _0\"></span>ales<span class=\"_ _2ae\"> </span><span class=\"ff15\">-<span class=\"_ _209\"> </span></span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsda5\">100.0<span class=\"_ _d5\"> </span><span class=\"ff16\">100.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff20 fs1 fc1 sc0 ls0 ws2e gsda7\">Asset finance and motor<span class=\"_ _0\"></span> finance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsda8\">Asset and motor<span class=\"_ _0\"></span> finance lending includes finance lease and hir<span class=\"_ _1\"></span>e purchase arrangements, which ar<span class=\"_ _0\"></span>e accounted f<span class=\"_ _0\"></span>or as finance leases </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsda9\">under IFRS 16. <span class=\"_ _0\"></span>The aver<span class=\"_ _0\"></span>age contractual life of<span class=\"_ _0\"></span> the asset<span class=\"_ _0\"></span> finance loans w<span class=\"_ _0\"></span>as 49 months (2022: 52 months) while <span class=\"_ _0\"></span>that of<span class=\"_ _0\"></span> the motor<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdaa\">finance loans w<span class=\"_ _0\"></span>as 68 months (2022: 67 months), but historical behaviour<span class=\"_ _1\"></span> suggests that a significant proportion o<span class=\"_ _0\"></span>f customers <span class=\"_ _0\"></span>will </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdab\">choose to settle <span class=\"_ _0\"></span>their oblig<span class=\"_ _0\"></span>ations early<span class=\"_ _0\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdac\">Asset finance customer<span class=\"_ _0\"></span>s are generally<span class=\"_ _1\"></span> small or medium sized businesses. T<span class=\"_ _0\"></span>he nature of<span class=\"_ _0\"></span> the assets underlying <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s asset </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdad\">finance lending by<span class=\"_ _0\"></span> gross carrying <span class=\"_ _0\"></span>value is set out belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsdae\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsdaf\">%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdb0\">Commercial vehicles<span class=\"_ _338\"> </span><span class=\"ff15\">41.9<span class=\"_ _3a\"> </span><span class=\"ff16\">37.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdb1\">Construction plant<span class=\"_ _21e\"> </span><span class=\"ff15\">30.9<span class=\"_ _3a\"> </span><span class=\"ff16\">33.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdb2\">Manufacturing<span class=\"_ _335\"> </span><span class=\"ff15\">6.3<span class=\"_ _9e\"> </span><span class=\"ff16\">6.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdb3\">T<span class=\"_ _2\"></span>echnology<span class=\"_ _2ba\"> </span><span class=\"ff15\">4.8<span class=\"_ _d1\"> </span><span class=\"ff16\">4.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdb4\">Other vehicles<span class=\"_ _339\"> </span><span class=\"ff15\">4.7<span class=\"_ _9e\"> </span><span class=\"ff16\">4.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdb5\">Refuse disposal v<span class=\"_ _0\"></span>ehicles<span class=\"_ _201\"> </span><span class=\"ff15\">3.4<span class=\"_ _9e\"> </span><span class=\"ff16\">3.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdb6\">Agriculture<span class=\"_ _2ba\"> </span><span class=\"ff15\">2.1<span class=\"_ _9e\"> </span><span class=\"ff16\">2.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdb7\">Print and paper<span class=\"_ _33a\"> </span><span class=\"ff15\">1.6<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdb8\">Other<span class=\"_ _332\"> </span><span class=\"ff15\">4.3<span class=\"_ _9e\"> </span><span class=\"ff16\">6.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsdb9\">100.0<span class=\"_ _d5\"> </span><span class=\"ff16\">100.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdba\">Motor<span class=\"_ _0\"></span> finance loans are secur<span class=\"_ _0\"></span>ed ov<span class=\"_ _0\"></span>er cars, mot<span class=\"_ _0\"></span>orhomes and light commercial <span class=\"_ _0\"></span>vehicles and repr<span class=\"_ _0\"></span>esent exposur<span class=\"_ _0\"></span>e to consumers and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdbb\">small businesses.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff20 fs1 fc1 sc0 ls0 ws0 gsdbc\">Structured lending<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws33 gsdbd\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s structured lending division pr<span class=\"_ _0\"></span>ovides re<span class=\"_ _0\"></span>volving loan <span class=\"_ _0\"></span>facilities to support non-bank<span class=\"_ _0\"></span> lending businesses. Loans are made <span class=\"_ _0\"></span>to a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdbe\">Special Purpose V<span class=\"_ _1\"></span>ehicle (\u2018SPV\u2019) company<span class=\"_ _0\"></span> controlled by<span class=\"_ _0\"></span> the customer<span class=\"_ _1\"></span> and effectively secur<span class=\"_ _0\"></span>ed on the loans made b<span class=\"_ _0\"></span>y the SP<span class=\"_ _0\"></span>V<span class=\"_ _1\"></span>. Exposure </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdbf\">is limited to a per<span class=\"_ _0\"></span>centage of<span class=\"_ _0\"></span> the underlying assets, pr<span class=\"_ _0\"></span>oviding a buffer<span class=\"_ _1\"></span> against credit loss.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdc0\">Summary details o<span class=\"_ _0\"></span>f the structur<span class=\"_ _1\"></span>ed lending portfolio are set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsdc1\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdc2\">Number of active facilities<span class=\"_ _1fa\"> </span><span class=\"ff15\">9<span class=\"_ _149\"> </span><span class=\"ff16\">8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdc3\">T<span class=\"_ _2\"></span>otal facilities (\u00a3m)<span class=\"_ _2d8\"> </span><span class=\"ff15\">235.7<span class=\"_ _d5\"> </span><span class=\"ff16\">220.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdc4\">Carrying value (\u00a3m)<span class=\"_ _22b\"> </span><span class=\"ff15\">169.0<span class=\"_ _150\"> </span><span class=\"ff16\">178.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdc5\">The maximum advance under<span class=\"_ _0\"></span> these <span class=\"_ _0\"></span>facilities w<span class=\"_ _0\"></span>as generally 80% o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the underlying assets, except<span class=\"_ _0\"></span> where loans secur<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> residential </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdc6\">property<span class=\"_ _0\"></span> form <span class=\"_ _0\"></span>the security <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the facility<span class=\"_ _1\"></span>, where 90% is admissible. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdc7\">These accounts do not hav<span class=\"_ _0\"></span>e a requir<span class=\"_ _0\"></span>ement to mak<span class=\"_ _0\"></span>e regular<span class=\"_ _0\"></span> payments, operating on a r<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>olving basis. The perf<span class=\"_ _0\"></span>ormance of each loan is </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdc8\">monitored monthly<span class=\"_ _0\"></span> on a case-by-case basis b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s Credit Risk <span class=\"_ _0\"></span>function, assessing compliance with cov<span class=\"_ _0\"></span>enants relating <span class=\"_ _0\"></span>to both </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdc9\">the customer and <span class=\"_ _0\"></span>the performance and composition of<span class=\"_ _0\"></span> the asset pool. <span class=\"_ _1\"></span>These assessments, which are r<span class=\"_ _0\"></span>eported to Cr<span class=\"_ _0\"></span>edit Committee, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdca\">are used <span class=\"_ _0\"></span>to inform the assessment<span class=\"_ _0\"></span> of expect<span class=\"_ _0\"></span>ed credit loss under<span class=\"_ _0\"></span> IFRS 9.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdcb\">At 30 Sept<span class=\"_ _0\"></span>ember 2023 one of<span class=\"_ _0\"></span> these f<span class=\"_ _0\"></span>acilities was identified as Stag<span class=\"_ _0\"></span>e 2 with <span class=\"_ _0\"></span>the remainder<span class=\"_ _0\"></span> in Stage 1. <span class=\"_ _0\"></span>At 30 September<span class=\"_ _0\"></span> 2022, all of<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdcc\">these facilities <span class=\"_ _0\"></span>were identified as S<span class=\"_ _0\"></span>tage 1.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff20 fs1 fc1 sc0 ls0 ws0 gsdce\">RLS, CBILS and BBL<span class=\"_ _0\"></span>S<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdcf\">Loans under<span class=\"_ _0\"></span> these schemes hav<span class=\"_ _0\"></span>e the benefit o<span class=\"_ _0\"></span>f guarantees underwritt<span class=\"_ _0\"></span>en by <span class=\"_ _0\"></span>the UK Gov<span class=\"_ _0\"></span>ernment, which launched <span class=\"_ _0\"></span>them as a response </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdd0\">to the impact o<span class=\"_ _0\"></span>f Covid on UK<span class=\"_ _0\"></span> SMEs.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsdd1\">CBILS and BBLS w<span class=\"_ _0\"></span>ere launched in 2020 and r<span class=\"_ _0\"></span>emained open for<span class=\"_ _0\"></span> new<span class=\"_ _0\"></span> applications until March 2021. RLS <span class=\"_ _0\"></span>was launched in <span class=\"_ _0\"></span>April 2021 as a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsdd2\">successor scheme and has subsequently<span class=\"_ _0\"></span> been extended <span class=\"_ _0\"></span>twice. It is currently<span class=\"_ _0\"></span> expected to be a<span class=\"_ _0\"></span>vailable f<span class=\"_ _0\"></span>or ne<span class=\"_ _0\"></span>w lending until <span class=\"_ _0\"></span>June 2024.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdd3\">The Group o<span class=\"_ _0\"></span>ffered <span class=\"_ _0\"></span>term loans and asset finance loans under<span class=\"_ _1\"></span> the CBIL scheme. Interest and <span class=\"_ _0\"></span>fees w<span class=\"_ _0\"></span>ere paid b<span class=\"_ _0\"></span>y the UK<span class=\"_ _0\"></span> Government<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdd4\">for<span class=\"_ _0\"></span> the first<span class=\"_ _0\"></span> twelv<span class=\"_ _0\"></span>e months and the go<span class=\"_ _0\"></span>vernment guarantee co<span class=\"_ _0\"></span>vers up <span class=\"_ _0\"></span>to 80% of <span class=\"_ _0\"></span>the lender\u2019<span class=\"_ _1\"></span>s principal loss after the application of<span class=\"_ _1\"></span> any </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdd5\">proceeds <span class=\"_ _0\"></span>from the asse<span class=\"_ _0\"></span>t financed (if<span class=\"_ _0\"></span> applicable).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdd6\">Loans under<span class=\"_ _0\"></span> the BBL<span class=\"_ _0\"></span> scheme are six <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> term loans at a standar<span class=\"_ _0\"></span>d 2.5% per annum inter<span class=\"_ _0\"></span>est rate. <span class=\"_ _0\"></span>The UK Go<span class=\"_ _0\"></span>vernment paid <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdd7\">interest on <span class=\"_ _0\"></span>the loan for<span class=\"_ _1\"></span> the first tw<span class=\"_ _0\"></span>elve months and pr<span class=\"_ _0\"></span>ovides lenders with a guar<span class=\"_ _0\"></span>antee covering <span class=\"_ _0\"></span>the whole outstanding balance.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdd8\">The Group o<span class=\"_ _0\"></span>ffers t<span class=\"_ _0\"></span>erm loans and asset finance loans under<span class=\"_ _0\"></span> the RLS. Inter<span class=\"_ _0\"></span>est and f<span class=\"_ _0\"></span>ees are pay<span class=\"_ _0\"></span>able by<span class=\"_ _0\"></span> the customer<span class=\"_ _0\"></span> from incep<span class=\"_ _0\"></span>tion. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdd9\">The Gov<span class=\"_ _0\"></span>ernment guarantee cov<span class=\"_ _0\"></span>ers up to 80% o<span class=\"_ _0\"></span>f the lender\u2019<span class=\"_ _2\"></span>s principal loss, after the application of<span class=\"_ _1\"></span> any proceeds <span class=\"_ _0\"></span>from the asse<span class=\"_ _0\"></span>t </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdda\">financed (if applicable<span class=\"_ _0\"></span>), on applications receiv<span class=\"_ _0\"></span>ed before 1 <span class=\"_ _1\"></span>January 2022 and up to 70% <span class=\"_ _0\"></span>for applications r<span class=\"_ _0\"></span>eceived <span class=\"_ _0\"></span>thereafter<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsddb\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s outstanding RLS, CBILS and BBLS loans at 30 Sep<span class=\"_ _0\"></span>tember 2023 <span class=\"_ _0\"></span>were:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsddc\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsddd\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsdde\">RLS<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsddf\">T<span class=\"_ _2\"></span>erm loans<span class=\"_ _33b\"> </span><span class=\"ff15\">1.0<span class=\"_ _9e\"> </span><span class=\"ff16\">0.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsde0\">Asset finance<span class=\"_ _336\"> </span><span class=\"ff15\">36.0<span class=\"_ _3a\"> </span><span class=\"ff16\">41.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsde1\">T<span class=\"_ _2\"></span>otal RLS<span class=\"_ _33c\"> </span><span class=\"ff15\">37.0<span class=\"_ _3a\"> </span><span class=\"ff16\">42.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsde2\">CBILS<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsde3\">T<span class=\"_ _2\"></span>erm loans<span class=\"_ _33d\"> </span><span class=\"ff15\">12.6<span class=\"_ _3a\"> </span><span class=\"ff16\">18.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsde4\">Asset finance<span class=\"_ _336\"> </span><span class=\"ff15\">14.5<span class=\"_ _3a\"> </span><span class=\"ff16\">23.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsde5\">T<span class=\"_ _2\"></span>otal CBILS<span class=\"_ _33d\"> </span><span class=\"ff15\">27.1<span class=\"_ _3a\"> </span><span class=\"ff16\">41.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsde6\">BBLS<span class=\"_ _33e\"> </span>3.1<span class=\"_ _9e\"> </span><span class=\"ff16\">4.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsde7\">67.2<span class=\"_ _3a\"> </span><span class=\"ff16\">88.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsde8\">T<span class=\"_ _2\"></span>otal term loans<span class=\"_ _1eb\"> </span><span class=\"ff15\">16.7<span class=\"_ _3a\"> </span><span class=\"ff16\">22.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsde9\">T<span class=\"_ _2\"></span>otal asset finance (note 18)<span class=\"_ _33f\"> </span><span class=\"ff15\">50.5<span class=\"_ _3a\"> </span><span class=\"ff16\">65.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsdea\">67.2<span class=\"_ _3a\"> </span><span class=\"ff16\">88.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdeb\">At 30 Sept<span class=\"_ _0\"></span>ember 2023, \u00a30<span class=\"_ _0\"></span>.7m of<span class=\"_ _0\"></span> this balance w<span class=\"_ _0\"></span>as considered <span class=\"_ _0\"></span>to be non-performing (2022: \u00a30<span class=\"_ _0\"></span>.6m).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff20 fs1 fc1 sc0 ls0 ws0 gsdec\">Unsecured consumer<span class=\"_ _0\"></span> loans<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsded\">The Group disposed o<span class=\"_ _0\"></span>f almost all its unsecur<span class=\"_ _0\"></span>ed consumer loan portf<span class=\"_ _0\"></span>olio during the y<span class=\"_ _0\"></span>ear ended 30 Sep<span class=\"_ _0\"></span>tember 2022 (<span class=\"_ _0\"></span>note 7). It retains </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdee\">an interest only<span class=\"_ _1\"></span> in a limited number of unsecur<span class=\"_ _0\"></span>ed accounts ex<span class=\"_ _0\"></span>cluded from <span class=\"_ _0\"></span>the sale. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdef\">Almost all the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s unsecured consumer loan assets <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e part of pur<span class=\"_ _0\"></span>chased debt portfolios <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>the consideration paid w<span class=\"_ _0\"></span>as </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdf0\">based on the cr<span class=\"_ _0\"></span>edit quality and perf<span class=\"_ _0\"></span>ormance of <span class=\"_ _0\"></span>the loans at the point of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>transaction. Collections on purchased accounts r<span class=\"_ _0\"></span>emained </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdf1\">in excess o<span class=\"_ _0\"></span>f those implicit<span class=\"_ _0\"></span> in the purchase prices until <span class=\"_ _0\"></span>the point of<span class=\"_ _0\"></span> sale in June 2022.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff20 fs1 fc1 sc0 ls0 ws0 gsdf3\">Arrears performance<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdf4\">The number<span class=\"_ _0\"></span> of accounts in arr<span class=\"_ _0\"></span>ears by<span class=\"_ _0\"></span> asset class, based on the most commonly<span class=\"_ _0\"></span> quoted definition of<span class=\"_ _1\"></span> arrears for<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>type of asset, at<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsdf5\">30 September<span class=\"_ _0\"></span> 2023 and 30 September 2022, compar<span class=\"_ _0\"></span>ed to <span class=\"_ _0\"></span>the industry a<span class=\"_ _0\"></span>verages at <span class=\"_ _0\"></span>those dates published by<span class=\"_ _0\"></span> UK Finance (\u2018UKF\u2019) and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws25 gsdf6\">the FLA, was: </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsdf7\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsdf8\">%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsdf9\">First mortg<span class=\"_ _0\"></span>ages<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsdfa\">Accounts more than thr<span class=\"_ _0\"></span>ee months in arrear<span class=\"_ _0\"></span>s</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdfb\"> <span class=\"_ _c0\"> </span>Buy-to-let accounts including r<span class=\"_ _0\"></span>eceiver of rent c<span class=\"_ _0\"></span>ases<span class=\"_ _2a1\"> </span><span class=\"ff15\">0.34<span class=\"_ _3a\"> </span><span class=\"ff16\">0.15</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdfc\"> <span class=\"_ _c0\"> </span>Buy-to-let accounts e<span class=\"_ _0\"></span>xcluding receiv<span class=\"_ _0\"></span>er of rent cases<span class=\"_ _128\"> </span><span class=\"ff15\">0.15<span class=\"_ _3a\"> </span><span class=\"ff16\">0.11</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdfd\"> <span class=\"_ _c0\"> </span>Owner-occupied accounts <span class=\"_ _2dc\"> </span><span class=\"ff15\">2.93<span class=\"_ _3a\"> </span><span class=\"ff16\">2.79<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsdfe\">UKF data f<span class=\"_ _0\"></span>or mortgage acc<span class=\"_ _0\"></span>ounts more than three mon<span class=\"_ _0\"></span>ths in arrears</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsdff\"> <span class=\"_ _c0\"> </span>Buy-to-let accounts including r<span class=\"_ _0\"></span>eceiver of rent c<span class=\"_ _0\"></span>ases<span class=\"_ _2a1\"> </span><span class=\"ff15\">0.69<span class=\"_ _3a\"> </span><span class=\"ff16\">0.41</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse00\"> <span class=\"_ _c0\"> </span>Buy-to-let accounts e<span class=\"_ _0\"></span>xcluding receiv<span class=\"_ _0\"></span>er of rent cases<span class=\"_ _128\"> </span><span class=\"ff15\">0.64<span class=\"_ _3a\"> </span><span class=\"ff16\">0.39</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse01\"> <span class=\"_ _c0\"> </span>Owner-occupied accounts <span class=\"_ _2dc\"> </span><span class=\"ff15\">0.89<span class=\"_ _3a\"> </span><span class=\"ff16\">0.80</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse02\"> <span class=\"_ _c0\"> </span>All mortgages<span class=\"_ _224\"> </span><span class=\"ff15\">0.84<span class=\"_ _3a\"> </span><span class=\"ff16\">0.72<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse03\">Second charge mortg<span class=\"_ _0\"></span>age loans<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gse04\">Accounts more than 2 mon<span class=\"_ _0\"></span>ths in arrears</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse05\"> <span class=\"_ _c0\"> </span>All accounts<span class=\"_ _340\"> </span><span class=\"ff15\">23.48<span class=\"_ _d5\"> </span><span class=\"ff16\">21.33</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse06\"> <span class=\"_ _c0\"> </span>Post<span class=\"_ _0\"></span>-2010 originations<span class=\"_ _1e4\"> </span><span class=\"ff15\">2.42<span class=\"_ _3a\"> </span><span class=\"ff16\">1.88</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse07\"> <span class=\"_ _c0\"> </span>Legacy cases (pre-2010 originations)<span class=\"_ _341\"> </span><span class=\"ff15\">26.58<span class=\"_ _d5\"> </span><span class=\"ff16\">24.45</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse08\"> <span class=\"_ _c0\"> </span>Purchased assets<span class=\"_ _342\"> </span><span class=\"ff15\">30.10<span class=\"_ _d5\"> </span><span class=\"ff16\">27.71<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse09\">FLA data f<span class=\"_ _0\"></span>or second mortgag<span class=\"_ _0\"></span>e loans <span class=\"_ _1ed\"> </span><span class=\"ff15\">6.30<span class=\"_ _3a\"> </span><span class=\"ff16\">7.50<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gse0a\">Motor finance loans<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gse0b\">Accounts more than 2 mon<span class=\"_ _0\"></span>ths in arrears</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse0c\"> <span class=\"_ _c0\"> </span>All accounts<span class=\"_ _343\"> </span><span class=\"ff15\">1.08<span class=\"_ _3a\"> </span><span class=\"ff16\">2.07</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse0d\"> <span class=\"_ _c0\"> </span>Originated cases<span class=\"_ _344\"> </span><span class=\"ff15\">1.07<span class=\"_ _3a\"> </span><span class=\"ff16\">1.58</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse0e\"> <span class=\"_ _c0\"> </span>Purchased assets<span class=\"_ _2d8\"> </span><span class=\"ff15\">1.32<span class=\"_ _3a\"> </span><span class=\"ff16\">8.94<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse0f\">FLA data f<span class=\"_ _0\"></span>or consumer point of sale hire pur<span class=\"_ _0\"></span>chase <span class=\"_ _27e\"> </span><span class=\"ff15\">3.60<span class=\"_ _3a\"> </span><span class=\"ff16\">3.40<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gse10\">Asset finance loans<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse11\">Accounts more than 2 mon<span class=\"_ _0\"></span>ths in arrears<span class=\"_ _ea\"> </span><span class=\"ff15\">0.23<span class=\"_ _3a\"> </span><span class=\"ff16\">0.08<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse12\">FLA data f<span class=\"_ _0\"></span>or business lease / hire purchase loans<span class=\"_ _345\"> </span><span class=\"ff15\">0.60<span class=\"_ _3a\"> </span><span class=\"ff16\">0.80<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse13\">No published industry data <span class=\"_ _0\"></span>for asse<span class=\"_ _0\"></span>t classes comparable to <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s other books has been identified. <span class=\"_ _0\"></span>Where r<span class=\"_ _0\"></span>evised data at  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse14\">30 September<span class=\"_ _0\"></span> 2022 has been published by <span class=\"_ _0\"></span>the FLA<span class=\"_ _0\"></span> or UKF<span class=\"_ _2\"></span>, the comparativ<span class=\"_ _0\"></span>e industry figur<span class=\"_ _0\"></span>es abov<span class=\"_ _0\"></span>e have been amended. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse15\">Arrears inf<span class=\"_ _0\"></span>ormation is not given <span class=\"_ _0\"></span>for de<span class=\"_ _0\"></span>velopment <span class=\"_ _0\"></span>finance, structured lending or<span class=\"_ _0\"></span> invoice <span class=\"_ _0\"></span>finance activities as the structure o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse16\">products means <span class=\"_ _0\"></span>that such a measure is not<span class=\"_ _0\"></span> appropriate. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse17\">The Group calculat<span class=\"_ _0\"></span>es its headline arrears measur<span class=\"_ _0\"></span>e for<span class=\"_ _0\"></span> buy-to-le<span class=\"_ _0\"></span>t mortgages, shown abo<span class=\"_ _0\"></span>ve, based on the number<span class=\"_ _0\"></span>s of accounts </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse18\">three months or<span class=\"_ _0\"></span> more in arr<span class=\"_ _0\"></span>ears, including purchased asse<span class=\"_ _0\"></span>ts, but excluding <span class=\"_ _0\"></span>those cases in possession and receiver<span class=\"_ _1\"></span> of rent cases </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse19\">designated for<span class=\"_ _1\"></span> sale. This is consistent <span class=\"_ _0\"></span>with the methodology<span class=\"_ _0\"></span> used by UKF<span class=\"_ _0\"></span> in compiling its statistics f<span class=\"_ _0\"></span>or the buy<span class=\"_ _0\"></span>-to-let mortg<span class=\"_ _0\"></span>age market </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws25 gse1a\">as a whole.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse1b\">The number<span class=\"_ _0\"></span> of accounts in arr<span class=\"_ _0\"></span>ears will naturally<span class=\"_ _0\"></span> be higher <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> legacy<span class=\"_ _0\"></span> books, such as the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s legacy<span class=\"_ _0\"></span> second charge mortgag<span class=\"_ _0\"></span>es and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse1c\">residential <span class=\"_ _0\"></span>first mortgages <span class=\"_ _0\"></span>than for<span class=\"_ _0\"></span> comparable active ones, as perf<span class=\"_ _0\"></span>orming accounts pay o<span class=\"_ _0\"></span>ff their<span class=\"_ _0\"></span> balances, leaving arr<span class=\"_ _0\"></span>ears accounts </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse1d\">repr<span class=\"_ _0\"></span>esenting a greater<span class=\"_ _0\"></span> proportion o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>total.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse1e\">The figur<span class=\"_ _0\"></span>es shown abov<span class=\"_ _0\"></span>e for<span class=\"_ _0\"></span> second charge mortgag<span class=\"_ _0\"></span>e loans incorporate pur<span class=\"_ _0\"></span>chased portfolios which gener<span class=\"_ _0\"></span>ally include a high </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse1f\">proportion of<span class=\"_ _0\"></span> cases in arrear<span class=\"_ _0\"></span>s at the time o<span class=\"_ _0\"></span>f pur<span class=\"_ _0\"></span>chase and wher<span class=\"_ _0\"></span>e this lev<span class=\"_ _0\"></span>el of perf<span class=\"_ _0\"></span>ormance is allowed <span class=\"_ _0\"></span>for in <span class=\"_ _0\"></span>the discount to curr<span class=\"_ _0\"></span>ent </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse20\">balance repr<span class=\"_ _0\"></span>esented by<span class=\"_ _0\"></span> the pur<span class=\"_ _0\"></span>chase price. Howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, this will lead <span class=\"_ _0\"></span>to higher <span class=\"_ _0\"></span>than averag<span class=\"_ _0\"></span>e reported arr<span class=\"_ _0\"></span>ears.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h51 ff29 fs1 fc1 sc0 ls0 ws0 gse22\">Acquired assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse23\">A significant<span class=\"_ _0\"></span> proportion of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019 second char<span class=\"_ _0\"></span>ge mortgage balances and, historically<span class=\"_ _1\"></span>, almost all its unsecured consumer<span class=\"_ _0\"></span> loan </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse24\">assets are, or<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>ere, part of<span class=\"_ _0\"></span> purchased deb<span class=\"_ _0\"></span>t portfolios, wher<span class=\"_ _0\"></span>e the consideration paid <span class=\"_ _0\"></span>was based on <span class=\"_ _0\"></span>the credit quality<span class=\"_ _0\"></span> and performance </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse25\">of <span class=\"_ _0\"></span>the loans at the point o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the transaction. No additional loans <span class=\"_ _0\"></span>to customers tr<span class=\"_ _0\"></span>eated as POCI w<span class=\"_ _0\"></span>ere acquir<span class=\"_ _0\"></span>ed in the y<span class=\"_ _0\"></span>ear ended  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse26\">30 September<span class=\"_ _0\"></span> 2022 or <span class=\"_ _0\"></span>the year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2023.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse27\">Collections on purchased accounts hav<span class=\"_ _0\"></span>e been comfortably<span class=\"_ _0\"></span> in excess of<span class=\"_ _0\"></span> those implicit in <span class=\"_ _0\"></span>the purchase prices.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse28\">In the debt pur<span class=\"_ _0\"></span>chase industry<span class=\"_ _1\"></span>, Estimated Remaining Collections (\u2018ERC\u2019) is commonly used as a measur<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>alue of a portf<span class=\"_ _0\"></span>olio. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse29\">This is defined as the sum o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the undiscounted cash flow<span class=\"_ _0\"></span>s expected to be r<span class=\"_ _0\"></span>eceived o<span class=\"_ _0\"></span>ver a specified <span class=\"_ _0\"></span>future period. In <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s view<span class=\"_ _1\"></span>, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse2a\">this measure ma<span class=\"_ _0\"></span>y be suitable f<span class=\"_ _0\"></span>or heavily<span class=\"_ _0\"></span> discounted, unsecured, distr<span class=\"_ _1\"></span>essed portfolios (which will be <span class=\"_ _0\"></span>treated as POCI under<span class=\"_ _0\"></span> IFRS 9), </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse2b\">but is less applicable for<span class=\"_ _1\"></span> the types of<span class=\"_ _0\"></span> portfolio in which <span class=\"_ _0\"></span>the Group has inv<span class=\"_ _0\"></span>ested, wher<span class=\"_ _0\"></span>e cash flow<span class=\"_ _0\"></span>s are higher<span class=\"_ _0\"></span> on acquisition, loans may </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse2c\">be secured on pr<span class=\"_ _0\"></span>operty and customers ma<span class=\"_ _0\"></span>y not<span class=\"_ _0\"></span> be in default. In such cases, the IFRS 9 amortised cost balance, at which <span class=\"_ _0\"></span>these assets </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse2d\">are carried in <span class=\"_ _0\"></span>the Group balance sheet, pr<span class=\"_ _0\"></span>ovides a better<span class=\"_ _0\"></span> indication of<span class=\"_ _0\"></span> value.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse2e\">Howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, to aid comparability<span class=\"_ _1\"></span>, the 84 and 120 month ERC v<span class=\"_ _0\"></span>alues for<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s purchased consumer loan assets, ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse2f\">These are deriv<span class=\"_ _0\"></span>ed using the same models and assumptions used in <span class=\"_ _0\"></span>the EIR calculations. ERCs are set out both <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> all purchased </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse30\">consumer portf<span class=\"_ _0\"></span>olios and for<span class=\"_ _0\"></span> those classified as POCI under<span class=\"_ _0\"></span> IFRS 9.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse31\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse32\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse33\">All purchased consumer assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse34\">Carrying value<span class=\"_ _227\"> </span><span class=\"ff15\">58.6<span class=\"_ _3a\"> </span><span class=\"ff16\">75.3<span class=\"_ _150\"> </span>185.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse35\">84 month ERCs<span class=\"_ _1c2\"> </span><span class=\"ff15\">68.9<span class=\"_ _3a\"> </span><span class=\"ff16\">88.6<span class=\"_ _150\"> </span>221.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse36\">120 month ERCs<span class=\"_ _1e6\"> </span><span class=\"ff15\">73.4<span class=\"_ _3a\"> </span><span class=\"ff16\">94.2<span class=\"_ _150\"> </span>245.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse37\">POCI assets only<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse38\">Carrying value<span class=\"_ _227\"> </span><span class=\"ff15\">17.7<span class=\"_ _3a\"> </span><span class=\"ff16\">21.4<span class=\"_ _150\"> </span>113.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse39\">84 month ERCs<span class=\"_ _1c2\"> </span><span class=\"ff15\">24.5<span class=\"_ _3a\"> </span><span class=\"ff16\">29.9<span class=\"_ _150\"> </span>143.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse3a\">120 month ERCs<span class=\"_ _1e6\"> </span><span class=\"ff15\">27.8<span class=\"_ _3a\"> </span><span class=\"ff16\">33.0<span class=\"_ _150\"> </span>163.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse3b\">Amounts shown abov<span class=\"_ _0\"></span>e are disclosed as loans <span class=\"_ _0\"></span>to customers (not<span class=\"_ _0\"></span>e 18). The<span class=\"_ _0\"></span>y include <span class=\"_ _0\"></span>first mortgages, second charg<span class=\"_ _0\"></span>e mortgage loans </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse3c\">and, in the amounts shown <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> 2021 unsecured consumer<span class=\"_ _0\"></span> loans.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse3d\">The reduction in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear ended 30 Sept<span class=\"_ _0\"></span>ember 2022 primarily<span class=\"_ _0\"></span> reflects <span class=\"_ _0\"></span>the disposal of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s unsecured consumer lending  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse3e\">assets (note 7).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gse40\">Cash balances<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse41\">The credit<span class=\"_ _0\"></span> risk inherent in <span class=\"_ _0\"></span>the cash positions of <span class=\"_ _0\"></span>the Group and <span class=\"_ _0\"></span>the Company is contr<span class=\"_ _0\"></span>olled by<span class=\"_ _0\"></span> AL<span class=\"_ _1\"></span>CO, which de<span class=\"_ _0\"></span>termines which </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse42\">institutions deposits may<span class=\"_ _0\"></span> be placed with. <span class=\"_ _0\"></span>The Group has <span class=\"_ _0\"></span>formal risk appetites, policies and limits, appr<span class=\"_ _0\"></span>oved b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Risk and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse43\">Compliance Committee. T<span class=\"_ _0\"></span>hese include limitations on large exposur<span class=\"_ _0\"></span>es to mitigat<span class=\"_ _0\"></span>e any concentration risk<span class=\"_ _0\"></span> in respect of<span class=\"_ _1\"></span> its investments. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse44\">F<span class=\"_ _1\"></span>or cash deposits within <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s securitisation structures, the scheme documents <span class=\"_ _0\"></span>will set out criteria f<span class=\"_ _0\"></span>or allow<span class=\"_ _0\"></span>able investments, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gse45\">including rating thresholds.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse46\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s cash balances are held in sterling at <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England and at highly rat<span class=\"_ _0\"></span>ed banks in current and call accounts. Cash is </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse47\">also invested in UK<span class=\"_ _0\"></span> gov<span class=\"_ _0\"></span>ernment securities and as short fix<span class=\"_ _0\"></span>ed-term money<span class=\"_ _1\"></span> market deposits fr<span class=\"_ _0\"></span>om time to <span class=\"_ _0\"></span>time. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse48\">The carrying v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s and the Company\u2019<span class=\"_ _1\"></span>s cash balances analysed b<span class=\"_ _0\"></span>y their<span class=\"_ _0\"></span> long-<span class=\"_ _0\"></span>term credit rating as de<span class=\"_ _0\"></span>termined by<span class=\"_ _0\"></span> Fitch is </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse49\">set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse4a\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse4b\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse4c\">The Group<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gse4d\">Cash with central bank<span class=\"_ _0\"></span>s rat<span class=\"_ _0\"></span>ed:</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls18 ws5e gse4e\"> <span class=\"_ _c0\"> </span>A<span class=\"_ _15\"></span>A-<span class=\"_ _206\"> </span><span class=\"ff15 ls0 ws0\">2,783.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,612.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse4f\">2,783.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,612.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gse50\">Cash with retail bank<span class=\"_ _0\"></span>s rat<span class=\"_ _0\"></span>ed:</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls18 ws5e gse51\"> <span class=\"_ _c0\"> </span>A<span class=\"_ _15\"></span>A-<span class=\"_ _346\"> </span><span class=\"ff15 ls0 ws0\">78.9<span class=\"_ _3a\"> </span><span class=\"ff16\">46.9</span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse52\"> <span class=\"_ _c0\"> </span>A+<span class=\"_ _347\"> </span><span class=\"ff15\">132.1<span class=\"_ _d5\"> </span><span class=\"ff16\">271.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse53\">211.0<span class=\"_ _d5\"> </span><span class=\"ff16\">318.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse54\">T<span class=\"_ _2\"></span>otal exposure<span class=\"_ _348\"> </span><span class=\"ff15\">2,994.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,930.9<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse55\">The Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gse56\">Cash with retail bank<span class=\"_ _0\"></span>s rat<span class=\"_ _0\"></span>ed:</div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse57\"> <span class=\"_ _c0\"> </span>A+<span class=\"_ _349\"> </span><span class=\"ff15\">27.6<span class=\"_ _3a\"> </span><span class=\"ff16\">19.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse58\">CRDs are exposur<span class=\"_ _0\"></span>es to <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England and thus shar<span class=\"_ _0\"></span>e the central bank rating no<span class=\"_ _0\"></span>ted above <span class=\"_ _0\"></span>while CSA<span class=\"_ _0\"></span> assets, placed with r<span class=\"_ _0\"></span>etail </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse59\">banks, have similar<span class=\"_ _1\"></span> ratings to those shown abo<span class=\"_ _0\"></span>ve f<span class=\"_ _0\"></span>or r<span class=\"_ _0\"></span>etail bank deposits.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse5a\">Credit risk<span class=\"_ _0\"></span> on all these balances, and any<span class=\"_ _0\"></span> interest accrued <span class=\"_ _0\"></span>thereon, is consider<span class=\"_ _0\"></span>ed to be minimal. <span class=\"_ _0\"></span>These balances ar<span class=\"_ _0\"></span>e considered as </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse5b\">Stage 1 f<span class=\"_ _0\"></span>or IFRS 9 impairment purposes with a PD such <span class=\"_ _0\"></span>that any<span class=\"_ _0\"></span> pro<span class=\"_ _0\"></span>vision required <span class=\"_ _0\"></span>would be immaterial.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gse5c\">T<span class=\"_ _1\"></span>rade debtors<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsc79\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s trade debt<span class=\"_ _0\"></span>ors balance repr<span class=\"_ _0\"></span>esents principally amounts outstanding on unpaid operating lease oblig<span class=\"_ _0\"></span>ations in the asset </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse5d\">finance business, wher<span class=\"_ _0\"></span>e similar acceptance crit<span class=\"_ _0\"></span>eria to those used <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> finance lease cases apply<span class=\"_ _0\"></span>. </div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gse5f\">Financial assets at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse60\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s financial assets held at <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value comprise solely<span class=\"_ _0\"></span> derivative <span class=\"_ _0\"></span>financial instruments used for<span class=\"_ _0\"></span> hedging purposes (note 26).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse61\">In order<span class=\"_ _0\"></span> to contr<span class=\"_ _0\"></span>ol credit risk<span class=\"_ _0\"></span> relating t<span class=\"_ _0\"></span>o counterparties to <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s derivative financial instruments, <span class=\"_ _1\"></span>ALCO r<span class=\"_ _0\"></span>eview<span class=\"_ _0\"></span>s and appro<span class=\"_ _0\"></span>ves </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse62\">which counterparties the Gr<span class=\"_ _0\"></span>oup will deal <span class=\"_ _0\"></span>with, establishes limits for<span class=\"_ _0\"></span> each counterparty and monitor<span class=\"_ _0\"></span>s compliance with those limits. <span class=\"_ _1\"></span>Any </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse63\">changes necessary<span class=\"_ _0\"></span> are advised t<span class=\"_ _0\"></span>o ERC. T<span class=\"_ _0\"></span>he Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s counterparties are typically<span class=\"_ _0\"></span> highly rat<span class=\"_ _0\"></span>ed banks and, for<span class=\"_ _0\"></span> all derivativ<span class=\"_ _0\"></span>e positions </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse64\">held within securitisation structur<span class=\"_ _0\"></span>es, must comply <span class=\"_ _0\"></span>with criteria set out in <span class=\"_ _0\"></span>the financing arrangements, <span class=\"_ _0\"></span>which are monitor<span class=\"_ _0\"></span>ed externally<span class=\"_ _1\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse65\">Since June 2019<span class=\"_ _1\"></span>, the Group has been centrally<span class=\"_ _0\"></span> clearing certain eligible derivativ<span class=\"_ _0\"></span>es with a Central Clearing Counterparty<span class=\"_ _0\"></span> (\u2018CCP\u2019) which </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse66\">remo<span class=\"_ _0\"></span>ves credit<span class=\"_ _0\"></span> risk between bilateral count<span class=\"_ _0\"></span>erparties and ensures timely<span class=\"_ _0\"></span> settlement and/<span class=\"_ _0\"></span>or porting o<span class=\"_ _0\"></span>f deriv<span class=\"_ _0\"></span>ative contracts in the e<span class=\"_ _0\"></span>vent </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse67\">of <span class=\"_ _0\"></span>the failur<span class=\"_ _0\"></span>e of a count<span class=\"_ _0\"></span>erparty<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse68\">The Group uses <span class=\"_ _0\"></span>the ISDA<span class=\"_ _0\"></span> Master<span class=\"_ _0\"></span> Agr<span class=\"_ _0\"></span>eement and Credit Support<span class=\"_ _0\"></span> Annex (\u2018CS<span class=\"_ _0\"></span>A<span class=\"_ _1\"></span>\u2019) for documenting unclear<span class=\"_ _1\"></span>ed derivative activity<span class=\"_ _0\"></span>. Under </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse69\">a CSA, collateral is passed betw<span class=\"_ _0\"></span>een counterparties to mitig<span class=\"_ _0\"></span>ate the mark<span class=\"_ _0\"></span>et contingent counterparty<span class=\"_ _0\"></span> risk inherent<span class=\"_ _0\"></span> in the outstanding </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse6a\">positions. Collateral pledged <span class=\"_ _0\"></span>to such counterparties by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup is shown in note 27<span class=\"_ _2\"></span>, while collateral pledg<span class=\"_ _0\"></span>ed to the Gr<span class=\"_ _0\"></span>oup is shown </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse6b\">in note 40<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse6c\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s exposure <span class=\"_ _0\"></span>to credit risk<span class=\"_ _0\"></span> in respect of<span class=\"_ _0\"></span> the counterparties <span class=\"_ _0\"></span>to its derivativ<span class=\"_ _0\"></span>e financial assets, analysed b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>their long<span class=\"_ _0\"></span>-term credit<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse6d\">rating as determined b<span class=\"_ _0\"></span>y Fitch is set out<span class=\"_ _0\"></span> below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse6e\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse6f\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gse70\">Carrying value of deriva<span class=\"_ _0\"></span>tive financial assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gse71\">Counterparties r<span class=\"_ _0\"></span>ated<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse72\">AA<span class=\"_ _34a\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">7.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls18 ws5e gse73\">AA-<span class=\"_ _2a8\"> </span><span class=\"ff15 ls0 ws0\">3.3<span class=\"_ _d1\"> </span><span class=\"ff16\">0.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse74\">A+<span class=\"_ _34b\"> </span><span class=\"ff15\">588.9<span class=\"_ _d5\"> </span><span class=\"ff16\">757.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse75\">A<span class=\"_ _34c\"> </span><span class=\"ff15\">5.5<span class=\"_ _3a\"> </span><span class=\"ff16\">14.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls18 ws5e gse76\">A- <span class=\"_ _34d\"> </span><span class=\"ff15 ls0 ws0\">17.7<span class=\"_ _43\"> </span><span class=\"ff17\">-<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse77\">Gross e<span class=\"_ _0\"></span>xposure (note 26)<span class=\"_ _21c\"> </span><span class=\"ff15\">615.4<span class=\"_ _d5\"> </span><span class=\"ff16\">779.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse78\">Collater<span class=\"_ _0\"></span>al amounts post<span class=\"_ _0\"></span>ed<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse79\">CSA collat<span class=\"_ _0\"></span>eral amounts (note 40)<span class=\"_ _231\"> </span><span class=\"ff15\">(383.4)<span class=\"_ _110\"> </span></span>(388.3)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse7a\">T<span class=\"_ _2\"></span>otal collater<span class=\"_ _0\"></span>al<span class=\"_ _34e\"> </span><span class=\"ff15\">(383.4)<span class=\"_ _110\"> </span></span>(388.3)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse7b\">Net exposur<span class=\"_ _0\"></span>e<span class=\"_ _18d\"> </span><span class=\"ff15\">232.0<span class=\"_ _150\"> </span><span class=\"ff16\">390.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gse7d\">64. <span class=\"_ _96\"></span>Liquidity risk<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse7e\">Liquidity risk is <span class=\"_ _0\"></span>the risk that<span class=\"_ _0\"></span> the Group might<span class=\"_ _0\"></span> be unable meet its liabilities and financial commitments as the<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>fall due. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse7f\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s principal source of<span class=\"_ _0\"></span> liquidity risk<span class=\"_ _0\"></span> is from its r<span class=\"_ _0\"></span>etail deposit funding<span class=\"_ _0\"></span>. Deposit balances raised are <span class=\"_ _0\"></span>typically used <span class=\"_ _0\"></span>to support </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse80\">lending activities wher<span class=\"_ _0\"></span>e maturity is o<span class=\"_ _0\"></span>ver a long<span class=\"_ _0\"></span>er period <span class=\"_ _0\"></span>than that of<span class=\"_ _0\"></span> the deposits. <span class=\"_ _0\"></span>This maturity<span class=\"_ _0\"></span> transformation exposes <span class=\"_ _0\"></span>the Group <span class=\"_ _0\"></span>to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse81\">liquidity risk.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse82\">Other sour<span class=\"_ _0\"></span>ces of<span class=\"_ _0\"></span> liquidity risk in <span class=\"_ _0\"></span>the normal course of business include <span class=\"_ _0\"></span>that arising:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse83\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>In the medium term <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s corporate and retail bonds <span class=\"_ _0\"></span>which are used t<span class=\"_ _0\"></span>o support its general operations and <span class=\"_ _0\"></span>from its </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse84\">participation in central bank funding schemes<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse85\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Fr<span class=\"_ _0\"></span>om the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s derivatives portfolio <span class=\"_ _0\"></span>which gives rise to liquidity<span class=\"_ _1\"></span> risk due to the collateral r<span class=\"_ _0\"></span>equirements <span class=\"_ _0\"></span>to cov<span class=\"_ _0\"></span>er adv<span class=\"_ _0\"></span>erse changes </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws30 gse86\">in valuation<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse87\">\u2022 <span class=\"_ _13\"> </span>Fr<span class=\"_ _0\"></span>om the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s participation in wholesale funding, including SPV<span class=\"_ _1\"></span>s, where sufficient<span class=\"_ _0\"></span> funding must be av<span class=\"_ _0\"></span>ailable<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse88\">Liquidity is also r<span class=\"_ _0\"></span>equired <span class=\"_ _0\"></span>to pro<span class=\"_ _0\"></span>vide capital support for<span class=\"_ _0\"></span> new<span class=\"_ _0\"></span> loans and working capital <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the Group.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse89\">Where assets ar<span class=\"_ _0\"></span>e funded b<span class=\"_ _0\"></span>y non-r<span class=\"_ _0\"></span>ecourse arrangements, thr<span class=\"_ _0\"></span>ough the securitisation pr<span class=\"_ _0\"></span>ocess, liquidity risk<span class=\"_ _0\"></span> is effectively<span class=\"_ _0\"></span> eliminated.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse8a\">As an authorised deposit tak<span class=\"_ _0\"></span>er<span class=\"_ _1\"></span>, the liquidity position of<span class=\"_ _0\"></span> Paragon Bank<span class=\"_ _0\"></span> PL<span class=\"_ _0\"></span>C, the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s banking subsidiary, is also managed on a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse8b\">stand-alone basis.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse8c\">Set out below<span class=\"_ _0\"></span> is a summary o<span class=\"_ _0\"></span>f the contr<span class=\"_ _0\"></span>actual cash flow<span class=\"_ _0\"></span>s expected to arise <span class=\"_ _0\"></span>from the Gr<span class=\"_ _1\"></span>oup\u2019<span class=\"_ _1\"></span>s financial and leasing liabilities, based on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse8d\">the earliest date at <span class=\"_ _0\"></span>which repayment can be demanded.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse8e\">Amounts pay<span class=\"_ _0\"></span>able<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse8f\">In one year </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse90\">or less, or on </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse91\">demand </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse92\">In more than </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse93\">one year<span class=\"_ _1\"></span>, but </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse94\">not more than </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse95\">two year<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse96\">In more than </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse97\">two year<span class=\"_ _0\"></span>s but </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse98\">not more than </div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gse99\">five year<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse9a\">In more than </div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gse9b\">five year<span class=\"_ _0\"></span>s<span class=\"ff15\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse9c\">T<span class=\"_ _2\"></span>otal </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse9d\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gse9e\">30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gse9f\">Ret<span class=\"_ _0\"></span>ail deposits<span class=\"_ _87\"> </span><span class=\"ff15\">11,278.3<span class=\"_ _86\"> </span>1,782.5<span class=\"_ _d5\"> </span>734.5<span class=\"_ _3a\"> </span>44.4<span class=\"_ _42\"> </span>13,839.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsea0\">Borrowings<span class=\"_ _34f\"> </span><span class=\"ff15\">327.1<span class=\"_ _d5\"> </span>160.3<span class=\"_ _86\"> </span>2,811.3<span class=\"_ _d5\"> </span>170.1<span class=\"_ _86\"> </span>3,468.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsea1\">Contingent c<span class=\"_ _0\"></span>onsideration<span class=\"_ _13a\"> </span><span class=\"ff15\">-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsea2\">T<span class=\"_ _2\"></span>otal non-derivative liabilities<span class=\"_ _179\"> </span><span class=\"ff15\">11,605.4<span class=\"_ _86\"> </span>1,942.8<span class=\"_ _12a\"> </span>3,545.8<span class=\"_ _150\"> </span>214.5<span class=\"_ _42\"> </span>17,308.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsea3\">Derivativ<span class=\"_ _0\"></span>e liabilities<span class=\"_ _16c\"> </span><span class=\"ff15\">52.8<span class=\"_ _ff\"> </span>(5.9)<span class=\"_ _72\"> </span>8.7<span class=\"_ _9e\"> </span>0.3<span class=\"_ _3a\"> </span>55.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsea4\">11,658.2<span class=\"_ _86\"> </span>1,936.9<span class=\"_ _12a\"> </span>3,554.5<span class=\"_ _d5\"> </span>214.8<span class=\"_ _42\"> </span>17,364.4<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsea5\">30 September 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsea6\">Ret<span class=\"_ _0\"></span>ail deposits<span class=\"_ _8b\"> </span><span class=\"ff16\">8,703.4<span class=\"_ _86\"> </span>1,697.8<span class=\"_ _150\"> </span>452.0<span class=\"_ _3a\"> </span>32.0<span class=\"_ _67\"> </span>10,885.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsea7\">Borrowings<span class=\"_ _34f\"> </span><span class=\"ff16\">116.8<span class=\"_ _d5\"> </span>251.3<span class=\"_ _86\"> </span>2,928.2<span class=\"_ _150\"> </span>178.1<span class=\"_ _86\"> </span>3,474.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsea8\">Contingent c<span class=\"_ _0\"></span>onsideration<span class=\"_ _196\"> </span><span class=\"ff16\">2.2<span class=\"_ _43\"> </span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsea9\">T<span class=\"_ _2\"></span>otal non-derivative liabilities<span class=\"_ _ba\"> </span><span class=\"ff16\">8,822.4<span class=\"_ _86\"> </span>1,949.1<span class=\"_ _86\"> </span>3,380.2<span class=\"_ _d5\"> </span>210.1<span class=\"_ _67\"> </span>14,361.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gseaa\">Derivativ<span class=\"_ _0\"></span>e liabilities<span class=\"_ _16c\"> </span><span class=\"ff16\">88.8<span class=\"_ _3a\"> </span>24.0<span class=\"_ _9e\"> </span>3.6<span class=\"_ _9e\"> </span>0.1<span class=\"_ _150\"> </span>116.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h27 ff16 fs1 fc1 sc0 ls0 ws0 gseab\">8,911.2<span class=\"_ _86\"> </span>1,973.1<span class=\"_ _86\"> </span>3,383.8<span class=\"_ _d5\"> </span>210.2<span class=\"_ _67\"> </span>14,478.3<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gseac\">Non-recourse balances ar<span class=\"_ _0\"></span>e payable only<span class=\"_ _1\"></span> to the extent <span class=\"_ _0\"></span>that funds ar<span class=\"_ _0\"></span>e available, as described <span class=\"_ _0\"></span>further below<span class=\"_ _1\"></span>, and do not expose the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsead\">Group <span class=\"_ _0\"></span>to any<span class=\"_ _0\"></span> material liquidity risk. <span class=\"_ _0\"></span>They<span class=\"_ _0\"></span> are <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore not included in <span class=\"_ _0\"></span>the table abov<span class=\"_ _0\"></span>e.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gseae\">As the amounts set out<span class=\"_ _0\"></span> above include all expected <span class=\"_ _0\"></span>future cash <span class=\"_ _0\"></span>flows, including principal and inter<span class=\"_ _0\"></span>est, the<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>will not agree <span class=\"_ _0\"></span>to amortised </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gseaf\">cost or <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value amounts r<span class=\"_ _0\"></span>eported in the balance sheet.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls5 ws0 gseb0\">F<span class=\"_ _0\"></span>urther inf<span class=\"_ _0\"></span>ormation on the liquidity e<span class=\"_ _0\"></span>xposure arising fr<span class=\"_ _0\"></span>om the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s retail deposits, securitisation and other<span class=\"_ _0\"></span> borrowings is set out<span class=\"_ _0\"></span> below<span class=\"_ _0\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gseb1\">The liquidity e<span class=\"_ _0\"></span>xposures of<span class=\"_ _0\"></span> the Company<span class=\"_ _0\"></span> arise only <span class=\"_ _0\"></span>from its borr<span class=\"_ _0\"></span>owings, and are se<span class=\"_ _0\"></span>t out below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gseb2\">The ov<span class=\"_ _0\"></span>erall responsibility<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> the manag<span class=\"_ _0\"></span>ement of liquidity<span class=\"_ _0\"></span> risk r<span class=\"_ _0\"></span>ests with <span class=\"_ _0\"></span>AL<span class=\"_ _0\"></span>CO which makes r<span class=\"_ _1\"></span>ecommendations for <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s liquidity </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gseb3\">policy<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> board appr<span class=\"_ _0\"></span>oval. <span class=\"_ _1\"></span>ALCO monitors liquidity<span class=\"_ _0\"></span> risk metrics <span class=\"_ _0\"></span>within limits set by<span class=\"_ _0\"></span> the Board or<span class=\"_ _1\"></span> regulators and uses detailed cash flo<span class=\"_ _0\"></span>w </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gseb4\">projections <span class=\"_ _0\"></span>to ensure <span class=\"_ _0\"></span>that an adequate lev<span class=\"_ _0\"></span>el of liquidity<span class=\"_ _0\"></span> is av<span class=\"_ _0\"></span>ailable at all times.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs403\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s and the Bank\u2019<span class=\"_ _1\"></span>s liquidity position is managed on a da<span class=\"_ _0\"></span>y-to-day<span class=\"_ _1\"></span> basis by the <span class=\"_ _0\"></span>treasury<span class=\"_ _0\"></span> function, under<span class=\"_ _0\"></span> the supervision of<span class=\"_ _0\"></span> AL<span class=\"_ _1\"></span>CO.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gseb6\">Retail deposits<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gseb7\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s retail <span class=\"_ _0\"></span>funding strategy is <span class=\"_ _0\"></span>focussed on building a stable mix of<span class=\"_ _0\"></span> deposit products. <span class=\"_ _0\"></span>A<span class=\"_ _0\"></span> high proportion of<span class=\"_ _0\"></span> balances, around </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gseb8\">95%, are pr<span class=\"_ _0\"></span>otected by<span class=\"_ _1\"></span> the FSCS which mitigates ag<span class=\"_ _0\"></span>ainst the possibility<span class=\"_ _0\"></span> of a r<span class=\"_ _0\"></span>etail run.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gseb9\">The cash outflow<span class=\"_ _0\"></span>s, including principal and estimated interest contr<span class=\"_ _0\"></span>actually r<span class=\"_ _0\"></span>equired by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s retail deposit balances, analysed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gseba\">by<span class=\"_ _0\"></span> the earliest date at <span class=\"_ _0\"></span>which repa<span class=\"_ _0\"></span>yment can be demanded are set out belo<span class=\"_ _0\"></span>w:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsebb\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsebc\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsebd\">Pa<span class=\"_ _0\"></span>yable on demand<span class=\"_ _22f\"> </span><span class=\"ff15\">4,181.5<span class=\"_ _86\"> </span><span class=\"ff16\">3,934.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsebe\">Pa<span class=\"_ _0\"></span>yable in less than three mon<span class=\"_ _0\"></span>ths<span class=\"_ _2d7\"> </span><span class=\"ff15\">1,649.5<span class=\"_ _150\"> </span><span class=\"ff16\">955.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsebf\">Pa<span class=\"_ _0\"></span>yable in less than one year but mor<span class=\"_ _0\"></span>e than three months<span class=\"_ _2a0\"> </span><span class=\"ff15\">5,447.3<span class=\"_ _86\"> </span><span class=\"ff16\">3,813.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsec0\">Pa<span class=\"_ _0\"></span>yable in less than one year or on demand<span class=\"_ _1b7\"> </span><span class=\"ff15\">11,278.3<span class=\"_ _86\"> </span><span class=\"ff16\">8,703.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsec1\">Pa<span class=\"_ _0\"></span>yable in one to two y<span class=\"_ _0\"></span>ears<span class=\"_ _2d0\"> </span><span class=\"ff15\">1,782.5<span class=\"_ _86\"> </span><span class=\"ff16\">1,697.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsec2\">Pa<span class=\"_ _0\"></span>yable in two to fiv<span class=\"_ _0\"></span>e years<span class=\"_ _1ec\"> </span><span class=\"ff15\">734.5<span class=\"_ _d5\"> </span><span class=\"ff16\">452.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsec3\">Pa<span class=\"_ _0\"></span>yable after mor<span class=\"_ _0\"></span>e than five year<span class=\"_ _0\"></span>s<span class=\"_ _229\"> </span><span class=\"ff15\">44.4<span class=\"_ _3a\"> </span><span class=\"ff16\">32.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsec4\">13,839.7<span class=\"_ _42\"> </span><span class=\"ff16\">10,885.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsec5\">In order<span class=\"_ _0\"></span> to r<span class=\"_ _0\"></span>educe the liquidity<span class=\"_ _0\"></span> risk inherent in <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s retail deposit balances, <span class=\"_ _0\"></span>the PRA r<span class=\"_ _1\"></span>equires that the Bank, lik<span class=\"_ _0\"></span>e other<span class=\"_ _0\"></span> regulated </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsec6\">banks, maintains a buffer<span class=\"_ _0\"></span> of liquid asse<span class=\"_ _0\"></span>ts to ensur<span class=\"_ _0\"></span>e it has sufficient available <span class=\"_ _0\"></span>funds at all times <span class=\"_ _0\"></span>to protect<span class=\"_ _0\"></span> against unfor<span class=\"_ _0\"></span>eseen </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsec7\">circumstances. <span class=\"_ _0\"></span>The amount of<span class=\"_ _0\"></span> this buffer<span class=\"_ _1\"></span> is calculated using Individual Liquidity Guidance (\u2018ILG\u2019) se<span class=\"_ _0\"></span>t by<span class=\"_ _0\"></span> the PRA<span class=\"_ _0\"></span> based on the Internal </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsec8\">Liquidity <span class=\"_ _0\"></span>Adequacy<span class=\"_ _0\"></span> <span class=\"_ _0\"></span>Assessment Process (\u2018ILAAP\u2019) undertaken b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Bank. The ILAAP<span class=\"_ _0\"></span> determines the liquid r<span class=\"_ _0\"></span>esources <span class=\"_ _0\"></span>that must be </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsec9\">maintained in the Bank <span class=\"_ _0\"></span>to meet the O<span class=\"_ _0\"></span>verall Liquidity<span class=\"_ _0\"></span> Adequac<span class=\"_ _0\"></span>y Rule (\u2018OLAR\u2019) and <span class=\"_ _0\"></span>to ensure <span class=\"_ _0\"></span>that it can meet its liabilities as <span class=\"_ _0\"></span>they <span class=\"_ _0\"></span>fall </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gseca\">due. It is based on an analysis of<span class=\"_ _0\"></span> its business as usual f<span class=\"_ _0\"></span>orecast cash r<span class=\"_ _0\"></span>equirements but also considers <span class=\"_ _0\"></span>their pr<span class=\"_ _0\"></span>edicted behaviour<span class=\"_ _0\"></span> in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsecb\">stressed conditions. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsecc\">At 30 Sept<span class=\"_ _0\"></span>ember 2023 the liquidity<span class=\"_ _1\"></span> buffer comprised the <span class=\"_ _0\"></span>following on and off<span class=\"_ _0\"></span> balance sheet assets. <span class=\"_ _0\"></span>All these assets ar<span class=\"_ _0\"></span>e held within <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsecd\">Bank and are r<span class=\"_ _0\"></span>eadily r<span class=\"_ _0\"></span>ealisable.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsece\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsecf\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsed0\">Balances with central bank<span class=\"_ _0\"></span>s<span class=\"_ _350\"> </span><span class=\"ff15\">2,589.7<span class=\"_ _86\"> </span><span class=\"ff16\">1,505.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsed1\">T<span class=\"_ _2\"></span>otal on balance sheet liquidity<span class=\"_ _351\"> </span><span class=\"ff15\">2,589.7<span class=\"_ _86\"> </span><span class=\"ff16\">1,505.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsed2\">Long / short repo tr<span class=\"_ _0\"></span>ansaction<span class=\"_ _1f8\"> </span><span class=\"ff15\">150.0<span class=\"_ _d5\"> </span><span class=\"ff16\">150.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsed3\">2,739.7<span class=\"_ _86\"> </span><span class=\"ff16\">1,655.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsed4\">Balances with central banks abo<span class=\"_ _0\"></span>ve ex<span class=\"_ _0\"></span>clude group cash balances placed on deposit at<span class=\"_ _0\"></span> the Bank of<span class=\"_ _0\"></span> England thr<span class=\"_ _0\"></span>ough Paragon Bank.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsed5\">Paragon Bank<span class=\"_ _0\"></span> manages its Liquidity Co<span class=\"_ _0\"></span>verage Ratio (\u2018L<span class=\"_ _1\"></span>CR\u2019), the lev<span class=\"_ _0\"></span>el of its High Quality<span class=\"_ _0\"></span> Liquid <span class=\"_ _0\"></span>Assets (\u2018HQLA<span class=\"_ _1\"></span>\u2019) relative <span class=\"_ _0\"></span>to its  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsed6\">short-term <span class=\"_ _0\"></span>forecast ne<span class=\"_ _0\"></span>t cash outflows. <span class=\"_ _0\"></span>A<span class=\"_ _0\"></span> minimum level o<span class=\"_ _0\"></span>f L<span class=\"_ _1\"></span>CR is set through r<span class=\"_ _0\"></span>egulation for<span class=\"_ _0\"></span> all regulated <span class=\"_ _0\"></span>financial institutions. As at<span class=\"_ _0\"></span>  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsed7\">30 September<span class=\"_ _0\"></span> 2023, the Bank\u2019<span class=\"_ _1\"></span>s LCR <span class=\"_ _0\"></span>was comfortably<span class=\"_ _1\"></span> above the r<span class=\"_ _0\"></span>equired minimum r<span class=\"_ _0\"></span>egulatory standar<span class=\"_ _0\"></span>d. The Bank<span class=\"_ _0\"></span> also monitors its </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsed8\">Net Stable F<span class=\"_ _1\"></span>unding Ratio (\u2018NSFR\u2019) which measures the stability<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the funding pr<span class=\"_ _0\"></span>ofile in r<span class=\"_ _0\"></span>elation to the composition o<span class=\"_ _0\"></span>f its assets and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsed9\">off balance shee<span class=\"_ _0\"></span>t activities.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gseda\">Liquidity is not<span class=\"_ _0\"></span> regulated at Gr<span class=\"_ _0\"></span>oup lev<span class=\"_ _0\"></span>el.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsedb\">Borrowings<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsedc\">Set out below<span class=\"_ _0\"></span> is the contractual maturity<span class=\"_ _0\"></span> pro<span class=\"_ _0\"></span>file of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s and the Company\u2019<span class=\"_ _1\"></span>s borrowings at 30 Sep<span class=\"_ _0\"></span>tember 2023 and  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsedd\">30 September<span class=\"_ _0\"></span> 2022 based on their<span class=\"_ _0\"></span> carrying values. <span class=\"_ _1\"></span>These are analysed betw<span class=\"_ _0\"></span>een non-recourse (<span class=\"_ _0\"></span>securitisation) and other<span class=\"_ _0\"></span> funding,  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsede\">with the liquidity<span class=\"_ _0\"></span> position arising principally <span class=\"_ _0\"></span>from the o<span class=\"_ _0\"></span>ther funding<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsee0\">The Group<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsee1\">Financial liabilities falling due:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsee2\">In one year </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsee3\">or less, or on </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsee4\">demand </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsee5\">In more than </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsee6\">one year<span class=\"_ _1\"></span>, but </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsee7\">not more than </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsee8\">two year<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsee9\">In more than </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gseea\">two year<span class=\"_ _0\"></span>s but </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gseeb\">not more than </div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gseec\">five year<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gseed\">In more than </div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gseee\">five year<span class=\"_ _0\"></span>s<span class=\"ff15\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gseef\">T<span class=\"_ _2\"></span>otal </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsef0\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsef1\">30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsef2\">Secured bank borro<span class=\"_ _0\"></span>wings <span class=\"_ _103\"> </span><span class=\"ff15\">-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsef3\">Asset back<span class=\"_ _0\"></span>ed loan notes<span class=\"_ _268\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _d1\"> </span>28.0<span class=\"_ _3a\"> </span>28.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsef4\">T<span class=\"_ _2\"></span>otal non-recourse funding<span class=\"_ _26b\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _d1\"> </span>28.0<span class=\"_ _3a\"> </span>28.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsef5\">Bank overdr<span class=\"_ _0\"></span>afts<span class=\"_ _352\"> </span><span class=\"ff15\">0.2<span class=\"_ _43\"> </span>-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span>0.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsef6\">Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _161\"> </span><span class=\"ff15\">112.4<span class=\"_ _a8\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span>112.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsef7\">Corporat<span class=\"_ _0\"></span>e bond<span class=\"_ _353\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span>145.8<span class=\"_ _d5\"> </span>145.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsef8\">Central bank f<span class=\"_ _0\"></span>acilities<span class=\"_ _87\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _12b\"> </span>2,750.0<span class=\"_ _43\"> </span>-<span class=\"_ _133\"> </span>2,750.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsef9\">Sale and repurchase agr<span class=\"_ _0\"></span>eements<span class=\"_ _b1\"> </span><span class=\"ff15\">50.0<span class=\"_ _43\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _d1\"> </span>50.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsefa\">Lease liabilities<span class=\"_ _301\"> </span><span class=\"ff15\">2.6<span class=\"_ _9e\"> </span>2.4<span class=\"_ _9e\"> </span>3.4<span class=\"_ _d1\"> </span>0.5<span class=\"_ _9e\"> </span>8.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsefb\">165.2<span class=\"_ _9e\"> </span>2.4<span class=\"_ _12a\"> </span>2,753.4<span class=\"_ _150\"> </span>174.3<span class=\"_ _86\"> </span>3,095.3<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsefc\">30 September 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsefd\">Secured bank borro<span class=\"_ _0\"></span>wings<span class=\"_ _17d\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">170.0<span class=\"_ _43\"> </span></span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">416.0<span class=\"_ _d5\"> </span>586.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsefe\">Asset back<span class=\"_ _0\"></span>ed loan notes<span class=\"_ _268\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">409.3<span class=\"_ _150\"> </span>409.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gseff\">T<span class=\"_ _2\"></span>otal non-recourse funding<span class=\"_ _26b\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">170.0<span class=\"_ _43\"> </span></span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">825.3<span class=\"_ _150\"> </span>995.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf00\">Bank overdr<span class=\"_ _0\"></span>afts<span class=\"_ _352\"> </span><span class=\"ff16\">0.4<span class=\"_ _43\"> </span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf01\">Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _2c8\"> </span>-<span class=\"_ _c8\"> </span><span class=\"ff16\">112.3<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">112.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf02\">Corporat<span class=\"_ _0\"></span>e bond<span class=\"_ _353\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">149.2<span class=\"_ _150\"> </span>149.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf03\">Central bank f<span class=\"_ _0\"></span>acilities<span class=\"_ _87\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _12b\"> </span><span class=\"ff16\">2,750.0<span class=\"_ _43\"> </span></span>-<span class=\"_ _12b\"> </span><span class=\"ff16\">2,750.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf04\">Sale and repurchase agr<span class=\"_ _0\"></span>eements<span class=\"_ _354\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf05\">Lease liabilities<span class=\"_ _301\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>1.9<span class=\"_ _9e\"> </span>3.8<span class=\"_ _9e\"> </span>1.1<span class=\"_ _9e\"> </span>9.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h27 ff16 fs1 fc1 sc0 ls0 ws0 gsf06\">2.6<span class=\"_ _d5\"> </span>284.2<span class=\"_ _86\"> </span>2,753.8<span class=\"_ _150\"> </span>975.6<span class=\"_ _86\"> </span>4,016.2<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsf07\">The Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsf08\">Financial liabilities falling due:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf09\">In one year </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf0a\">or less, or on </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf0b\">demand </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf0c\">In more than </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf0d\">one year<span class=\"_ _1\"></span>, but </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf0e\">not more than </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf0f\">two year<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf10\">In more than </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf11\">two year<span class=\"_ _0\"></span>s but </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf12\">not more than </div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsf13\">five year<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf14\">In more than </div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsf15\">five year<span class=\"_ _0\"></span>s<span class=\"ff15\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf16\">T<span class=\"_ _2\"></span>otal </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf17\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf18\">30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf19\">Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _161\"> </span><span class=\"ff15\">112.4<span class=\"_ _a8\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span>112.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf1a\">Corporat<span class=\"_ _0\"></span>e bond<span class=\"_ _353\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span>149.4<span class=\"_ _d5\"> </span>149.4<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf1b\">Lease liabilities<span class=\"_ _301\"> </span><span class=\"ff15\">1.3<span class=\"_ _9e\"> </span>1.4<span class=\"_ _9e\"> </span>4.3<span class=\"_ _d1\"> </span>6.7<span class=\"_ _3a\"> </span>13.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf1c\">113.7<span class=\"_ _9e\"> </span>1.4<span class=\"_ _d1\"> </span>4.3<span class=\"_ _150\"> </span>156.1<span class=\"_ _d5\"> </span>275.5<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf1d\">30 September 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf1e\">Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _2c8\"> </span>-<span class=\"_ _c8\"> </span><span class=\"ff16\">112.3<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">112.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf1f\">Corporat<span class=\"_ _0\"></span>e bond<span class=\"_ _353\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">149.2<span class=\"_ _150\"> </span>149.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf20\">Lease liabilities<span class=\"_ _301\"> </span><span class=\"ff16\">1.3<span class=\"_ _9e\"> </span>1.3<span class=\"_ _9e\"> </span>4.2<span class=\"_ _9e\"> </span>8.2<span class=\"_ _f7\"> </span>15.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h27 ff16 fs1 fc1 sc0 ls0 ws0 gsf21\">1.3<span class=\"_ _d5\"> </span>113.6<span class=\"_ _11f\"> </span>4.2<span class=\"_ _d5\"> </span>157.4<span class=\"_ _150\"> </span>276.5<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf22\">IFRS 7 requires <span class=\"_ _0\"></span>the disclosure of<span class=\"_ _1\"></span> future contractual cash flo<span class=\"_ _0\"></span>ws (including inter<span class=\"_ _0\"></span>est) on these borro<span class=\"_ _0\"></span>wings, and these ar<span class=\"_ _0\"></span>e described and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs191\">set out on <span class=\"_ _0\"></span>the following pag<span class=\"_ _0\"></span>es.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws2e gsf24\">Non-recourse funding<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf25\">The Group has hist<span class=\"_ _0\"></span>orically used securitisation as a principal sour<span class=\"_ _0\"></span>ce of <span class=\"_ _0\"></span>funding, but currently<span class=\"_ _0\"></span> only accesses <span class=\"_ _0\"></span>this market on a str<span class=\"_ _0\"></span>ategic </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf26\">basis. In a securitisation an SPV<span class=\"_ _0\"></span> company <span class=\"_ _0\"></span>within the Gr<span class=\"_ _0\"></span>oup will issue asset back<span class=\"_ _0\"></span>ed loan notes secur<span class=\"_ _0\"></span>ed on a pool of mortgag<span class=\"_ _0\"></span>e or other<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf27\">loan assets beneficially<span class=\"_ _0\"></span> owned by<span class=\"_ _0\"></span> the SPV<span class=\"_ _0\"></span> in a public offer<span class=\"_ _1\"></span>. T<span class=\"_ _0\"></span>he notes have a maturity<span class=\"_ _0\"></span> date later<span class=\"_ _0\"></span> than the <span class=\"_ _0\"></span>final repa<span class=\"_ _0\"></span>yment date for<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf28\">any<span class=\"_ _0\"></span> asset in the pool, <span class=\"_ _0\"></span>typically ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>thirty <span class=\"_ _0\"></span>years fr<span class=\"_ _0\"></span>om the issue date. <span class=\"_ _1\"></span>The noteholders are entitled <span class=\"_ _0\"></span>to receiv<span class=\"_ _0\"></span>e repayment o<span class=\"_ _0\"></span>f the no<span class=\"_ _0\"></span>te </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf29\">principal fr<span class=\"_ _0\"></span>om principal funds generated b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the loan assets fr<span class=\"_ _0\"></span>om time t<span class=\"_ _0\"></span>o time, but their<span class=\"_ _1\"></span> right to the r<span class=\"_ _0\"></span>epayment of<span class=\"_ _0\"></span> principal is limited to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf2a\">the cash available in <span class=\"_ _0\"></span>the SPV<span class=\"_ _1\"></span>. Similarly<span class=\"_ _0\"></span>, payment of<span class=\"_ _0\"></span> accrued interest<span class=\"_ _0\"></span> to the no<span class=\"_ _0\"></span>teholders is limited to cash g<span class=\"_ _0\"></span>enerated within <span class=\"_ _0\"></span>the SPV<span class=\"_ _1\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf2b\">There is no r<span class=\"_ _0\"></span>equirement<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> any Gr<span class=\"_ _0\"></span>oup company<span class=\"_ _0\"></span> other <span class=\"_ _0\"></span>than the issuing SPV<span class=\"_ _1\"></span> to make principal or<span class=\"_ _0\"></span> interest pa<span class=\"_ _0\"></span>yments in respect of<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf2c\">notes. <span class=\"_ _0\"></span>This matching of<span class=\"_ _0\"></span> the maturities of<span class=\"_ _0\"></span> the assets and <span class=\"_ _0\"></span>the related <span class=\"_ _0\"></span>funding substantially r<span class=\"_ _0\"></span>educes the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s exposure <span class=\"_ _0\"></span>to liquidity </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf2d\">risk. Details of<span class=\"_ _0\"></span> notes in issue are giv<span class=\"_ _0\"></span>en in note 34 and the assets backing <span class=\"_ _0\"></span>the notes ar<span class=\"_ _0\"></span>e shown in note 18. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsf2e\">In each case the Gr<span class=\"_ _0\"></span>oup provides <span class=\"_ _0\"></span>funding to <span class=\"_ _0\"></span>the SPV<span class=\"_ _0\"></span> at inception, subordinated <span class=\"_ _0\"></span>to the not<span class=\"_ _0\"></span>es, which means that <span class=\"_ _0\"></span>the primary cr<span class=\"_ _0\"></span>edit risk on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsf2f\">the pool assets is retained <span class=\"_ _0\"></span>within the Gr<span class=\"_ _0\"></span>oup. <span class=\"_ _0\"></span>The Group r<span class=\"_ _0\"></span>eceives the r<span class=\"_ _0\"></span>esidual income generated b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the assets. T<span class=\"_ _0\"></span>hese factors mean <span class=\"_ _0\"></span>that </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsf30\">the risks and re<span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ds of o<span class=\"_ _0\"></span>wnership of <span class=\"_ _0\"></span>the assets remain <span class=\"_ _0\"></span>with the Gr<span class=\"_ _0\"></span>oup, and hence the loans r<span class=\"_ _0\"></span>emain on the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s balance sheet.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf31\">Cash receiv<span class=\"_ _0\"></span>ed from <span class=\"_ _0\"></span>time to <span class=\"_ _0\"></span>time in each SPV<span class=\"_ _0\"></span> is held until the next inter<span class=\"_ _0\"></span>est payment date <span class=\"_ _0\"></span>when, follo<span class=\"_ _0\"></span>wing payment of<span class=\"_ _0\"></span> principal, interest </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf32\">and the associated costs of<span class=\"_ _1\"></span> the SPV<span class=\"_ _1\"></span>, the remaining balances become av<span class=\"_ _0\"></span>ailable to <span class=\"_ _0\"></span>the Group. Cash balances ar<span class=\"_ _0\"></span>e also held within each </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf33\">SPV<span class=\"_ _0\"></span> to pr<span class=\"_ _0\"></span>ovide credit<span class=\"_ _0\"></span> enhancement for<span class=\"_ _0\"></span> the particular<span class=\"_ _0\"></span> securitisation, allowing inter<span class=\"_ _0\"></span>est and principal payments t<span class=\"_ _0\"></span>o be made even if<span class=\"_ _0\"></span> some </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf34\">of <span class=\"_ _0\"></span>the loans default. <span class=\"_ _0\"></span>The cash balances of<span class=\"_ _0\"></span> the SPV<span class=\"_ _0\"></span> companies are included <span class=\"_ _0\"></span>within the r<span class=\"_ _0\"></span>estricted cash balances disclosed in note 17 as </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf35\">\u2018securitisation cash<span class=\"_ _0\"></span>\u2019<span class=\"_ _2\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf36\">Newly<span class=\"_ _0\"></span> originated mortgage loans may<span class=\"_ _1\"></span> be initially funded by<span class=\"_ _0\"></span> a re<span class=\"_ _0\"></span>volving loan facility<span class=\"_ _1\"></span> or \u2018warehouse<span class=\"_ _1\"></span>\u2019 from the point o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>their origination </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf37\">until their<span class=\"_ _0\"></span> inclusion in a securitisation transaction or<span class=\"_ _0\"></span> other<span class=\"_ _0\"></span> refinancing. <span class=\"_ _1\"></span>A w<span class=\"_ _0\"></span>arehouse may<span class=\"_ _0\"></span> also be used to hold acquir<span class=\"_ _0\"></span>ed loans or <span class=\"_ _0\"></span>to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf38\">refinance gr<span class=\"_ _0\"></span>oup loans on a short-term basis. <span class=\"_ _1\"></span>A w<span class=\"_ _0\"></span>arehouse company<span class=\"_ _0\"></span> functions in a similar<span class=\"_ _0\"></span> wa<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>to an SPV<span class=\"_ _1\"></span>, except <span class=\"_ _0\"></span>that funds ar<span class=\"_ _0\"></span>e drawn </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf39\">down as advances ar<span class=\"_ _0\"></span>e made or<span class=\"_ _0\"></span> loans are sold in, repaid <span class=\"_ _0\"></span>when loans are securitised or<span class=\"_ _0\"></span> re<span class=\"_ _0\"></span>financed by an internal asse<span class=\"_ _0\"></span>t sale and may </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf3a\">subsequently be r<span class=\"_ _0\"></span>edrawn up t<span class=\"_ _0\"></span>o the end of<span class=\"_ _0\"></span> a commitment period. T<span class=\"_ _0\"></span>he Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s Paragon Second F<span class=\"_ _0\"></span>unding facility<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>as initiated as a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf3b\">war<span class=\"_ _0\"></span>ehouse, but w<span class=\"_ _0\"></span>as no longer a<span class=\"_ _0\"></span>vailable f<span class=\"_ _0\"></span>or new<span class=\"_ _0\"></span> drawings in <span class=\"_ _0\"></span>the period and was r<span class=\"_ _0\"></span>epaid in September<span class=\"_ _0\"></span> 2023.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf3c\">Repayment o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the principal amount of <span class=\"_ _0\"></span>the facilities is not r<span class=\"_ _1\"></span>equired unless amounts are r<span class=\"_ _0\"></span>ealised from <span class=\"_ _0\"></span>the secured assets either<span class=\"_ _0\"></span> thr<span class=\"_ _0\"></span>ough </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf3d\">repa<span class=\"_ _0\"></span>yment, securitisation or asset sales, e<span class=\"_ _0\"></span>ven after<span class=\"_ _0\"></span> the end of<span class=\"_ _0\"></span> the commitment period. <span class=\"_ _0\"></span>Ther<span class=\"_ _0\"></span>e is no further r<span class=\"_ _1\"></span>ecourse to other asse<span class=\"_ _0\"></span>ts of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf3e\">the Group in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> either inter<span class=\"_ _0\"></span>est or principal on <span class=\"_ _0\"></span>the borro<span class=\"_ _0\"></span>wings.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf3f\">As with <span class=\"_ _0\"></span>the SPV<span class=\"_ _0\"></span>s, the Gr<span class=\"_ _0\"></span>oup pro<span class=\"_ _0\"></span>vides subordinated <span class=\"_ _0\"></span>funding to active <span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ehouse companies and restricted cash balances ar<span class=\"_ _0\"></span>e held </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf40\">within them. Contributions <span class=\"_ _0\"></span>to the subor<span class=\"_ _0\"></span>dinated funding are made each <span class=\"_ _0\"></span>time a drawing on <span class=\"_ _0\"></span>the facility concerned is made. <span class=\"_ _1\"></span>These </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf41\">amounts pro<span class=\"_ _0\"></span>vide credit enhancement <span class=\"_ _0\"></span>to the <span class=\"_ _0\"></span>warehouse and co<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> certain fees. <span class=\"_ _0\"></span>This funding is r<span class=\"_ _0\"></span>epaid when assets ar<span class=\"_ _0\"></span>e securitised or </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf42\">refinanced b<span class=\"_ _0\"></span>y an internal asset<span class=\"_ _0\"></span> sale. Credit enhancement in <span class=\"_ _0\"></span>the active w<span class=\"_ _0\"></span>arehouse at 30 Sep<span class=\"_ _0\"></span>tember 2022 <span class=\"_ _0\"></span>was \u00a323.2m and ther<span class=\"_ _0\"></span>e w<span class=\"_ _0\"></span>ere </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf43\">no active <span class=\"_ _0\"></span>warehouses at<span class=\"_ _0\"></span> 30 September 2023. <span class=\"_ _0\"></span>Ther<span class=\"_ _0\"></span>e wer<span class=\"_ _0\"></span>e no undrawn f<span class=\"_ _0\"></span>acilities available at <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear end (2022: \u00a3280<span class=\"_ _0\"></span>.0m).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gsf44\">F<span class=\"_ _0\"></span>urther details o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ehouse facilities ar<span class=\"_ _0\"></span>e given in note 35 and details o<span class=\"_ _0\"></span>f the loan asse<span class=\"_ _0\"></span>ts within the <span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ehouses are given in no<span class=\"_ _0\"></span>te 18.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf45\">The final r<span class=\"_ _0\"></span>epayment date <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the securitisation borro<span class=\"_ _0\"></span>wings is more than <span class=\"_ _0\"></span>five <span class=\"_ _0\"></span>years fr<span class=\"_ _0\"></span>om the balance sheet dat<span class=\"_ _0\"></span>e, falling due in 2045.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf46\">The sterling principal amount outstanding at 30 Sept<span class=\"_ _0\"></span>ember 2023 under<span class=\"_ _0\"></span> the SPV<span class=\"_ _0\"></span> and w<span class=\"_ _0\"></span>arehouse arrang<span class=\"_ _0\"></span>ements was \u00a328.<span class=\"_ _0\"></span>4m  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf47\">(2022: \u00a3996.5m). <span class=\"_ _0\"></span>The to<span class=\"_ _0\"></span>tal sterling amount payable under<span class=\"_ _1\"></span> these arrangements, w<span class=\"_ _0\"></span>ere <span class=\"_ _0\"></span>these principal amounts to r<span class=\"_ _0\"></span>emain outstanding </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf48\">until the final r<span class=\"_ _1\"></span>epayment date, would be \u00a343.3m (2022: \u00a31,<span class=\"_ _0\"></span>912.3m). <span class=\"_ _0\"></span>As the principal will, as discussed abo<span class=\"_ _0\"></span>ve, r<span class=\"_ _0\"></span>educe as customers </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf49\">repa<span class=\"_ _0\"></span>y or<span class=\"_ _0\"></span> redeem their<span class=\"_ _1\"></span> accounts, the cash flow<span class=\"_ _0\"></span> will be far<span class=\"_ _0\"></span> less than <span class=\"_ _0\"></span>this amount in practice. </div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsf4a\">Corporate debt<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf4b\">In F<span class=\"_ _1\"></span>ebruary 2013, the Company<span class=\"_ _0\"></span> initiated a Eur<span class=\"_ _0\"></span>o Medium T<span class=\"_ _2\"></span>erm Note issuance pr<span class=\"_ _0\"></span>ogramme, with a maximum issuance of<span class=\"_ _0\"></span> \u00a31,000<span class=\"_ _0\"></span>.0m. <span class=\"_ _0\"></span>The </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf4c\">Company<span class=\"_ _0\"></span> had the ability <span class=\"_ _0\"></span>to issue further<span class=\"_ _0\"></span> notes under<span class=\"_ _0\"></span> the pr<span class=\"_ _0\"></span>ogramme and has issued thr<span class=\"_ _0\"></span>ee fixed r<span class=\"_ _0\"></span>ate bonds for<span class=\"_ _0\"></span> a total o<span class=\"_ _0\"></span>f \u00a3297<span class=\"_ _2\"></span>.5m, with </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf4d\">interest r<span class=\"_ _0\"></span>ates ranging fr<span class=\"_ _0\"></span>om 6.000% <span class=\"_ _0\"></span>to 6.<span class=\"_ _0\"></span>125% and maturities ranging fr<span class=\"_ _0\"></span>om December 2020 <span class=\"_ _0\"></span>to <span class=\"_ _0\"></span>August 2024, the most<span class=\"_ _0\"></span> recent issue of<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf4e\">\u00a3112.5m being made in August 2015. F<span class=\"_ _1\"></span>ollowing redemp<span class=\"_ _0\"></span>tions in previous <span class=\"_ _0\"></span>years, only<span class=\"_ _0\"></span> the most r<span class=\"_ _0\"></span>ecent bond r<span class=\"_ _0\"></span>emains outstanding. This is </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf4f\">repa<span class=\"_ _0\"></span>yable within <span class=\"_ _0\"></span>twelve months o<span class=\"_ _0\"></span>f the balance shee<span class=\"_ _0\"></span>t date.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf50\">The Group issued \u00a3150<span class=\"_ _0\"></span>.0m o<span class=\"_ _0\"></span>f gr<span class=\"_ _0\"></span>een Tier<span class=\"_ _1\"></span>-2 debt in Mar<span class=\"_ _0\"></span>ch 2021. T<span class=\"_ _0\"></span>his bond is optionally callable betw<span class=\"_ _0\"></span>een 25 June 2026 and  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf51\">25 September<span class=\"_ _0\"></span> 2026 and has a final maturity dat<span class=\"_ _0\"></span>e of 25 Sept<span class=\"_ _0\"></span>ember 2031.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf52\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s ability <span class=\"_ _0\"></span>to issue debt is supported by<span class=\"_ _0\"></span> its credit<span class=\"_ _0\"></span> rating issued by<span class=\"_ _0\"></span> Fitch which <span class=\"_ _0\"></span>was affirmed at BBB+ in F<span class=\"_ _1\"></span>ebruary 2023.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws2e gsf53\">Central bank facilities<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf54\">The Group has accessed <span class=\"_ _0\"></span>term credit<span class=\"_ _0\"></span> facilities under<span class=\"_ _0\"></span> the central bank schemes described in not<span class=\"_ _0\"></span>e 38. The Gr<span class=\"_ _0\"></span>oup has prepositioned </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf55\">further assets <span class=\"_ _0\"></span>with the Bank o<span class=\"_ _0\"></span>f England <span class=\"_ _0\"></span>which can be used to r<span class=\"_ _0\"></span>elease more funds <span class=\"_ _0\"></span>for liquidity<span class=\"_ _1\"></span> or other purposes. <span class=\"_ _1\"></span>At 30 September 2023 </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf56\">the amount of<span class=\"_ _0\"></span> drawings av<span class=\"_ _0\"></span>ailable in respect of<span class=\"_ _0\"></span> prepositioned assets <span class=\"_ _0\"></span>was \u00a31,<span class=\"_ _0\"></span>715.4m (2022: \u00a31,776.<span class=\"_ _0\"></span>0m).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsf58\">Additional liquidity<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf59\">The Group holds certain o<span class=\"_ _0\"></span>f its own list<span class=\"_ _0\"></span>ed, externally r<span class=\"_ _0\"></span>ated, asset backed securities <span class=\"_ _0\"></span>which may<span class=\"_ _0\"></span> be used as security t<span class=\"_ _0\"></span>o access term </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf5a\">credit and o<span class=\"_ _0\"></span>ther f<span class=\"_ _0\"></span>acilities, including those offer<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the Bank of<span class=\"_ _1\"></span> England. The principal v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>these notes is analysed b<span class=\"_ _0\"></span>y cr<span class=\"_ _0\"></span>edit </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf5b\">grade and utilisation status below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf5c\">2023<span class=\"_ _2df\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsf5d\">Utilised<span class=\"_ _7f\"> </span><span class=\"ff15\">A<span class=\"_ _0\"></span>vailable<span class=\"_ _a0\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _12a\"> </span><span class=\"ff17\">Utilised<span class=\"_ _1d4\"> </span>Available<span class=\"_ _276\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf5e\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsf5f\">Rating<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf60\">AAA<span class=\"_ _189\"> </span><span class=\"ff15\">222.1<span class=\"_ _d5\"> </span>986.9<span class=\"_ _86\"> </span>1,209.0<span class=\"_ _86\"> </span><span class=\"ff16\">1,212.7<span class=\"_ _d5\"> </span>213.0<span class=\"_ _86\"> </span>1,425.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf61\">AA+ / AA / AA-<span class=\"_ _ac\"> </span><span class=\"ff15\">5.3<span class=\"_ _150\"> </span>100.9<span class=\"_ _d5\"> </span>106.2<span class=\"_ _9e\"> </span><span class=\"ff16\">5.3<span class=\"_ _150\"> </span>100.9<span class=\"_ _150\"> </span>106.2<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf62\">A+ / A / A-<span class=\"_ _354\"> </span><span class=\"ff15\">3.1<span class=\"_ _3a\"> </span>59.9<span class=\"_ _3a\"> </span>63.0<span class=\"_ _9e\"> </span><span class=\"ff16\">4.6<span class=\"_ _3a\"> </span>59.9<span class=\"_ _3a\"> </span>64.5<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf63\">BBB+ / BBB / BBB-<span class=\"_ _116\"> </span><span class=\"ff15\">3.1<span class=\"_ _3a\"> </span>57.9<span class=\"_ _3a\"> </span>61.0<span class=\"_ _9e\"> </span><span class=\"ff16\">4.3<span class=\"_ _3a\"> </span>81.4<span class=\"_ _f7\"> </span>85.7<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf64\">233.6<span class=\"_ _86\"> </span>1,205.6<span class=\"_ _12a\"> </span>1,439.2<span class=\"_ _86\"> </span><span class=\"ff16\">1,226.9<span class=\"_ _d5\"> </span>455.2<span class=\"_ _86\"> </span>1,682.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf65\">As these notes ar<span class=\"_ _0\"></span>e held internally<span class=\"_ _1\"></span>, they<span class=\"_ _0\"></span> are not included in balance sheet<span class=\"_ _0\"></span> liabilities. Mortgage assets backing these securities r<span class=\"_ _1\"></span>emain </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf66\">on the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s balance sheet and are included in amounts pledged as collateral in no<span class=\"_ _0\"></span>te 18.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf67\">Utilised notes includes those <span class=\"_ _0\"></span>which the Gr<span class=\"_ _0\"></span>oup is obliged t<span class=\"_ _0\"></span>o hold under r<span class=\"_ _0\"></span>egulations governing securitisation issuance.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf68\">The av<span class=\"_ _0\"></span>ailable AAA<span class=\"_ _0\"></span> notes <span class=\"_ _0\"></span>would give access <span class=\"_ _0\"></span>to \u00a3769<span class=\"_ _0\"></span>.8m (2022: \u00a3171.6m) if<span class=\"_ _0\"></span> used to secur<span class=\"_ _0\"></span>e drawings on Bank o<span class=\"_ _0\"></span>f England f<span class=\"_ _0\"></span>acilities.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscb6\">During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2020<span class=\"_ _0\"></span>, the Gr<span class=\"_ _0\"></span>oup entered into a back<span class=\"_ _1\"></span>-to-back long / short sale and repur<span class=\"_ _0\"></span>chase (\u2018repo<span class=\"_ _1\"></span>\u2019) </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf69\">transaction with a UK<span class=\"_ _0\"></span> bank which continued <span class=\"_ _0\"></span>throughout <span class=\"_ _0\"></span>the current <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>. This pr<span class=\"_ _0\"></span>ovides \u00a3150<span class=\"_ _0\"></span>.0m of<span class=\"_ _0\"></span> liquidity (2022: \u00a3150<span class=\"_ _0\"></span>.0m<span class=\"_ _0\"></span>), utilising </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gscb8\">\u00a326.5m of <span class=\"_ _0\"></span>the loan notes shown abo<span class=\"_ _0\"></span>ve, but does not<span class=\"_ _0\"></span> appear on the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s balance sheet.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf6a\">The Group has also ent<span class=\"_ _0\"></span>ered into short-<span class=\"_ _0\"></span>term repo <span class=\"_ _0\"></span>transactions fr<span class=\"_ _0\"></span>om time-to-<span class=\"_ _0\"></span>time, most recently<span class=\"_ _0\"></span> during the curr<span class=\"_ _0\"></span>ent year<span class=\"_ _2\"></span>, and maintains </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf6b\">the capability <span class=\"_ _0\"></span>to access the r<span class=\"_ _0\"></span>epo market <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> liquidity purposes. <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>ransactions in place at 30 September 2023 utilised \u00a358.5m of<span class=\"_ _1\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf6c\">loan notes shown abo<span class=\"_ _0\"></span>ve (2022: \u00a3nil).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws2e gsf6e\">Contractual cash flows<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf6f\">The to<span class=\"_ _0\"></span>tal undiscounted amounts, inclusive of<span class=\"_ _0\"></span> estimated inter<span class=\"_ _0\"></span>est, which w<span class=\"_ _0\"></span>ould be payable in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> the non-securitisation </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf70\">borro<span class=\"_ _0\"></span>wings of <span class=\"_ _0\"></span>the Group and the Compan<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, should those balances r<span class=\"_ _0\"></span>emain outstanding until the contracted r<span class=\"_ _0\"></span>epayment date, or<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsf71\">earliest date on which r<span class=\"_ _0\"></span>epayment can be r<span class=\"_ _0\"></span>equired, ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf72\">Corpora<span class=\"_ _0\"></span>te  </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf73\">bonds<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf74\">Retail <span class=\"_ _0\"></span> </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf75\">bonds<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf76\">Central bank </div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsf77\">facilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf78\">Sale and </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf79\">repurchase </div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsf7a\">transactions<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf7b\">Lease </div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsf7c\">liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf7d\">T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf7e\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf7f\">a) The Group<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf80\">30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf81\">Pa<span class=\"_ _0\"></span>yable in:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf82\">Less than one year<span class=\"_ _be\"> </span><span class=\"ff15\">6.6<span class=\"_ _d5\"> </span>119.3<span class=\"_ _150\"> </span>147.8<span class=\"_ _3a\"> </span>50.8<span class=\"_ _9e\"> </span>2.6<span class=\"_ _d5\"> </span>327.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf83\">One to two year<span class=\"_ _0\"></span>s<span class=\"_ _16f\"> </span><span class=\"ff15\">6.6<span class=\"_ _43\"> </span>-<span class=\"_ _cb\"> </span>151.3<span class=\"_ _43\"> </span>-<span class=\"_ _9b\"> </span>2.4<span class=\"_ _150\"> </span>160.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf84\">T<span class=\"_ _0\"></span>wo to five y<span class=\"_ _0\"></span>ears<span class=\"_ _7c\"> </span><span class=\"ff15\">19.7<span class=\"_ _43\"> </span>-<span class=\"_ _133\"> </span>2,788.2<span class=\"_ _43\"> </span>-<span class=\"_ _a8\"> </span>3.4<span class=\"_ _12a\"> </span>2,811.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf85\">Over five y<span class=\"_ _0\"></span>ears<span class=\"_ _fd\"> </span><span class=\"ff15\">169.6<span class=\"_ _43\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span>0.5<span class=\"_ _d5\"> </span>170.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf86\">202.5<span class=\"_ _d5\"> </span>119.3<span class=\"_ _86\"> </span>3,087.3<span class=\"_ _cb\"> </span>50.8<span class=\"_ _9e\"> </span>8.9<span class=\"_ _86\"> </span>3,468.8<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf87\">30 September 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf88\">Pa<span class=\"_ _0\"></span>yable in:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf89\">Less than one year<span class=\"_ _be\"> </span><span class=\"ff16\">6.6<span class=\"_ _9e\"> </span>6.8<span class=\"_ _150\"> </span>101.4<span class=\"_ _43\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.0<span class=\"_ _d5\"> </span>116.8<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf8a\">One to two year<span class=\"_ _0\"></span>s<span class=\"_ _16f\"> </span><span class=\"ff16\">6.6<span class=\"_ _150\"> </span>119.2<span class=\"_ _150\"> </span>123.8<span class=\"_ _43\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.7<span class=\"_ _d5\"> </span>251.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf8b\">T<span class=\"_ _0\"></span>wo to five y<span class=\"_ _0\"></span>ears<span class=\"_ _7c\"> </span><span class=\"ff16\">19.7<span class=\"_ _43\"> </span></span>-<span class=\"_ _12b\"> </span><span class=\"ff16\">2,905.0<span class=\"_ _43\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">3.5<span class=\"_ _86\"> </span>2,928.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf8c\">Over five y<span class=\"_ _0\"></span>ears<span class=\"_ _fd\"> </span><span class=\"ff16\">176.2<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.9<span class=\"_ _150\"> </span>178.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff16 fs1 fc1 sc0 ls0 ws0 gsf8d\">209.1<span class=\"_ _d5\"> </span>126.0<span class=\"_ _86\"> </span>3,130.2<span class=\"_ _43\"> </span><span class=\"ff17\">-<span class=\"_ _a8\"> </span></span>9.1<span class=\"_ _86\"> </span>3,474.4<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf8e\">Corpora<span class=\"_ _0\"></span>te </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf8f\">bonds<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf90\">Retail<span class=\"_ _0\"></span> </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf91\">bonds<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf92\">Lease </div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsf93\">liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf94\">T<span class=\"_ _2\"></span>otal </div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf95\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf96\">b) The Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf97\">30 September 2023<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf98\">Pa<span class=\"_ _0\"></span>yable in:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf99\">Less than one year<span class=\"_ _2d1\"> </span><span class=\"ff15\">6.6<span class=\"_ _d5\"> </span>119.3<span class=\"_ _9e\"> </span>1.7<span class=\"_ _d5\"> </span>127.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf9a\">One to two year<span class=\"_ _0\"></span>s<span class=\"_ _1b5\"> </span><span class=\"ff15\">6.6<span class=\"_ _43\"> </span>-<span class=\"_ _a8\"> </span>1.7<span class=\"_ _d1\"> </span>8.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf9b\">T<span class=\"_ _0\"></span>wo to five y<span class=\"_ _0\"></span>ears<span class=\"_ _24f\"> </span><span class=\"ff15\">19.7<span class=\"_ _a8\"> </span>-<span class=\"_ _a8\"> </span>5.0<span class=\"_ _3a\"> </span>24.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsf9c\">Over five y<span class=\"_ _0\"></span>ears<span class=\"_ _1ab\"> </span><span class=\"ff15\">169.6<span class=\"_ _a8\"> </span>-<span class=\"_ _a8\"> </span>7.0<span class=\"_ _d5\"> </span>176.6<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf9d\">202.5<span class=\"_ _d5\"> </span>119.3<span class=\"_ _3a\"> </span>15.4<span class=\"_ _d5\"> </span>337.2<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsf9e\">30 September 2022<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsf9f\">Pa<span class=\"_ _0\"></span>yable in:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsfa0\">Less than one year<span class=\"_ _2d1\"> </span><span class=\"ff16\">6.6<span class=\"_ _9e\"> </span>6.8<span class=\"_ _9e\"> </span>1.7<span class=\"_ _3a\"> </span>15.1<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsfa1\">One to two year<span class=\"_ _0\"></span>s<span class=\"_ _1b5\"> </span><span class=\"ff16\">6.6<span class=\"_ _150\"> </span>119.2<span class=\"_ _9e\"> </span>1.7<span class=\"_ _150\"> </span>127.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsfa2\">T<span class=\"_ _0\"></span>wo to five y<span class=\"_ _0\"></span>ears<span class=\"_ _24f\"> </span><span class=\"ff16\">19.7<span class=\"_ _43\"> </span></span>-<span class=\"_ _9b\"> </span><span class=\"ff16\">5.0<span class=\"_ _f7\"> </span>24.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsfa3\">Over five y<span class=\"_ _0\"></span>ears<span class=\"_ _1ab\"> </span><span class=\"ff16\">176.2<span class=\"_ _a8\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">8.7<span class=\"_ _150\"> </span>184.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h27 ff16 fs1 fc1 sc0 ls0 ws0 gsfa4\">209.1<span class=\"_ _d5\"> </span>126.0<span class=\"_ _f7\"> </span>17.1<span class=\"_ _150\"> </span>352.2<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfa5\">Amounts payable in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> the \u2018<span class=\"_ _0\"></span>other accruals<span class=\"_ _0\"></span>\u2019 and \u2018trade cr<span class=\"_ _0\"></span>editors\u2019 shown in no<span class=\"_ _0\"></span>te 40 fall due <span class=\"_ _0\"></span>within one year<span class=\"_ _1\"></span>. T<span class=\"_ _0\"></span>he cash flow<span class=\"_ _0\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfa6\">described above <span class=\"_ _0\"></span>will include those <span class=\"_ _0\"></span>for int<span class=\"_ _0\"></span>erest on borr<span class=\"_ _0\"></span>owings accrued at 30 September<span class=\"_ _0\"></span> 2023 disclosed in note 40<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfa8\">The cash flo<span class=\"_ _0\"></span>ws which ar<span class=\"_ _0\"></span>e expected t<span class=\"_ _0\"></span>o arise from deriv<span class=\"_ _0\"></span>ative contracts in place at <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear end, estimating <span class=\"_ _0\"></span>future floating r<span class=\"_ _0\"></span>ate payments </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfa9\">and receipts on <span class=\"_ _0\"></span>the basis of<span class=\"_ _0\"></span> the yield curv<span class=\"_ _0\"></span>e at the balance sheet dat<span class=\"_ _0\"></span>e are as f<span class=\"_ _0\"></span>ollows:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsfaa\">2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsfab\">T<span class=\"_ _2\"></span>otal cash </div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsfac\">outflow / (inflow)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsfad\">T<span class=\"_ _2\"></span>otal cash<span class=\"ff16\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gsfae\">outflow / (inflow)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsfaf\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsfb0\">On derivativ<span class=\"_ _0\"></span>e liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsfb1\">Pa<span class=\"_ _0\"></span>yable in less than one year<span class=\"_ _20b\"> </span><span class=\"ff15\">52.8<span class=\"_ _cb\"> </span><span class=\"ff16\">88.8<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsfb2\">Pa<span class=\"_ _0\"></span>yable in one to two y<span class=\"_ _0\"></span>ears<span class=\"_ _304\"> </span><span class=\"ff15\">(5.9)<span class=\"_ _84\"> </span><span class=\"ff16\">24.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsfb3\">Pa<span class=\"_ _0\"></span>yable in two to fiv<span class=\"_ _0\"></span>e years<span class=\"_ _29b\"> </span><span class=\"ff15\">8.7<span class=\"_ _9e\"> </span><span class=\"ff16\">3.6<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsfb4\">Pa<span class=\"_ _0\"></span>yable in over fiv<span class=\"_ _0\"></span>e years<span class=\"_ _355\"> </span><span class=\"ff15\">0.3<span class=\"_ _9e\"> </span><span class=\"ff16\">0.1<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsfb5\">55.9<span class=\"_ _d5\"> </span><span class=\"ff16\">116.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gsfb6\">On derivativ<span class=\"_ _0\"></span>e assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsfb7\">Pa<span class=\"_ _0\"></span>yable in less than one year<span class=\"_ _221\"> </span><span class=\"ff15\">(218.2)<span class=\"_ _b6\"> </span></span>(253.1)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsfb8\">Pa<span class=\"_ _0\"></span>yable in one to two y<span class=\"_ _0\"></span>ears<span class=\"_ _298\"> </span><span class=\"ff15\">(175.4)<span class=\"_ _b6\"> </span></span>(246.2)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsfb9\">Pa<span class=\"_ _0\"></span>yable in two to fiv<span class=\"_ _0\"></span>e years<span class=\"_ _eb\"> </span><span class=\"ff15\">(162.3)<span class=\"_ _b6\"> </span></span>(342.0)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gsfba\">Pa<span class=\"_ _0\"></span>yable in over fiv<span class=\"_ _0\"></span>e years<span class=\"_ _201\"> </span><span class=\"ff15\">-<span class=\"_ _fb\"> </span></span>(2.7)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsfbb\">(555.9)<span class=\"_ _110\"> </span><span class=\"ff17\">(844.0)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gsfbc\">(500.0)<span class=\"_ _110\"> </span><span class=\"ff17\">(727.5)<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gsfbd\">65. <span class=\"_ _1c\"></span>Mark<span class=\"_ _0\"></span>et risk<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfbe\">Market risk<span class=\"_ _0\"></span> is the risk <span class=\"_ _0\"></span>that the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value or<span class=\"_ _0\"></span> future cash <span class=\"_ _0\"></span>flows o<span class=\"_ _0\"></span>f a financial instrument <span class=\"_ _0\"></span>will fluctuate because of<span class=\"_ _1\"></span> changes in market </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfbf\">prices. T<span class=\"_ _0\"></span>he Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s exposure to mark<span class=\"_ _0\"></span>et risk is mainly<span class=\"_ _0\"></span> thr<span class=\"_ _0\"></span>ough interest r<span class=\"_ _0\"></span>ate risk, though <span class=\"_ _0\"></span>there is some minor<span class=\"_ _0\"></span> exposure <span class=\"_ _0\"></span>to currency<span class=\"_ _1\"></span> risk. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfc0\">These exposur<span class=\"_ _0\"></span>es arise solely <span class=\"_ _0\"></span>through the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s lending and deposit taking business - no speculative tr<span class=\"_ _0\"></span>ading in financial instruments </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfc1\">is undertaken. </div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsfc2\">Interest rat<span class=\"_ _0\"></span>e risk<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfc3\">Interest r<span class=\"_ _0\"></span>ate risk is the curr<span class=\"_ _0\"></span>ent or<span class=\"_ _0\"></span> prospective risk<span class=\"_ _0\"></span> to capital or<span class=\"_ _0\"></span> earnings arising from adv<span class=\"_ _0\"></span>erse mov<span class=\"_ _0\"></span>ements in interest rat<span class=\"_ _0\"></span>es. The<span class=\"_ _0\"></span> </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfc4\">Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s exposure <span class=\"_ _0\"></span>to this risk is a natural consequence o<span class=\"_ _0\"></span>f its lending, deposit-<span class=\"_ _0\"></span>taking and other borr<span class=\"_ _0\"></span>owing activities, as some of<span class=\"_ _0\"></span> its </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfc5\">financial assets and liabilities bear int<span class=\"_ _0\"></span>erest at rat<span class=\"_ _0\"></span>es which float <span class=\"_ _0\"></span>with v<span class=\"_ _0\"></span>arious market r<span class=\"_ _0\"></span>ates while others ar<span class=\"_ _0\"></span>e fix<span class=\"_ _0\"></span>ed, either <span class=\"_ _0\"></span>for a <span class=\"_ _0\"></span>term </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfc6\">or <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>their <span class=\"_ _0\"></span>whole lives. Such risk is r<span class=\"_ _0\"></span>eferr<span class=\"_ _0\"></span>ed to as Inter<span class=\"_ _0\"></span>est Rate Risk in <span class=\"_ _0\"></span>the Banking Book (\u2018IRRBB\u2019). The Gr<span class=\"_ _0\"></span>oup does not seek <span class=\"_ _0\"></span>to </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfc7\">generate income <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>taking interest rat<span class=\"_ _0\"></span>e risk and aims to minimise exposur<span class=\"_ _0\"></span>es that occur<span class=\"_ _0\"></span> as a natural consequence of<span class=\"_ _0\"></span> carrying out </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfc8\">its normal business activities.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfc9\">The principal marke<span class=\"_ _0\"></span>t-set inter<span class=\"_ _0\"></span>est rate used by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup has historically been LIBOR, which has been used <span class=\"_ _0\"></span>to set rates <span class=\"_ _0\"></span>for certain<span class=\"_ _0\"></span> </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfca\">loan assets and borro<span class=\"_ _0\"></span>wings. Howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, the Group complet<span class=\"_ _0\"></span>ed its transition t<span class=\"_ _0\"></span>o the use of<span class=\"_ _0\"></span> alternative r<span class=\"_ _0\"></span>eference r<span class=\"_ _0\"></span>ates, principally<span class=\"_ _0\"></span> </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfcb\">SONIA, during the y<span class=\"_ _0\"></span>ear ended 30 Sept<span class=\"_ _0\"></span>ember 2022. <span class=\"_ _0\"></span>All new<span class=\"_ _0\"></span> wholesale debt and inter<span class=\"_ _0\"></span>est rate s<span class=\"_ _0\"></span>waps recognised since <span class=\"_ _0\"></span>that point hav<span class=\"_ _0\"></span>e </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfcc\">ref<span class=\"_ _0\"></span>erenced SONIA, while existing LIBOR linked instruments <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e transitioned bef<span class=\"_ _0\"></span>ore the start<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the current <span class=\"_ _0\"></span>financial year<span class=\"_ _2\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfcd\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s risk management <span class=\"_ _0\"></span>framework<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> IRRBB continues to ev<span class=\"_ _0\"></span>olve in line with updat<span class=\"_ _0\"></span>es in regulatory<span class=\"_ _0\"></span> guidance on methods </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfce\">expected t<span class=\"_ _0\"></span>o be used by bank<span class=\"_ _0\"></span>s measuring, managing, monitoring and controlling such risk<span class=\"_ _0\"></span>s. </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfcf\">IRRBB is managed thr<span class=\"_ _0\"></span>ough board appro<span class=\"_ _0\"></span>ved risk appetit<span class=\"_ _0\"></span>e limits and policies. The Gr<span class=\"_ _0\"></span>oup seeks to mat<span class=\"_ _0\"></span>ch the structure o<span class=\"_ _0\"></span>f assets </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfd0\">and liabilities naturally <span class=\"_ _0\"></span>where possible or<span class=\"_ _0\"></span> by<span class=\"_ _0\"></span> using appropriate <span class=\"_ _0\"></span>financial instruments, such as interest r<span class=\"_ _0\"></span>ate swaps. Da<span class=\"_ _0\"></span>y-to-da<span class=\"_ _0\"></span>y </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls30 ws0 gsfd1\">management of<span class=\"_ _0\"></span> interest<span class=\"_ _0\"></span> rate risk is the r<span class=\"_ _0\"></span>esponsibility o<span class=\"_ _0\"></span>f the Gr<span class=\"_ _1\"></span>oup\u2019<span class=\"_ _1\"></span>s T<span class=\"_ _2\"></span>reasury <span class=\"_ _0\"></span>function, with contr<span class=\"_ _0\"></span>ol and oversight<span class=\"_ _0\"></span> provided b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>AL<span class=\"_ _0\"></span>CO.<span class=\"_ _36a\"> </span><span class=\"_ _0\"></span> </div><div class=\"t m2 h3 ff12 fs1 fc1 sc0 ls0 ws0 gsfd3\">IRRBB exposures<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfd4\">Risk exposur<span class=\"_ _0\"></span>e in the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s operations might occur<span class=\"_ _0\"></span> through:<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfd5\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>Duration or<span class=\"_ _1\"></span> repricing risk. The risk<span class=\"_ _0\"></span> created <span class=\"_ _0\"></span>when interest rat<span class=\"_ _0\"></span>es on assets, liabilities and off-balance sheet<span class=\"_ _0\"></span> items reprice at differ<span class=\"_ _1\"></span>ent </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfd6\">times causing them <span class=\"_ _0\"></span>to move b<span class=\"_ _0\"></span>y differ<span class=\"_ _0\"></span>ent amounts<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfd7\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>Basis risk. <span class=\"_ _0\"></span>The risk arising <span class=\"_ _0\"></span>where assets and liabilities r<span class=\"_ _0\"></span>eprice with r<span class=\"_ _0\"></span>eference <span class=\"_ _0\"></span>to differ<span class=\"_ _0\"></span>ent ref<span class=\"_ _0\"></span>erence inter<span class=\"_ _0\"></span>est rates, f<span class=\"_ _0\"></span>or example r<span class=\"_ _0\"></span>ates </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfd8\">set by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup and market r<span class=\"_ _0\"></span>ates, such as Bank of<span class=\"_ _0\"></span> England base rate and SONIA. Relative chang<span class=\"_ _0\"></span>es in the differ<span class=\"_ _0\"></span>ence between the </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfd9\">ref<span class=\"_ _0\"></span>erence rates o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> time may<span class=\"_ _0\"></span> impact earnings<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfda\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>Optionality<span class=\"_ _0\"></span> or pr<span class=\"_ _0\"></span>epayment risk. <span class=\"_ _0\"></span>The risk <span class=\"_ _0\"></span>that settlement of<span class=\"_ _0\"></span> asset and liability balances at<span class=\"_ _0\"></span> different <span class=\"_ _0\"></span>times fr<span class=\"_ _0\"></span>om those f<span class=\"_ _0\"></span>orecast due <span class=\"_ _0\"></span>to </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfdb\">economic conditions or customer<span class=\"_ _1\"></span> behaviour may<span class=\"_ _0\"></span> create a mismatch in <span class=\"_ _0\"></span>future periods<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfdc\">Due to <span class=\"_ _0\"></span>the maturity <span class=\"_ _0\"></span>transformation inherent<span class=\"_ _0\"></span> in the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s business model it is also exposed t<span class=\"_ _0\"></span>o the risk that<span class=\"_ _0\"></span> the relationship be<span class=\"_ _0\"></span>tween </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfdd\">the rates affecting <span class=\"_ _0\"></span>the shorter<span class=\"_ _0\"></span>-term funding balance and <span class=\"_ _0\"></span>the rates affecting <span class=\"_ _0\"></span>the longer <span class=\"_ _0\"></span>term lending balance will ha<span class=\"_ _0\"></span>ve alter<span class=\"_ _0\"></span>ed when the </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfde\">funding has to be r<span class=\"_ _0\"></span>efinanced.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfdf\">The Group measur<span class=\"_ _0\"></span>es these risks <span class=\"_ _0\"></span>through a combination of<span class=\"_ _1\"></span> economic value and earnings-based measures considering pr<span class=\"_ _0\"></span>epayment risk:<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfe0\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>E<span class=\"_ _0\"></span>conomic V<span class=\"_ _1\"></span>alue (\u2018EV\u2019) \u2013 a range of<span class=\"_ _0\"></span> parallel and non-parallel inter<span class=\"_ _0\"></span>est rate str<span class=\"_ _0\"></span>esses are applied <span class=\"_ _0\"></span>to assess the change in mark<span class=\"_ _0\"></span>et v<span class=\"_ _0\"></span>alue </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfe1\">from assets, liabilities and o<span class=\"_ _0\"></span>ff balance sheet items r<span class=\"_ _0\"></span>epricing at differ<span class=\"_ _0\"></span>ent times<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfe2\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>Net Int<span class=\"_ _0\"></span>erest Income (\u2018NII\u2019) - impact on earnings from a r<span class=\"_ _0\"></span>ange of<span class=\"_ _0\"></span> interest rat<span class=\"_ _0\"></span>e stresses<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfe3\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s use of <span class=\"_ _0\"></span>financial derivatives <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> hedging interest rat<span class=\"_ _0\"></span>e risk relating <span class=\"_ _0\"></span>to its fix<span class=\"_ _0\"></span>ed rate lending, deposit <span class=\"_ _0\"></span>taking and borrowing </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfe4\">activities is discussed further<span class=\"_ _0\"></span> in note 26.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gsfe5\">Interest r<span class=\"_ _0\"></span>ate sensitivity<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfe6\">T<span class=\"_ _2\"></span>o provide a br<span class=\"_ _0\"></span>oad indication of <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s exposure <span class=\"_ _0\"></span>to interest r<span class=\"_ _0\"></span>ate movements, <span class=\"_ _0\"></span>the notional impact of<span class=\"_ _0\"></span> a 1.0% change in UK<span class=\"_ _0\"></span> interest </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfe7\">rates on the equity<span class=\"_ _1\"></span> of the Gr<span class=\"_ _0\"></span>oup at 30 September<span class=\"_ _0\"></span> 2023, and the notional annualised impact of<span class=\"_ _0\"></span> such a change on <span class=\"_ _0\"></span>the operating profit<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfe8\">of <span class=\"_ _0\"></span>the Group, based on <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear<span class=\"_ _0\"></span>-end balance sheet have been calculated. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfe9\">As a simplification this calculation assumes <span class=\"_ _0\"></span>that all rele<span class=\"_ _0\"></span>vant UK int<span class=\"_ _0\"></span>erest rates mo<span class=\"_ _0\"></span>ve by<span class=\"_ _1\"></span> the same amount in parallel and that all </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfea\">repricing <span class=\"_ _0\"></span>takes place at <span class=\"_ _0\"></span>the balance sheet date.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfeb\">On this basis, a 1.<span class=\"_ _0\"></span>0% increase in UK int<span class=\"_ _0\"></span>erest rates <span class=\"_ _0\"></span>would incr<span class=\"_ _0\"></span>ease profit be<span class=\"_ _0\"></span>fore <span class=\"_ _0\"></span>tax by<span class=\"_ _0\"></span> \u00a316.<span class=\"_ _0\"></span>1m (2022: increase by<span class=\"_ _0\"></span> \u00a321.7m<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfec\">The principal direct<span class=\"_ _0\"></span> point in time impact on <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s equity w<span class=\"_ _0\"></span>ould result fr<span class=\"_ _0\"></span>om the r<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>aluation of deriv<span class=\"_ _0\"></span>ative assets and liabilities </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfed\">which are not<span class=\"_ _0\"></span> part of <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value hedges at<span class=\"_ _0\"></span> the balance sheet date. <span class=\"_ _1\"></span>A 1.0% incr<span class=\"_ _0\"></span>ease in rate expectations <span class=\"_ _0\"></span>would increase equity<span class=\"_ _0\"></span> by<span class=\"_ _0\"></span> \u00a316.0m </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfee\">(2022: increase b<span class=\"_ _0\"></span>y \u00a334.<span class=\"_ _0\"></span>6m). F<span class=\"_ _1\"></span>or <span class=\"_ _0\"></span>this illustration no ineffectiveness in hedging r<span class=\"_ _0\"></span>elationships is assumed.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfef\">These calculations allow<span class=\"_ _0\"></span> only f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the direct eff<span class=\"_ _0\"></span>ects of an<span class=\"_ _0\"></span>y change in UK<span class=\"_ _0\"></span> interest r<span class=\"_ _0\"></span>ates. In practice, such a change might hav<span class=\"_ _0\"></span>e wider<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsff0\">economic consequences which <span class=\"_ _0\"></span>would themselv<span class=\"_ _0\"></span>es potentially aff<span class=\"_ _0\"></span>ect the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s business and results.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsff1\">It should be noted <span class=\"_ _0\"></span>that these sensitivities ar<span class=\"_ _0\"></span>e illustrative only<span class=\"_ _1\"></span>, and much simplified from those used <span class=\"_ _0\"></span>to manage IRRBB in practice.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gsff2\">The Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsff3\">All the borr<span class=\"_ _0\"></span>owings of<span class=\"_ _0\"></span> the Company<span class=\"_ _0\"></span> have <span class=\"_ _0\"></span>fixed inter<span class=\"_ _0\"></span>est rates. <span class=\"_ _0\"></span>The Company\u2019<span class=\"_ _1\"></span>s investments in loans <span class=\"_ _0\"></span>to subsidiary companies include </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsff4\">a T<span class=\"_ _0\"></span>ier-<span class=\"_ _1\"></span>2 Bond issued by Par<span class=\"_ _0\"></span>agon Bank PL<span class=\"_ _0\"></span>C, <span class=\"_ _0\"></span>with terms matching <span class=\"_ _0\"></span>the Tier<span class=\"_ _1\"></span>-2 Bond issued by<span class=\"_ _0\"></span> the Compan<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>. Its intercompany<span class=\"_ _0\"></span> balance </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsff5\">with Paragon Bank<span class=\"_ _0\"></span> (note 27) also includes \u00a3193.<span class=\"_ _0\"></span>6m which is placed on deposit <span class=\"_ _0\"></span>with the Bank of<span class=\"_ _0\"></span> England (2022: \u00a3257<span class=\"_ _2\"></span>.0m). Inter<span class=\"_ _0\"></span>est is </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsff6\">receiv<span class=\"_ _0\"></span>ed on this balance at <span class=\"_ _0\"></span>the same rate as that paid b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Bank of England. Other<span class=\"_ _1\"></span> assets and liabilities with group entities bear<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsff7\">interest at<span class=\"_ _0\"></span> rates based on SONIA. All other<span class=\"_ _0\"></span> balances in the Compan<span class=\"_ _0\"></span>y balance sheet ar<span class=\"_ _0\"></span>e non-interest<span class=\"_ _0\"></span> bearing. </div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gsff9\">Currency<span class=\"_ _0\"></span> risk<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsffa\">Currenc<span class=\"_ _0\"></span>y risk, also r<span class=\"_ _0\"></span>eferred <span class=\"_ _0\"></span>to as for<span class=\"_ _0\"></span>eign ex<span class=\"_ _0\"></span>change or <span class=\"_ _0\"></span>fore<span class=\"_ _0\"></span>x risk, is the risk <span class=\"_ _0\"></span>that the fair<span class=\"_ _1\"></span> value or<span class=\"_ _0\"></span> future cash <span class=\"_ _0\"></span>flows of<span class=\"_ _1\"></span> a financial </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsffb\">instrument will <span class=\"_ _0\"></span>fluctuate because of chang<span class=\"_ _0\"></span>es in for<span class=\"_ _0\"></span>eign exchang<span class=\"_ _0\"></span>e rates.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsffc\">The Group has little appe<span class=\"_ _0\"></span>tite for<span class=\"_ _0\"></span> material amounts of<span class=\"_ _0\"></span> exposure <span class=\"_ _0\"></span>to currenc<span class=\"_ _0\"></span>y risk and applies a hedging strat<span class=\"_ _0\"></span>egy f<span class=\"_ _0\"></span>or any<span class=\"_ _0\"></span> material open </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsffd\">positions thr<span class=\"_ _0\"></span>ough the use of<span class=\"_ _0\"></span> spot or<span class=\"_ _0\"></span> forw<span class=\"_ _0\"></span>ard contracts or<span class=\"_ _0\"></span> derivatives.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsffe\">All the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s significant assets and liabilities at 30 September 2023 and 30 Sept<span class=\"_ _0\"></span>ember 2022 ar<span class=\"_ _0\"></span>e denominated in sterling. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gsfff\">The SME lending business has a limited amount of<span class=\"_ _0\"></span> lending denominated in US dollars, principally \u00a37<span class=\"_ _2\"></span>.6m of<span class=\"_ _0\"></span> aircraft mortg<span class=\"_ _0\"></span>age balances. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1000\">It may<span class=\"_ _0\"></span> also contract to pur<span class=\"_ _0\"></span>chase assets f<span class=\"_ _0\"></span>or leasing in curr<span class=\"_ _0\"></span>ency<span class=\"_ _1\"></span>. These balances are hedg<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the purchase o<span class=\"_ _0\"></span>f curr<span class=\"_ _0\"></span>ency deriv<span class=\"_ _0\"></span>atives </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1001\">and / or appr<span class=\"_ _0\"></span>opriate currenc<span class=\"_ _0\"></span>y balances. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws33 gs1002\">As a result o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>these arrangements the Gr<span class=\"_ _0\"></span>oup has no material exposur<span class=\"_ _0\"></span>e to <span class=\"_ _0\"></span>foreign curr<span class=\"_ _0\"></span>ency<span class=\"_ _0\"></span> risk, and no sensitivity analysis is pr<span class=\"_ _0\"></span>esented </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1003\">for<span class=\"_ _0\"></span> currency<span class=\"_ _0\"></span> risk. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1004\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s use of <span class=\"_ _0\"></span>financial derivatives <span class=\"_ _0\"></span>to manage curr<span class=\"_ _0\"></span>ency risk<span class=\"_ _0\"></span> is described further<span class=\"_ _0\"></span> in note 26.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs9ec\">None of <span class=\"_ _0\"></span>the assets or<span class=\"_ _0\"></span> liabilities of <span class=\"_ _0\"></span>the Company ar<span class=\"_ _0\"></span>e denominated in f<span class=\"_ _0\"></span>oreign currencies. </div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialRiskManagementExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-398": {
   "value": "63. <span class=\"_ _96\"></span>Credit risk<span class=\"_ _36a\"> </span>The assets of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup and the Company<span class=\"_ _0\"></span> which ar<span class=\"_ _0\"></span>e subject to cr<span class=\"_ _0\"></span>edit risk ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _180\"> </span>The Company<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _a0\"> </span></span>2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Financial assets at amortised cos<span class=\"_ _0\"></span>t<span class=\"_ _36a\"> </span>Loans to customer<span class=\"_ _0\"></span>s<span class=\"_ _2b4\"> </span><span class=\"ff2c\">18<span class=\"_ _12a\"> </span><span class=\"ff15\">14,874.3<span class=\"_ _42\"> </span><span class=\"ff16\">14,210.3<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span></span></span>-<span class=\"_ _36a\"> </span>T<span class=\"_ _1\"></span>rade receivables<span class=\"_ _26f\"> </span><span class=\"ff2c\">27<span class=\"_ _9b\"> </span><span class=\"ff15\">1.5<span class=\"_ _9e\"> </span><span class=\"ff16\">1.9<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span></span></span>-<span class=\"_ _36a\"> </span>Intra-gr<span class=\"_ _0\"></span>oup cash deposits<span class=\"_ _153\"> </span><span class=\"ff2c\">27<span class=\"_ _10b\"> </span><span class=\"ff15\">-<span class=\"_ _18b\"> </span>193.6<span class=\"_ _36a\"> </span></span></span>Amounts owed by Gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _64\"> </span><span class=\"ff2c\">27<span class=\"_ _10b\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span></span>-<span class=\"_ _d1\"> </span><span class=\"ff15\">35.1<span class=\"_ _3a\"> </span><span class=\"ff16\">39.1<span class=\"_ _36a\"> </span></span></span>Cash<span class=\"_ _1b1\"> </span><span class=\"ff2c\">17<span class=\"_ _133\"> </span><span class=\"ff15\">2,994.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,930.9<span class=\"_ _3a\"> </span></span>27.6<span class=\"_ _3a\"> </span><span class=\"ff16\">19.7<span class=\"_ _36a\"> </span></span></span></span>CRDs<span class=\"_ _2df\"> </span><span class=\"ff2c\">27<span class=\"_ _40\"> </span><span class=\"ff15\">38.0<span class=\"_ _3a\"> </span><span class=\"ff16\">30.2<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span></span></span>-<span class=\"_ _36a\"> </span>Accrued inter<span class=\"_ _0\"></span>est income<span class=\"_ _252\"> </span><span class=\"ff2c\">27<span class=\"_ _9b\"> </span><span class=\"ff15\">4.6<span class=\"_ _9e\"> </span><span class=\"ff16\">1.0<span class=\"_ _9e\"> </span></span>0.1<span class=\"_ _9e\"> </span><span class=\"ff16\">0.1<span class=\"_ _36a\"> </span></span></span></span>17,912.7<span class=\"_ _42\"> </span><span class=\"ff16\">16,174.3<span class=\"_ _150\"> </span></span>256.4<span class=\"_ _3a\"> </span><span class=\"ff16\">58.9<span class=\"_ _36a\"> </span></span>Financial assets at f<span class=\"_ _0\"></span>air value<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial assets<span class=\"_ _c3\"> </span><span class=\"ff2c\">26<span class=\"_ _cb\"> </span><span class=\"ff15\">615.4<span class=\"_ _d5\"> </span><span class=\"ff16\">779.0<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span></span></span>-<span class=\"_ _36a\"> </span>Maximum exposur<span class=\"_ _0\"></span>e to credit risk<span class=\"_ _273\"> </span>18,528.1<span class=\"_ _42\"> </span><span class=\"ff16\">16,953.3<span class=\"_ _150\"> </span></span>256.4<span class=\"_ _3a\"> </span><span class=\"ff16\">58.9<span class=\"_ _36a\"> </span></span>While this maximum exposur<span class=\"_ _0\"></span>e repr<span class=\"_ _0\"></span>esents the potential loss <span class=\"_ _0\"></span>which might hav<span class=\"_ _0\"></span>e to be accounted <span class=\"_ _0\"></span>for b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group, <span class=\"_ _0\"></span>the terms on which a significant proportion o<span class=\"_ _0\"></span>f the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s loan assets are funded, described under<span class=\"_ _0\"></span> Liquidity Risk in no<span class=\"_ _0\"></span>te 64, limit the amount<span class=\"_ _0\"></span> of principal repa<span class=\"_ _0\"></span>yments on the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s securitised and war<span class=\"_ _0\"></span>ehouse borro<span class=\"_ _0\"></span>wings in cases of capital losses on assets, consider<span class=\"_ _0\"></span>ably r<span class=\"_ _0\"></span>educing the effective shar<span class=\"_ _1\"></span>eholder v<span class=\"_ _0\"></span>alue at risk.<span class=\"_ _36a\"> </span>All financial assets at amortised cost ar<span class=\"_ _0\"></span>e subject t<span class=\"_ _0\"></span>o the requir<span class=\"_ _0\"></span>ements of<span class=\"_ _0\"></span> IFRS 9 relating to impairment.<span class=\"_ _36a\"> </span>F<span class=\"_ _0\"></span>urther inf<span class=\"_ _0\"></span>ormation on the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s exposure <span class=\"_ _0\"></span>to credit risk<span class=\"_ _0\"></span> by asse<span class=\"_ _0\"></span>t type, including the cr<span class=\"_ _0\"></span>edit quality<span class=\"_ _0\"></span> of assets and an<span class=\"_ _0\"></span>y potential concentrations of<span class=\"_ _0\"></span> credit risk, is set out<span class=\"_ _0\"></span> below <span class=\"_ _0\"></span>for:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _1b\"> </span>Loans to customers<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Cash balances (including CSA assets, CRDs and accrued int<span class=\"_ _0\"></span>erest)<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>T<span class=\"_ _1\"></span>rade receiv<span class=\"_ _0\"></span>ables<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Derivative financial assets<span class=\"_ _36a\"> </span>Loans to customers<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s credit risk is primarily<span class=\"_ _1\"></span> attributable to its loans to customers and its business objectiv<span class=\"_ _0\"></span>es rely<span class=\"_ _0\"></span> on maintaining a high-quality customer base and place str<span class=\"_ _0\"></span>ong emphasis on prudent cr<span class=\"_ _0\"></span>edit management, both at <span class=\"_ _0\"></span>the time of<span class=\"_ _0\"></span> acquiring or underwriting a ne<span class=\"_ _0\"></span>w loan, where r<span class=\"_ _0\"></span>obust lending criteria are applied, and <span class=\"_ _0\"></span>throughout <span class=\"_ _0\"></span>the loan\u2019<span class=\"_ _1\"></span>s life.<span class=\"_ _36a\"> </span>Primary r<span class=\"_ _0\"></span>esponsibility <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the management of<span class=\"_ _0\"></span> credit risk<span class=\"_ _0\"></span> relating <span class=\"_ _0\"></span>to lending activities across <span class=\"_ _0\"></span>the Group lies with <span class=\"_ _0\"></span>the Credit Committ<span class=\"_ _0\"></span>ee. The Credit<span class=\"_ _0\"></span> Committee, which r<span class=\"_ _0\"></span>eports to the ERC<span class=\"_ _0\"></span>, is made up of senior<span class=\"_ _1\"></span> employees, drawn fr<span class=\"_ _0\"></span>om financial and risk <span class=\"_ _0\"></span>functions independent of<span class=\"_ _0\"></span> the underwriting process. It<span class=\"_ _0\"></span> is chaired by<span class=\"_ _0\"></span> the Cr<span class=\"_ _0\"></span>edit Risk Dir<span class=\"_ _0\"></span>ector<span class=\"_ _1\"></span>. Its key<span class=\"_ _0\"></span> responsibilities include setting and r<span class=\"_ _0\"></span>eviewing credit polic<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, controlling applicant quality<span class=\"_ _1\"></span>, tracking account performance ag<span class=\"_ _0\"></span>ainst targ<span class=\"_ _0\"></span>ets, agreeing pr<span class=\"_ _0\"></span>oduct criteria and lending guidelines and monitoring performance and <span class=\"_ _0\"></span>trends.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s underwriting philosophy is based on sophisticat<span class=\"_ _0\"></span>ed individual credit assessment supported b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the automated efficiencies of statistically<span class=\"_ _0\"></span>-based ev<span class=\"_ _0\"></span>aluation models. Information on each applicant is combined with data <span class=\"_ _0\"></span>taken <span class=\"_ _0\"></span>from cr<span class=\"_ _0\"></span>edit ref<span class=\"_ _0\"></span>erence agencies and other e<span class=\"_ _0\"></span>xternal sources <span class=\"_ _0\"></span>to pro<span class=\"_ _0\"></span>vide a complete credit pictur<span class=\"_ _0\"></span>e of<span class=\"_ _0\"></span> the applicant and the borr<span class=\"_ _1\"></span>owing requested. Ke<span class=\"_ _0\"></span>y inf<span class=\"_ _0\"></span>ormation is v<span class=\"_ _0\"></span>alidated thr<span class=\"_ _0\"></span>ough a combination of documentation and statistical data <span class=\"_ _0\"></span>which collectively<span class=\"_ _0\"></span> provides e<span class=\"_ _0\"></span>vidence of<span class=\"_ _0\"></span> the applicant\u2019<span class=\"_ _1\"></span>s ability and <span class=\"_ _0\"></span>willingness to pay<span class=\"_ _1\"></span> the amount contracted under <span class=\"_ _0\"></span>the loan agreement. Similarly<span class=\"_ _1\"></span>, where asse<span class=\"_ _0\"></span>ts form part of<span class=\"_ _0\"></span> the security<span class=\"_ _0\"></span> to support the loan, r<span class=\"_ _0\"></span>obust asset <span class=\"_ _0\"></span>valuation pr<span class=\"_ _0\"></span>ocesses ensure appropriat<span class=\"_ _0\"></span>e risk mitigation is in place. E<span class=\"_ _0\"></span>ven so, in assessing cr<span class=\"_ _0\"></span>edit risk, an applicant\u2019<span class=\"_ _1\"></span>s ability and propensity<span class=\"_ _0\"></span> to r<span class=\"_ _0\"></span>epay<span class=\"_ _0\"></span> the loan remain <span class=\"_ _0\"></span>the principal factors in <span class=\"_ _0\"></span>the decision to lend, e<span class=\"_ _0\"></span>ven <span class=\"_ _0\"></span>where the Gr<span class=\"_ _0\"></span>oup w<span class=\"_ _0\"></span>ould have security<span class=\"_ _0\"></span> on the pr<span class=\"_ _0\"></span>oposed loan.<span class=\"_ _36a\"> </span>In considering whether<span class=\"_ _0\"></span> to acquir<span class=\"_ _0\"></span>e pools of<span class=\"_ _0\"></span> loan assets, the Gr<span class=\"_ _0\"></span>oup will undertake a due dilig<span class=\"_ _0\"></span>ence exer<span class=\"_ _0\"></span>cise on the underlying loan accounts. Such assets are g<span class=\"_ _0\"></span>enerally not<span class=\"_ _0\"></span> fully perf<span class=\"_ _0\"></span>orming and are off<span class=\"_ _0\"></span>ered at a discount <span class=\"_ _0\"></span>to their<span class=\"_ _0\"></span> current balance. <span class=\"_ _1\"></span>The Group\u2019<span class=\"_ _2\"></span>s procedur<span class=\"_ _0\"></span>es may<span class=\"_ _0\"></span> include inspection of original loan documents, <span class=\"_ _0\"></span>verification of<span class=\"_ _0\"></span> security and <span class=\"_ _0\"></span>the examination of <span class=\"_ _0\"></span>the credit status of borr<span class=\"_ _0\"></span>ow<span class=\"_ _0\"></span>ers. Current and historic cash <span class=\"_ _0\"></span>flow data <span class=\"_ _0\"></span>will also be examined. <span class=\"_ _0\"></span>The objective of<span class=\"_ _0\"></span> the ex<span class=\"_ _0\"></span>ercise is <span class=\"_ _0\"></span>to establish, to a le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> confidence similar <span class=\"_ _0\"></span>to that pr<span class=\"_ _0\"></span>ovided b<span class=\"_ _0\"></span>y the underwriting pr<span class=\"_ _0\"></span>ocess, that <span class=\"_ _0\"></span>the assets will g<span class=\"_ _0\"></span>enerate sufficient cash flo<span class=\"_ _0\"></span>ws to r<span class=\"_ _0\"></span>ecov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s investment and gener<span class=\"_ _0\"></span>ate an appropriate r<span class=\"_ _0\"></span>eturn without e<span class=\"_ _0\"></span>xposing the Gr<span class=\"_ _0\"></span>oup to material operational or<span class=\"_ _0\"></span> conduct risks. This section sets out information r<span class=\"_ _0\"></span>elev<span class=\"_ _0\"></span>ant to assessing <span class=\"_ _0\"></span>the credit risk<span class=\"_ _0\"></span> inherent in <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s loans to customers balances. It is set out<span class=\"_ _0\"></span> in the following subsections:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>T<span class=\"_ _1\"></span>ypes of lending and r<span class=\"_ _0\"></span>elated security<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Overall cr<span class=\"_ _0\"></span>edit grading<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Credit characteristics of<span class=\"_ _1\"></span> particular portfolios<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Arrears performance<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Acquired assets<span class=\"_ _36a\"> </span>T<span class=\"_ _1\"></span>ypes of lending<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s balance sheet loan assets at 30 September<span class=\"_ _1\"></span> 2023 are analysed as follo<span class=\"_ _0\"></span>ws:<span class=\"_ _36a\"> </span>2023<span class=\"_ _287\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _209\"> </span>%<span class=\"_ _f8\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _209\"> </span>%<span class=\"_ _36a\"> </span></span>Buy-t<span class=\"_ _0\"></span>o-let mortgages<span class=\"_ _2e4\"> </span><span class=\"ff15\">12,720.1<span class=\"_ _84\"> </span>85.6%<span class=\"_ _55\"> </span><span class=\"ff16\">12,086.0<span class=\"_ _291\"> </span>85.1%<span class=\"_ _36a\"> </span></span></span>Owner-occupied mortg<span class=\"_ _0\"></span>ages<span class=\"_ _195\"> </span><span class=\"ff15\">27.7<span class=\"_ _1c1\"> </span>0.1%<span class=\"_ _1d6\"> </span><span class=\"ff16\">36.4<span class=\"_ _72\"> </span>0.2%<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal first charg<span class=\"_ _0\"></span>e residential mortg<span class=\"_ _0\"></span>ages<span class=\"_ _102\"> </span><span class=\"ff15\">12,747.8<span class=\"_ _84\"> </span>85.7%<span class=\"_ _55\"> </span><span class=\"ff16\">12,122.4<span class=\"_ _291\"> </span>85.3%<span class=\"_ _36a\"> </span></span></span>Second charge mortg<span class=\"_ _0\"></span>age loans<span class=\"_ _f9\"> </span><span class=\"ff15\">154.5<span class=\"_ _72\"> </span>1.0%<span class=\"_ _b9\"> </span><span class=\"ff16\">206.3<span class=\"_ _72\"> </span>1.4%<span class=\"_ _36a\"> </span></span></span>Loans secured on residen<span class=\"_ _0\"></span>tial property<span class=\"_ _144\"> </span><span class=\"ff15\">12,902.3<span class=\"_ _1d6\"> </span>86.7%<span class=\"_ _55\"> </span><span class=\"ff16\">12,328.7<span class=\"_ _291\"> </span>86.7%<span class=\"_ _36a\"> </span></span></span>Development finance<span class=\"_ _1d7\"> </span><span class=\"ff15\">747.8<span class=\"_ _1c1\"> </span>5.0%<span class=\"_ _b9\"> </span><span class=\"ff16\">719.9<span class=\"_ _72\"> </span>5.1%<span class=\"_ _36a\"> </span></span></span>Loans secured on property<span class=\"_ _16d\"> </span>13,650.1<span class=\"_ _84\"> </span>91.7%<span class=\"_ _55\"> </span><span class=\"ff16\">13,048.6<span class=\"_ _291\"> </span>91.8%<span class=\"_ _36a\"> </span></span>Asset finance loans<span class=\"_ _11a\"> </span><span class=\"ff15\">559.1<span class=\"_ _1c1\"> </span>3.8%<span class=\"_ _b9\"> </span><span class=\"ff16\">498.8<span class=\"_ _72\"> </span>3.5%<span class=\"_ _36a\"> </span></span></span>Motor finance loans<span class=\"_ _2e2\"> </span><span class=\"ff15\">297.7<span class=\"_ _72\"> </span>2.0%<span class=\"_ _b9\"> </span><span class=\"ff16\">261.3<span class=\"_ _72\"> </span>1.8%<span class=\"_ _36a\"> </span></span></span>Aircr<span class=\"_ _0\"></span>aft mortgages<span class=\"_ _20a\"> </span><span class=\"ff15\">26.9<span class=\"_ _72\"> </span>0.2%<span class=\"_ _1d6\"> </span><span class=\"ff16\">33.7<span class=\"_ _72\"> </span>0.3%<span class=\"_ _36a\"> </span></span></span>Secured RLS and CBILS<span class=\"_ _327\"> </span><span class=\"ff15\">50.5<span class=\"_ _1c1\"> </span>0.4%<span class=\"_ _84\"> </span><span class=\"ff16\">65.1<span class=\"_ _72\"> </span>0.4%<span class=\"_ _36a\"> </span></span></span>Structured lending<span class=\"_ _259\"> </span><span class=\"ff15\">169.0<span class=\"_ _72\"> </span>1.1%<span class=\"_ _b9\"> </span><span class=\"ff16\">178.7<span class=\"_ _72\"> </span>1.3%<span class=\"_ _36a\"> </span></span></span>Invoice finance<span class=\"_ _1a5\"> </span><span class=\"ff15\">31.7<span class=\"_ _1c1\"> </span>0.2%<span class=\"_ _1d6\"> </span><span class=\"ff16\">25.7<span class=\"_ _72\"> </span>0.2%<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal secured loans<span class=\"_ _2ab\"> </span>14,785.0<span class=\"_ _84\"> </span>99.4%<span class=\"_ _55\"> </span><span class=\"ff16\">14,111.9<span class=\"_ _84\"> </span>99.3%<span class=\"_ _36a\"> </span></span>Prof<span class=\"_ _0\"></span>essions finance<span class=\"_ _2a0\"> </span><span class=\"ff15\">52.2<span class=\"_ _1c1\"> </span>0.4%<span class=\"_ _84\"> </span><span class=\"ff16\">60.9<span class=\"_ _72\"> </span>0.4%<span class=\"_ _36a\"> </span></span></span>Unsecured RLS, CBILS and BBLS<span class=\"_ _108\"> </span><span class=\"ff15\">16.7<span class=\"_ _72\"> </span>0.1%<span class=\"_ _84\"> </span><span class=\"ff16\">22.9<span class=\"_ _1c1\"> </span>0.2%<span class=\"_ _36a\"> </span></span></span>Other unsecured commer<span class=\"_ _0\"></span>cial loans<span class=\"_ _328\"> </span><span class=\"ff15\">20.4<span class=\"_ _1c1\"> </span>0.1%<span class=\"_ _84\"> </span><span class=\"ff16\">14.6<span class=\"_ _72\"> </span>0.1%<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal loans to customers<span class=\"_ _28e\"> </span>14,874.3<span class=\"_ _b9\"> </span>100.0%<span class=\"_ _55\"> </span><span class=\"ff16\">14,210.3<span class=\"_ _133\"> </span>100.0%<span class=\"_ _36a\"> </span></span>First and second charge mortg<span class=\"_ _0\"></span>ages are secur<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> charges ov<span class=\"_ _0\"></span>er r<span class=\"_ _0\"></span>esidential properties in England and <span class=\"_ _0\"></span>W<span class=\"_ _0\"></span>ales, or similar<span class=\"_ _0\"></span> Scottish or<span class=\"_ _0\"></span> Northern Irish securities. Dev<span class=\"_ _0\"></span>elopment finance loans are secur<span class=\"_ _1\"></span>ed by a first char<span class=\"_ _0\"></span>ge (<span class=\"_ _0\"></span>or similar<span class=\"_ _0\"></span> Scottish security) o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the dev<span class=\"_ _0\"></span>elopment property<span class=\"_ _0\"></span> and v<span class=\"_ _0\"></span>arious charges o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>the build. Asset finance loans and mot<span class=\"_ _0\"></span>or finance loans ar<span class=\"_ _1\"></span>e effectively secur<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the financed asset, <span class=\"_ _0\"></span>while aircr<span class=\"_ _0\"></span>aft mortgages ar<span class=\"_ _0\"></span>e secured by<span class=\"_ _0\"></span> a charge on <span class=\"_ _0\"></span>the aircraft <span class=\"_ _0\"></span>funded.<span class=\"_ _36a\"> </span>Structured lending and in<span class=\"_ _0\"></span>voice finance balances ar<span class=\"_ _0\"></span>e effectively<span class=\"_ _1\"></span> secured over<span class=\"_ _0\"></span> the assets o<span class=\"_ _0\"></span>f the cust<span class=\"_ _0\"></span>omer<span class=\"_ _0\"></span>, with security<span class=\"_ _0\"></span> enhanced by<span class=\"_ _0\"></span> maintaining balances at a lev<span class=\"_ _0\"></span>el less than the <span class=\"_ _0\"></span>total amount of<span class=\"_ _0\"></span> the security<span class=\"_ _0\"></span> (the advance per<span class=\"_ _0\"></span>centage<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span>Prof<span class=\"_ _0\"></span>essions finance balances ar<span class=\"_ _0\"></span>e generally short<span class=\"_ _0\"></span> term unsecur<span class=\"_ _0\"></span>ed loans made to firms o<span class=\"_ _0\"></span>f lawy<span class=\"_ _0\"></span>ers and accountants for<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>orking  capital purposes.<span class=\"_ _36a\"> </span>Loans made under<span class=\"_ _0\"></span> the R<span class=\"_ _0\"></span>ecovery<span class=\"_ _0\"></span> Loan Scheme (\u2018RL<span class=\"_ _0\"></span>S\u2019), the Corona<span class=\"_ _0\"></span>virus Business Interruption Loan Scheme (\u2018CBILS\u2019) and <span class=\"_ _0\"></span>the Bounce Back Loan Scheme (\u2018BBL<span class=\"_ _0\"></span>S\u2019) have <span class=\"_ _0\"></span>the benefit of<span class=\"_ _0\"></span> a guarantee underwritten by<span class=\"_ _0\"></span> the UK<span class=\"_ _0\"></span> Government.<span class=\"_ _36a\"> </span>Other unsecur<span class=\"_ _0\"></span>ed consumer loans include unsecur<span class=\"_ _0\"></span>ed loans either adv<span class=\"_ _0\"></span>anced by<span class=\"_ _0\"></span> group companies or<span class=\"_ _0\"></span> acquired <span class=\"_ _0\"></span>from their<span class=\"_ _0\"></span> originators at a discount. There ar<span class=\"_ _0\"></span>e no significant concentrations of<span class=\"_ _0\"></span> credit<span class=\"_ _0\"></span> risk to individual counterparties due <span class=\"_ _0\"></span>to the larg<span class=\"_ _0\"></span>e number of<span class=\"_ _0\"></span> customers included in the portfolios. <span class=\"_ _0\"></span>All lending is to customers <span class=\"_ _0\"></span>within the UK. <span class=\"_ _0\"></span>The t<span class=\"_ _0\"></span>otal gross carrying <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s loans to customers due fr<span class=\"_ _0\"></span>om customers with <span class=\"_ _0\"></span>total portfolio e<span class=\"_ _0\"></span>xposures ov<span class=\"_ _0\"></span>er \u00a310<span class=\"_ _0\"></span>.0m is analy<span class=\"_ _0\"></span>sed below b<span class=\"_ _0\"></span>y pr<span class=\"_ _0\"></span>oduct type.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Buy-t<span class=\"_ _0\"></span>o-let mortgages<span class=\"_ _1fa\"> </span><span class=\"ff15\">149.6<span class=\"_ _d5\"> </span><span class=\"ff16\">151.9<span class=\"_ _36a\"> </span></span></span>Development finance<span class=\"_ _30c\"> </span><span class=\"ff15\">390.6<span class=\"_ _150\"> </span><span class=\"ff16\">306.9<span class=\"_ _36a\"> </span></span></span>Structured lending<span class=\"_ _1f9\"> </span><span class=\"ff15\">160.3<span class=\"_ _d5\"> </span><span class=\"ff16\">179.4<span class=\"_ _36a\"> </span></span></span>Asset finance<span class=\"_ _329\"> </span><span class=\"ff15\">24.6<span class=\"_ _43\"> </span></span>-<span class=\"_ _36a\"> </span>725.1<span class=\"_ _d5\"> </span><span class=\"ff16\">638.2<span class=\"_ _36a\"> </span></span>The thr<span class=\"_ _0\"></span>eshold of<span class=\"_ _0\"></span> \u00a310.0m is used int<span class=\"_ _0\"></span>ernally f<span class=\"_ _0\"></span>or monitoring lar<span class=\"_ _0\"></span>ge exposures. Credit grading<span class=\"_ _36a\"> </span>An analysis of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s loans to customers by<span class=\"_ _0\"></span> absolute lev<span class=\"_ _0\"></span>el of cr<span class=\"_ _0\"></span>edit risk at 30 Sept<span class=\"_ _0\"></span>ember 2023 is set out belo<span class=\"_ _0\"></span>w<span class=\"_ _0\"></span>. The analy<span class=\"_ _0\"></span>sed amount repr<span class=\"_ _0\"></span>esents gross carrying amount.<span class=\"_ _36a\"> </span>Stage 1<span class=\"_ _86\"> </span>Stage 2<span class=\"_ _86\"> </span>Stage 3<span class=\"_ _2c\"> </span>POCI<span class=\"_ _a0\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>V<span class=\"_ _0\"></span>ery low risk<span class=\"_ _1ae\"> </span><span class=\"ff15\">11,393.7<span class=\"_ _cb\"> </span>23.0<span class=\"_ _9e\"> </span>1.9<span class=\"_ _9e\"> </span>6.6<span class=\"_ _42\"> </span>11,425.2<span class=\"_ _36a\"> </span></span>Low risk<span class=\"_ _2b1\"> </span><span class=\"ff15\">2,236.4<span class=\"_ _150\"> </span>395.5<span class=\"_ _3a\"> </span>73.8<span class=\"_ _9e\"> </span>2.5<span class=\"_ _12a\"> </span>2,708.2<span class=\"_ _36a\"> </span></span>Moderat<span class=\"_ _0\"></span>e risk<span class=\"_ _257\"> </span><span class=\"ff15\">157.1<span class=\"_ _d5\"> </span>147.3<span class=\"_ _9e\"> </span>9.7<span class=\"_ _9e\"> </span>1.8<span class=\"_ _d5\"> </span>315.9<span class=\"_ _36a\"> </span></span>High risk<span class=\"_ _138\"> </span><span class=\"ff15\">34.0<span class=\"_ _d5\"> </span>113.3<span class=\"_ _3a\"> </span>13.6<span class=\"_ _9e\"> </span>3.2<span class=\"_ _d5\"> </span>164.1<span class=\"_ _36a\"> </span></span>V<span class=\"_ _0\"></span>ery high risk<span class=\"_ _32a\"> </span><span class=\"ff15\">37.7<span class=\"_ _3a\"> </span>63.3<span class=\"_ _d5\"> </span>104.1<span class=\"_ _9e\"> </span>9.3<span class=\"_ _d5\"> </span>214.4<span class=\"_ _36a\"> </span></span>Not graded<span class=\"_ _2d4\"> </span><span class=\"ff15\">113.4<span class=\"_ _9e\"> </span>2.4<span class=\"_ _9e\"> </span>2.9<span class=\"_ _9e\"> </span>1.4<span class=\"_ _d5\"> </span>120.1<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal gross carrying amount<span class=\"_ _ad\"> </span><span class=\"ff15\">13,972.3<span class=\"_ _150\"> </span>744.8<span class=\"_ _d5\"> </span>206.0<span class=\"_ _3a\"> </span>24.8<span class=\"_ _42\"> </span>14,947.9<span class=\"_ _36a\"> </span></span>Impairment<span class=\"_ _2d4\"> </span><span class=\"ff15\">(19.6)<span class=\"_ _1db\"> </span>(9.4)<span class=\"_ _bf\"> </span>(39.8)<span class=\"_ _1db\"> </span>(4.8)<span class=\"_ _6c\"> </span>(73.6)<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal loans to customers<span class=\"_ _5e\"> </span><span class=\"ff15\">13,952.7<span class=\"_ _d5\"> </span>735.4<span class=\"_ _d5\"> </span>166.2<span class=\"_ _3a\"> </span>20.0<span class=\"_ _42\"> </span>14,874.3<span class=\"_ _36a\"> </span></span>30 September 2022<span class=\"_ _36a\"> </span>V<span class=\"_ _0\"></span>ery low risk<span class=\"_ _1ae\"> </span><span class=\"ff16\">10,270.3<span class=\"_ _d5\"> </span>846.7<span class=\"_ _9e\"> </span>1.1<span class=\"_ _9e\"> </span>9.2<span class=\"_ _67\"> </span>11,127.3<span class=\"_ _36a\"> </span></span>Low risk<span class=\"_ _2b1\"> </span><span class=\"ff16\">1,563.9<span class=\"_ _150\"> </span>932.0<span class=\"_ _f7\"> </span>63.6<span class=\"_ _9e\"> </span>1.9<span class=\"_ _86\"> </span>2,561.4<span class=\"_ _36a\"> </span></span>Moderat<span class=\"_ _0\"></span>e risk<span class=\"_ _257\"> </span><span class=\"ff16\">118.6<span class=\"_ _150\"> </span>114.1<span class=\"_ _9e\"> </span>4.3<span class=\"_ _9e\"> </span>2.5<span class=\"_ _150\"> </span>239.5<span class=\"_ _36a\"> </span></span>High risk<span class=\"_ _138\"> </span><span class=\"ff16\">35.0<span class=\"_ _3a\"> </span>34.6<span class=\"_ _9e\"> </span>9.7<span class=\"_ _9e\"> </span>4.1<span class=\"_ _f7\"> </span>83.4<span class=\"_ _36a\"> </span></span>V<span class=\"_ _0\"></span>ery high risk<span class=\"_ _32a\"> </span><span class=\"ff16\">44.4<span class=\"_ _3a\"> </span>35.1<span class=\"_ _3a\"> </span>42.2<span class=\"_ _9e\"> </span>9.3<span class=\"_ _150\"> </span>131.0<span class=\"_ _36a\"> </span></span>Not graded<span class=\"_ _2d4\"> </span><span class=\"ff16\">124.8<span class=\"_ _9e\"> </span>1.1<span class=\"_ _11f\"> </span>3.5<span class=\"_ _9e\"> </span>1.8<span class=\"_ _d5\"> </span>131.2<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal gross carrying amount<span class=\"_ _179\"> </span><span class=\"ff16\">12,157.0<span class=\"_ _86\"> </span>1,963.6<span class=\"_ _d5\"> </span>124.4<span class=\"_ _f7\"> </span>28.8<span class=\"_ _67\"> </span>14,273.8<span class=\"_ _36a\"> </span></span>Impairment<span class=\"_ _2d4\"> </span>(25.5)<span class=\"_ _c8\"> </span>(8.0)<span class=\"_ _6c\"> </span>(28.5)<span class=\"_ _c8\"> </span>(1.5)<span class=\"_ _6c\"> </span>(63.5)<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal loans to customers<span class=\"_ _5e\"> </span><span class=\"ff16\">12,131.5<span class=\"_ _86\"> </span>1,955.6<span class=\"_ _3a\"> </span>95.9<span class=\"_ _3a\"> </span>27.3<span class=\"_ _67\"> </span>14,210.3<span class=\"_ _36a\"> </span></span>Gradings abov<span class=\"_ _0\"></span>e are based on cr<span class=\"_ _0\"></span>edit scorecar<span class=\"_ _0\"></span>ds or internally<span class=\"_ _0\"></span> assigned risk ratings as appr<span class=\"_ _0\"></span>opriate for<span class=\"_ _0\"></span> the individual asset<span class=\"_ _0\"></span> class. These measures ar<span class=\"_ _0\"></span>e calibrated acr<span class=\"_ _0\"></span>oss product <span class=\"_ _0\"></span>types and used internally <span class=\"_ _0\"></span>to monitor <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s overall cr<span class=\"_ _0\"></span>edit risk pr<span class=\"_ _0\"></span>ofile against its risk appetite.<span class=\"_ _36a\"> </span>These gradings r<span class=\"_ _0\"></span>epresent curr<span class=\"_ _0\"></span>ent credit quality<span class=\"_ _0\"></span> on an absolute basis and this ma<span class=\"_ _0\"></span>y r<span class=\"_ _0\"></span>esult in assets in higher IFRS 9 stages <span class=\"_ _0\"></span>with low risk grades, especially <span class=\"_ _0\"></span>where a case qualifies <span class=\"_ _0\"></span>through br<span class=\"_ _0\"></span>eaching, for<span class=\"_ _1\"></span> example, an arrears thr<span class=\"_ _0\"></span>eshold but is making regular<span class=\"_ _0\"></span> payments. <span class=\"_ _0\"></span>This will apply especially<span class=\"_ _0\"></span> to Stag<span class=\"_ _0\"></span>e 3 cases reported in not<span class=\"_ _0\"></span>e 22, other <span class=\"_ _0\"></span>than those shown as \u2018r<span class=\"_ _0\"></span>ealisations\u2019<span class=\"_ _2f\"></span>.<span class=\"_ _36a\"> </span>Examples of lo<span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span> risk cases in higher IFRS 9 stages include <span class=\"_ _0\"></span>fully up-to-dat<span class=\"_ _0\"></span>e receiver<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> rent cases; accounts <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>the customer is in arrears on <span class=\"_ _0\"></span>their account <span class=\"_ _0\"></span>with the Gr<span class=\"_ _0\"></span>oup but up to date on accounts <span class=\"_ _0\"></span>with other<span class=\"_ _0\"></span> lenders, creating an o<span class=\"_ _0\"></span>verall positive cr<span class=\"_ _0\"></span>edit rating; and accounts wher<span class=\"_ _0\"></span>e the default on <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s loan has yet<span class=\"_ _0\"></span> to impact on <span class=\"_ _0\"></span>the external credit scor<span class=\"_ _1\"></span>e.<span class=\"_ _36a\"> </span>A small pr<span class=\"_ _0\"></span>oportion of<span class=\"_ _0\"></span> the loan book (2023: 0<span class=\"_ _0\"></span>.8%, 2022: 0.<span class=\"_ _0\"></span>9%) is classed as \u2018not graded\u2019 abov<span class=\"_ _0\"></span>e. This r<span class=\"_ _0\"></span>ating generally<span class=\"_ _0\"></span> relates <span class=\"_ _0\"></span>to loans  that have been <span class=\"_ _0\"></span>fully underwritten at<span class=\"_ _0\"></span> origination but wher<span class=\"_ _0\"></span>e the customer<span class=\"_ _0\"></span> falls outside the aut<span class=\"_ _0\"></span>omated assessment techniques used post-completion.<span class=\"_ _36a\"> </span>Credit characteristics b<span class=\"_ _0\"></span>y portf<span class=\"_ _0\"></span>olio<span class=\"_ _36a\"> </span>L<span class=\"_ _0\"></span>oans secured on residential pr<span class=\"_ _0\"></span>operty<span class=\"_ _36a\"> </span>First mortgage loans ha<span class=\"_ _0\"></span>ve a contractual <span class=\"_ _0\"></span>term of up <span class=\"_ _0\"></span>to thirty<span class=\"_ _0\"></span> y<span class=\"_ _0\"></span>ears and second charge mortgag<span class=\"_ _0\"></span>e loans up to <span class=\"_ _0\"></span>twenty <span class=\"_ _0\"></span>five <span class=\"_ _0\"></span>years. In all cases the customer<span class=\"_ _0\"></span> is entitled to settle <span class=\"_ _0\"></span>the loan at any<span class=\"_ _0\"></span> point and in most cases early se<span class=\"_ _0\"></span>ttlement does tak<span class=\"_ _0\"></span>e place. All customers on these accounts are r<span class=\"_ _0\"></span>equired <span class=\"_ _0\"></span>to make monthly<span class=\"_ _0\"></span> payments.<span class=\"_ _36a\"> </span>An analysis of<span class=\"_ _0\"></span> the index<span class=\"_ _0\"></span>ed Loan-<span class=\"_ _0\"></span>to-V<span class=\"_ _1\"></span>alue (\u2018L<span class=\"_ _2f\"></span>TV\u2019) ratio for<span class=\"_ _0\"></span> those loan accounts secured on r<span class=\"_ _0\"></span>esidential property<span class=\"_ _0\"></span> by<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue at  30 September<span class=\"_ _0\"></span> 2023 is set out below<span class=\"_ _1\"></span>. L<span class=\"_ _2\"></span>TVs <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> second charge mortgages ar<span class=\"_ _1\"></span>e calculated allowing for<span class=\"_ _0\"></span> the inter<span class=\"_ _0\"></span>est of <span class=\"_ _0\"></span>the first char<span class=\"_ _0\"></span>ge holder<span class=\"_ _1\"></span>, based on the most recent <span class=\"_ _0\"></span>first charge amount held b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group, <span class=\"_ _0\"></span>while for<span class=\"_ _0\"></span> acquired accounts <span class=\"_ _0\"></span>the effect of<span class=\"_ _0\"></span> any<span class=\"_ _0\"></span> discount on purchase is allo<span class=\"_ _0\"></span>wed for<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>First char<span class=\"_ _0\"></span>ge mortgages<span class=\"_ _291\"> </span>Second charge mortg<span class=\"_ _0\"></span>ages<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span></span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _12d\"> </span></span>%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _36a\"> </span></span>Loan to value r<span class=\"_ _0\"></span>atio<span class=\"_ _36a\"> </span>Less than 70%<span class=\"_ _32b\"> </span><span class=\"ff15\">72.7<span class=\"_ _3a\"> </span><span class=\"ff16\">89.2<span class=\"_ _3a\"> </span></span>94.6<span class=\"_ _3a\"> </span><span class=\"ff16\">95.6<span class=\"_ _36a\"> </span></span></span>70% to 80%<span class=\"_ _32c\"> </span><span class=\"ff15\">23.8<span class=\"_ _9e\"> </span><span class=\"ff16\">9.4<span class=\"_ _9e\"> </span></span>3.2<span class=\"_ _d1\"> </span><span class=\"ff16\">2.4<span class=\"_ _36a\"> </span></span></span>80% to 90%<span class=\"_ _dd\"> </span><span class=\"ff15\">2.5<span class=\"_ _d1\"> </span><span class=\"ff16\">0.4<span class=\"_ _9e\"> </span></span>0.9<span class=\"_ _9e\"> </span><span class=\"ff16\">0.8<span class=\"_ _36a\"> </span></span></span>90% to 100%<span class=\"_ _32c\"> </span><span class=\"ff15\">0.2<span class=\"_ _9e\"> </span><span class=\"ff16\">0.3<span class=\"_ _9e\"> </span></span>0.3<span class=\"_ _d1\"> </span><span class=\"ff16\">0.2<span class=\"_ _36a\"> </span></span></span>Over 100%<span class=\"_ _1c3\"> </span><span class=\"ff15\">0.8<span class=\"_ _9e\"> </span><span class=\"ff16\">0.7<span class=\"_ _9e\"> </span></span>1.0<span class=\"_ _d1\"> </span><span class=\"ff16\">1.0<span class=\"_ _36a\"> </span></span></span>100.0<span class=\"_ _d5\"> </span><span class=\"ff16\">100.0<span class=\"_ _150\"> </span></span>100.0<span class=\"_ _d5\"> </span><span class=\"ff16\">100.0<span class=\"_ _36a\"> </span></span>Av<span class=\"_ _0\"></span>erage L<span class=\"_ _2\"></span>TV ratio<span class=\"_ _177\"> </span><span class=\"ff15\">62.7<span class=\"_ _3a\"> </span><span class=\"ff16\">57.8<span class=\"_ _3a\"> </span></span>52.3<span class=\"_ _3a\"> </span><span class=\"ff16\">50.6<span class=\"_ _36a\"> </span></span></span>Of which:<span class=\"_ _36a\"> </span>Buy-t<span class=\"_ _0\"></span>o-let<span class=\"_ _27f\"> </span><span class=\"ff15\">62.8<span class=\"_ _3a\"> </span><span class=\"ff16\">57.9<span class=\"_ _36a\"> </span></span></span>Owner-occupied<span class=\"_ _2f6\"> </span><span class=\"ff15\">39.0<span class=\"_ _cb\"> </span><span class=\"ff16\">37.6<span class=\"_ _36a\"> </span></span></span>The regionally<span class=\"_ _0\"></span> index<span class=\"_ _0\"></span>ed L<span class=\"_ _2\"></span>TV<span class=\"_ _0\"></span>s shown abo<span class=\"_ _0\"></span>ve are aff<span class=\"_ _0\"></span>ected by<span class=\"_ _0\"></span> changes in house prices, with <span class=\"_ _0\"></span>the Nationwide house price index, for<span class=\"_ _1\"></span> the UK as a whole, r<span class=\"_ _0\"></span>egistering an annual decrease of<span class=\"_ _1\"></span> 5.3% in the year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2023 (2022: increase of<span class=\"_ _0\"></span> 9<span class=\"_ _0\"></span>.5%).<span class=\"_ _36a\"> </span>The geographical distribution o<span class=\"_ _0\"></span>f the Gr<span class=\"_ _1\"></span>oup\u2019<span class=\"_ _1\"></span>s residential mortgage assets b<span class=\"_ _0\"></span>y gr<span class=\"_ _0\"></span>oss carrying v<span class=\"_ _0\"></span>alue is set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>First char<span class=\"_ _0\"></span>ge<span class=\"_ _cf\"> </span>Second charge<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span></span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _12d\"> </span></span>%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _36a\"> </span></span>East Anglia<span class=\"_ _1c3\"> </span><span class=\"ff15\">3.3<span class=\"_ _d1\"> </span><span class=\"ff16\">3.3<span class=\"_ _9e\"> </span></span>3.4<span class=\"_ _9e\"> </span><span class=\"ff16\">3.3<span class=\"_ _36a\"> </span></span></span>East Midlands<span class=\"_ _28a\"> </span><span class=\"ff15\">5.9<span class=\"_ _9e\"> </span><span class=\"ff16\">5.7<span class=\"_ _9e\"> </span></span>6.2<span class=\"_ _9e\"> </span><span class=\"ff16\">6.2<span class=\"_ _36a\"> </span></span></span>Great<span class=\"_ _0\"></span>er London<span class=\"_ _32d\"> </span><span class=\"ff15\">18.2<span class=\"_ _3a\"> </span><span class=\"ff16\">18.2<span class=\"_ _9e\"> </span></span>7.4<span class=\"_ _9e\"> </span><span class=\"ff16\">7.8<span class=\"_ _36a\"> </span></span></span>North<span class=\"_ _2fb\"> </span><span class=\"ff15\">3.5<span class=\"_ _d1\"> </span><span class=\"ff16\">3.3<span class=\"_ _9e\"> </span></span>4.2<span class=\"_ _9e\"> </span><span class=\"ff16\">4.1<span class=\"_ _36a\"> </span></span></span>North W<span class=\"_ _0\"></span>est<span class=\"_ _219\"> </span><span class=\"ff15\">10.3<span class=\"_ _3a\"> </span><span class=\"ff16\">10.3<span class=\"_ _9e\"> </span></span>7.5<span class=\"_ _9e\"> </span><span class=\"ff16\">7.7<span class=\"_ _36a\"> </span></span></span>South East<span class=\"_ _32e\"> </span><span class=\"ff15\">30.6<span class=\"_ _3a\"> </span><span class=\"ff16\">31.2<span class=\"_ _3a\"> </span></span>37.8<span class=\"_ _3a\"> </span><span class=\"ff16\">38.2<span class=\"_ _36a\"> </span></span></span>South W<span class=\"_ _0\"></span>est<span class=\"_ _2af\"> </span><span class=\"ff15\">9.0<span class=\"_ _9e\"> </span><span class=\"ff16\">8.8<span class=\"_ _9e\"> </span></span>8.4<span class=\"_ _d1\"> </span><span class=\"ff16\">8.4<span class=\"_ _36a\"> </span></span></span>W<span class=\"_ _0\"></span>est Midlands<span class=\"_ _2aa\"> </span><span class=\"ff15\">6.2<span class=\"_ _d1\"> </span><span class=\"ff16\">5.9<span class=\"_ _9e\"> </span></span>7.3<span class=\"_ _9e\"> </span><span class=\"ff16\">7.4<span class=\"_ _36a\"> </span></span></span>Y<span class=\"_ _1\"></span>orkshire and Humberside<span class=\"_ _125\"> </span><span class=\"ff15\">7.4<span class=\"_ _9e\"> </span><span class=\"ff16\">7.8<span class=\"_ _9e\"> </span></span>6.2<span class=\"_ _9e\"> </span><span class=\"ff16\">6.1<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal England<span class=\"_ _318\"> </span><span class=\"ff15\">94.4<span class=\"_ _3a\"> </span><span class=\"ff16\">94.5<span class=\"_ _3a\"> </span></span>88.4<span class=\"_ _3a\"> </span><span class=\"ff16\">89.2<span class=\"_ _36a\"> </span></span></span>Northern Ireland<span class=\"_ _123\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.1<span class=\"_ _9e\"> </span></span>2.3<span class=\"_ _d1\"> </span><span class=\"ff16\">2.0<span class=\"_ _36a\"> </span></span></span>Scotland<span class=\"_ _286\"> </span><span class=\"ff15\">2.5<span class=\"_ _d1\"> </span><span class=\"ff16\">2.3<span class=\"_ _9e\"> </span></span>5.5<span class=\"_ _9e\"> </span><span class=\"ff16\">5.4<span class=\"_ _36a\"> </span></span></span>W<span class=\"_ _0\"></span>ales<span class=\"_ _32f\"> </span><span class=\"ff15\">3.1<span class=\"_ _9e\"> </span><span class=\"ff16\">3.1<span class=\"_ _9e\"> </span></span>3.8<span class=\"_ _d1\"> </span><span class=\"ff16\">3.4<span class=\"_ _36a\"> </span></span></span>100.0<span class=\"_ _d5\"> </span><span class=\"ff16\">100.0<span class=\"_ _150\"> </span></span>100.0<span class=\"_ _d5\"> </span><span class=\"ff16\">100.0<span class=\"_ _36a\"> </span></span>Developmen<span class=\"_ _0\"></span>t finance<span class=\"_ _36a\"> </span>Dev<span class=\"_ _0\"></span>elopment finance loans hav<span class=\"_ _0\"></span>e an averag<span class=\"_ _0\"></span>e term of<span class=\"_ _0\"></span> 26 months (2022: 24 months). Settlement<span class=\"_ _0\"></span> of principal and accrued inter<span class=\"_ _0\"></span>est tak<span class=\"_ _0\"></span>es place either on <span class=\"_ _0\"></span>the sale of <span class=\"_ _0\"></span>the dev<span class=\"_ _0\"></span>elopment, or units <span class=\"_ _0\"></span>within it, where appr<span class=\"_ _0\"></span>opriate, or<span class=\"_ _0\"></span> on the re<span class=\"_ _0\"></span>financing of <span class=\"_ _0\"></span>the property<span class=\"_ _0\"></span> follo<span class=\"_ _0\"></span>wing its completion. T<span class=\"_ _0\"></span>he customer is no<span class=\"_ _0\"></span>t normally r<span class=\"_ _0\"></span>equired t<span class=\"_ _0\"></span>o make payments during <span class=\"_ _0\"></span>the term of<span class=\"_ _0\"></span> the loan. <span class=\"_ _0\"></span>The loans ar<span class=\"_ _0\"></span>e secured by<span class=\"_ _0\"></span> a legal charge o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>the site and/<span class=\"_ _0\"></span>or pr<span class=\"_ _0\"></span>operty <span class=\"_ _0\"></span>together<span class=\"_ _0\"></span> with other<span class=\"_ _0\"></span> charges and <span class=\"_ _0\"></span>warranties r<span class=\"_ _0\"></span>elated to <span class=\"_ _0\"></span>the build.<span class=\"_ _36a\"> </span>As customers are no<span class=\"_ _0\"></span>t requir<span class=\"_ _0\"></span>ed to mak<span class=\"_ _0\"></span>e payments during the lif<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the loan, arrears and past due measur<span class=\"_ _0\"></span>es cannot be used <span class=\"_ _0\"></span>to monitor cr<span class=\"_ _0\"></span>edit risk. Instead, cases ar<span class=\"_ _0\"></span>e monitored on an individual basis against<span class=\"_ _0\"></span> the costs and progr<span class=\"_ _0\"></span>ess in the agr<span class=\"_ _0\"></span>eed dev<span class=\"_ _0\"></span>elopment programme b<span class=\"_ _0\"></span>y manag<span class=\"_ _0\"></span>ement and Credit Risk. <span class=\"_ _0\"></span>The av<span class=\"_ _0\"></span>erage loan t<span class=\"_ _0\"></span>o gross dev<span class=\"_ _0\"></span>elopment v<span class=\"_ _0\"></span>alue (\u2018L<span class=\"_ _2f\"></span>TGDV\u2019) r<span class=\"_ _0\"></span>atio for<span class=\"_ _0\"></span> the portfolio at<span class=\"_ _0\"></span> year<span class=\"_ _0\"></span> end, a measure of<span class=\"_ _0\"></span> security co<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, is analysed below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span>2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _a0\"> </span>2022<span class=\"_ _36a\"> </span></span>By value<span class=\"_ _1e\"> </span>By number<span class=\"_ _d6\"> </span><span class=\"ff17\">By value<span class=\"_ _31\"> </span>By number<span class=\"_ _36a\"> </span></span>%<span class=\"_ _43\"> </span>%<span class=\"_ _12d\"> </span><span class=\"ff16\">%<span class=\"_ _43\"> </span>%<span class=\"_ _36a\"> </span></span>LT<span class=\"_ _15\"></span>G<span class=\"_ _96\"></span>D<span class=\"_ _15\"></span>V<span class=\"_ _36a\"> </span>50% or less<span class=\"_ _2a2\"> </span><span class=\"ff15\">8.2<span class=\"_ _9e\"> </span>6.1<span class=\"_ _9e\"> </span><span class=\"ff16\">7.9<span class=\"_ _9e\"> </span>5.1<span class=\"_ _36a\"> </span></span></span>50% to 60%<span class=\"_ _32c\"> </span><span class=\"ff15\">17.3<span class=\"_ _3a\"> </span>21.7<span class=\"_ _3a\"> </span><span class=\"ff16\">17.0<span class=\"_ _3a\"> </span>21.7<span class=\"_ _36a\"> </span></span></span>60% to 65%<span class=\"_ _32c\"> </span><span class=\"ff15\">37.7<span class=\"_ _3a\"> </span>33.0<span class=\"_ _3a\"> </span><span class=\"ff16\">45.0<span class=\"_ _3a\"> </span>39.1<span class=\"_ _36a\"> </span></span></span>65% to 70%<span class=\"_ _32c\"> </span><span class=\"ff15\">25.5<span class=\"_ _3a\"> </span>27.4<span class=\"_ _3a\"> </span><span class=\"ff16\">22.2<span class=\"_ _3a\"> </span>27.2<span class=\"_ _36a\"> </span></span></span>70% to 75%<span class=\"_ _32e\"> </span><span class=\"ff15\">5.8<span class=\"_ _9e\"> </span>7.4<span class=\"_ _9e\"> </span><span class=\"ff16\">5.8<span class=\"_ _9e\"> </span>6.2<span class=\"_ _36a\"> </span></span></span>Over 75%<span class=\"_ _23a\"> </span><span class=\"ff15\">5.5<span class=\"_ _d1\"> </span>4.4<span class=\"_ _9e\"> </span><span class=\"ff16\">2.1<span class=\"_ _9e\"> </span>0.7<span class=\"_ _36a\"> </span></span></span>100.0<span class=\"_ _d5\"> </span>100.0<span class=\"_ _150\"> </span><span class=\"ff16\">100.0<span class=\"_ _d5\"> </span>100.0<span class=\"_ _36a\"> </span></span>The av<span class=\"_ _0\"></span>erage L<span class=\"_ _2f\"></span>TGD<span class=\"_ _0\"></span>V co<span class=\"_ _0\"></span>ver at<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year end <span class=\"_ _0\"></span>was 63.<span class=\"_ _1\"></span>1% (2022: 62.1%).<span class=\"_ _36a\"> </span>L<span class=\"_ _2f\"></span>TGDV<span class=\"_ _1\"></span> is calculated by comparing <span class=\"_ _0\"></span>the current expected end o<span class=\"_ _0\"></span>f t<span class=\"_ _0\"></span>erm exposure <span class=\"_ _0\"></span>with the latest estimate o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>value o<span class=\"_ _0\"></span>f the comple<span class=\"_ _0\"></span>ted dev<span class=\"_ _0\"></span>elopment based on survey<span class=\"_ _0\"></span>ors\u2019 r<span class=\"_ _0\"></span>eports. T<span class=\"_ _0\"></span>he focus on r<span class=\"_ _0\"></span>esidential property<span class=\"_ _0\"></span> development<span class=\"_ _0\"></span> within the portf<span class=\"_ _0\"></span>olio means that asset <span class=\"_ _0\"></span>values will generally<span class=\"_ _0\"></span> move in line <span class=\"_ _0\"></span>with the UK r<span class=\"_ _1\"></span>esidential property mark<span class=\"_ _0\"></span>et.<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2023, the de<span class=\"_ _0\"></span>velopment <span class=\"_ _0\"></span>finance portfolio comprised 230 accounts (2022: 276) <span class=\"_ _0\"></span>with a total carrying <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> \u00a37<span class=\"_ _0\"></span>47<span class=\"_ _2\"></span>.8m (2022: \u00a3719.<span class=\"_ _0\"></span>9m). Of<span class=\"_ _0\"></span> these accounts only<span class=\"_ _0\"></span> 15 wer<span class=\"_ _0\"></span>e included in Stage 2 at 30 Sept<span class=\"_ _0\"></span>ember 2023 (2022: nine<span class=\"_ _0\"></span>), with tw<span class=\"_ _0\"></span>elve accounts classified as Stage 3 (2022: nil). In addition, one acquir<span class=\"_ _0\"></span>ed account had been classified as POCI (2022: one). <span class=\"_ _0\"></span>An allow<span class=\"_ _0\"></span>ance for<span class=\"_ _0\"></span> this loss was made in <span class=\"_ _0\"></span>the IFRS 3 fair <span class=\"_ _0\"></span>value calculation.<span class=\"_ _36a\"> </span>The geographical distribution o<span class=\"_ _0\"></span>f the Gr<span class=\"_ _1\"></span>oup\u2019<span class=\"_ _1\"></span>s development <span class=\"_ _0\"></span>finance loans by gr<span class=\"_ _0\"></span>oss carrying v<span class=\"_ _0\"></span>alue is set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _36a\"> </span></span>East Anglia<span class=\"_ _330\"> </span><span class=\"ff15\">4.4<span class=\"_ _9e\"> </span><span class=\"ff16\">2.8<span class=\"_ _36a\"> </span></span></span>East Midlands<span class=\"_ _2e8\"> </span><span class=\"ff15\">11.8<span class=\"_ _3a\"> </span><span class=\"ff16\">11.7<span class=\"_ _36a\"> </span></span></span>Great<span class=\"_ _0\"></span>er London<span class=\"_ _331\"> </span><span class=\"ff15\">11.8<span class=\"_ _3a\"> </span><span class=\"ff16\">10.5<span class=\"_ _36a\"> </span></span></span>North<span class=\"_ _332\"> </span><span class=\"ff15\">0.8<span class=\"_ _9e\"> </span><span class=\"ff16\">1.2<span class=\"_ _36a\"> </span></span></span>North W<span class=\"_ _0\"></span>est<span class=\"_ _333\"> </span><span class=\"ff15\">0.4<span class=\"_ _9e\"> </span><span class=\"ff16\">0.1<span class=\"_ _36a\"> </span></span></span>South East<span class=\"_ _334\"> </span><span class=\"ff15\">34.0<span class=\"_ _3a\"> </span><span class=\"ff16\">46.3<span class=\"_ _36a\"> </span></span></span>South W<span class=\"_ _0\"></span>est<span class=\"_ _30e\"> </span><span class=\"ff15\">21.3<span class=\"_ _cb\"> </span><span class=\"ff16\">13.0<span class=\"_ _36a\"> </span></span></span>W<span class=\"_ _0\"></span>est Midlands<span class=\"_ _335\"> </span><span class=\"ff15\">6.2<span class=\"_ _9e\"> </span><span class=\"ff16\">7.1<span class=\"_ _36a\"> </span></span></span>Y<span class=\"_ _1\"></span>orkshire and Humberside<span class=\"_ _2fc\"> </span><span class=\"ff15\">6.6<span class=\"_ _9e\"> </span><span class=\"ff16\">6.0<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal England<span class=\"_ _336\"> </span><span class=\"ff15\">97.3<span class=\"_ _3a\"> </span><span class=\"ff16\">98.7<span class=\"_ _36a\"> </span></span></span>Northern Ireland<span class=\"_ _1fb\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span></span>-<span class=\"_ _36a\"> </span>Scotland<span class=\"_ _337\"> </span><span class=\"ff15\">2.7<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _36a\"> </span></span></span>W<span class=\"_ _0\"></span>ales<span class=\"_ _2ae\"> </span><span class=\"ff15\">-<span class=\"_ _209\"> </span></span>-<span class=\"_ _36a\"> </span>100.0<span class=\"_ _d5\"> </span><span class=\"ff16\">100.0<span class=\"_ _36a\"> </span></span>Asset finance and motor<span class=\"_ _0\"></span> finance<span class=\"_ _36a\"> </span>Asset and motor<span class=\"_ _0\"></span> finance lending includes finance lease and hir<span class=\"_ _1\"></span>e purchase arrangements, which ar<span class=\"_ _0\"></span>e accounted f<span class=\"_ _0\"></span>or as finance leases under IFRS 16. <span class=\"_ _0\"></span>The aver<span class=\"_ _0\"></span>age contractual life of<span class=\"_ _0\"></span> the asset<span class=\"_ _0\"></span> finance loans w<span class=\"_ _0\"></span>as 49 months (2022: 52 months) while <span class=\"_ _0\"></span>that of<span class=\"_ _0\"></span> the motor<span class=\"_ _0\"></span> finance loans w<span class=\"_ _0\"></span>as 68 months (2022: 67 months), but historical behaviour<span class=\"_ _1\"></span> suggests that a significant proportion o<span class=\"_ _0\"></span>f customers <span class=\"_ _0\"></span>will choose to settle <span class=\"_ _0\"></span>their oblig<span class=\"_ _0\"></span>ations early<span class=\"_ _0\"></span>. Asset finance customer<span class=\"_ _0\"></span>s are generally<span class=\"_ _1\"></span> small or medium sized businesses. T<span class=\"_ _0\"></span>he nature of<span class=\"_ _0\"></span> the assets underlying <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s asset finance lending by<span class=\"_ _0\"></span> gross carrying <span class=\"_ _0\"></span>value is set out belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _36a\"> </span></span>Commercial vehicles<span class=\"_ _338\"> </span><span class=\"ff15\">41.9<span class=\"_ _3a\"> </span><span class=\"ff16\">37.4<span class=\"_ _36a\"> </span></span></span>Construction plant<span class=\"_ _21e\"> </span><span class=\"ff15\">30.9<span class=\"_ _3a\"> </span><span class=\"ff16\">33.2<span class=\"_ _36a\"> </span></span></span>Manufacturing<span class=\"_ _335\"> </span><span class=\"ff15\">6.3<span class=\"_ _9e\"> </span><span class=\"ff16\">6.1<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>echnology<span class=\"_ _2ba\"> </span><span class=\"ff15\">4.8<span class=\"_ _d1\"> </span><span class=\"ff16\">4.9<span class=\"_ _36a\"> </span></span></span>Other vehicles<span class=\"_ _339\"> </span><span class=\"ff15\">4.7<span class=\"_ _9e\"> </span><span class=\"ff16\">4.7<span class=\"_ _36a\"> </span></span></span>Refuse disposal v<span class=\"_ _0\"></span>ehicles<span class=\"_ _201\"> </span><span class=\"ff15\">3.4<span class=\"_ _9e\"> </span><span class=\"ff16\">3.7<span class=\"_ _36a\"> </span></span></span>Agriculture<span class=\"_ _2ba\"> </span><span class=\"ff15\">2.1<span class=\"_ _9e\"> </span><span class=\"ff16\">2.4<span class=\"_ _36a\"> </span></span></span>Print and paper<span class=\"_ _33a\"> </span><span class=\"ff15\">1.6<span class=\"_ _9e\"> </span><span class=\"ff16\">1.3<span class=\"_ _36a\"> </span></span></span>Other<span class=\"_ _332\"> </span><span class=\"ff15\">4.3<span class=\"_ _9e\"> </span><span class=\"ff16\">6.3<span class=\"_ _36a\"> </span></span></span>100.0<span class=\"_ _d5\"> </span><span class=\"ff16\">100.0<span class=\"_ _36a\"> </span></span>Motor<span class=\"_ _0\"></span> finance loans are secur<span class=\"_ _0\"></span>ed ov<span class=\"_ _0\"></span>er cars, mot<span class=\"_ _0\"></span>orhomes and light commercial <span class=\"_ _0\"></span>vehicles and repr<span class=\"_ _0\"></span>esent exposur<span class=\"_ _0\"></span>e to consumers and small businesses.<span class=\"_ _36a\"> </span>Structured lending<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s structured lending division pr<span class=\"_ _0\"></span>ovides re<span class=\"_ _0\"></span>volving loan <span class=\"_ _0\"></span>facilities to support non-bank<span class=\"_ _0\"></span> lending businesses. Loans are made <span class=\"_ _0\"></span>to a Special Purpose V<span class=\"_ _1\"></span>ehicle (\u2018SPV\u2019) company<span class=\"_ _0\"></span> controlled by<span class=\"_ _0\"></span> the customer<span class=\"_ _1\"></span> and effectively secur<span class=\"_ _0\"></span>ed on the loans made b<span class=\"_ _0\"></span>y the SP<span class=\"_ _0\"></span>V<span class=\"_ _1\"></span>. Exposure is limited to a per<span class=\"_ _0\"></span>centage of<span class=\"_ _0\"></span> the underlying assets, pr<span class=\"_ _0\"></span>oviding a buffer<span class=\"_ _1\"></span> against credit loss.<span class=\"_ _36a\"> </span>Summary details o<span class=\"_ _0\"></span>f the structur<span class=\"_ _1\"></span>ed lending portfolio are set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>Number of active facilities<span class=\"_ _1fa\"> </span><span class=\"ff15\">9<span class=\"_ _149\"> </span><span class=\"ff16\">8<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal facilities (\u00a3m)<span class=\"_ _2d8\"> </span><span class=\"ff15\">235.7<span class=\"_ _d5\"> </span><span class=\"ff16\">220.5<span class=\"_ _36a\"> </span></span></span>Carrying value (\u00a3m)<span class=\"_ _22b\"> </span><span class=\"ff15\">169.0<span class=\"_ _150\"> </span><span class=\"ff16\">178.7<span class=\"_ _36a\"> </span></span></span>The maximum advance under<span class=\"_ _0\"></span> these <span class=\"_ _0\"></span>facilities w<span class=\"_ _0\"></span>as generally 80% o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the underlying assets, except<span class=\"_ _0\"></span> where loans secur<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> residential property<span class=\"_ _0\"></span> form <span class=\"_ _0\"></span>the security <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the facility<span class=\"_ _1\"></span>, where 90% is admissible. These accounts do not hav<span class=\"_ _0\"></span>e a requir<span class=\"_ _0\"></span>ement to mak<span class=\"_ _0\"></span>e regular<span class=\"_ _0\"></span> payments, operating on a r<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>olving basis. The perf<span class=\"_ _0\"></span>ormance of each loan is monitored monthly<span class=\"_ _0\"></span> on a case-by-case basis b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s Credit Risk <span class=\"_ _0\"></span>function, assessing compliance with cov<span class=\"_ _0\"></span>enants relating <span class=\"_ _0\"></span>to both the customer and <span class=\"_ _0\"></span>the performance and composition of<span class=\"_ _0\"></span> the asset pool. <span class=\"_ _1\"></span>These assessments, which are r<span class=\"_ _0\"></span>eported to Cr<span class=\"_ _0\"></span>edit Committee, are used <span class=\"_ _0\"></span>to inform the assessment<span class=\"_ _0\"></span> of expect<span class=\"_ _0\"></span>ed credit loss under<span class=\"_ _0\"></span> IFRS 9.<span class=\"_ _36a\"> </span>At 30 Sept<span class=\"_ _0\"></span>ember 2023 one of<span class=\"_ _0\"></span> these f<span class=\"_ _0\"></span>acilities was identified as Stag<span class=\"_ _0\"></span>e 2 with <span class=\"_ _0\"></span>the remainder<span class=\"_ _0\"></span> in Stage 1. <span class=\"_ _0\"></span>At 30 September<span class=\"_ _0\"></span> 2022, all of<span class=\"_ _0\"></span> these facilities <span class=\"_ _0\"></span>were identified as S<span class=\"_ _0\"></span>tage 1.<span class=\"_ _36a\"> </span>RLS, CBILS and BBL<span class=\"_ _0\"></span>S<span class=\"_ _36a\"> </span>Loans under<span class=\"_ _0\"></span> these schemes hav<span class=\"_ _0\"></span>e the benefit o<span class=\"_ _0\"></span>f guarantees underwritt<span class=\"_ _0\"></span>en by <span class=\"_ _0\"></span>the UK Gov<span class=\"_ _0\"></span>ernment, which launched <span class=\"_ _0\"></span>them as a response to the impact o<span class=\"_ _0\"></span>f Covid on UK<span class=\"_ _0\"></span> SMEs.<span class=\"_ _36a\"> </span>CBILS and BBLS w<span class=\"_ _0\"></span>ere launched in 2020 and r<span class=\"_ _0\"></span>emained open for<span class=\"_ _0\"></span> new<span class=\"_ _0\"></span> applications until March 2021. RLS <span class=\"_ _0\"></span>was launched in <span class=\"_ _0\"></span>April 2021 as a successor scheme and has subsequently<span class=\"_ _0\"></span> been extended <span class=\"_ _0\"></span>twice. It is currently<span class=\"_ _0\"></span> expected to be a<span class=\"_ _0\"></span>vailable f<span class=\"_ _0\"></span>or ne<span class=\"_ _0\"></span>w lending until <span class=\"_ _0\"></span>June 2024.<span class=\"_ _36a\"> </span>The Group o<span class=\"_ _0\"></span>ffered <span class=\"_ _0\"></span>term loans and asset finance loans under<span class=\"_ _1\"></span> the CBIL scheme. Interest and <span class=\"_ _0\"></span>fees w<span class=\"_ _0\"></span>ere paid b<span class=\"_ _0\"></span>y the UK<span class=\"_ _0\"></span> Government<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> the first<span class=\"_ _0\"></span> twelv<span class=\"_ _0\"></span>e months and the go<span class=\"_ _0\"></span>vernment guarantee co<span class=\"_ _0\"></span>vers up <span class=\"_ _0\"></span>to 80% of <span class=\"_ _0\"></span>the lender\u2019<span class=\"_ _1\"></span>s principal loss after the application of<span class=\"_ _1\"></span> any proceeds <span class=\"_ _0\"></span>from the asse<span class=\"_ _0\"></span>t financed (if<span class=\"_ _0\"></span> applicable).<span class=\"_ _36a\"> </span>Loans under<span class=\"_ _0\"></span> the BBL<span class=\"_ _0\"></span> scheme are six <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> term loans at a standar<span class=\"_ _0\"></span>d 2.5% per annum inter<span class=\"_ _0\"></span>est rate. <span class=\"_ _0\"></span>The UK Go<span class=\"_ _0\"></span>vernment paid <span class=\"_ _0\"></span>the interest on <span class=\"_ _0\"></span>the loan for<span class=\"_ _1\"></span> the first tw<span class=\"_ _0\"></span>elve months and pr<span class=\"_ _0\"></span>ovides lenders with a guar<span class=\"_ _0\"></span>antee covering <span class=\"_ _0\"></span>the whole outstanding balance.<span class=\"_ _36a\"> </span>The Group o<span class=\"_ _0\"></span>ffers t<span class=\"_ _0\"></span>erm loans and asset finance loans under<span class=\"_ _0\"></span> the RLS. Inter<span class=\"_ _0\"></span>est and f<span class=\"_ _0\"></span>ees are pay<span class=\"_ _0\"></span>able by<span class=\"_ _0\"></span> the customer<span class=\"_ _0\"></span> from incep<span class=\"_ _0\"></span>tion. The Gov<span class=\"_ _0\"></span>ernment guarantee cov<span class=\"_ _0\"></span>ers up to 80% o<span class=\"_ _0\"></span>f the lender\u2019<span class=\"_ _2\"></span>s principal loss, after the application of<span class=\"_ _1\"></span> any proceeds <span class=\"_ _0\"></span>from the asse<span class=\"_ _0\"></span>t financed (if applicable<span class=\"_ _0\"></span>), on applications receiv<span class=\"_ _0\"></span>ed before 1 <span class=\"_ _1\"></span>January 2022 and up to 70% <span class=\"_ _0\"></span>for applications r<span class=\"_ _0\"></span>eceived <span class=\"_ _0\"></span>thereafter<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s outstanding RLS, CBILS and BBLS loans at 30 Sep<span class=\"_ _0\"></span>tember 2023 <span class=\"_ _0\"></span>were:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>RLS<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>erm loans<span class=\"_ _33b\"> </span><span class=\"ff15\">1.0<span class=\"_ _9e\"> </span><span class=\"ff16\">0.6<span class=\"_ _36a\"> </span></span></span>Asset finance<span class=\"_ _336\"> </span><span class=\"ff15\">36.0<span class=\"_ _3a\"> </span><span class=\"ff16\">41.5<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal RLS<span class=\"_ _33c\"> </span><span class=\"ff15\">37.0<span class=\"_ _3a\"> </span><span class=\"ff16\">42.1<span class=\"_ _36a\"> </span></span></span>CBILS<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>erm loans<span class=\"_ _33d\"> </span><span class=\"ff15\">12.6<span class=\"_ _3a\"> </span><span class=\"ff16\">18.3<span class=\"_ _36a\"> </span></span></span>Asset finance<span class=\"_ _336\"> </span><span class=\"ff15\">14.5<span class=\"_ _3a\"> </span><span class=\"ff16\">23.6<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal CBILS<span class=\"_ _33d\"> </span><span class=\"ff15\">27.1<span class=\"_ _3a\"> </span><span class=\"ff16\">41.9<span class=\"_ _36a\"> </span></span></span>BBLS<span class=\"_ _33e\"> </span>3.1<span class=\"_ _9e\"> </span><span class=\"ff16\">4.0<span class=\"_ _36a\"> </span></span>67.2<span class=\"_ _3a\"> </span><span class=\"ff16\">88.0<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal term loans<span class=\"_ _1eb\"> </span><span class=\"ff15\">16.7<span class=\"_ _3a\"> </span><span class=\"ff16\">22.9<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal asset finance (note 18)<span class=\"_ _33f\"> </span><span class=\"ff15\">50.5<span class=\"_ _3a\"> </span><span class=\"ff16\">65.1<span class=\"_ _36a\"> </span></span></span>67.2<span class=\"_ _3a\"> </span><span class=\"ff16\">88.0<span class=\"_ _36a\"> </span></span>At 30 Sept<span class=\"_ _0\"></span>ember 2023, \u00a30<span class=\"_ _0\"></span>.7m of<span class=\"_ _0\"></span> this balance w<span class=\"_ _0\"></span>as considered <span class=\"_ _0\"></span>to be non-performing (2022: \u00a30<span class=\"_ _0\"></span>.6m).<span class=\"_ _36a\"> </span>Unsecured consumer<span class=\"_ _0\"></span> loans<span class=\"_ _36a\"> </span>The Group disposed o<span class=\"_ _0\"></span>f almost all its unsecur<span class=\"_ _0\"></span>ed consumer loan portf<span class=\"_ _0\"></span>olio during the y<span class=\"_ _0\"></span>ear ended 30 Sep<span class=\"_ _0\"></span>tember 2022 (<span class=\"_ _0\"></span>note 7). It retains an interest only<span class=\"_ _1\"></span> in a limited number of unsecur<span class=\"_ _0\"></span>ed accounts ex<span class=\"_ _0\"></span>cluded from <span class=\"_ _0\"></span>the sale. Almost all the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s unsecured consumer loan assets <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e part of pur<span class=\"_ _0\"></span>chased debt portfolios <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>the consideration paid w<span class=\"_ _0\"></span>as based on the cr<span class=\"_ _0\"></span>edit quality and perf<span class=\"_ _0\"></span>ormance of <span class=\"_ _0\"></span>the loans at the point of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>transaction. Collections on purchased accounts r<span class=\"_ _0\"></span>emained in excess o<span class=\"_ _0\"></span>f those implicit<span class=\"_ _0\"></span> in the purchase prices until <span class=\"_ _0\"></span>the point of<span class=\"_ _0\"></span> sale in June 2022.<span class=\"_ _36a\"> </span>Arrears performance<span class=\"_ _36a\"> </span>The number<span class=\"_ _0\"></span> of accounts in arr<span class=\"_ _0\"></span>ears by<span class=\"_ _0\"></span> asset class, based on the most commonly<span class=\"_ _0\"></span> quoted definition of<span class=\"_ _1\"></span> arrears for<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>type of asset, at<span class=\"_ _0\"></span> 30 September<span class=\"_ _0\"></span> 2023 and 30 September 2022, compar<span class=\"_ _0\"></span>ed to <span class=\"_ _0\"></span>the industry a<span class=\"_ _0\"></span>verages at <span class=\"_ _0\"></span>those dates published by<span class=\"_ _0\"></span> UK Finance (\u2018UKF\u2019) and the FLA, was: 2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>%<span class=\"_ _43\"> </span><span class=\"ff16\">%<span class=\"_ _36a\"> </span></span>First mortg<span class=\"_ _0\"></span>ages<span class=\"_ _36a\"> </span>Accounts more than thr<span class=\"_ _0\"></span>ee months in arrear<span class=\"_ _0\"></span>s <span class=\"_ _c0\"> </span>Buy-to-let accounts including r<span class=\"_ _0\"></span>eceiver of rent c<span class=\"_ _0\"></span>ases<span class=\"_ _2a1\"> </span><span class=\"ff15\">0.34<span class=\"_ _3a\"> </span><span class=\"ff16\">0.15</span></span> <span class=\"_ _c0\"> </span>Buy-to-let accounts e<span class=\"_ _0\"></span>xcluding receiv<span class=\"_ _0\"></span>er of rent cases<span class=\"_ _128\"> </span><span class=\"ff15\">0.15<span class=\"_ _3a\"> </span><span class=\"ff16\">0.11</span></span> <span class=\"_ _c0\"> </span>Owner-occupied accounts <span class=\"_ _2dc\"> </span><span class=\"ff15\">2.93<span class=\"_ _3a\"> </span><span class=\"ff16\">2.79<span class=\"_ _36a\"> </span></span></span>UKF data f<span class=\"_ _0\"></span>or mortgage acc<span class=\"_ _0\"></span>ounts more than three mon<span class=\"_ _0\"></span>ths in arrears <span class=\"_ _c0\"> </span>Buy-to-let accounts including r<span class=\"_ _0\"></span>eceiver of rent c<span class=\"_ _0\"></span>ases<span class=\"_ _2a1\"> </span><span class=\"ff15\">0.69<span class=\"_ _3a\"> </span><span class=\"ff16\">0.41</span></span> <span class=\"_ _c0\"> </span>Buy-to-let accounts e<span class=\"_ _0\"></span>xcluding receiv<span class=\"_ _0\"></span>er of rent cases<span class=\"_ _128\"> </span><span class=\"ff15\">0.64<span class=\"_ _3a\"> </span><span class=\"ff16\">0.39</span></span> <span class=\"_ _c0\"> </span>Owner-occupied accounts <span class=\"_ _2dc\"> </span><span class=\"ff15\">0.89<span class=\"_ _3a\"> </span><span class=\"ff16\">0.80</span></span> <span class=\"_ _c0\"> </span>All mortgages<span class=\"_ _224\"> </span><span class=\"ff15\">0.84<span class=\"_ _3a\"> </span><span class=\"ff16\">0.72<span class=\"_ _36a\"> </span></span></span>Second charge mortg<span class=\"_ _0\"></span>age loans<span class=\"_ _36a\"> </span>Accounts more than 2 mon<span class=\"_ _0\"></span>ths in arrears <span class=\"_ _c0\"> </span>All accounts<span class=\"_ _340\"> </span><span class=\"ff15\">23.48<span class=\"_ _d5\"> </span><span class=\"ff16\">21.33</span></span> <span class=\"_ _c0\"> </span>Post<span class=\"_ _0\"></span>-2010 originations<span class=\"_ _1e4\"> </span><span class=\"ff15\">2.42<span class=\"_ _3a\"> </span><span class=\"ff16\">1.88</span></span> <span class=\"_ _c0\"> </span>Legacy cases (pre-2010 originations)<span class=\"_ _341\"> </span><span class=\"ff15\">26.58<span class=\"_ _d5\"> </span><span class=\"ff16\">24.45</span></span> <span class=\"_ _c0\"> </span>Purchased assets<span class=\"_ _342\"> </span><span class=\"ff15\">30.10<span class=\"_ _d5\"> </span><span class=\"ff16\">27.71<span class=\"_ _36a\"> </span></span></span>FLA data f<span class=\"_ _0\"></span>or second mortgag<span class=\"_ _0\"></span>e loans <span class=\"_ _1ed\"> </span><span class=\"ff15\">6.30<span class=\"_ _3a\"> </span><span class=\"ff16\">7.50<span class=\"_ _36a\"> </span></span></span>Motor finance loans<span class=\"_ _36a\"> </span>Accounts more than 2 mon<span class=\"_ _0\"></span>ths in arrears <span class=\"_ _c0\"> </span>All accounts<span class=\"_ _343\"> </span><span class=\"ff15\">1.08<span class=\"_ _3a\"> </span><span class=\"ff16\">2.07</span></span> <span class=\"_ _c0\"> </span>Originated cases<span class=\"_ _344\"> </span><span class=\"ff15\">1.07<span class=\"_ _3a\"> </span><span class=\"ff16\">1.58</span></span> <span class=\"_ _c0\"> </span>Purchased assets<span class=\"_ _2d8\"> </span><span class=\"ff15\">1.32<span class=\"_ _3a\"> </span><span class=\"ff16\">8.94<span class=\"_ _36a\"> </span></span></span>FLA data f<span class=\"_ _0\"></span>or consumer point of sale hire pur<span class=\"_ _0\"></span>chase <span class=\"_ _27e\"> </span><span class=\"ff15\">3.60<span class=\"_ _3a\"> </span><span class=\"ff16\">3.40<span class=\"_ _36a\"> </span></span></span>Asset finance loans<span class=\"_ _36a\"> </span>Accounts more than 2 mon<span class=\"_ _0\"></span>ths in arrears<span class=\"_ _ea\"> </span><span class=\"ff15\">0.23<span class=\"_ _3a\"> </span><span class=\"ff16\">0.08<span class=\"_ _36a\"> </span></span></span>FLA data f<span class=\"_ _0\"></span>or business lease / hire purchase loans<span class=\"_ _345\"> </span><span class=\"ff15\">0.60<span class=\"_ _3a\"> </span><span class=\"ff16\">0.80<span class=\"_ _36a\"> </span></span></span>No published industry data <span class=\"_ _0\"></span>for asse<span class=\"_ _0\"></span>t classes comparable to <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s other books has been identified. <span class=\"_ _0\"></span>Where r<span class=\"_ _0\"></span>evised data at  30 September<span class=\"_ _0\"></span> 2022 has been published by <span class=\"_ _0\"></span>the FLA<span class=\"_ _0\"></span> or UKF<span class=\"_ _2\"></span>, the comparativ<span class=\"_ _0\"></span>e industry figur<span class=\"_ _0\"></span>es abov<span class=\"_ _0\"></span>e have been amended. Arrears inf<span class=\"_ _0\"></span>ormation is not given <span class=\"_ _0\"></span>for de<span class=\"_ _0\"></span>velopment <span class=\"_ _0\"></span>finance, structured lending or<span class=\"_ _0\"></span> invoice <span class=\"_ _0\"></span>finance activities as the structure o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the products means <span class=\"_ _0\"></span>that such a measure is not<span class=\"_ _0\"></span> appropriate. The Group calculat<span class=\"_ _0\"></span>es its headline arrears measur<span class=\"_ _0\"></span>e for<span class=\"_ _0\"></span> buy-to-le<span class=\"_ _0\"></span>t mortgages, shown abo<span class=\"_ _0\"></span>ve, based on the number<span class=\"_ _0\"></span>s of accounts three months or<span class=\"_ _0\"></span> more in arr<span class=\"_ _0\"></span>ears, including purchased asse<span class=\"_ _0\"></span>ts, but excluding <span class=\"_ _0\"></span>those cases in possession and receiver<span class=\"_ _1\"></span> of rent cases designated for<span class=\"_ _1\"></span> sale. This is consistent <span class=\"_ _0\"></span>with the methodology<span class=\"_ _0\"></span> used by UKF<span class=\"_ _0\"></span> in compiling its statistics f<span class=\"_ _0\"></span>or the buy<span class=\"_ _0\"></span>-to-let mortg<span class=\"_ _0\"></span>age market as a whole.<span class=\"_ _36a\"> </span>The number<span class=\"_ _0\"></span> of accounts in arr<span class=\"_ _0\"></span>ears will naturally<span class=\"_ _0\"></span> be higher <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> legacy<span class=\"_ _0\"></span> books, such as the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s legacy<span class=\"_ _0\"></span> second charge mortgag<span class=\"_ _0\"></span>es and residential <span class=\"_ _0\"></span>first mortgages <span class=\"_ _0\"></span>than for<span class=\"_ _0\"></span> comparable active ones, as perf<span class=\"_ _0\"></span>orming accounts pay o<span class=\"_ _0\"></span>ff their<span class=\"_ _0\"></span> balances, leaving arr<span class=\"_ _0\"></span>ears accounts repr<span class=\"_ _0\"></span>esenting a greater<span class=\"_ _0\"></span> proportion o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>total.<span class=\"_ _36a\"> </span>The figur<span class=\"_ _0\"></span>es shown abov<span class=\"_ _0\"></span>e for<span class=\"_ _0\"></span> second charge mortgag<span class=\"_ _0\"></span>e loans incorporate pur<span class=\"_ _0\"></span>chased portfolios which gener<span class=\"_ _0\"></span>ally include a high proportion of<span class=\"_ _0\"></span> cases in arrear<span class=\"_ _0\"></span>s at the time o<span class=\"_ _0\"></span>f pur<span class=\"_ _0\"></span>chase and wher<span class=\"_ _0\"></span>e this lev<span class=\"_ _0\"></span>el of perf<span class=\"_ _0\"></span>ormance is allowed <span class=\"_ _0\"></span>for in <span class=\"_ _0\"></span>the discount to curr<span class=\"_ _0\"></span>ent balance repr<span class=\"_ _0\"></span>esented by<span class=\"_ _0\"></span> the pur<span class=\"_ _0\"></span>chase price. Howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, this will lead <span class=\"_ _0\"></span>to higher <span class=\"_ _0\"></span>than averag<span class=\"_ _0\"></span>e reported arr<span class=\"_ _0\"></span>ears.<span class=\"_ _36a\"> </span>Acquired assets<span class=\"_ _36a\"> </span>A significant<span class=\"_ _0\"></span> proportion of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019 second char<span class=\"_ _0\"></span>ge mortgage balances and, historically<span class=\"_ _1\"></span>, almost all its unsecured consumer<span class=\"_ _0\"></span> loan assets are, or<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>ere, part of<span class=\"_ _0\"></span> purchased deb<span class=\"_ _0\"></span>t portfolios, wher<span class=\"_ _0\"></span>e the consideration paid <span class=\"_ _0\"></span>was based on <span class=\"_ _0\"></span>the credit quality<span class=\"_ _0\"></span> and performance of <span class=\"_ _0\"></span>the loans at the point o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the transaction. No additional loans <span class=\"_ _0\"></span>to customers tr<span class=\"_ _0\"></span>eated as POCI w<span class=\"_ _0\"></span>ere acquir<span class=\"_ _0\"></span>ed in the y<span class=\"_ _0\"></span>ear ended  30 September<span class=\"_ _0\"></span> 2022 or <span class=\"_ _0\"></span>the year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2023.<span class=\"_ _36a\"> </span>Collections on purchased accounts hav<span class=\"_ _0\"></span>e been comfortably<span class=\"_ _0\"></span> in excess of<span class=\"_ _0\"></span> those implicit in <span class=\"_ _0\"></span>the purchase prices.<span class=\"_ _36a\"> </span>In the debt pur<span class=\"_ _0\"></span>chase industry<span class=\"_ _1\"></span>, Estimated Remaining Collections (\u2018ERC\u2019) is commonly used as a measur<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>alue of a portf<span class=\"_ _0\"></span>olio. This is defined as the sum o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the undiscounted cash flow<span class=\"_ _0\"></span>s expected to be r<span class=\"_ _0\"></span>eceived o<span class=\"_ _0\"></span>ver a specified <span class=\"_ _0\"></span>future period. In <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s view<span class=\"_ _1\"></span>, this measure ma<span class=\"_ _0\"></span>y be suitable f<span class=\"_ _0\"></span>or heavily<span class=\"_ _0\"></span> discounted, unsecured, distr<span class=\"_ _1\"></span>essed portfolios (which will be <span class=\"_ _0\"></span>treated as POCI under<span class=\"_ _0\"></span> IFRS 9), but is less applicable for<span class=\"_ _1\"></span> the types of<span class=\"_ _0\"></span> portfolio in which <span class=\"_ _0\"></span>the Group has inv<span class=\"_ _0\"></span>ested, wher<span class=\"_ _0\"></span>e cash flow<span class=\"_ _0\"></span>s are higher<span class=\"_ _0\"></span> on acquisition, loans may be secured on pr<span class=\"_ _0\"></span>operty and customers ma<span class=\"_ _0\"></span>y not<span class=\"_ _0\"></span> be in default. In such cases, the IFRS 9 amortised cost balance, at which <span class=\"_ _0\"></span>these assets are carried in <span class=\"_ _0\"></span>the Group balance sheet, pr<span class=\"_ _0\"></span>ovides a better<span class=\"_ _0\"></span> indication of<span class=\"_ _0\"></span> value.<span class=\"_ _36a\"> </span>Howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, to aid comparability<span class=\"_ _1\"></span>, the 84 and 120 month ERC v<span class=\"_ _0\"></span>alues for<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s purchased consumer loan assets, ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>. These are deriv<span class=\"_ _0\"></span>ed using the same models and assumptions used in <span class=\"_ _0\"></span>the EIR calculations. ERCs are set out both <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> all purchased consumer portf<span class=\"_ _0\"></span>olios and for<span class=\"_ _0\"></span> those classified as POCI under<span class=\"_ _0\"></span> IFRS 9.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2021<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>All purchased consumer assets<span class=\"_ _36a\"> </span>Carrying value<span class=\"_ _227\"> </span><span class=\"ff15\">58.6<span class=\"_ _3a\"> </span><span class=\"ff16\">75.3<span class=\"_ _150\"> </span>185.2<span class=\"_ _36a\"> </span></span></span>84 month ERCs<span class=\"_ _1c2\"> </span><span class=\"ff15\">68.9<span class=\"_ _3a\"> </span><span class=\"ff16\">88.6<span class=\"_ _150\"> </span>221.2<span class=\"_ _36a\"> </span></span></span>120 month ERCs<span class=\"_ _1e6\"> </span><span class=\"ff15\">73.4<span class=\"_ _3a\"> </span><span class=\"ff16\">94.2<span class=\"_ _150\"> </span>245.2<span class=\"_ _36a\"> </span></span></span>POCI assets only<span class=\"_ _36a\"> </span>Carrying value<span class=\"_ _227\"> </span><span class=\"ff15\">17.7<span class=\"_ _3a\"> </span><span class=\"ff16\">21.4<span class=\"_ _150\"> </span>113.2<span class=\"_ _36a\"> </span></span></span>84 month ERCs<span class=\"_ _1c2\"> </span><span class=\"ff15\">24.5<span class=\"_ _3a\"> </span><span class=\"ff16\">29.9<span class=\"_ _150\"> </span>143.9<span class=\"_ _36a\"> </span></span></span>120 month ERCs<span class=\"_ _1e6\"> </span><span class=\"ff15\">27.8<span class=\"_ _3a\"> </span><span class=\"ff16\">33.0<span class=\"_ _150\"> </span>163.4<span class=\"_ _36a\"> </span></span></span>Amounts shown abov<span class=\"_ _0\"></span>e are disclosed as loans <span class=\"_ _0\"></span>to customers (not<span class=\"_ _0\"></span>e 18). The<span class=\"_ _0\"></span>y include <span class=\"_ _0\"></span>first mortgages, second charg<span class=\"_ _0\"></span>e mortgage loans and, in the amounts shown <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> 2021 unsecured consumer<span class=\"_ _0\"></span> loans.<span class=\"_ _36a\"> </span>The reduction in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear ended 30 Sept<span class=\"_ _0\"></span>ember 2022 primarily<span class=\"_ _0\"></span> reflects <span class=\"_ _0\"></span>the disposal of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s unsecured consumer lending  assets (note 7).<span class=\"_ _36a\"> </span>Cash balances<span class=\"_ _36a\"> </span>The credit<span class=\"_ _0\"></span> risk inherent in <span class=\"_ _0\"></span>the cash positions of <span class=\"_ _0\"></span>the Group and <span class=\"_ _0\"></span>the Company is contr<span class=\"_ _0\"></span>olled by<span class=\"_ _0\"></span> AL<span class=\"_ _1\"></span>CO, which de<span class=\"_ _0\"></span>termines which institutions deposits may<span class=\"_ _0\"></span> be placed with. <span class=\"_ _0\"></span>The Group has <span class=\"_ _0\"></span>formal risk appetites, policies and limits, appr<span class=\"_ _0\"></span>oved b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Risk and Compliance Committee. T<span class=\"_ _0\"></span>hese include limitations on large exposur<span class=\"_ _0\"></span>es to mitigat<span class=\"_ _0\"></span>e any concentration risk<span class=\"_ _0\"></span> in respect of<span class=\"_ _1\"></span> its investments. F<span class=\"_ _1\"></span>or cash deposits within <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s securitisation structures, the scheme documents <span class=\"_ _0\"></span>will set out criteria f<span class=\"_ _0\"></span>or allow<span class=\"_ _0\"></span>able investments, including rating thresholds.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s cash balances are held in sterling at <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England and at highly rat<span class=\"_ _0\"></span>ed banks in current and call accounts. Cash is also invested in UK<span class=\"_ _0\"></span> gov<span class=\"_ _0\"></span>ernment securities and as short fix<span class=\"_ _0\"></span>ed-term money<span class=\"_ _1\"></span> market deposits fr<span class=\"_ _0\"></span>om time to <span class=\"_ _0\"></span>time. The carrying v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s and the Company\u2019<span class=\"_ _1\"></span>s cash balances analysed b<span class=\"_ _0\"></span>y their<span class=\"_ _0\"></span> long-<span class=\"_ _0\"></span>term credit rating as de<span class=\"_ _0\"></span>termined by<span class=\"_ _0\"></span> Fitch is set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>The Group<span class=\"_ _36a\"> </span>Cash with central bank<span class=\"_ _0\"></span>s rat<span class=\"_ _0\"></span>ed: <span class=\"_ _c0\"> </span>A<span class=\"_ _15\"></span>A-<span class=\"_ _206\"> </span><span class=\"ff15 ls0 ws0\">2,783.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,612.5<span class=\"_ _36a\"> </span></span></span>2,783.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,612.5<span class=\"_ _36a\"> </span></span>Cash with retail bank<span class=\"_ _0\"></span>s rat<span class=\"_ _0\"></span>ed: <span class=\"_ _c0\"> </span>A<span class=\"_ _15\"></span>A-<span class=\"_ _346\"> </span><span class=\"ff15 ls0 ws0\">78.9<span class=\"_ _3a\"> </span><span class=\"ff16\">46.9</span></span> <span class=\"_ _c0\"> </span>A+<span class=\"_ _347\"> </span><span class=\"ff15\">132.1<span class=\"_ _d5\"> </span><span class=\"ff16\">271.5<span class=\"_ _36a\"> </span></span></span>211.0<span class=\"_ _d5\"> </span><span class=\"ff16\">318.4<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal exposure<span class=\"_ _348\"> </span><span class=\"ff15\">2,994.3<span class=\"_ _86\"> </span><span class=\"ff16\">1,930.9<span class=\"_ _36a\"> </span></span></span>The Company<span class=\"_ _36a\"> </span>Cash with retail bank<span class=\"_ _0\"></span>s rat<span class=\"_ _0\"></span>ed: <span class=\"_ _c0\"> </span>A+<span class=\"_ _349\"> </span><span class=\"ff15\">27.6<span class=\"_ _3a\"> </span><span class=\"ff16\">19.7<span class=\"_ _36a\"> </span></span></span>CRDs are exposur<span class=\"_ _0\"></span>es to <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England and thus shar<span class=\"_ _0\"></span>e the central bank rating no<span class=\"_ _0\"></span>ted above <span class=\"_ _0\"></span>while CSA<span class=\"_ _0\"></span> assets, placed with r<span class=\"_ _0\"></span>etail banks, have similar<span class=\"_ _1\"></span> ratings to those shown abo<span class=\"_ _0\"></span>ve f<span class=\"_ _0\"></span>or r<span class=\"_ _0\"></span>etail bank deposits.<span class=\"_ _36a\"> </span>Credit risk<span class=\"_ _0\"></span> on all these balances, and any<span class=\"_ _0\"></span> interest accrued <span class=\"_ _0\"></span>thereon, is consider<span class=\"_ _0\"></span>ed to be minimal. <span class=\"_ _0\"></span>These balances ar<span class=\"_ _0\"></span>e considered as Stage 1 f<span class=\"_ _0\"></span>or IFRS 9 impairment purposes with a PD such <span class=\"_ _0\"></span>that any<span class=\"_ _0\"></span> pro<span class=\"_ _0\"></span>vision required <span class=\"_ _0\"></span>would be immaterial.<span class=\"_ _36a\"> </span>T<span class=\"_ _1\"></span>rade debtors<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s trade debt<span class=\"_ _0\"></span>ors balance repr<span class=\"_ _0\"></span>esents principally amounts outstanding on unpaid operating lease oblig<span class=\"_ _0\"></span>ations in the asset finance business, wher<span class=\"_ _0\"></span>e similar acceptance crit<span class=\"_ _0\"></span>eria to those used <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> finance lease cases apply<span class=\"_ _0\"></span>. Financial assets at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s financial assets held at <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value comprise solely<span class=\"_ _0\"></span> derivative <span class=\"_ _0\"></span>financial instruments used for<span class=\"_ _0\"></span> hedging purposes (note 26).<span class=\"_ _36a\"> </span>In order<span class=\"_ _0\"></span> to contr<span class=\"_ _0\"></span>ol credit risk<span class=\"_ _0\"></span> relating t<span class=\"_ _0\"></span>o counterparties to <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s derivative financial instruments, <span class=\"_ _1\"></span>ALCO r<span class=\"_ _0\"></span>eview<span class=\"_ _0\"></span>s and appro<span class=\"_ _0\"></span>ves which counterparties the Gr<span class=\"_ _0\"></span>oup will deal <span class=\"_ _0\"></span>with, establishes limits for<span class=\"_ _0\"></span> each counterparty and monitor<span class=\"_ _0\"></span>s compliance with those limits. <span class=\"_ _1\"></span>Any changes necessary<span class=\"_ _0\"></span> are advised t<span class=\"_ _0\"></span>o ERC. T<span class=\"_ _0\"></span>he Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s counterparties are typically<span class=\"_ _0\"></span> highly rat<span class=\"_ _0\"></span>ed banks and, for<span class=\"_ _0\"></span> all derivativ<span class=\"_ _0\"></span>e positions held within securitisation structur<span class=\"_ _0\"></span>es, must comply <span class=\"_ _0\"></span>with criteria set out in <span class=\"_ _0\"></span>the financing arrangements, <span class=\"_ _0\"></span>which are monitor<span class=\"_ _0\"></span>ed externally<span class=\"_ _1\"></span>. Since June 2019<span class=\"_ _1\"></span>, the Group has been centrally<span class=\"_ _0\"></span> clearing certain eligible derivativ<span class=\"_ _0\"></span>es with a Central Clearing Counterparty<span class=\"_ _0\"></span> (\u2018CCP\u2019) which remo<span class=\"_ _0\"></span>ves credit<span class=\"_ _0\"></span> risk between bilateral count<span class=\"_ _0\"></span>erparties and ensures timely<span class=\"_ _0\"></span> settlement and/<span class=\"_ _0\"></span>or porting o<span class=\"_ _0\"></span>f deriv<span class=\"_ _0\"></span>ative contracts in the e<span class=\"_ _0\"></span>vent of <span class=\"_ _0\"></span>the failur<span class=\"_ _0\"></span>e of a count<span class=\"_ _0\"></span>erparty<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>The Group uses <span class=\"_ _0\"></span>the ISDA<span class=\"_ _0\"></span> Master<span class=\"_ _0\"></span> Agr<span class=\"_ _0\"></span>eement and Credit Support<span class=\"_ _0\"></span> Annex (\u2018CS<span class=\"_ _0\"></span>A<span class=\"_ _1\"></span>\u2019) for documenting unclear<span class=\"_ _1\"></span>ed derivative activity<span class=\"_ _0\"></span>. Under a CSA, collateral is passed betw<span class=\"_ _0\"></span>een counterparties to mitig<span class=\"_ _0\"></span>ate the mark<span class=\"_ _0\"></span>et contingent counterparty<span class=\"_ _0\"></span> risk inherent<span class=\"_ _0\"></span> in the outstanding positions. Collateral pledged <span class=\"_ _0\"></span>to such counterparties by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup is shown in note 27<span class=\"_ _2\"></span>, while collateral pledg<span class=\"_ _0\"></span>ed to the Gr<span class=\"_ _0\"></span>oup is shown in note 40<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s exposure <span class=\"_ _0\"></span>to credit risk<span class=\"_ _0\"></span> in respect of<span class=\"_ _0\"></span> the counterparties <span class=\"_ _0\"></span>to its derivativ<span class=\"_ _0\"></span>e financial assets, analysed b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>their long<span class=\"_ _0\"></span>-term credit<span class=\"_ _0\"></span> rating as determined b<span class=\"_ _0\"></span>y Fitch is set out<span class=\"_ _0\"></span> below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Carrying value of deriva<span class=\"_ _0\"></span>tive financial assets<span class=\"_ _36a\"> </span>Counterparties r<span class=\"_ _0\"></span>ated<span class=\"_ _36a\"> </span>AA<span class=\"_ _34a\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">7.0<span class=\"_ _36a\"> </span></span></span>AA-<span class=\"_ _2a8\"> </span><span class=\"ff15 ls0 ws0\">3.3<span class=\"_ _d1\"> </span><span class=\"ff16\">0.5<span class=\"_ _36a\"> </span></span></span>A+<span class=\"_ _34b\"> </span><span class=\"ff15\">588.9<span class=\"_ _d5\"> </span><span class=\"ff16\">757.0<span class=\"_ _36a\"> </span></span></span>A<span class=\"_ _34c\"> </span><span class=\"ff15\">5.5<span class=\"_ _3a\"> </span><span class=\"ff16\">14.5<span class=\"_ _36a\"> </span></span></span>A- <span class=\"_ _34d\"> </span><span class=\"ff15 ls0 ws0\">17.7<span class=\"_ _43\"> </span><span class=\"ff17\">-<span class=\"_ _36a\"> </span></span></span>Gross e<span class=\"_ _0\"></span>xposure (note 26)<span class=\"_ _21c\"> </span><span class=\"ff15\">615.4<span class=\"_ _d5\"> </span><span class=\"ff16\">779.0<span class=\"_ _36a\"> </span></span></span>Collater<span class=\"_ _0\"></span>al amounts post<span class=\"_ _0\"></span>ed<span class=\"_ _36a\"> </span>CSA collat<span class=\"_ _0\"></span>eral amounts (note 40)<span class=\"_ _231\"> </span><span class=\"ff15\">(383.4)<span class=\"_ _110\"> </span></span>(388.3)<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal collater<span class=\"_ _0\"></span>al<span class=\"_ _34e\"> </span><span class=\"ff15\">(383.4)<span class=\"_ _110\"> </span></span>(388.3)<span class=\"_ _36a\"> </span>Net exposur<span class=\"_ _0\"></span>e<span class=\"_ _18d\"> </span><span class=\"ff15\">232.0<span class=\"_ _150\"> </span><span class=\"ff16\">390.7<span class=\"_ _36a\"> </span></span></span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCreditRiskExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-399": {
   "value": "64. <span class=\"_ _96\"></span>Liquidity risk<span class=\"_ _36a\"> </span>Liquidity risk is <span class=\"_ _0\"></span>the risk that<span class=\"_ _0\"></span> the Group might<span class=\"_ _0\"></span> be unable meet its liabilities and financial commitments as the<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>fall due. The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s principal source of<span class=\"_ _0\"></span> liquidity risk<span class=\"_ _0\"></span> is from its r<span class=\"_ _0\"></span>etail deposit funding<span class=\"_ _0\"></span>. Deposit balances raised are <span class=\"_ _0\"></span>typically used <span class=\"_ _0\"></span>to support lending activities wher<span class=\"_ _0\"></span>e maturity is o<span class=\"_ _0\"></span>ver a long<span class=\"_ _0\"></span>er period <span class=\"_ _0\"></span>than that of<span class=\"_ _0\"></span> the deposits. <span class=\"_ _0\"></span>This maturity<span class=\"_ _0\"></span> transformation exposes <span class=\"_ _0\"></span>the Group <span class=\"_ _0\"></span>to liquidity risk.<span class=\"_ _36a\"> </span>Other sour<span class=\"_ _0\"></span>ces of<span class=\"_ _0\"></span> liquidity risk in <span class=\"_ _0\"></span>the normal course of business include <span class=\"_ _0\"></span>that arising:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>In the medium term <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s corporate and retail bonds <span class=\"_ _0\"></span>which are used t<span class=\"_ _0\"></span>o support its general operations and <span class=\"_ _0\"></span>from its participation in central bank funding schemes<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Fr<span class=\"_ _0\"></span>om the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s derivatives portfolio <span class=\"_ _0\"></span>which gives rise to liquidity<span class=\"_ _1\"></span> risk due to the collateral r<span class=\"_ _0\"></span>equirements <span class=\"_ _0\"></span>to cov<span class=\"_ _0\"></span>er adv<span class=\"_ _0\"></span>erse changes in valuation<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Fr<span class=\"_ _0\"></span>om the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s participation in wholesale funding, including SPV<span class=\"_ _1\"></span>s, where sufficient<span class=\"_ _0\"></span> funding must be av<span class=\"_ _0\"></span>ailable<span class=\"_ _36a\"> </span>Liquidity is also r<span class=\"_ _0\"></span>equired <span class=\"_ _0\"></span>to pro<span class=\"_ _0\"></span>vide capital support for<span class=\"_ _0\"></span> new<span class=\"_ _0\"></span> loans and working capital <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the Group.<span class=\"_ _36a\"> </span>Where assets ar<span class=\"_ _0\"></span>e funded b<span class=\"_ _0\"></span>y non-r<span class=\"_ _0\"></span>ecourse arrangements, thr<span class=\"_ _0\"></span>ough the securitisation pr<span class=\"_ _0\"></span>ocess, liquidity risk<span class=\"_ _0\"></span> is effectively<span class=\"_ _0\"></span> eliminated.<span class=\"_ _36a\"> </span>As an authorised deposit tak<span class=\"_ _0\"></span>er<span class=\"_ _1\"></span>, the liquidity position of<span class=\"_ _0\"></span> Paragon Bank<span class=\"_ _0\"></span> PL<span class=\"_ _0\"></span>C, the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s banking subsidiary, is also managed on a stand-alone basis.<span class=\"_ _36a\"> </span>Set out below<span class=\"_ _0\"></span> is a summary o<span class=\"_ _0\"></span>f the contr<span class=\"_ _0\"></span>actual cash flow<span class=\"_ _0\"></span>s expected to arise <span class=\"_ _0\"></span>from the Gr<span class=\"_ _1\"></span>oup\u2019<span class=\"_ _1\"></span>s financial and leasing liabilities, based on the earliest date at <span class=\"_ _0\"></span>which repayment can be demanded.<span class=\"_ _36a\"> </span>Amounts pay<span class=\"_ _0\"></span>able<span class=\"_ _36a\"> </span>In one year or less, or on demand In more than one year<span class=\"_ _1\"></span>, but not more than two year<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span>In more than two year<span class=\"_ _0\"></span>s but not more than five year<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span>In more than five year<span class=\"_ _0\"></span>s<span class=\"ff15\"> </span>T<span class=\"_ _2\"></span>otal \u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Ret<span class=\"_ _0\"></span>ail deposits<span class=\"_ _87\"> </span><span class=\"ff15\">11,278.3<span class=\"_ _86\"> </span>1,782.5<span class=\"_ _d5\"> </span>734.5<span class=\"_ _3a\"> </span>44.4<span class=\"_ _42\"> </span>13,839.7<span class=\"_ _36a\"> </span></span>Borrowings<span class=\"_ _34f\"> </span><span class=\"ff15\">327.1<span class=\"_ _d5\"> </span>160.3<span class=\"_ _86\"> </span>2,811.3<span class=\"_ _d5\"> </span>170.1<span class=\"_ _86\"> </span>3,468.8<span class=\"_ _36a\"> </span></span>Contingent c<span class=\"_ _0\"></span>onsideration<span class=\"_ _13a\"> </span><span class=\"ff15\">-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal non-derivative liabilities<span class=\"_ _179\"> </span><span class=\"ff15\">11,605.4<span class=\"_ _86\"> </span>1,942.8<span class=\"_ _12a\"> </span>3,545.8<span class=\"_ _150\"> </span>214.5<span class=\"_ _42\"> </span>17,308.5<span class=\"_ _36a\"> </span></span>Derivativ<span class=\"_ _0\"></span>e liabilities<span class=\"_ _16c\"> </span><span class=\"ff15\">52.8<span class=\"_ _ff\"> </span>(5.9)<span class=\"_ _72\"> </span>8.7<span class=\"_ _9e\"> </span>0.3<span class=\"_ _3a\"> </span>55.9<span class=\"_ _36a\"> </span></span>11,658.2<span class=\"_ _86\"> </span>1,936.9<span class=\"_ _12a\"> </span>3,554.5<span class=\"_ _d5\"> </span>214.8<span class=\"_ _42\"> </span>17,364.4<span class=\"_ _36a\"> </span>30 September 2022<span class=\"_ _36a\"> </span>Ret<span class=\"_ _0\"></span>ail deposits<span class=\"_ _8b\"> </span><span class=\"ff16\">8,703.4<span class=\"_ _86\"> </span>1,697.8<span class=\"_ _150\"> </span>452.0<span class=\"_ _3a\"> </span>32.0<span class=\"_ _67\"> </span>10,885.2<span class=\"_ _36a\"> </span></span>Borrowings<span class=\"_ _34f\"> </span><span class=\"ff16\">116.8<span class=\"_ _d5\"> </span>251.3<span class=\"_ _86\"> </span>2,928.2<span class=\"_ _150\"> </span>178.1<span class=\"_ _86\"> </span>3,474.4<span class=\"_ _36a\"> </span></span>Contingent c<span class=\"_ _0\"></span>onsideration<span class=\"_ _196\"> </span><span class=\"ff16\">2.2<span class=\"_ _43\"> </span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal non-derivative liabilities<span class=\"_ _ba\"> </span><span class=\"ff16\">8,822.4<span class=\"_ _86\"> </span>1,949.1<span class=\"_ _86\"> </span>3,380.2<span class=\"_ _d5\"> </span>210.1<span class=\"_ _67\"> </span>14,361.8<span class=\"_ _36a\"> </span></span>Derivativ<span class=\"_ _0\"></span>e liabilities<span class=\"_ _16c\"> </span><span class=\"ff16\">88.8<span class=\"_ _3a\"> </span>24.0<span class=\"_ _9e\"> </span>3.6<span class=\"_ _9e\"> </span>0.1<span class=\"_ _150\"> </span>116.5<span class=\"_ _36a\"> </span></span>8,911.2<span class=\"_ _86\"> </span>1,973.1<span class=\"_ _86\"> </span>3,383.8<span class=\"_ _d5\"> </span>210.2<span class=\"_ _67\"> </span>14,478.3<span class=\"_ _36a\"> </span>Non-recourse balances ar<span class=\"_ _0\"></span>e payable only<span class=\"_ _1\"></span> to the extent <span class=\"_ _0\"></span>that funds ar<span class=\"_ _0\"></span>e available, as described <span class=\"_ _0\"></span>further below<span class=\"_ _1\"></span>, and do not expose the Group <span class=\"_ _0\"></span>to any<span class=\"_ _0\"></span> material liquidity risk. <span class=\"_ _0\"></span>They<span class=\"_ _0\"></span> are <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore not included in <span class=\"_ _0\"></span>the table abov<span class=\"_ _0\"></span>e.<span class=\"_ _36a\"> </span>As the amounts set out<span class=\"_ _0\"></span> above include all expected <span class=\"_ _0\"></span>future cash <span class=\"_ _0\"></span>flows, including principal and inter<span class=\"_ _0\"></span>est, the<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>will not agree <span class=\"_ _0\"></span>to amortised cost or <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value amounts r<span class=\"_ _0\"></span>eported in the balance sheet.<span class=\"_ _36a\"> </span>F<span class=\"_ _0\"></span>urther inf<span class=\"_ _0\"></span>ormation on the liquidity e<span class=\"_ _0\"></span>xposure arising fr<span class=\"_ _0\"></span>om the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s retail deposits, securitisation and other<span class=\"_ _0\"></span> borrowings is set out<span class=\"_ _0\"></span> below<span class=\"_ _0\"></span>. The liquidity e<span class=\"_ _0\"></span>xposures of<span class=\"_ _0\"></span> the Company<span class=\"_ _0\"></span> arise only <span class=\"_ _0\"></span>from its borr<span class=\"_ _0\"></span>owings, and are se<span class=\"_ _0\"></span>t out below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>The ov<span class=\"_ _0\"></span>erall responsibility<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> the manag<span class=\"_ _0\"></span>ement of liquidity<span class=\"_ _0\"></span> risk r<span class=\"_ _0\"></span>ests with <span class=\"_ _0\"></span>AL<span class=\"_ _0\"></span>CO which makes r<span class=\"_ _1\"></span>ecommendations for <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s liquidity policy<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> board appr<span class=\"_ _0\"></span>oval. <span class=\"_ _1\"></span>ALCO monitors liquidity<span class=\"_ _0\"></span> risk metrics <span class=\"_ _0\"></span>within limits set by<span class=\"_ _0\"></span> the Board or<span class=\"_ _1\"></span> regulators and uses detailed cash flo<span class=\"_ _0\"></span>w projections <span class=\"_ _0\"></span>to ensure <span class=\"_ _0\"></span>that an adequate lev<span class=\"_ _0\"></span>el of liquidity<span class=\"_ _0\"></span> is av<span class=\"_ _0\"></span>ailable at all times.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s and the Bank\u2019<span class=\"_ _1\"></span>s liquidity position is managed on a da<span class=\"_ _0\"></span>y-to-day<span class=\"_ _1\"></span> basis by the <span class=\"_ _0\"></span>treasury<span class=\"_ _0\"></span> function, under<span class=\"_ _0\"></span> the supervision of<span class=\"_ _0\"></span> AL<span class=\"_ _1\"></span>CO.<span class=\"_ _36a\"> </span>Retail deposits<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s retail <span class=\"_ _0\"></span>funding strategy is <span class=\"_ _0\"></span>focussed on building a stable mix of<span class=\"_ _0\"></span> deposit products. <span class=\"_ _0\"></span>A<span class=\"_ _0\"></span> high proportion of<span class=\"_ _0\"></span> balances, around 95%, are pr<span class=\"_ _0\"></span>otected by<span class=\"_ _1\"></span> the FSCS which mitigates ag<span class=\"_ _0\"></span>ainst the possibility<span class=\"_ _0\"></span> of a r<span class=\"_ _0\"></span>etail run.<span class=\"_ _36a\"> </span>The cash outflow<span class=\"_ _0\"></span>s, including principal and estimated interest contr<span class=\"_ _0\"></span>actually r<span class=\"_ _0\"></span>equired by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s retail deposit balances, analysed by<span class=\"_ _0\"></span> the earliest date at <span class=\"_ _0\"></span>which repa<span class=\"_ _0\"></span>yment can be demanded are set out belo<span class=\"_ _0\"></span>w:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Pa<span class=\"_ _0\"></span>yable on demand<span class=\"_ _22f\"> </span><span class=\"ff15\">4,181.5<span class=\"_ _86\"> </span><span class=\"ff16\">3,934.6<span class=\"_ _36a\"> </span></span></span>Pa<span class=\"_ _0\"></span>yable in less than three mon<span class=\"_ _0\"></span>ths<span class=\"_ _2d7\"> </span><span class=\"ff15\">1,649.5<span class=\"_ _150\"> </span><span class=\"ff16\">955.1<span class=\"_ _36a\"> </span></span></span>Pa<span class=\"_ _0\"></span>yable in less than one year but mor<span class=\"_ _0\"></span>e than three months<span class=\"_ _2a0\"> </span><span class=\"ff15\">5,447.3<span class=\"_ _86\"> </span><span class=\"ff16\">3,813.7<span class=\"_ _36a\"> </span></span></span>Pa<span class=\"_ _0\"></span>yable in less than one year or on demand<span class=\"_ _1b7\"> </span><span class=\"ff15\">11,278.3<span class=\"_ _86\"> </span><span class=\"ff16\">8,703.4<span class=\"_ _36a\"> </span></span></span>Pa<span class=\"_ _0\"></span>yable in one to two y<span class=\"_ _0\"></span>ears<span class=\"_ _2d0\"> </span><span class=\"ff15\">1,782.5<span class=\"_ _86\"> </span><span class=\"ff16\">1,697.8<span class=\"_ _36a\"> </span></span></span>Pa<span class=\"_ _0\"></span>yable in two to fiv<span class=\"_ _0\"></span>e years<span class=\"_ _1ec\"> </span><span class=\"ff15\">734.5<span class=\"_ _d5\"> </span><span class=\"ff16\">452.0<span class=\"_ _36a\"> </span></span></span>Pa<span class=\"_ _0\"></span>yable after mor<span class=\"_ _0\"></span>e than five year<span class=\"_ _0\"></span>s<span class=\"_ _229\"> </span><span class=\"ff15\">44.4<span class=\"_ _3a\"> </span><span class=\"ff16\">32.0<span class=\"_ _36a\"> </span></span></span>13,839.7<span class=\"_ _42\"> </span><span class=\"ff16\">10,885.2<span class=\"_ _36a\"> </span></span>In order<span class=\"_ _0\"></span> to r<span class=\"_ _0\"></span>educe the liquidity<span class=\"_ _0\"></span> risk inherent in <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s retail deposit balances, <span class=\"_ _0\"></span>the PRA r<span class=\"_ _1\"></span>equires that the Bank, lik<span class=\"_ _0\"></span>e other<span class=\"_ _0\"></span> regulated banks, maintains a buffer<span class=\"_ _0\"></span> of liquid asse<span class=\"_ _0\"></span>ts to ensur<span class=\"_ _0\"></span>e it has sufficient available <span class=\"_ _0\"></span>funds at all times <span class=\"_ _0\"></span>to protect<span class=\"_ _0\"></span> against unfor<span class=\"_ _0\"></span>eseen circumstances. <span class=\"_ _0\"></span>The amount of<span class=\"_ _0\"></span> this buffer<span class=\"_ _1\"></span> is calculated using Individual Liquidity Guidance (\u2018ILG\u2019) se<span class=\"_ _0\"></span>t by<span class=\"_ _0\"></span> the PRA<span class=\"_ _0\"></span> based on the Internal Liquidity <span class=\"_ _0\"></span>Adequacy<span class=\"_ _0\"></span> <span class=\"_ _0\"></span>Assessment Process (\u2018ILAAP\u2019) undertaken b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Bank. The ILAAP<span class=\"_ _0\"></span> determines the liquid r<span class=\"_ _0\"></span>esources <span class=\"_ _0\"></span>that must be maintained in the Bank <span class=\"_ _0\"></span>to meet the O<span class=\"_ _0\"></span>verall Liquidity<span class=\"_ _0\"></span> Adequac<span class=\"_ _0\"></span>y Rule (\u2018OLAR\u2019) and <span class=\"_ _0\"></span>to ensure <span class=\"_ _0\"></span>that it can meet its liabilities as <span class=\"_ _0\"></span>they <span class=\"_ _0\"></span>fall due. It is based on an analysis of<span class=\"_ _0\"></span> its business as usual f<span class=\"_ _0\"></span>orecast cash r<span class=\"_ _0\"></span>equirements but also considers <span class=\"_ _0\"></span>their pr<span class=\"_ _0\"></span>edicted behaviour<span class=\"_ _0\"></span> in stressed conditions. At 30 Sept<span class=\"_ _0\"></span>ember 2023 the liquidity<span class=\"_ _1\"></span> buffer comprised the <span class=\"_ _0\"></span>following on and off<span class=\"_ _0\"></span> balance sheet assets. <span class=\"_ _0\"></span>All these assets ar<span class=\"_ _0\"></span>e held within <span class=\"_ _0\"></span>the Bank and are r<span class=\"_ _0\"></span>eadily r<span class=\"_ _0\"></span>ealisable.<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Balances with central bank<span class=\"_ _0\"></span>s<span class=\"_ _350\"> </span><span class=\"ff15\">2,589.7<span class=\"_ _86\"> </span><span class=\"ff16\">1,505.5<span class=\"_ _36a\"> </span></span></span>T<span class=\"_ _2\"></span>otal on balance sheet liquidity<span class=\"_ _351\"> </span><span class=\"ff15\">2,589.7<span class=\"_ _86\"> </span><span class=\"ff16\">1,505.5<span class=\"_ _36a\"> </span></span></span>Long / short repo tr<span class=\"_ _0\"></span>ansaction<span class=\"_ _1f8\"> </span><span class=\"ff15\">150.0<span class=\"_ _d5\"> </span><span class=\"ff16\">150.0<span class=\"_ _36a\"> </span></span></span>2,739.7<span class=\"_ _86\"> </span><span class=\"ff16\">1,655.5<span class=\"_ _36a\"> </span></span>Balances with central banks abo<span class=\"_ _0\"></span>ve ex<span class=\"_ _0\"></span>clude group cash balances placed on deposit at<span class=\"_ _0\"></span> the Bank of<span class=\"_ _0\"></span> England thr<span class=\"_ _0\"></span>ough Paragon Bank.<span class=\"_ _36a\"> </span>Paragon Bank<span class=\"_ _0\"></span> manages its Liquidity Co<span class=\"_ _0\"></span>verage Ratio (\u2018L<span class=\"_ _1\"></span>CR\u2019), the lev<span class=\"_ _0\"></span>el of its High Quality<span class=\"_ _0\"></span> Liquid <span class=\"_ _0\"></span>Assets (\u2018HQLA<span class=\"_ _1\"></span>\u2019) relative <span class=\"_ _0\"></span>to its  short-term <span class=\"_ _0\"></span>forecast ne<span class=\"_ _0\"></span>t cash outflows. <span class=\"_ _0\"></span>A<span class=\"_ _0\"></span> minimum level o<span class=\"_ _0\"></span>f L<span class=\"_ _1\"></span>CR is set through r<span class=\"_ _0\"></span>egulation for<span class=\"_ _0\"></span> all regulated <span class=\"_ _0\"></span>financial institutions. As at<span class=\"_ _0\"></span>  30 September<span class=\"_ _0\"></span> 2023, the Bank\u2019<span class=\"_ _1\"></span>s LCR <span class=\"_ _0\"></span>was comfortably<span class=\"_ _1\"></span> above the r<span class=\"_ _0\"></span>equired minimum r<span class=\"_ _0\"></span>egulatory standar<span class=\"_ _0\"></span>d. The Bank<span class=\"_ _0\"></span> also monitors its Net Stable F<span class=\"_ _1\"></span>unding Ratio (\u2018NSFR\u2019) which measures the stability<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the funding pr<span class=\"_ _0\"></span>ofile in r<span class=\"_ _0\"></span>elation to the composition o<span class=\"_ _0\"></span>f its assets and off balance shee<span class=\"_ _0\"></span>t activities.<span class=\"_ _36a\"> </span>Liquidity is not<span class=\"_ _0\"></span> regulated at Gr<span class=\"_ _0\"></span>oup lev<span class=\"_ _0\"></span>el.<span class=\"_ _36a\"> </span>Borrowings<span class=\"_ _36a\"> </span>Set out below<span class=\"_ _0\"></span> is the contractual maturity<span class=\"_ _0\"></span> pro<span class=\"_ _0\"></span>file of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s and the Company\u2019<span class=\"_ _1\"></span>s borrowings at 30 Sep<span class=\"_ _0\"></span>tember 2023 and  30 September<span class=\"_ _0\"></span> 2022 based on their<span class=\"_ _0\"></span> carrying values. <span class=\"_ _1\"></span>These are analysed betw<span class=\"_ _0\"></span>een non-recourse (<span class=\"_ _0\"></span>securitisation) and other<span class=\"_ _0\"></span> funding,  with the liquidity<span class=\"_ _0\"></span> position arising principally <span class=\"_ _0\"></span>from the o<span class=\"_ _0\"></span>ther funding<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _36a\"> </span>Financial liabilities falling due:<span class=\"_ _36a\"> </span>In one year or less, or on demand In more than one year<span class=\"_ _1\"></span>, but not more than two year<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span>In more than two year<span class=\"_ _0\"></span>s but not more than five year<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span>In more than five year<span class=\"_ _0\"></span>s<span class=\"ff15\"> </span>T<span class=\"_ _2\"></span>otal \u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Secured bank borro<span class=\"_ _0\"></span>wings <span class=\"_ _103\"> </span><span class=\"ff15\">-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></span>Asset back<span class=\"_ _0\"></span>ed loan notes<span class=\"_ _268\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _d1\"> </span>28.0<span class=\"_ _3a\"> </span>28.0<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal non-recourse funding<span class=\"_ _26b\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _d1\"> </span>28.0<span class=\"_ _3a\"> </span>28.0<span class=\"_ _36a\"> </span></span>Bank overdr<span class=\"_ _0\"></span>afts<span class=\"_ _352\"> </span><span class=\"ff15\">0.2<span class=\"_ _43\"> </span>-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span>0.2<span class=\"_ _36a\"> </span></span>Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _161\"> </span><span class=\"ff15\">112.4<span class=\"_ _a8\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span>112.4<span class=\"_ _36a\"> </span></span>Corporat<span class=\"_ _0\"></span>e bond<span class=\"_ _353\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span>145.8<span class=\"_ _d5\"> </span>145.8<span class=\"_ _36a\"> </span></span>Central bank f<span class=\"_ _0\"></span>acilities<span class=\"_ _87\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _12b\"> </span>2,750.0<span class=\"_ _43\"> </span>-<span class=\"_ _133\"> </span>2,750.0<span class=\"_ _36a\"> </span></span>Sale and repurchase agr<span class=\"_ _0\"></span>eements<span class=\"_ _b1\"> </span><span class=\"ff15\">50.0<span class=\"_ _43\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _d1\"> </span>50.0<span class=\"_ _36a\"> </span></span>Lease liabilities<span class=\"_ _301\"> </span><span class=\"ff15\">2.6<span class=\"_ _9e\"> </span>2.4<span class=\"_ _9e\"> </span>3.4<span class=\"_ _d1\"> </span>0.5<span class=\"_ _9e\"> </span>8.9<span class=\"_ _36a\"> </span></span>165.2<span class=\"_ _9e\"> </span>2.4<span class=\"_ _12a\"> </span>2,753.4<span class=\"_ _150\"> </span>174.3<span class=\"_ _86\"> </span>3,095.3<span class=\"_ _36a\"> </span>30 September 2022<span class=\"_ _36a\"> </span>Secured bank borro<span class=\"_ _0\"></span>wings<span class=\"_ _17d\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">170.0<span class=\"_ _43\"> </span></span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">416.0<span class=\"_ _d5\"> </span>586.0<span class=\"_ _36a\"> </span></span>Asset back<span class=\"_ _0\"></span>ed loan notes<span class=\"_ _268\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">409.3<span class=\"_ _150\"> </span>409.3<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal non-recourse funding<span class=\"_ _26b\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">170.0<span class=\"_ _43\"> </span></span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">825.3<span class=\"_ _150\"> </span>995.3<span class=\"_ _36a\"> </span></span>Bank overdr<span class=\"_ _0\"></span>afts<span class=\"_ _352\"> </span><span class=\"ff16\">0.4<span class=\"_ _43\"> </span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">0.4<span class=\"_ _36a\"> </span></span>Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _2c8\"> </span>-<span class=\"_ _c8\"> </span><span class=\"ff16\">112.3<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">112.3<span class=\"_ _36a\"> </span></span>Corporat<span class=\"_ _0\"></span>e bond<span class=\"_ _353\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">149.2<span class=\"_ _150\"> </span>149.2<span class=\"_ _36a\"> </span></span>Central bank f<span class=\"_ _0\"></span>acilities<span class=\"_ _87\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _12b\"> </span><span class=\"ff16\">2,750.0<span class=\"_ _43\"> </span></span>-<span class=\"_ _12b\"> </span><span class=\"ff16\">2,750.0<span class=\"_ _36a\"> </span></span>Sale and repurchase agr<span class=\"_ _0\"></span>eements<span class=\"_ _354\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>Lease liabilities<span class=\"_ _301\"> </span><span class=\"ff16\">2.2<span class=\"_ _9e\"> </span>1.9<span class=\"_ _9e\"> </span>3.8<span class=\"_ _9e\"> </span>1.1<span class=\"_ _9e\"> </span>9.0<span class=\"_ _36a\"> </span></span>2.6<span class=\"_ _d5\"> </span>284.2<span class=\"_ _86\"> </span>2,753.8<span class=\"_ _150\"> </span>975.6<span class=\"_ _86\"> </span>4,016.2<span class=\"_ _36a\"> </span>The Company<span class=\"_ _36a\"> </span>Financial liabilities falling due:<span class=\"_ _36a\"> </span>In one year or less, or on demand In more than one year<span class=\"_ _1\"></span>, but not more than two year<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span>In more than two year<span class=\"_ _0\"></span>s but not more than five year<span class=\"_ _0\"></span>s<span class=\"_ _36a\"> </span>In more than five year<span class=\"_ _0\"></span>s<span class=\"ff15\"> </span>T<span class=\"_ _2\"></span>otal \u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _161\"> </span><span class=\"ff15\">112.4<span class=\"_ _a8\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span>112.4<span class=\"_ _36a\"> </span></span>Corporat<span class=\"_ _0\"></span>e bond<span class=\"_ _353\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span>149.4<span class=\"_ _d5\"> </span>149.4<span class=\"_ _36a\"> </span></span>Lease liabilities<span class=\"_ _301\"> </span><span class=\"ff15\">1.3<span class=\"_ _9e\"> </span>1.4<span class=\"_ _9e\"> </span>4.3<span class=\"_ _d1\"> </span>6.7<span class=\"_ _3a\"> </span>13.7<span class=\"_ _36a\"> </span></span>113.7<span class=\"_ _9e\"> </span>1.4<span class=\"_ _d1\"> </span>4.3<span class=\"_ _150\"> </span>156.1<span class=\"_ _d5\"> </span>275.5<span class=\"_ _36a\"> </span>30 September 2022<span class=\"_ _36a\"> </span>Ret<span class=\"_ _0\"></span>ail bonds<span class=\"_ _2c8\"> </span>-<span class=\"_ _c8\"> </span><span class=\"ff16\">112.3<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">112.3<span class=\"_ _36a\"> </span></span>Corporat<span class=\"_ _0\"></span>e bond<span class=\"_ _353\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _cb\"> </span><span class=\"ff16\">149.2<span class=\"_ _150\"> </span>149.2<span class=\"_ _36a\"> </span></span>Lease liabilities<span class=\"_ _301\"> </span><span class=\"ff16\">1.3<span class=\"_ _9e\"> </span>1.3<span class=\"_ _9e\"> </span>4.2<span class=\"_ _9e\"> </span>8.2<span class=\"_ _f7\"> </span>15.0<span class=\"_ _36a\"> </span></span>1.3<span class=\"_ _d5\"> </span>113.6<span class=\"_ _11f\"> </span>4.2<span class=\"_ _d5\"> </span>157.4<span class=\"_ _150\"> </span>276.5<span class=\"_ _36a\"> </span>IFRS 7 requires <span class=\"_ _0\"></span>the disclosure of<span class=\"_ _1\"></span> future contractual cash flo<span class=\"_ _0\"></span>ws (including inter<span class=\"_ _0\"></span>est) on these borro<span class=\"_ _0\"></span>wings, and these ar<span class=\"_ _0\"></span>e described and set out on <span class=\"_ _0\"></span>the following pag<span class=\"_ _0\"></span>es.<span class=\"_ _36a\"> </span>Non-recourse funding<span class=\"_ _36a\"> </span>The Group has hist<span class=\"_ _0\"></span>orically used securitisation as a principal sour<span class=\"_ _0\"></span>ce of <span class=\"_ _0\"></span>funding, but currently<span class=\"_ _0\"></span> only accesses <span class=\"_ _0\"></span>this market on a str<span class=\"_ _0\"></span>ategic basis. In a securitisation an SPV<span class=\"_ _0\"></span> company <span class=\"_ _0\"></span>within the Gr<span class=\"_ _0\"></span>oup will issue asset back<span class=\"_ _0\"></span>ed loan notes secur<span class=\"_ _0\"></span>ed on a pool of mortgag<span class=\"_ _0\"></span>e or other<span class=\"_ _0\"></span> loan assets beneficially<span class=\"_ _0\"></span> owned by<span class=\"_ _0\"></span> the SPV<span class=\"_ _0\"></span> in a public offer<span class=\"_ _1\"></span>. T<span class=\"_ _0\"></span>he notes have a maturity<span class=\"_ _0\"></span> date later<span class=\"_ _0\"></span> than the <span class=\"_ _0\"></span>final repa<span class=\"_ _0\"></span>yment date for<span class=\"_ _0\"></span> any<span class=\"_ _0\"></span> asset in the pool, <span class=\"_ _0\"></span>typically ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>thirty <span class=\"_ _0\"></span>years fr<span class=\"_ _0\"></span>om the issue date. <span class=\"_ _1\"></span>The noteholders are entitled <span class=\"_ _0\"></span>to receiv<span class=\"_ _0\"></span>e repayment o<span class=\"_ _0\"></span>f the no<span class=\"_ _0\"></span>te principal fr<span class=\"_ _0\"></span>om principal funds generated b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the loan assets fr<span class=\"_ _0\"></span>om time t<span class=\"_ _0\"></span>o time, but their<span class=\"_ _1\"></span> right to the r<span class=\"_ _0\"></span>epayment of<span class=\"_ _0\"></span> principal is limited to the cash available in <span class=\"_ _0\"></span>the SPV<span class=\"_ _1\"></span>. Similarly<span class=\"_ _0\"></span>, payment of<span class=\"_ _0\"></span> accrued interest<span class=\"_ _0\"></span> to the no<span class=\"_ _0\"></span>teholders is limited to cash g<span class=\"_ _0\"></span>enerated within <span class=\"_ _0\"></span>the SPV<span class=\"_ _1\"></span>. There is no r<span class=\"_ _0\"></span>equirement<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> any Gr<span class=\"_ _0\"></span>oup company<span class=\"_ _0\"></span> other <span class=\"_ _0\"></span>than the issuing SPV<span class=\"_ _1\"></span> to make principal or<span class=\"_ _0\"></span> interest pa<span class=\"_ _0\"></span>yments in respect of<span class=\"_ _0\"></span> the notes. <span class=\"_ _0\"></span>This matching of<span class=\"_ _0\"></span> the maturities of<span class=\"_ _0\"></span> the assets and <span class=\"_ _0\"></span>the related <span class=\"_ _0\"></span>funding substantially r<span class=\"_ _0\"></span>educes the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s exposure <span class=\"_ _0\"></span>to liquidity risk. Details of<span class=\"_ _0\"></span> notes in issue are giv<span class=\"_ _0\"></span>en in note 34 and the assets backing <span class=\"_ _0\"></span>the notes ar<span class=\"_ _0\"></span>e shown in note 18. In each case the Gr<span class=\"_ _0\"></span>oup provides <span class=\"_ _0\"></span>funding to <span class=\"_ _0\"></span>the SPV<span class=\"_ _0\"></span> at inception, subordinated <span class=\"_ _0\"></span>to the not<span class=\"_ _0\"></span>es, which means that <span class=\"_ _0\"></span>the primary cr<span class=\"_ _0\"></span>edit risk on the pool assets is retained <span class=\"_ _0\"></span>within the Gr<span class=\"_ _0\"></span>oup. <span class=\"_ _0\"></span>The Group r<span class=\"_ _0\"></span>eceives the r<span class=\"_ _0\"></span>esidual income generated b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the assets. T<span class=\"_ _0\"></span>hese factors mean <span class=\"_ _0\"></span>that the risks and re<span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ds of o<span class=\"_ _0\"></span>wnership of <span class=\"_ _0\"></span>the assets remain <span class=\"_ _0\"></span>with the Gr<span class=\"_ _0\"></span>oup, and hence the loans r<span class=\"_ _0\"></span>emain on the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s balance sheet.<span class=\"_ _36a\"> </span>Cash receiv<span class=\"_ _0\"></span>ed from <span class=\"_ _0\"></span>time to <span class=\"_ _0\"></span>time in each SPV<span class=\"_ _0\"></span> is held until the next inter<span class=\"_ _0\"></span>est payment date <span class=\"_ _0\"></span>when, follo<span class=\"_ _0\"></span>wing payment of<span class=\"_ _0\"></span> principal, interest and the associated costs of<span class=\"_ _1\"></span> the SPV<span class=\"_ _1\"></span>, the remaining balances become av<span class=\"_ _0\"></span>ailable to <span class=\"_ _0\"></span>the Group. Cash balances ar<span class=\"_ _0\"></span>e also held within each SPV<span class=\"_ _0\"></span> to pr<span class=\"_ _0\"></span>ovide credit<span class=\"_ _0\"></span> enhancement for<span class=\"_ _0\"></span> the particular<span class=\"_ _0\"></span> securitisation, allowing inter<span class=\"_ _0\"></span>est and principal payments t<span class=\"_ _0\"></span>o be made even if<span class=\"_ _0\"></span> some of <span class=\"_ _0\"></span>the loans default. <span class=\"_ _0\"></span>The cash balances of<span class=\"_ _0\"></span> the SPV<span class=\"_ _0\"></span> companies are included <span class=\"_ _0\"></span>within the r<span class=\"_ _0\"></span>estricted cash balances disclosed in note 17 as \u2018securitisation cash<span class=\"_ _0\"></span>\u2019<span class=\"_ _2\"></span>.<span class=\"_ _36a\"> </span>Newly<span class=\"_ _0\"></span> originated mortgage loans may<span class=\"_ _1\"></span> be initially funded by<span class=\"_ _0\"></span> a re<span class=\"_ _0\"></span>volving loan facility<span class=\"_ _1\"></span> or \u2018warehouse<span class=\"_ _1\"></span>\u2019 from the point o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>their origination until their<span class=\"_ _0\"></span> inclusion in a securitisation transaction or<span class=\"_ _0\"></span> other<span class=\"_ _0\"></span> refinancing. <span class=\"_ _1\"></span>A w<span class=\"_ _0\"></span>arehouse may<span class=\"_ _0\"></span> also be used to hold acquir<span class=\"_ _0\"></span>ed loans or <span class=\"_ _0\"></span>to refinance gr<span class=\"_ _0\"></span>oup loans on a short-term basis. <span class=\"_ _1\"></span>A w<span class=\"_ _0\"></span>arehouse company<span class=\"_ _0\"></span> functions in a similar<span class=\"_ _0\"></span> wa<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>to an SPV<span class=\"_ _1\"></span>, except <span class=\"_ _0\"></span>that funds ar<span class=\"_ _0\"></span>e drawn down as advances ar<span class=\"_ _0\"></span>e made or<span class=\"_ _0\"></span> loans are sold in, repaid <span class=\"_ _0\"></span>when loans are securitised or<span class=\"_ _0\"></span> re<span class=\"_ _0\"></span>financed by an internal asse<span class=\"_ _0\"></span>t sale and may subsequently be r<span class=\"_ _0\"></span>edrawn up t<span class=\"_ _0\"></span>o the end of<span class=\"_ _0\"></span> a commitment period. T<span class=\"_ _0\"></span>he Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s Paragon Second F<span class=\"_ _0\"></span>unding facility<span class=\"_ _0\"></span> w<span class=\"_ _0\"></span>as initiated as a war<span class=\"_ _0\"></span>ehouse, but w<span class=\"_ _0\"></span>as no longer a<span class=\"_ _0\"></span>vailable f<span class=\"_ _0\"></span>or new<span class=\"_ _0\"></span> drawings in <span class=\"_ _0\"></span>the period and was r<span class=\"_ _0\"></span>epaid in September<span class=\"_ _0\"></span> 2023.<span class=\"_ _36a\"> </span>Repayment o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the principal amount of <span class=\"_ _0\"></span>the facilities is not r<span class=\"_ _1\"></span>equired unless amounts are r<span class=\"_ _0\"></span>ealised from <span class=\"_ _0\"></span>the secured assets either<span class=\"_ _0\"></span> thr<span class=\"_ _0\"></span>ough repa<span class=\"_ _0\"></span>yment, securitisation or asset sales, e<span class=\"_ _0\"></span>ven after<span class=\"_ _0\"></span> the end of<span class=\"_ _0\"></span> the commitment period. <span class=\"_ _0\"></span>Ther<span class=\"_ _0\"></span>e is no further r<span class=\"_ _1\"></span>ecourse to other asse<span class=\"_ _0\"></span>ts of the Group in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> either inter<span class=\"_ _0\"></span>est or principal on <span class=\"_ _0\"></span>the borro<span class=\"_ _0\"></span>wings.<span class=\"_ _36a\"> </span>As with <span class=\"_ _0\"></span>the SPV<span class=\"_ _0\"></span>s, the Gr<span class=\"_ _0\"></span>oup pro<span class=\"_ _0\"></span>vides subordinated <span class=\"_ _0\"></span>funding to active <span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ehouse companies and restricted cash balances ar<span class=\"_ _0\"></span>e held within them. Contributions <span class=\"_ _0\"></span>to the subor<span class=\"_ _0\"></span>dinated funding are made each <span class=\"_ _0\"></span>time a drawing on <span class=\"_ _0\"></span>the facility concerned is made. <span class=\"_ _1\"></span>These amounts pro<span class=\"_ _0\"></span>vide credit enhancement <span class=\"_ _0\"></span>to the <span class=\"_ _0\"></span>warehouse and co<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> certain fees. <span class=\"_ _0\"></span>This funding is r<span class=\"_ _0\"></span>epaid when assets ar<span class=\"_ _0\"></span>e securitised or refinanced b<span class=\"_ _0\"></span>y an internal asset<span class=\"_ _0\"></span> sale. Credit enhancement in <span class=\"_ _0\"></span>the active w<span class=\"_ _0\"></span>arehouse at 30 Sep<span class=\"_ _0\"></span>tember 2022 <span class=\"_ _0\"></span>was \u00a323.2m and ther<span class=\"_ _0\"></span>e w<span class=\"_ _0\"></span>ere no active <span class=\"_ _0\"></span>warehouses at<span class=\"_ _0\"></span> 30 September 2023. <span class=\"_ _0\"></span>Ther<span class=\"_ _0\"></span>e wer<span class=\"_ _0\"></span>e no undrawn f<span class=\"_ _0\"></span>acilities available at <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear end (2022: \u00a3280<span class=\"_ _0\"></span>.0m).<span class=\"_ _36a\"> </span>F<span class=\"_ _0\"></span>urther details o<span class=\"_ _0\"></span>f the <span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ehouse facilities ar<span class=\"_ _0\"></span>e given in note 35 and details o<span class=\"_ _0\"></span>f the loan asse<span class=\"_ _0\"></span>ts within the <span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ehouses are given in no<span class=\"_ _0\"></span>te 18.<span class=\"_ _36a\"> </span>The final r<span class=\"_ _0\"></span>epayment date <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the securitisation borro<span class=\"_ _0\"></span>wings is more than <span class=\"_ _0\"></span>five <span class=\"_ _0\"></span>years fr<span class=\"_ _0\"></span>om the balance sheet dat<span class=\"_ _0\"></span>e, falling due in 2045.<span class=\"_ _36a\"> </span>The sterling principal amount outstanding at 30 Sept<span class=\"_ _0\"></span>ember 2023 under<span class=\"_ _0\"></span> the SPV<span class=\"_ _0\"></span> and w<span class=\"_ _0\"></span>arehouse arrang<span class=\"_ _0\"></span>ements was \u00a328.<span class=\"_ _0\"></span>4m  (2022: \u00a3996.5m). <span class=\"_ _0\"></span>The to<span class=\"_ _0\"></span>tal sterling amount payable under<span class=\"_ _1\"></span> these arrangements, w<span class=\"_ _0\"></span>ere <span class=\"_ _0\"></span>these principal amounts to r<span class=\"_ _0\"></span>emain outstanding until the final r<span class=\"_ _1\"></span>epayment date, would be \u00a343.3m (2022: \u00a31,<span class=\"_ _0\"></span>912.3m). <span class=\"_ _0\"></span>As the principal will, as discussed abo<span class=\"_ _0\"></span>ve, r<span class=\"_ _0\"></span>educe as customers repa<span class=\"_ _0\"></span>y or<span class=\"_ _0\"></span> redeem their<span class=\"_ _1\"></span> accounts, the cash flow<span class=\"_ _0\"></span> will be far<span class=\"_ _0\"></span> less than <span class=\"_ _0\"></span>this amount in practice. Corporate debt<span class=\"_ _36a\"> </span>In F<span class=\"_ _1\"></span>ebruary 2013, the Company<span class=\"_ _0\"></span> initiated a Eur<span class=\"_ _0\"></span>o Medium T<span class=\"_ _2\"></span>erm Note issuance pr<span class=\"_ _0\"></span>ogramme, with a maximum issuance of<span class=\"_ _0\"></span> \u00a31,000<span class=\"_ _0\"></span>.0m. <span class=\"_ _0\"></span>The Company<span class=\"_ _0\"></span> had the ability <span class=\"_ _0\"></span>to issue further<span class=\"_ _0\"></span> notes under<span class=\"_ _0\"></span> the pr<span class=\"_ _0\"></span>ogramme and has issued thr<span class=\"_ _0\"></span>ee fixed r<span class=\"_ _0\"></span>ate bonds for<span class=\"_ _0\"></span> a total o<span class=\"_ _0\"></span>f \u00a3297<span class=\"_ _2\"></span>.5m, with interest r<span class=\"_ _0\"></span>ates ranging fr<span class=\"_ _0\"></span>om 6.000% <span class=\"_ _0\"></span>to 6.<span class=\"_ _0\"></span>125% and maturities ranging fr<span class=\"_ _0\"></span>om December 2020 <span class=\"_ _0\"></span>to <span class=\"_ _0\"></span>August 2024, the most<span class=\"_ _0\"></span> recent issue of<span class=\"_ _0\"></span> \u00a3112.5m being made in August 2015. F<span class=\"_ _1\"></span>ollowing redemp<span class=\"_ _0\"></span>tions in previous <span class=\"_ _0\"></span>years, only<span class=\"_ _0\"></span> the most r<span class=\"_ _0\"></span>ecent bond r<span class=\"_ _0\"></span>emains outstanding. This is repa<span class=\"_ _0\"></span>yable within <span class=\"_ _0\"></span>twelve months o<span class=\"_ _0\"></span>f the balance shee<span class=\"_ _0\"></span>t date.<span class=\"_ _36a\"> </span>The Group issued \u00a3150<span class=\"_ _0\"></span>.0m o<span class=\"_ _0\"></span>f gr<span class=\"_ _0\"></span>een Tier<span class=\"_ _1\"></span>-2 debt in Mar<span class=\"_ _0\"></span>ch 2021. T<span class=\"_ _0\"></span>his bond is optionally callable betw<span class=\"_ _0\"></span>een 25 June 2026 and  25 September<span class=\"_ _0\"></span> 2026 and has a final maturity dat<span class=\"_ _0\"></span>e of 25 Sept<span class=\"_ _0\"></span>ember 2031.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s ability <span class=\"_ _0\"></span>to issue debt is supported by<span class=\"_ _0\"></span> its credit<span class=\"_ _0\"></span> rating issued by<span class=\"_ _0\"></span> Fitch which <span class=\"_ _0\"></span>was affirmed at BBB+ in F<span class=\"_ _1\"></span>ebruary 2023.<span class=\"_ _36a\"> </span>Central bank facilities<span class=\"_ _36a\"> </span>The Group has accessed <span class=\"_ _0\"></span>term credit<span class=\"_ _0\"></span> facilities under<span class=\"_ _0\"></span> the central bank schemes described in not<span class=\"_ _0\"></span>e 38. The Gr<span class=\"_ _0\"></span>oup has prepositioned further assets <span class=\"_ _0\"></span>with the Bank o<span class=\"_ _0\"></span>f England <span class=\"_ _0\"></span>which can be used to r<span class=\"_ _0\"></span>elease more funds <span class=\"_ _0\"></span>for liquidity<span class=\"_ _1\"></span> or other purposes. <span class=\"_ _1\"></span>At 30 September 2023 the amount of<span class=\"_ _0\"></span> drawings av<span class=\"_ _0\"></span>ailable in respect of<span class=\"_ _0\"></span> prepositioned assets <span class=\"_ _0\"></span>was \u00a31,<span class=\"_ _0\"></span>715.4m (2022: \u00a31,776.<span class=\"_ _0\"></span>0m).<span class=\"_ _36a\"> </span>Additional liquidity<span class=\"_ _36a\"> </span>The Group holds certain o<span class=\"_ _0\"></span>f its own list<span class=\"_ _0\"></span>ed, externally r<span class=\"_ _0\"></span>ated, asset backed securities <span class=\"_ _0\"></span>which may<span class=\"_ _0\"></span> be used as security t<span class=\"_ _0\"></span>o access term credit and o<span class=\"_ _0\"></span>ther f<span class=\"_ _0\"></span>acilities, including those offer<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the Bank of<span class=\"_ _1\"></span> England. The principal v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>these notes is analysed b<span class=\"_ _0\"></span>y cr<span class=\"_ _0\"></span>edit grade and utilisation status below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>2023<span class=\"_ _2df\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>Utilised<span class=\"_ _7f\"> </span><span class=\"ff15\">A<span class=\"_ _0\"></span>vailable<span class=\"_ _a0\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _12a\"> </span><span class=\"ff17\">Utilised<span class=\"_ _1d4\"> </span>Available<span class=\"_ _276\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>Rating<span class=\"_ _36a\"> </span>AAA<span class=\"_ _189\"> </span><span class=\"ff15\">222.1<span class=\"_ _d5\"> </span>986.9<span class=\"_ _86\"> </span>1,209.0<span class=\"_ _86\"> </span><span class=\"ff16\">1,212.7<span class=\"_ _d5\"> </span>213.0<span class=\"_ _86\"> </span>1,425.7<span class=\"_ _36a\"> </span></span></span>AA+ / AA / AA-<span class=\"_ _ac\"> </span><span class=\"ff15\">5.3<span class=\"_ _150\"> </span>100.9<span class=\"_ _d5\"> </span>106.2<span class=\"_ _9e\"> </span><span class=\"ff16\">5.3<span class=\"_ _150\"> </span>100.9<span class=\"_ _150\"> </span>106.2<span class=\"_ _36a\"> </span></span></span>A+ / A / A-<span class=\"_ _354\"> </span><span class=\"ff15\">3.1<span class=\"_ _3a\"> </span>59.9<span class=\"_ _3a\"> </span>63.0<span class=\"_ _9e\"> </span><span class=\"ff16\">4.6<span class=\"_ _3a\"> </span>59.9<span class=\"_ _3a\"> </span>64.5<span class=\"_ _36a\"> </span></span></span>BBB+ / BBB / BBB-<span class=\"_ _116\"> </span><span class=\"ff15\">3.1<span class=\"_ _3a\"> </span>57.9<span class=\"_ _3a\"> </span>61.0<span class=\"_ _9e\"> </span><span class=\"ff16\">4.3<span class=\"_ _3a\"> </span>81.4<span class=\"_ _f7\"> </span>85.7<span class=\"_ _36a\"> </span></span></span>233.6<span class=\"_ _86\"> </span>1,205.6<span class=\"_ _12a\"> </span>1,439.2<span class=\"_ _86\"> </span><span class=\"ff16\">1,226.9<span class=\"_ _d5\"> </span>455.2<span class=\"_ _86\"> </span>1,682.1<span class=\"_ _36a\"> </span></span>As these notes ar<span class=\"_ _0\"></span>e held internally<span class=\"_ _1\"></span>, they<span class=\"_ _0\"></span> are not included in balance sheet<span class=\"_ _0\"></span> liabilities. Mortgage assets backing these securities r<span class=\"_ _1\"></span>emain on the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s balance sheet and are included in amounts pledged as collateral in no<span class=\"_ _0\"></span>te 18.<span class=\"_ _36a\"> </span>Utilised notes includes those <span class=\"_ _0\"></span>which the Gr<span class=\"_ _0\"></span>oup is obliged t<span class=\"_ _0\"></span>o hold under r<span class=\"_ _0\"></span>egulations governing securitisation issuance.<span class=\"_ _36a\"> </span>The av<span class=\"_ _0\"></span>ailable AAA<span class=\"_ _0\"></span> notes <span class=\"_ _0\"></span>would give access <span class=\"_ _0\"></span>to \u00a3769<span class=\"_ _0\"></span>.8m (2022: \u00a3171.6m) if<span class=\"_ _0\"></span> used to secur<span class=\"_ _0\"></span>e drawings on Bank o<span class=\"_ _0\"></span>f England f<span class=\"_ _0\"></span>acilities.<span class=\"_ _36a\"> </span>During the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2020<span class=\"_ _0\"></span>, the Gr<span class=\"_ _0\"></span>oup entered into a back<span class=\"_ _1\"></span>-to-back long / short sale and repur<span class=\"_ _0\"></span>chase (\u2018repo<span class=\"_ _1\"></span>\u2019) transaction with a UK<span class=\"_ _0\"></span> bank which continued <span class=\"_ _0\"></span>throughout <span class=\"_ _0\"></span>the current <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>. This pr<span class=\"_ _0\"></span>ovides \u00a3150<span class=\"_ _0\"></span>.0m of<span class=\"_ _0\"></span> liquidity (2022: \u00a3150<span class=\"_ _0\"></span>.0m<span class=\"_ _0\"></span>), utilising \u00a326.5m of <span class=\"_ _0\"></span>the loan notes shown abo<span class=\"_ _0\"></span>ve, but does not<span class=\"_ _0\"></span> appear on the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s balance sheet.<span class=\"_ _36a\"> </span>The Group has also ent<span class=\"_ _0\"></span>ered into short-<span class=\"_ _0\"></span>term repo <span class=\"_ _0\"></span>transactions fr<span class=\"_ _0\"></span>om time-to-<span class=\"_ _0\"></span>time, most recently<span class=\"_ _0\"></span> during the curr<span class=\"_ _0\"></span>ent year<span class=\"_ _2\"></span>, and maintains the capability <span class=\"_ _0\"></span>to access the r<span class=\"_ _0\"></span>epo market <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> liquidity purposes. <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>ransactions in place at 30 September 2023 utilised \u00a358.5m of<span class=\"_ _1\"></span> the loan notes shown abo<span class=\"_ _0\"></span>ve (2022: \u00a3nil).<span class=\"_ _36a\"> </span>Contractual cash flows<span class=\"_ _36a\"> </span>The to<span class=\"_ _0\"></span>tal undiscounted amounts, inclusive of<span class=\"_ _0\"></span> estimated inter<span class=\"_ _0\"></span>est, which w<span class=\"_ _0\"></span>ould be payable in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> the non-securitisation borro<span class=\"_ _0\"></span>wings of <span class=\"_ _0\"></span>the Group and the Compan<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, should those balances r<span class=\"_ _0\"></span>emain outstanding until the contracted r<span class=\"_ _0\"></span>epayment date, or<span class=\"_ _0\"></span> the earliest date on which r<span class=\"_ _0\"></span>epayment can be r<span class=\"_ _0\"></span>equired, ar<span class=\"_ _0\"></span>e set out below<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>Corpora<span class=\"_ _0\"></span>te  bonds<span class=\"_ _36a\"> </span>Retail <span class=\"_ _0\"></span> bonds<span class=\"_ _36a\"> </span>Central bank facilities<span class=\"_ _36a\"> </span>Sale and repurchase transactions<span class=\"_ _36a\"> </span>Lease liabilities<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _40\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span>a) The Group<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Pa<span class=\"_ _0\"></span>yable in:<span class=\"_ _36a\"> </span>Less than one year<span class=\"_ _be\"> </span><span class=\"ff15\">6.6<span class=\"_ _d5\"> </span>119.3<span class=\"_ _150\"> </span>147.8<span class=\"_ _3a\"> </span>50.8<span class=\"_ _9e\"> </span>2.6<span class=\"_ _d5\"> </span>327.1<span class=\"_ _36a\"> </span></span>One to two year<span class=\"_ _0\"></span>s<span class=\"_ _16f\"> </span><span class=\"ff15\">6.6<span class=\"_ _43\"> </span>-<span class=\"_ _cb\"> </span>151.3<span class=\"_ _43\"> </span>-<span class=\"_ _9b\"> </span>2.4<span class=\"_ _150\"> </span>160.3<span class=\"_ _36a\"> </span></span>T<span class=\"_ _0\"></span>wo to five y<span class=\"_ _0\"></span>ears<span class=\"_ _7c\"> </span><span class=\"ff15\">19.7<span class=\"_ _43\"> </span>-<span class=\"_ _133\"> </span>2,788.2<span class=\"_ _43\"> </span>-<span class=\"_ _a8\"> </span>3.4<span class=\"_ _12a\"> </span>2,811.3<span class=\"_ _36a\"> </span></span>Over five y<span class=\"_ _0\"></span>ears<span class=\"_ _fd\"> </span><span class=\"ff15\">169.6<span class=\"_ _43\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span>0.5<span class=\"_ _d5\"> </span>170.1<span class=\"_ _36a\"> </span></span>202.5<span class=\"_ _d5\"> </span>119.3<span class=\"_ _86\"> </span>3,087.3<span class=\"_ _cb\"> </span>50.8<span class=\"_ _9e\"> </span>8.9<span class=\"_ _86\"> </span>3,468.8<span class=\"_ _36a\"> </span>30 September 2022<span class=\"_ _36a\"> </span>Pa<span class=\"_ _0\"></span>yable in:<span class=\"_ _36a\"> </span>Less than one year<span class=\"_ _be\"> </span><span class=\"ff16\">6.6<span class=\"_ _9e\"> </span>6.8<span class=\"_ _150\"> </span>101.4<span class=\"_ _43\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.0<span class=\"_ _d5\"> </span>116.8<span class=\"_ _36a\"> </span></span>One to two year<span class=\"_ _0\"></span>s<span class=\"_ _16f\"> </span><span class=\"ff16\">6.6<span class=\"_ _150\"> </span>119.2<span class=\"_ _150\"> </span>123.8<span class=\"_ _43\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.7<span class=\"_ _d5\"> </span>251.3<span class=\"_ _36a\"> </span></span>T<span class=\"_ _0\"></span>wo to five y<span class=\"_ _0\"></span>ears<span class=\"_ _7c\"> </span><span class=\"ff16\">19.7<span class=\"_ _43\"> </span></span>-<span class=\"_ _12b\"> </span><span class=\"ff16\">2,905.0<span class=\"_ _43\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">3.5<span class=\"_ _86\"> </span>2,928.2<span class=\"_ _36a\"> </span></span>Over five y<span class=\"_ _0\"></span>ears<span class=\"_ _fd\"> </span><span class=\"ff16\">176.2<span class=\"_ _43\"> </span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">1.9<span class=\"_ _150\"> </span>178.1<span class=\"_ _36a\"> </span></span>209.1<span class=\"_ _d5\"> </span>126.0<span class=\"_ _86\"> </span>3,130.2<span class=\"_ _43\"> </span><span class=\"ff17\">-<span class=\"_ _a8\"> </span></span>9.1<span class=\"_ _86\"> </span>3,474.4<span class=\"_ _36a\"> </span>Corpora<span class=\"_ _0\"></span>te bonds<span class=\"_ _36a\"> </span>Retail<span class=\"_ _0\"></span> bonds<span class=\"_ _36a\"> </span>Lease liabilities<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal \u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span>b) The Company<span class=\"_ _36a\"> </span>30 September 2023<span class=\"_ _36a\"> </span>Pa<span class=\"_ _0\"></span>yable in:<span class=\"_ _36a\"> </span>Less than one year<span class=\"_ _2d1\"> </span><span class=\"ff15\">6.6<span class=\"_ _d5\"> </span>119.3<span class=\"_ _9e\"> </span>1.7<span class=\"_ _d5\"> </span>127.6<span class=\"_ _36a\"> </span></span>One to two year<span class=\"_ _0\"></span>s<span class=\"_ _1b5\"> </span><span class=\"ff15\">6.6<span class=\"_ _43\"> </span>-<span class=\"_ _a8\"> </span>1.7<span class=\"_ _d1\"> </span>8.3<span class=\"_ _36a\"> </span></span>T<span class=\"_ _0\"></span>wo to five y<span class=\"_ _0\"></span>ears<span class=\"_ _24f\"> </span><span class=\"ff15\">19.7<span class=\"_ _a8\"> </span>-<span class=\"_ _a8\"> </span>5.0<span class=\"_ _3a\"> </span>24.7<span class=\"_ _36a\"> </span></span>Over five y<span class=\"_ _0\"></span>ears<span class=\"_ _1ab\"> </span><span class=\"ff15\">169.6<span class=\"_ _a8\"> </span>-<span class=\"_ _a8\"> </span>7.0<span class=\"_ _d5\"> </span>176.6<span class=\"_ _36a\"> </span></span>202.5<span class=\"_ _d5\"> </span>119.3<span class=\"_ _3a\"> </span>15.4<span class=\"_ _d5\"> </span>337.2<span class=\"_ _36a\"> </span>30 September 2022<span class=\"_ _36a\"> </span>Pa<span class=\"_ _0\"></span>yable in:<span class=\"_ _36a\"> </span>Less than one year<span class=\"_ _2d1\"> </span><span class=\"ff16\">6.6<span class=\"_ _9e\"> </span>6.8<span class=\"_ _9e\"> </span>1.7<span class=\"_ _3a\"> </span>15.1<span class=\"_ _36a\"> </span></span>One to two year<span class=\"_ _0\"></span>s<span class=\"_ _1b5\"> </span><span class=\"ff16\">6.6<span class=\"_ _150\"> </span>119.2<span class=\"_ _9e\"> </span>1.7<span class=\"_ _150\"> </span>127.5<span class=\"_ _36a\"> </span></span>T<span class=\"_ _0\"></span>wo to five y<span class=\"_ _0\"></span>ears<span class=\"_ _24f\"> </span><span class=\"ff16\">19.7<span class=\"_ _43\"> </span></span>-<span class=\"_ _9b\"> </span><span class=\"ff16\">5.0<span class=\"_ _f7\"> </span>24.7<span class=\"_ _36a\"> </span></span>Over five y<span class=\"_ _0\"></span>ears<span class=\"_ _1ab\"> </span><span class=\"ff16\">176.2<span class=\"_ _a8\"> </span></span>-<span class=\"_ _a8\"> </span><span class=\"ff16\">8.7<span class=\"_ _150\"> </span>184.9<span class=\"_ _36a\"> </span></span>209.1<span class=\"_ _d5\"> </span>126.0<span class=\"_ _f7\"> </span>17.1<span class=\"_ _150\"> </span>352.2<span class=\"_ _36a\"> </span>Amounts payable in r<span class=\"_ _0\"></span>espect of<span class=\"_ _0\"></span> the \u2018<span class=\"_ _0\"></span>other accruals<span class=\"_ _0\"></span>\u2019 and \u2018trade cr<span class=\"_ _0\"></span>editors\u2019 shown in no<span class=\"_ _0\"></span>te 40 fall due <span class=\"_ _0\"></span>within one year<span class=\"_ _1\"></span>. T<span class=\"_ _0\"></span>he cash flow<span class=\"_ _0\"></span>s described above <span class=\"_ _0\"></span>will include those <span class=\"_ _0\"></span>for int<span class=\"_ _0\"></span>erest on borr<span class=\"_ _0\"></span>owings accrued at 30 September<span class=\"_ _0\"></span> 2023 disclosed in note 40<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>The cash flo<span class=\"_ _0\"></span>ws which ar<span class=\"_ _0\"></span>e expected t<span class=\"_ _0\"></span>o arise from deriv<span class=\"_ _0\"></span>ative contracts in place at <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear end, estimating <span class=\"_ _0\"></span>future floating r<span class=\"_ _0\"></span>ate payments and receipts on <span class=\"_ _0\"></span>the basis of<span class=\"_ _0\"></span> the yield curv<span class=\"_ _0\"></span>e at the balance sheet dat<span class=\"_ _0\"></span>e are as f<span class=\"_ _0\"></span>ollows:<span class=\"_ _36a\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span>T<span class=\"_ _2\"></span>otal cash outflow / (inflow)<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>otal cash<span class=\"ff16\"> </span>outflow / (inflow)<span class=\"_ _36a\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>On derivativ<span class=\"_ _0\"></span>e liabilities<span class=\"_ _36a\"> </span>Pa<span class=\"_ _0\"></span>yable in less than one year<span class=\"_ _20b\"> </span><span class=\"ff15\">52.8<span class=\"_ _cb\"> </span><span class=\"ff16\">88.8<span class=\"_ _36a\"> </span></span></span>Pa<span class=\"_ _0\"></span>yable in one to two y<span class=\"_ _0\"></span>ears<span class=\"_ _304\"> </span><span class=\"ff15\">(5.9)<span class=\"_ _84\"> </span><span class=\"ff16\">24.0<span class=\"_ _36a\"> </span></span></span>Pa<span class=\"_ _0\"></span>yable in two to fiv<span class=\"_ _0\"></span>e years<span class=\"_ _29b\"> </span><span class=\"ff15\">8.7<span class=\"_ _9e\"> </span><span class=\"ff16\">3.6<span class=\"_ _36a\"> </span></span></span>Pa<span class=\"_ _0\"></span>yable in over fiv<span class=\"_ _0\"></span>e years<span class=\"_ _355\"> </span><span class=\"ff15\">0.3<span class=\"_ _9e\"> </span><span class=\"ff16\">0.1<span class=\"_ _36a\"> </span></span></span>55.9<span class=\"_ _d5\"> </span><span class=\"ff16\">116.5<span class=\"_ _36a\"> </span></span>On derivativ<span class=\"_ _0\"></span>e assets<span class=\"_ _36a\"> </span>Pa<span class=\"_ _0\"></span>yable in less than one year<span class=\"_ _221\"> </span><span class=\"ff15\">(218.2)<span class=\"_ _b6\"> </span></span>(253.1)<span class=\"_ _36a\"> </span>Pa<span class=\"_ _0\"></span>yable in one to two y<span class=\"_ _0\"></span>ears<span class=\"_ _298\"> </span><span class=\"ff15\">(175.4)<span class=\"_ _b6\"> </span></span>(246.2)<span class=\"_ _36a\"> </span>Pa<span class=\"_ _0\"></span>yable in two to fiv<span class=\"_ _0\"></span>e years<span class=\"_ _eb\"> </span><span class=\"ff15\">(162.3)<span class=\"_ _b6\"> </span></span>(342.0)<span class=\"_ _36a\"> </span>Pa<span class=\"_ _0\"></span>yable in over fiv<span class=\"_ _0\"></span>e years<span class=\"_ _201\"> </span><span class=\"ff15\">-<span class=\"_ _fb\"> </span></span>(2.7)<span class=\"_ _36a\"> </span>(555.9)<span class=\"_ _110\"> </span><span class=\"ff17\">(844.0)<span class=\"_ _36a\"> </span></span>(500.0)<span class=\"_ _110\"> </span><span class=\"ff17\">(727.5)<span class=\"_ _36a\"> </span></span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfLiquidityRiskExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-400": {
   "value": "65. <span class=\"_ _1c\"></span>Mark<span class=\"_ _0\"></span>et risk<span class=\"_ _36a\"> </span>Market risk<span class=\"_ _0\"></span> is the risk <span class=\"_ _0\"></span>that the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value or<span class=\"_ _0\"></span> future cash <span class=\"_ _0\"></span>flows o<span class=\"_ _0\"></span>f a financial instrument <span class=\"_ _0\"></span>will fluctuate because of<span class=\"_ _1\"></span> changes in market prices. T<span class=\"_ _0\"></span>he Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s exposure to mark<span class=\"_ _0\"></span>et risk is mainly<span class=\"_ _0\"></span> thr<span class=\"_ _0\"></span>ough interest r<span class=\"_ _0\"></span>ate risk, though <span class=\"_ _0\"></span>there is some minor<span class=\"_ _0\"></span> exposure <span class=\"_ _0\"></span>to currency<span class=\"_ _1\"></span> risk. These exposur<span class=\"_ _0\"></span>es arise solely <span class=\"_ _0\"></span>through the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s lending and deposit taking business - no speculative tr<span class=\"_ _0\"></span>ading in financial instruments is undertaken. Interest rat<span class=\"_ _0\"></span>e risk<span class=\"_ _36a\"> </span>Interest r<span class=\"_ _0\"></span>ate risk is the curr<span class=\"_ _0\"></span>ent or<span class=\"_ _0\"></span> prospective risk<span class=\"_ _0\"></span> to capital or<span class=\"_ _0\"></span> earnings arising from adv<span class=\"_ _0\"></span>erse mov<span class=\"_ _0\"></span>ements in interest rat<span class=\"_ _0\"></span>es. The<span class=\"_ _0\"></span> Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s exposure <span class=\"_ _0\"></span>to this risk is a natural consequence o<span class=\"_ _0\"></span>f its lending, deposit-<span class=\"_ _0\"></span>taking and other borr<span class=\"_ _0\"></span>owing activities, as some of<span class=\"_ _0\"></span> its financial assets and liabilities bear int<span class=\"_ _0\"></span>erest at rat<span class=\"_ _0\"></span>es which float <span class=\"_ _0\"></span>with v<span class=\"_ _0\"></span>arious market r<span class=\"_ _0\"></span>ates while others ar<span class=\"_ _0\"></span>e fix<span class=\"_ _0\"></span>ed, either <span class=\"_ _0\"></span>for a <span class=\"_ _0\"></span>term or <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>their <span class=\"_ _0\"></span>whole lives. Such risk is r<span class=\"_ _0\"></span>eferr<span class=\"_ _0\"></span>ed to as Inter<span class=\"_ _0\"></span>est Rate Risk in <span class=\"_ _0\"></span>the Banking Book (\u2018IRRBB\u2019). The Gr<span class=\"_ _0\"></span>oup does not seek <span class=\"_ _0\"></span>to generate income <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>taking interest rat<span class=\"_ _0\"></span>e risk and aims to minimise exposur<span class=\"_ _0\"></span>es that occur<span class=\"_ _0\"></span> as a natural consequence of<span class=\"_ _0\"></span> carrying out its normal business activities.<span class=\"_ _36a\"> </span>The principal marke<span class=\"_ _0\"></span>t-set inter<span class=\"_ _0\"></span>est rate used by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup has historically been LIBOR, which has been used <span class=\"_ _0\"></span>to set rates <span class=\"_ _0\"></span>for certain<span class=\"_ _0\"></span> loan assets and borro<span class=\"_ _0\"></span>wings. Howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, the Group complet<span class=\"_ _0\"></span>ed its transition t<span class=\"_ _0\"></span>o the use of<span class=\"_ _0\"></span> alternative r<span class=\"_ _0\"></span>eference r<span class=\"_ _0\"></span>ates, principally<span class=\"_ _0\"></span> SONIA, during the y<span class=\"_ _0\"></span>ear ended 30 Sept<span class=\"_ _0\"></span>ember 2022. <span class=\"_ _0\"></span>All new<span class=\"_ _0\"></span> wholesale debt and inter<span class=\"_ _0\"></span>est rate s<span class=\"_ _0\"></span>waps recognised since <span class=\"_ _0\"></span>that point hav<span class=\"_ _0\"></span>e ref<span class=\"_ _0\"></span>erenced SONIA, while existing LIBOR linked instruments <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e transitioned bef<span class=\"_ _0\"></span>ore the start<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the current <span class=\"_ _0\"></span>financial year<span class=\"_ _2\"></span>.<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s risk management <span class=\"_ _0\"></span>framework<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> IRRBB continues to ev<span class=\"_ _0\"></span>olve in line with updat<span class=\"_ _0\"></span>es in regulatory<span class=\"_ _0\"></span> guidance on methods expected t<span class=\"_ _0\"></span>o be used by bank<span class=\"_ _0\"></span>s measuring, managing, monitoring and controlling such risk<span class=\"_ _0\"></span>s. IRRBB is managed thr<span class=\"_ _0\"></span>ough board appro<span class=\"_ _0\"></span>ved risk appetit<span class=\"_ _0\"></span>e limits and policies. The Gr<span class=\"_ _0\"></span>oup seeks to mat<span class=\"_ _0\"></span>ch the structure o<span class=\"_ _0\"></span>f assets and liabilities naturally <span class=\"_ _0\"></span>where possible or<span class=\"_ _0\"></span> by<span class=\"_ _0\"></span> using appropriate <span class=\"_ _0\"></span>financial instruments, such as interest r<span class=\"_ _0\"></span>ate swaps. Da<span class=\"_ _0\"></span>y-to-da<span class=\"_ _0\"></span>y management of<span class=\"_ _0\"></span> interest<span class=\"_ _0\"></span> rate risk is the r<span class=\"_ _0\"></span>esponsibility o<span class=\"_ _0\"></span>f the Gr<span class=\"_ _1\"></span>oup\u2019<span class=\"_ _1\"></span>s T<span class=\"_ _2\"></span>reasury <span class=\"_ _0\"></span>function, with contr<span class=\"_ _0\"></span>ol and oversight<span class=\"_ _0\"></span> provided b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>AL<span class=\"_ _0\"></span>CO.<span class=\"_ _36a\"> </span>Page 314<span class=\"_ _36a\"> </span>IRRBB exposures<span class=\"_ _36a\"> </span>Risk exposur<span class=\"_ _0\"></span>e in the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s operations might occur<span class=\"_ _0\"></span> through:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>Duration or<span class=\"_ _1\"></span> repricing risk. The risk<span class=\"_ _0\"></span> created <span class=\"_ _0\"></span>when interest rat<span class=\"_ _0\"></span>es on assets, liabilities and off-balance sheet<span class=\"_ _0\"></span> items reprice at differ<span class=\"_ _1\"></span>ent times causing them <span class=\"_ _0\"></span>to move b<span class=\"_ _0\"></span>y differ<span class=\"_ _0\"></span>ent amounts<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>Basis risk. <span class=\"_ _0\"></span>The risk arising <span class=\"_ _0\"></span>where assets and liabilities r<span class=\"_ _0\"></span>eprice with r<span class=\"_ _0\"></span>eference <span class=\"_ _0\"></span>to differ<span class=\"_ _0\"></span>ent ref<span class=\"_ _0\"></span>erence inter<span class=\"_ _0\"></span>est rates, f<span class=\"_ _0\"></span>or example r<span class=\"_ _0\"></span>ates set by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup and market r<span class=\"_ _0\"></span>ates, such as Bank of<span class=\"_ _0\"></span> England base rate and SONIA. Relative chang<span class=\"_ _0\"></span>es in the differ<span class=\"_ _0\"></span>ence between the ref<span class=\"_ _0\"></span>erence rates o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> time may<span class=\"_ _0\"></span> impact earnings<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>Optionality<span class=\"_ _0\"></span> or pr<span class=\"_ _0\"></span>epayment risk. <span class=\"_ _0\"></span>The risk <span class=\"_ _0\"></span>that settlement of<span class=\"_ _0\"></span> asset and liability balances at<span class=\"_ _0\"></span> different <span class=\"_ _0\"></span>times fr<span class=\"_ _0\"></span>om those f<span class=\"_ _0\"></span>orecast due <span class=\"_ _0\"></span>to economic conditions or customer<span class=\"_ _1\"></span> behaviour may<span class=\"_ _0\"></span> create a mismatch in <span class=\"_ _0\"></span>future periods<span class=\"_ _36a\"> </span>Due to <span class=\"_ _0\"></span>the maturity <span class=\"_ _0\"></span>transformation inherent<span class=\"_ _0\"></span> in the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s business model it is also exposed t<span class=\"_ _0\"></span>o the risk that<span class=\"_ _0\"></span> the relationship be<span class=\"_ _0\"></span>tween the rates affecting <span class=\"_ _0\"></span>the shorter<span class=\"_ _0\"></span>-term funding balance and <span class=\"_ _0\"></span>the rates affecting <span class=\"_ _0\"></span>the longer <span class=\"_ _0\"></span>term lending balance will ha<span class=\"_ _0\"></span>ve alter<span class=\"_ _0\"></span>ed when the funding has to be r<span class=\"_ _0\"></span>efinanced.<span class=\"_ _36a\"> </span>The Group measur<span class=\"_ _0\"></span>es these risks <span class=\"_ _0\"></span>through a combination of<span class=\"_ _1\"></span> economic value and earnings-based measures considering pr<span class=\"_ _0\"></span>epayment risk:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>E<span class=\"_ _0\"></span>conomic V<span class=\"_ _1\"></span>alue (\u2018EV\u2019) \u2013 a range of<span class=\"_ _0\"></span> parallel and non-parallel inter<span class=\"_ _0\"></span>est rate str<span class=\"_ _0\"></span>esses are applied <span class=\"_ _0\"></span>to assess the change in mark<span class=\"_ _0\"></span>et v<span class=\"_ _0\"></span>alue from assets, liabilities and o<span class=\"_ _0\"></span>ff balance sheet items r<span class=\"_ _0\"></span>epricing at differ<span class=\"_ _0\"></span>ent times<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>Net Int<span class=\"_ _0\"></span>erest Income (\u2018NII\u2019) - impact on earnings from a r<span class=\"_ _0\"></span>ange of<span class=\"_ _0\"></span> interest rat<span class=\"_ _0\"></span>e stresses<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s use of <span class=\"_ _0\"></span>financial derivatives <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> hedging interest rat<span class=\"_ _0\"></span>e risk relating <span class=\"_ _0\"></span>to its fix<span class=\"_ _0\"></span>ed rate lending, deposit <span class=\"_ _0\"></span>taking and borrowing activities is discussed further<span class=\"_ _0\"></span> in note 26.<span class=\"_ _36a\"> </span>Interest r<span class=\"_ _0\"></span>ate sensitivity<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>o provide a br<span class=\"_ _0\"></span>oad indication of <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s exposure <span class=\"_ _0\"></span>to interest r<span class=\"_ _0\"></span>ate movements, <span class=\"_ _0\"></span>the notional impact of<span class=\"_ _0\"></span> a 1.0% change in UK<span class=\"_ _0\"></span> interest rates on the equity<span class=\"_ _1\"></span> of the Gr<span class=\"_ _0\"></span>oup at 30 September<span class=\"_ _0\"></span> 2023, and the notional annualised impact of<span class=\"_ _0\"></span> such a change on <span class=\"_ _0\"></span>the operating profit<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the Group, based on <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear<span class=\"_ _0\"></span>-end balance sheet have been calculated. As a simplification this calculation assumes <span class=\"_ _0\"></span>that all rele<span class=\"_ _0\"></span>vant UK int<span class=\"_ _0\"></span>erest rates mo<span class=\"_ _0\"></span>ve by<span class=\"_ _1\"></span> the same amount in parallel and that all repricing <span class=\"_ _0\"></span>takes place at <span class=\"_ _0\"></span>the balance sheet date.<span class=\"_ _36a\"> </span>On this basis, a 1.<span class=\"_ _0\"></span>0% increase in UK int<span class=\"_ _0\"></span>erest rates <span class=\"_ _0\"></span>would incr<span class=\"_ _0\"></span>ease profit be<span class=\"_ _0\"></span>fore <span class=\"_ _0\"></span>tax by<span class=\"_ _0\"></span> \u00a316.<span class=\"_ _0\"></span>1m (2022: increase by<span class=\"_ _0\"></span> \u00a321.7m<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span>The principal direct<span class=\"_ _0\"></span> point in time impact on <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s equity w<span class=\"_ _0\"></span>ould result fr<span class=\"_ _0\"></span>om the r<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>aluation of deriv<span class=\"_ _0\"></span>ative assets and liabilities which are not<span class=\"_ _0\"></span> part of <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value hedges at<span class=\"_ _0\"></span> the balance sheet date. <span class=\"_ _1\"></span>A 1.0% incr<span class=\"_ _0\"></span>ease in rate expectations <span class=\"_ _0\"></span>would increase equity<span class=\"_ _0\"></span> by<span class=\"_ _0\"></span> \u00a316.0m (2022: increase b<span class=\"_ _0\"></span>y \u00a334.<span class=\"_ _0\"></span>6m). F<span class=\"_ _1\"></span>or <span class=\"_ _0\"></span>this illustration no ineffectiveness in hedging r<span class=\"_ _0\"></span>elationships is assumed.<span class=\"_ _36a\"> </span>These calculations allow<span class=\"_ _0\"></span> only f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the direct eff<span class=\"_ _0\"></span>ects of an<span class=\"_ _0\"></span>y change in UK<span class=\"_ _0\"></span> interest r<span class=\"_ _0\"></span>ates. In practice, such a change might hav<span class=\"_ _0\"></span>e wider<span class=\"_ _0\"></span> economic consequences which <span class=\"_ _0\"></span>would themselv<span class=\"_ _0\"></span>es potentially aff<span class=\"_ _0\"></span>ect the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s business and results.<span class=\"_ _36a\"> </span>It should be noted <span class=\"_ _0\"></span>that these sensitivities ar<span class=\"_ _0\"></span>e illustrative only<span class=\"_ _1\"></span>, and much simplified from those used <span class=\"_ _0\"></span>to manage IRRBB in practice.<span class=\"_ _36a\"> </span>The Company<span class=\"_ _36a\"> </span>All the borr<span class=\"_ _0\"></span>owings of<span class=\"_ _0\"></span> the Company<span class=\"_ _0\"></span> have <span class=\"_ _0\"></span>fixed inter<span class=\"_ _0\"></span>est rates. <span class=\"_ _0\"></span>The Company\u2019<span class=\"_ _1\"></span>s investments in loans <span class=\"_ _0\"></span>to subsidiary companies include a T<span class=\"_ _0\"></span>ier-<span class=\"_ _1\"></span>2 Bond issued by Par<span class=\"_ _0\"></span>agon Bank PL<span class=\"_ _0\"></span>C, <span class=\"_ _0\"></span>with terms matching <span class=\"_ _0\"></span>the Tier<span class=\"_ _1\"></span>-2 Bond issued by<span class=\"_ _0\"></span> the Compan<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>. Its intercompany<span class=\"_ _0\"></span> balance with Paragon Bank<span class=\"_ _0\"></span> (note 27) also includes \u00a3193.<span class=\"_ _0\"></span>6m which is placed on deposit <span class=\"_ _0\"></span>with the Bank of<span class=\"_ _0\"></span> England (2022: \u00a3257<span class=\"_ _2\"></span>.0m). Inter<span class=\"_ _0\"></span>est is receiv<span class=\"_ _0\"></span>ed on this balance at <span class=\"_ _0\"></span>the same rate as that paid b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Bank of England. Other<span class=\"_ _1\"></span> assets and liabilities with group entities bear<span class=\"_ _0\"></span> interest at<span class=\"_ _0\"></span> rates based on SONIA. All other<span class=\"_ _0\"></span> balances in the Compan<span class=\"_ _0\"></span>y balance sheet ar<span class=\"_ _0\"></span>e non-interest<span class=\"_ _0\"></span> bearing. Currency<span class=\"_ _0\"></span> risk<span class=\"_ _36a\"> </span>Currenc<span class=\"_ _0\"></span>y risk, also r<span class=\"_ _0\"></span>eferred <span class=\"_ _0\"></span>to as for<span class=\"_ _0\"></span>eign ex<span class=\"_ _0\"></span>change or <span class=\"_ _0\"></span>fore<span class=\"_ _0\"></span>x risk, is the risk <span class=\"_ _0\"></span>that the fair<span class=\"_ _1\"></span> value or<span class=\"_ _0\"></span> future cash <span class=\"_ _0\"></span>flows of<span class=\"_ _1\"></span> a financial instrument will <span class=\"_ _0\"></span>fluctuate because of chang<span class=\"_ _0\"></span>es in for<span class=\"_ _0\"></span>eign exchang<span class=\"_ _0\"></span>e rates.<span class=\"_ _36a\"> </span>The Group has little appe<span class=\"_ _0\"></span>tite for<span class=\"_ _0\"></span> material amounts of<span class=\"_ _0\"></span> exposure <span class=\"_ _0\"></span>to currenc<span class=\"_ _0\"></span>y risk and applies a hedging strat<span class=\"_ _0\"></span>egy f<span class=\"_ _0\"></span>or any<span class=\"_ _0\"></span> material open positions thr<span class=\"_ _0\"></span>ough the use of<span class=\"_ _0\"></span> spot or<span class=\"_ _0\"></span> forw<span class=\"_ _0\"></span>ard contracts or<span class=\"_ _0\"></span> derivatives.<span class=\"_ _36a\"> </span>All the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s significant assets and liabilities at 30 September 2023 and 30 Sept<span class=\"_ _0\"></span>ember 2022 ar<span class=\"_ _0\"></span>e denominated in sterling. The SME lending business has a limited amount of<span class=\"_ _0\"></span> lending denominated in US dollars, principally \u00a37<span class=\"_ _2\"></span>.6m of<span class=\"_ _0\"></span> aircraft mortg<span class=\"_ _0\"></span>age balances. It may<span class=\"_ _0\"></span> also contract to pur<span class=\"_ _0\"></span>chase assets f<span class=\"_ _0\"></span>or leasing in curr<span class=\"_ _0\"></span>ency<span class=\"_ _1\"></span>. These balances are hedg<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the purchase o<span class=\"_ _0\"></span>f curr<span class=\"_ _0\"></span>ency deriv<span class=\"_ _0\"></span>atives and / or appr<span class=\"_ _0\"></span>opriate currenc<span class=\"_ _0\"></span>y balances. As a result o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>these arrangements the Gr<span class=\"_ _0\"></span>oup has no material exposur<span class=\"_ _0\"></span>e to <span class=\"_ _0\"></span>foreign curr<span class=\"_ _0\"></span>ency<span class=\"_ _0\"></span> risk, and no sensitivity analysis is pr<span class=\"_ _0\"></span>esented for<span class=\"_ _0\"></span> currency<span class=\"_ _0\"></span> risk. The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s use of <span class=\"_ _0\"></span>financial derivatives <span class=\"_ _0\"></span>to manage curr<span class=\"_ _0\"></span>ency risk<span class=\"_ _0\"></span> is described further<span class=\"_ _0\"></span> in note 26.<span class=\"_ _36a\"> </span>None of <span class=\"_ _0\"></span>the assets or<span class=\"_ _0\"></span> liabilities of <span class=\"_ _0\"></span>the Company ar<span class=\"_ _0\"></span>e denominated in f<span class=\"_ _0\"></span>oreign currencies.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfMarketRiskExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-401": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs1006\">66. <span class=\"_ _96\"></span>Basis of<span class=\"_ _0\"></span> preparation<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1007\">The Group is r<span class=\"_ _0\"></span>equired, b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Companies A<span class=\"_ _0\"></span>ct 2006 and the Listing Rules of<span class=\"_ _0\"></span> the F<span class=\"_ _0\"></span>CA, to pr<span class=\"_ _0\"></span>epare its <span class=\"_ _0\"></span>financial statements for<span class=\"_ _1\"></span> the year<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1008\">ended 30 September<span class=\"_ _0\"></span> 2023 in accordance with UK<span class=\"_ _1\"></span>-adopted international accounting standards. In <span class=\"_ _0\"></span>the financial <span class=\"_ _0\"></span>years r<span class=\"_ _0\"></span>eported on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1009\">this also means, in the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s circumstances, that <span class=\"_ _0\"></span>the financial statements also accord <span class=\"_ _0\"></span>with IFRS as approv<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the International </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs100a\">Accounting Standar<span class=\"_ _0\"></span>ds Board.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs100b\">The particular<span class=\"_ _0\"></span> accounting policies adopted have been set<span class=\"_ _0\"></span> out in note 67 and the critical accounting judg<span class=\"_ _0\"></span>ements and estimates which </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs100c\">have been r<span class=\"_ _0\"></span>equired in pr<span class=\"_ _0\"></span>eparing these <span class=\"_ _0\"></span>financial statements are described in notes 68 and 69 r<span class=\"_ _0\"></span>espectively<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs100d\">The Group has hist<span class=\"_ _0\"></span>orically chosen t<span class=\"_ _0\"></span>o present an additional comparativ<span class=\"_ _0\"></span>e balance sheet. </div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs100e\">Adoption of<span class=\"_ _0\"></span> new<span class=\"_ _0\"></span> and revised r<span class=\"_ _0\"></span>eporting standards<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs100f\">In the pr<span class=\"_ _0\"></span>eparation of<span class=\"_ _0\"></span> these financial statements, no accounting standar<span class=\"_ _0\"></span>ds are being applied <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the first <span class=\"_ _0\"></span>time.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs1010\">Standards not <span class=\"_ _0\"></span>yet adop<span class=\"_ _0\"></span>ted<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls31 ws0 gs1011\">There ar<span class=\"_ _0\"></span>e no standards and interpr<span class=\"_ _1\"></span>etations in issue but not effective <span class=\"_ _0\"></span>which address matters r<span class=\"_ _0\"></span>elev<span class=\"_ _0\"></span>ant to <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s accounting </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls31 ws0 gs1012\">and reporting.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBasisOfPreparationOfFinancialStatementsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-456": {
   "value": "The Group is r<span class=\"_ _0\"></span>equired, b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the Companies A<span class=\"_ _0\"></span>ct 2006 and the Listing Rules of<span class=\"_ _0\"></span> the F<span class=\"_ _0\"></span>CA, to pr<span class=\"_ _0\"></span>epare its <span class=\"_ _0\"></span>financial statements for<span class=\"_ _1\"></span> the year<span class=\"_ _0\"></span> ended 30 September<span class=\"_ _0\"></span> 2023 in accordance with UK<span class=\"_ _1\"></span>-adopted international accounting standards. In <span class=\"_ _0\"></span>the financial <span class=\"_ _0\"></span>years r<span class=\"_ _0\"></span>eported on this also means, in the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s circumstances, that <span class=\"_ _0\"></span>the financial statements also accord <span class=\"_ _0\"></span>with IFRS as approv<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the International Accounting Standar<span class=\"_ _0\"></span>ds Board.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:StatementOfIFRSCompliance",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-457": {
   "value": "Adoption of<span class=\"_ _0\"></span> new<span class=\"_ _0\"></span> and revised r<span class=\"_ _0\"></span>eporting standards<span class=\"_ _36a\"> </span>In the pr<span class=\"_ _0\"></span>eparation of<span class=\"_ _0\"></span> these financial statements, no accounting standar<span class=\"_ _0\"></span>ds are being applied <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the first <span class=\"_ _0\"></span>time.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfInitialApplicationOfStandardsOrInterpretations",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-458": {
   "value": "Standards not <span class=\"_ _0\"></span>yet adop<span class=\"_ _0\"></span>ted<span class=\"_ _36a\"> </span>There ar<span class=\"_ _0\"></span>e no standards and interpr<span class=\"_ _1\"></span>etations in issue but not effective <span class=\"_ _0\"></span>which address matters r<span class=\"_ _0\"></span>elev<span class=\"_ _0\"></span>ant to <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s accounting and reporting.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfExpectedImpactOfInitialApplicationOfNewStandardsOrInterpretations",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-362": {
   "value": "67<span class=\"_ _2\"></span>.  A<span class=\"_ _0\"></span>ccounting policies<span class=\"_ _36a\"> </span>The particular<span class=\"_ _0\"></span> policies applied by <span class=\"_ _0\"></span>the Group in pr<span class=\"_ _0\"></span>eparing these financial stat<span class=\"_ _0\"></span>ements in accordance with <span class=\"_ _0\"></span>the IFRS regime as adopted in the UK ar<span class=\"_ _0\"></span>e described below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>(a<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>Accounting <span class=\"_ _15\"></span>convention The financial statements ha<span class=\"_ _0\"></span>ve been prepar<span class=\"_ _0\"></span>ed under<span class=\"_ _0\"></span> the historical cost conv<span class=\"_ _0\"></span>ention, except<span class=\"_ _0\"></span> as requir<span class=\"_ _0\"></span>ed in the v<span class=\"_ _0\"></span>aluation of<span class=\"_ _0\"></span> certain financial instruments which ar<span class=\"_ _0\"></span>e carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span>(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Basis of<span class=\"_ _0\"></span> consolidation The consolidated financial stat<span class=\"_ _0\"></span>ements deal with the accounts o<span class=\"_ _0\"></span>f the Compan<span class=\"_ _0\"></span>y and its subsidiaries made up <span class=\"_ _0\"></span>to 30 September 2023. Subsidiaries comprise all those entities o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>which the Gr<span class=\"_ _0\"></span>oup has control, as defined b<span class=\"_ _0\"></span>y IFRS 10 \u2013 \u2018Consolidated Financial Statements<span class=\"_ _0\"></span>\u2019<span class=\"_ _2\"></span>.<span class=\"_ _36a\"> </span>In addition to legal subsidiaries, <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>the Company o<span class=\"_ _0\"></span>wns shares in <span class=\"_ _0\"></span>the entity<span class=\"_ _0\"></span>, directly<span class=\"_ _0\"></span> or indir<span class=\"_ _0\"></span>ectly<span class=\"_ _0\"></span>, in accordance <span class=\"_ _0\"></span>with IFRS 10, companies owned by<span class=\"_ _0\"></span> charitable trusts into <span class=\"_ _0\"></span>which loans originated by<span class=\"_ _0\"></span> group companies <span class=\"_ _0\"></span>were sold as part<span class=\"_ _0\"></span> of its <span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ehouse and securitisation funding arrang<span class=\"_ _0\"></span>ements, where <span class=\"_ _0\"></span>the Group enjo<span class=\"_ _0\"></span>ys the bene<span class=\"_ _0\"></span>fits of owner<span class=\"_ _0\"></span>ship and which, ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e, it is considered <span class=\"_ _0\"></span>to control, ar<span class=\"_ _0\"></span>e tr<span class=\"_ _0\"></span>eated as subsidiaries.<span class=\"_ _36a\"> </span>Similarly<span class=\"_ _0\"></span>, trusts set up <span class=\"_ _0\"></span>to hold shares in conjunction <span class=\"_ _0\"></span>with the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s employee share o<span class=\"_ _0\"></span>wnership arrangements ar<span class=\"_ _0\"></span>e also tr<span class=\"_ _0\"></span>eated  as subsidiaries. A <span class=\"_ _0\"></span>full list of<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s subsidiaries is set out in note 72, <span class=\"_ _0\"></span>together<span class=\"_ _0\"></span> with further<span class=\"_ _1\"></span> information on the basis on which <span class=\"_ _0\"></span>they ar<span class=\"_ _1\"></span>e  considered <span class=\"_ _0\"></span>to be controlled b<span class=\"_ _0\"></span>y the Compan<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>. T<span class=\"_ _0\"></span>he results of<span class=\"_ _0\"></span> businesses acquired ar<span class=\"_ _0\"></span>e dealt with in <span class=\"_ _0\"></span>the consolidated accounts  from <span class=\"_ _0\"></span>the date of acquisition.<span class=\"_ _36a\"> </span>(c<span class=\"_ _1\"></span>)  <span class=\"_ _ce\"> </span>Going concern<span class=\"_ _36a\"> </span>The consolidated financial stat<span class=\"_ _0\"></span>ements have been pr<span class=\"_ _0\"></span>epared on the g<span class=\"_ _0\"></span>oing concern basis.<span class=\"_ _36a\"> </span>The direct<span class=\"_ _0\"></span>ors have adopt<span class=\"_ _0\"></span>ed this basis follo<span class=\"_ _0\"></span>wing a going concern assessment f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the Group and <span class=\"_ _0\"></span>the Company co<span class=\"_ _0\"></span>vering a period of<span class=\"_ _0\"></span> at least tw<span class=\"_ _0\"></span>elve months f<span class=\"_ _0\"></span>ollowing the date of<span class=\"_ _1\"></span> approval o<span class=\"_ _0\"></span>f these <span class=\"_ _0\"></span>financial statements. Details of<span class=\"_ _0\"></span> this assessment ar<span class=\"_ _0\"></span>e set out in note 70<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>(d) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Acquisitions and g<span class=\"_ _0\"></span>oodwill Goodwill arising fr<span class=\"_ _0\"></span>om the purchase o<span class=\"_ _0\"></span>f subsidiary<span class=\"_ _0\"></span> undertakings, repr<span class=\"_ _0\"></span>esenting the ex<span class=\"_ _0\"></span>cess of <span class=\"_ _0\"></span>the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the purchase consideration over<span class=\"_ _1\"></span> the fair<span class=\"_ _0\"></span> values o<span class=\"_ _0\"></span>f acquir<span class=\"_ _0\"></span>ed assets, including intangible assets, is held on the balance sheet and r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>wed annually<span class=\"_ _0\"></span> to determine whether an<span class=\"_ _0\"></span>y impairment has occurr<span class=\"_ _0\"></span>ed.<span class=\"_ _36a\"> </span>As permitted by<span class=\"_ _0\"></span> IFRS 1, the Group has elected no<span class=\"_ _0\"></span>t to apply<span class=\"_ _0\"></span> IFRS 3 \u2013 \u2018Business Combinations\u2019 to combinations <span class=\"_ _0\"></span>taking place befor<span class=\"_ _0\"></span>e its transition date t<span class=\"_ _0\"></span>o IFRS (1 October 2004). <span class=\"_ _0\"></span>There<span class=\"_ _0\"></span>fore an<span class=\"_ _0\"></span>y goodwill <span class=\"_ _0\"></span>which was <span class=\"_ _0\"></span>written off<span class=\"_ _0\"></span> to r<span class=\"_ _0\"></span>eserves under<span class=\"_ _0\"></span> UK GAAP <span class=\"_ _0\"></span>will not be charg<span class=\"_ _0\"></span>ed or cr<span class=\"_ _0\"></span>edited to <span class=\"_ _0\"></span>the profit<span class=\"_ _0\"></span> and loss account on any <span class=\"_ _0\"></span>future disposal of<span class=\"_ _1\"></span> the business to which it r<span class=\"_ _1\"></span>elates.<span class=\"_ _36a\"> </span>Contingent consideration arising on acquisitions is <span class=\"_ _0\"></span>first recognised in <span class=\"_ _0\"></span>the accounts at its fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue at the acquisition date and subsequently r<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>alued at each accounting date until it falls due <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> payment, or <span class=\"_ _0\"></span>the final amount is otherwise det<span class=\"_ _0\"></span>ermined.<span class=\"_ _36a\"> </span>(e<span class=\"_ _1\"></span>)  <span class=\"_ _29\"> </span>Cash and cash equivalents Balances shown as cash and cash equivalents in <span class=\"_ _0\"></span>the balance sheet comprise demand deposits and short-t<span class=\"_ _0\"></span>erm deposits with banks with initial maturities of no<span class=\"_ _0\"></span>t more <span class=\"_ _0\"></span>than 90 days. (f)  <span class=\"_ _194\"> </span>Leases F<span class=\"_ _1\"></span>or leases wher<span class=\"_ _0\"></span>e the Group is <span class=\"_ _0\"></span>the lessee a right of<span class=\"_ _0\"></span> use asset is recognised in pr<span class=\"_ _0\"></span>operty<span class=\"_ _1\"></span>, plant and equipment on the inception of<span class=\"_ _0\"></span> the lease based on the discounted <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the minimum lease pa<span class=\"_ _0\"></span>yments at inception. A<span class=\"_ _1\"></span> lease liability of <span class=\"_ _0\"></span>the same amount is recognised at inception, with <span class=\"_ _0\"></span>the unwinding of<span class=\"_ _0\"></span> the discount included in inter<span class=\"_ _0\"></span>est pay<span class=\"_ _0\"></span>able.<span class=\"_ _36a\"> </span>Leases <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>the Group is lessor<span class=\"_ _0\"></span> are accounted <span class=\"_ _0\"></span>for as oper<span class=\"_ _0\"></span>ating or finance leases in accor<span class=\"_ _0\"></span>dance with IFRS 16 \u2013 \u2018Leases<span class=\"_ _0\"></span>\u2019<span class=\"_ _2\"></span>. A<span class=\"_ _1\"></span> finance lease is one which <span class=\"_ _0\"></span>transfers substantially<span class=\"_ _0\"></span> all of <span class=\"_ _0\"></span>the risks and re<span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ds of <span class=\"_ _0\"></span>the ownership of<span class=\"_ _0\"></span> the asset concerned. <span class=\"_ _1\"></span>Any other<span class=\"_ _0\"></span> lease is an operating lease.<span class=\"_ _36a\"> </span>Finance lease receiv<span class=\"_ _0\"></span>ables are accounted <span class=\"_ _0\"></span>for as loans <span class=\"_ _0\"></span>to customers, <span class=\"_ _0\"></span>with impairment provisions de<span class=\"_ _0\"></span>termined in accordance <span class=\"_ _0\"></span>with IFRS 9.<span class=\"_ _36a\"> </span>Rental income and costs on operating leases ar<span class=\"_ _0\"></span>e charged or<span class=\"_ _0\"></span> credited <span class=\"_ _0\"></span>to the pr<span class=\"_ _0\"></span>ofit and loss account on a straight-line basis o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the lease term. <span class=\"_ _0\"></span>The associated assets ar<span class=\"_ _0\"></span>e included within pr<span class=\"_ _0\"></span>operty<span class=\"_ _0\"></span>, plant and equipment.<span class=\"_ _36a\"> </span>(g)  <span class=\"_ _13e\"> </span>Loans  to <span class=\"_ _1c\"> </span>customers Loans <span class=\"_ _0\"></span>to customers includes assets accounted <span class=\"_ _0\"></span>for as <span class=\"_ _0\"></span>financial assets and finance leases. <span class=\"_ _0\"></span>The Group assesses <span class=\"_ _0\"></span>the classification and measurement o<span class=\"_ _0\"></span>f a financial asse<span class=\"_ _0\"></span>t based on the contractual cash <span class=\"_ _0\"></span>flow charact<span class=\"_ _0\"></span>eristics of <span class=\"_ _0\"></span>the asset and its business model for<span class=\"_ _0\"></span> managing the asset. T<span class=\"_ _0\"></span>he Group has concluded <span class=\"_ _0\"></span>that its business model for<span class=\"_ _0\"></span> its customer loan asse<span class=\"_ _0\"></span>ts is of <span class=\"_ _0\"></span>the type defined as \u2018Held <span class=\"_ _0\"></span>to collect\u2019 by<span class=\"_ _0\"></span> IFRS 9 and the contractual t<span class=\"_ _0\"></span>erms of <span class=\"_ _0\"></span>the asset should give rise <span class=\"_ _0\"></span>to cash flow<span class=\"_ _0\"></span>s that ar<span class=\"_ _0\"></span>e solely payments o<span class=\"_ _0\"></span>f principal and inter<span class=\"_ _0\"></span>est (\u2018SPPI\u2019). Such loans are <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore accounted f<span class=\"_ _0\"></span>or on <span class=\"_ _0\"></span>the amortised cost basis.<span class=\"_ _36a\"> </span>Loans adv<span class=\"_ _0\"></span>anced are <span class=\"_ _0\"></span>valued at inception at <span class=\"_ _0\"></span>the initial advance amount, <span class=\"_ _0\"></span>which is the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value at that<span class=\"_ _0\"></span> time, inclusive of<span class=\"_ _1\"></span> procuration fees paid t<span class=\"_ _0\"></span>o brok<span class=\"_ _0\"></span>ers or other<span class=\"_ _0\"></span> business pro<span class=\"_ _0\"></span>viders and less initial fees paid b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the customer<span class=\"_ _1\"></span>. Loans acquired fr<span class=\"_ _0\"></span>om thir<span class=\"_ _0\"></span>d parties are initially <span class=\"_ _0\"></span>valued at <span class=\"_ _0\"></span>the purchase consideration paid or<span class=\"_ _0\"></span> pay<span class=\"_ _0\"></span>able. Ther<span class=\"_ _0\"></span>eafter<span class=\"_ _1\"></span>, all loans to customers ar<span class=\"_ _0\"></span>e valued at<span class=\"_ _0\"></span> this initial amount less the cumulative amortisation calculated using <span class=\"_ _0\"></span>the Effectiv<span class=\"_ _0\"></span>e Interest Rate (\u2018EIR\u2019) method. <span class=\"_ _0\"></span>The loan balances are <span class=\"_ _0\"></span>then reduced <span class=\"_ _0\"></span>where necessary b<span class=\"_ _0\"></span>y an impairment pr<span class=\"_ _0\"></span>ovision.<span class=\"_ _36a\"> </span>The EIR method spreads <span class=\"_ _0\"></span>the expected net income arising fr<span class=\"_ _0\"></span>om a loan ov<span class=\"_ _0\"></span>er its expected lif<span class=\"_ _0\"></span>e. The EIR is <span class=\"_ _0\"></span>that rate of<span class=\"_ _0\"></span> interest <span class=\"_ _0\"></span>which, at inception, exactly<span class=\"_ _0\"></span> discounts the futur<span class=\"_ _0\"></span>e cash payments and r<span class=\"_ _0\"></span>eceipts arising fr<span class=\"_ _0\"></span>om the loan to <span class=\"_ _0\"></span>the initial carrying amount. Where <span class=\"_ _0\"></span>financial assets are cr<span class=\"_ _0\"></span>edit-impaired at initial r<span class=\"_ _0\"></span>ecognition the EIR is calculated on the basis o<span class=\"_ _0\"></span>f expected <span class=\"_ _0\"></span>future cash r<span class=\"_ _0\"></span>eceipts allowing f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the effect of<span class=\"_ _0\"></span> credit risk. In o<span class=\"_ _0\"></span>ther cases, the e<span class=\"_ _0\"></span>xpected contractual cash flo<span class=\"_ _0\"></span>ws are used. (h) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Finance lease receiv<span class=\"_ _0\"></span>ables<span class=\"_ _36a\"> </span>Finance lease receiv<span class=\"_ _0\"></span>ables are included <span class=\"_ _0\"></span>within \u2018Loans t<span class=\"_ _0\"></span>o Customers\u2019 at <span class=\"_ _0\"></span>the total amount<span class=\"_ _0\"></span> receivable less int<span class=\"_ _0\"></span>erest not <span class=\"_ _0\"></span>yet accrued, unamortised commissions and pro<span class=\"_ _0\"></span>vision for<span class=\"_ _0\"></span> impairment.<span class=\"_ _36a\"> </span>Income fr<span class=\"_ _0\"></span>om finance lease contracts is go<span class=\"_ _0\"></span>verned by<span class=\"_ _0\"></span> IFRS 16 \u2013 \u2018Leases\u2019 and account<span class=\"_ _0\"></span>ed for<span class=\"_ _0\"></span> on the actuarial basis.<span class=\"_ _36a\"> </span>(i)   <span class=\"_ _29\"> </span>Impairment of loans <span class=\"_ _0\"></span>to customers<span class=\"_ _36a\"> </span>The carrying v<span class=\"_ _0\"></span>alues of<span class=\"_ _0\"></span> all loans to customers, <span class=\"_ _0\"></span>whether accounted <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> under IFRS 9 or IFRS 16, ar<span class=\"_ _0\"></span>e reduced by<span class=\"_ _0\"></span> an impairment pro<span class=\"_ _0\"></span>vision based on their<span class=\"_ _0\"></span> ECL, determined in accor<span class=\"_ _0\"></span>dance with IFRS 9<span class=\"_ _0\"></span>. These estimates ar<span class=\"_ _1\"></span>e review<span class=\"_ _0\"></span>ed thr<span class=\"_ _0\"></span>oughout the <span class=\"_ _0\"></span>year and at<span class=\"_ _0\"></span> each balance sheet date. With the ex<span class=\"_ _0\"></span>ception of<span class=\"_ _0\"></span> POCI financial assets (<span class=\"_ _0\"></span>which are discussed separately<span class=\"_ _0\"></span> below<span class=\"_ _0\"></span>), all assets are assessed <span class=\"_ _0\"></span>to determine whe<span class=\"_ _0\"></span>ther there has been a significant incr<span class=\"_ _0\"></span>ease in credit risk<span class=\"_ _0\"></span> (\u2018SICR\u2019) since the point of<span class=\"_ _0\"></span> first r<span class=\"_ _0\"></span>ecognition (<span class=\"_ _0\"></span>origination or acquisition). <span class=\"_ _1\"></span>Assets are also re<span class=\"_ _0\"></span>viewed <span class=\"_ _0\"></span>to identify an<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>which are \u2018Cr<span class=\"_ _0\"></span>edit Impaired\u2019<span class=\"_ _2f\"></span>. SICR and credit impairment are identified on <span class=\"_ _0\"></span>the basis of<span class=\"_ _0\"></span> pre-determined metrics including qualitative and quantitative <span class=\"_ _0\"></span>factors r<span class=\"_ _0\"></span>elevant<span class=\"_ _0\"></span> to each portfolio<span class=\"_ _0\"></span>, with a management r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>w t<span class=\"_ _0\"></span>o ensure appropriat<span class=\"_ _0\"></span>e allocation. Assets which ha<span class=\"_ _0\"></span>ve not experienced an SICR ar<span class=\"_ _0\"></span>e ref<span class=\"_ _0\"></span>erred <span class=\"_ _0\"></span>to as \u2018Stage 1\u2019 accounts, assets <span class=\"_ _0\"></span>which have experienced an SICR but ar<span class=\"_ _0\"></span>e not credit impair<span class=\"_ _0\"></span>ed are r<span class=\"_ _0\"></span>eferr<span class=\"_ _0\"></span>ed to as \u2018Stag<span class=\"_ _0\"></span>e 2\u2019 accounts, while credit<span class=\"_ _0\"></span> impaired assets ar<span class=\"_ _0\"></span>e referr<span class=\"_ _1\"></span>ed to as \u2018Stage 3\u2019 accounts.<span class=\"_ _36a\"> </span>An impairment allow<span class=\"_ _0\"></span>ance is provided on an account b<span class=\"_ _0\"></span>y account basis: \u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>F<span class=\"_ _1\"></span>or Stag<span class=\"_ _0\"></span>e 1, at an amount equal to 12<span class=\"_ _0\"></span>-month ECL, <span class=\"_ _0\"></span>the total E<span class=\"_ _0\"></span>CL <span class=\"_ _0\"></span>that results <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>those default ev<span class=\"_ _0\"></span>ents that ar<span class=\"_ _0\"></span>e possible within  12 months of <span class=\"_ _0\"></span>the reporting date, <span class=\"_ _0\"></span>weighted b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the probability<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>those events occurring<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>F<span class=\"_ _1\"></span>or Stag<span class=\"_ _0\"></span>e 2 and 3 accounts, at an amount equal to lif<span class=\"_ _0\"></span>etime ECL, <span class=\"_ _0\"></span>the total E<span class=\"_ _0\"></span>CL <span class=\"_ _0\"></span>that results <span class=\"_ _0\"></span>from any<span class=\"_ _0\"></span> futur<span class=\"_ _0\"></span>e default ev<span class=\"_ _0\"></span>ents, weight<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the pr<span class=\"_ _0\"></span>obability of<span class=\"_ _0\"></span> those e<span class=\"_ _0\"></span>vents occurring<span class=\"_ _36a\"> </span>In establishing an ECL<span class=\"_ _0\"></span> allow<span class=\"_ _0\"></span>ance, the Group assesses its PD<span class=\"_ _0\"></span>, L<span class=\"_ _0\"></span>GD and exposur<span class=\"_ _0\"></span>e at default f<span class=\"_ _0\"></span>or each r<span class=\"_ _0\"></span>eporting period, discounted to giv<span class=\"_ _0\"></span>e a net present<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue. The estimates used in <span class=\"_ _0\"></span>these assessments must be unbiased and tak<span class=\"_ _0\"></span>e into account reasonable and supportable information including f<span class=\"_ _0\"></span>orward-looking economic inputs. While the Gr<span class=\"_ _0\"></span>oup uses statistical models as the basis f<span class=\"_ _0\"></span>or its calculation of<span class=\"_ _0\"></span> ECLs <span class=\"_ _0\"></span>where appr<span class=\"_ _0\"></span>opriate, expert judgement <span class=\"_ _0\"></span>will alwa<span class=\"_ _0\"></span>ys be used to assess <span class=\"_ _0\"></span>the adequacy o<span class=\"_ _0\"></span>f any<span class=\"_ _0\"></span> calculated amount and additional pr<span class=\"_ _0\"></span>ovision made if r<span class=\"_ _0\"></span>equired.<span class=\"_ _36a\"> </span>Within its buy-to-le<span class=\"_ _0\"></span>t portfolio the Gr<span class=\"_ _0\"></span>oup utilises a receiv<span class=\"_ _0\"></span>er of<span class=\"_ _0\"></span> rent pr<span class=\"_ _0\"></span>ocess, wher<span class=\"_ _0\"></span>eby<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>eceiver stands be<span class=\"_ _0\"></span>tween the landlor<span class=\"_ _0\"></span>d and tenant and will de<span class=\"_ _0\"></span>termine an appropriate strat<span class=\"_ _0\"></span>egy f<span class=\"_ _0\"></span>or dealing <span class=\"_ _0\"></span>with any delinquenc<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>. This str<span class=\"_ _0\"></span>ategy ma<span class=\"_ _0\"></span>y inv<span class=\"_ _0\"></span>olve the immediate sale of an<span class=\"_ _0\"></span>y underlying security<span class=\"_ _0\"></span> or <span class=\"_ _0\"></span>the short or long <span class=\"_ _0\"></span>term letting of<span class=\"_ _0\"></span> the pr<span class=\"_ _0\"></span>operty t<span class=\"_ _0\"></span>o cover<span class=\"_ _0\"></span> arrears and principal shortfalls. Such cases ar<span class=\"_ _0\"></span>e automatically consider<span class=\"_ _0\"></span>ed to ha<span class=\"_ _0\"></span>ve an SICR, but wher<span class=\"_ _1\"></span>e a letting strategy is adopted b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the receiver<span class=\"_ _0\"></span> and a tenant<span class=\"_ _0\"></span> is in place, arrears may<span class=\"_ _0\"></span> be reduced or<span class=\"_ _0\"></span> cleared. Pr<span class=\"_ _0\"></span>operties in receiv<span class=\"_ _0\"></span>ership are e<span class=\"_ _0\"></span>ventually either<span class=\"_ _1\"></span> returned to <span class=\"_ _0\"></span>their landlor<span class=\"_ _0\"></span>d owners or<span class=\"_ _0\"></span> sold.<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>or loan portfolios acquired at<span class=\"_ _0\"></span> a discount, the discounts tak<span class=\"_ _0\"></span>e account of<span class=\"_ _0\"></span> future e<span class=\"_ _0\"></span>xpected impairments, and such assets are <span class=\"_ _0\"></span>treated as POCI. F<span class=\"_ _1\"></span>or these assets, <span class=\"_ _0\"></span>the Group r<span class=\"_ _0\"></span>ecognises all changes in futur<span class=\"_ _0\"></span>e cash flow<span class=\"_ _0\"></span>s arising fr<span class=\"_ _0\"></span>om changes in credit quality<span class=\"_ _0\"></span> since initial recognition as a loss allo<span class=\"_ _0\"></span>wance with an<span class=\"_ _0\"></span>y changes r<span class=\"_ _0\"></span>ecognised in profit<span class=\"_ _0\"></span> or loss. F<span class=\"_ _1\"></span>or financial accounting purposes, pr<span class=\"_ _0\"></span>ovisions for<span class=\"_ _1\"></span> impairments of loans to customer<span class=\"_ _0\"></span>s are held in an impairment allow<span class=\"_ _0\"></span>ance account fr<span class=\"_ _0\"></span>om the point at which <span class=\"_ _0\"></span>they<span class=\"_ _0\"></span> are <span class=\"_ _0\"></span>first recognised. <span class=\"_ _0\"></span>These balances ar<span class=\"_ _0\"></span>e released t<span class=\"_ _0\"></span>o offset against <span class=\"_ _0\"></span>the gross <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the loan when it<span class=\"_ _0\"></span> is written off <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> accounting purposes. This occurs <span class=\"_ _0\"></span>when standard enf<span class=\"_ _0\"></span>orcement pr<span class=\"_ _0\"></span>ocesses have been completed, subject<span class=\"_ _0\"></span> to any<span class=\"_ _0\"></span> amount re<span class=\"_ _0\"></span>tained in respect o<span class=\"_ _0\"></span>f expected salv<span class=\"_ _0\"></span>age receip<span class=\"_ _0\"></span>ts. An<span class=\"_ _0\"></span>y further<span class=\"_ _0\"></span> gains fr<span class=\"_ _0\"></span>om post-write off<span class=\"_ _1\"></span> salvage activity ar<span class=\"_ _0\"></span>e reported as impairment g<span class=\"_ _0\"></span>ains.<span class=\"_ _36a\"> </span>(<span class=\"_ _15\"></span>j) <span class=\"_ _41\"> </span> <span class=\"_ _29\"> </span>Amounts owed by<span class=\"_ _0\"></span> or <span class=\"_ _0\"></span>to group companies<span class=\"_ _36a\"> </span>In the accounts of<span class=\"_ _0\"></span> the Company<span class=\"_ _1\"></span>, balances owed b<span class=\"_ _0\"></span>y or<span class=\"_ _0\"></span> to other<span class=\"_ _0\"></span> group companies ar<span class=\"_ _0\"></span>e carried at the curr<span class=\"_ _0\"></span>ent amount outstanding less any<span class=\"_ _0\"></span> pro<span class=\"_ _0\"></span>vision. Wher<span class=\"_ _0\"></span>e balances owing between gr<span class=\"_ _0\"></span>oup companies fall <span class=\"_ _0\"></span>within the definition of<span class=\"_ _0\"></span> either <span class=\"_ _0\"></span>financial assets or <span class=\"_ _0\"></span>financial liabilities given in IAS 32 \u2013 \u2018Financial Instruments: Pr<span class=\"_ _0\"></span>esentation\u2019 the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e classified as assets or liabilities at<span class=\"_ _0\"></span> amortised cost, as defined by<span class=\"_ _0\"></span> IFRS 9.<span class=\"_ _36a\"> </span>(k) <span class=\"_ _2\"></span> <span class=\"_ _29\"> </span>Property, plant and equipment Property<span class=\"_ _1\"></span>, plant and equipment is stated at cost less accumulated depr<span class=\"_ _0\"></span>eciation. Assets held for<span class=\"_ _1\"></span> letting under operating leases are depr<span class=\"_ _0\"></span>eciated in equal annual instalments t<span class=\"_ _0\"></span>o their<span class=\"_ _0\"></span> estimated residual <span class=\"_ _0\"></span>value ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the life of<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>elated lease. V<span class=\"_ _1\"></span>ehicles held for<span class=\"_ _0\"></span> short term hir<span class=\"_ _0\"></span>e are depr<span class=\"_ _0\"></span>eciated in equal annual instalments to <span class=\"_ _0\"></span>their estimated r<span class=\"_ _1\"></span>esidual value over<span class=\"_ _1\"></span> their expected useful lif<span class=\"_ _0\"></span>e. This depr<span class=\"_ _1\"></span>eciation is deducted in arriving at net lease income and is shown in note 6.<span class=\"_ _36a\"> </span>The assets\u2019 r<span class=\"_ _1\"></span>esidual values and useful lives ar<span class=\"_ _0\"></span>e re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span>ed by manag<span class=\"_ _0\"></span>ement and adjusted, if appr<span class=\"_ _0\"></span>opriate, at each balance sheet date.<span class=\"_ _36a\"> </span>Depreciation on operating asse<span class=\"_ _0\"></span>ts is provided on cost<span class=\"_ _0\"></span> in equal annual instalments over<span class=\"_ _0\"></span> the lives o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the assets. Land is not depreciat<span class=\"_ _0\"></span>ed. The rates of<span class=\"_ _0\"></span> depreciation ar<span class=\"_ _0\"></span>e as follo<span class=\"_ _0\"></span>ws:<span class=\"_ _36a\"> </span>Freehold premises<span class=\"_ _45\"> </span>Short leasehold premises<span class=\"_ _2e5\"> </span>Computer hardware<span class=\"_ _ae\"> </span><span class=\"ff1e\">Furniture, fixtures and office equipment<span class=\"_ _1a\"> </span></span>Company motor vehicles<span class=\"_ _36a\"> </span>2% per annum<span class=\"_ _12\"> </span>over the term of the lease<span class=\"_ _1a\"> </span>25% per annum<span class=\"_ _66\"> </span>15% per annum<span class=\"_ _ba\"> </span>25% per annum<span class=\"_ _36a\"> </span>Depreciation on right o<span class=\"_ _0\"></span>f use assets r<span class=\"_ _0\"></span>ecognised in accordance <span class=\"_ _0\"></span>with IFRS 16 is provided on a straight line basis o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the term o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the lease.<span class=\"_ _36a\"> </span>(l)   <span class=\"_ _29\"> </span>Intangible assets Intangible assets comprise purchased comput<span class=\"_ _0\"></span>er softw<span class=\"_ _0\"></span>are and other<span class=\"_ _0\"></span> intangible assets acquired in business combinations.<span class=\"_ _36a\"> </span>Purchased computer<span class=\"_ _0\"></span> softwar<span class=\"_ _1\"></span>e is capitalised where it has a sufficiently<span class=\"_ _0\"></span> enduring nature and is stated at cost less accumulat<span class=\"_ _0\"></span>ed amortisation. Amortisation is pr<span class=\"_ _0\"></span>ovided in equal instalments at a r<span class=\"_ _0\"></span>ate of 25% per<span class=\"_ _0\"></span> annum.<span class=\"_ _36a\"> </span>Other intangible assets acquir<span class=\"_ _0\"></span>ed in business combinations include brands and business netw<span class=\"_ _0\"></span>orks and are capitalised in accor<span class=\"_ _0\"></span>dance with the r<span class=\"_ _0\"></span>equirements of<span class=\"_ _0\"></span> IFRS 3 \u2013 \u2018Business Combinations\u2019<span class=\"_ _2\"></span>. Such assets are stat<span class=\"_ _0\"></span>ed at attributed cost less accumulated amortisation. Amortisation is pro<span class=\"_ _0\"></span>vided in equal instalments at a rate determined at <span class=\"_ _0\"></span>the point of<span class=\"_ _0\"></span> acquisition.<span class=\"_ _36a\"> </span>(m<span class=\"_ _0\"></span>) <span class=\"_ _27\"> </span>Inves<span class=\"_ _0\"></span>tments in subsidiaries<span class=\"_ _36a\"> </span>The Company\u2019<span class=\"_ _1\"></span>s investments in subsidiary<span class=\"_ _0\"></span> undertakings are <span class=\"_ _0\"></span>valued at cost less pr<span class=\"_ _0\"></span>ovision <span class=\"_ _0\"></span>for impairment. Impairment is de<span class=\"_ _0\"></span>termined based on the net asse<span class=\"_ _0\"></span>t v<span class=\"_ _0\"></span>alues of subsidiary<span class=\"_ _0\"></span> entities after pr<span class=\"_ _0\"></span>ovision <span class=\"_ _0\"></span>for inter<span class=\"_ _1\"></span> company balances and investments at<span class=\"_ _0\"></span> the subsidiary le<span class=\"_ _0\"></span>vel.<span class=\"_ _36a\"> </span>(n<span class=\"_ _0\"></span>)  <span class=\"_ _13e\"> </span>Own <span class=\"_ _96\"></span>shares Shares in Par<span class=\"_ _0\"></span>agon Banking Group PL<span class=\"_ _1\"></span>C held in treasury<span class=\"_ _0\"></span> or b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the trustee of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s employee share o<span class=\"_ _0\"></span>wnership plan are shown on the balance sheet as a deduction in arriving at <span class=\"_ _0\"></span>total equity<span class=\"_ _0\"></span>. Own shares ar<span class=\"_ _0\"></span>e stated at cost.<span class=\"_ _36a\"> </span>Any<span class=\"_ _0\"></span> shortfall on disposal of such shar<span class=\"_ _0\"></span>es is offset against<span class=\"_ _0\"></span> retained earnings. <span class=\"_ _0\"></span>Any<span class=\"_ _0\"></span> excess of<span class=\"_ _0\"></span> disposal proceeds o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> cost is added to <span class=\"_ _0\"></span>the share pr<span class=\"_ _0\"></span>emium account. Wher<span class=\"_ _0\"></span>e an irre<span class=\"_ _0\"></span>vocable instruction f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the purchase of<span class=\"_ _0\"></span> such shares has been giv<span class=\"_ _0\"></span>en, it is tr<span class=\"_ _0\"></span>eated as a reduction in capital fr<span class=\"_ _0\"></span>om the point at <span class=\"_ _0\"></span>which the instruction becomes irr<span class=\"_ _0\"></span>evocable.<span class=\"_ _36a\"> </span>(o<span class=\"_ _1\"></span>)  <span class=\"_ _ce\"> </span>Retail <span class=\"_ _96\"></span>deposits<span class=\"_ _36a\"> </span>Retail deposits ar<span class=\"_ _0\"></span>e carried in the balance sheet on <span class=\"_ _0\"></span>the amortised cost basis. T<span class=\"_ _0\"></span>he initial fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue recognised repr<span class=\"_ _1\"></span>esents the cash amount receiv<span class=\"_ _0\"></span>ed fr<span class=\"_ _0\"></span>om the customer<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>Interest pa<span class=\"_ _0\"></span>yable <span class=\"_ _0\"></span>to the customer<span class=\"_ _0\"></span> is expensed to <span class=\"_ _0\"></span>the income statement as inter<span class=\"_ _0\"></span>est payable o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the deposit t<span class=\"_ _0\"></span>erm on an EIR basis.<span class=\"_ _36a\"> </span>(p<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>Borrowings Borro<span class=\"_ _0\"></span>wings are carried in the balance shee<span class=\"_ _0\"></span>t on the amortised cost basis. <span class=\"_ _0\"></span>The initial v<span class=\"_ _0\"></span>alue recognised includes <span class=\"_ _0\"></span>the principal amount receiv<span class=\"_ _0\"></span>ed less any discount on issue or<span class=\"_ _1\"></span> costs of issuance.<span class=\"_ _36a\"> </span>Interest and all o<span class=\"_ _0\"></span>ther costs of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>funding are expensed <span class=\"_ _0\"></span>to the income statement as int<span class=\"_ _0\"></span>erest pay<span class=\"_ _0\"></span>able over<span class=\"_ _1\"></span> the term of<span class=\"_ _0\"></span> the borr<span class=\"_ _0\"></span>owing on an EIR basis.<span class=\"_ _36a\"> </span>(q)  <span class=\"_ _ce\"> </span>Central  bank  f<span class=\"_ _0\"></span>acilities Where central bank<span class=\"_ _0\"></span> facilities ar<span class=\"_ _0\"></span>e provided at<span class=\"_ _0\"></span> a below mark<span class=\"_ _0\"></span>et rate of<span class=\"_ _0\"></span> interest, and <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore <span class=\"_ _0\"></span>fall within the de<span class=\"_ _0\"></span>finition of g<span class=\"_ _0\"></span>overnment assistance as defined by<span class=\"_ _0\"></span> IAS 20 \u2013 \u2018<span class=\"_ _1\"></span>Accounting f<span class=\"_ _0\"></span>or Gov<span class=\"_ _0\"></span>ernment Grants and Disclosur<span class=\"_ _0\"></span>e of Go<span class=\"_ _0\"></span>vernment <span class=\"_ _0\"></span>Assistance\u2019<span class=\"_ _2f\"></span>, the liability is initially<span class=\"_ _0\"></span> recognised at <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>alue of its e<span class=\"_ _0\"></span>xpected cash flow<span class=\"_ _0\"></span>s discounted at a market<span class=\"_ _0\"></span> rate of int<span class=\"_ _0\"></span>erest <span class=\"_ _0\"></span>for a compar<span class=\"_ _0\"></span>able commercial borro<span class=\"_ _0\"></span>wing. Interest is r<span class=\"_ _1\"></span>ecognised on this liability on an EIR basis, using the imputed mark<span class=\"_ _0\"></span>et rate <span class=\"_ _0\"></span>to determine the EIR.<span class=\"_ _36a\"> </span>The remaining amount<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the advance is r<span class=\"_ _0\"></span>ecognised as deferred g<span class=\"_ _0\"></span>overnment assistance and r<span class=\"_ _0\"></span>eleased to <span class=\"_ _0\"></span>the pro<span class=\"_ _0\"></span>fit and loss account through inter<span class=\"_ _0\"></span>est pay<span class=\"_ _0\"></span>able over<span class=\"_ _0\"></span> the periods during <span class=\"_ _0\"></span>which the arrangement<span class=\"_ _0\"></span> affects pro<span class=\"_ _0\"></span>fit.<span class=\"_ _36a\"> </span>(r<span class=\"_ _0\"></span>) <span class=\"_ _1c\"> </span> <span class=\"_ _29\"> </span>Sale and repurchase agreements<span class=\"_ _36a\"> </span>Securities, including the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s own retained asset-back<span class=\"_ _0\"></span>ed notes, can be sold subject <span class=\"_ _0\"></span>to a commitment to r<span class=\"_ _0\"></span>epurchase <span class=\"_ _0\"></span>them at a subsequent date at a price calculated on a pr<span class=\"_ _0\"></span>e-determined basis (a r<span class=\"_ _0\"></span>epo<span class=\"_ _0\"></span>). Wher<span class=\"_ _0\"></span>e this price comprises a fix<span class=\"_ _0\"></span>ed amount plus a lenders return, <span class=\"_ _0\"></span>the funds r<span class=\"_ _0\"></span>eceived are <span class=\"_ _0\"></span>treated as borr<span class=\"_ _0\"></span>owings of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup.<span class=\"_ _36a\"> </span>Where <span class=\"_ _0\"></span>the securities concerned are r<span class=\"_ _0\"></span>etained notes no liability<span class=\"_ _0\"></span> is recognised in asset-back<span class=\"_ _0\"></span>ed loan notes and wher<span class=\"_ _0\"></span>e the securities ar<span class=\"_ _0\"></span>e recognised on <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s balance sheet prior <span class=\"_ _0\"></span>to the tr<span class=\"_ _0\"></span>ansaction, these ar<span class=\"_ _0\"></span>e not derecognised. The differ<span class=\"_ _0\"></span>ence between <span class=\"_ _0\"></span>the sale and purchase price is accrued ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the life of<span class=\"_ _0\"></span> the agreement<span class=\"_ _0\"></span> using the effectiv<span class=\"_ _0\"></span>e interest r<span class=\"_ _0\"></span>ate method.<span class=\"_ _36a\"> </span>(s<span class=\"_ _0\"></span>)  <span class=\"_ _45\"> </span>Derivativ<span class=\"_ _0\"></span>e financial instruments All derivativ<span class=\"_ _0\"></span>e financial instruments are carried in <span class=\"_ _0\"></span>the balance sheet at f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value, as assets <span class=\"_ _0\"></span>where the <span class=\"_ _0\"></span>value is positiv<span class=\"_ _0\"></span>e or as liabilities where <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>alue is negative. F<span class=\"_ _1\"></span>air <span class=\"_ _0\"></span>value is based on marke<span class=\"_ _0\"></span>t prices, wher<span class=\"_ _0\"></span>e a market exists. If<span class=\"_ _0\"></span> ther<span class=\"_ _0\"></span>e is no active mark<span class=\"_ _0\"></span>et, fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue is calculated using present <span class=\"_ _1\"></span>value models which incorporate assumptions based on mark<span class=\"_ _0\"></span>et conditions and ar<span class=\"_ _0\"></span>e consistent with accepted economic methodologies for<span class=\"_ _1\"></span> pricing financial instruments. Changes in the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> derivatives ar<span class=\"_ _0\"></span>e recognised in <span class=\"_ _0\"></span>the income statement, excep<span class=\"_ _0\"></span>t wher<span class=\"_ _0\"></span>e such amounts are permitted <span class=\"_ _0\"></span>to be tak<span class=\"_ _0\"></span>en to equity<span class=\"_ _0\"></span> as part of <span class=\"_ _0\"></span>the accounting for<span class=\"_ _1\"></span> a cash flow hedge. (t)  <span class=\"_ _4a\"> </span>Hedging<span class=\"_ _36a\"> </span>IFRS 9 paragraph 7<span class=\"_ _2\"></span>.2.21 permits an entity to elect, as a matter<span class=\"_ _0\"></span> of accounting polic<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, to continue <span class=\"_ _0\"></span>to apply <span class=\"_ _0\"></span>the hedge accounting requir<span class=\"_ _0\"></span>ements of IA<span class=\"_ _0\"></span>S 39 in place of <span class=\"_ _0\"></span>those set out in Chapter<span class=\"_ _1\"></span> 6 of IFRS 9. <span class=\"_ _0\"></span>The Group has made <span class=\"_ _0\"></span>this election and the accounting policy<span class=\"_ _0\"></span> below has been de<span class=\"_ _0\"></span>termined in accordance <span class=\"_ _0\"></span>with IAS 39<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>or all hedges, the Gr<span class=\"_ _0\"></span>oup documents the r<span class=\"_ _0\"></span>elationship between <span class=\"_ _0\"></span>the hedging instruments and the hedged items at incep<span class=\"_ _0\"></span>tion, as well as its risk management str<span class=\"_ _0\"></span>ategy and objectives <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> undertaking the tr<span class=\"_ _0\"></span>ansaction. The Gr<span class=\"_ _0\"></span>oup also documents its assessment, both at hedge inception and on an ongoing basis, o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>whether <span class=\"_ _0\"></span>the hedging arrangements put in place ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be \u2018highly eff<span class=\"_ _0\"></span>ective\u2019 as defined by<span class=\"_ _0\"></span> IAS 39<span class=\"_ _0\"></span>. F<span class=\"_ _1\"></span>or a fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue hedge, as long as the hedging r<span class=\"_ _0\"></span>elationship is deemed \u2018highly eff<span class=\"_ _0\"></span>ective\u2019 and mee<span class=\"_ _0\"></span>ts the hedging requir<span class=\"_ _1\"></span>ements of IAS 39, an<span class=\"_ _0\"></span>y gain or<span class=\"_ _0\"></span> loss on the hedging instrument r<span class=\"_ _0\"></span>ecognised in income can be offset against<span class=\"_ _0\"></span> the fair<span class=\"_ _1\"></span> value loss or<span class=\"_ _0\"></span> gain arising fr<span class=\"_ _0\"></span>om the hedged item f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the hedged risk. F<span class=\"_ _1\"></span>or macro hedg<span class=\"_ _0\"></span>es (hedges of<span class=\"_ _0\"></span> interest rat<span class=\"_ _0\"></span>e risk for<span class=\"_ _0\"></span> a portfolio of<span class=\"_ _0\"></span> loan assets or r<span class=\"_ _1\"></span>etail deposit liabilities) this fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue adjustment is disclosed in the balance sheet alongside <span class=\"_ _0\"></span>the hedged item, f<span class=\"_ _0\"></span>or other<span class=\"_ _1\"></span> hedges the adjustment is made to <span class=\"_ _0\"></span>the carrying v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the hedged asset or<span class=\"_ _0\"></span> liability<span class=\"_ _0\"></span>. Only <span class=\"_ _0\"></span>the net ineffectiv<span class=\"_ _0\"></span>eness of <span class=\"_ _0\"></span>the hedge is charged or<span class=\"_ _1\"></span> credited to income. <span class=\"_ _0\"></span>Where a <span class=\"_ _0\"></span>fair value hedge r<span class=\"_ _0\"></span>elationship is terminat<span class=\"_ _0\"></span>ed, or deemed ineffectiv<span class=\"_ _0\"></span>e, the <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value adjustment is amortised o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>the remaining <span class=\"_ _0\"></span>term of<span class=\"_ _0\"></span> the underlying item.<span class=\"_ _36a\"> </span>(u<span class=\"_ _0\"></span>)  <span class=\"_ _13e\"> </span>T<span class=\"_ _2\"></span>axation<span class=\"_ _36a\"> </span>The charge <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> taxation repr<span class=\"_ _0\"></span>esents the expect<span class=\"_ _0\"></span>ed UK corporation tax (including <span class=\"_ _0\"></span>the Bank Corporation <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>ax Surcharge <span class=\"_ _0\"></span>where applicable<span class=\"_ _0\"></span>) and other income <span class=\"_ _0\"></span>taxes arising <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s profit f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span>. T<span class=\"_ _0\"></span>his consists of <span class=\"_ _0\"></span>the current <span class=\"_ _0\"></span>tax which will be sho<span class=\"_ _0\"></span>wn in tax r<span class=\"_ _0\"></span>eturns for<span class=\"_ _0\"></span> the y<span class=\"_ _0\"></span>ear and <span class=\"_ _0\"></span>tax deferr<span class=\"_ _0\"></span>ed because of <span class=\"_ _0\"></span>temporary<span class=\"_ _0\"></span> differences. <span class=\"_ _0\"></span>This in general, r<span class=\"_ _0\"></span>epresents <span class=\"_ _0\"></span>the tax impact o<span class=\"_ _0\"></span>f items r<span class=\"_ _0\"></span>ecorded in the current <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> but which <span class=\"_ _0\"></span>will impact tax r<span class=\"_ _0\"></span>eturns for<span class=\"_ _0\"></span> periods other<span class=\"_ _0\"></span> than the one in <span class=\"_ _0\"></span>which the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e included in the financial statements. The Group <span class=\"_ _0\"></span>will hold a pro<span class=\"_ _0\"></span>vision for<span class=\"_ _0\"></span> any<span class=\"_ _0\"></span> uncertain tax positions at the balance shee<span class=\"_ _0\"></span>t date based on a global assessment of<span class=\"_ _0\"></span> the expected amount <span class=\"_ _0\"></span>that will ultimately<span class=\"_ _0\"></span> be payable.<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>ax relating to items <span class=\"_ _0\"></span>taken dir<span class=\"_ _0\"></span>ectly <span class=\"_ _0\"></span>to equity is also <span class=\"_ _0\"></span>taken dir<span class=\"_ _0\"></span>ectly <span class=\"_ _0\"></span>to equity<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>(v<span class=\"_ _0\"></span>)  <span class=\"_ _45\"> </span>Deferred tax<span class=\"_ _0\"></span>ation Deferr<span class=\"_ _0\"></span>ed taxation is pr<span class=\"_ _0\"></span>ovided in full on <span class=\"_ _0\"></span>temporary diff<span class=\"_ _0\"></span>erences <span class=\"_ _0\"></span>that result in an obligation at<span class=\"_ _0\"></span> the balance sheet date <span class=\"_ _0\"></span>to pay<span class=\"_ _0\"></span> more tax, or<span class=\"_ _0\"></span> a right to pa<span class=\"_ _0\"></span>y less <span class=\"_ _0\"></span>tax, at a future dat<span class=\"_ _0\"></span>e, at rates expected <span class=\"_ _0\"></span>to apply <span class=\"_ _0\"></span>when the<span class=\"_ _0\"></span>y crystallise based on curr<span class=\"_ _0\"></span>ent tax r<span class=\"_ _0\"></span>ates and law<span class=\"_ _0\"></span>. Deferred tax assets are r<span class=\"_ _0\"></span>ecognised to <span class=\"_ _0\"></span>the extent <span class=\"_ _0\"></span>that it is regar<span class=\"_ _0\"></span>ded as probable <span class=\"_ _0\"></span>that the<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>will be recov<span class=\"_ _0\"></span>ered. <span class=\"_ _0\"></span>As requir<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> IAS 12 \u2013 \u2018Income T<span class=\"_ _2\"></span>axes\u2019<span class=\"_ _2f\"></span>, deferred <span class=\"_ _0\"></span>tax assets and liabilities are not discount<span class=\"_ _0\"></span>ed to tak<span class=\"_ _0\"></span>e account of<span class=\"_ _0\"></span> the expected <span class=\"_ _0\"></span>timing of r<span class=\"_ _0\"></span>ealisation.<span class=\"_ _36a\"> </span>(w<span class=\"_ _0\"></span>) <span class=\"_ _29\"> </span>Retirement bene<span class=\"_ _0\"></span>fit obligations The expected cost o<span class=\"_ _0\"></span>f pr<span class=\"_ _0\"></span>oviding pensions within <span class=\"_ _0\"></span>the funded defined benefit scheme, det<span class=\"_ _0\"></span>ermined on the basis of<span class=\"_ _0\"></span> annual v<span class=\"_ _0\"></span>aluations by prof<span class=\"_ _0\"></span>essionally qualified actuaries using <span class=\"_ _0\"></span>the projected unit method, is char<span class=\"_ _0\"></span>ged to <span class=\"_ _0\"></span>the income statement. <span class=\"_ _0\"></span>Actuarial gains and losses are recognised in <span class=\"_ _0\"></span>full in the period in which <span class=\"_ _0\"></span>they<span class=\"_ _0\"></span> occur and do not<span class=\"_ _0\"></span> form part of<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>esult for<span class=\"_ _1\"></span> the period, being recognised in the S<span class=\"_ _0\"></span>tatement of Compr<span class=\"_ _0\"></span>ehensive Income.<span class=\"_ _36a\"> </span>The re<span class=\"_ _0\"></span>tirement benefit oblig<span class=\"_ _0\"></span>ation recognised in the balance shee<span class=\"_ _0\"></span>t repr<span class=\"_ _0\"></span>esents the pr<span class=\"_ _0\"></span>esent v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the defined benefit obligation, as reduced b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the fair <span class=\"_ _1\"></span>value of scheme assets at <span class=\"_ _0\"></span>the balance sheet date. The expected <span class=\"_ _0\"></span>financing cost of <span class=\"_ _0\"></span>the deficit, as estimated at <span class=\"_ _0\"></span>the beginning of <span class=\"_ _0\"></span>the period is recognised in the r<span class=\"_ _0\"></span>esult f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the period within interest pa<span class=\"_ _0\"></span>yable. <span class=\"_ _0\"></span>Any<span class=\"_ _0\"></span> variances ag<span class=\"_ _0\"></span>ainst the estimated amount in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear f<span class=\"_ _0\"></span>orm part of<span class=\"_ _0\"></span> the actuarial gain or<span class=\"_ _0\"></span> loss.<span class=\"_ _36a\"> </span>The charge <span class=\"_ _0\"></span>to the income statement<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> providing pensions under<span class=\"_ _1\"></span> defined contribution pension schemes is equal to the contributions payable t<span class=\"_ _0\"></span>o such <span class=\"_ _15\"></span>schemes for the y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>(x)  <span class=\"_ _ce\"> </span>Rev<span class=\"_ _0\"></span>enue<span class=\"_ _36a\"> </span>The re<span class=\"_ _0\"></span>venue of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup comprises interest<span class=\"_ _0\"></span> receivable and similar<span class=\"_ _1\"></span> charges, operating lease income and other income. <span class=\"_ _1\"></span>The accounting policy<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>ecognition of each element o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>evenue is described separ<span class=\"_ _0\"></span>ately <span class=\"_ _0\"></span>within these accounting policies. (y)  <span class=\"_ _45\"> </span>Other<span class=\"_ _0\"></span> <span class=\"_ _15\"></span>income<span class=\"_ _36a\"> </span>Other income, <span class=\"_ _0\"></span>which is accounted for<span class=\"_ _1\"></span> in accordance with IFRS 15, includes:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Event<span class=\"_ _0\"></span>-based administration fees charg<span class=\"_ _0\"></span>ed to borr<span class=\"_ _0\"></span>owers (<span class=\"_ _1\"></span>other than <span class=\"_ _0\"></span>the initial fees included in amortised cost), <span class=\"_ _0\"></span>which are cr<span class=\"_ _0\"></span>edited when the r<span class=\"_ _0\"></span>elated service is performed<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>F<span class=\"_ _0\"></span>ees charged <span class=\"_ _0\"></span>to third parties <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> account administration services, which ar<span class=\"_ _0\"></span>e credited as <span class=\"_ _0\"></span>those services are perf<span class=\"_ _0\"></span>ormed<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Commissions receivable on <span class=\"_ _0\"></span>the sale of insur<span class=\"_ _0\"></span>ances, as agent of<span class=\"_ _0\"></span> the thir<span class=\"_ _0\"></span>d-party insur<span class=\"_ _0\"></span>er<span class=\"_ _1\"></span>, which are <span class=\"_ _0\"></span>taken t<span class=\"_ _0\"></span>o profit at <span class=\"_ _0\"></span>the point at which the Group becomes unconditionally<span class=\"_ _0\"></span> entitled to <span class=\"_ _0\"></span>the income<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Maintenance income charged as part of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s contract hire arrangements <span class=\"_ _0\"></span>which is recognised as <span class=\"_ _0\"></span>the services are pr<span class=\"_ _0\"></span>ovided. Costs of <span class=\"_ _0\"></span>these services are deducted in o<span class=\"_ _0\"></span>ther income<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Broker<span class=\"_ _0\"></span> fees r<span class=\"_ _1\"></span>eceivable on the arrangement o<span class=\"_ _0\"></span>f loans funded b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>third parties, on an agenc<span class=\"_ _0\"></span>y basis, <span class=\"_ _0\"></span>which are tak<span class=\"_ _0\"></span>en to pr<span class=\"_ _0\"></span>ofit at <span class=\"_ _0\"></span>the point of<span class=\"_ _0\"></span> completion of <span class=\"_ _0\"></span>the related loan<span class=\"_ _36a\"> </span>(z)  <span class=\"_ _29\"> </span>Share based payments<span class=\"_ _36a\"> </span>In accordance <span class=\"_ _0\"></span>with IFRS 2 \u2013 \u2018Share-based Payments<span class=\"_ _0\"></span>\u2019<span class=\"_ _2\"></span>, the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue at the date o<span class=\"_ _0\"></span>f grant o<span class=\"_ _0\"></span>f aw<span class=\"_ _0\"></span>ards t<span class=\"_ _0\"></span>o be made in respect of<span class=\"_ _0\"></span> options and shares grant<span class=\"_ _0\"></span>ed under <span class=\"_ _0\"></span>the terms of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s v<span class=\"_ _0\"></span>arious share based emplo<span class=\"_ _0\"></span>yee incentive arrang<span class=\"_ _0\"></span>ements is charged <span class=\"_ _0\"></span>to the pr<span class=\"_ _0\"></span>ofit and loss account ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the period between the date o<span class=\"_ _0\"></span>f grant and <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>esting date.<span class=\"_ _36a\"> </span>National Insurance on share based pa<span class=\"_ _0\"></span>yments is accrued over<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>vesting period, based on <span class=\"_ _0\"></span>the share price at <span class=\"_ _0\"></span>the balance sheet date.<span class=\"_ _36a\"> </span>Where <span class=\"_ _0\"></span>the allowable cost o<span class=\"_ _0\"></span>f shar<span class=\"_ _0\"></span>e based awar<span class=\"_ _0\"></span>ds for<span class=\"_ _0\"></span> tax purposes is gr<span class=\"_ _0\"></span>eater <span class=\"_ _0\"></span>than the cost determined in accor<span class=\"_ _0\"></span>dance with IFRS 2, the tax effect of<span class=\"_ _0\"></span> the e<span class=\"_ _0\"></span>xcess is tak<span class=\"_ _0\"></span>en to r<span class=\"_ _0\"></span>eserves. (aa<span class=\"_ _0\"></span>) Dividends<span class=\"_ _36a\"> </span>In accordance <span class=\"_ _0\"></span>with IAS 10 \u2013 \u2018E<span class=\"_ _0\"></span>vents after<span class=\"_ _0\"></span> the balance sheet date<span class=\"_ _0\"></span>\u2019<span class=\"_ _2\"></span>, dividends payable on or<span class=\"_ _0\"></span>dinary shar<span class=\"_ _0\"></span>es are r<span class=\"_ _0\"></span>ecognised in equity once they<span class=\"_ _0\"></span> are appr<span class=\"_ _0\"></span>opriately authorised and ar<span class=\"_ _0\"></span>e no longer<span class=\"_ _0\"></span> at the discr<span class=\"_ _0\"></span>etion of <span class=\"_ _0\"></span>the Company<span class=\"_ _1\"></span>. Dividends declared after <span class=\"_ _0\"></span>the balance sheet date, but befor<span class=\"_ _0\"></span>e the authorisation of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>financial statements remain <span class=\"_ _0\"></span>within shareholders<span class=\"_ _0\"></span>\u2019 funds. Howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, such dividends are deducted fr<span class=\"_ _0\"></span>om regulat<span class=\"_ _0\"></span>ory capital fr<span class=\"_ _0\"></span>om the point at <span class=\"_ _0\"></span>which the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e announced, and capital disclosures ar<span class=\"_ _0\"></span>e prepar<span class=\"_ _0\"></span>ed on this basis.<span class=\"_ _36a\"> </span>(bb) <span class=\"_ _9\"> </span>F<span class=\"_ _0\"></span>oreign currenc<span class=\"_ _0\"></span>y<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>oreign currency<span class=\"_ _0\"></span> transactions, asse<span class=\"_ _0\"></span>ts and liabilities are accounted <span class=\"_ _0\"></span>for in accor<span class=\"_ _0\"></span>dance with IAS 21 \u2013 \u2018T<span class=\"_ _0\"></span>he Effects of<span class=\"_ _0\"></span> Changes in F<span class=\"_ _1\"></span>oreign Exchange Rat<span class=\"_ _0\"></span>es\u2019<span class=\"_ _2f\"></span>. The functional curr<span class=\"_ _0\"></span>ency<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the Company and all o<span class=\"_ _0\"></span>f the o<span class=\"_ _0\"></span>ther entities in <span class=\"_ _0\"></span>the Group is the pound st<span class=\"_ _0\"></span>erling. T<span class=\"_ _2\"></span>ransactions which are not<span class=\"_ _0\"></span> denominated in sterling are <span class=\"_ _0\"></span>translated into sterling at <span class=\"_ _0\"></span>the spot rate of<span class=\"_ _0\"></span> ex<span class=\"_ _0\"></span>change on the date of<span class=\"_ _1\"></span> transaction. Monetary assets and liabilities which ar<span class=\"_ _0\"></span>e not denominated in sterling ar<span class=\"_ _0\"></span>e translated at<span class=\"_ _0\"></span> the closing rate on <span class=\"_ _0\"></span>the balance sheet date.<span class=\"_ _36a\"> </span>Gains and losses on retr<span class=\"_ _0\"></span>anslation are included in inter<span class=\"_ _0\"></span>est payable or<span class=\"_ _0\"></span> inter<span class=\"_ _0\"></span>est receiv<span class=\"_ _0\"></span>able depending on whether<span class=\"_ _0\"></span> the underlying instrument is an asset or<span class=\"_ _0\"></span> a liability<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>(cc<span class=\"_ _1\"></span>) <span class=\"_ _11\"> </span>Segmental reporting<span class=\"_ _36a\"> </span>The accounting policies of<span class=\"_ _0\"></span> the segments ar<span class=\"_ _0\"></span>e the same as those described abo<span class=\"_ _0\"></span>ve f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the Group as a whole. Int<span class=\"_ _0\"></span>erest pay<span class=\"_ _0\"></span>able by<span class=\"_ _0\"></span> each segment includes directly<span class=\"_ _0\"></span> attributable funding and <span class=\"_ _0\"></span>the allocated cost of<span class=\"_ _0\"></span> retail deposit <span class=\"_ _0\"></span>funds utilised. Costs attributed to each segment repr<span class=\"_ _0\"></span>esent the dir<span class=\"_ _0\"></span>ect costs incurred b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the segment operations.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSummaryOfSignificantAccountingPoliciesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-402": {
   "value": "(a)   Accounting convention The financial statements have been prepared under the historical cost convention, except as required in the valuation of certain financial instruments which are carried at fair value. ",
   "dimensions": {
    "concept": "paragon:DescriptionOfAccountingPolicyForAccountingConvention",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-403": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs1017\">(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Basis of<span class=\"_ _0\"></span> consolidation </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1018\">The consolidated financial stat<span class=\"_ _0\"></span>ements deal with the accounts o<span class=\"_ _0\"></span>f the Compan<span class=\"_ _0\"></span>y and its subsidiaries made up <span class=\"_ _0\"></span>to 30 September 2023. </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1019\">Subsidiaries comprise all those entities o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>which the Gr<span class=\"_ _0\"></span>oup has control, as defined b<span class=\"_ _0\"></span>y IFRS 10 \u2013 \u2018Consolidated Financial Statements<span class=\"_ _0\"></span>\u2019<span class=\"_ _2\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs101a\">In addition to legal subsidiaries, <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>the Company o<span class=\"_ _0\"></span>wns shares in <span class=\"_ _0\"></span>the entity<span class=\"_ _0\"></span>, directly<span class=\"_ _0\"></span> or indir<span class=\"_ _0\"></span>ectly<span class=\"_ _0\"></span>, in accordance <span class=\"_ _0\"></span>with IFRS 10, </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs101b\">companies owned by<span class=\"_ _0\"></span> charitable trusts into <span class=\"_ _0\"></span>which loans originated by<span class=\"_ _0\"></span> group companies <span class=\"_ _0\"></span>were sold as part<span class=\"_ _0\"></span> of its <span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ehouse and </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs101c\">securitisation funding arrang<span class=\"_ _0\"></span>ements, where <span class=\"_ _0\"></span>the Group enjo<span class=\"_ _0\"></span>ys the bene<span class=\"_ _0\"></span>fits of owner<span class=\"_ _0\"></span>ship and which, ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e, it is considered <span class=\"_ _0\"></span>to </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gse\">control, ar<span class=\"_ _0\"></span>e tr<span class=\"_ _0\"></span>eated as subsidiaries.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs101d\">Similarly<span class=\"_ _0\"></span>, trusts set up <span class=\"_ _0\"></span>to hold shares in conjunction <span class=\"_ _0\"></span>with the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s employee share o<span class=\"_ _0\"></span>wnership arrangements ar<span class=\"_ _0\"></span>e also tr<span class=\"_ _0\"></span>eated  </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10\">as subsidiaries. </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs101e\">A <span class=\"_ _0\"></span>full list of<span class=\"_ _0\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s subsidiaries is set out in note 72, <span class=\"_ _0\"></span>together<span class=\"_ _0\"></span> with further<span class=\"_ _1\"></span> information on the basis on which <span class=\"_ _0\"></span>they ar<span class=\"_ _1\"></span>e  </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs12\">considered <span class=\"_ _0\"></span>to be controlled b<span class=\"_ _0\"></span>y the Compan<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>. T<span class=\"_ _0\"></span>he results of<span class=\"_ _0\"></span> businesses acquired ar<span class=\"_ _0\"></span>e dealt with in <span class=\"_ _0\"></span>the consolidated accounts  </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs101f\">from <span class=\"_ _0\"></span>the date of acquisition.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBasisOfConsolidationExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-404": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws40 gs1021\">(c<span class=\"_ _1\"></span>)  <span class=\"_ _ce\"> </span>Going concern<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1022\">The consolidated financial stat<span class=\"_ _0\"></span>ements have been pr<span class=\"_ _0\"></span>epared on the g<span class=\"_ _0\"></span>oing concern basis.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1023\">The direct<span class=\"_ _0\"></span>ors have adopt<span class=\"_ _0\"></span>ed this basis follo<span class=\"_ _0\"></span>wing a going concern assessment f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the Group and <span class=\"_ _0\"></span>the Company co<span class=\"_ _0\"></span>vering a period of<span class=\"_ _0\"></span> at </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1024\">least tw<span class=\"_ _0\"></span>elve months f<span class=\"_ _0\"></span>ollowing the date of<span class=\"_ _1\"></span> approval o<span class=\"_ _0\"></span>f these <span class=\"_ _0\"></span>financial statements. Details of<span class=\"_ _0\"></span> this assessment ar<span class=\"_ _0\"></span>e set out in note 70<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs11c1\">70. Going concern<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11c2\">Accounting standards r<span class=\"_ _0\"></span>equire <span class=\"_ _0\"></span>the directors <span class=\"_ _0\"></span>to assess the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s ability to continue <span class=\"_ _0\"></span>to adopt the g<span class=\"_ _0\"></span>oing concern basis of accounting. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11c3\">In performing this assessment, <span class=\"_ _0\"></span>the director<span class=\"_ _0\"></span>s consider all av<span class=\"_ _0\"></span>ailable information about the <span class=\"_ _0\"></span>future, <span class=\"_ _0\"></span>the possible outcomes of<span class=\"_ _0\"></span> events </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11c4\">and changes in conditions and the r<span class=\"_ _0\"></span>ealistically possible r<span class=\"_ _0\"></span>esponses to such e<span class=\"_ _0\"></span>vents and conditions <span class=\"_ _0\"></span>that would be a<span class=\"_ _0\"></span>vailable t<span class=\"_ _0\"></span>o them, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11c5\">having reg<span class=\"_ _0\"></span>ard <span class=\"_ _0\"></span>to the \u2018Guidance on Risk Management, Int<span class=\"_ _0\"></span>ernal Control and Relat<span class=\"_ _0\"></span>ed Financial and Business Reporting\u2019 published by<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11c6\">Financial Reporting Council in September<span class=\"_ _0\"></span> 2014.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11c7\">Particular<span class=\"_ _0\"></span> focus is given <span class=\"_ _0\"></span>to the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s financial forecasts <span class=\"_ _0\"></span>to ensure <span class=\"_ _0\"></span>the adequacy<span class=\"_ _0\"></span> of r<span class=\"_ _0\"></span>esources a<span class=\"_ _0\"></span>vailable f<span class=\"_ _0\"></span>or the Gr<span class=\"_ _0\"></span>oup to mee<span class=\"_ _0\"></span>t its </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11c8\">business objectives on both a short-<span class=\"_ _0\"></span>term and strategic basis. <span class=\"_ _0\"></span>The guidance requir<span class=\"_ _0\"></span>es that <span class=\"_ _0\"></span>this assessment cov<span class=\"_ _0\"></span>ers a period of at least<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11c9\">twelve months <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the date of appr<span class=\"_ _0\"></span>ov<span class=\"_ _0\"></span>al of <span class=\"_ _0\"></span>these financial statements.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs11ca\">Financial and capital forecas<span class=\"_ _0\"></span>ting<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11cb\">The Group has a <span class=\"_ _0\"></span>formalised pr<span class=\"_ _0\"></span>ocess of budge<span class=\"_ _0\"></span>ting, reporting and r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>w. <span class=\"_ _1\"></span>The Group\u2019<span class=\"_ _2\"></span>s planning procedures f<span class=\"_ _0\"></span>orecast its pr<span class=\"_ _0\"></span>ofitability<span class=\"_ _1\"></span>, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11cc\">capital position, funding r<span class=\"_ _0\"></span>equirement and cash <span class=\"_ _0\"></span>flows. Detailed plans ar<span class=\"_ _0\"></span>e produced <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>two <span class=\"_ _0\"></span>year periods <span class=\"_ _0\"></span>with longer<span class=\"_ _0\"></span>-term <span class=\"_ _0\"></span>forecasts </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11cd\">covering a <span class=\"_ _0\"></span>five <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> period which include detailed income f<span class=\"_ _0\"></span>orecasts. <span class=\"_ _0\"></span>These plans pro<span class=\"_ _0\"></span>vide information t<span class=\"_ _0\"></span>o the director<span class=\"_ _0\"></span>s which is used t<span class=\"_ _0\"></span>o </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11ce\">ensure <span class=\"_ _0\"></span>the adequacy o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>esources av<span class=\"_ _0\"></span>ailable for<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup to meet its business objectiv<span class=\"_ _0\"></span>es, both on a short-term and str<span class=\"_ _0\"></span>ategic basis.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11cf\">The f<span class=\"_ _0\"></span>orecast is updated e<span class=\"_ _0\"></span>very<span class=\"_ _0\"></span> six months, and the direct<span class=\"_ _0\"></span>ors have based <span class=\"_ _0\"></span>their going concern assessment<span class=\"_ _0\"></span> on the f<span class=\"_ _0\"></span>orecast f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the period </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11d0\">beginning on 1 October 2023.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11d1\">The Group mak<span class=\"_ _0\"></span>es extensiv<span class=\"_ _0\"></span>e use of str<span class=\"_ _0\"></span>ess testing in compiling and r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>wing its for<span class=\"_ _0\"></span>ecasts. This str<span class=\"_ _0\"></span>ess testing appr<span class=\"_ _0\"></span>oach w<span class=\"_ _0\"></span>as re<span class=\"_ _0\"></span>viewed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11d2\">in detail during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> as part of <span class=\"_ _0\"></span>the annual ICAAP<span class=\"_ _0\"></span> cycle, <span class=\"_ _0\"></span>where t<span class=\"_ _0\"></span>esting considered the impact<span class=\"_ _0\"></span> of a number<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> sever<span class=\"_ _0\"></span>e but plausible </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11d3\">scenarios. During the planning pr<span class=\"_ _0\"></span>ocess, sensitivity analy<span class=\"_ _0\"></span>sis was carried out on a number<span class=\"_ _1\"></span> of ke<span class=\"_ _0\"></span>y assumptions <span class=\"_ _0\"></span>that underpin the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11d4\">for<span class=\"_ _0\"></span>ecast to e<span class=\"_ _0\"></span>valuate the impact<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s principal risks.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11d5\">The ke<span class=\"_ _0\"></span>y str<span class=\"_ _0\"></span>esses modelled in detail to e<span class=\"_ _0\"></span>valuate <span class=\"_ _0\"></span>the for<span class=\"_ _0\"></span>ecast w<span class=\"_ _0\"></span>ere:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11d6\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>An increase in buy-t<span class=\"_ _0\"></span>o-let v<span class=\"_ _0\"></span>olumes. This e<span class=\"_ _0\"></span>xamined the impact of<span class=\"_ _0\"></span> higher <span class=\"_ _0\"></span>volumes at a r<span class=\"_ _0\"></span>educed yield on pr<span class=\"_ _0\"></span>ofitability and illustr<span class=\"_ _0\"></span>ated the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11d7\">extent <span class=\"_ _0\"></span>to which capital r<span class=\"_ _0\"></span>esources and liquidity<span class=\"_ _0\"></span> would be str<span class=\"_ _0\"></span>etched due t<span class=\"_ _0\"></span>o the higher cash and capital r<span class=\"_ _0\"></span>equirements<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11d8\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Higher funding costs. Higher<span class=\"_ _0\"></span> cost on all new<span class=\"_ _0\"></span> savings deposits, both fr<span class=\"_ _0\"></span>ont book and back book<span class=\"_ _0\"></span> throughout<span class=\"_ _0\"></span> the f<span class=\"_ _0\"></span>orecast horizon. <span class=\"_ _1\"></span>This </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11d9\">scenario illustrates the impact<span class=\"_ _0\"></span> of a significant, pr<span class=\"_ _0\"></span>olonged margin squeeze on pr<span class=\"_ _0\"></span>ofitability<span class=\"_ _1\"></span>, and whether <span class=\"_ _0\"></span>this would cause significant<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11da\">impacts on any<span class=\"_ _0\"></span> capital, liquidity or<span class=\"_ _0\"></span> encumbrance ratios<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11db\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Higher buy-t<span class=\"_ _0\"></span>o-let redemption r<span class=\"_ _0\"></span>ates for<span class=\"_ _0\"></span> buy-t<span class=\"_ _0\"></span>o-let mortgages r<span class=\"_ _0\"></span>eaching the end of<span class=\"_ _0\"></span> their<span class=\"_ _0\"></span> fixed-r<span class=\"_ _0\"></span>ate period. T<span class=\"_ _0\"></span>his illustrates the potential </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11dc\">risk inherent<span class=\"_ _0\"></span> in the fiv<span class=\"_ _0\"></span>e-year<span class=\"_ _0\"></span> fix<span class=\"_ _0\"></span>ed rate business<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11dd\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Increased economic stress on customer<span class=\"_ _0\"></span>s. As <span class=\"_ _0\"></span>well as modelling the impact o<span class=\"_ _0\"></span>f each of<span class=\"_ _0\"></span> the economic scenarios set out<span class=\"_ _0\"></span> in note </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11de\">24 across <span class=\"_ _0\"></span>the for<span class=\"_ _0\"></span>ecast horizon, <span class=\"_ _0\"></span>the sever<span class=\"_ _0\"></span>e economic scenario w<span class=\"_ _0\"></span>as also modelled over<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>five-y<span class=\"_ _0\"></span>ear horizon. <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>o ensure this </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11df\">repr<span class=\"_ _0\"></span>esented a w<span class=\"_ _0\"></span>orst-case scenario all other<span class=\"_ _0\"></span> assumptions wer<span class=\"_ _0\"></span>e held steady<span class=\"_ _1\"></span>, although in reality adjustments <span class=\"_ _0\"></span>to new business </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11e0\">appetite and other<span class=\"_ _0\"></span> factors <span class=\"_ _0\"></span>would be made<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11e1\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Combined downside stress. <span class=\"_ _0\"></span>The IFRS 9 downside economic scenario described in note 24 <span class=\"_ _0\"></span>was modelled out <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>the plan horizon </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11e2\">along with a plausible set o<span class=\"_ _0\"></span>f other<span class=\"_ _0\"></span> adverse <span class=\"_ _0\"></span>factors to <span class=\"_ _0\"></span>the business model, creating a pr<span class=\"_ _0\"></span>olonged tail-risk<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11e3\">These stresses did no<span class=\"_ _0\"></span>t tak<span class=\"_ _0\"></span>e account of manag<span class=\"_ _0\"></span>ement actions which might mitigat<span class=\"_ _0\"></span>e the impact of<span class=\"_ _0\"></span> the adv<span class=\"_ _0\"></span>erse assumptions used. T<span class=\"_ _0\"></span>hey<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11e4\">wer<span class=\"_ _0\"></span>e designed to demonstrate ho<span class=\"_ _0\"></span>w such str<span class=\"_ _0\"></span>esses would aff<span class=\"_ _0\"></span>ect the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s financing, capital and liquidity<span class=\"_ _0\"></span> positions and highlight </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11e5\">any<span class=\"_ _0\"></span> areas which might<span class=\"_ _0\"></span> impact the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s going concern status. Under<span class=\"_ _0\"></span> all these scenarios, the Gr<span class=\"_ _0\"></span>oup had the ability<span class=\"_ _0\"></span> to meet its </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11e6\">obligations ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the for<span class=\"_ _0\"></span>ecast horizon and maintain a surplus ov<span class=\"_ _0\"></span>er its r<span class=\"_ _0\"></span>egulatory r<span class=\"_ _0\"></span>equirements <span class=\"_ _0\"></span>for bo<span class=\"_ _0\"></span>th capital and liquidity thr<span class=\"_ _1\"></span>ough </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11e7\">normal balance sheet management activities.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11e8\">As part of<span class=\"_ _0\"></span> the ICAAP<span class=\"_ _0\"></span> process <span class=\"_ _0\"></span>the Group also assessed the po<span class=\"_ _0\"></span>tential operational risks it could f<span class=\"_ _0\"></span>ace. This <span class=\"_ _0\"></span>was done <span class=\"_ _0\"></span>through the analy<span class=\"_ _0\"></span>sis </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11e9\">of <span class=\"_ _0\"></span>the impact and cost of<span class=\"_ _0\"></span> a series of se<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span>e but plausible scenarios. T<span class=\"_ _0\"></span>his analysis did not highlight an<span class=\"_ _0\"></span>y f<span class=\"_ _0\"></span>actors which cast doubt<span class=\"_ _0\"></span> on the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11ea\">Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s ability t<span class=\"_ _0\"></span>o continue as a going concern.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11eb\">The Group begins <span class=\"_ _0\"></span>the for<span class=\"_ _0\"></span>ecast period with a str<span class=\"_ _0\"></span>ong capital and liquidity position, enabling <span class=\"_ _0\"></span>the management of<span class=\"_ _0\"></span> any<span class=\"_ _0\"></span> significant outflows </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11ec\">of deposits and/<span class=\"_ _1\"></span>or reduced inflo<span class=\"_ _0\"></span>ws fr<span class=\"_ _0\"></span>om customer r<span class=\"_ _0\"></span>eceipts. Over<span class=\"_ _0\"></span>all the f<span class=\"_ _0\"></span>orecasts, e<span class=\"_ _0\"></span>ven under r<span class=\"_ _0\"></span>easonable further<span class=\"_ _0\"></span> lev<span class=\"_ _0\"></span>els of str<span class=\"_ _0\"></span>ess show </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11ed\">the Group r<span class=\"_ _0\"></span>etaining sufficient equity<span class=\"_ _1\"></span>, capital, cash and liquidity thr<span class=\"_ _0\"></span>oughout the f<span class=\"_ _0\"></span>orecast period <span class=\"_ _0\"></span>to satisfy its r<span class=\"_ _0\"></span>egulatory and oper<span class=\"_ _0\"></span>ational </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11ee\">requir<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs11f0\">Av<span class=\"_ _0\"></span>ailability of<span class=\"_ _0\"></span> funding and liquidity<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11f1\">The av<span class=\"_ _0\"></span>ailability of<span class=\"_ _0\"></span> funding and liquidity<span class=\"_ _0\"></span> is a ke<span class=\"_ _0\"></span>y consideration, including r<span class=\"_ _0\"></span>etail deposit, wholesale <span class=\"_ _0\"></span>funding, central bank and other<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11f2\">contingent liquidity<span class=\"_ _0\"></span> options.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11f3\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s retail deposits of<span class=\"_ _1\"></span> \u00a313,265.3m (note 33), raised thr<span class=\"_ _0\"></span>ough Paragon Bank, ar<span class=\"_ _0\"></span>e repa<span class=\"_ _0\"></span>yable within <span class=\"_ _0\"></span>five <span class=\"_ _0\"></span>years, with 82.<span class=\"_ _0\"></span>9% of <span class=\"_ _0\"></span>this </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11f4\">balance (\u00a310,<span class=\"_ _0\"></span>990.5m) pa<span class=\"_ _0\"></span>yable <span class=\"_ _0\"></span>within twelv<span class=\"_ _0\"></span>e months of <span class=\"_ _0\"></span>the balance sheet date. <span class=\"_ _0\"></span>The liquidity exposur<span class=\"_ _0\"></span>e repr<span class=\"_ _0\"></span>esented by<span class=\"_ _0\"></span> these deposits </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11f5\">is closely monitor<span class=\"_ _0\"></span>ed; a process supervised b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the AL<span class=\"_ _1\"></span>CO. T<span class=\"_ _0\"></span>he Group is r<span class=\"_ _0\"></span>equired <span class=\"_ _0\"></span>to hold liquid assets in Paragon Bank<span class=\"_ _0\"></span> to mitigate </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11f6\">this liquidity risk. <span class=\"_ _0\"></span>At 30 Sep<span class=\"_ _0\"></span>tember 2023 Par<span class=\"_ _0\"></span>agon Bank held \u00a32,589<span class=\"_ _0\"></span>.7m of<span class=\"_ _0\"></span> balance sheet assets f<span class=\"_ _0\"></span>or liquidity<span class=\"_ _0\"></span> purposes, in the <span class=\"_ _0\"></span>form of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11f7\">central bank deposits (no<span class=\"_ _0\"></span>te 64). <span class=\"_ _0\"></span>A <span class=\"_ _0\"></span>further \u00a3150<span class=\"_ _0\"></span>.0m of<span class=\"_ _0\"></span> liquidity <span class=\"_ _0\"></span>was pr<span class=\"_ _0\"></span>ovided by<span class=\"_ _0\"></span> the off<span class=\"_ _0\"></span> balance sheet long / short <span class=\"_ _0\"></span>transaction described </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11f8\">in note 64, bringing <span class=\"_ _0\"></span>the total <span class=\"_ _0\"></span>to \u00a32,739<span class=\"_ _1\"></span>.7m. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs11f9\">Paragon Bank<span class=\"_ _0\"></span> manages its liquidity in line <span class=\"_ _0\"></span>with the Boar<span class=\"_ _0\"></span>d\u2019<span class=\"_ _1\"></span>s risk appetite and the requir<span class=\"_ _0\"></span>ements of<span class=\"_ _0\"></span> the PRA, <span class=\"_ _0\"></span>which are f<span class=\"_ _0\"></span>ormally </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs11fa\">documented in the Boar<span class=\"_ _0\"></span>d\u2019<span class=\"_ _1\"></span>s approved ILAAP<span class=\"_ _2\"></span>, updated annually<span class=\"_ _0\"></span>. T<span class=\"_ _0\"></span>he Bank maintains a liquidity <span class=\"_ _0\"></span>framew<span class=\"_ _0\"></span>ork that includes a short <span class=\"_ _0\"></span>to medium </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs11fb\">term cash flow<span class=\"_ _0\"></span> requir<span class=\"_ _0\"></span>ement analysis, a long<span class=\"_ _0\"></span>er-<span class=\"_ _0\"></span>term funding plan and access t<span class=\"_ _0\"></span>o the Bank of<span class=\"_ _0\"></span> England\u2019<span class=\"_ _1\"></span>s liquidity insurance f<span class=\"_ _0\"></span>acilities, where </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs11fc\">pre-positioned assets <span class=\"_ _0\"></span>would support dra<span class=\"_ _0\"></span>wings of \u00a31,<span class=\"_ _0\"></span>715.4m. Holdings of <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s own externally<span class=\"_ _0\"></span> rated mortgage back<span class=\"_ _0\"></span>ed loan notes </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs11fd\">can also be used to access <span class=\"_ _0\"></span>the Bank of<span class=\"_ _0\"></span> England\u2019<span class=\"_ _1\"></span>s liquidity facilities or<span class=\"_ _0\"></span> other <span class=\"_ _0\"></span>funding arrangements. <span class=\"_ _0\"></span>At 30 September<span class=\"_ _1\"></span> 2023 the Group had </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs11fe\">\u00a31,205.6m of<span class=\"_ _0\"></span> such notes av<span class=\"_ _0\"></span>ailable for<span class=\"_ _0\"></span> use, of<span class=\"_ _0\"></span> which \u00a3986.9m <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e rated <span class=\"_ _0\"></span>AAA. The a<span class=\"_ _0\"></span>vailable <span class=\"_ _0\"></span>AAA not<span class=\"_ _0\"></span>es would giv<span class=\"_ _0\"></span>e access to \u00a3769<span class=\"_ _1\"></span>.8m if </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs11ff\">used to support dr<span class=\"_ _0\"></span>awings on Bank of<span class=\"_ _0\"></span> England facilities.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1200\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s securitisation funding structures, described in no<span class=\"_ _0\"></span>te 64, pr<span class=\"_ _0\"></span>ovide match funding <span class=\"_ _0\"></span>for part<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the asset base. Repayment<span class=\"_ _0\"></span> of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1201\">the securitisation borro<span class=\"_ _0\"></span>wings is restricted <span class=\"_ _0\"></span>to funds generat<span class=\"_ _0\"></span>ed by <span class=\"_ _0\"></span>the underlying assets and ther<span class=\"_ _0\"></span>e is limited recourse <span class=\"_ _0\"></span>to the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1202\">general <span class=\"_ _0\"></span>funds. Recent and current<span class=\"_ _0\"></span> loan originations are financed <span class=\"_ _0\"></span>through r<span class=\"_ _0\"></span>etail deposits and may<span class=\"_ _0\"></span> be refinanced <span class=\"_ _0\"></span>through securitisation </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1203\">where <span class=\"_ _0\"></span>this is appropriate and cost-eff<span class=\"_ _0\"></span>ective. <span class=\"_ _0\"></span>While the Gr<span class=\"_ _0\"></span>oup has not accessed the public securitisation mark<span class=\"_ _0\"></span>et during the <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>, the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1204\">market r<span class=\"_ _1\"></span>emains active with strong le<span class=\"_ _0\"></span>vels of<span class=\"_ _0\"></span> demand and the Gr<span class=\"_ _0\"></span>oup maintains the infrastructur<span class=\"_ _0\"></span>e requir<span class=\"_ _0\"></span>ed to access it.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1205\">The earliest maturity<span class=\"_ _0\"></span> of an<span class=\"_ _0\"></span>y of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s bond debt is the \u00a3112.5m r<span class=\"_ _0\"></span>etail bond, due August<span class=\"_ _0\"></span> 2024. No central bank debt<span class=\"_ _0\"></span> is payable </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1206\">until 2025.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1207\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s access to debt is enhanced b<span class=\"_ _0\"></span>y its corpor<span class=\"_ _0\"></span>ate BBB+ rating, confirmed by<span class=\"_ _0\"></span> Fitch Ratings in F<span class=\"_ _1\"></span>ebruary 2023, and its status as </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1208\">an issuer is e<span class=\"_ _0\"></span>videnced by<span class=\"_ _0\"></span> the BBB- inv<span class=\"_ _0\"></span>estment grade rating of<span class=\"_ _0\"></span> its \u00a3150.<span class=\"_ _0\"></span>0m T<span class=\"_ _0\"></span>ier-<span class=\"_ _1\"></span>2 bond. It has regularly accessed <span class=\"_ _0\"></span>the capital markets </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1209\">for<span class=\"_ _0\"></span> war<span class=\"_ _0\"></span>ehouse funding and corporate and r<span class=\"_ _0\"></span>etail bonds ov<span class=\"_ _0\"></span>er r<span class=\"_ _0\"></span>ecent y<span class=\"_ _0\"></span>ears and continues to be able <span class=\"_ _0\"></span>to access these mark<span class=\"_ _0\"></span>ets. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs120a\">The Group has access <span class=\"_ _0\"></span>to the short-<span class=\"_ _0\"></span>term repo mark<span class=\"_ _0\"></span>et f<span class=\"_ _0\"></span>or liquidity<span class=\"_ _0\"></span> purposes which it uses <span class=\"_ _0\"></span>from time <span class=\"_ _0\"></span>to time.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs120b\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s cash analysis, which includes <span class=\"_ _0\"></span>the impact of<span class=\"_ _0\"></span> all scheduled debt and deposit r<span class=\"_ _0\"></span>epayments, continues to sho<span class=\"_ _0\"></span>w a strong </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs120c\">position, ev<span class=\"_ _0\"></span>en after allo<span class=\"_ _0\"></span>wing scope for<span class=\"_ _0\"></span> significant discretionary<span class=\"_ _0\"></span> payments and capital distributions. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs120d\">As described in note 61 the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s capital base is subject to consolidated supervision by<span class=\"_ _0\"></span> the PRA. <span class=\"_ _0\"></span>The most r<span class=\"_ _0\"></span>ecent re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs120e\">Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s capital position and management sy<span class=\"_ _0\"></span>stems, during the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> ended 30 September 2021, r<span class=\"_ _0\"></span>esulted in a reduction o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the minimum </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs120f\">capital lev<span class=\"_ _0\"></span>el. Its capital at 30 September<span class=\"_ _0\"></span> 2023 was in ex<span class=\"_ _0\"></span>cess of<span class=\"_ _0\"></span> regulatory<span class=\"_ _0\"></span> requir<span class=\"_ _0\"></span>ements and its for<span class=\"_ _0\"></span>ecasts indicate this <span class=\"_ _0\"></span>will continue to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gs1210\">be the case.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs1211\">Going concern assessment<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs1212\">In order<span class=\"_ _0\"></span> to assess <span class=\"_ _0\"></span>the appropriateness of<span class=\"_ _0\"></span> the g<span class=\"_ _0\"></span>oing concern basis, the direct<span class=\"_ _0\"></span>ors considered <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s financial position, the cash flo<span class=\"_ _0\"></span>w </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs1213\">requir<span class=\"_ _0\"></span>ements laid out in its for<span class=\"_ _0\"></span>ecasts, its access to <span class=\"_ _0\"></span>funding, the assumptions underlying <span class=\"_ _0\"></span>the for<span class=\"_ _0\"></span>ecasts and potential risks aff<span class=\"_ _0\"></span>ecting them.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs1214\">After<span class=\"_ _0\"></span> performing this assessment, <span class=\"_ _0\"></span>the directors concluded <span class=\"_ _0\"></span>that ther<span class=\"_ _0\"></span>e w<span class=\"_ _0\"></span>as no material uncertainty as <span class=\"_ _0\"></span>to whether<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup and the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs1215\">Company<span class=\"_ _0\"></span> would be able <span class=\"_ _0\"></span>to maintain adequate capital and liquidity <span class=\"_ _0\"></span>for at<span class=\"_ _0\"></span> least twelv<span class=\"_ _0\"></span>e months follo<span class=\"_ _0\"></span>wing the date of<span class=\"_ _0\"></span> appro<span class=\"_ _0\"></span>val of<span class=\"_ _0\"></span> these </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs1216\">financial statements and consequently <span class=\"_ _0\"></span>that it w<span class=\"_ _0\"></span>as appropriate <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> them to continue <span class=\"_ _0\"></span>to adopt <span class=\"_ _0\"></span>the going concern basis in preparing <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs1217\">financial statements of<span class=\"_ _0\"></span> the Group and <span class=\"_ _0\"></span>the Company<span class=\"_ _1\"></span>.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGoingConcernExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-405": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs1026\">(d) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Acquisitions and g<span class=\"_ _0\"></span>oodwill </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1027\">Goodwill arising fr<span class=\"_ _0\"></span>om the purchase o<span class=\"_ _0\"></span>f subsidiary<span class=\"_ _0\"></span> undertakings, repr<span class=\"_ _0\"></span>esenting the ex<span class=\"_ _0\"></span>cess of <span class=\"_ _0\"></span>the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the purchase consideration </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1028\">over<span class=\"_ _1\"></span> the fair<span class=\"_ _0\"></span> values o<span class=\"_ _0\"></span>f acquir<span class=\"_ _0\"></span>ed assets, including intangible assets, is held on the balance sheet and r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>wed annually<span class=\"_ _0\"></span> to determine </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs29e\">whether an<span class=\"_ _0\"></span>y impairment has occurr<span class=\"_ _0\"></span>ed.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1029\">As permitted by<span class=\"_ _0\"></span> IFRS 1, the Group has elected no<span class=\"_ _0\"></span>t to apply<span class=\"_ _0\"></span> IFRS 3 \u2013 \u2018Business Combinations\u2019 to combinations <span class=\"_ _0\"></span>taking place befor<span class=\"_ _0\"></span>e its </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs102a\">transition date t<span class=\"_ _0\"></span>o IFRS (1 October 2004). <span class=\"_ _0\"></span>There<span class=\"_ _0\"></span>fore an<span class=\"_ _0\"></span>y goodwill <span class=\"_ _0\"></span>which was <span class=\"_ _0\"></span>written off<span class=\"_ _0\"></span> to r<span class=\"_ _0\"></span>eserves under<span class=\"_ _0\"></span> UK GAAP <span class=\"_ _0\"></span>will not be charg<span class=\"_ _0\"></span>ed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2a1\">or cr<span class=\"_ _0\"></span>edited to <span class=\"_ _0\"></span>the profit<span class=\"_ _0\"></span> and loss account on any <span class=\"_ _0\"></span>future disposal of<span class=\"_ _1\"></span> the business to which it r<span class=\"_ _1\"></span>elates.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2a2\">Contingent consideration arising on acquisitions is <span class=\"_ _0\"></span>first recognised in <span class=\"_ _0\"></span>the accounts at its fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue at the acquisition date and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs2a3\">subsequently r<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>alued at each accounting date until it falls due <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> payment, or <span class=\"_ _0\"></span>the final amount is otherwise det<span class=\"_ _0\"></span>ermined.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForBusinessCombinationsAndGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-486": {
   "value": "(d) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Acquisitions and g<span class=\"_ _0\"></span>oodwill Goodwill arising fr<span class=\"_ _0\"></span>om the purchase o<span class=\"_ _0\"></span>f subsidiary<span class=\"_ _0\"></span> undertakings, repr<span class=\"_ _0\"></span>esenting the ex<span class=\"_ _0\"></span>cess of <span class=\"_ _0\"></span>the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the purchase consideration over<span class=\"_ _1\"></span> the fair<span class=\"_ _0\"></span> values o<span class=\"_ _0\"></span>f acquir<span class=\"_ _0\"></span>ed assets, including intangible assets, is held on the balance sheet and r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>wed annually<span class=\"_ _0\"></span> to determine whether an<span class=\"_ _0\"></span>y impairment has occurr<span class=\"_ _0\"></span>ed.<span class=\"_ _36a\"> </span>As permitted by<span class=\"_ _0\"></span> IFRS 1, the Group has elected no<span class=\"_ _0\"></span>t to apply<span class=\"_ _0\"></span> IFRS 3 \u2013 \u2018Business Combinations\u2019 to combinations <span class=\"_ _0\"></span>taking place befor<span class=\"_ _0\"></span>e its transition date t<span class=\"_ _0\"></span>o IFRS (1 October 2004). <span class=\"_ _0\"></span>There<span class=\"_ _0\"></span>fore an<span class=\"_ _0\"></span>y goodwill <span class=\"_ _0\"></span>which was <span class=\"_ _0\"></span>written off<span class=\"_ _0\"></span> to r<span class=\"_ _0\"></span>eserves under<span class=\"_ _0\"></span> UK GAAP <span class=\"_ _0\"></span>will not be charg<span class=\"_ _0\"></span>ed or cr<span class=\"_ _0\"></span>edited to <span class=\"_ _0\"></span>the profit<span class=\"_ _0\"></span> and loss account on any <span class=\"_ _0\"></span>future disposal of<span class=\"_ _1\"></span> the business to which it r<span class=\"_ _1\"></span>elates.<span class=\"_ _36a\"> </span>Contingent consideration arising on acquisitions is <span class=\"_ _0\"></span>first recognised in <span class=\"_ _0\"></span>the accounts at its fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue at the acquisition date and subsequently r<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>alued at each accounting date until it falls due <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> payment, or <span class=\"_ _0\"></span>the final amount is otherwise det<span class=\"_ _0\"></span>ermined.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-459": {
   "value": "(d) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Acquisitions and g<span class=\"_ _0\"></span>oodwill Goodwill arising fr<span class=\"_ _0\"></span>om the purchase o<span class=\"_ _0\"></span>f subsidiary<span class=\"_ _0\"></span> undertakings, repr<span class=\"_ _0\"></span>esenting the ex<span class=\"_ _0\"></span>cess of <span class=\"_ _0\"></span>the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the purchase consideration over<span class=\"_ _1\"></span> the fair<span class=\"_ _0\"></span> values o<span class=\"_ _0\"></span>f acquir<span class=\"_ _0\"></span>ed assets, including intangible assets, is held on the balance sheet and r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>wed annually<span class=\"_ _0\"></span> to determine whether an<span class=\"_ _0\"></span>y impairment has occurr<span class=\"_ _0\"></span>ed.<span class=\"_ _36a\"> </span>As permitted by<span class=\"_ _0\"></span> IFRS 1, the Group has elected no<span class=\"_ _0\"></span>t to apply<span class=\"_ _0\"></span> IFRS 3 \u2013 \u2018Business Combinations\u2019 to combinations <span class=\"_ _0\"></span>taking place befor<span class=\"_ _0\"></span>e its transition date t<span class=\"_ _0\"></span>o IFRS (1 October 2004). <span class=\"_ _0\"></span>There<span class=\"_ _0\"></span>fore an<span class=\"_ _0\"></span>y goodwill <span class=\"_ _0\"></span>which was <span class=\"_ _0\"></span>written off<span class=\"_ _0\"></span> to r<span class=\"_ _0\"></span>eserves under<span class=\"_ _0\"></span> UK GAAP <span class=\"_ _0\"></span>will not be charg<span class=\"_ _0\"></span>ed or cr<span class=\"_ _0\"></span>edited to <span class=\"_ _0\"></span>the profit<span class=\"_ _0\"></span> and loss account on any <span class=\"_ _0\"></span>future disposal of<span class=\"_ _1\"></span> the business to which it r<span class=\"_ _1\"></span>elates.<span class=\"_ _36a\"> </span>Contingent consideration arising on acquisitions is <span class=\"_ _0\"></span>first recognised in <span class=\"_ _0\"></span>the accounts at its fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue at the acquisition date and subsequently r<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>alued at each accounting date until it falls due <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> payment, or <span class=\"_ _0\"></span>the final amount is otherwise det<span class=\"_ _0\"></span>ermined.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForBusinessCombinationsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-497": {
   "value": "Contingent consideration arising on acquisitions is <span class=\"_ _0\"></span>first recognised in <span class=\"_ _0\"></span>the accounts at its fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue at the acquisition date and subsequently r<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>alued at each accounting date until it falls due <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> payment, or <span class=\"_ _0\"></span>the final amount is otherwise det<span class=\"_ _0\"></span>ermined.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForContingentLiabilitiesAndContingentAssetsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-406": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs102c\">(e<span class=\"_ _1\"></span>)  <span class=\"_ _29\"> </span>Cash and cash equivalents </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs102d\">Balances shown as cash and cash equivalents in <span class=\"_ _0\"></span>the balance sheet comprise demand deposits and short-t<span class=\"_ _0\"></span>erm deposits with banks </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs102e\">with initial maturities of no<span class=\"_ _0\"></span>t more <span class=\"_ _0\"></span>than 90 days. </div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyToDetermineComponentsOfCashAndCashEquivalents",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-407": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 wsa8 gs1030\">(f)  <span class=\"_ _194\"> </span>Leases </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1031\">F<span class=\"_ _1\"></span>or leases wher<span class=\"_ _0\"></span>e the Group is <span class=\"_ _0\"></span>the lessee a right of<span class=\"_ _0\"></span> use asset is recognised in pr<span class=\"_ _0\"></span>operty<span class=\"_ _1\"></span>, plant and equipment on the inception of<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1032\">lease based on the discounted <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the minimum lease pa<span class=\"_ _0\"></span>yments at inception. A<span class=\"_ _1\"></span> lease liability of <span class=\"_ _0\"></span>the same amount is recognised </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1033\">at inception, with <span class=\"_ _0\"></span>the unwinding of<span class=\"_ _0\"></span> the discount included in inter<span class=\"_ _0\"></span>est pay<span class=\"_ _0\"></span>able.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1034\">Leases <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>the Group is lessor<span class=\"_ _0\"></span> are accounted <span class=\"_ _0\"></span>for as oper<span class=\"_ _0\"></span>ating or finance leases in accor<span class=\"_ _0\"></span>dance with IFRS 16 \u2013 \u2018Leases<span class=\"_ _0\"></span>\u2019<span class=\"_ _2\"></span>. A<span class=\"_ _1\"></span> finance </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1035\">lease is one which <span class=\"_ _0\"></span>transfers substantially<span class=\"_ _0\"></span> all of <span class=\"_ _0\"></span>the risks and re<span class=\"_ _0\"></span>war<span class=\"_ _0\"></span>ds of <span class=\"_ _0\"></span>the ownership of<span class=\"_ _0\"></span> the asset concerned. <span class=\"_ _1\"></span>Any other<span class=\"_ _0\"></span> lease is an </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1036\">operating lease.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs1037\">Finance lease receiv<span class=\"_ _0\"></span>ables are accounted <span class=\"_ _0\"></span>for as loans <span class=\"_ _0\"></span>to customers, <span class=\"_ _0\"></span>with impairment provisions de<span class=\"_ _0\"></span>termined in accordance <span class=\"_ _0\"></span>with IFRS 9.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1038\">Rental income and costs on operating leases ar<span class=\"_ _0\"></span>e charged or<span class=\"_ _0\"></span> credited <span class=\"_ _0\"></span>to the pr<span class=\"_ _0\"></span>ofit and loss account on a straight-line basis o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1039\">lease term. <span class=\"_ _0\"></span>The associated assets ar<span class=\"_ _0\"></span>e included within pr<span class=\"_ _0\"></span>operty<span class=\"_ _0\"></span>, plant and equipment.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs104b\">(h) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Finance lease receiv<span class=\"_ _0\"></span>ables<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs104c\">Finance lease receiv<span class=\"_ _0\"></span>ables are included <span class=\"_ _0\"></span>within \u2018Loans t<span class=\"_ _0\"></span>o Customers\u2019 at <span class=\"_ _0\"></span>the total amount<span class=\"_ _0\"></span> receivable less int<span class=\"_ _0\"></span>erest not <span class=\"_ _0\"></span>yet accrued, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs104d\">unamortised commissions and pro<span class=\"_ _0\"></span>vision for<span class=\"_ _0\"></span> impairment.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs104e\">Income fr<span class=\"_ _0\"></span>om finance lease contracts is go<span class=\"_ _0\"></span>verned by<span class=\"_ _0\"></span> IFRS 16 \u2013 \u2018Leases\u2019 and account<span class=\"_ _0\"></span>ed for<span class=\"_ _0\"></span> on the actuarial basis.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForLeasesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-408": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 wsa9 gs103b\">(g)  <span class=\"_ _13e\"> </span>Loans  to <span class=\"_ _1c\"> </span>customers </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs103c\">Loans <span class=\"_ _0\"></span>to customers includes assets accounted <span class=\"_ _0\"></span>for as <span class=\"_ _0\"></span>financial assets and finance leases. <span class=\"_ _0\"></span>The Group assesses <span class=\"_ _0\"></span>the classification and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs103d\">measurement o<span class=\"_ _0\"></span>f a financial asse<span class=\"_ _0\"></span>t based on the contractual cash <span class=\"_ _0\"></span>flow charact<span class=\"_ _0\"></span>eristics of <span class=\"_ _0\"></span>the asset and its business model for<span class=\"_ _0\"></span> managing </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs103e\">the asset. T<span class=\"_ _0\"></span>he Group has concluded <span class=\"_ _0\"></span>that its business model for<span class=\"_ _0\"></span> its customer loan asse<span class=\"_ _0\"></span>ts is of <span class=\"_ _0\"></span>the type defined as \u2018Held <span class=\"_ _0\"></span>to collect\u2019 by<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs103f\">IFRS 9 and the contractual t<span class=\"_ _0\"></span>erms of <span class=\"_ _0\"></span>the asset should give rise <span class=\"_ _0\"></span>to cash flow<span class=\"_ _0\"></span>s that ar<span class=\"_ _0\"></span>e solely payments o<span class=\"_ _0\"></span>f principal and inter<span class=\"_ _0\"></span>est (\u2018SPPI\u2019). </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1040\">Such loans are <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore accounted f<span class=\"_ _0\"></span>or on <span class=\"_ _0\"></span>the amortised cost basis.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1041\">Loans adv<span class=\"_ _0\"></span>anced are <span class=\"_ _0\"></span>valued at inception at <span class=\"_ _0\"></span>the initial advance amount, <span class=\"_ _0\"></span>which is the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value at that<span class=\"_ _0\"></span> time, inclusive of<span class=\"_ _1\"></span> procuration </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1042\">fees paid t<span class=\"_ _0\"></span>o brok<span class=\"_ _0\"></span>ers or other<span class=\"_ _0\"></span> business pro<span class=\"_ _0\"></span>viders and less initial fees paid b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the customer<span class=\"_ _1\"></span>. Loans acquired fr<span class=\"_ _0\"></span>om thir<span class=\"_ _0\"></span>d parties are </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1043\">initially <span class=\"_ _0\"></span>valued at <span class=\"_ _0\"></span>the purchase consideration paid or<span class=\"_ _0\"></span> pay<span class=\"_ _0\"></span>able. Ther<span class=\"_ _0\"></span>eafter<span class=\"_ _1\"></span>, all loans to customers ar<span class=\"_ _0\"></span>e valued at<span class=\"_ _0\"></span> this initial amount less </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1044\">the cumulative amortisation calculated using <span class=\"_ _0\"></span>the Effectiv<span class=\"_ _0\"></span>e Interest Rate (\u2018EIR\u2019) method. <span class=\"_ _0\"></span>The loan balances are <span class=\"_ _0\"></span>then reduced <span class=\"_ _0\"></span>where </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1045\">necessary b<span class=\"_ _0\"></span>y an impairment pr<span class=\"_ _0\"></span>ovision.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1046\">The EIR method spreads <span class=\"_ _0\"></span>the expected net income arising fr<span class=\"_ _0\"></span>om a loan ov<span class=\"_ _0\"></span>er its expected lif<span class=\"_ _0\"></span>e. The EIR is <span class=\"_ _0\"></span>that rate of<span class=\"_ _0\"></span> interest <span class=\"_ _0\"></span>which, at </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1047\">inception, exactly<span class=\"_ _0\"></span> discounts the futur<span class=\"_ _0\"></span>e cash payments and r<span class=\"_ _0\"></span>eceipts arising fr<span class=\"_ _0\"></span>om the loan to <span class=\"_ _0\"></span>the initial carrying amount. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1048\">Where <span class=\"_ _0\"></span>financial assets are cr<span class=\"_ _0\"></span>edit-impaired at initial r<span class=\"_ _0\"></span>ecognition the EIR is calculated on the basis o<span class=\"_ _0\"></span>f expected <span class=\"_ _0\"></span>future cash r<span class=\"_ _0\"></span>eceipts </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1049\">allowing f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the effect of<span class=\"_ _0\"></span> credit risk. In o<span class=\"_ _0\"></span>ther cases, the e<span class=\"_ _0\"></span>xpected contractual cash flo<span class=\"_ _0\"></span>ws are used. </div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForLoansAndReceivablesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-460": {
   "value": "(g)  <span class=\"_ _13e\"> </span>Loans  to <span class=\"_ _1c\"> </span>customers Loans <span class=\"_ _0\"></span>to customers includes assets accounted <span class=\"_ _0\"></span>for as <span class=\"_ _0\"></span>financial assets and finance leases. <span class=\"_ _0\"></span>The Group assesses <span class=\"_ _0\"></span>the classification and measurement o<span class=\"_ _0\"></span>f a financial asse<span class=\"_ _0\"></span>t based on the contractual cash <span class=\"_ _0\"></span>flow charact<span class=\"_ _0\"></span>eristics of <span class=\"_ _0\"></span>the asset and its business model for<span class=\"_ _0\"></span> managing the asset. T<span class=\"_ _0\"></span>he Group has concluded <span class=\"_ _0\"></span>that its business model for<span class=\"_ _0\"></span> its customer loan asse<span class=\"_ _0\"></span>ts is of <span class=\"_ _0\"></span>the type defined as \u2018Held <span class=\"_ _0\"></span>to collect\u2019 by<span class=\"_ _0\"></span> IFRS 9 and the contractual t<span class=\"_ _0\"></span>erms of <span class=\"_ _0\"></span>the asset should give rise <span class=\"_ _0\"></span>to cash flow<span class=\"_ _0\"></span>s that ar<span class=\"_ _0\"></span>e solely payments o<span class=\"_ _0\"></span>f principal and inter<span class=\"_ _0\"></span>est (\u2018SPPI\u2019). Such loans are <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore accounted f<span class=\"_ _0\"></span>or on <span class=\"_ _0\"></span>the amortised cost basis.<span class=\"_ _36a\"> </span>Loans adv<span class=\"_ _0\"></span>anced are <span class=\"_ _0\"></span>valued at inception at <span class=\"_ _0\"></span>the initial advance amount, <span class=\"_ _0\"></span>which is the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value at that<span class=\"_ _0\"></span> time, inclusive of<span class=\"_ _1\"></span> procuration fees paid t<span class=\"_ _0\"></span>o brok<span class=\"_ _0\"></span>ers or other<span class=\"_ _0\"></span> business pro<span class=\"_ _0\"></span>viders and less initial fees paid b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the customer<span class=\"_ _1\"></span>. Loans acquired fr<span class=\"_ _0\"></span>om thir<span class=\"_ _0\"></span>d parties are initially <span class=\"_ _0\"></span>valued at <span class=\"_ _0\"></span>the purchase consideration paid or<span class=\"_ _0\"></span> pay<span class=\"_ _0\"></span>able. Ther<span class=\"_ _0\"></span>eafter<span class=\"_ _1\"></span>, all loans to customers ar<span class=\"_ _0\"></span>e valued at<span class=\"_ _0\"></span> this initial amount less the cumulative amortisation calculated using <span class=\"_ _0\"></span>the Effectiv<span class=\"_ _0\"></span>e Interest Rate (\u2018EIR\u2019) method. <span class=\"_ _0\"></span>The loan balances are <span class=\"_ _0\"></span>then reduced <span class=\"_ _0\"></span>where necessary b<span class=\"_ _0\"></span>y an impairment pr<span class=\"_ _0\"></span>ovision.<span class=\"_ _36a\"> </span>The EIR method spreads <span class=\"_ _0\"></span>the expected net income arising fr<span class=\"_ _0\"></span>om a loan ov<span class=\"_ _0\"></span>er its expected lif<span class=\"_ _0\"></span>e. The EIR is <span class=\"_ _0\"></span>that rate of<span class=\"_ _0\"></span> interest <span class=\"_ _0\"></span>which, at inception, exactly<span class=\"_ _0\"></span> discounts the futur<span class=\"_ _0\"></span>e cash payments and r<span class=\"_ _0\"></span>eceipts arising fr<span class=\"_ _0\"></span>om the loan to <span class=\"_ _0\"></span>the initial carrying amount. Where <span class=\"_ _0\"></span>financial assets are cr<span class=\"_ _0\"></span>edit-impaired at initial r<span class=\"_ _0\"></span>ecognition the EIR is calculated on the basis o<span class=\"_ _0\"></span>f expected <span class=\"_ _0\"></span>future cash r<span class=\"_ _0\"></span>eceipts allowing f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the effect of<span class=\"_ _0\"></span> credit risk. In o<span class=\"_ _0\"></span>ther cases, the e<span class=\"_ _0\"></span>xpected contractual cash flo<span class=\"_ _0\"></span>ws are used. (h) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Finance lease receiv<span class=\"_ _0\"></span>ables<span class=\"_ _36a\"> </span>Finance lease receiv<span class=\"_ _0\"></span>ables are included <span class=\"_ _0\"></span>within \u2018Loans t<span class=\"_ _0\"></span>o Customers\u2019 at <span class=\"_ _0\"></span>the total amount<span class=\"_ _0\"></span> receivable less int<span class=\"_ _0\"></span>erest not <span class=\"_ _0\"></span>yet accrued, unamortised commissions and pro<span class=\"_ _0\"></span>vision for<span class=\"_ _0\"></span> impairment.<span class=\"_ _36a\"> </span>Income fr<span class=\"_ _0\"></span>om finance lease contracts is go<span class=\"_ _0\"></span>verned by<span class=\"_ _0\"></span> IFRS 16 \u2013 \u2018Leases\u2019 and account<span class=\"_ _0\"></span>ed for<span class=\"_ _0\"></span> on the actuarial basis.<span class=\"_ _36a\"> </span>(p<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>Borrowings Borro<span class=\"_ _0\"></span>wings are carried in the balance shee<span class=\"_ _0\"></span>t on the amortised cost basis. <span class=\"_ _0\"></span>The initial v<span class=\"_ _0\"></span>alue recognised includes <span class=\"_ _0\"></span>the principal amount receiv<span class=\"_ _0\"></span>ed less any discount on issue or<span class=\"_ _1\"></span> costs of issuance.<span class=\"_ _36a\"> </span>Interest and all o<span class=\"_ _0\"></span>ther costs of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>funding are expensed <span class=\"_ _0\"></span>to the income statement as int<span class=\"_ _0\"></span>erest pay<span class=\"_ _0\"></span>able over<span class=\"_ _1\"></span> the term of<span class=\"_ _0\"></span> the borr<span class=\"_ _0\"></span>owing on an EIR basis.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForInterestIncomeAndExpenseExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-409": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs1050\">(i)   <span class=\"_ _29\"> </span>Impairment of loans <span class=\"_ _0\"></span>to customers<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1051\">The carrying v<span class=\"_ _0\"></span>alues of<span class=\"_ _0\"></span> all loans to customers, <span class=\"_ _0\"></span>whether accounted <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> under IFRS 9 or IFRS 16, ar<span class=\"_ _0\"></span>e reduced by<span class=\"_ _0\"></span> an impairment pro<span class=\"_ _0\"></span>vision </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1052\">based on their<span class=\"_ _0\"></span> ECL, determined in accor<span class=\"_ _0\"></span>dance with IFRS 9<span class=\"_ _0\"></span>. These estimates ar<span class=\"_ _1\"></span>e review<span class=\"_ _0\"></span>ed thr<span class=\"_ _0\"></span>oughout the <span class=\"_ _0\"></span>year and at<span class=\"_ _0\"></span> each balance </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1053\">sheet date. </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1054\">With the ex<span class=\"_ _0\"></span>ception of<span class=\"_ _0\"></span> POCI financial assets (<span class=\"_ _0\"></span>which are discussed separately<span class=\"_ _0\"></span> below<span class=\"_ _0\"></span>), all assets are assessed <span class=\"_ _0\"></span>to determine whe<span class=\"_ _0\"></span>ther </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1055\">there has been a significant incr<span class=\"_ _0\"></span>ease in credit risk<span class=\"_ _0\"></span> (\u2018SICR\u2019) since the point of<span class=\"_ _0\"></span> first r<span class=\"_ _0\"></span>ecognition (<span class=\"_ _0\"></span>origination or acquisition). <span class=\"_ _1\"></span>Assets are also </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1056\">re<span class=\"_ _0\"></span>viewed <span class=\"_ _0\"></span>to identify an<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>which are \u2018Cr<span class=\"_ _0\"></span>edit Impaired\u2019<span class=\"_ _2f\"></span>. SICR and credit impairment are identified on <span class=\"_ _0\"></span>the basis of<span class=\"_ _0\"></span> pre-determined metrics </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1057\">including qualitative and quantitative <span class=\"_ _0\"></span>factors r<span class=\"_ _0\"></span>elevant<span class=\"_ _0\"></span> to each portfolio<span class=\"_ _0\"></span>, with a management r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>w t<span class=\"_ _0\"></span>o ensure appropriat<span class=\"_ _0\"></span>e allocation. </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1058\">Assets which ha<span class=\"_ _0\"></span>ve not experienced an SICR ar<span class=\"_ _0\"></span>e ref<span class=\"_ _0\"></span>erred <span class=\"_ _0\"></span>to as \u2018Stage 1\u2019 accounts, assets <span class=\"_ _0\"></span>which have experienced an SICR but ar<span class=\"_ _0\"></span>e not </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1059\">credit impair<span class=\"_ _0\"></span>ed are r<span class=\"_ _0\"></span>eferr<span class=\"_ _0\"></span>ed to as \u2018Stag<span class=\"_ _0\"></span>e 2\u2019 accounts, while credit<span class=\"_ _0\"></span> impaired assets ar<span class=\"_ _0\"></span>e referr<span class=\"_ _1\"></span>ed to as \u2018Stage 3\u2019 accounts.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs105a\">An impairment allow<span class=\"_ _0\"></span>ance is provided on an account b<span class=\"_ _0\"></span>y account basis: </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs105b\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>F<span class=\"_ _1\"></span>or Stag<span class=\"_ _0\"></span>e 1, at an amount equal to 12<span class=\"_ _0\"></span>-month ECL, <span class=\"_ _0\"></span>the total E<span class=\"_ _0\"></span>CL <span class=\"_ _0\"></span>that results <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>those default ev<span class=\"_ _0\"></span>ents that ar<span class=\"_ _0\"></span>e possible within  </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs105c\">12 months of <span class=\"_ _0\"></span>the reporting date, <span class=\"_ _0\"></span>weighted b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the probability<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>those events occurring<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs105d\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>F<span class=\"_ _1\"></span>or Stag<span class=\"_ _0\"></span>e 2 and 3 accounts, at an amount equal to lif<span class=\"_ _0\"></span>etime ECL, <span class=\"_ _0\"></span>the total E<span class=\"_ _0\"></span>CL <span class=\"_ _0\"></span>that results <span class=\"_ _0\"></span>from any<span class=\"_ _0\"></span> futur<span class=\"_ _0\"></span>e default ev<span class=\"_ _0\"></span>ents, weight<span class=\"_ _0\"></span>ed </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs105e\">by<span class=\"_ _0\"></span> the pr<span class=\"_ _0\"></span>obability of<span class=\"_ _0\"></span> those e<span class=\"_ _0\"></span>vents occurring<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs105f\">In establishing an ECL<span class=\"_ _0\"></span> allow<span class=\"_ _0\"></span>ance, the Group assesses its PD<span class=\"_ _0\"></span>, L<span class=\"_ _0\"></span>GD and exposur<span class=\"_ _0\"></span>e at default f<span class=\"_ _0\"></span>or each r<span class=\"_ _0\"></span>eporting period, discounted to giv<span class=\"_ _0\"></span>e </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1060\">a net present<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue. The estimates used in <span class=\"_ _0\"></span>these assessments must be unbiased and tak<span class=\"_ _0\"></span>e into account reasonable and supportable </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1061\">information including f<span class=\"_ _0\"></span>orward-looking economic inputs. </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1062\">While the Gr<span class=\"_ _0\"></span>oup uses statistical models as the basis f<span class=\"_ _0\"></span>or its calculation of<span class=\"_ _0\"></span> ECLs <span class=\"_ _0\"></span>where appr<span class=\"_ _0\"></span>opriate, expert judgement <span class=\"_ _0\"></span>will alwa<span class=\"_ _0\"></span>ys be </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1063\">used to assess <span class=\"_ _0\"></span>the adequacy o<span class=\"_ _0\"></span>f any<span class=\"_ _0\"></span> calculated amount and additional pr<span class=\"_ _0\"></span>ovision made if r<span class=\"_ _0\"></span>equired.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1064\">Within its buy-to-le<span class=\"_ _0\"></span>t portfolio the Gr<span class=\"_ _0\"></span>oup utilises a receiv<span class=\"_ _0\"></span>er of<span class=\"_ _0\"></span> rent pr<span class=\"_ _0\"></span>ocess, wher<span class=\"_ _0\"></span>eby<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>eceiver stands be<span class=\"_ _0\"></span>tween the landlor<span class=\"_ _0\"></span>d and </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1065\">tenant and will de<span class=\"_ _0\"></span>termine an appropriate strat<span class=\"_ _0\"></span>egy f<span class=\"_ _0\"></span>or dealing <span class=\"_ _0\"></span>with any delinquenc<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>. This str<span class=\"_ _0\"></span>ategy ma<span class=\"_ _0\"></span>y inv<span class=\"_ _0\"></span>olve the immediate sale </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1066\">of an<span class=\"_ _0\"></span>y underlying security<span class=\"_ _0\"></span> or <span class=\"_ _0\"></span>the short or long <span class=\"_ _0\"></span>term letting of<span class=\"_ _0\"></span> the pr<span class=\"_ _0\"></span>operty t<span class=\"_ _0\"></span>o cover<span class=\"_ _0\"></span> arrears and principal shortfalls. Such cases ar<span class=\"_ _0\"></span>e </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1067\">automatically consider<span class=\"_ _0\"></span>ed to ha<span class=\"_ _0\"></span>ve an SICR, but wher<span class=\"_ _1\"></span>e a letting strategy is adopted b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the receiver<span class=\"_ _0\"></span> and a tenant<span class=\"_ _0\"></span> is in place, arrears may<span class=\"_ _0\"></span> </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1068\">be reduced or<span class=\"_ _0\"></span> cleared. Pr<span class=\"_ _0\"></span>operties in receiv<span class=\"_ _0\"></span>ership are e<span class=\"_ _0\"></span>ventually either<span class=\"_ _1\"></span> returned to <span class=\"_ _0\"></span>their landlor<span class=\"_ _0\"></span>d owners or<span class=\"_ _0\"></span> sold.<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1069\">F<span class=\"_ _1\"></span>or loan portfolios acquired at<span class=\"_ _0\"></span> a discount, the discounts tak<span class=\"_ _0\"></span>e account of<span class=\"_ _0\"></span> future e<span class=\"_ _0\"></span>xpected impairments, and such assets are <span class=\"_ _0\"></span>treated </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs106a\">as POCI. F<span class=\"_ _1\"></span>or these assets, <span class=\"_ _0\"></span>the Group r<span class=\"_ _0\"></span>ecognises all changes in futur<span class=\"_ _0\"></span>e cash flow<span class=\"_ _0\"></span>s arising fr<span class=\"_ _0\"></span>om changes in credit quality<span class=\"_ _0\"></span> since initial </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs106b\">recognition as a loss allo<span class=\"_ _0\"></span>wance with an<span class=\"_ _0\"></span>y changes r<span class=\"_ _0\"></span>ecognised in profit<span class=\"_ _0\"></span> or loss. </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs106c\">F<span class=\"_ _1\"></span>or financial accounting purposes, pr<span class=\"_ _0\"></span>ovisions for<span class=\"_ _1\"></span> impairments of loans to customer<span class=\"_ _0\"></span>s are held in an impairment allow<span class=\"_ _0\"></span>ance account fr<span class=\"_ _0\"></span>om </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs106d\">the point at which <span class=\"_ _0\"></span>they<span class=\"_ _0\"></span> are <span class=\"_ _0\"></span>first recognised. <span class=\"_ _0\"></span>These balances ar<span class=\"_ _0\"></span>e released t<span class=\"_ _0\"></span>o offset against <span class=\"_ _0\"></span>the gross <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the loan when it<span class=\"_ _0\"></span> is written </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs106e\">off <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> accounting purposes. This occurs <span class=\"_ _0\"></span>when standard enf<span class=\"_ _0\"></span>orcement pr<span class=\"_ _0\"></span>ocesses have been completed, subject<span class=\"_ _0\"></span> to any<span class=\"_ _0\"></span> amount re<span class=\"_ _0\"></span>tained </div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs106f\">in respect o<span class=\"_ _0\"></span>f expected salv<span class=\"_ _0\"></span>age receip<span class=\"_ _0\"></span>ts. An<span class=\"_ _0\"></span>y further<span class=\"_ _0\"></span> gains fr<span class=\"_ _0\"></span>om post-write off<span class=\"_ _1\"></span> salvage activity ar<span class=\"_ _0\"></span>e reported as impairment g<span class=\"_ _0\"></span>ains.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForImpairmentOfAssetsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-461": {
   "value": "(i)   <span class=\"_ _29\"> </span>Impairment of loans <span class=\"_ _0\"></span>to customers<span class=\"_ _36a\"> </span>The carrying v<span class=\"_ _0\"></span>alues of<span class=\"_ _0\"></span> all loans to customers, <span class=\"_ _0\"></span>whether accounted <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> under IFRS 9 or IFRS 16, ar<span class=\"_ _0\"></span>e reduced by<span class=\"_ _0\"></span> an impairment pro<span class=\"_ _0\"></span>vision based on their<span class=\"_ _0\"></span> ECL, determined in accor<span class=\"_ _0\"></span>dance with IFRS 9<span class=\"_ _0\"></span>. These estimates ar<span class=\"_ _1\"></span>e review<span class=\"_ _0\"></span>ed thr<span class=\"_ _0\"></span>oughout the <span class=\"_ _0\"></span>year and at<span class=\"_ _0\"></span> each balance sheet date. With the ex<span class=\"_ _0\"></span>ception of<span class=\"_ _0\"></span> POCI financial assets (<span class=\"_ _0\"></span>which are discussed separately<span class=\"_ _0\"></span> below<span class=\"_ _0\"></span>), all assets are assessed <span class=\"_ _0\"></span>to determine whe<span class=\"_ _0\"></span>ther there has been a significant incr<span class=\"_ _0\"></span>ease in credit risk<span class=\"_ _0\"></span> (\u2018SICR\u2019) since the point of<span class=\"_ _0\"></span> first r<span class=\"_ _0\"></span>ecognition (<span class=\"_ _0\"></span>origination or acquisition). <span class=\"_ _1\"></span>Assets are also re<span class=\"_ _0\"></span>viewed <span class=\"_ _0\"></span>to identify an<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>which are \u2018Cr<span class=\"_ _0\"></span>edit Impaired\u2019<span class=\"_ _2f\"></span>. SICR and credit impairment are identified on <span class=\"_ _0\"></span>the basis of<span class=\"_ _0\"></span> pre-determined metrics including qualitative and quantitative <span class=\"_ _0\"></span>factors r<span class=\"_ _0\"></span>elevant<span class=\"_ _0\"></span> to each portfolio<span class=\"_ _0\"></span>, with a management r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>w t<span class=\"_ _0\"></span>o ensure appropriat<span class=\"_ _0\"></span>e allocation. Assets which ha<span class=\"_ _0\"></span>ve not experienced an SICR ar<span class=\"_ _0\"></span>e ref<span class=\"_ _0\"></span>erred <span class=\"_ _0\"></span>to as \u2018Stage 1\u2019 accounts, assets <span class=\"_ _0\"></span>which have experienced an SICR but ar<span class=\"_ _0\"></span>e not credit impair<span class=\"_ _0\"></span>ed are r<span class=\"_ _0\"></span>eferr<span class=\"_ _0\"></span>ed to as \u2018Stag<span class=\"_ _0\"></span>e 2\u2019 accounts, while credit<span class=\"_ _0\"></span> impaired assets ar<span class=\"_ _0\"></span>e referr<span class=\"_ _1\"></span>ed to as \u2018Stage 3\u2019 accounts.<span class=\"_ _36a\"> </span>An impairment allow<span class=\"_ _0\"></span>ance is provided on an account b<span class=\"_ _0\"></span>y account basis: \u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>F<span class=\"_ _1\"></span>or Stag<span class=\"_ _0\"></span>e 1, at an amount equal to 12<span class=\"_ _0\"></span>-month ECL, <span class=\"_ _0\"></span>the total E<span class=\"_ _0\"></span>CL <span class=\"_ _0\"></span>that results <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>those default ev<span class=\"_ _0\"></span>ents that ar<span class=\"_ _0\"></span>e possible within  12 months of <span class=\"_ _0\"></span>the reporting date, <span class=\"_ _0\"></span>weighted b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the probability<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>those events occurring<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _25\"></span>F<span class=\"_ _1\"></span>or Stag<span class=\"_ _0\"></span>e 2 and 3 accounts, at an amount equal to lif<span class=\"_ _0\"></span>etime ECL, <span class=\"_ _0\"></span>the total E<span class=\"_ _0\"></span>CL <span class=\"_ _0\"></span>that results <span class=\"_ _0\"></span>from any<span class=\"_ _0\"></span> futur<span class=\"_ _0\"></span>e default ev<span class=\"_ _0\"></span>ents, weight<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> the pr<span class=\"_ _0\"></span>obability of<span class=\"_ _0\"></span> those e<span class=\"_ _0\"></span>vents occurring<span class=\"_ _36a\"> </span>In establishing an ECL<span class=\"_ _0\"></span> allow<span class=\"_ _0\"></span>ance, the Group assesses its PD<span class=\"_ _0\"></span>, L<span class=\"_ _0\"></span>GD and exposur<span class=\"_ _0\"></span>e at default f<span class=\"_ _0\"></span>or each r<span class=\"_ _0\"></span>eporting period, discounted to giv<span class=\"_ _0\"></span>e a net present<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue. The estimates used in <span class=\"_ _0\"></span>these assessments must be unbiased and tak<span class=\"_ _0\"></span>e into account reasonable and supportable information including f<span class=\"_ _0\"></span>orward-looking economic inputs. While the Gr<span class=\"_ _0\"></span>oup uses statistical models as the basis f<span class=\"_ _0\"></span>or its calculation of<span class=\"_ _0\"></span> ECLs <span class=\"_ _0\"></span>where appr<span class=\"_ _0\"></span>opriate, expert judgement <span class=\"_ _0\"></span>will alwa<span class=\"_ _0\"></span>ys be used to assess <span class=\"_ _0\"></span>the adequacy o<span class=\"_ _0\"></span>f any<span class=\"_ _0\"></span> calculated amount and additional pr<span class=\"_ _0\"></span>ovision made if r<span class=\"_ _0\"></span>equired.<span class=\"_ _36a\"> </span>Within its buy-to-le<span class=\"_ _0\"></span>t portfolio the Gr<span class=\"_ _0\"></span>oup utilises a receiv<span class=\"_ _0\"></span>er of<span class=\"_ _0\"></span> rent pr<span class=\"_ _0\"></span>ocess, wher<span class=\"_ _0\"></span>eby<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>eceiver stands be<span class=\"_ _0\"></span>tween the landlor<span class=\"_ _0\"></span>d and tenant and will de<span class=\"_ _0\"></span>termine an appropriate strat<span class=\"_ _0\"></span>egy f<span class=\"_ _0\"></span>or dealing <span class=\"_ _0\"></span>with any delinquenc<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>. This str<span class=\"_ _0\"></span>ategy ma<span class=\"_ _0\"></span>y inv<span class=\"_ _0\"></span>olve the immediate sale of an<span class=\"_ _0\"></span>y underlying security<span class=\"_ _0\"></span> or <span class=\"_ _0\"></span>the short or long <span class=\"_ _0\"></span>term letting of<span class=\"_ _0\"></span> the pr<span class=\"_ _0\"></span>operty t<span class=\"_ _0\"></span>o cover<span class=\"_ _0\"></span> arrears and principal shortfalls. Such cases ar<span class=\"_ _0\"></span>e automatically consider<span class=\"_ _0\"></span>ed to ha<span class=\"_ _0\"></span>ve an SICR, but wher<span class=\"_ _1\"></span>e a letting strategy is adopted b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the receiver<span class=\"_ _0\"></span> and a tenant<span class=\"_ _0\"></span> is in place, arrears may<span class=\"_ _0\"></span> be reduced or<span class=\"_ _0\"></span> cleared. Pr<span class=\"_ _0\"></span>operties in receiv<span class=\"_ _0\"></span>ership are e<span class=\"_ _0\"></span>ventually either<span class=\"_ _1\"></span> returned to <span class=\"_ _0\"></span>their landlor<span class=\"_ _0\"></span>d owners or<span class=\"_ _0\"></span> sold.<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>or loan portfolios acquired at<span class=\"_ _0\"></span> a discount, the discounts tak<span class=\"_ _0\"></span>e account of<span class=\"_ _0\"></span> future e<span class=\"_ _0\"></span>xpected impairments, and such assets are <span class=\"_ _0\"></span>treated as POCI. F<span class=\"_ _1\"></span>or these assets, <span class=\"_ _0\"></span>the Group r<span class=\"_ _0\"></span>ecognises all changes in futur<span class=\"_ _0\"></span>e cash flow<span class=\"_ _0\"></span>s arising fr<span class=\"_ _0\"></span>om changes in credit quality<span class=\"_ _0\"></span> since initial recognition as a loss allo<span class=\"_ _0\"></span>wance with an<span class=\"_ _0\"></span>y changes r<span class=\"_ _0\"></span>ecognised in profit<span class=\"_ _0\"></span> or loss. F<span class=\"_ _1\"></span>or financial accounting purposes, pr<span class=\"_ _0\"></span>ovisions for<span class=\"_ _1\"></span> impairments of loans to customer<span class=\"_ _0\"></span>s are held in an impairment allow<span class=\"_ _0\"></span>ance account fr<span class=\"_ _0\"></span>om the point at which <span class=\"_ _0\"></span>they<span class=\"_ _0\"></span> are <span class=\"_ _0\"></span>first recognised. <span class=\"_ _0\"></span>These balances ar<span class=\"_ _0\"></span>e released t<span class=\"_ _0\"></span>o offset against <span class=\"_ _0\"></span>the gross <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the loan when it<span class=\"_ _0\"></span> is written off <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> accounting purposes. This occurs <span class=\"_ _0\"></span>when standard enf<span class=\"_ _0\"></span>orcement pr<span class=\"_ _0\"></span>ocesses have been completed, subject<span class=\"_ _0\"></span> to any<span class=\"_ _0\"></span> amount re<span class=\"_ _0\"></span>tained in respect o<span class=\"_ _0\"></span>f expected salv<span class=\"_ _0\"></span>age receip<span class=\"_ _0\"></span>ts. An<span class=\"_ _0\"></span>y further<span class=\"_ _0\"></span> gains fr<span class=\"_ _0\"></span>om post-write off<span class=\"_ _1\"></span> salvage activity ar<span class=\"_ _0\"></span>e reported as impairment g<span class=\"_ _0\"></span>ains.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForImpairmentOfFinancialAssetsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-410": {
   "value": "(j)    Amounts owed by or to group companies In the accounts of the Company, balances owed by or to other group companies are carried at the current amount outstanding less any provision. Where balances owing between group companies fall within the definition of either financial assets or financial liabilities given in IAS 32 \u2013 \u2018Financial Instruments: Presentation\u2019 they are classified as assets or liabilities at amortised cost, as defined by IFRS 9. ",
   "dimensions": {
    "concept": "paragon:DescriptionOfAccountingPolicyForAmountsOwedByOrToGroupCompanies",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-411": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs1075\">(k) <span class=\"_ _2\"></span> <span class=\"_ _29\"> </span>Property, plant and equipment </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1076\">Property<span class=\"_ _1\"></span>, plant and equipment is stated at cost less accumulated depr<span class=\"_ _0\"></span>eciation. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1077\">Assets held for<span class=\"_ _1\"></span> letting under operating leases are depr<span class=\"_ _0\"></span>eciated in equal annual instalments t<span class=\"_ _0\"></span>o their<span class=\"_ _0\"></span> estimated residual <span class=\"_ _0\"></span>value ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1078\">life of<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>elated lease. V<span class=\"_ _1\"></span>ehicles held for<span class=\"_ _0\"></span> short term hir<span class=\"_ _0\"></span>e are depr<span class=\"_ _0\"></span>eciated in equal annual instalments to <span class=\"_ _0\"></span>their estimated r<span class=\"_ _1\"></span>esidual value </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1079\">over<span class=\"_ _1\"></span> their expected useful lif<span class=\"_ _0\"></span>e. This depr<span class=\"_ _1\"></span>eciation is deducted in arriving at net lease income and is shown in note 6.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs107a\">The assets\u2019 r<span class=\"_ _1\"></span>esidual values and useful lives ar<span class=\"_ _0\"></span>e re<span class=\"_ _0\"></span>view<span class=\"_ _0\"></span>ed by manag<span class=\"_ _0\"></span>ement and adjusted, if appr<span class=\"_ _0\"></span>opriate, at each balance sheet date.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs107b\">Depreciation on operating asse<span class=\"_ _0\"></span>ts is provided on cost<span class=\"_ _0\"></span> in equal annual instalments over<span class=\"_ _0\"></span> the lives o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the assets. Land is not depreciat<span class=\"_ _0\"></span>ed. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs107c\">The rates of<span class=\"_ _0\"></span> depreciation ar<span class=\"_ _0\"></span>e as follo<span class=\"_ _0\"></span>ws:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs107d\">Freehold premises<span class=\"_ _45\"> </span>Short leasehold premises<span class=\"_ _2e5\"> </span>Computer hardware<span class=\"_ _ae\"> </span><span class=\"ff1e\">Furniture, fixtures and office equipment<span class=\"_ _1a\"> </span></span>Company motor vehicles<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2d ff17 fs1 fc1 sc0 ls0 ws0 gs107e\">2% per annum<span class=\"_ _12\"> </span>over the term of the lease<span class=\"_ _1a\"> </span>25% per annum<span class=\"_ _66\"> </span>15% per annum<span class=\"_ _ba\"> </span>25% per annum<span class=\"_ _36a\"> </span></div><div class=\"t m2 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs107f\">Depreciation on right o<span class=\"_ _0\"></span>f use assets r<span class=\"_ _0\"></span>ecognised in accordance <span class=\"_ _0\"></span>with IFRS 16 is provided on a straight line basis o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the term o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the lease.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForPropertyPlantAndEquipmentExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-462": {
   "value": "Depreciation on operating asse<span class=\"_ _0\"></span>ts is provided on cost<span class=\"_ _0\"></span> in equal annual instalments over<span class=\"_ _0\"></span> the lives o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the assets. Land is not depreciat<span class=\"_ _0\"></span>ed. The rates of<span class=\"_ _0\"></span> depreciation ar<span class=\"_ _0\"></span>e as follo<span class=\"_ _0\"></span>ws:<span class=\"_ _36a\"> </span>Freehold premises<span class=\"_ _45\"> </span>Short leasehold premises<span class=\"_ _2e5\"> </span>Computer hardware<span class=\"_ _ae\"> </span><span class=\"ff1e\">Furniture, fixtures and office equipment<span class=\"_ _1a\"> </span></span>Company motor vehicles<span class=\"_ _36a\"> </span>2% per annum<span class=\"_ _12\"> </span>over the term of the lease<span class=\"_ _1a\"> </span>25% per annum<span class=\"_ _66\"> </span>15% per annum<span class=\"_ _ba\"> </span>25% per annum<span class=\"_ _36a\"> </span>Depreciation on right o<span class=\"_ _0\"></span>f use assets r<span class=\"_ _0\"></span>ecognised in accordance <span class=\"_ _0\"></span>with IFRS 16 is provided on a straight line basis o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the term o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the lease.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDepreciationExpenseExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-412": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs1081\">(l)   <span class=\"_ _29\"> </span>Intangible assets </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1082\">Intangible assets comprise purchased comput<span class=\"_ _0\"></span>er softw<span class=\"_ _0\"></span>are and other<span class=\"_ _0\"></span> intangible assets acquired in business combinations.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1083\">Purchased computer<span class=\"_ _0\"></span> softwar<span class=\"_ _1\"></span>e is capitalised where it has a sufficiently<span class=\"_ _0\"></span> enduring nature and is stated at cost less accumulat<span class=\"_ _0\"></span>ed </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1084\">amortisation. Amortisation is pr<span class=\"_ _0\"></span>ovided in equal instalments at a r<span class=\"_ _0\"></span>ate of 25% per<span class=\"_ _0\"></span> annum.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1085\">Other intangible assets acquir<span class=\"_ _0\"></span>ed in business combinations include brands and business netw<span class=\"_ _0\"></span>orks and are capitalised in accor<span class=\"_ _0\"></span>dance </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1086\">with the r<span class=\"_ _0\"></span>equirements of<span class=\"_ _0\"></span> IFRS 3 \u2013 \u2018Business Combinations\u2019<span class=\"_ _2\"></span>. Such assets are stat<span class=\"_ _0\"></span>ed at attributed cost less accumulated amortisation. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1087\">Amortisation is pro<span class=\"_ _0\"></span>vided in equal instalments at a rate determined at <span class=\"_ _0\"></span>the point of<span class=\"_ _0\"></span> acquisition.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIntangibleAssetsOtherThanGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-413": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs1089\">(m<span class=\"_ _0\"></span>) <span class=\"_ _27\"> </span>Inves<span class=\"_ _0\"></span>tments in subsidiaries<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs108a\">The Company\u2019<span class=\"_ _1\"></span>s investments in subsidiary<span class=\"_ _0\"></span> undertakings are <span class=\"_ _0\"></span>valued at cost less pr<span class=\"_ _0\"></span>ovision <span class=\"_ _0\"></span>for impairment. Impairment is de<span class=\"_ _0\"></span>termined </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs108b\">based on the net asse<span class=\"_ _0\"></span>t v<span class=\"_ _0\"></span>alues of subsidiary<span class=\"_ _0\"></span> entities after pr<span class=\"_ _0\"></span>ovision <span class=\"_ _0\"></span>for inter<span class=\"_ _1\"></span> company balances and investments at<span class=\"_ _0\"></span> the subsidiary le<span class=\"_ _0\"></span>vel.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForSubsidiariesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-414": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 wsaa gs108d\">(n<span class=\"_ _0\"></span>)  <span class=\"_ _13e\"> </span>Own <span class=\"_ _96\"></span>shares </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs108e\">Shares in Par<span class=\"_ _0\"></span>agon Banking Group PL<span class=\"_ _1\"></span>C held in treasury<span class=\"_ _0\"></span> or b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the trustee of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s employee share o<span class=\"_ _0\"></span>wnership plan are shown on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs108f\">the balance sheet as a deduction in arriving at <span class=\"_ _0\"></span>total equity<span class=\"_ _0\"></span>. Own shares ar<span class=\"_ _0\"></span>e stated at cost.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1090\">Any<span class=\"_ _0\"></span> shortfall on disposal of such shar<span class=\"_ _0\"></span>es is offset against<span class=\"_ _0\"></span> retained earnings. <span class=\"_ _0\"></span>Any<span class=\"_ _0\"></span> excess of<span class=\"_ _0\"></span> disposal proceeds o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> cost is added to <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1091\">share pr<span class=\"_ _0\"></span>emium account. Wher<span class=\"_ _0\"></span>e an irre<span class=\"_ _0\"></span>vocable instruction f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the purchase of<span class=\"_ _0\"></span> such shares has been giv<span class=\"_ _0\"></span>en, it is tr<span class=\"_ _0\"></span>eated as a reduction </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1092\">in capital fr<span class=\"_ _0\"></span>om the point at <span class=\"_ _0\"></span>which the instruction becomes irr<span class=\"_ _0\"></span>evocable.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTreasurySharesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-415": {
   "value": "(o)   Retail deposits Retail deposits are carried in the balance sheet on the amortised cost basis. The initial fair value recognised represents the cash amount received from the customer. Interest payable to the customer is expensed to the income statement as interest payable over the deposit term on an EIR basis. ",
   "dimensions": {
    "concept": "paragon:DescriptionOfAccountingPolicyForRetailDeposits",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-416": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 wsab gs1099\">(p<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>Borrowings </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs109a\">Borro<span class=\"_ _0\"></span>wings are carried in the balance shee<span class=\"_ _0\"></span>t on the amortised cost basis. <span class=\"_ _0\"></span>The initial v<span class=\"_ _0\"></span>alue recognised includes <span class=\"_ _0\"></span>the principal amount </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs109b\">receiv<span class=\"_ _0\"></span>ed less any discount on issue or<span class=\"_ _1\"></span> costs of issuance.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs109c\">Interest and all o<span class=\"_ _0\"></span>ther costs of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>funding are expensed <span class=\"_ _0\"></span>to the income statement as int<span class=\"_ _0\"></span>erest pay<span class=\"_ _0\"></span>able over<span class=\"_ _1\"></span> the term of<span class=\"_ _0\"></span> the borr<span class=\"_ _0\"></span>owing </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs109d\">on an EIR basis.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForBorrowingsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-498": {
   "value": "(p<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>Borrowings Borro<span class=\"_ _0\"></span>wings are carried in the balance shee<span class=\"_ _0\"></span>t on the amortised cost basis. <span class=\"_ _0\"></span>The initial v<span class=\"_ _0\"></span>alue recognised includes <span class=\"_ _0\"></span>the principal amount receiv<span class=\"_ _0\"></span>ed less any discount on issue or<span class=\"_ _1\"></span> costs of issuance.<span class=\"_ _36a\"> </span>Interest and all o<span class=\"_ _0\"></span>ther costs of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>funding are expensed <span class=\"_ _0\"></span>to the income statement as int<span class=\"_ _0\"></span>erest pay<span class=\"_ _0\"></span>able over<span class=\"_ _1\"></span> the term of<span class=\"_ _0\"></span> the borr<span class=\"_ _0\"></span>owing on an EIR basis.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinanceCostsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-487": {
   "value": "(p<span class=\"_ _0\"></span>)  <span class=\"_ _ce\"> </span>Borrowings Borro<span class=\"_ _0\"></span>wings are carried in the balance shee<span class=\"_ _0\"></span>t on the amortised cost basis. <span class=\"_ _0\"></span>The initial v<span class=\"_ _0\"></span>alue recognised includes <span class=\"_ _0\"></span>the principal amount receiv<span class=\"_ _0\"></span>ed less any discount on issue or<span class=\"_ _1\"></span> costs of issuance.<span class=\"_ _36a\"> </span>Interest and all o<span class=\"_ _0\"></span>ther costs of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>funding are expensed <span class=\"_ _0\"></span>to the income statement as int<span class=\"_ _0\"></span>erest pay<span class=\"_ _0\"></span>able over<span class=\"_ _1\"></span> the term of<span class=\"_ _0\"></span> the borr<span class=\"_ _0\"></span>owing on an EIR basis.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForBorrowingCostsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-417": {
   "value": "(q)   Central  bank  facilities Where central bank facilities are provided at a below market rate of interest, and therefore fall within the definition of government assistance as defined by IAS 20 \u2013 \u2018Accounting for Government Grants and Disclosure of Government Assistance\u2019, the liability is initially recognised at the value of its expected cash flows discounted at a market rate of interest for a comparable commercial borrowing. Interest is recognised on this liability on an EIR basis, using the imputed market rate to determine the EIR. The remaining amount of the advance is recognised as deferred government assistance and released to the profit and loss account through interest payable over the periods during which the arrangement affects profit. ",
   "dimensions": {
    "concept": "paragon:DescriptionOfAccountingPolicyForCentralBankFacilities",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-463": {
   "value": "(q)  <span class=\"_ _ce\"> </span>Central  bank  f<span class=\"_ _0\"></span>acilities Where central bank<span class=\"_ _0\"></span> facilities ar<span class=\"_ _0\"></span>e provided at<span class=\"_ _0\"></span> a below mark<span class=\"_ _0\"></span>et rate of<span class=\"_ _0\"></span> interest, and <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore <span class=\"_ _0\"></span>fall within the de<span class=\"_ _0\"></span>finition of g<span class=\"_ _0\"></span>overnment assistance as defined by<span class=\"_ _0\"></span> IAS 20 \u2013 \u2018<span class=\"_ _1\"></span>Accounting f<span class=\"_ _0\"></span>or Gov<span class=\"_ _0\"></span>ernment Grants and Disclosur<span class=\"_ _0\"></span>e of Go<span class=\"_ _0\"></span>vernment <span class=\"_ _0\"></span>Assistance\u2019<span class=\"_ _2f\"></span>, the liability is initially<span class=\"_ _0\"></span> recognised at <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>alue of its e<span class=\"_ _0\"></span>xpected cash flow<span class=\"_ _0\"></span>s discounted at a market<span class=\"_ _0\"></span> rate of int<span class=\"_ _0\"></span>erest <span class=\"_ _0\"></span>for a compar<span class=\"_ _0\"></span>able commercial borro<span class=\"_ _0\"></span>wing. Interest is r<span class=\"_ _1\"></span>ecognised on this liability on an EIR basis, using the imputed mark<span class=\"_ _0\"></span>et rate <span class=\"_ _0\"></span>to determine the EIR.<span class=\"_ _36a\"> </span>The remaining amount<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the advance is r<span class=\"_ _0\"></span>ecognised as deferred g<span class=\"_ _0\"></span>overnment assistance and r<span class=\"_ _0\"></span>eleased to <span class=\"_ _0\"></span>the pro<span class=\"_ _0\"></span>fit and loss account through inter<span class=\"_ _0\"></span>est pay<span class=\"_ _0\"></span>able over<span class=\"_ _0\"></span> the periods during <span class=\"_ _0\"></span>which the arrangement<span class=\"_ _0\"></span> affects pro<span class=\"_ _0\"></span>fit.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForGovernmentGrants",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-418": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs4e8\">(r<span class=\"_ _0\"></span>) <span class=\"_ _1c\"> </span> <span class=\"_ _29\"> </span>Sale and repurchase agreements<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10a5\">Securities, including the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s own retained asset-back<span class=\"_ _0\"></span>ed notes, can be sold subject <span class=\"_ _0\"></span>to a commitment to r<span class=\"_ _0\"></span>epurchase <span class=\"_ _0\"></span>them at a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10a6\">subsequent date at a price calculated on a pr<span class=\"_ _0\"></span>e-determined basis (a r<span class=\"_ _0\"></span>epo<span class=\"_ _0\"></span>). Wher<span class=\"_ _0\"></span>e this price comprises a fix<span class=\"_ _0\"></span>ed amount plus a lenders </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10a7\">return, <span class=\"_ _0\"></span>the funds r<span class=\"_ _0\"></span>eceived are <span class=\"_ _0\"></span>treated as borr<span class=\"_ _0\"></span>owings of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10a8\">Where <span class=\"_ _0\"></span>the securities concerned are r<span class=\"_ _0\"></span>etained notes no liability<span class=\"_ _0\"></span> is recognised in asset-back<span class=\"_ _0\"></span>ed loan notes and wher<span class=\"_ _0\"></span>e the securities ar<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10a9\">recognised on <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s balance sheet prior <span class=\"_ _0\"></span>to the tr<span class=\"_ _0\"></span>ansaction, these ar<span class=\"_ _0\"></span>e not derecognised. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs4ed\">The differ<span class=\"_ _0\"></span>ence between <span class=\"_ _0\"></span>the sale and purchase price is accrued ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the life of<span class=\"_ _0\"></span> the agreement<span class=\"_ _0\"></span> using the effectiv<span class=\"_ _0\"></span>e interest r<span class=\"_ _0\"></span>ate method.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForRepurchaseAndReverseRepurchaseAgreementsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-419": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws1b gs10ab\">(s<span class=\"_ _0\"></span>)  <span class=\"_ _45\"> </span>Derivativ<span class=\"_ _0\"></span>e financial instruments </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10ac\">All derivativ<span class=\"_ _0\"></span>e financial instruments are carried in <span class=\"_ _0\"></span>the balance sheet at f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value, as assets <span class=\"_ _0\"></span>where the <span class=\"_ _0\"></span>value is positiv<span class=\"_ _0\"></span>e or as liabilities </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10ad\">where <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>alue is negative. F<span class=\"_ _1\"></span>air <span class=\"_ _0\"></span>value is based on marke<span class=\"_ _0\"></span>t prices, wher<span class=\"_ _0\"></span>e a market exists. If<span class=\"_ _0\"></span> ther<span class=\"_ _0\"></span>e is no active mark<span class=\"_ _0\"></span>et, fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue is </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10ae\">calculated using present <span class=\"_ _1\"></span>value models which incorporate assumptions based on mark<span class=\"_ _0\"></span>et conditions and ar<span class=\"_ _0\"></span>e consistent with accepted </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10af\">economic methodologies for<span class=\"_ _1\"></span> pricing financial instruments. Changes in the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> derivatives ar<span class=\"_ _0\"></span>e recognised in <span class=\"_ _0\"></span>the income </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10b0\">statement, excep<span class=\"_ _0\"></span>t wher<span class=\"_ _0\"></span>e such amounts are permitted <span class=\"_ _0\"></span>to be tak<span class=\"_ _0\"></span>en to equity<span class=\"_ _0\"></span> as part of <span class=\"_ _0\"></span>the accounting for<span class=\"_ _1\"></span> a cash flow hedge. </div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 wsad gs10b1\">(t)  <span class=\"_ _4a\"> </span>Hedging<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10b2\">IFRS 9 paragraph 7<span class=\"_ _2\"></span>.2.21 permits an entity to elect, as a matter<span class=\"_ _0\"></span> of accounting polic<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, to continue <span class=\"_ _0\"></span>to apply <span class=\"_ _0\"></span>the hedge accounting </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10b3\">requir<span class=\"_ _0\"></span>ements of IA<span class=\"_ _0\"></span>S 39 in place of <span class=\"_ _0\"></span>those set out in Chapter<span class=\"_ _1\"></span> 6 of IFRS 9. <span class=\"_ _0\"></span>The Group has made <span class=\"_ _0\"></span>this election and the accounting policy<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10b4\">below has been de<span class=\"_ _0\"></span>termined in accordance <span class=\"_ _0\"></span>with IAS 39<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10b5\">F<span class=\"_ _1\"></span>or all hedges, the Gr<span class=\"_ _0\"></span>oup documents the r<span class=\"_ _0\"></span>elationship between <span class=\"_ _0\"></span>the hedging instruments and the hedged items at incep<span class=\"_ _0\"></span>tion, as well </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10b6\">as its risk management str<span class=\"_ _0\"></span>ategy and objectives <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> undertaking the tr<span class=\"_ _0\"></span>ansaction. The Gr<span class=\"_ _0\"></span>oup also documents its assessment, both at </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10b7\">hedge inception and on an ongoing basis, o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>whether <span class=\"_ _0\"></span>the hedging arrangements put in place ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be \u2018highly eff<span class=\"_ _0\"></span>ective\u2019 as </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10b8\">defined by<span class=\"_ _0\"></span> IAS 39<span class=\"_ _0\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10b9\">F<span class=\"_ _1\"></span>or a fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue hedge, as long as the hedging r<span class=\"_ _0\"></span>elationship is deemed \u2018highly eff<span class=\"_ _0\"></span>ective\u2019 and mee<span class=\"_ _0\"></span>ts the hedging requir<span class=\"_ _1\"></span>ements of IAS </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10ba\">39, an<span class=\"_ _0\"></span>y gain or<span class=\"_ _0\"></span> loss on the hedging instrument r<span class=\"_ _0\"></span>ecognised in income can be offset against<span class=\"_ _0\"></span> the fair<span class=\"_ _1\"></span> value loss or<span class=\"_ _0\"></span> gain arising fr<span class=\"_ _0\"></span>om the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10bb\">hedged item f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the hedged risk. F<span class=\"_ _1\"></span>or macro hedg<span class=\"_ _0\"></span>es (hedges of<span class=\"_ _0\"></span> interest rat<span class=\"_ _0\"></span>e risk for<span class=\"_ _0\"></span> a portfolio of<span class=\"_ _0\"></span> loan assets or r<span class=\"_ _1\"></span>etail deposit liabilities) </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10bc\">this fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue adjustment is disclosed in the balance sheet alongside <span class=\"_ _0\"></span>the hedged item, f<span class=\"_ _0\"></span>or other<span class=\"_ _1\"></span> hedges the adjustment is made to <span class=\"_ _0\"></span>the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10bd\">carrying v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the hedged asset or<span class=\"_ _0\"></span> liability<span class=\"_ _0\"></span>. Only <span class=\"_ _0\"></span>the net ineffectiv<span class=\"_ _0\"></span>eness of <span class=\"_ _0\"></span>the hedge is charged or<span class=\"_ _1\"></span> credited to income. <span class=\"_ _0\"></span>Where a <span class=\"_ _0\"></span>fair </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10be\">value hedge r<span class=\"_ _0\"></span>elationship is terminat<span class=\"_ _0\"></span>ed, or deemed ineffectiv<span class=\"_ _0\"></span>e, the <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value adjustment is amortised o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>the remaining <span class=\"_ _0\"></span>term of<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10bf\">underlying item.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDerivativeFinancialInstrumentsAndHedgingExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-464": {
   "value": "(s<span class=\"_ _0\"></span>)  <span class=\"_ _45\"> </span>Derivativ<span class=\"_ _0\"></span>e financial instruments All derivativ<span class=\"_ _0\"></span>e financial instruments are carried in <span class=\"_ _0\"></span>the balance sheet at f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value, as assets <span class=\"_ _0\"></span>where the <span class=\"_ _0\"></span>value is positiv<span class=\"_ _0\"></span>e or as liabilities where <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>alue is negative. F<span class=\"_ _1\"></span>air <span class=\"_ _0\"></span>value is based on marke<span class=\"_ _0\"></span>t prices, wher<span class=\"_ _0\"></span>e a market exists. If<span class=\"_ _0\"></span> ther<span class=\"_ _0\"></span>e is no active mark<span class=\"_ _0\"></span>et, fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue is calculated using present <span class=\"_ _1\"></span>value models which incorporate assumptions based on mark<span class=\"_ _0\"></span>et conditions and ar<span class=\"_ _0\"></span>e consistent with accepted economic methodologies for<span class=\"_ _1\"></span> pricing financial instruments. Changes in the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> derivatives ar<span class=\"_ _0\"></span>e recognised in <span class=\"_ _0\"></span>the income statement, excep<span class=\"_ _0\"></span>t wher<span class=\"_ _0\"></span>e such amounts are permitted <span class=\"_ _0\"></span>to be tak<span class=\"_ _0\"></span>en to equity<span class=\"_ _0\"></span> as part of <span class=\"_ _0\"></span>the accounting for<span class=\"_ _1\"></span> a cash flow hedge. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDerivativeFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-465": {
   "value": "(t)  <span class=\"_ _4a\"> </span>Hedging<span class=\"_ _36a\"> </span>IFRS 9 paragraph 7<span class=\"_ _2\"></span>.2.21 permits an entity to elect, as a matter<span class=\"_ _0\"></span> of accounting polic<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, to continue <span class=\"_ _0\"></span>to apply <span class=\"_ _0\"></span>the hedge accounting requir<span class=\"_ _0\"></span>ements of IA<span class=\"_ _0\"></span>S 39 in place of <span class=\"_ _0\"></span>those set out in Chapter<span class=\"_ _1\"></span> 6 of IFRS 9. <span class=\"_ _0\"></span>The Group has made <span class=\"_ _0\"></span>this election and the accounting policy<span class=\"_ _0\"></span> below has been de<span class=\"_ _0\"></span>termined in accordance <span class=\"_ _0\"></span>with IAS 39<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>or all hedges, the Gr<span class=\"_ _0\"></span>oup documents the r<span class=\"_ _0\"></span>elationship between <span class=\"_ _0\"></span>the hedging instruments and the hedged items at incep<span class=\"_ _0\"></span>tion, as well as its risk management str<span class=\"_ _0\"></span>ategy and objectives <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> undertaking the tr<span class=\"_ _0\"></span>ansaction. The Gr<span class=\"_ _0\"></span>oup also documents its assessment, both at hedge inception and on an ongoing basis, o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>whether <span class=\"_ _0\"></span>the hedging arrangements put in place ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be \u2018highly eff<span class=\"_ _0\"></span>ective\u2019 as defined by<span class=\"_ _0\"></span> IAS 39<span class=\"_ _0\"></span>. F<span class=\"_ _1\"></span>or a fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue hedge, as long as the hedging r<span class=\"_ _0\"></span>elationship is deemed \u2018highly eff<span class=\"_ _0\"></span>ective\u2019 and mee<span class=\"_ _0\"></span>ts the hedging requir<span class=\"_ _1\"></span>ements of IAS 39, an<span class=\"_ _0\"></span>y gain or<span class=\"_ _0\"></span> loss on the hedging instrument r<span class=\"_ _0\"></span>ecognised in income can be offset against<span class=\"_ _0\"></span> the fair<span class=\"_ _1\"></span> value loss or<span class=\"_ _0\"></span> gain arising fr<span class=\"_ _0\"></span>om the hedged item f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the hedged risk. F<span class=\"_ _1\"></span>or macro hedg<span class=\"_ _0\"></span>es (hedges of<span class=\"_ _0\"></span> interest rat<span class=\"_ _0\"></span>e risk for<span class=\"_ _0\"></span> a portfolio of<span class=\"_ _0\"></span> loan assets or r<span class=\"_ _1\"></span>etail deposit liabilities) this fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue adjustment is disclosed in the balance sheet alongside <span class=\"_ _0\"></span>the hedged item, f<span class=\"_ _0\"></span>or other<span class=\"_ _1\"></span> hedges the adjustment is made to <span class=\"_ _0\"></span>the carrying v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the hedged asset or<span class=\"_ _0\"></span> liability<span class=\"_ _0\"></span>. Only <span class=\"_ _0\"></span>the net ineffectiv<span class=\"_ _0\"></span>eness of <span class=\"_ _0\"></span>the hedge is charged or<span class=\"_ _1\"></span> credited to income. <span class=\"_ _0\"></span>Where a <span class=\"_ _0\"></span>fair value hedge r<span class=\"_ _0\"></span>elationship is terminat<span class=\"_ _0\"></span>ed, or deemed ineffectiv<span class=\"_ _0\"></span>e, the <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value adjustment is amortised o<span class=\"_ _0\"></span>ver <span class=\"_ _0\"></span>the remaining <span class=\"_ _0\"></span>term of<span class=\"_ _0\"></span> the underlying item.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForHedgingExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-420": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 wsab gs10c1\">(u<span class=\"_ _0\"></span>)  <span class=\"_ _13e\"> </span>T<span class=\"_ _2\"></span>axation<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10c2\">The charge <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> taxation repr<span class=\"_ _0\"></span>esents the expect<span class=\"_ _0\"></span>ed UK corporation tax (including <span class=\"_ _0\"></span>the Bank Corporation <span class=\"_ _0\"></span>T<span class=\"_ _2\"></span>ax Surcharge <span class=\"_ _0\"></span>where applicable<span class=\"_ _0\"></span>) </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10c3\">and other income <span class=\"_ _0\"></span>taxes arising <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s profit f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span>. T<span class=\"_ _0\"></span>his consists of <span class=\"_ _0\"></span>the current <span class=\"_ _0\"></span>tax which will be sho<span class=\"_ _0\"></span>wn in tax r<span class=\"_ _0\"></span>eturns </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10c4\">for<span class=\"_ _0\"></span> the y<span class=\"_ _0\"></span>ear and <span class=\"_ _0\"></span>tax deferr<span class=\"_ _0\"></span>ed because of <span class=\"_ _0\"></span>temporary<span class=\"_ _0\"></span> differences. <span class=\"_ _0\"></span>This in general, r<span class=\"_ _0\"></span>epresents <span class=\"_ _0\"></span>the tax impact o<span class=\"_ _0\"></span>f items r<span class=\"_ _0\"></span>ecorded in the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10c5\">current <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> but which <span class=\"_ _0\"></span>will impact tax r<span class=\"_ _0\"></span>eturns for<span class=\"_ _0\"></span> periods other<span class=\"_ _0\"></span> than the one in <span class=\"_ _0\"></span>which the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e included in the financial statements. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10c6\">The Group <span class=\"_ _0\"></span>will hold a pro<span class=\"_ _0\"></span>vision for<span class=\"_ _0\"></span> any<span class=\"_ _0\"></span> uncertain tax positions at the balance shee<span class=\"_ _0\"></span>t date based on a global assessment of<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10c7\">expected amount <span class=\"_ _0\"></span>that will ultimately<span class=\"_ _0\"></span> be payable.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10c8\">T<span class=\"_ _2\"></span>ax relating to items <span class=\"_ _0\"></span>taken dir<span class=\"_ _0\"></span>ectly <span class=\"_ _0\"></span>to equity is also <span class=\"_ _0\"></span>taken dir<span class=\"_ _0\"></span>ectly <span class=\"_ _0\"></span>to equity<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-421": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws21 gs10ca\">(v<span class=\"_ _0\"></span>)  <span class=\"_ _45\"> </span>Deferred tax<span class=\"_ _0\"></span>ation </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10cb\">Deferr<span class=\"_ _0\"></span>ed taxation is pr<span class=\"_ _0\"></span>ovided in full on <span class=\"_ _0\"></span>temporary diff<span class=\"_ _0\"></span>erences <span class=\"_ _0\"></span>that result in an obligation at<span class=\"_ _0\"></span> the balance sheet date <span class=\"_ _0\"></span>to pay<span class=\"_ _0\"></span> more tax, or<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10cc\">a right to pa<span class=\"_ _0\"></span>y less <span class=\"_ _0\"></span>tax, at a future dat<span class=\"_ _0\"></span>e, at rates expected <span class=\"_ _0\"></span>to apply <span class=\"_ _0\"></span>when the<span class=\"_ _0\"></span>y crystallise based on curr<span class=\"_ _0\"></span>ent tax r<span class=\"_ _0\"></span>ates and law<span class=\"_ _0\"></span>. Deferred </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10cd\">tax assets are r<span class=\"_ _0\"></span>ecognised to <span class=\"_ _0\"></span>the extent <span class=\"_ _0\"></span>that it is regar<span class=\"_ _0\"></span>ded as probable <span class=\"_ _0\"></span>that the<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>will be recov<span class=\"_ _0\"></span>ered. <span class=\"_ _0\"></span>As requir<span class=\"_ _0\"></span>ed by<span class=\"_ _0\"></span> IAS 12 \u2013 \u2018Income </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10ce\">T<span class=\"_ _2\"></span>axes\u2019<span class=\"_ _2f\"></span>, deferred <span class=\"_ _0\"></span>tax assets and liabilities are not discount<span class=\"_ _0\"></span>ed to tak<span class=\"_ _0\"></span>e account of<span class=\"_ _0\"></span> the expected <span class=\"_ _0\"></span>timing of r<span class=\"_ _0\"></span>ealisation.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDeferredIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-422": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs10d0\">(w<span class=\"_ _0\"></span>) <span class=\"_ _29\"> </span>Retirement bene<span class=\"_ _0\"></span>fit obligations </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10d1\">The expected cost o<span class=\"_ _0\"></span>f pr<span class=\"_ _0\"></span>oviding pensions within <span class=\"_ _0\"></span>the funded defined benefit scheme, det<span class=\"_ _0\"></span>ermined on the basis of<span class=\"_ _0\"></span> annual v<span class=\"_ _0\"></span>aluations by </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10d2\">prof<span class=\"_ _0\"></span>essionally qualified actuaries using <span class=\"_ _0\"></span>the projected unit method, is char<span class=\"_ _0\"></span>ged to <span class=\"_ _0\"></span>the income statement. <span class=\"_ _0\"></span>Actuarial gains and losses are </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10d3\">recognised in <span class=\"_ _0\"></span>full in the period in which <span class=\"_ _0\"></span>they<span class=\"_ _0\"></span> occur and do not<span class=\"_ _0\"></span> form part of<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>esult for<span class=\"_ _1\"></span> the period, being recognised in the S<span class=\"_ _0\"></span>tatement </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10d4\">of Compr<span class=\"_ _0\"></span>ehensive Income.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10d5\">The re<span class=\"_ _0\"></span>tirement benefit oblig<span class=\"_ _0\"></span>ation recognised in the balance shee<span class=\"_ _0\"></span>t repr<span class=\"_ _0\"></span>esents the pr<span class=\"_ _0\"></span>esent v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the defined benefit obligation, as </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10d6\">reduced b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the fair <span class=\"_ _1\"></span>value of scheme assets at <span class=\"_ _0\"></span>the balance sheet date. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10d7\">The expected <span class=\"_ _0\"></span>financing cost of <span class=\"_ _0\"></span>the deficit, as estimated at <span class=\"_ _0\"></span>the beginning of <span class=\"_ _0\"></span>the period is recognised in the r<span class=\"_ _0\"></span>esult f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the period within </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10d8\">interest pa<span class=\"_ _0\"></span>yable. <span class=\"_ _0\"></span>Any<span class=\"_ _0\"></span> variances ag<span class=\"_ _0\"></span>ainst the estimated amount in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear f<span class=\"_ _0\"></span>orm part of<span class=\"_ _0\"></span> the actuarial gain or<span class=\"_ _0\"></span> loss.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10d9\">The charge <span class=\"_ _0\"></span>to the income statement<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> providing pensions under<span class=\"_ _1\"></span> defined contribution pension schemes is equal to the contributions </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gs10da\">payable t<span class=\"_ _0\"></span>o such <span class=\"_ _15\"></span>schemes for the y<span class=\"_ _0\"></span>ear<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForEmployeeBenefitsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-423": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 wsae gs10dc\">(x)  <span class=\"_ _ce\"> </span>Rev<span class=\"_ _0\"></span>enue<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10dd\">The re<span class=\"_ _0\"></span>venue of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup comprises interest<span class=\"_ _0\"></span> receivable and similar<span class=\"_ _1\"></span> charges, operating lease income and other income. <span class=\"_ _1\"></span>The </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10de\">accounting policy<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>ecognition of each element o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>evenue is described separ<span class=\"_ _0\"></span>ately <span class=\"_ _0\"></span>within these accounting policies. </div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForRecognitionOfRevenue",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-424": {
   "value": "(y)   Other income Other income, which is accounted for in accordance with IFRS 15, includes: \u2022   Event-based administration fees charged to borrowers (other than the initial fees included in amortised cost), which are credited when the related service is performed \u2022  Fees charged to third parties for account administration services, which are credited as those services are performed \u2022   Commissions receivable on the sale of insurances, as agent of the third-party insurer, which are taken to profit at the point at which the Group becomes unconditionally entitled to the income \u2022   Maintenance income charged as part of the Group\u2019s contract hire arrangements which is recognised as the services are provided. Costs of these services are deducted in other income \u2022   Broker fees receivable on the arrangement of loans funded by third parties, on an agency basis, which are taken to profit at the point of completion of the related loan ",
   "dimensions": {
    "concept": "paragon:DescriptionOfAccountingPolicyForOtherIncome",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-466": {
   "value": "(y)  <span class=\"_ _45\"> </span>Other<span class=\"_ _0\"></span> <span class=\"_ _15\"></span>income<span class=\"_ _36a\"> </span>Other income, <span class=\"_ _0\"></span>which is accounted for<span class=\"_ _1\"></span> in accordance with IFRS 15, includes:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Event<span class=\"_ _0\"></span>-based administration fees charg<span class=\"_ _0\"></span>ed to borr<span class=\"_ _0\"></span>owers (<span class=\"_ _1\"></span>other than <span class=\"_ _0\"></span>the initial fees included in amortised cost), <span class=\"_ _0\"></span>which are cr<span class=\"_ _0\"></span>edited when the r<span class=\"_ _0\"></span>elated service is performed<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>F<span class=\"_ _0\"></span>ees charged <span class=\"_ _0\"></span>to third parties <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> account administration services, which ar<span class=\"_ _0\"></span>e credited as <span class=\"_ _0\"></span>those services are perf<span class=\"_ _0\"></span>ormed<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Commissions receivable on <span class=\"_ _0\"></span>the sale of insur<span class=\"_ _0\"></span>ances, as agent of<span class=\"_ _0\"></span> the thir<span class=\"_ _0\"></span>d-party insur<span class=\"_ _0\"></span>er<span class=\"_ _1\"></span>, which are <span class=\"_ _0\"></span>taken t<span class=\"_ _0\"></span>o profit at <span class=\"_ _0\"></span>the point at which the Group becomes unconditionally<span class=\"_ _0\"></span> entitled to <span class=\"_ _0\"></span>the income<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Maintenance income charged as part of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s contract hire arrangements <span class=\"_ _0\"></span>which is recognised as <span class=\"_ _0\"></span>the services are pr<span class=\"_ _0\"></span>ovided. Costs of <span class=\"_ _0\"></span>these services are deducted in o<span class=\"_ _0\"></span>ther income<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Broker<span class=\"_ _0\"></span> fees r<span class=\"_ _1\"></span>eceivable on the arrangement o<span class=\"_ _0\"></span>f loans funded b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>third parties, on an agenc<span class=\"_ _0\"></span>y basis, <span class=\"_ _0\"></span>which are tak<span class=\"_ _0\"></span>en to pr<span class=\"_ _0\"></span>ofit at <span class=\"_ _0\"></span>the point of<span class=\"_ _0\"></span> completion of <span class=\"_ _0\"></span>the related loan<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFeeAndCommissionIncomeAndExpenseExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-425": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs10ec\">(z)  <span class=\"_ _29\"> </span>Share based payments<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10ed\">In accordance <span class=\"_ _0\"></span>with IFRS 2 \u2013 \u2018Share-based Payments<span class=\"_ _0\"></span>\u2019<span class=\"_ _2\"></span>, the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue at the date o<span class=\"_ _0\"></span>f grant o<span class=\"_ _0\"></span>f aw<span class=\"_ _0\"></span>ards t<span class=\"_ _0\"></span>o be made in respect of<span class=\"_ _0\"></span> options and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10ee\">shares grant<span class=\"_ _0\"></span>ed under <span class=\"_ _0\"></span>the terms of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _1\"></span>s v<span class=\"_ _0\"></span>arious share based emplo<span class=\"_ _0\"></span>yee incentive arrang<span class=\"_ _0\"></span>ements is charged <span class=\"_ _0\"></span>to the pr<span class=\"_ _0\"></span>ofit and loss </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10ef\">account ov<span class=\"_ _0\"></span>er <span class=\"_ _0\"></span>the period between the date o<span class=\"_ _0\"></span>f grant and <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>esting date.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10f0\">National Insurance on share based pa<span class=\"_ _0\"></span>yments is accrued over<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>vesting period, based on <span class=\"_ _0\"></span>the share price at <span class=\"_ _0\"></span>the balance sheet date.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10f1\">Where <span class=\"_ _0\"></span>the allowable cost o<span class=\"_ _0\"></span>f shar<span class=\"_ _0\"></span>e based awar<span class=\"_ _0\"></span>ds for<span class=\"_ _0\"></span> tax purposes is gr<span class=\"_ _0\"></span>eater <span class=\"_ _0\"></span>than the cost determined in accor<span class=\"_ _0\"></span>dance with IFRS 2, the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10f2\">tax effect of<span class=\"_ _0\"></span> the e<span class=\"_ _0\"></span>xcess is tak<span class=\"_ _0\"></span>en to r<span class=\"_ _0\"></span>eserves. </div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForSharebasedPaymentTransactionsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-426": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 wsaf gs10f4\">(aa<span class=\"_ _0\"></span>) Dividends<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10f5\">In accordance <span class=\"_ _0\"></span>with IAS 10 \u2013 \u2018E<span class=\"_ _0\"></span>vents after<span class=\"_ _0\"></span> the balance sheet date<span class=\"_ _0\"></span>\u2019<span class=\"_ _2\"></span>, dividends payable on or<span class=\"_ _0\"></span>dinary shar<span class=\"_ _0\"></span>es are r<span class=\"_ _0\"></span>ecognised in equity once </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10f6\">they<span class=\"_ _0\"></span> are appr<span class=\"_ _0\"></span>opriately authorised and ar<span class=\"_ _0\"></span>e no longer<span class=\"_ _0\"></span> at the discr<span class=\"_ _0\"></span>etion of <span class=\"_ _0\"></span>the Company<span class=\"_ _1\"></span>. Dividends declared after <span class=\"_ _0\"></span>the balance sheet </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10f7\">date, but befor<span class=\"_ _0\"></span>e the authorisation of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>financial statements remain <span class=\"_ _0\"></span>within shareholders<span class=\"_ _0\"></span>\u2019 funds. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10f8\">Howe<span class=\"_ _0\"></span>ver<span class=\"_ _1\"></span>, such dividends are deducted fr<span class=\"_ _0\"></span>om regulat<span class=\"_ _0\"></span>ory capital fr<span class=\"_ _0\"></span>om the point at <span class=\"_ _0\"></span>which the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e announced, and capital disclosures ar<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10f9\">prepar<span class=\"_ _0\"></span>ed on this basis.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDividendsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-427": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs10fb\">(bb) <span class=\"_ _9\"> </span>F<span class=\"_ _0\"></span>oreign currenc<span class=\"_ _0\"></span>y<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10fc\">F<span class=\"_ _1\"></span>oreign currency<span class=\"_ _0\"></span> transactions, asse<span class=\"_ _0\"></span>ts and liabilities are accounted <span class=\"_ _0\"></span>for in accor<span class=\"_ _0\"></span>dance with IAS 21 \u2013 \u2018T<span class=\"_ _0\"></span>he Effects of<span class=\"_ _0\"></span> Changes in F<span class=\"_ _1\"></span>oreign </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10fd\">Exchange Rat<span class=\"_ _0\"></span>es\u2019<span class=\"_ _2f\"></span>. The functional curr<span class=\"_ _0\"></span>ency<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the Company and all o<span class=\"_ _0\"></span>f the o<span class=\"_ _0\"></span>ther entities in <span class=\"_ _0\"></span>the Group is the pound st<span class=\"_ _0\"></span>erling. T<span class=\"_ _2\"></span>ransactions </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10fe\">which are not<span class=\"_ _0\"></span> denominated in sterling are <span class=\"_ _0\"></span>translated into sterling at <span class=\"_ _0\"></span>the spot rate of<span class=\"_ _0\"></span> ex<span class=\"_ _0\"></span>change on the date of<span class=\"_ _1\"></span> transaction. Monetary </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs10ff\">assets and liabilities which ar<span class=\"_ _0\"></span>e not denominated in sterling ar<span class=\"_ _0\"></span>e translated at<span class=\"_ _0\"></span> the closing rate on <span class=\"_ _0\"></span>the balance sheet date.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1100\">Gains and losses on retr<span class=\"_ _0\"></span>anslation are included in inter<span class=\"_ _0\"></span>est payable or<span class=\"_ _0\"></span> inter<span class=\"_ _0\"></span>est receiv<span class=\"_ _0\"></span>able depending on whether<span class=\"_ _0\"></span> the underlying </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1101\">instrument is an asset or<span class=\"_ _0\"></span> a liability<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForForeignCurrencyTranslationExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-467": {
   "value": "(bb) <span class=\"_ _9\"> </span>F<span class=\"_ _0\"></span>oreign currenc<span class=\"_ _0\"></span>y<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>oreign currency<span class=\"_ _0\"></span> transactions, asse<span class=\"_ _0\"></span>ts and liabilities are accounted <span class=\"_ _0\"></span>for in accor<span class=\"_ _0\"></span>dance with IAS 21 \u2013 \u2018T<span class=\"_ _0\"></span>he Effects of<span class=\"_ _0\"></span> Changes in F<span class=\"_ _1\"></span>oreign Exchange Rat<span class=\"_ _0\"></span>es\u2019<span class=\"_ _2f\"></span>. The functional curr<span class=\"_ _0\"></span>ency<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the Company and all o<span class=\"_ _0\"></span>f the o<span class=\"_ _0\"></span>ther entities in <span class=\"_ _0\"></span>the Group is the pound st<span class=\"_ _0\"></span>erling. T<span class=\"_ _2\"></span>ransactions which are not<span class=\"_ _0\"></span> denominated in sterling are <span class=\"_ _0\"></span>translated into sterling at <span class=\"_ _0\"></span>the spot rate of<span class=\"_ _0\"></span> ex<span class=\"_ _0\"></span>change on the date of<span class=\"_ _1\"></span> transaction. Monetary assets and liabilities which ar<span class=\"_ _0\"></span>e not denominated in sterling ar<span class=\"_ _0\"></span>e translated at<span class=\"_ _0\"></span> the closing rate on <span class=\"_ _0\"></span>the balance sheet date.<span class=\"_ _36a\"> </span>Gains and losses on retr<span class=\"_ _0\"></span>anslation are included in inter<span class=\"_ _0\"></span>est payable or<span class=\"_ _0\"></span> inter<span class=\"_ _0\"></span>est receiv<span class=\"_ _0\"></span>able depending on whether<span class=\"_ _0\"></span> the underlying instrument is an asset or<span class=\"_ _0\"></span> a liability<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFunctionalCurrencyExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-428": {
   "value": "<div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs1103\">(cc<span class=\"_ _1\"></span>) <span class=\"_ _11\"> </span>Segmental reporting<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1104\">The accounting policies of<span class=\"_ _0\"></span> the segments ar<span class=\"_ _0\"></span>e the same as those described abo<span class=\"_ _0\"></span>ve f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the Group as a whole. Int<span class=\"_ _0\"></span>erest pay<span class=\"_ _0\"></span>able by<span class=\"_ _0\"></span> each </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1105\">segment includes directly<span class=\"_ _0\"></span> attributable funding and <span class=\"_ _0\"></span>the allocated cost of<span class=\"_ _0\"></span> retail deposit <span class=\"_ _0\"></span>funds utilised. Costs attributed to each segment </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1106\">repr<span class=\"_ _0\"></span>esent the dir<span class=\"_ _0\"></span>ect costs incurred b<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>the segment operations.</div>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForSegmentReportingExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-429": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs1108\">68. <span class=\"_ _96\"></span>Critical accounting judg<span class=\"_ _0\"></span>ements<span class=\"_ _36a\"> </span></div><div class=\"t m1 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1109\">The most significant judgements <span class=\"_ _0\"></span>which the dir<span class=\"_ _0\"></span>ectors hav<span class=\"_ _0\"></span>e made in the application of<span class=\"_ _0\"></span> the accounting policies set out in no<span class=\"_ _0\"></span>te 67 relate <span class=\"_ _0\"></span>to:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs110a\">(a<span class=\"_ _0\"></span>) <span class=\"_ _1\"></span> <span class=\"_ _45\"> </span>Significant Increase in Credit Risk (\u2018SICR\u2019)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs110b\">Under IFRS 9<span class=\"_ _0\"></span>, the dir<span class=\"_ _0\"></span>ectors are r<span class=\"_ _0\"></span>equired <span class=\"_ _0\"></span>to assess wher<span class=\"_ _0\"></span>e a credit obligation has suff<span class=\"_ _0\"></span>ered a Significant Incr<span class=\"_ _0\"></span>ease in Credit Risk<span class=\"_ _0\"></span> (\u2018SICR\u2019). </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs110c\">The direct<span class=\"_ _0\"></span>ors\u2019 assessment is based primarily<span class=\"_ _0\"></span> on changes in the calculated PD<span class=\"_ _1\"></span>, but also includes consideration of other<span class=\"_ _0\"></span> qualitative </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs110d\">indicators and the adop<span class=\"_ _0\"></span>tion of <span class=\"_ _0\"></span>the backstop assumption in the S<span class=\"_ _0\"></span>tandard that all cases <span class=\"_ _0\"></span>which are mor<span class=\"_ _0\"></span>e than 30 da<span class=\"_ _0\"></span>ys ov<span class=\"_ _0\"></span>erdue hav<span class=\"_ _0\"></span>e an </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs110e\">SICR, for<span class=\"_ _0\"></span> account types <span class=\"_ _0\"></span>where da<span class=\"_ _0\"></span>ys ov<span class=\"_ _0\"></span>erdue is an appr<span class=\"_ _0\"></span>opriate measure.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs110f\">As part of<span class=\"_ _0\"></span> its consideration of <span class=\"_ _0\"></span>the adequacy<span class=\"_ _0\"></span> of its impairment pr<span class=\"_ _0\"></span>ovisioning, manag<span class=\"_ _0\"></span>ement have consider<span class=\"_ _0\"></span>ed whether<span class=\"_ _1\"></span> there are an<span class=\"_ _0\"></span>y </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1110\">factors not r<span class=\"_ _0\"></span>eflected in its normal appr<span class=\"_ _0\"></span>oach which indicate <span class=\"_ _0\"></span>that a group, or<span class=\"_ _0\"></span> groups of<span class=\"_ _1\"></span> accounts should be considered as having an </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1111\">SICR. No such accounts wer<span class=\"_ _1\"></span>e identified.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1112\">If additional accounts <span class=\"_ _0\"></span>were de<span class=\"_ _0\"></span>termined to hav<span class=\"_ _0\"></span>e an SICR, these balances <span class=\"_ _0\"></span>would attract additional impairment pr<span class=\"_ _0\"></span>ovision, as such cases </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1113\">are pr<span class=\"_ _0\"></span>ovided on the basis o<span class=\"_ _0\"></span>f life<span class=\"_ _0\"></span>time expected loss, rather<span class=\"_ _0\"></span> than 12<span class=\"_ _0\"></span>-month expected loss, and the o<span class=\"_ _0\"></span>verall pr<span class=\"_ _0\"></span>ovision charge <span class=\"_ _0\"></span>would be </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1114\">higher<span class=\"_ _1\"></span>. Conversely<span class=\"_ _1\"></span>, if cases are incorr<span class=\"_ _0\"></span>ectly identified as SICR, impairment pr<span class=\"_ _0\"></span>ovisions will be o<span class=\"_ _0\"></span>verstated. F<span class=\"_ _1\"></span>urthermore, adjustments to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1115\">current PD estimates in <span class=\"_ _0\"></span>the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s models may also ha<span class=\"_ _0\"></span>ve the eff<span class=\"_ _0\"></span>ect of<span class=\"_ _0\"></span> identifying more or<span class=\"_ _0\"></span> less accounts as having an SICR.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1116\">More inf<span class=\"_ _0\"></span>ormation on the definition of<span class=\"_ _0\"></span> SICR adopted is given in no<span class=\"_ _0\"></span>te 21.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs1117\">(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Definition of<span class=\"_ _0\"></span> default<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1118\">In applying the impairment pr<span class=\"_ _0\"></span>ovisions of<span class=\"_ _0\"></span> IFRS 9, <span class=\"_ _0\"></span>the directors hav<span class=\"_ _0\"></span>e used models to deriv<span class=\"_ _0\"></span>e the pr<span class=\"_ _0\"></span>obabilities of default. In or<span class=\"_ _0\"></span>der <span class=\"_ _0\"></span>to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1119\">derive and apply<span class=\"_ _0\"></span> such models, it is requir<span class=\"_ _0\"></span>ed to define \u2018<span class=\"_ _1\"></span>default\u2019 for <span class=\"_ _0\"></span>this purpose. T<span class=\"_ _0\"></span>he Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s definition of default<span class=\"_ _0\"></span> is aligned to its </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs111a\">internal operational pr<span class=\"_ _0\"></span>ocedures. IFRS 9 pro<span class=\"_ _0\"></span>vides a rebuttable pr<span class=\"_ _0\"></span>esumption of def<span class=\"_ _0\"></span>ault when an account is 90 day<span class=\"_ _0\"></span>s ov<span class=\"_ _0\"></span>erdue, and this </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs111b\">was used as <span class=\"_ _0\"></span>the starting point for<span class=\"_ _0\"></span> this ex<span class=\"_ _0\"></span>ercise. Other<span class=\"_ _0\"></span> factors include account<span class=\"_ _0\"></span> management activities such as appointment of<span class=\"_ _0\"></span> a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs111c\">receiv<span class=\"_ _0\"></span>er or<span class=\"_ _0\"></span> enforcement<span class=\"_ _0\"></span> procedur<span class=\"_ _0\"></span>es.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs111d\">A combination o<span class=\"_ _0\"></span>f qualitative and quantitativ<span class=\"_ _0\"></span>e measures <span class=\"_ _0\"></span>was consider<span class=\"_ _0\"></span>ed in developing <span class=\"_ _0\"></span>the definition of<span class=\"_ _0\"></span> default. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs111e\">If a diff<span class=\"_ _0\"></span>erent definition of<span class=\"_ _0\"></span> default had been adopt<span class=\"_ _0\"></span>ed the expected loss amounts deriv<span class=\"_ _0\"></span>ed might differ<span class=\"_ _0\"></span> from <span class=\"_ _0\"></span>those shown in the accounts.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs111f\">More inf<span class=\"_ _0\"></span>ormation on the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s definition of de<span class=\"_ _0\"></span>fault adopted is given in no<span class=\"_ _0\"></span>te 21.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs1120\">(c<span class=\"_ _1\"></span>)  <span class=\"_ _29\"> </span>Classification of financial assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1121\">The classification of<span class=\"_ _0\"></span> financial assets under<span class=\"_ _0\"></span> IFRS 9 is based on two fact<span class=\"_ _0\"></span>ors:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1122\">\u2022 <span class=\"_ _13\"> </span>The company\u2019<span class=\"_ _1\"></span>s \u2018business model\u2019 \u2013 how it intends <span class=\"_ _0\"></span>to generate cash and pr<span class=\"_ _0\"></span>ofit fr<span class=\"_ _0\"></span>om the assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1123\">\u2022 <span class=\"_ _13\"> </span>The nature of<span class=\"_ _0\"></span> the contractual cash <span class=\"_ _0\"></span>flows inher<span class=\"_ _0\"></span>ent in the assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1124\">Financial assets are classified as held at<span class=\"_ _0\"></span> amortised cost, at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue through OCI<span class=\"_ _0\"></span>, or at <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value <span class=\"_ _0\"></span>through pro<span class=\"_ _0\"></span>fit and loss.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1125\">F<span class=\"_ _1\"></span>or an asset to be held at<span class=\"_ _0\"></span> amortised cost, the cash flo<span class=\"_ _0\"></span>ws receiv<span class=\"_ _0\"></span>ed fr<span class=\"_ _0\"></span>om it must comprise solely pa<span class=\"_ _0\"></span>yments of principal and inter<span class=\"_ _0\"></span>est </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1126\">(\u2018SPPI\u2019). In effect, <span class=\"_ _0\"></span>this restricts this classification <span class=\"_ _0\"></span>to \u2018normal\u2019 lending activities, ex<span class=\"_ _0\"></span>cluding arrangements wher<span class=\"_ _0\"></span>e the lender<span class=\"_ _0\"></span> may<span class=\"_ _0\"></span> have a </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1127\">contingent r<span class=\"_ _0\"></span>eturn or pr<span class=\"_ _0\"></span>ofit shar<span class=\"_ _0\"></span>e from <span class=\"_ _0\"></span>the activities funded. <span class=\"_ _0\"></span>The Group has consider<span class=\"_ _0\"></span>ed its products and concluded <span class=\"_ _0\"></span>that, as standard </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1128\">lending products, <span class=\"_ _0\"></span>they<span class=\"_ _0\"></span> fall within <span class=\"_ _0\"></span>the SPPI criteria.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1129\">This is because all the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s lending arrangements involve <span class=\"_ _0\"></span>the advancing of<span class=\"_ _0\"></span> amounts to cust<span class=\"_ _0\"></span>omers, either as loans or<span class=\"_ _0\"></span> finance lease </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs112a\">products and <span class=\"_ _0\"></span>the receipt o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>epayments of<span class=\"_ _0\"></span> principal and charges, wher<span class=\"_ _0\"></span>e those charg<span class=\"_ _0\"></span>es are calculated based on <span class=\"_ _0\"></span>the amount loaned. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs112b\">There ar<span class=\"_ _0\"></span>e no \u2018success <span class=\"_ _0\"></span>fee\u2019 or<span class=\"_ _0\"></span> other<span class=\"_ _0\"></span> compensation arrangements not link<span class=\"_ _0\"></span>ed to <span class=\"_ _0\"></span>the loan principal.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs112c\">The use of<span class=\"_ _0\"></span> amortised cost accounting is also restricted <span class=\"_ _0\"></span>to assets which a compan<span class=\"_ _0\"></span>y holds <span class=\"_ _0\"></span>within a business model whose object is t<span class=\"_ _0\"></span>o </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs112d\">collect cash flow<span class=\"_ _0\"></span>s arising fr<span class=\"_ _0\"></span>om them, rather<span class=\"_ _0\"></span> than seek <span class=\"_ _0\"></span>to pro<span class=\"_ _0\"></span>fit by disposing o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>them (a \u2018Held to Collect\u2019 model). <span class=\"_ _1\"></span>The Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s strategy </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs112e\">is to hold loan assets until <span class=\"_ _0\"></span>they<span class=\"_ _0\"></span> are r<span class=\"_ _0\"></span>epaid or <span class=\"_ _0\"></span>written off<span class=\"_ _0\"></span>. Loan disposals are r<span class=\"_ _0\"></span>are, and <span class=\"_ _0\"></span>the Group does not manag<span class=\"_ _0\"></span>e its assets in order<span class=\"_ _0\"></span> to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs112f\">generate pr<span class=\"_ _0\"></span>ofits on sale. On this basis, it<span class=\"_ _0\"></span> has categorised its business model as Held to Collect.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1130\">There<span class=\"_ _0\"></span>fore, <span class=\"_ _0\"></span>the Group has classified its customer<span class=\"_ _0\"></span> loan assets as carried at amortised cost. <span class=\"_ _0\"></span>There <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e no significant changes in the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1131\">nature of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s products, nor in the business models in <span class=\"_ _0\"></span>which the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e held, during the <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs1133\">69<span class=\"_ _0\"></span>. <span class=\"_ _1c\"></span>Critical accounting estimates<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1134\">Certain balances reported in <span class=\"_ _0\"></span>the financial statements ar<span class=\"_ _0\"></span>e based wholly<span class=\"_ _0\"></span> or in part on estimates or<span class=\"_ _0\"></span> assumptions made by<span class=\"_ _1\"></span> the directors. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1135\">There is, <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore, a potential risk<span class=\"_ _0\"></span> that <span class=\"_ _0\"></span>they ma<span class=\"_ _0\"></span>y be subject <span class=\"_ _0\"></span>to change in futur<span class=\"_ _0\"></span>e periods. T<span class=\"_ _0\"></span>he most important of<span class=\"_ _0\"></span> these, those <span class=\"_ _0\"></span>which </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1136\">could, if r<span class=\"_ _0\"></span>evised significantly<span class=\"_ _0\"></span> in the next <span class=\"_ _0\"></span>financial y<span class=\"_ _0\"></span>ear<span class=\"_ _0\"></span>, have a mat<span class=\"_ _0\"></span>erial impact on the carrying amounts of<span class=\"_ _0\"></span> assets or liabilities ar<span class=\"_ _0\"></span>e:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs1137\">(a<span class=\"_ _0\"></span>) <span class=\"_ _1\"></span> <span class=\"_ _45\"> </span>Impairment losses on loans to customers<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1138\">Impairment losses on loans are calculat<span class=\"_ _0\"></span>ed based on statistical models, applied to the pr<span class=\"_ _0\"></span>esent status, performance and manag<span class=\"_ _0\"></span>ement </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1139\">strategy<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> the loans concerned <span class=\"_ _0\"></span>which are used t<span class=\"_ _0\"></span>o determine each loan\u2019<span class=\"_ _1\"></span>s PD and L<span class=\"_ _0\"></span>GD.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs113a\">Internal information used <span class=\"_ _0\"></span>will include number of<span class=\"_ _0\"></span> months arrears, qualitativ<span class=\"_ _0\"></span>e information, such as possession by<span class=\"_ _0\"></span> a first char<span class=\"_ _0\"></span>ge holder </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs113b\">on a second charge mortgag<span class=\"_ _0\"></span>e or <span class=\"_ _0\"></span>where a buy-<span class=\"_ _0\"></span>to-let case is under<span class=\"_ _0\"></span> the control o<span class=\"_ _0\"></span>f a r<span class=\"_ _0\"></span>eceiver o<span class=\"_ _0\"></span>f r<span class=\"_ _0\"></span>ent, the r<span class=\"_ _0\"></span>eceiver\u2019<span class=\"_ _1\"></span>s present and likely<span class=\"_ _1\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs113c\">future strat<span class=\"_ _0\"></span>egy f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>the property<span class=\"_ _0\"></span> (which might include k<span class=\"_ _0\"></span>eeping current <span class=\"_ _0\"></span>tenants in place, refurbish and r<span class=\"_ _0\"></span>elet, immediate sale etc<span class=\"_ _0\"></span>). </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs113d\">External information used includes customer<span class=\"_ _0\"></span> specific data, such as credit bur<span class=\"_ _0\"></span>eau information as <span class=\"_ _0\"></span>well as more g<span class=\"_ _0\"></span>eneral economic data.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs113e\">Ke<span class=\"_ _0\"></span>y internal assumptions in <span class=\"_ _0\"></span>the models relate <span class=\"_ _0\"></span>to estimates of<span class=\"_ _0\"></span> future cash <span class=\"_ _0\"></span>flows <span class=\"_ _0\"></span>from customers<span class=\"_ _0\"></span>\u2019 accounts, their<span class=\"_ _0\"></span> timing and, <span class=\"_ _0\"></span>for </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs113f\">secured accounts, <span class=\"_ _0\"></span>the expected proceeds <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the realisation of<span class=\"_ _0\"></span> the pr<span class=\"_ _0\"></span>operty or<span class=\"_ _0\"></span> other char<span class=\"_ _0\"></span>ged assets. <span class=\"_ _0\"></span>These cash flow<span class=\"_ _0\"></span>s will include </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1140\">payments r<span class=\"_ _0\"></span>eceived fr<span class=\"_ _0\"></span>om the customer<span class=\"_ _1\"></span>, and, for<span class=\"_ _0\"></span> buy-to-let<span class=\"_ _0\"></span> cases where a r<span class=\"_ _0\"></span>eceiver<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> rent is appointed, r<span class=\"_ _0\"></span>ental receipts <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>tenants, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1141\">after allo<span class=\"_ _0\"></span>wing for<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>oid periods and running costs. These k<span class=\"_ _0\"></span>ey<span class=\"_ _0\"></span> assumptions ar<span class=\"_ _0\"></span>e based on observed data fr<span class=\"_ _0\"></span>om historical patterns and are </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1142\">updated regularly<span class=\"_ _0\"></span> based on new<span class=\"_ _0\"></span> data as it becomes available. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1143\">In addition, the dir<span class=\"_ _0\"></span>ectors consider ho<span class=\"_ _0\"></span>w appr<span class=\"_ _0\"></span>opriate past tr<span class=\"_ _0\"></span>ends and patterns might be in the curr<span class=\"_ _0\"></span>ent economic situation and make an<span class=\"_ _0\"></span>y </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1144\">adjustments the<span class=\"_ _0\"></span>y belie<span class=\"_ _0\"></span>ve are necessary<span class=\"_ _0\"></span> to r<span class=\"_ _0\"></span>eflect curr<span class=\"_ _0\"></span>ent and expected conditions.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1145\">In ev<span class=\"_ _0\"></span>aluating the potential impact o<span class=\"_ _0\"></span>f the economic situation at<span class=\"_ _0\"></span> 30 September 2023 <span class=\"_ _0\"></span>there is little r<span class=\"_ _0\"></span>ecent history<span class=\"_ _0\"></span> against which <span class=\"_ _0\"></span>to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1146\">benchmark likely<span class=\"_ _0\"></span> customer<span class=\"_ _0\"></span> behaviour<span class=\"_ _1\"></span>. Interest rates ha<span class=\"_ _0\"></span>ve risen to higher<span class=\"_ _0\"></span> lev<span class=\"_ _0\"></span>els, at a more rapid r<span class=\"_ _0\"></span>ate than at an<span class=\"_ _0\"></span>y time in r<span class=\"_ _0\"></span>ecent history<span class=\"_ _1\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1147\">UK base rates had r<span class=\"_ _0\"></span>eached 5.25% at the balance sheet<span class=\"_ _0\"></span> date, a level <span class=\"_ _0\"></span>they<span class=\"_ _0\"></span> had not t<span class=\"_ _0\"></span>ouched since April 2008, since <span class=\"_ _0\"></span>when significant </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1148\">regulatory<span class=\"_ _0\"></span> intervention in <span class=\"_ _0\"></span>the UK\u2019<span class=\"_ _1\"></span>s lending markets has tak<span class=\"_ _0\"></span>en place. T<span class=\"_ _0\"></span>here hav<span class=\"_ _0\"></span>e also been significant changes in product<span class=\"_ _0\"></span> structures in </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1149\">that period, including the gr<span class=\"_ _0\"></span>owth of<span class=\"_ _0\"></span> longer<span class=\"_ _0\"></span> term fix<span class=\"_ _0\"></span>ed-rate mortgag<span class=\"_ _0\"></span>e lending in recent <span class=\"_ _0\"></span>years. <span class=\"_ _0\"></span>All of <span class=\"_ _0\"></span>these make <span class=\"_ _0\"></span>the historical recor<span class=\"_ _0\"></span>d of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs114a\">behaviours in higher<span class=\"_ _0\"></span> interest r<span class=\"_ _0\"></span>ate environments an uncertain guide <span class=\"_ _0\"></span>to the lik<span class=\"_ _0\"></span>ely impact o<span class=\"_ _0\"></span>f curr<span class=\"_ _0\"></span>ent rate lev<span class=\"_ _0\"></span>els.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs114b\">There is also little agr<span class=\"_ _0\"></span>eement between economic <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span>ecasters as to <span class=\"_ _0\"></span>the future dir<span class=\"_ _0\"></span>ection of<span class=\"_ _0\"></span> the UK econom<span class=\"_ _0\"></span>y<span class=\"_ _0\"></span>, exacerbated by<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs114c\">potential impact of<span class=\"_ _0\"></span> the g<span class=\"_ _0\"></span>eneral election which must be held <span class=\"_ _0\"></span>within the next eighteen months. <span class=\"_ _1\"></span>At the same time, <span class=\"_ _0\"></span>the lev<span class=\"_ _0\"></span>el to <span class=\"_ _0\"></span>which </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs114d\">economic pressur<span class=\"_ _0\"></span>es on customers hav<span class=\"_ _0\"></span>e ye<span class=\"_ _0\"></span>t to manifest<span class=\"_ _0\"></span> themselves in cr<span class=\"_ _0\"></span>edit metrics is still unclear<span class=\"_ _1\"></span>, with credit perf<span class=\"_ _0\"></span>ormance across </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs114e\">the markets in <span class=\"_ _0\"></span>which the Gr<span class=\"_ _0\"></span>oup is active being better<span class=\"_ _0\"></span> than some expected o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> the past <span class=\"_ _0\"></span>year<span class=\"_ _1\"></span>, but considerable uncertainty as <span class=\"_ _0\"></span>to </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs114f\">whether <span class=\"_ _0\"></span>this repr<span class=\"_ _0\"></span>esents a more benign outcome, or<span class=\"_ _0\"></span> merely<span class=\"_ _0\"></span> a delay<span class=\"_ _0\"></span> in credit issues emerging be<span class=\"_ _0\"></span>yond <span class=\"_ _0\"></span>what w<span class=\"_ _0\"></span>as anticipated. T<span class=\"_ _2f\"></span>ogether<span class=\"_ _0\"></span>, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1150\">these factors mak<span class=\"_ _0\"></span>e f<span class=\"_ _0\"></span>orecasting credit<span class=\"_ _0\"></span> behaviour in curr<span class=\"_ _0\"></span>ent conditions particularly challenging<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1151\">The accuracy<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the impairment calculations <span class=\"_ _0\"></span>would ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e be affected by<span class=\"_ _0\"></span> unexpected changes <span class=\"_ _0\"></span>to the economic situation, <span class=\"_ _0\"></span>variances </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1152\">between <span class=\"_ _0\"></span>the models used and the actual results, or<span class=\"_ _1\"></span> assumptions which differ<span class=\"_ _0\"></span> from <span class=\"_ _0\"></span>the actual outcomes. In particular<span class=\"_ _1\"></span>, if the impact </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1153\">of economic <span class=\"_ _0\"></span>factors such as emplo<span class=\"_ _0\"></span>yment levels on cust<span class=\"_ _0\"></span>omers is worse <span class=\"_ _0\"></span>than is implicit in the model <span class=\"_ _0\"></span>then the number<span class=\"_ _0\"></span> of accounts </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1154\">requiring pr<span class=\"_ _0\"></span>ovision might be gr<span class=\"_ _0\"></span>eater <span class=\"_ _0\"></span>than suggested by<span class=\"_ _1\"></span> the model, while falls in house prices, o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> and above any<span class=\"_ _1\"></span> assumed by </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1155\">the model might increase <span class=\"_ _0\"></span>the pro<span class=\"_ _0\"></span>vision requir<span class=\"_ _0\"></span>ed in respect of<span class=\"_ _0\"></span> accounts currently<span class=\"_ _0\"></span> pro<span class=\"_ _0\"></span>vided. Similarly<span class=\"_ _0\"></span>, if <span class=\"_ _0\"></span>the account management </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1156\">approach assumed in <span class=\"_ _0\"></span>the modelling cannot be adopted <span class=\"_ _0\"></span>the provision r<span class=\"_ _0\"></span>equired ma<span class=\"_ _0\"></span>y be differ<span class=\"_ _0\"></span>ent.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1157\">In order<span class=\"_ _0\"></span> to pr<span class=\"_ _0\"></span>ovide f<span class=\"_ _0\"></span>orward looking economic inputs <span class=\"_ _0\"></span>to the modelling o<span class=\"_ _0\"></span>f the E<span class=\"_ _0\"></span>CL, the Gr<span class=\"_ _0\"></span>oup must derive a set<span class=\"_ _0\"></span> of scenarios <span class=\"_ _0\"></span>which are </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1158\">internally coher<span class=\"_ _0\"></span>ent. T<span class=\"_ _0\"></span>he Group addr<span class=\"_ _0\"></span>esses these r<span class=\"_ _0\"></span>equirements using f<span class=\"_ _0\"></span>our distinct economic scenarios chosen <span class=\"_ _0\"></span>to repr<span class=\"_ _0\"></span>esent the rang<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1159\">of possible out<span class=\"_ _0\"></span>comes. These scenarios at 30 Sep<span class=\"_ _0\"></span>tember 2023 ha<span class=\"_ _0\"></span>ve been derived in light o<span class=\"_ _0\"></span>f the curr<span class=\"_ _0\"></span>ent economic situation, at <span class=\"_ _0\"></span>that </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs115a\">date, modelling a v<span class=\"_ _0\"></span>ariety o<span class=\"_ _0\"></span>f possible outcomes as described in not<span class=\"_ _0\"></span>e 24. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs115b\">As noted abov<span class=\"_ _0\"></span>e, ther<span class=\"_ _0\"></span>e remains a significant rang<span class=\"_ _0\"></span>e of diff<span class=\"_ _0\"></span>erent opinions amongst economists about <span class=\"_ _0\"></span>the longer<span class=\"_ _0\"></span>-term pr<span class=\"_ _0\"></span>ospects for<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs115c\">the UK, although these hav<span class=\"_ _0\"></span>e conver<span class=\"_ _0\"></span>ged, to some ext<span class=\"_ _0\"></span>ent, over<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>twelve months since 30 September<span class=\"_ _1\"></span> 2022, when the impact of<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs115d\">September<span class=\"_ _0\"></span> 2022 mini-budget had significantly<span class=\"_ _0\"></span> broadened the r<span class=\"_ _0\"></span>ange of<span class=\"_ _0\"></span> plausible outcomes.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs115e\">The v<span class=\"_ _0\"></span>ariables are used <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>two purposes in <span class=\"_ _0\"></span>the IFRS 9 calculations:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs115f\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>They<span class=\"_ _0\"></span> are applied as inputs in the models <span class=\"_ _0\"></span>which generate PD <span class=\"_ _0\"></span>values, <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>those found by<span class=\"_ _1\"></span> statistical analysis to have <span class=\"_ _0\"></span>the most </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1160\">predictiv<span class=\"_ _0\"></span>e v<span class=\"_ _0\"></span>alue are used<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1161\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>They<span class=\"_ _0\"></span> are used as part of<span class=\"_ _0\"></span> the calculation <span class=\"_ _0\"></span>where the <span class=\"_ _0\"></span>variable has a dir<span class=\"_ _0\"></span>ect impact on the e<span class=\"_ _0\"></span>xpected loss calculation, such as the house </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1162\">price index<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1163\">The economic v<span class=\"_ _0\"></span>ariables will also inf<span class=\"_ _0\"></span>orm assumptions about the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s approach to account manag<span class=\"_ _0\"></span>ement given a particular<span class=\"_ _0\"></span> scenario.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1164\">In addition to uncertainty<span class=\"_ _0\"></span> repr<span class=\"_ _0\"></span>esented by<span class=\"_ _0\"></span> the economic scenarios, <span class=\"_ _0\"></span>the Group recognises <span class=\"_ _0\"></span>that economic situations can arise which </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1165\">lie outside the rang<span class=\"_ _0\"></span>e of pot<span class=\"_ _0\"></span>ential positions considered as a basis f<span class=\"_ _0\"></span>or its IFRS 9 approach <span class=\"_ _0\"></span>to impairment when <span class=\"_ _0\"></span>the current models </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1166\">wer<span class=\"_ _0\"></span>e built. The curr<span class=\"_ _0\"></span>ent f<span class=\"_ _0\"></span>orecast scenarios, <span class=\"_ _0\"></span>which include higher rates o<span class=\"_ _0\"></span>f inter<span class=\"_ _0\"></span>est and inflation than in <span class=\"_ _0\"></span>the historically observ<span class=\"_ _0\"></span>ed data, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1167\">repr<span class=\"_ _0\"></span>esent situations wher<span class=\"_ _0\"></span>e its models may<span class=\"_ _0\"></span> not be able to <span class=\"_ _0\"></span>fully allow<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> potential economic impacts on its loan portfolios. It<span class=\"_ _0\"></span> there<span class=\"_ _0\"></span>fore </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1168\">assessed, for<span class=\"_ _0\"></span> each class of<span class=\"_ _0\"></span> asset, whether<span class=\"_ _0\"></span> any<span class=\"_ _0\"></span> adjustment to <span class=\"_ _0\"></span>the normal approach w<span class=\"_ _0\"></span>as requir<span class=\"_ _0\"></span>ed to ensur<span class=\"_ _0\"></span>e sufficient pro<span class=\"_ _0\"></span>vision </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1169\">was cr<span class=\"_ _0\"></span>eated and also re<span class=\"_ _0\"></span>viewed o<span class=\"_ _0\"></span>ther av<span class=\"_ _0\"></span>ailable data, both fr<span class=\"_ _0\"></span>om account performance and customer<span class=\"_ _0\"></span> feedback <span class=\"_ _0\"></span>to f<span class=\"_ _0\"></span>orm a view<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs116a\">underlying reasons <span class=\"_ _0\"></span>for observ<span class=\"_ _0\"></span>ed customer beha<span class=\"_ _0\"></span>viours and of <span class=\"_ _0\"></span>their <span class=\"_ _0\"></span>future intentions and pr<span class=\"_ _0\"></span>ospects.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs116c\">As a result o<span class=\"_ _0\"></span>f this e<span class=\"_ _0\"></span>xer<span class=\"_ _0\"></span>cise additional requir<span class=\"_ _0\"></span>ements for<span class=\"_ _0\"></span> provision <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e identified, to compensate <span class=\"_ _0\"></span>for po<span class=\"_ _0\"></span>tential model weakness and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs116d\">to allow<span class=\"_ _0\"></span> for<span class=\"_ _0\"></span> economic pressur<span class=\"_ _0\"></span>es in the wider<span class=\"_ _1\"></span> economy which cannot<span class=\"_ _0\"></span> be identified by a modelled appr<span class=\"_ _0\"></span>oach. By<span class=\"_ _0\"></span> their natur<span class=\"_ _0\"></span>e such </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs116e\">adjustments are less s<span class=\"_ _0\"></span>ystematic and <span class=\"_ _0\"></span>therefor<span class=\"_ _0\"></span>e subject to a <span class=\"_ _0\"></span>wider r<span class=\"_ _0\"></span>ange of<span class=\"_ _0\"></span> outturns. The natur<span class=\"_ _0\"></span>e and amounts of<span class=\"_ _0\"></span> these judgemental </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs116f\">adjustments are set out<span class=\"_ _0\"></span> in note 21.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1170\">The position after<span class=\"_ _0\"></span> considering all these matters is set out<span class=\"_ _0\"></span> in notes 21 to 23, <span class=\"_ _0\"></span>together<span class=\"_ _0\"></span> with <span class=\"_ _0\"></span>further information on <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s approach. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1171\">The economic scenarios described abov<span class=\"_ _0\"></span>e and their<span class=\"_ _0\"></span> impact on the ov<span class=\"_ _0\"></span>erall pro<span class=\"_ _0\"></span>vision are set<span class=\"_ _0\"></span> out in note 24, <span class=\"_ _0\"></span>while sensitivity analy<span class=\"_ _0\"></span>ses on </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1172\">impairment pro<span class=\"_ _0\"></span>visioning are set out<span class=\"_ _0\"></span> in note 25.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs1173\">(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Effectiv<span class=\"_ _0\"></span>e interest r<span class=\"_ _0\"></span>ates<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1174\">In order<span class=\"_ _0\"></span> to det<span class=\"_ _0\"></span>ermine the EIR applicable to loans and borr<span class=\"_ _0\"></span>owings an estimate must be made of<span class=\"_ _0\"></span> the expected lif<span class=\"_ _0\"></span>e of each asset<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1175\">or liability<span class=\"_ _0\"></span> and the cash <span class=\"_ _0\"></span>flows r<span class=\"_ _0\"></span>elating ther<span class=\"_ _0\"></span>eto, including those r<span class=\"_ _0\"></span>elating to early<span class=\"_ _0\"></span> redemption char<span class=\"_ _0\"></span>ges tog<span class=\"_ _0\"></span>ether <span class=\"_ _0\"></span>with any initial <span class=\"_ _0\"></span>fees </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1176\">receiv<span class=\"_ _0\"></span>able from <span class=\"_ _0\"></span>the customer<span class=\"_ _0\"></span> or pr<span class=\"_ _0\"></span>ocurement <span class=\"_ _0\"></span>fees payable <span class=\"_ _0\"></span>to a mortgage br<span class=\"_ _0\"></span>oker<span class=\"_ _0\"></span> or o<span class=\"_ _0\"></span>ther intr<span class=\"_ _0\"></span>oducer<span class=\"_ _0\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1177\">Where an account ma<span class=\"_ _0\"></span>y hav<span class=\"_ _0\"></span>e differing inter<span class=\"_ _0\"></span>est charging arrangements in diff<span class=\"_ _0\"></span>erent phases of<span class=\"_ _0\"></span> its contractual life, such as <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1178\">buy-to-le<span class=\"_ _0\"></span>t mortgage accounts which ha<span class=\"_ _0\"></span>ve a fix<span class=\"_ _0\"></span>ed interest<span class=\"_ _0\"></span> rate for<span class=\"_ _0\"></span> a set period and <span class=\"_ _0\"></span>then re<span class=\"_ _0\"></span>vert to a <span class=\"_ _0\"></span>variable r<span class=\"_ _0\"></span>ate set by<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup (the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1179\">\u2018re<span class=\"_ _0\"></span>versionary<span class=\"_ _0\"></span> rate\u2019), <span class=\"_ _0\"></span>the behavioural lif<span class=\"_ _0\"></span>e and the expected le<span class=\"_ _0\"></span>vel of<span class=\"_ _0\"></span> the r<span class=\"_ _0\"></span>eversionary<span class=\"_ _1\"></span> rate will have a significant impact<span class=\"_ _0\"></span> on the ov<span class=\"_ _0\"></span>erall EIR. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs117a\">F<span class=\"_ _1\"></span>or each portfolio a model is in place to ensur<span class=\"_ _1\"></span>e that income is appropriately<span class=\"_ _0\"></span> spread.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs117b\">F<span class=\"_ _1\"></span>or loan accounts such as those in <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s mortgage portfolios wher<span class=\"_ _0\"></span>e borro<span class=\"_ _0\"></span>wers typically<span class=\"_ _0\"></span> repa<span class=\"_ _0\"></span>y <span class=\"_ _0\"></span>their balances befor<span class=\"_ _0\"></span>e the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs117c\">contractual repa<span class=\"_ _0\"></span>yment date, the estimated lif<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the account will be dependent on cust<span class=\"_ _0\"></span>omer behaviour<span class=\"_ _1\"></span>. T<span class=\"_ _0\"></span>he customer may<span class=\"_ _0\"></span> choose </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs117d\">to sell their<span class=\"_ _0\"></span> property<span class=\"_ _0\"></span> and redeem <span class=\"_ _0\"></span>the mortgage at any<span class=\"_ _1\"></span> point, but may also choose to r<span class=\"_ _0\"></span>efinance their<span class=\"_ _1\"></span> account, if a more attractiv<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs117e\">alternative is av<span class=\"_ _0\"></span>ailable, based on the inter<span class=\"_ _0\"></span>est rate <span class=\"_ _0\"></span>they<span class=\"_ _0\"></span> are being charg<span class=\"_ _0\"></span>ed at that point in <span class=\"_ _0\"></span>time, or expect <span class=\"_ _0\"></span>to be charged in <span class=\"_ _0\"></span>the futur<span class=\"_ _0\"></span>e. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs117f\">The behavioural lif<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the loan may <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore be influenced b<span class=\"_ _0\"></span>y lev<span class=\"_ _0\"></span>els of<span class=\"_ _0\"></span> activity in the r<span class=\"_ _0\"></span>esidential property<span class=\"_ _0\"></span> market, or<span class=\"_ _1\"></span> by the natur<span class=\"_ _0\"></span>e and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1180\">pricing of alt<span class=\"_ _0\"></span>ernative funding sour<span class=\"_ _0\"></span>ces, at each point in the loan<span class=\"_ _0\"></span>'<span class=\"_ _1\"></span>s life and these are lik<span class=\"_ _0\"></span>ely <span class=\"_ _0\"></span>to v<span class=\"_ _0\"></span>ary o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> time. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1181\">F<span class=\"_ _1\"></span>or loans which hav<span class=\"_ _0\"></span>e a fixed-r<span class=\"_ _0\"></span>ate period, the length of<span class=\"_ _0\"></span> that period <span class=\"_ _0\"></span>will have a significant beha<span class=\"_ _0\"></span>vioural impact, with man<span class=\"_ _0\"></span>y customers </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1182\">choosing to consider<span class=\"_ _0\"></span> their<span class=\"_ _0\"></span> positions at the point at<span class=\"_ _0\"></span> which the <span class=\"_ _0\"></span>fixed rate e<span class=\"_ _0\"></span>xpires, influenced by<span class=\"_ _0\"></span> the mark<span class=\"_ _0\"></span>et conditions then pr<span class=\"_ _0\"></span>ev<span class=\"_ _0\"></span>ailing. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1183\">The futur<span class=\"_ _0\"></span>e for<span class=\"_ _0\"></span>ecast futur<span class=\"_ _0\"></span>e choices of cust<span class=\"_ _0\"></span>omers currently<span class=\"_ _0\"></span> on fixed-r<span class=\"_ _0\"></span>ate products at <span class=\"_ _0\"></span>this point ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e has a significant impact on the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1184\">EIR modelling for<span class=\"_ _0\"></span> these assets. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1185\">Where loans ar<span class=\"_ _0\"></span>e more lik<span class=\"_ _0\"></span>ely <span class=\"_ _0\"></span>to run to contractual <span class=\"_ _0\"></span>term, and inter<span class=\"_ _0\"></span>est rates are less lik<span class=\"_ _0\"></span>ely <span class=\"_ _0\"></span>to v<span class=\"_ _0\"></span>ary o<span class=\"_ _0\"></span>ver<span class=\"_ _0\"></span> that t<span class=\"_ _0\"></span>erm, as is the case f<span class=\"_ _0\"></span>or the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1186\">majority of<span class=\"_ _1\"></span> the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s motor finance and asset<span class=\"_ _0\"></span>-backed SME lending, the det<span class=\"_ _0\"></span>ermination of an EIR model is less judgemental, and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1187\">reflects principally<span class=\"_ _0\"></span> the spr<span class=\"_ _0\"></span>eading of kno<span class=\"_ _0\"></span>wn fees and commissions.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1188\">The Group models liv<span class=\"_ _0\"></span>es for<span class=\"_ _0\"></span> each of<span class=\"_ _0\"></span> its asset classes, based on its current e<span class=\"_ _0\"></span>xpectation of <span class=\"_ _0\"></span>future borr<span class=\"_ _0\"></span>ower<span class=\"_ _0\"></span> behaviour<span class=\"_ _1\"></span>, and uses these </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1189\">profiles, <span class=\"_ _0\"></span>together<span class=\"_ _0\"></span> with its expectations o<span class=\"_ _0\"></span>f futur<span class=\"_ _0\"></span>e re<span class=\"_ _0\"></span>versionary<span class=\"_ _0\"></span> interest<span class=\"_ _0\"></span> rates, to det<span class=\"_ _0\"></span>ermine the correct<span class=\"_ _0\"></span> EIR to be applied to each </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs118a\">account. T<span class=\"_ _0\"></span>he underlying estimates are based on historical data, adjusted <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> expected changes, and r<span class=\"_ _0\"></span>eview<span class=\"_ _0\"></span>ed regularly<span class=\"_ _1\"></span>. The accurac<span class=\"_ _0\"></span>y </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs118b\">of <span class=\"_ _0\"></span>the EIR applied would <span class=\"_ _0\"></span>therefor<span class=\"_ _0\"></span>e be compromised b<span class=\"_ _0\"></span>y an<span class=\"_ _0\"></span>y differ<span class=\"_ _0\"></span>ences between actual r<span class=\"_ _0\"></span>epayment pr<span class=\"_ _0\"></span>ofiles and charging rates and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs118c\">those predicted, <span class=\"_ _0\"></span>which in turn <span class=\"_ _0\"></span>would depend directly<span class=\"_ _0\"></span> on customer<span class=\"_ _0\"></span> behaviour and mark<span class=\"_ _0\"></span>et conditions.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs118d\">The Group <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore k<span class=\"_ _0\"></span>eeps its models under r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>w and re<span class=\"_ _0\"></span>fines its modelling in the light of<span class=\"_ _0\"></span> any emer<span class=\"_ _0\"></span>ging deviations fr<span class=\"_ _0\"></span>om expected </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs118e\">behaviour<span class=\"_ _1\"></span>. These ar<span class=\"_ _0\"></span>e particularly lik<span class=\"_ _0\"></span>ely <span class=\"_ _0\"></span>where the curr<span class=\"_ _0\"></span>ent or<span class=\"_ _0\"></span> expected economic envir<span class=\"_ _0\"></span>onment differs fr<span class=\"_ _0\"></span>om historic scenarios f<span class=\"_ _0\"></span>or <span class=\"_ _0\"></span>which </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs118f\">rele<span class=\"_ _0\"></span>vant data observ<span class=\"_ _0\"></span>ations are av<span class=\"_ _0\"></span>ailable. T<span class=\"_ _0\"></span>his is currently<span class=\"_ _0\"></span> the case, with mark<span class=\"_ _0\"></span>et mortgag<span class=\"_ _0\"></span>e rates at far<span class=\"_ _0\"></span> higher le<span class=\"_ _0\"></span>vels <span class=\"_ _0\"></span>than have been </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1190\">seen in many<span class=\"_ _0\"></span> years. In such cases manag<span class=\"_ _0\"></span>ement consider car<span class=\"_ _0\"></span>efully<span class=\"_ _0\"></span> the impacts which an<span class=\"_ _0\"></span>y new<span class=\"_ _0\"></span> conditions may<span class=\"_ _0\"></span> have on customer<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1191\">behaviour<span class=\"_ _0\"></span> and rev<span class=\"_ _0\"></span>ersionary r<span class=\"_ _0\"></span>ates and reflect <span class=\"_ _0\"></span>them in the model as appr<span class=\"_ _0\"></span>opriate, re<span class=\"_ _0\"></span>visiting these assumptions r<span class=\"_ _0\"></span>egularly as observ<span class=\"_ _0\"></span>able </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1192\">data becomes available, <span class=\"_ _0\"></span>with a detailed ex<span class=\"_ _0\"></span>ercise t<span class=\"_ _0\"></span>o analyse any<span class=\"_ _0\"></span> emerging themes <span class=\"_ _0\"></span>taking place every<span class=\"_ _0\"></span> six months as part of<span class=\"_ _0\"></span> the half<span class=\"_ _0\"></span> year<span class=\"_ _1\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1193\">and y<span class=\"_ _0\"></span>ear end r<span class=\"_ _0\"></span>esults processes.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1194\">F<span class=\"_ _1\"></span>or purchased loans <span class=\"_ _0\"></span>the EIR calculation will involv<span class=\"_ _0\"></span>e estimating the likely<span class=\"_ _1\"></span> future credit perf<span class=\"_ _0\"></span>ormance of <span class=\"_ _0\"></span>the accounts at the <span class=\"_ _0\"></span>time of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1195\">acquisition as well as <span class=\"_ _0\"></span>the customers<span class=\"_ _0\"></span>\u2019 payment behaviour<span class=\"_ _1\"></span>. In the initial modelling historical data obtained <span class=\"_ _0\"></span>from the <span class=\"_ _0\"></span>vendor<span class=\"_ _0\"></span> will be </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1196\">examined, with assump<span class=\"_ _0\"></span>tions revisit<span class=\"_ _0\"></span>ed through <span class=\"_ _0\"></span>the asset lives based on actual and e<span class=\"_ _0\"></span>xpected customer beha<span class=\"_ _0\"></span>viour<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1197\">The application of<span class=\"_ _0\"></span> these estimates r<span class=\"_ _0\"></span>esults in an over<span class=\"_ _0\"></span>all increase in the carrying <span class=\"_ _0\"></span>value of<span class=\"_ _1\"></span> the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s loans to customers, including </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1198\">POCI accounts, at 30 September<span class=\"_ _0\"></span> 2023 of \u00a320<span class=\"_ _0\"></span>.5m.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1199\">T<span class=\"_ _2\"></span>o illustrate the potential <span class=\"_ _0\"></span>variability<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>the estimate, the amortised cost <span class=\"_ _0\"></span>values <span class=\"_ _0\"></span>wer<span class=\"_ _0\"></span>e recalculated b<span class=\"_ _0\"></span>y changing one fact<span class=\"_ _0\"></span>or in <span class=\"_ _0\"></span>the EIR </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs119a\">calculation and keeping all other<span class=\"_ _0\"></span>s at their<span class=\"_ _0\"></span> current le<span class=\"_ _0\"></span>vels.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs119b\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Currently <span class=\"_ _0\"></span>the aver<span class=\"_ _0\"></span>age behavioural life used in <span class=\"_ _0\"></span>the buy-to-le<span class=\"_ _0\"></span>t modelling for<span class=\"_ _0\"></span> non-legacy<span class=\"_ _0\"></span> assets, which ha<span class=\"_ _0\"></span>ve an aver<span class=\"_ _0\"></span>age fix<span class=\"_ _0\"></span>ed period of </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs119c\">49 months, w<span class=\"_ _0\"></span>as 83 months. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs119d\"> <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>A reduction o<span class=\"_ _0\"></span>f the assumed a<span class=\"_ _0\"></span>verage liv<span class=\"_ _0\"></span>es of<span class=\"_ _0\"></span> all loans secured on residential pr<span class=\"_ _1\"></span>operty by <span class=\"_ _0\"></span>three months <span class=\"_ _0\"></span>would reduce balance shee<span class=\"_ _0\"></span>t </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs119e\">assets by<span class=\"_ _0\"></span> \u00a39.3m (2022: \u00a313.3m<span class=\"_ _0\"></span>), while an incr<span class=\"_ _0\"></span>ease of <span class=\"_ _0\"></span>the assumed asset lives o<span class=\"_ _0\"></span>f such assets by<span class=\"_ _1\"></span> three months w<span class=\"_ _0\"></span>ould increase </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs119f\">balance sheet assets by<span class=\"_ _1\"></span> \u00a39.2m (2022: \u00a313.3m). \u00a38.8m of<span class=\"_ _0\"></span> both the incr<span class=\"_ _0\"></span>ease and decrease r<span class=\"_ _0\"></span>elated to non-leg<span class=\"_ _0\"></span>acy buy<span class=\"_ _0\"></span>-to-let assets.</div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11a0\"> <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>A reduction o<span class=\"_ _0\"></span>f the assumed a<span class=\"_ _0\"></span>verage liv<span class=\"_ _0\"></span>es of<span class=\"_ _0\"></span> all loans secured on residential pr<span class=\"_ _1\"></span>operty by six months <span class=\"_ _0\"></span>would r<span class=\"_ _0\"></span>educe balance sheet </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11a1\">assets by<span class=\"_ _0\"></span> \u00a318.5m (2022: \u00a325.8m), <span class=\"_ _0\"></span>while an increase of<span class=\"_ _0\"></span> the assumed asset liv<span class=\"_ _0\"></span>es of such asse<span class=\"_ _0\"></span>ts by six months <span class=\"_ _0\"></span>would incr<span class=\"_ _0\"></span>ease </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11a2\">balance sheet assets by<span class=\"_ _1\"></span> \u00a318.4m (2022: \u00a325.8m). \u00a317<span class=\"_ _1\"></span>.5m of bo<span class=\"_ _0\"></span>th the increase and decr<span class=\"_ _0\"></span>ease related <span class=\"_ _0\"></span>to non-legacy<span class=\"_ _0\"></span> buy-t<span class=\"_ _0\"></span>o-let assets.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11a3\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>The EIR calculation is based on management estimates of <span class=\"_ _0\"></span>the re<span class=\"_ _0\"></span>versionary<span class=\"_ _0\"></span> rates which <span class=\"_ _0\"></span>would be charg<span class=\"_ _0\"></span>ed to customers after<span class=\"_ _1\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11a4\">end of <span class=\"_ _0\"></span>their <span class=\"_ _0\"></span>fixed rate periods. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11a5\">If it <span class=\"_ _0\"></span>was assumed <span class=\"_ _0\"></span>that the maximum r<span class=\"_ _0\"></span>eversionary<span class=\"_ _1\"></span> rate which could be charged in <span class=\"_ _0\"></span>future w<span class=\"_ _0\"></span>as 6.00%, <span class=\"_ _0\"></span>then the <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the non-legac<span class=\"_ _0\"></span>y </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11a6\">buy-to-le<span class=\"_ _0\"></span>t loan book w<span class=\"_ _0\"></span>ould be decreased by<span class=\"_ _0\"></span> \u00a33.0m (2022: \u00a3nil). </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11a8\">If it <span class=\"_ _0\"></span>was assumed <span class=\"_ _0\"></span>that the maximum r<span class=\"_ _0\"></span>eversionary<span class=\"_ _1\"></span> rate which could be charged in <span class=\"_ _0\"></span>future w<span class=\"_ _0\"></span>as 8.00%, <span class=\"_ _0\"></span>then the <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the non-legac<span class=\"_ _0\"></span>y </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11a9\">buy-to-le<span class=\"_ _0\"></span>t loan book w<span class=\"_ _0\"></span>ould be increased by<span class=\"_ _0\"></span> \u00a33.9m (2022: \u00a3nil).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11aa\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>Where fix<span class=\"_ _0\"></span>ed rate buy-t<span class=\"_ _0\"></span>o-let assets redeem be<span class=\"_ _0\"></span>fore <span class=\"_ _0\"></span>the end of <span class=\"_ _0\"></span>their <span class=\"_ _0\"></span>fixed rate period, an early<span class=\"_ _0\"></span> redemption char<span class=\"_ _0\"></span>ge is made, and an </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11ab\">estimate for<span class=\"_ _1\"></span> the impact of <span class=\"_ _0\"></span>these charges must be included in <span class=\"_ _0\"></span>the EIR calculation.</div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11ac\"> <span class=\"_ _29\"> </span> <span class=\"_ _3\"></span>An increase of 50% in <span class=\"_ _0\"></span>the number o<span class=\"_ _0\"></span>f fiv<span class=\"_ _0\"></span>e y<span class=\"_ _0\"></span>ear fix<span class=\"_ _0\"></span>ed rate buy-<span class=\"_ _0\"></span>to-let loan assets assumed <span class=\"_ _0\"></span>to redeem befor<span class=\"_ _1\"></span>e the end of <span class=\"_ _0\"></span>the fixed-rat<span class=\"_ _0\"></span>e </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11ad\">period would incr<span class=\"_ _1\"></span>ease balance sheet assets by \u00a39<span class=\"_ _0\"></span>.6m (2022: \u00a38.8m<span class=\"_ _0\"></span>).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11ae\">\u2022 <span class=\"_ _13\"> </span> <span class=\"_ _3\"></span>A r<span class=\"_ _0\"></span>eduction (or<span class=\"_ _0\"></span> increase<span class=\"_ _0\"></span>) in estimated cash flow<span class=\"_ _0\"></span>s fr<span class=\"_ _0\"></span>om purchased loan assets (principally<span class=\"_ _1\"></span> buy-to-let first mortg<span class=\"_ _0\"></span>age loans and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11af\">second charge consumer<span class=\"_ _0\"></span> loan assets) o<span class=\"_ _0\"></span>f 5% w<span class=\"_ _0\"></span>ould reduce (<span class=\"_ _0\"></span>or incr<span class=\"_ _0\"></span>ease) balance sheet<span class=\"_ _0\"></span> assets by<span class=\"_ _0\"></span> \u00a31.6m (2022: \u00a32.0m<span class=\"_ _0\"></span>). Such assets </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11b0\">now r<span class=\"_ _0\"></span>epresent<span class=\"_ _0\"></span> only \u00a358.8m of<span class=\"_ _0\"></span> the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s loan portfolio (2022: \u00a375.8m).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11b1\">As any<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>these changes w<span class=\"_ _0\"></span>ould, in reality<span class=\"_ _1\"></span>, be accompanied by mov<span class=\"_ _0\"></span>ements in other <span class=\"_ _0\"></span>factors, actual outcomes ma<span class=\"_ _0\"></span>y differ<span class=\"_ _0\"></span> fr<span class=\"_ _0\"></span>om  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11b2\">these estimates.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs11b3\">(c<span class=\"_ _1\"></span>)  <span class=\"_ _29\"> </span>Impairment of goodwill<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11b4\">The carrying v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> goodwill recognised on acquisitions is <span class=\"_ _0\"></span>verified by<span class=\"_ _1\"></span> use of an impairment test<span class=\"_ _0\"></span> based on the projected cash <span class=\"_ _0\"></span>flows </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11b5\">for<span class=\"_ _0\"></span> the CGU, based on manag<span class=\"_ _0\"></span>ement for<span class=\"_ _0\"></span>ecasts and other<span class=\"_ _0\"></span> assumptions described in note 31, including a discount f<span class=\"_ _0\"></span>actor<span class=\"_ _0\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11b6\">The accuracy<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> this impairment calculation <span class=\"_ _0\"></span>would ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e be compromised by<span class=\"_ _0\"></span> any<span class=\"_ _0\"></span> differences betw<span class=\"_ _0\"></span>een these <span class=\"_ _0\"></span>forecasts and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11b7\">the lev<span class=\"_ _0\"></span>els of business activity<span class=\"_ _0\"></span> that <span class=\"_ _0\"></span>the CGU is able to achie<span class=\"_ _0\"></span>ve in practice. <span class=\"_ _0\"></span>As the Gr<span class=\"_ _0\"></span>oup for<span class=\"_ _0\"></span>ecasts are based on <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s central </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11b8\">economic scenario, any<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>ariance from <span class=\"_ _0\"></span>this will potentially<span class=\"_ _1\"></span> impact on the valuation. <span class=\"_ _1\"></span>This test will also be aff<span class=\"_ _0\"></span>ected by<span class=\"_ _0\"></span> the accuracy<span class=\"_ _1\"></span> of the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws1b gs11b9\">discount factor<span class=\"_ _0\"></span> used.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11ba\">The sensitivity o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the impairment test <span class=\"_ _0\"></span>to reasonably<span class=\"_ _0\"></span> possible movements in <span class=\"_ _0\"></span>these assumptions is discussed in note 31.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws9d gs11bb\">(d)  <span class=\"_ _ce\"> </span>Retirement <span class=\"_ _96\"></span>benefits<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11bc\">The present<span class=\"_ _0\"></span> value o<span class=\"_ _0\"></span>f <span class=\"_ _0\"></span>the retir<span class=\"_ _0\"></span>ement benefit obligation is deriv<span class=\"_ _0\"></span>ed from an actuarial calculation <span class=\"_ _0\"></span>which rests on a number<span class=\"_ _0\"></span> of assump<span class=\"_ _0\"></span>tions </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11bd\">relating <span class=\"_ _0\"></span>to inflation, long-term r<span class=\"_ _0\"></span>eturn on inv<span class=\"_ _0\"></span>estments and mortality<span class=\"_ _0\"></span>. T<span class=\"_ _0\"></span>hese are listed in note 60<span class=\"_ _0\"></span>. Wher<span class=\"_ _0\"></span>e actual conditions differ<span class=\"_ _0\"></span> fr<span class=\"_ _0\"></span>om </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11be\">those assumed the ultimate <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the obligation <span class=\"_ _0\"></span>would be differ<span class=\"_ _0\"></span>ent.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs11bf\">Information on the sensitivity<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the v<span class=\"_ _0\"></span>aluation to <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>arious assumptions is given in note 60<span class=\"_ _1\"></span>.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAccountingJudgementsAndEstimatesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-468": {
   "value": "69. Critical accounting estimates Certain balances reported in the financial statements are based wholly or in part on estimates or assumptions made by the directors. There is, therefore, a potential risk that they may be subject to change in future periods. The most important of these, those which could, if revised significantly in the next financial year, have a material impact on the carrying amounts of assets or liabilities are: (a)   Impairment losses on loans to customers Impairment losses on loans are calculated based on statistical models, applied to the present status, performance and management strategy for the loans concerned which are used to determine each loan\u2019s PD and LGD. Internal information used will include number of months arrears, qualitative information, such as possession by a first charge holder on a second charge mortgage or where a buy-to-let case is under the control of a receiver of rent, the receiver\u2019s present and likely future strategy for the property (which might include keeping current tenants in place, refurbish and relet, immediate sale etc). External information used includes customer specific data, such as credit bureau information as well as more general economic data. Key internal assumptions in the models relate to estimates of future cash flows from customers\u2019 accounts, their timing and, for secured accounts, the expected proceeds from the realisation of the property or other charged assets. These cash flows will include payments received from the customer, and, for buy-to-let cases where a receiver of rent is appointed, rental receipts from tenants, after allowing for void periods and running costs. These key assumptions are based on observed data from historical patterns and are updated regularly based on new data as it becomes available. In addition, the directors consider how appropriate past trends and patterns might be in the current economic situation and make any adjustments they believe are necessary to reflect current and expected conditions. In evaluating the potential impact of the economic situation at 30 September 2023 there is little recent history against which to benchmark likely customer behaviour. Interest rates have risen to higher levels, at a more rapid rate than at any time in recent history. UK base rates had reached 5.25% at the balance sheet date, a level they had not touched since April 2008, since when significant regulatory intervention in the UK\u2019s lending markets has taken place. There have also been significant changes in product structures in that period, including the growth of longer term fixed-rate mortgage lending in recent years. All of these make the historical record of behaviours in higher interest rate environments an uncertain guide to the likely impact of current rate levels. There is also little agreement between economic forecasters as to the future direction of the UK economy, exacerbated by the potential impact of the general election which must be held within the next eighteen months. At the same time, the level to which economic pressures on customers have yet to manifest themselves in credit metrics is still unclear, with credit performance across the markets in which the Group is active being better than some expected over the past year, but considerable uncertainty as to whether this represents a more benign outcome, or merely a delay in credit issues emerging beyond what was anticipated. Together, these factors make forecasting credit behaviour in current conditions particularly challenging. The accuracy of the impairment calculations would therefore be affected by unexpected changes to the economic situation, variances between the models used and the actual results, or assumptions which differ from the actual outcomes. In particular, if the impact of economic factors such as employment levels on customers is worse than is implicit in the model then the number of accounts requiring provision might be greater than suggested by the model, while falls in house prices, over and above any assumed by the model might increase the provision required in respect of accounts currently provided. Similarly, if the account management approach assumed in the modelling cannot be adopted the provision required may be different. In order to provide forward looking economic inputs to the modelling of the ECL, the Group must derive a set of scenarios which are internally coherent. The Group addresses these requirements using four distinct economic scenarios chosen to represent the range of possible outcomes. These scenarios at 30 September 2023 have been derived in light of the current economic situation, at that date, modelling a variety of possible outcomes as described in note 24. As noted above, there remains a significant range of different opinions amongst economists about the longer-term prospects for the UK, although these have converged, to some extent, over the twelve months since 30 September 2022, when the impact of the September 2022 mini-budget had significantly broadened the range of plausible outcomes. The variables are used for two purposes in the IFRS 9 calculations: \u2022   They are applied as inputs in the models which generate PD values, where those found by statistical analysis to have the most predictive value are used \u2022   They are used as part of the calculation where the variable has a direct impact on the expected loss calculation, such as the house price index The economic variables will also inform assumptions about the Group\u2019s approach to account management given a particular scenario. In addition to uncertainty represented by the economic scenarios, the Group recognises that economic situations can arise which lie outside the range of potential positions considered as a basis for its IFRS 9 approach to impairment when the current models were built. The current forecast scenarios, which include higher rates of interest and inflation than in the historically observed data, represent situations where its models may not be able to fully allow for potential economic impacts on its loan portfolios. It therefore assessed, for each class of asset, whether any adjustment to the normal approach was required to ensure sufficient provision was created and also reviewed other available data, both from account performance and customer feedback to form a view of the underlying reasons for observed customer behaviours and of their future intentions and prospects. As a result of this exercise additional requirements for provision were identified, to compensate for potential model weakness and to allow for economic pressures in the wider economy which cannot be identified by a modelled approach. By their nature such adjustments are less systematic and therefore subject to a wider range of outturns. The nature and amounts of these judgemental adjustments are set out in note 21. The position after considering all these matters is set out in notes 21 to 23, together with further information on the Group\u2019s approach. The economic scenarios described above and their impact on the overall provision are set out in note 24, while sensitivity analyses on impairment provisioning are set out in note 25. (b)   Effective interest rates In order to determine the EIR applicable to loans and borrowings an estimate must be made of the expected life of each asset or liability and the cash flows relating thereto, including those relating to early redemption charges together with any initial fees receivable from the customer or procurement fees payable to a mortgage broker or other introducer. Where an account may have differing interest charging arrangements in different phases of its contractual life, such as the Group\u2019s buy-to-let mortgage accounts which have a fixed interest rate for a set period and then revert to a variable rate set by the Group (the \u2018reversionary rate\u2019), the behavioural life and the expected level of the reversionary rate will have a significant impact on the overall EIR. For each portfolio a model is in place to ensure that income is appropriately spread. For loan accounts such as those in the Group\u2019s mortgage portfolios where borrowers typically repay their balances before the contractual repayment date, the estimated life of the account will be dependent on customer behaviour. The customer may choose to sell their property and redeem the mortgage at any point, but may also choose to refinance their account, if a more attractive alternative is available, based on the interest rate they are being charged at that point in time, or expect to be charged in the future. The behavioural life of the loan may therefore be influenced by levels of activity in the residential property market, or by the nature and pricing of alternative funding sources, at each point in the loan's life and these are likely to vary over time. For loans which have a fixed-rate period, the length of that period will have a significant behavioural impact, with many customers choosing to consider their positions at the point at which the fixed rate expires, influenced by the market conditions then prevailing. The future forecast future choices of customers currently on fixed-rate products at this point therefore has a significant impact on the EIR modelling for these assets. Where loans are more likely to run to contractual term, and interest rates are less likely to vary over that term, as is the case for the majority of the Group\u2019s motor finance and asset-backed SME lending, the determination of an EIR model is less judgemental, and reflects principally the spreading of known fees and commissions. The Group models lives for each of its asset classes, based on its current expectation of future borrower behaviour, and uses these profiles, together with its expectations of future reversionary interest rates, to determine the correct EIR to be applied to each account. The underlying estimates are based on historical data, adjusted for expected changes, and reviewed regularly. The accuracy of the EIR applied would therefore be compromised by any differences between actual repayment profiles and charging rates and those predicted, which in turn would depend directly on customer behaviour and market conditions. The Group therefore keeps its models under review and refines its modelling in the light of any emerging deviations from expected behaviour. These are particularly likely where the current or expected economic environment differs from historic scenarios for which relevant data observations are available. This is currently the case, with market mortgage rates at far higher levels than have been seen in many years. In such cases management consider carefully the impacts which any new conditions may have on customer behaviour and reversionary rates and reflect them in the model as appropriate, revisiting these assumptions regularly as observable data becomes available, with a detailed exercise to analyse any emerging themes taking place every six months as part of the half year and year end results processes. For purchased loans the EIR calculation will involve estimating the likely future credit performance of the accounts at the time of acquisition as well as the customers\u2019 payment behaviour. In the initial modelling historical data obtained from the vendor will be examined, with assumptions revisited through the asset lives based on actual and expected customer behaviour. The application of these estimates results in an overall increase in the carrying value of the Group\u2019s loans to customers, including POCI accounts, at 30 September 2023 of \u00a320.5m. To illustrate the potential variability of the estimate, the amortised cost values were recalculated by changing one factor in the EIR calculation and keeping all others at their current levels. \u2022   Currently the average behavioural life used in the buy-to-let modelling for non-legacy assets, which have an average fixed period of 49 months, was 83 months.    A reduction of the assumed average lives of all loans secured on residential property by three months would reduce balance sheet assets by \u00a39.3m (2022: \u00a313.3m), while an increase of the assumed asset lives of such assets by three months would increase balance sheet assets by \u00a39.2m (2022: \u00a313.3m). \u00a38.8m of both the increase and decrease related to non-legacy buy-to-let assets.   A reduction of the assumed average lives of all loans secured on residential property by six months would reduce balance sheet assets by \u00a318.5m (2022: \u00a325.8m), while an increase of the assumed asset lives of such assets by six months would increase balance sheet assets by \u00a318.4m (2022: \u00a325.8m). \u00a317.5m of both the increase and decrease related to non-legacy buy-to-let assets. \u2022   The EIR calculation is based on management estimates of the reversionary rates which would be charged to customers after the end of their fixed rate periods. If it was assumed that the maximum reversionary rate which could be charged in future was 6.00%, then the value of the non-legacy buy-to-let loan book would be decreased by \u00a33.0m (2022: \u00a3nil). If it was assumed that the maximum reversionary rate which could be charged in future was 8.00%, then the value of the non-legacy buy-to-let loan book would be increased by \u00a33.9m (2022: \u00a3nil). \u2022   Where fixed rate buy-to-let assets redeem before the end of their fixed rate period, an early redemption charge is made, and an estimate for the impact of these charges must be included in the EIR calculation.   An increase of 50% in the number of five year fixed rate buy-to-let loan assets assumed to redeem before the end of the fixed-rate period would increase balance sheet assets by \u00a39.6m (2022: \u00a38.8m). \u2022   A reduction (or increase) in estimated cash flows from purchased loan assets (principally buy-to-let first mortgage loans and second charge consumer loan assets) of 5% would reduce (or increase) balance sheet assets by \u00a31.6m (2022: \u00a32.0m). Such assets now represent only \u00a358.8m of the Group\u2019s loan portfolio (2022: \u00a375.8m). As any of these changes would, in reality, be accompanied by movements in other factors, actual outcomes may differ from  these estimates. (c)   Impairment of goodwill The carrying value of goodwill recognised on acquisitions is verified by use of an impairment test based on the projected cash flows for the CGU, based on management forecasts and other assumptions described in note 31, including a discount factor. The accuracy of this impairment calculation would therefore be compromised by any differences between these forecasts and the levels of business activity that the CGU is able to achieve in practice. As the Group forecasts are based on the Group\u2019s central economic scenario, any variance from this will potentially impact on the valuation. This test will also be affected by the accuracy of the discount factor used. The sensitivity of the impairment test to reasonably possible movements in these assumptions is discussed in note 31. (d)   Retirement benefits The present value of the retirement benefit obligation is derived from an actuarial calculation which rests on a number of assumptions relating to inflation, long-term return on investments and mortality. These are listed in note 60. Where actual conditions differ from those assumed the ultimate value of the obligation would be different. Information on the sensitivity of the valuation to the various assumptions is given in note 60.",
   "dimensions": {
    "concept": "ifrs-full:ExplanationOfAssumptionAboutFutureWithSignificantRiskOfResultingInMaterialAdjustments",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-430": {
   "value": "<div class=\"t m0 h2 ff4 fs0 fc1 sc0 ls0 ws0 gs1219\">71. <span class=\"_ _18\"> </span>Financial asse<span class=\"_ _0\"></span>ts and financial liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs121a\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s financial assets and financial liabilities ar<span class=\"_ _0\"></span>e v<span class=\"_ _0\"></span>alued on one of<span class=\"_ _0\"></span> two bases, defined b<span class=\"_ _0\"></span>y IFRS 9:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs121b\">\u2022 <span class=\"_ _13\"> </span>Financial assets and liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue through pr<span class=\"_ _0\"></span>ofit and loss (\u2018FVTPL<span class=\"_ _2f\"></span>\u2019)<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs121c\">\u2022 <span class=\"_ _13\"> </span>Financial assets and liabilities carried at amortised cost<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs121d\">IFRS 7 \u2013 \u2018Financial Instruments: Disclosures\u2019 r<span class=\"_ _0\"></span>equires <span class=\"_ _0\"></span>that wher<span class=\"_ _0\"></span>e assets are measur<span class=\"_ _0\"></span>ed at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue these measur<span class=\"_ _0\"></span>ements should be </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs121e\">classified using the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value hierar<span class=\"_ _0\"></span>chy se<span class=\"_ _0\"></span>t out in IFRS 13 \u2013 \u2018F<span class=\"_ _0\"></span>air <span class=\"_ _1\"></span>Value Measur<span class=\"_ _0\"></span>ement\u2019<span class=\"_ _2\"></span>. This hier<span class=\"_ _0\"></span>archy<span class=\"_ _0\"></span> reflects <span class=\"_ _0\"></span>the inputs used and </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gs121f\">defines three lev<span class=\"_ _0\"></span>els:<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1220\">\u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 1 measurements ar<span class=\"_ _0\"></span>e unadjusted market prices </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1221\">\u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 2 measurements ar<span class=\"_ _0\"></span>e derived fr<span class=\"_ _0\"></span>om directly<span class=\"_ _0\"></span> or indir<span class=\"_ _0\"></span>ectly observ<span class=\"_ _0\"></span>able data, such as market prices or<span class=\"_ _1\"></span> rates </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1222\">\u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 3 measurements r<span class=\"_ _0\"></span>ely on significant inputs <span class=\"_ _0\"></span>which are not deriv<span class=\"_ _0\"></span>ed fr<span class=\"_ _0\"></span>om observable data </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1223\">As quoted prices ar<span class=\"_ _0\"></span>e not available <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> level 2 and 3 measur<span class=\"_ _0\"></span>ements, the <span class=\"_ _0\"></span>valuation is derived <span class=\"_ _0\"></span>from cash <span class=\"_ _0\"></span>flow models based, <span class=\"_ _0\"></span>where </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1224\">possible, on independently sour<span class=\"_ _0\"></span>ced parameters. <span class=\"_ _0\"></span>The accurac<span class=\"_ _0\"></span>y of<span class=\"_ _0\"></span> the calculation <span class=\"_ _0\"></span>would ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e be affected by<span class=\"_ _0\"></span> unexpected mark<span class=\"_ _0\"></span>et </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1225\">movements or<span class=\"_ _1\"></span> other v<span class=\"_ _0\"></span>ariances in the operation of<span class=\"_ _1\"></span> the models or the assump<span class=\"_ _0\"></span>tions used.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1226\">The Group had no <span class=\"_ _0\"></span>financial assets or liabilities in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear ended 30 Sept<span class=\"_ _0\"></span>ember 2023 or<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year ended 30 Sep<span class=\"_ _0\"></span>tember 2022 carried at </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1227\">fair <span class=\"_ _0\"></span>value and <span class=\"_ _0\"></span>valued using le<span class=\"_ _0\"></span>vel 3 measur<span class=\"_ _0\"></span>ements, other <span class=\"_ _0\"></span>than contingent consideration amounts (no<span class=\"_ _0\"></span>te 41).<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1228\">The Group has no<span class=\"_ _0\"></span>t reclassified any<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> its measurements during <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1229\">The methods by<span class=\"_ _0\"></span> which <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value is established <span class=\"_ _0\"></span>for each class o<span class=\"_ _0\"></span>f financial assets and liabilities ar<span class=\"_ _1\"></span>e set out below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs122a\">(a<span class=\"_ _0\"></span>) <span class=\"_ _1\"></span> <span class=\"_ _45\"> </span>Assets and liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs122b\">The f<span class=\"_ _0\"></span>ollowing table summarises <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s financial assets and liabilities which ar<span class=\"_ _0\"></span>e carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gs122c\">Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs122d\">\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs122e\">Financial assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs122f\">Derivativ<span class=\"_ _0\"></span>e financial assets<span class=\"_ _325\"> </span><span class=\"ff2c\">26<span class=\"_ _c8\"> </span><span class=\"ff15\">615.4<span class=\"_ _150\"> </span><span class=\"ff16\">779.0<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1230\">615.4<span class=\"_ _d5\"> </span><span class=\"ff16\">779.0<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs1231\">Financial liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1232\">Derivativ<span class=\"_ _0\"></span>e financial liabilities<span class=\"_ _251\"> </span><span class=\"ff2c\">26<span class=\"_ _d1\"> </span><span class=\"ff15\">39.9<span class=\"_ _d5\"> </span><span class=\"ff16\">102.1<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1233\">Contingent c<span class=\"_ _0\"></span>onsideration<span class=\"_ _1cc\"> </span><span class=\"ff2c\">41<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1234\">39.9<span class=\"_ _d5\"> </span><span class=\"ff16\">104.3<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1235\">All of <span class=\"_ _0\"></span>these financial assets and <span class=\"_ _0\"></span>financial liabilities are r<span class=\"_ _0\"></span>equired t<span class=\"_ _0\"></span>o be carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue by IFRS 9<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1236\">The Company<span class=\"_ _0\"></span> has no financial assets or<span class=\"_ _0\"></span> liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs1237\">Derivativ<span class=\"_ _0\"></span>e financial assets and liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls8 ws0 gs1238\">Derivativ<span class=\"_ _0\"></span>e financial instruments are stated at<span class=\"_ _0\"></span> their<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> values in <span class=\"_ _0\"></span>the accounts. T<span class=\"_ _0\"></span>he Group uses a number<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>techniques to det<span class=\"_ _0\"></span>ermine </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls8 ws0 gs1239\">the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of its deriv<span class=\"_ _0\"></span>ative assets and liabilities, <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>which observable prices in activ<span class=\"_ _0\"></span>e markets ar<span class=\"_ _0\"></span>e not av<span class=\"_ _0\"></span>ailable. These ar<span class=\"_ _0\"></span>e principally </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls8 ws0 gs123a\">present <span class=\"_ _0\"></span>value calculations based on estimated <span class=\"_ _0\"></span>future cash <span class=\"_ _0\"></span>flows arising fr<span class=\"_ _0\"></span>om the instruments, discounted using a mark<span class=\"_ _0\"></span>et inter<span class=\"_ _0\"></span>est rate, </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls8 ws0 gs123b\">adjusted for<span class=\"_ _1\"></span> risk as appropriate. <span class=\"_ _0\"></span>The principal inputs to <span class=\"_ _0\"></span>these valuation models ar<span class=\"_ _1\"></span>e SON<span class=\"_ _15\"></span>IA sterling benchmark int<span class=\"_ _0\"></span>erest rates.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls8 ws0 gs123c\">In order<span class=\"_ _0\"></span> to det<span class=\"_ _0\"></span>ermine the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues, the management<span class=\"_ _0\"></span> applies valuation adjustments <span class=\"_ _0\"></span>to observed data <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>that data would no<span class=\"_ _0\"></span>t </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls8 ws0 gs123d\">fully r<span class=\"_ _0\"></span>eflect the attribut<span class=\"_ _0\"></span>es of <span class=\"_ _0\"></span>the instrument being v<span class=\"_ _0\"></span>alued, such as particular contractual <span class=\"_ _0\"></span>features or<span class=\"_ _0\"></span> the identity<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the counterparty<span class=\"_ _1\"></span>. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls8 ws0 gs123e\">The management r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>ws the models used on an ong<span class=\"_ _0\"></span>oing basis to ensur<span class=\"_ _0\"></span>e that the <span class=\"_ _1\"></span>valuations produced are r<span class=\"_ _0\"></span>easonable and re<span class=\"_ _0\"></span>flect all </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls8 ws0 gs123f\">rele<span class=\"_ _0\"></span>vant <span class=\"_ _0\"></span>factors. T<span class=\"_ _0\"></span>hese v<span class=\"_ _0\"></span>aluations are based on mark<span class=\"_ _0\"></span>et information, and the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e classified as level 2 measur<span class=\"_ _0\"></span>ements. Details </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls8 ws0 gs1240\">of <span class=\"_ _0\"></span>these assets are giv<span class=\"_ _0\"></span>en in note 26.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff12 fs1 fc1 sc0 ls0 ws0 gs1242\">Contingent considera<span class=\"_ _0\"></span>tion<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1243\">The v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> the contingent consideration balances sho<span class=\"_ _0\"></span>wn in note 41 ar<span class=\"_ _0\"></span>e requir<span class=\"_ _0\"></span>ed to be stated at <span class=\"_ _0\"></span>fair <span class=\"_ _1\"></span>value in the accounts. T<span class=\"_ _0\"></span>hese </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1244\">amounts are <span class=\"_ _0\"></span>valued based on <span class=\"_ _0\"></span>the expected outcomes of<span class=\"_ _0\"></span> the performance <span class=\"_ _0\"></span>tests set out in <span class=\"_ _0\"></span>the respective sale and pur<span class=\"_ _0\"></span>chase </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1245\">agreements, discounted as appr<span class=\"_ _0\"></span>opriate. <span class=\"_ _0\"></span>The most significant inputs t<span class=\"_ _0\"></span>o these v<span class=\"_ _0\"></span>aluations are <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s forecasts on <span class=\"_ _0\"></span>future activity<span class=\"_ _0\"></span> </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1246\">relating <span class=\"_ _0\"></span>to business generated b<span class=\"_ _0\"></span>y operational units acquir<span class=\"_ _0\"></span>ed, business derived as a r<span class=\"_ _0\"></span>esult of <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>endor\u2019<span class=\"_ _1\"></span>s contacts or other g<span class=\"_ _0\"></span>oodwill </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1247\">and any<span class=\"_ _0\"></span> other ne<span class=\"_ _0\"></span>w business flo<span class=\"_ _0\"></span>ws which ar<span class=\"_ _0\"></span>e or might<span class=\"_ _0\"></span> be attributable to the acquisition agr<span class=\"_ _0\"></span>eement, which ar<span class=\"_ _0\"></span>e drawn fr<span class=\"_ _0\"></span>om the o<span class=\"_ _0\"></span>verall </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1248\">Group <span class=\"_ _0\"></span>forecasting model. <span class=\"_ _1\"></span>As such, these are classified as unobservable inputs and <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>aluations classified as level 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h3 ff4 fs1 fc1 sc0 ls0 ws0 gs1249\">(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Assets and liabilities carried at amortised cost<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs124a\">The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues for<span class=\"_ _1\"></span> financial assets and financial liabilities held at amortised cost, determined in accor<span class=\"_ _0\"></span>dance with the me<span class=\"_ _0\"></span>thodologies </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs124b\">set out below<span class=\"_ _0\"></span> are summarised belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gs124c\">Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2022<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs124d\">Carrying amount<span class=\"_ _3f\"> </span>Fair value<span class=\"_ _c2\"> </span><span class=\"ff17\">Carrying amount<span class=\"_ _73\"> </span>Fair v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs124e\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h93 ff24 fs1 fc1 sc0 ls0 ws0 gs124f\">The Group<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1250\">Financial assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1251\">Cash<span class=\"_ _1b1\"> </span><span class=\"ff2c\">17<span class=\"_ _133\"> </span><span class=\"ff15\">2,994.3<span class=\"_ _86\"> </span>2,994.3<span class=\"_ _12a\"> </span><span class=\"ff16\">1,930.9<span class=\"_ _86\"> </span>1,930.9<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1252\">Loans to customer<span class=\"_ _0\"></span>s<span class=\"_ _2b4\"> </span><span class=\"ff2c\">18<span class=\"_ _12a\"> </span><span class=\"ff15\">14,874.3<span class=\"_ _42\"> </span>14,524.0<span class=\"_ _42\"> </span><span class=\"ff16\">14,210.3<span class=\"_ _67\"> </span>13,898.4<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1253\">Sundry financial assets<span class=\"_ _144\"> </span><span class=\"ff2c\">27<span class=\"_ _d1\"> </span><span class=\"ff15\">46.0<span class=\"_ _3a\"> </span>46.0<span class=\"_ _3a\"> </span><span class=\"ff16\">35.4<span class=\"_ _3a\"> </span>35.4<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1254\">17,914.6<span class=\"_ _42\"> </span>17,564.3<span class=\"_ _42\"> </span><span class=\"ff16\">16,176.6<span class=\"_ _67\"> </span>15,864.7<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs1255\">Financial liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1256\">Short-t<span class=\"_ _0\"></span>erm bank borrowings<span class=\"_ _2f9\"> </span><span class=\"ff15\">0.2<span class=\"_ _d1\"> </span>0.2<span class=\"_ _9e\"> </span><span class=\"ff16\">0.4<span class=\"_ _9e\"> </span>0.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1257\">Asset back<span class=\"_ _0\"></span>ed loan notes <span class=\"_ _83\"> </span><span class=\"ff15\">28.0<span class=\"_ _cb\"> </span>28.0<span class=\"_ _150\"> </span><span class=\"ff16\">409.3<span class=\"_ _150\"> </span>409.3<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1258\">Secured bank borro<span class=\"_ _0\"></span>wings<span class=\"_ _167\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _3a\"> </span><span class=\"ff16\">586.0<span class=\"_ _d5\"> </span>586.0<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1259\">Ret<span class=\"_ _0\"></span>ail deposits<span class=\"_ _356\"> </span><span class=\"ff2c\">33<span class=\"_ _70\"> </span><span class=\"ff15\">13,265.3<span class=\"_ _42\"> </span>13,177.3<span class=\"_ _42\"> </span><span class=\"ff16\">10,669.2<span class=\"_ _67\"> </span>10,592.9<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs125a\">Corporat<span class=\"_ _0\"></span>e and retail bonds<span class=\"_ _2ff\"> </span><span class=\"ff15\">258.2<span class=\"_ _d5\"> </span>234.8<span class=\"_ _150\"> </span><span class=\"ff16\">261.5<span class=\"_ _150\"> </span>254.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs125b\">Sale and repurchase agr<span class=\"_ _0\"></span>eements<span class=\"_ _1a7\"> </span><span class=\"ff2c\">39<span class=\"_ _d1\"> </span><span class=\"ff15\">50.0<span class=\"_ _3a\"> </span>50.0<span class=\"_ _a8\"> </span></span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs125c\">Other financial liabilities<span class=\"_ _260\"> </span><span class=\"ff2c\">40<span class=\"_ _cb\"> </span><span class=\"ff15\">608.8<span class=\"_ _d5\"> </span>608.8<span class=\"_ _150\"> </span><span class=\"ff16\">491.2<span class=\"_ _d5\"> </span>491.2<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs125d\">14,210.5<span class=\"_ _42\"> </span>14,099.1<span class=\"_ _42\"> </span><span class=\"ff16\">12,417.6<span class=\"_ _67\"> </span>12,334.2<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff22 fs1 fc1 sc0 ls0 ws0 gs125e\">Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2022<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs125f\">Carrying amount<span class=\"_ _3f\"> </span>Fair value<span class=\"_ _c2\"> </span><span class=\"ff17\">Carrying amount<span class=\"_ _73\"> </span>Fair v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1260\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h93 ff24 fs1 fc1 sc0 ls0 ws0 gs1261\">The Company<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1262\">Financial assets<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1263\">Cash<span class=\"_ _1b1\"> </span><span class=\"ff2c\">17<span class=\"_ _40\"> </span><span class=\"ff15\">27.6<span class=\"_ _3a\"> </span>27.6<span class=\"_ _3a\"> </span><span class=\"ff16\">19.7<span class=\"_ _f7\"> </span>19.7<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1264\">Intra-gr<span class=\"_ _0\"></span>oup cash deposits<span class=\"_ _153\"> </span><span class=\"ff2c\">27<span class=\"_ _cb\"> </span><span class=\"ff15\">193.6<span class=\"_ _d5\"> </span>193.6<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1265\">Amounts owed to gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _76\"> </span><span class=\"ff2c\">27<span class=\"_ _40\"> </span><span class=\"ff15\">35.1<span class=\"_ _3a\"> </span>35.1<span class=\"_ _3a\"> </span><span class=\"ff16\">39.1<span class=\"_ _f7\"> </span>39.1<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1266\">Sundry financial assets<span class=\"_ _144\"> </span><span class=\"ff2c\">27<span class=\"_ _a8\"> </span><span class=\"ff15\">0.1<span class=\"_ _d1\"> </span>0.1<span class=\"_ _9e\"> </span><span class=\"ff16\">0.1<span class=\"_ _9e\"> </span>0.1<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs1267\">256.4<span class=\"_ _d5\"> </span>256.4<span class=\"_ _3a\"> </span><span class=\"ff16\">58.9<span class=\"_ _3a\"> </span>58.9<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h26 ff1e fs1 fc1 sc0 ls0 ws0 gs1268\">Financial liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs1269\">Corporat<span class=\"_ _0\"></span>e and retail bonds<span class=\"_ _2ff\"> </span><span class=\"ff15\">261.8<span class=\"_ _d5\"> </span>234.8<span class=\"_ _150\"> </span><span class=\"ff16\">261.5<span class=\"_ _150\"> </span>254.4<span class=\"_ _36a\"> </span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs126a\">Amounts owed by gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _4d\"> </span><span class=\"ff2c\">40<span class=\"_ _40\"> </span><span class=\"ff15\">24.0<span class=\"_ _3a\"> </span>24.0<span class=\"_ _3a\"> </span><span class=\"ff16\">23.2<span class=\"_ _f7\"> </span>23.2<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff17 fs1 fc1 sc0 ls0 ws0 gs126b\">Other financial liabilities<span class=\"_ _260\"> </span><span class=\"ff2c\">40<span class=\"_ _a8\"> </span><span class=\"ff15\">0.7<span class=\"_ _d1\"> </span>0.7<span class=\"_ _3a\"> </span><span class=\"ff16\">12.9<span class=\"_ _f7\"> </span>12.9<span class=\"_ _36a\"> </span></span></span></span></div><div class=\"t m0 h26 ff15 fs1 fc1 sc0 ls0 ws0 gs126c\">286.5<span class=\"_ _d5\"> </span>259.5<span class=\"_ _150\"> </span><span class=\"ff16\">297.6<span class=\"_ _d5\"> </span>290.5<span class=\"_ _36a\"> </span></span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs126d\">The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of<span class=\"_ _0\"></span> retail deposits and corporate and r<span class=\"_ _0\"></span>etail bonds shown abo<span class=\"_ _0\"></span>ve will include amounts <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the relat<span class=\"_ _0\"></span>ed accrued interest.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff20 fs1 fc1 sc0 ls0 ws0 gs126f\">Cash, sale and repurchase agr<span class=\"_ _0\"></span>eements, bank loans and securitisation borro<span class=\"_ _0\"></span>wings<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1270\">The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of<span class=\"_ _0\"></span> cash and cash equivalents, sale and repur<span class=\"_ _0\"></span>chase agreements, bank<span class=\"_ _0\"></span> loans and over<span class=\"_ _0\"></span>drafts and asset back<span class=\"_ _0\"></span>ed loan </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1271\">notes, which ar<span class=\"_ _0\"></span>e carried at amortised cost ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be not materially<span class=\"_ _0\"></span> different <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>their book <span class=\"_ _0\"></span>values. In arriving at <span class=\"_ _0\"></span>that </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1272\">conclusion market inputs ha<span class=\"_ _0\"></span>ve been consider<span class=\"_ _0\"></span>ed but because all the assets and <span class=\"_ _0\"></span>the sale and repur<span class=\"_ _0\"></span>chase agreements matur<span class=\"_ _0\"></span>e within </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1273\">three months of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end and the inter<span class=\"_ _0\"></span>est rates charg<span class=\"_ _0\"></span>ed on financial liabilities rese<span class=\"_ _0\"></span>t to mark<span class=\"_ _0\"></span>et rates on a quarterly<span class=\"_ _0\"></span> basis, little </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1274\">differ<span class=\"_ _0\"></span>ence arises. This also applies <span class=\"_ _0\"></span>to the par<span class=\"_ _0\"></span>ent company\u2019<span class=\"_ _1\"></span>s loans to its subsidiaries. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs1275\">While the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s asset backed loan notes ar<span class=\"_ _0\"></span>e listed, the quoted prices <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> an individual note may<span class=\"_ _0\"></span> not be indicative of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls6 ws0 gs1276\">issue as a whole, due <span class=\"_ _0\"></span>to the specialised natur<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the market in such instruments and <span class=\"_ _0\"></span>the limited number o<span class=\"_ _0\"></span>f inv<span class=\"_ _0\"></span>estors participating in it. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1277\">As these <span class=\"_ _0\"></span>valuation ex<span class=\"_ _0\"></span>ercises ar<span class=\"_ _0\"></span>e not wholly<span class=\"_ _0\"></span> market<span class=\"_ _0\"></span> based, they<span class=\"_ _0\"></span> are consider<span class=\"_ _0\"></span>ed to be le<span class=\"_ _0\"></span>vel 2 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff20 fs1 fc1 sc0 ls0 ws25 gs1278\">L<span class=\"_ _0\"></span>oans to customers<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1279\">T<span class=\"_ _2\"></span>o assess the likely<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s loan assets in the absence of<span class=\"_ _0\"></span> a liquid market, <span class=\"_ _0\"></span>the directors ha<span class=\"_ _0\"></span>ve considered <span class=\"_ _0\"></span>the estimated </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs127a\">cash flow<span class=\"_ _0\"></span>s expected to arise <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s investments in its loans to cust<span class=\"_ _0\"></span>omers based on a mixture of<span class=\"_ _0\"></span> market<span class=\"_ _0\"></span> based inputs, such </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs127b\">as rates and pricing and non-mark<span class=\"_ _0\"></span>et based inputs such as redemption r<span class=\"_ _0\"></span>ates. Given the mixtur<span class=\"_ _1\"></span>e of observable and non-observ<span class=\"_ _0\"></span>able </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs127c\">inputs these ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be level 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff20 fs1 fc1 sc0 ls0 ws0 gs127d\">Corporate debt<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs127e\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s retail and corporat<span class=\"_ _0\"></span>e bonds are listed on <span class=\"_ _0\"></span>the London Stock Ex<span class=\"_ _0\"></span>change and <span class=\"_ _0\"></span>there is pr<span class=\"_ _0\"></span>esently a r<span class=\"_ _0\"></span>easonably liquid mark<span class=\"_ _0\"></span>et </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs127f\">in the instruments. It is <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore appr<span class=\"_ _0\"></span>opriate to consider<span class=\"_ _0\"></span> that <span class=\"_ _0\"></span>the market price of<span class=\"_ _1\"></span> these borrowings constitutes a <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value. <span class=\"_ _0\"></span>As this </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1280\">valuation is based on a mark<span class=\"_ _0\"></span>et price, it is consider<span class=\"_ _0\"></span>ed to be a lev<span class=\"_ _0\"></span>el 1 measurement.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff20 fs1 fc1 sc0 ls0 ws0 gs1281\">Retail deposits<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1282\">T<span class=\"_ _2\"></span>o assess the likely<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s retail deposit liabilities, <span class=\"_ _0\"></span>the directors ha<span class=\"_ _0\"></span>ve considered <span class=\"_ _0\"></span>the estimated cash flow<span class=\"_ _0\"></span>s expected </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1283\">to arise based on a mixture o<span class=\"_ _0\"></span>f mark<span class=\"_ _0\"></span>et based inputs, such as rates and pricing and non-mark<span class=\"_ _0\"></span>et based inputs such as withdra<span class=\"_ _0\"></span>wal rates. </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1284\">Given <span class=\"_ _0\"></span>the mixture of<span class=\"_ _0\"></span> observable and non-observ<span class=\"_ _0\"></span>able inputs, these are consider<span class=\"_ _0\"></span>ed to be le<span class=\"_ _0\"></span>vel 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff20 fs1 fc1 sc0 ls0 ws0 gs1285\">Sundry assets and liabilities<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1286\">F<span class=\"_ _1\"></span>air v<span class=\"_ _0\"></span>alues of <span class=\"_ _0\"></span>financial assets and liabilities disclosed as sundry assets and sundry<span class=\"_ _0\"></span> liabilities are no<span class=\"_ _0\"></span>t considered <span class=\"_ _0\"></span>to be materially </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gs1287\">differ<span class=\"_ _0\"></span>ent to their carrying values.<span class=\"_ _36a\"> </span></div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws0 gs1288\">These assets and liabilities ar<span class=\"_ _0\"></span>e of r<span class=\"_ _0\"></span>elatively<span class=\"_ _0\"></span> low <span class=\"_ _0\"></span>value and may<span class=\"_ _0\"></span> be settled at <span class=\"_ _0\"></span>their carrying <span class=\"_ _0\"></span>value at <span class=\"_ _0\"></span>the balance sheet date or  </div><div class=\"t m0 h7 ff3 fs1 fc1 sc0 ls0 ws18 gs1289\">shortly ther<span class=\"_ _0\"></span>eafter<span class=\"_ _1\"></span>.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-499": {
   "value": "71. <span class=\"_ _18\"> </span>Financial asse<span class=\"_ _0\"></span>ts and financial liabilities<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s financial assets and financial liabilities ar<span class=\"_ _0\"></span>e v<span class=\"_ _0\"></span>alued on one of<span class=\"_ _0\"></span> two bases, defined b<span class=\"_ _0\"></span>y IFRS 9:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Financial assets and liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue through pr<span class=\"_ _0\"></span>ofit and loss (\u2018FVTPL<span class=\"_ _2f\"></span>\u2019)<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Financial assets and liabilities carried at amortised cost<span class=\"_ _36a\"> </span>IFRS 7 \u2013 \u2018Financial Instruments: Disclosures\u2019 r<span class=\"_ _0\"></span>equires <span class=\"_ _0\"></span>that wher<span class=\"_ _0\"></span>e assets are measur<span class=\"_ _0\"></span>ed at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue these measur<span class=\"_ _0\"></span>ements should be classified using the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value hierar<span class=\"_ _0\"></span>chy se<span class=\"_ _0\"></span>t out in IFRS 13 \u2013 \u2018F<span class=\"_ _0\"></span>air <span class=\"_ _1\"></span>Value Measur<span class=\"_ _0\"></span>ement\u2019<span class=\"_ _2\"></span>. This hier<span class=\"_ _0\"></span>archy<span class=\"_ _0\"></span> reflects <span class=\"_ _0\"></span>the inputs used and defines three lev<span class=\"_ _0\"></span>els:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 1 measurements ar<span class=\"_ _0\"></span>e unadjusted market prices \u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 2 measurements ar<span class=\"_ _0\"></span>e derived fr<span class=\"_ _0\"></span>om directly<span class=\"_ _0\"></span> or indir<span class=\"_ _0\"></span>ectly observ<span class=\"_ _0\"></span>able data, such as market prices or<span class=\"_ _1\"></span> rates \u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 3 measurements r<span class=\"_ _0\"></span>ely on significant inputs <span class=\"_ _0\"></span>which are not deriv<span class=\"_ _0\"></span>ed fr<span class=\"_ _0\"></span>om observable data As quoted prices ar<span class=\"_ _0\"></span>e not available <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> level 2 and 3 measur<span class=\"_ _0\"></span>ements, the <span class=\"_ _0\"></span>valuation is derived <span class=\"_ _0\"></span>from cash <span class=\"_ _0\"></span>flow models based, <span class=\"_ _0\"></span>where possible, on independently sour<span class=\"_ _0\"></span>ced parameters. <span class=\"_ _0\"></span>The accurac<span class=\"_ _0\"></span>y of<span class=\"_ _0\"></span> the calculation <span class=\"_ _0\"></span>would ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e be affected by<span class=\"_ _0\"></span> unexpected mark<span class=\"_ _0\"></span>et movements or<span class=\"_ _1\"></span> other v<span class=\"_ _0\"></span>ariances in the operation of<span class=\"_ _1\"></span> the models or the assump<span class=\"_ _0\"></span>tions used.<span class=\"_ _36a\"> </span>The Group had no <span class=\"_ _0\"></span>financial assets or liabilities in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear ended 30 Sept<span class=\"_ _0\"></span>ember 2023 or<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year ended 30 Sep<span class=\"_ _0\"></span>tember 2022 carried at fair <span class=\"_ _0\"></span>value and <span class=\"_ _0\"></span>valued using le<span class=\"_ _0\"></span>vel 3 measur<span class=\"_ _0\"></span>ements, other <span class=\"_ _0\"></span>than contingent consideration amounts (no<span class=\"_ _0\"></span>te 41).<span class=\"_ _36a\"> </span>The Group has no<span class=\"_ _0\"></span>t reclassified any<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> its measurements during <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>The methods by<span class=\"_ _0\"></span> which <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value is established <span class=\"_ _0\"></span>for each class o<span class=\"_ _0\"></span>f financial assets and liabilities ar<span class=\"_ _1\"></span>e set out below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>(a<span class=\"_ _0\"></span>) <span class=\"_ _1\"></span> <span class=\"_ _45\"> </span>Assets and liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span>The f<span class=\"_ _0\"></span>ollowing table summarises <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s financial assets and liabilities which ar<span class=\"_ _0\"></span>e carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Financial assets<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial assets<span class=\"_ _325\"> </span><span class=\"ff2c\">26<span class=\"_ _c8\"> </span><span class=\"ff15\">615.4<span class=\"_ _150\"> </span><span class=\"ff16\">779.0<span class=\"_ _36a\"> </span></span></span></span>615.4<span class=\"_ _d5\"> </span><span class=\"ff16\">779.0<span class=\"_ _36a\"> </span></span>Financial liabilities<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial liabilities<span class=\"_ _251\"> </span><span class=\"ff2c\">26<span class=\"_ _d1\"> </span><span class=\"ff15\">39.9<span class=\"_ _d5\"> </span><span class=\"ff16\">102.1<span class=\"_ _36a\"> </span></span></span></span>Contingent c<span class=\"_ _0\"></span>onsideration<span class=\"_ _1cc\"> </span><span class=\"ff2c\">41<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _36a\"> </span></span></span></span>39.9<span class=\"_ _d5\"> </span><span class=\"ff16\">104.3<span class=\"_ _36a\"> </span></span>All of <span class=\"_ _0\"></span>these financial assets and <span class=\"_ _0\"></span>financial liabilities are r<span class=\"_ _0\"></span>equired t<span class=\"_ _0\"></span>o be carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue by IFRS 9<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>The Company<span class=\"_ _0\"></span> has no financial assets or<span class=\"_ _0\"></span> liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial assets and liabilities<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial instruments are stated at<span class=\"_ _0\"></span> their<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> values in <span class=\"_ _0\"></span>the accounts. T<span class=\"_ _0\"></span>he Group uses a number<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>techniques to det<span class=\"_ _0\"></span>ermine the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of its deriv<span class=\"_ _0\"></span>ative assets and liabilities, <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>which observable prices in activ<span class=\"_ _0\"></span>e markets ar<span class=\"_ _0\"></span>e not av<span class=\"_ _0\"></span>ailable. These ar<span class=\"_ _0\"></span>e principally present <span class=\"_ _0\"></span>value calculations based on estimated <span class=\"_ _0\"></span>future cash <span class=\"_ _0\"></span>flows arising fr<span class=\"_ _0\"></span>om the instruments, discounted using a mark<span class=\"_ _0\"></span>et inter<span class=\"_ _0\"></span>est rate, adjusted for<span class=\"_ _1\"></span> risk as appropriate. <span class=\"_ _0\"></span>The principal inputs to <span class=\"_ _0\"></span>these valuation models ar<span class=\"_ _1\"></span>e SON<span class=\"_ _15\"></span>IA sterling benchmark int<span class=\"_ _0\"></span>erest rates.<span class=\"_ _36a\"> </span>In order<span class=\"_ _0\"></span> to det<span class=\"_ _0\"></span>ermine the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues, the management<span class=\"_ _0\"></span> applies valuation adjustments <span class=\"_ _0\"></span>to observed data <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>that data would no<span class=\"_ _0\"></span>t fully r<span class=\"_ _0\"></span>eflect the attribut<span class=\"_ _0\"></span>es of <span class=\"_ _0\"></span>the instrument being v<span class=\"_ _0\"></span>alued, such as particular contractual <span class=\"_ _0\"></span>features or<span class=\"_ _0\"></span> the identity<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the counterparty<span class=\"_ _1\"></span>. The management r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>ws the models used on an ong<span class=\"_ _0\"></span>oing basis to ensur<span class=\"_ _0\"></span>e that the <span class=\"_ _1\"></span>valuations produced are r<span class=\"_ _0\"></span>easonable and re<span class=\"_ _0\"></span>flect all rele<span class=\"_ _0\"></span>vant <span class=\"_ _0\"></span>factors. T<span class=\"_ _0\"></span>hese v<span class=\"_ _0\"></span>aluations are based on mark<span class=\"_ _0\"></span>et information, and the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e classified as level 2 measur<span class=\"_ _0\"></span>ements. Details of <span class=\"_ _0\"></span>these assets are giv<span class=\"_ _0\"></span>en in note 26.<span class=\"_ _36a\"> </span>Contingent considera<span class=\"_ _0\"></span>tion<span class=\"_ _36a\"> </span>The v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> the contingent consideration balances sho<span class=\"_ _0\"></span>wn in note 41 ar<span class=\"_ _0\"></span>e requir<span class=\"_ _0\"></span>ed to be stated at <span class=\"_ _0\"></span>fair <span class=\"_ _1\"></span>value in the accounts. T<span class=\"_ _0\"></span>hese amounts are <span class=\"_ _0\"></span>valued based on <span class=\"_ _0\"></span>the expected outcomes of<span class=\"_ _0\"></span> the performance <span class=\"_ _0\"></span>tests set out in <span class=\"_ _0\"></span>the respective sale and pur<span class=\"_ _0\"></span>chase agreements, discounted as appr<span class=\"_ _0\"></span>opriate. <span class=\"_ _0\"></span>The most significant inputs t<span class=\"_ _0\"></span>o these v<span class=\"_ _0\"></span>aluations are <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s forecasts on <span class=\"_ _0\"></span>future activity<span class=\"_ _0\"></span> relating <span class=\"_ _0\"></span>to business generated b<span class=\"_ _0\"></span>y operational units acquir<span class=\"_ _0\"></span>ed, business derived as a r<span class=\"_ _0\"></span>esult of <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>endor\u2019<span class=\"_ _1\"></span>s contacts or other g<span class=\"_ _0\"></span>oodwill and any<span class=\"_ _0\"></span> other ne<span class=\"_ _0\"></span>w business flo<span class=\"_ _0\"></span>ws which ar<span class=\"_ _0\"></span>e or might<span class=\"_ _0\"></span> be attributable to the acquisition agr<span class=\"_ _0\"></span>eement, which ar<span class=\"_ _0\"></span>e drawn fr<span class=\"_ _0\"></span>om the o<span class=\"_ _0\"></span>verall Group <span class=\"_ _0\"></span>forecasting model. <span class=\"_ _1\"></span>As such, these are classified as unobservable inputs and <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>aluations classified as level 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Assets and liabilities carried at amortised cost<span class=\"_ _36a\"> </span>The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues for<span class=\"_ _1\"></span> financial assets and financial liabilities held at amortised cost, determined in accor<span class=\"_ _0\"></span>dance with the me<span class=\"_ _0\"></span>thodologies set out below<span class=\"_ _0\"></span> are summarised belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2022<span class=\"_ _36a\"> </span></span></span>Carrying amount<span class=\"_ _3f\"> </span>Fair value<span class=\"_ _c2\"> </span><span class=\"ff17\">Carrying amount<span class=\"_ _73\"> </span>Fair v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>The Group<span class=\"_ _36a\"> </span>Financial assets<span class=\"_ _36a\"> </span>Cash<span class=\"_ _1b1\"> </span><span class=\"ff2c\">17<span class=\"_ _133\"> </span><span class=\"ff15\">2,994.3<span class=\"_ _86\"> </span>2,994.3<span class=\"_ _12a\"> </span><span class=\"ff16\">1,930.9<span class=\"_ _86\"> </span>1,930.9<span class=\"_ _36a\"> </span></span></span></span>Loans to customer<span class=\"_ _0\"></span>s<span class=\"_ _2b4\"> </span><span class=\"ff2c\">18<span class=\"_ _12a\"> </span><span class=\"ff15\">14,874.3<span class=\"_ _42\"> </span>14,524.0<span class=\"_ _42\"> </span><span class=\"ff16\">14,210.3<span class=\"_ _67\"> </span>13,898.4<span class=\"_ _36a\"> </span></span></span></span>Sundry financial assets<span class=\"_ _144\"> </span><span class=\"ff2c\">27<span class=\"_ _d1\"> </span><span class=\"ff15\">46.0<span class=\"_ _3a\"> </span>46.0<span class=\"_ _3a\"> </span><span class=\"ff16\">35.4<span class=\"_ _3a\"> </span>35.4<span class=\"_ _36a\"> </span></span></span></span>17,914.6<span class=\"_ _42\"> </span>17,564.3<span class=\"_ _42\"> </span><span class=\"ff16\">16,176.6<span class=\"_ _67\"> </span>15,864.7<span class=\"_ _36a\"> </span></span>Financial liabilities<span class=\"_ _36a\"> </span>Short-t<span class=\"_ _0\"></span>erm bank borrowings<span class=\"_ _2f9\"> </span><span class=\"ff15\">0.2<span class=\"_ _d1\"> </span>0.2<span class=\"_ _9e\"> </span><span class=\"ff16\">0.4<span class=\"_ _9e\"> </span>0.4<span class=\"_ _36a\"> </span></span></span>Asset back<span class=\"_ _0\"></span>ed loan notes <span class=\"_ _83\"> </span><span class=\"ff15\">28.0<span class=\"_ _cb\"> </span>28.0<span class=\"_ _150\"> </span><span class=\"ff16\">409.3<span class=\"_ _150\"> </span>409.3<span class=\"_ _36a\"> </span></span></span>Secured bank borro<span class=\"_ _0\"></span>wings<span class=\"_ _167\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _3a\"> </span><span class=\"ff16\">586.0<span class=\"_ _d5\"> </span>586.0<span class=\"_ _36a\"> </span></span></span>Ret<span class=\"_ _0\"></span>ail deposits<span class=\"_ _356\"> </span><span class=\"ff2c\">33<span class=\"_ _70\"> </span><span class=\"ff15\">13,265.3<span class=\"_ _42\"> </span>13,177.3<span class=\"_ _42\"> </span><span class=\"ff16\">10,669.2<span class=\"_ _67\"> </span>10,592.9<span class=\"_ _36a\"> </span></span></span></span>Corporat<span class=\"_ _0\"></span>e and retail bonds<span class=\"_ _2ff\"> </span><span class=\"ff15\">258.2<span class=\"_ _d5\"> </span>234.8<span class=\"_ _150\"> </span><span class=\"ff16\">261.5<span class=\"_ _150\"> </span>254.4<span class=\"_ _36a\"> </span></span></span>Sale and repurchase agr<span class=\"_ _0\"></span>eements<span class=\"_ _1a7\"> </span><span class=\"ff2c\">39<span class=\"_ _d1\"> </span><span class=\"ff15\">50.0<span class=\"_ _3a\"> </span>50.0<span class=\"_ _a8\"> </span></span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>Other financial liabilities<span class=\"_ _260\"> </span><span class=\"ff2c\">40<span class=\"_ _cb\"> </span><span class=\"ff15\">608.8<span class=\"_ _d5\"> </span>608.8<span class=\"_ _150\"> </span><span class=\"ff16\">491.2<span class=\"_ _d5\"> </span>491.2<span class=\"_ _36a\"> </span></span></span></span>14,210.5<span class=\"_ _42\"> </span>14,099.1<span class=\"_ _42\"> </span><span class=\"ff16\">12,417.6<span class=\"_ _67\"> </span>12,334.2<span class=\"_ _36a\"> </span></span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2022<span class=\"_ _36a\"> </span></span></span>Carrying amount<span class=\"_ _3f\"> </span>Fair value<span class=\"_ _c2\"> </span><span class=\"ff17\">Carrying amount<span class=\"_ _73\"> </span>Fair v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>The Company<span class=\"_ _36a\"> </span>Financial assets<span class=\"_ _36a\"> </span>Cash<span class=\"_ _1b1\"> </span><span class=\"ff2c\">17<span class=\"_ _40\"> </span><span class=\"ff15\">27.6<span class=\"_ _3a\"> </span>27.6<span class=\"_ _3a\"> </span><span class=\"ff16\">19.7<span class=\"_ _f7\"> </span>19.7<span class=\"_ _36a\"> </span></span></span></span>Intra-gr<span class=\"_ _0\"></span>oup cash deposits<span class=\"_ _153\"> </span><span class=\"ff2c\">27<span class=\"_ _cb\"> </span><span class=\"ff15\">193.6<span class=\"_ _d5\"> </span>193.6<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _36a\"> </span>Amounts owed to gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _76\"> </span><span class=\"ff2c\">27<span class=\"_ _40\"> </span><span class=\"ff15\">35.1<span class=\"_ _3a\"> </span>35.1<span class=\"_ _3a\"> </span><span class=\"ff16\">39.1<span class=\"_ _f7\"> </span>39.1<span class=\"_ _36a\"> </span></span></span></span>Sundry financial assets<span class=\"_ _144\"> </span><span class=\"ff2c\">27<span class=\"_ _a8\"> </span><span class=\"ff15\">0.1<span class=\"_ _d1\"> </span>0.1<span class=\"_ _9e\"> </span><span class=\"ff16\">0.1<span class=\"_ _9e\"> </span>0.1<span class=\"_ _36a\"> </span></span></span></span>256.4<span class=\"_ _d5\"> </span>256.4<span class=\"_ _3a\"> </span><span class=\"ff16\">58.9<span class=\"_ _3a\"> </span>58.9<span class=\"_ _36a\"> </span></span>Financial liabilities<span class=\"_ _36a\"> </span>Corporat<span class=\"_ _0\"></span>e and retail bonds<span class=\"_ _2ff\"> </span><span class=\"ff15\">261.8<span class=\"_ _d5\"> </span>234.8<span class=\"_ _150\"> </span><span class=\"ff16\">261.5<span class=\"_ _150\"> </span>254.4<span class=\"_ _36a\"> </span></span></span>Amounts owed by gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _4d\"> </span><span class=\"ff2c\">40<span class=\"_ _40\"> </span><span class=\"ff15\">24.0<span class=\"_ _3a\"> </span>24.0<span class=\"_ _3a\"> </span><span class=\"ff16\">23.2<span class=\"_ _f7\"> </span>23.2<span class=\"_ _36a\"> </span></span></span></span>Other financial liabilities<span class=\"_ _260\"> </span><span class=\"ff2c\">40<span class=\"_ _a8\"> </span><span class=\"ff15\">0.7<span class=\"_ _d1\"> </span>0.7<span class=\"_ _3a\"> </span><span class=\"ff16\">12.9<span class=\"_ _f7\"> </span>12.9<span class=\"_ _36a\"> </span></span></span></span>286.5<span class=\"_ _d5\"> </span>259.5<span class=\"_ _150\"> </span><span class=\"ff16\">297.6<span class=\"_ _d5\"> </span>290.5<span class=\"_ _36a\"> </span></span>The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of<span class=\"_ _0\"></span> retail deposits and corporate and r<span class=\"_ _0\"></span>etail bonds shown abo<span class=\"_ _0\"></span>ve will include amounts <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the relat<span class=\"_ _0\"></span>ed accrued interest.<span class=\"_ _36a\"> </span>Cash, sale and repurchase agr<span class=\"_ _0\"></span>eements, bank loans and securitisation borro<span class=\"_ _0\"></span>wings<span class=\"_ _36a\"> </span>The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of<span class=\"_ _0\"></span> cash and cash equivalents, sale and repur<span class=\"_ _0\"></span>chase agreements, bank<span class=\"_ _0\"></span> loans and over<span class=\"_ _0\"></span>drafts and asset back<span class=\"_ _0\"></span>ed loan notes, which ar<span class=\"_ _0\"></span>e carried at amortised cost ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be not materially<span class=\"_ _0\"></span> different <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>their book <span class=\"_ _0\"></span>values. In arriving at <span class=\"_ _0\"></span>that conclusion market inputs ha<span class=\"_ _0\"></span>ve been consider<span class=\"_ _0\"></span>ed but because all the assets and <span class=\"_ _0\"></span>the sale and repur<span class=\"_ _0\"></span>chase agreements matur<span class=\"_ _0\"></span>e within three months of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end and the inter<span class=\"_ _0\"></span>est rates charg<span class=\"_ _0\"></span>ed on financial liabilities rese<span class=\"_ _0\"></span>t to mark<span class=\"_ _0\"></span>et rates on a quarterly<span class=\"_ _0\"></span> basis, little differ<span class=\"_ _0\"></span>ence arises. This also applies <span class=\"_ _0\"></span>to the par<span class=\"_ _0\"></span>ent company\u2019<span class=\"_ _1\"></span>s loans to its subsidiaries. While the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s asset backed loan notes ar<span class=\"_ _0\"></span>e listed, the quoted prices <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> an individual note may<span class=\"_ _0\"></span> not be indicative of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the issue as a whole, due <span class=\"_ _0\"></span>to the specialised natur<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the market in such instruments and <span class=\"_ _0\"></span>the limited number o<span class=\"_ _0\"></span>f inv<span class=\"_ _0\"></span>estors participating in it. As these <span class=\"_ _0\"></span>valuation ex<span class=\"_ _0\"></span>ercises ar<span class=\"_ _0\"></span>e not wholly<span class=\"_ _0\"></span> market<span class=\"_ _0\"></span> based, they<span class=\"_ _0\"></span> are consider<span class=\"_ _0\"></span>ed to be le<span class=\"_ _0\"></span>vel 2 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>L<span class=\"_ _0\"></span>oans to customers<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>o assess the likely<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s loan assets in the absence of<span class=\"_ _0\"></span> a liquid market, <span class=\"_ _0\"></span>the directors ha<span class=\"_ _0\"></span>ve considered <span class=\"_ _0\"></span>the estimated cash flow<span class=\"_ _0\"></span>s expected to arise <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s investments in its loans to cust<span class=\"_ _0\"></span>omers based on a mixture of<span class=\"_ _0\"></span> market<span class=\"_ _0\"></span> based inputs, such as rates and pricing and non-mark<span class=\"_ _0\"></span>et based inputs such as redemption r<span class=\"_ _0\"></span>ates. Given the mixtur<span class=\"_ _1\"></span>e of observable and non-observ<span class=\"_ _0\"></span>able inputs these ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be level 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>Corporate debt<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s retail and corporat<span class=\"_ _0\"></span>e bonds are listed on <span class=\"_ _0\"></span>the London Stock Ex<span class=\"_ _0\"></span>change and <span class=\"_ _0\"></span>there is pr<span class=\"_ _0\"></span>esently a r<span class=\"_ _0\"></span>easonably liquid mark<span class=\"_ _0\"></span>et in the instruments. It is <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore appr<span class=\"_ _0\"></span>opriate to consider<span class=\"_ _0\"></span> that <span class=\"_ _0\"></span>the market price of<span class=\"_ _1\"></span> these borrowings constitutes a <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value. <span class=\"_ _0\"></span>As this valuation is based on a mark<span class=\"_ _0\"></span>et price, it is consider<span class=\"_ _0\"></span>ed to be a lev<span class=\"_ _0\"></span>el 1 measurement.<span class=\"_ _36a\"> </span>Retail deposits<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>o assess the likely<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s retail deposit liabilities, <span class=\"_ _0\"></span>the directors ha<span class=\"_ _0\"></span>ve considered <span class=\"_ _0\"></span>the estimated cash flow<span class=\"_ _0\"></span>s expected to arise based on a mixture o<span class=\"_ _0\"></span>f mark<span class=\"_ _0\"></span>et based inputs, such as rates and pricing and non-mark<span class=\"_ _0\"></span>et based inputs such as withdra<span class=\"_ _0\"></span>wal rates. Given <span class=\"_ _0\"></span>the mixture of<span class=\"_ _0\"></span> observable and non-observ<span class=\"_ _0\"></span>able inputs, these are consider<span class=\"_ _0\"></span>ed to be le<span class=\"_ _0\"></span>vel 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>Sundry assets and liabilities<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>air v<span class=\"_ _0\"></span>alues of <span class=\"_ _0\"></span>financial assets and liabilities disclosed as sundry assets and sundry<span class=\"_ _0\"></span> liabilities are no<span class=\"_ _0\"></span>t considered <span class=\"_ _0\"></span>to be materially differ<span class=\"_ _0\"></span>ent to their carrying values.<span class=\"_ _36a\"> </span>These assets and liabilities ar<span class=\"_ _0\"></span>e of r<span class=\"_ _0\"></span>elatively<span class=\"_ _0\"></span> low <span class=\"_ _0\"></span>value and may<span class=\"_ _0\"></span> be settled at <span class=\"_ _0\"></span>their carrying <span class=\"_ _0\"></span>value at <span class=\"_ _0\"></span>the balance sheet date or  shortly ther<span class=\"_ _0\"></span>eafter<span class=\"_ _1\"></span>.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFairValueMeasurementExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-488": {
   "value": "71. <span class=\"_ _18\"> </span>Financial asse<span class=\"_ _0\"></span>ts and financial liabilities<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s financial assets and financial liabilities ar<span class=\"_ _0\"></span>e v<span class=\"_ _0\"></span>alued on one of<span class=\"_ _0\"></span> two bases, defined b<span class=\"_ _0\"></span>y IFRS 9:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Financial assets and liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue through pr<span class=\"_ _0\"></span>ofit and loss (\u2018FVTPL<span class=\"_ _2f\"></span>\u2019)<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Financial assets and liabilities carried at amortised cost<span class=\"_ _36a\"> </span>IFRS 7 \u2013 \u2018Financial Instruments: Disclosures\u2019 r<span class=\"_ _0\"></span>equires <span class=\"_ _0\"></span>that wher<span class=\"_ _0\"></span>e assets are measur<span class=\"_ _0\"></span>ed at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue these measur<span class=\"_ _0\"></span>ements should be classified using the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value hierar<span class=\"_ _0\"></span>chy se<span class=\"_ _0\"></span>t out in IFRS 13 \u2013 \u2018F<span class=\"_ _0\"></span>air <span class=\"_ _1\"></span>Value Measur<span class=\"_ _0\"></span>ement\u2019<span class=\"_ _2\"></span>. This hier<span class=\"_ _0\"></span>archy<span class=\"_ _0\"></span> reflects <span class=\"_ _0\"></span>the inputs used and defines three lev<span class=\"_ _0\"></span>els:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 1 measurements ar<span class=\"_ _0\"></span>e unadjusted market prices \u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 2 measurements ar<span class=\"_ _0\"></span>e derived fr<span class=\"_ _0\"></span>om directly<span class=\"_ _0\"></span> or indir<span class=\"_ _0\"></span>ectly observ<span class=\"_ _0\"></span>able data, such as market prices or<span class=\"_ _1\"></span> rates \u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 3 measurements r<span class=\"_ _0\"></span>ely on significant inputs <span class=\"_ _0\"></span>which are not deriv<span class=\"_ _0\"></span>ed fr<span class=\"_ _0\"></span>om observable data As quoted prices ar<span class=\"_ _0\"></span>e not available <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> level 2 and 3 measur<span class=\"_ _0\"></span>ements, the <span class=\"_ _0\"></span>valuation is derived <span class=\"_ _0\"></span>from cash <span class=\"_ _0\"></span>flow models based, <span class=\"_ _0\"></span>where possible, on independently sour<span class=\"_ _0\"></span>ced parameters. <span class=\"_ _0\"></span>The accurac<span class=\"_ _0\"></span>y of<span class=\"_ _0\"></span> the calculation <span class=\"_ _0\"></span>would ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e be affected by<span class=\"_ _0\"></span> unexpected mark<span class=\"_ _0\"></span>et movements or<span class=\"_ _1\"></span> other v<span class=\"_ _0\"></span>ariances in the operation of<span class=\"_ _1\"></span> the models or the assump<span class=\"_ _0\"></span>tions used.<span class=\"_ _36a\"> </span>The Group had no <span class=\"_ _0\"></span>financial assets or liabilities in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear ended 30 Sept<span class=\"_ _0\"></span>ember 2023 or<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year ended 30 Sep<span class=\"_ _0\"></span>tember 2022 carried at fair <span class=\"_ _0\"></span>value and <span class=\"_ _0\"></span>valued using le<span class=\"_ _0\"></span>vel 3 measur<span class=\"_ _0\"></span>ements, other <span class=\"_ _0\"></span>than contingent consideration amounts (no<span class=\"_ _0\"></span>te 41).<span class=\"_ _36a\"> </span>The Group has no<span class=\"_ _0\"></span>t reclassified any<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> its measurements during <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>The methods by<span class=\"_ _0\"></span> which <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value is established <span class=\"_ _0\"></span>for each class o<span class=\"_ _0\"></span>f financial assets and liabilities ar<span class=\"_ _1\"></span>e set out below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>(a<span class=\"_ _0\"></span>) <span class=\"_ _1\"></span> <span class=\"_ _45\"> </span>Assets and liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span>The f<span class=\"_ _0\"></span>ollowing table summarises <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s financial assets and liabilities which ar<span class=\"_ _0\"></span>e carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Financial assets<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial assets<span class=\"_ _325\"> </span><span class=\"ff2c\">26<span class=\"_ _c8\"> </span><span class=\"ff15\">615.4<span class=\"_ _150\"> </span><span class=\"ff16\">779.0<span class=\"_ _36a\"> </span></span></span></span>615.4<span class=\"_ _d5\"> </span><span class=\"ff16\">779.0<span class=\"_ _36a\"> </span></span>Financial liabilities<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial liabilities<span class=\"_ _251\"> </span><span class=\"ff2c\">26<span class=\"_ _d1\"> </span><span class=\"ff15\">39.9<span class=\"_ _d5\"> </span><span class=\"ff16\">102.1<span class=\"_ _36a\"> </span></span></span></span>Contingent c<span class=\"_ _0\"></span>onsideration<span class=\"_ _1cc\"> </span><span class=\"ff2c\">41<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _36a\"> </span></span></span></span>39.9<span class=\"_ _d5\"> </span><span class=\"ff16\">104.3<span class=\"_ _36a\"> </span></span>All of <span class=\"_ _0\"></span>these financial assets and <span class=\"_ _0\"></span>financial liabilities are r<span class=\"_ _0\"></span>equired t<span class=\"_ _0\"></span>o be carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue by IFRS 9<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>The Company<span class=\"_ _0\"></span> has no financial assets or<span class=\"_ _0\"></span> liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial assets and liabilities<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial instruments are stated at<span class=\"_ _0\"></span> their<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> values in <span class=\"_ _0\"></span>the accounts. T<span class=\"_ _0\"></span>he Group uses a number<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>techniques to det<span class=\"_ _0\"></span>ermine the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of its deriv<span class=\"_ _0\"></span>ative assets and liabilities, <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>which observable prices in activ<span class=\"_ _0\"></span>e markets ar<span class=\"_ _0\"></span>e not av<span class=\"_ _0\"></span>ailable. These ar<span class=\"_ _0\"></span>e principally present <span class=\"_ _0\"></span>value calculations based on estimated <span class=\"_ _0\"></span>future cash <span class=\"_ _0\"></span>flows arising fr<span class=\"_ _0\"></span>om the instruments, discounted using a mark<span class=\"_ _0\"></span>et inter<span class=\"_ _0\"></span>est rate, adjusted for<span class=\"_ _1\"></span> risk as appropriate. <span class=\"_ _0\"></span>The principal inputs to <span class=\"_ _0\"></span>these valuation models ar<span class=\"_ _1\"></span>e SON<span class=\"_ _15\"></span>IA sterling benchmark int<span class=\"_ _0\"></span>erest rates.<span class=\"_ _36a\"> </span>In order<span class=\"_ _0\"></span> to det<span class=\"_ _0\"></span>ermine the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues, the management<span class=\"_ _0\"></span> applies valuation adjustments <span class=\"_ _0\"></span>to observed data <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>that data would no<span class=\"_ _0\"></span>t fully r<span class=\"_ _0\"></span>eflect the attribut<span class=\"_ _0\"></span>es of <span class=\"_ _0\"></span>the instrument being v<span class=\"_ _0\"></span>alued, such as particular contractual <span class=\"_ _0\"></span>features or<span class=\"_ _0\"></span> the identity<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the counterparty<span class=\"_ _1\"></span>. The management r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>ws the models used on an ong<span class=\"_ _0\"></span>oing basis to ensur<span class=\"_ _0\"></span>e that the <span class=\"_ _1\"></span>valuations produced are r<span class=\"_ _0\"></span>easonable and re<span class=\"_ _0\"></span>flect all rele<span class=\"_ _0\"></span>vant <span class=\"_ _0\"></span>factors. T<span class=\"_ _0\"></span>hese v<span class=\"_ _0\"></span>aluations are based on mark<span class=\"_ _0\"></span>et information, and the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e classified as level 2 measur<span class=\"_ _0\"></span>ements. Details of <span class=\"_ _0\"></span>these assets are giv<span class=\"_ _0\"></span>en in note 26.<span class=\"_ _36a\"> </span>Contingent considera<span class=\"_ _0\"></span>tion<span class=\"_ _36a\"> </span>The v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> the contingent consideration balances sho<span class=\"_ _0\"></span>wn in note 41 ar<span class=\"_ _0\"></span>e requir<span class=\"_ _0\"></span>ed to be stated at <span class=\"_ _0\"></span>fair <span class=\"_ _1\"></span>value in the accounts. T<span class=\"_ _0\"></span>hese amounts are <span class=\"_ _0\"></span>valued based on <span class=\"_ _0\"></span>the expected outcomes of<span class=\"_ _0\"></span> the performance <span class=\"_ _0\"></span>tests set out in <span class=\"_ _0\"></span>the respective sale and pur<span class=\"_ _0\"></span>chase agreements, discounted as appr<span class=\"_ _0\"></span>opriate. <span class=\"_ _0\"></span>The most significant inputs t<span class=\"_ _0\"></span>o these v<span class=\"_ _0\"></span>aluations are <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s forecasts on <span class=\"_ _0\"></span>future activity<span class=\"_ _0\"></span> relating <span class=\"_ _0\"></span>to business generated b<span class=\"_ _0\"></span>y operational units acquir<span class=\"_ _0\"></span>ed, business derived as a r<span class=\"_ _0\"></span>esult of <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>endor\u2019<span class=\"_ _1\"></span>s contacts or other g<span class=\"_ _0\"></span>oodwill and any<span class=\"_ _0\"></span> other ne<span class=\"_ _0\"></span>w business flo<span class=\"_ _0\"></span>ws which ar<span class=\"_ _0\"></span>e or might<span class=\"_ _0\"></span> be attributable to the acquisition agr<span class=\"_ _0\"></span>eement, which ar<span class=\"_ _0\"></span>e drawn fr<span class=\"_ _0\"></span>om the o<span class=\"_ _0\"></span>verall Group <span class=\"_ _0\"></span>forecasting model. <span class=\"_ _1\"></span>As such, these are classified as unobservable inputs and <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>aluations classified as level 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Assets and liabilities carried at amortised cost<span class=\"_ _36a\"> </span>The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues for<span class=\"_ _1\"></span> financial assets and financial liabilities held at amortised cost, determined in accor<span class=\"_ _0\"></span>dance with the me<span class=\"_ _0\"></span>thodologies set out below<span class=\"_ _0\"></span> are summarised belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2022<span class=\"_ _36a\"> </span></span></span>Carrying amount<span class=\"_ _3f\"> </span>Fair value<span class=\"_ _c2\"> </span><span class=\"ff17\">Carrying amount<span class=\"_ _73\"> </span>Fair v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>The Group<span class=\"_ _36a\"> </span>Financial assets<span class=\"_ _36a\"> </span>Cash<span class=\"_ _1b1\"> </span><span class=\"ff2c\">17<span class=\"_ _133\"> </span><span class=\"ff15\">2,994.3<span class=\"_ _86\"> </span>2,994.3<span class=\"_ _12a\"> </span><span class=\"ff16\">1,930.9<span class=\"_ _86\"> </span>1,930.9<span class=\"_ _36a\"> </span></span></span></span>Loans to customer<span class=\"_ _0\"></span>s<span class=\"_ _2b4\"> </span><span class=\"ff2c\">18<span class=\"_ _12a\"> </span><span class=\"ff15\">14,874.3<span class=\"_ _42\"> </span>14,524.0<span class=\"_ _42\"> </span><span class=\"ff16\">14,210.3<span class=\"_ _67\"> </span>13,898.4<span class=\"_ _36a\"> </span></span></span></span>Sundry financial assets<span class=\"_ _144\"> </span><span class=\"ff2c\">27<span class=\"_ _d1\"> </span><span class=\"ff15\">46.0<span class=\"_ _3a\"> </span>46.0<span class=\"_ _3a\"> </span><span class=\"ff16\">35.4<span class=\"_ _3a\"> </span>35.4<span class=\"_ _36a\"> </span></span></span></span>17,914.6<span class=\"_ _42\"> </span>17,564.3<span class=\"_ _42\"> </span><span class=\"ff16\">16,176.6<span class=\"_ _67\"> </span>15,864.7<span class=\"_ _36a\"> </span></span>Financial liabilities<span class=\"_ _36a\"> </span>Short-t<span class=\"_ _0\"></span>erm bank borrowings<span class=\"_ _2f9\"> </span><span class=\"ff15\">0.2<span class=\"_ _d1\"> </span>0.2<span class=\"_ _9e\"> </span><span class=\"ff16\">0.4<span class=\"_ _9e\"> </span>0.4<span class=\"_ _36a\"> </span></span></span>Asset back<span class=\"_ _0\"></span>ed loan notes <span class=\"_ _83\"> </span><span class=\"ff15\">28.0<span class=\"_ _cb\"> </span>28.0<span class=\"_ _150\"> </span><span class=\"ff16\">409.3<span class=\"_ _150\"> </span>409.3<span class=\"_ _36a\"> </span></span></span>Secured bank borro<span class=\"_ _0\"></span>wings<span class=\"_ _167\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _3a\"> </span><span class=\"ff16\">586.0<span class=\"_ _d5\"> </span>586.0<span class=\"_ _36a\"> </span></span></span>Ret<span class=\"_ _0\"></span>ail deposits<span class=\"_ _356\"> </span><span class=\"ff2c\">33<span class=\"_ _70\"> </span><span class=\"ff15\">13,265.3<span class=\"_ _42\"> </span>13,177.3<span class=\"_ _42\"> </span><span class=\"ff16\">10,669.2<span class=\"_ _67\"> </span>10,592.9<span class=\"_ _36a\"> </span></span></span></span>Corporat<span class=\"_ _0\"></span>e and retail bonds<span class=\"_ _2ff\"> </span><span class=\"ff15\">258.2<span class=\"_ _d5\"> </span>234.8<span class=\"_ _150\"> </span><span class=\"ff16\">261.5<span class=\"_ _150\"> </span>254.4<span class=\"_ _36a\"> </span></span></span>Sale and repurchase agr<span class=\"_ _0\"></span>eements<span class=\"_ _1a7\"> </span><span class=\"ff2c\">39<span class=\"_ _d1\"> </span><span class=\"ff15\">50.0<span class=\"_ _3a\"> </span>50.0<span class=\"_ _a8\"> </span></span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>Other financial liabilities<span class=\"_ _260\"> </span><span class=\"ff2c\">40<span class=\"_ _cb\"> </span><span class=\"ff15\">608.8<span class=\"_ _d5\"> </span>608.8<span class=\"_ _150\"> </span><span class=\"ff16\">491.2<span class=\"_ _d5\"> </span>491.2<span class=\"_ _36a\"> </span></span></span></span>14,210.5<span class=\"_ _42\"> </span>14,099.1<span class=\"_ _42\"> </span><span class=\"ff16\">12,417.6<span class=\"_ _67\"> </span>12,334.2<span class=\"_ _36a\"> </span></span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2022<span class=\"_ _36a\"> </span></span></span>Carrying amount<span class=\"_ _3f\"> </span>Fair value<span class=\"_ _c2\"> </span><span class=\"ff17\">Carrying amount<span class=\"_ _73\"> </span>Fair v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>The Company<span class=\"_ _36a\"> </span>Financial assets<span class=\"_ _36a\"> </span>Cash<span class=\"_ _1b1\"> </span><span class=\"ff2c\">17<span class=\"_ _40\"> </span><span class=\"ff15\">27.6<span class=\"_ _3a\"> </span>27.6<span class=\"_ _3a\"> </span><span class=\"ff16\">19.7<span class=\"_ _f7\"> </span>19.7<span class=\"_ _36a\"> </span></span></span></span>Intra-gr<span class=\"_ _0\"></span>oup cash deposits<span class=\"_ _153\"> </span><span class=\"ff2c\">27<span class=\"_ _cb\"> </span><span class=\"ff15\">193.6<span class=\"_ _d5\"> </span>193.6<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _36a\"> </span>Amounts owed to gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _76\"> </span><span class=\"ff2c\">27<span class=\"_ _40\"> </span><span class=\"ff15\">35.1<span class=\"_ _3a\"> </span>35.1<span class=\"_ _3a\"> </span><span class=\"ff16\">39.1<span class=\"_ _f7\"> </span>39.1<span class=\"_ _36a\"> </span></span></span></span>Sundry financial assets<span class=\"_ _144\"> </span><span class=\"ff2c\">27<span class=\"_ _a8\"> </span><span class=\"ff15\">0.1<span class=\"_ _d1\"> </span>0.1<span class=\"_ _9e\"> </span><span class=\"ff16\">0.1<span class=\"_ _9e\"> </span>0.1<span class=\"_ _36a\"> </span></span></span></span>256.4<span class=\"_ _d5\"> </span>256.4<span class=\"_ _3a\"> </span><span class=\"ff16\">58.9<span class=\"_ _3a\"> </span>58.9<span class=\"_ _36a\"> </span></span>Financial liabilities<span class=\"_ _36a\"> </span>Corporat<span class=\"_ _0\"></span>e and retail bonds<span class=\"_ _2ff\"> </span><span class=\"ff15\">261.8<span class=\"_ _d5\"> </span>234.8<span class=\"_ _150\"> </span><span class=\"ff16\">261.5<span class=\"_ _150\"> </span>254.4<span class=\"_ _36a\"> </span></span></span>Amounts owed by gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _4d\"> </span><span class=\"ff2c\">40<span class=\"_ _40\"> </span><span class=\"ff15\">24.0<span class=\"_ _3a\"> </span>24.0<span class=\"_ _3a\"> </span><span class=\"ff16\">23.2<span class=\"_ _f7\"> </span>23.2<span class=\"_ _36a\"> </span></span></span></span>Other financial liabilities<span class=\"_ _260\"> </span><span class=\"ff2c\">40<span class=\"_ _a8\"> </span><span class=\"ff15\">0.7<span class=\"_ _d1\"> </span>0.7<span class=\"_ _3a\"> </span><span class=\"ff16\">12.9<span class=\"_ _f7\"> </span>12.9<span class=\"_ _36a\"> </span></span></span></span>286.5<span class=\"_ _d5\"> </span>259.5<span class=\"_ _150\"> </span><span class=\"ff16\">297.6<span class=\"_ _d5\"> </span>290.5<span class=\"_ _36a\"> </span></span>The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of<span class=\"_ _0\"></span> retail deposits and corporate and r<span class=\"_ _0\"></span>etail bonds shown abo<span class=\"_ _0\"></span>ve will include amounts <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the relat<span class=\"_ _0\"></span>ed accrued interest.<span class=\"_ _36a\"> </span>Cash, sale and repurchase agr<span class=\"_ _0\"></span>eements, bank loans and securitisation borro<span class=\"_ _0\"></span>wings<span class=\"_ _36a\"> </span>The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of<span class=\"_ _0\"></span> cash and cash equivalents, sale and repur<span class=\"_ _0\"></span>chase agreements, bank<span class=\"_ _0\"></span> loans and over<span class=\"_ _0\"></span>drafts and asset back<span class=\"_ _0\"></span>ed loan notes, which ar<span class=\"_ _0\"></span>e carried at amortised cost ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be not materially<span class=\"_ _0\"></span> different <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>their book <span class=\"_ _0\"></span>values. In arriving at <span class=\"_ _0\"></span>that conclusion market inputs ha<span class=\"_ _0\"></span>ve been consider<span class=\"_ _0\"></span>ed but because all the assets and <span class=\"_ _0\"></span>the sale and repur<span class=\"_ _0\"></span>chase agreements matur<span class=\"_ _0\"></span>e within three months of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end and the inter<span class=\"_ _0\"></span>est rates charg<span class=\"_ _0\"></span>ed on financial liabilities rese<span class=\"_ _0\"></span>t to mark<span class=\"_ _0\"></span>et rates on a quarterly<span class=\"_ _0\"></span> basis, little differ<span class=\"_ _0\"></span>ence arises. This also applies <span class=\"_ _0\"></span>to the par<span class=\"_ _0\"></span>ent company\u2019<span class=\"_ _1\"></span>s loans to its subsidiaries. While the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s asset backed loan notes ar<span class=\"_ _0\"></span>e listed, the quoted prices <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> an individual note may<span class=\"_ _0\"></span> not be indicative of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the issue as a whole, due <span class=\"_ _0\"></span>to the specialised natur<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the market in such instruments and <span class=\"_ _0\"></span>the limited number o<span class=\"_ _0\"></span>f inv<span class=\"_ _0\"></span>estors participating in it. As these <span class=\"_ _0\"></span>valuation ex<span class=\"_ _0\"></span>ercises ar<span class=\"_ _0\"></span>e not wholly<span class=\"_ _0\"></span> market<span class=\"_ _0\"></span> based, they<span class=\"_ _0\"></span> are consider<span class=\"_ _0\"></span>ed to be le<span class=\"_ _0\"></span>vel 2 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>L<span class=\"_ _0\"></span>oans to customers<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>o assess the likely<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s loan assets in the absence of<span class=\"_ _0\"></span> a liquid market, <span class=\"_ _0\"></span>the directors ha<span class=\"_ _0\"></span>ve considered <span class=\"_ _0\"></span>the estimated cash flow<span class=\"_ _0\"></span>s expected to arise <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s investments in its loans to cust<span class=\"_ _0\"></span>omers based on a mixture of<span class=\"_ _0\"></span> market<span class=\"_ _0\"></span> based inputs, such as rates and pricing and non-mark<span class=\"_ _0\"></span>et based inputs such as redemption r<span class=\"_ _0\"></span>ates. Given the mixtur<span class=\"_ _1\"></span>e of observable and non-observ<span class=\"_ _0\"></span>able inputs these ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be level 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>Corporate debt<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s retail and corporat<span class=\"_ _0\"></span>e bonds are listed on <span class=\"_ _0\"></span>the London Stock Ex<span class=\"_ _0\"></span>change and <span class=\"_ _0\"></span>there is pr<span class=\"_ _0\"></span>esently a r<span class=\"_ _0\"></span>easonably liquid mark<span class=\"_ _0\"></span>et in the instruments. It is <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore appr<span class=\"_ _0\"></span>opriate to consider<span class=\"_ _0\"></span> that <span class=\"_ _0\"></span>the market price of<span class=\"_ _1\"></span> these borrowings constitutes a <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value. <span class=\"_ _0\"></span>As this valuation is based on a mark<span class=\"_ _0\"></span>et price, it is consider<span class=\"_ _0\"></span>ed to be a lev<span class=\"_ _0\"></span>el 1 measurement.<span class=\"_ _36a\"> </span>Retail deposits<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>o assess the likely<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s retail deposit liabilities, <span class=\"_ _0\"></span>the directors ha<span class=\"_ _0\"></span>ve considered <span class=\"_ _0\"></span>the estimated cash flow<span class=\"_ _0\"></span>s expected to arise based on a mixture o<span class=\"_ _0\"></span>f mark<span class=\"_ _0\"></span>et based inputs, such as rates and pricing and non-mark<span class=\"_ _0\"></span>et based inputs such as withdra<span class=\"_ _0\"></span>wal rates. Given <span class=\"_ _0\"></span>the mixture of<span class=\"_ _0\"></span> observable and non-observ<span class=\"_ _0\"></span>able inputs, these are consider<span class=\"_ _0\"></span>ed to be le<span class=\"_ _0\"></span>vel 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>Sundry assets and liabilities<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>air v<span class=\"_ _0\"></span>alues of <span class=\"_ _0\"></span>financial assets and liabilities disclosed as sundry assets and sundry<span class=\"_ _0\"></span> liabilities are no<span class=\"_ _0\"></span>t considered <span class=\"_ _0\"></span>to be materially differ<span class=\"_ _0\"></span>ent to their carrying values.<span class=\"_ _36a\"> </span>These assets and liabilities ar<span class=\"_ _0\"></span>e of r<span class=\"_ _0\"></span>elatively<span class=\"_ _0\"></span> low <span class=\"_ _0\"></span>value and may<span class=\"_ _0\"></span> be settled at <span class=\"_ _0\"></span>their carrying <span class=\"_ _0\"></span>value at <span class=\"_ _0\"></span>the balance sheet date or  shortly ther<span class=\"_ _0\"></span>eafter<span class=\"_ _1\"></span>.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  },
  "fact-469": {
   "value": "71. <span class=\"_ _18\"> </span>Financial asse<span class=\"_ _0\"></span>ts and financial liabilities<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s financial assets and financial liabilities ar<span class=\"_ _0\"></span>e v<span class=\"_ _0\"></span>alued on one of<span class=\"_ _0\"></span> two bases, defined b<span class=\"_ _0\"></span>y IFRS 9:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Financial assets and liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue through pr<span class=\"_ _0\"></span>ofit and loss (\u2018FVTPL<span class=\"_ _2f\"></span>\u2019)<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Financial assets and liabilities carried at amortised cost<span class=\"_ _36a\"> </span>IFRS 7 \u2013 \u2018Financial Instruments: Disclosures\u2019 r<span class=\"_ _0\"></span>equires <span class=\"_ _0\"></span>that wher<span class=\"_ _0\"></span>e assets are measur<span class=\"_ _0\"></span>ed at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue these measur<span class=\"_ _0\"></span>ements should be classified using the f<span class=\"_ _0\"></span>air <span class=\"_ _0\"></span>value hierar<span class=\"_ _0\"></span>chy se<span class=\"_ _0\"></span>t out in IFRS 13 \u2013 \u2018F<span class=\"_ _0\"></span>air <span class=\"_ _1\"></span>Value Measur<span class=\"_ _0\"></span>ement\u2019<span class=\"_ _2\"></span>. This hier<span class=\"_ _0\"></span>archy<span class=\"_ _0\"></span> reflects <span class=\"_ _0\"></span>the inputs used and defines three lev<span class=\"_ _0\"></span>els:<span class=\"_ _36a\"> </span>\u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 1 measurements ar<span class=\"_ _0\"></span>e unadjusted market prices \u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 2 measurements ar<span class=\"_ _0\"></span>e derived fr<span class=\"_ _0\"></span>om directly<span class=\"_ _0\"></span> or indir<span class=\"_ _0\"></span>ectly observ<span class=\"_ _0\"></span>able data, such as market prices or<span class=\"_ _1\"></span> rates \u2022 <span class=\"_ _13\"> </span>Lev<span class=\"_ _0\"></span>el 3 measurements r<span class=\"_ _0\"></span>ely on significant inputs <span class=\"_ _0\"></span>which are not deriv<span class=\"_ _0\"></span>ed fr<span class=\"_ _0\"></span>om observable data As quoted prices ar<span class=\"_ _0\"></span>e not available <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> level 2 and 3 measur<span class=\"_ _0\"></span>ements, the <span class=\"_ _0\"></span>valuation is derived <span class=\"_ _0\"></span>from cash <span class=\"_ _0\"></span>flow models based, <span class=\"_ _0\"></span>where possible, on independently sour<span class=\"_ _0\"></span>ced parameters. <span class=\"_ _0\"></span>The accurac<span class=\"_ _0\"></span>y of<span class=\"_ _0\"></span> the calculation <span class=\"_ _0\"></span>would ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e be affected by<span class=\"_ _0\"></span> unexpected mark<span class=\"_ _0\"></span>et movements or<span class=\"_ _1\"></span> other v<span class=\"_ _0\"></span>ariances in the operation of<span class=\"_ _1\"></span> the models or the assump<span class=\"_ _0\"></span>tions used.<span class=\"_ _36a\"> </span>The Group had no <span class=\"_ _0\"></span>financial assets or liabilities in <span class=\"_ _0\"></span>the y<span class=\"_ _0\"></span>ear ended 30 Sept<span class=\"_ _0\"></span>ember 2023 or<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year ended 30 Sep<span class=\"_ _0\"></span>tember 2022 carried at fair <span class=\"_ _0\"></span>value and <span class=\"_ _0\"></span>valued using le<span class=\"_ _0\"></span>vel 3 measur<span class=\"_ _0\"></span>ements, other <span class=\"_ _0\"></span>than contingent consideration amounts (no<span class=\"_ _0\"></span>te 41).<span class=\"_ _36a\"> </span>The Group has no<span class=\"_ _0\"></span>t reclassified any<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> its measurements during <span class=\"_ _0\"></span>the year<span class=\"_ _1\"></span>.<span class=\"_ _36a\"> </span>The methods by<span class=\"_ _0\"></span> which <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value is established <span class=\"_ _0\"></span>for each class o<span class=\"_ _0\"></span>f financial assets and liabilities ar<span class=\"_ _1\"></span>e set out below<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>(a<span class=\"_ _0\"></span>) <span class=\"_ _1\"></span> <span class=\"_ _45\"> </span>Assets and liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span>The f<span class=\"_ _0\"></span>ollowing table summarises <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s financial assets and liabilities which ar<span class=\"_ _0\"></span>e carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span><span class=\"ff16\">2022<span class=\"_ _36a\"> </span></span></span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _36a\"> </span></span>Financial assets<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial assets<span class=\"_ _325\"> </span><span class=\"ff2c\">26<span class=\"_ _c8\"> </span><span class=\"ff15\">615.4<span class=\"_ _150\"> </span><span class=\"ff16\">779.0<span class=\"_ _36a\"> </span></span></span></span>615.4<span class=\"_ _d5\"> </span><span class=\"ff16\">779.0<span class=\"_ _36a\"> </span></span>Financial liabilities<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial liabilities<span class=\"_ _251\"> </span><span class=\"ff2c\">26<span class=\"_ _d1\"> </span><span class=\"ff15\">39.9<span class=\"_ _d5\"> </span><span class=\"ff16\">102.1<span class=\"_ _36a\"> </span></span></span></span>Contingent c<span class=\"_ _0\"></span>onsideration<span class=\"_ _1cc\"> </span><span class=\"ff2c\">41<span class=\"_ _209\"> </span><span class=\"ff15\">-<span class=\"_ _a8\"> </span><span class=\"ff16\">2.2<span class=\"_ _36a\"> </span></span></span></span>39.9<span class=\"_ _d5\"> </span><span class=\"ff16\">104.3<span class=\"_ _36a\"> </span></span>All of <span class=\"_ _0\"></span>these financial assets and <span class=\"_ _0\"></span>financial liabilities are r<span class=\"_ _0\"></span>equired t<span class=\"_ _0\"></span>o be carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue by IFRS 9<span class=\"_ _0\"></span>.<span class=\"_ _36a\"> </span>The Company<span class=\"_ _0\"></span> has no financial assets or<span class=\"_ _0\"></span> liabilities carried at fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue.<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial assets and liabilities<span class=\"_ _36a\"> </span>Derivativ<span class=\"_ _0\"></span>e financial instruments are stated at<span class=\"_ _0\"></span> their<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> values in <span class=\"_ _0\"></span>the accounts. T<span class=\"_ _0\"></span>he Group uses a number<span class=\"_ _0\"></span> of <span class=\"_ _0\"></span>techniques to det<span class=\"_ _0\"></span>ermine the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of its deriv<span class=\"_ _0\"></span>ative assets and liabilities, <span class=\"_ _0\"></span>for <span class=\"_ _0\"></span>which observable prices in activ<span class=\"_ _0\"></span>e markets ar<span class=\"_ _0\"></span>e not av<span class=\"_ _0\"></span>ailable. These ar<span class=\"_ _0\"></span>e principally present <span class=\"_ _0\"></span>value calculations based on estimated <span class=\"_ _0\"></span>future cash <span class=\"_ _0\"></span>flows arising fr<span class=\"_ _0\"></span>om the instruments, discounted using a mark<span class=\"_ _0\"></span>et inter<span class=\"_ _0\"></span>est rate, adjusted for<span class=\"_ _1\"></span> risk as appropriate. <span class=\"_ _0\"></span>The principal inputs to <span class=\"_ _0\"></span>these valuation models ar<span class=\"_ _1\"></span>e SON<span class=\"_ _15\"></span>IA sterling benchmark int<span class=\"_ _0\"></span>erest rates.<span class=\"_ _36a\"> </span>In order<span class=\"_ _0\"></span> to det<span class=\"_ _0\"></span>ermine the fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues, the management<span class=\"_ _0\"></span> applies valuation adjustments <span class=\"_ _0\"></span>to observed data <span class=\"_ _0\"></span>where <span class=\"_ _0\"></span>that data would no<span class=\"_ _0\"></span>t fully r<span class=\"_ _0\"></span>eflect the attribut<span class=\"_ _0\"></span>es of <span class=\"_ _0\"></span>the instrument being v<span class=\"_ _0\"></span>alued, such as particular contractual <span class=\"_ _0\"></span>features or<span class=\"_ _0\"></span> the identity<span class=\"_ _0\"></span> of<span class=\"_ _0\"></span> the counterparty<span class=\"_ _1\"></span>. The management r<span class=\"_ _0\"></span>evie<span class=\"_ _0\"></span>ws the models used on an ong<span class=\"_ _0\"></span>oing basis to ensur<span class=\"_ _0\"></span>e that the <span class=\"_ _1\"></span>valuations produced are r<span class=\"_ _0\"></span>easonable and re<span class=\"_ _0\"></span>flect all rele<span class=\"_ _0\"></span>vant <span class=\"_ _0\"></span>factors. T<span class=\"_ _0\"></span>hese v<span class=\"_ _0\"></span>aluations are based on mark<span class=\"_ _0\"></span>et information, and the<span class=\"_ _0\"></span>y ar<span class=\"_ _0\"></span>e ther<span class=\"_ _0\"></span>efor<span class=\"_ _0\"></span>e classified as level 2 measur<span class=\"_ _0\"></span>ements. Details of <span class=\"_ _0\"></span>these assets are giv<span class=\"_ _0\"></span>en in note 26.<span class=\"_ _36a\"> </span>Contingent considera<span class=\"_ _0\"></span>tion<span class=\"_ _36a\"> </span>The v<span class=\"_ _0\"></span>alue of<span class=\"_ _0\"></span> the contingent consideration balances sho<span class=\"_ _0\"></span>wn in note 41 ar<span class=\"_ _0\"></span>e requir<span class=\"_ _0\"></span>ed to be stated at <span class=\"_ _0\"></span>fair <span class=\"_ _1\"></span>value in the accounts. T<span class=\"_ _0\"></span>hese amounts are <span class=\"_ _0\"></span>valued based on <span class=\"_ _0\"></span>the expected outcomes of<span class=\"_ _0\"></span> the performance <span class=\"_ _0\"></span>tests set out in <span class=\"_ _0\"></span>the respective sale and pur<span class=\"_ _0\"></span>chase agreements, discounted as appr<span class=\"_ _0\"></span>opriate. <span class=\"_ _0\"></span>The most significant inputs t<span class=\"_ _0\"></span>o these v<span class=\"_ _0\"></span>aluations are <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s forecasts on <span class=\"_ _0\"></span>future activity<span class=\"_ _0\"></span> relating <span class=\"_ _0\"></span>to business generated b<span class=\"_ _0\"></span>y operational units acquir<span class=\"_ _0\"></span>ed, business derived as a r<span class=\"_ _0\"></span>esult of <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>endor\u2019<span class=\"_ _1\"></span>s contacts or other g<span class=\"_ _0\"></span>oodwill and any<span class=\"_ _0\"></span> other ne<span class=\"_ _0\"></span>w business flo<span class=\"_ _0\"></span>ws which ar<span class=\"_ _0\"></span>e or might<span class=\"_ _0\"></span> be attributable to the acquisition agr<span class=\"_ _0\"></span>eement, which ar<span class=\"_ _0\"></span>e drawn fr<span class=\"_ _0\"></span>om the o<span class=\"_ _0\"></span>verall Group <span class=\"_ _0\"></span>forecasting model. <span class=\"_ _1\"></span>As such, these are classified as unobservable inputs and <span class=\"_ _0\"></span>the v<span class=\"_ _0\"></span>aluations classified as level 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>(b) <span class=\"_ _2f\"></span> <span class=\"_ _45\"> </span>Assets and liabilities carried at amortised cost<span class=\"_ _36a\"> </span>The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues for<span class=\"_ _1\"></span> financial assets and financial liabilities held at amortised cost, determined in accor<span class=\"_ _0\"></span>dance with the me<span class=\"_ _0\"></span>thodologies set out below<span class=\"_ _0\"></span> are summarised belo<span class=\"_ _0\"></span>w.<span class=\"_ _36a\"> </span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2022<span class=\"_ _36a\"> </span></span></span>Carrying amount<span class=\"_ _3f\"> </span>Fair value<span class=\"_ _c2\"> </span><span class=\"ff17\">Carrying amount<span class=\"_ _73\"> </span>Fair v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>The Group<span class=\"_ _36a\"> </span>Financial assets<span class=\"_ _36a\"> </span>Cash<span class=\"_ _1b1\"> </span><span class=\"ff2c\">17<span class=\"_ _133\"> </span><span class=\"ff15\">2,994.3<span class=\"_ _86\"> </span>2,994.3<span class=\"_ _12a\"> </span><span class=\"ff16\">1,930.9<span class=\"_ _86\"> </span>1,930.9<span class=\"_ _36a\"> </span></span></span></span>Loans to customer<span class=\"_ _0\"></span>s<span class=\"_ _2b4\"> </span><span class=\"ff2c\">18<span class=\"_ _12a\"> </span><span class=\"ff15\">14,874.3<span class=\"_ _42\"> </span>14,524.0<span class=\"_ _42\"> </span><span class=\"ff16\">14,210.3<span class=\"_ _67\"> </span>13,898.4<span class=\"_ _36a\"> </span></span></span></span>Sundry financial assets<span class=\"_ _144\"> </span><span class=\"ff2c\">27<span class=\"_ _d1\"> </span><span class=\"ff15\">46.0<span class=\"_ _3a\"> </span>46.0<span class=\"_ _3a\"> </span><span class=\"ff16\">35.4<span class=\"_ _3a\"> </span>35.4<span class=\"_ _36a\"> </span></span></span></span>17,914.6<span class=\"_ _42\"> </span>17,564.3<span class=\"_ _42\"> </span><span class=\"ff16\">16,176.6<span class=\"_ _67\"> </span>15,864.7<span class=\"_ _36a\"> </span></span>Financial liabilities<span class=\"_ _36a\"> </span>Short-t<span class=\"_ _0\"></span>erm bank borrowings<span class=\"_ _2f9\"> </span><span class=\"ff15\">0.2<span class=\"_ _d1\"> </span>0.2<span class=\"_ _9e\"> </span><span class=\"ff16\">0.4<span class=\"_ _9e\"> </span>0.4<span class=\"_ _36a\"> </span></span></span>Asset back<span class=\"_ _0\"></span>ed loan notes <span class=\"_ _83\"> </span><span class=\"ff15\">28.0<span class=\"_ _cb\"> </span>28.0<span class=\"_ _150\"> </span><span class=\"ff16\">409.3<span class=\"_ _150\"> </span>409.3<span class=\"_ _36a\"> </span></span></span>Secured bank borro<span class=\"_ _0\"></span>wings<span class=\"_ _167\"> </span><span class=\"ff15\">-<span class=\"_ _10b\"> </span>-<span class=\"_ _3a\"> </span><span class=\"ff16\">586.0<span class=\"_ _d5\"> </span>586.0<span class=\"_ _36a\"> </span></span></span>Ret<span class=\"_ _0\"></span>ail deposits<span class=\"_ _356\"> </span><span class=\"ff2c\">33<span class=\"_ _70\"> </span><span class=\"ff15\">13,265.3<span class=\"_ _42\"> </span>13,177.3<span class=\"_ _42\"> </span><span class=\"ff16\">10,669.2<span class=\"_ _67\"> </span>10,592.9<span class=\"_ _36a\"> </span></span></span></span>Corporat<span class=\"_ _0\"></span>e and retail bonds<span class=\"_ _2ff\"> </span><span class=\"ff15\">258.2<span class=\"_ _d5\"> </span>234.8<span class=\"_ _150\"> </span><span class=\"ff16\">261.5<span class=\"_ _150\"> </span>254.4<span class=\"_ _36a\"> </span></span></span>Sale and repurchase agr<span class=\"_ _0\"></span>eements<span class=\"_ _1a7\"> </span><span class=\"ff2c\">39<span class=\"_ _d1\"> </span><span class=\"ff15\">50.0<span class=\"_ _3a\"> </span>50.0<span class=\"_ _a8\"> </span></span></span>-<span class=\"_ _10b\"> </span>-<span class=\"_ _36a\"> </span>Other financial liabilities<span class=\"_ _260\"> </span><span class=\"ff2c\">40<span class=\"_ _cb\"> </span><span class=\"ff15\">608.8<span class=\"_ _d5\"> </span>608.8<span class=\"_ _150\"> </span><span class=\"ff16\">491.2<span class=\"_ _d5\"> </span>491.2<span class=\"_ _36a\"> </span></span></span></span>14,210.5<span class=\"_ _42\"> </span>14,099.1<span class=\"_ _42\"> </span><span class=\"ff16\">12,417.6<span class=\"_ _67\"> </span>12,334.2<span class=\"_ _36a\"> </span></span>Note<span class=\"_ _84\"> </span><span class=\"ff15\">2023<span class=\"_ _2c\"> </span>2023<span class=\"_ _a0\"> </span><span class=\"ff16\">2022<span class=\"_ _2c\"> </span>2022<span class=\"_ _36a\"> </span></span></span>Carrying amount<span class=\"_ _3f\"> </span>Fair value<span class=\"_ _c2\"> </span><span class=\"ff17\">Carrying amount<span class=\"_ _73\"> </span>Fair v<span class=\"_ _0\"></span>alue<span class=\"_ _36a\"> </span></span>\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _d1\"> </span><span class=\"ff16\">\u00a3m<span class=\"_ _d1\"> </span>\u00a3m<span class=\"_ _36a\"> </span></span>The Company<span class=\"_ _36a\"> </span>Financial assets<span class=\"_ _36a\"> </span>Cash<span class=\"_ _1b1\"> </span><span class=\"ff2c\">17<span class=\"_ _40\"> </span><span class=\"ff15\">27.6<span class=\"_ _3a\"> </span>27.6<span class=\"_ _3a\"> </span><span class=\"ff16\">19.7<span class=\"_ _f7\"> </span>19.7<span class=\"_ _36a\"> </span></span></span></span>Intra-gr<span class=\"_ _0\"></span>oup cash deposits<span class=\"_ _153\"> </span><span class=\"ff2c\">27<span class=\"_ _cb\"> </span><span class=\"ff15\">193.6<span class=\"_ _d5\"> </span>193.6<span class=\"_ _43\"> </span></span></span>-<span class=\"_ _209\"> </span>-<span class=\"_ _36a\"> </span>Amounts owed to gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _76\"> </span><span class=\"ff2c\">27<span class=\"_ _40\"> </span><span class=\"ff15\">35.1<span class=\"_ _3a\"> </span>35.1<span class=\"_ _3a\"> </span><span class=\"ff16\">39.1<span class=\"_ _f7\"> </span>39.1<span class=\"_ _36a\"> </span></span></span></span>Sundry financial assets<span class=\"_ _144\"> </span><span class=\"ff2c\">27<span class=\"_ _a8\"> </span><span class=\"ff15\">0.1<span class=\"_ _d1\"> </span>0.1<span class=\"_ _9e\"> </span><span class=\"ff16\">0.1<span class=\"_ _9e\"> </span>0.1<span class=\"_ _36a\"> </span></span></span></span>256.4<span class=\"_ _d5\"> </span>256.4<span class=\"_ _3a\"> </span><span class=\"ff16\">58.9<span class=\"_ _3a\"> </span>58.9<span class=\"_ _36a\"> </span></span>Financial liabilities<span class=\"_ _36a\"> </span>Corporat<span class=\"_ _0\"></span>e and retail bonds<span class=\"_ _2ff\"> </span><span class=\"ff15\">261.8<span class=\"_ _d5\"> </span>234.8<span class=\"_ _150\"> </span><span class=\"ff16\">261.5<span class=\"_ _150\"> </span>254.4<span class=\"_ _36a\"> </span></span></span>Amounts owed by gr<span class=\"_ _0\"></span>oup companies<span class=\"_ _4d\"> </span><span class=\"ff2c\">40<span class=\"_ _40\"> </span><span class=\"ff15\">24.0<span class=\"_ _3a\"> </span>24.0<span class=\"_ _3a\"> </span><span class=\"ff16\">23.2<span class=\"_ _f7\"> </span>23.2<span class=\"_ _36a\"> </span></span></span></span>Other financial liabilities<span class=\"_ _260\"> </span><span class=\"ff2c\">40<span class=\"_ _a8\"> </span><span class=\"ff15\">0.7<span class=\"_ _d1\"> </span>0.7<span class=\"_ _3a\"> </span><span class=\"ff16\">12.9<span class=\"_ _f7\"> </span>12.9<span class=\"_ _36a\"> </span></span></span></span>286.5<span class=\"_ _d5\"> </span>259.5<span class=\"_ _150\"> </span><span class=\"ff16\">297.6<span class=\"_ _d5\"> </span>290.5<span class=\"_ _36a\"> </span></span>The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of<span class=\"_ _0\"></span> retail deposits and corporate and r<span class=\"_ _0\"></span>etail bonds shown abo<span class=\"_ _0\"></span>ve will include amounts <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> the relat<span class=\"_ _0\"></span>ed accrued interest.<span class=\"_ _36a\"> </span>Cash, sale and repurchase agr<span class=\"_ _0\"></span>eements, bank loans and securitisation borro<span class=\"_ _0\"></span>wings<span class=\"_ _36a\"> </span>The fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alues of<span class=\"_ _0\"></span> cash and cash equivalents, sale and repur<span class=\"_ _0\"></span>chase agreements, bank<span class=\"_ _0\"></span> loans and over<span class=\"_ _0\"></span>drafts and asset back<span class=\"_ _0\"></span>ed loan notes, which ar<span class=\"_ _0\"></span>e carried at amortised cost ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be not materially<span class=\"_ _0\"></span> different <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>their book <span class=\"_ _0\"></span>values. In arriving at <span class=\"_ _0\"></span>that conclusion market inputs ha<span class=\"_ _0\"></span>ve been consider<span class=\"_ _0\"></span>ed but because all the assets and <span class=\"_ _0\"></span>the sale and repur<span class=\"_ _0\"></span>chase agreements matur<span class=\"_ _0\"></span>e within three months of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>year<span class=\"_ _0\"></span> end and the inter<span class=\"_ _0\"></span>est rates charg<span class=\"_ _0\"></span>ed on financial liabilities rese<span class=\"_ _0\"></span>t to mark<span class=\"_ _0\"></span>et rates on a quarterly<span class=\"_ _0\"></span> basis, little differ<span class=\"_ _0\"></span>ence arises. This also applies <span class=\"_ _0\"></span>to the par<span class=\"_ _0\"></span>ent company\u2019<span class=\"_ _1\"></span>s loans to its subsidiaries. While the Gr<span class=\"_ _0\"></span>oup\u2019<span class=\"_ _2\"></span>s asset backed loan notes ar<span class=\"_ _0\"></span>e listed, the quoted prices <span class=\"_ _0\"></span>for<span class=\"_ _0\"></span> an individual note may<span class=\"_ _0\"></span> not be indicative of<span class=\"_ _0\"></span> the <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value of<span class=\"_ _0\"></span> the issue as a whole, due <span class=\"_ _0\"></span>to the specialised natur<span class=\"_ _0\"></span>e of <span class=\"_ _0\"></span>the market in such instruments and <span class=\"_ _0\"></span>the limited number o<span class=\"_ _0\"></span>f inv<span class=\"_ _0\"></span>estors participating in it. As these <span class=\"_ _0\"></span>valuation ex<span class=\"_ _0\"></span>ercises ar<span class=\"_ _0\"></span>e not wholly<span class=\"_ _0\"></span> market<span class=\"_ _0\"></span> based, they<span class=\"_ _0\"></span> are consider<span class=\"_ _0\"></span>ed to be le<span class=\"_ _0\"></span>vel 2 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>L<span class=\"_ _0\"></span>oans to customers<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>o assess the likely<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s loan assets in the absence of<span class=\"_ _0\"></span> a liquid market, <span class=\"_ _0\"></span>the directors ha<span class=\"_ _0\"></span>ve considered <span class=\"_ _0\"></span>the estimated cash flow<span class=\"_ _0\"></span>s expected to arise <span class=\"_ _0\"></span>from <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s investments in its loans to cust<span class=\"_ _0\"></span>omers based on a mixture of<span class=\"_ _0\"></span> market<span class=\"_ _0\"></span> based inputs, such as rates and pricing and non-mark<span class=\"_ _0\"></span>et based inputs such as redemption r<span class=\"_ _0\"></span>ates. Given the mixtur<span class=\"_ _1\"></span>e of observable and non-observ<span class=\"_ _0\"></span>able inputs these ar<span class=\"_ _0\"></span>e considered <span class=\"_ _0\"></span>to be level 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>Corporate debt<span class=\"_ _36a\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _0\"></span>s retail and corporat<span class=\"_ _0\"></span>e bonds are listed on <span class=\"_ _0\"></span>the London Stock Ex<span class=\"_ _0\"></span>change and <span class=\"_ _0\"></span>there is pr<span class=\"_ _0\"></span>esently a r<span class=\"_ _0\"></span>easonably liquid mark<span class=\"_ _0\"></span>et in the instruments. It is <span class=\"_ _0\"></span>theref<span class=\"_ _0\"></span>ore appr<span class=\"_ _0\"></span>opriate to consider<span class=\"_ _0\"></span> that <span class=\"_ _0\"></span>the market price of<span class=\"_ _1\"></span> these borrowings constitutes a <span class=\"_ _0\"></span>fair <span class=\"_ _0\"></span>value. <span class=\"_ _0\"></span>As this valuation is based on a mark<span class=\"_ _0\"></span>et price, it is consider<span class=\"_ _0\"></span>ed to be a lev<span class=\"_ _0\"></span>el 1 measurement.<span class=\"_ _36a\"> </span>Retail deposits<span class=\"_ _36a\"> </span>T<span class=\"_ _2\"></span>o assess the likely<span class=\"_ _0\"></span> fair<span class=\"_ _0\"></span> v<span class=\"_ _0\"></span>alue of <span class=\"_ _0\"></span>the Group<span class=\"_ _0\"></span>\u2019<span class=\"_ _1\"></span>s retail deposit liabilities, <span class=\"_ _0\"></span>the directors ha<span class=\"_ _0\"></span>ve considered <span class=\"_ _0\"></span>the estimated cash flow<span class=\"_ _0\"></span>s expected to arise based on a mixture o<span class=\"_ _0\"></span>f mark<span class=\"_ _0\"></span>et based inputs, such as rates and pricing and non-mark<span class=\"_ _0\"></span>et based inputs such as withdra<span class=\"_ _0\"></span>wal rates. Given <span class=\"_ _0\"></span>the mixture of<span class=\"_ _0\"></span> observable and non-observ<span class=\"_ _0\"></span>able inputs, these are consider<span class=\"_ _0\"></span>ed to be le<span class=\"_ _0\"></span>vel 3 measur<span class=\"_ _0\"></span>ements.<span class=\"_ _36a\"> </span>Sundry assets and liabilities<span class=\"_ _36a\"> </span>F<span class=\"_ _1\"></span>air v<span class=\"_ _0\"></span>alues of <span class=\"_ _0\"></span>financial assets and liabilities disclosed as sundry assets and sundry<span class=\"_ _0\"></span> liabilities are no<span class=\"_ _0\"></span>t considered <span class=\"_ _0\"></span>to be materially differ<span class=\"_ _0\"></span>ent to their carrying values.<span class=\"_ _36a\"> </span>These assets and liabilities ar<span class=\"_ _0\"></span>e of r<span class=\"_ _0\"></span>elatively<span class=\"_ _0\"></span> low <span class=\"_ _0\"></span>value and may<span class=\"_ _0\"></span> be settled at <span class=\"_ _0\"></span>their carrying <span class=\"_ _0\"></span>value at <span class=\"_ _0\"></span>the balance sheet date or  shortly ther<span class=\"_ _0\"></span>eafter<span class=\"_ _1\"></span>.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialAssetsExplanatory",
    "language": "en",
    "entity": "scheme:213800S1TDKIB1IUTS72",
    "period": "2022-10-01T00:00:00/2023-10-01T00:00:00"
   }
  }
 }
}